Loading...
HomeMy WebLinkAboutMS 16-01; PACIFIC WIND; WATER STUDY FOR PACIFIC WIND DEVELOPMENT IN THE CITY OF CARLSBAD; 2021-12-06REVISED: DECEMBER 06, 2021 WATER STUDY FOR THE PACIFIC WIND DEVELOPMENT IN THE CITY OF CARLSBAD ORIGINAL: AUGUST 23, 2021 REVISED: OCTOBER 13, 2021 REVISED: NOVEMBER 16, 2021 PREPARED BY: SWS ENGINEERING, INC. 1635 LAKE SAN MARCOS DR., SUITE 200 SAN MARCOS, CA 92078 (760) 744-0011 JOB NO. 21-119   Introduction  The Pacific Wind project is in the City of Carlsbad on the northeast corner of the Magnolia  Avenue and Jefferson Street, abutting interstate 5. The project will be between the new  termination at Harding Street and Carol Place, both which will now be cul‐de‐sacs. Figure 1  provides a vicinity map for the Pacific Wind project.     Project Description  The total project lot area is 4.77 acres which includes 6 multi‐family residential units ranging in  size up to 28,430 square feet. The disturbed area for this project will be 4.28 acres which  includes the residential buildings, associated parking & flatwork, stormwater treatment areas,  and new cul‐de‐sacs at Harding Street and Carol Place. The site plan is attached to this report as  Appendix A.    Purpose of Study  The purpose of this study is to provide water system analysis based upon the building and  waterline layout. This report provides a recommended private water distribution system to  serve the proposed residential buildings and assesses the sizes of the water mains on which  connections are being made.    Water System Design Criteria  The design criteria used in the sizing of the water distribution system piping for the Pacific Wind  development project are consistent with the latest Carlsbad Municipal Water District (CMWD)  Water Master Plan dated June 2019. Appendix B includes a copy of table 4‐2 from the Master  Plan which includes the CMWD potable water design criteria.     Fire Flow Requirements  The fire flow requirement for the Pacific Wind project is based on the CMWD Engineering  Standards and California Fire Code (CFC) Table B105.1, a copy of which is included in Appendix  B. This table states that the fire flow required is based on the size of the largest building (28,430  square feet) and the construction type (VB, in this case). For this project, the fire flow  requirement would be 4,500gpm for 4 hours. Per the City of Carlsbad, the fire flow requirement  can be reduced by 50% due to the building having an approved automated fire sprinkler    system. Therefore, the fire flow requirement is reduced to 2,250gpm for 4 hours. Per CMWD, a  minimum of 3,000gpm for 2 hours at a minimum of 20psi is required. Given this is greater than  the CFC requirement, this will dictate the required hydrant fire flow.    Figure 1:      CITY OF OCEAINSIDE PACIFIC OCEAN MAP CITY OF EINCI INIT AS NOT TO SCALE CITY Of' VISTA or N MARCOS   Existing Water System  The Pacific Wind project is in an area of the City of Carlsbad which is served by the 255 Pressure  Zone. The existing 255 Pressure Zone System includes a 6” pipeline in Carol Place, located on  the southeast end of the project. It also includes a 6” pipeline in Harding Street, located on the  west end of the project. 6” pipelines are also present in Jefferson Street and Magnolia Avenue,  which are adjacent to the property.   Building pad elevations at the Pacific Wind project range from 61.5 to 64 feet. With service  from the 255 Pressure Zone, available pressure is between 76 psi and 84 psi, which is within the  CMWD pressure design criteria.     Proposed Water System  The Pacific Wind project is proposing to obtain potable water service from the 255 Pressure  Zone. This will be accomplished by connecting a new 8” pipeline from the 6” pipeline in Harding  Street, looping through the project site, and connecting to the existing 6” pipeline at Carol  Place. The Harding Street and Carol Place waterlines will be resized from 6” to 8”. The proposed  onsite layout is shown on the site plan in Appendix A.     Water System Computer Model  The City of Carlsbad complete hydraulic model was utilized by Mission Consulting Services  (MCS) to analyze the City’s full hydraulic system from the Connections to the County Water  Authority to the coast, including all pressure regulating valves and reservoirs. The resulting  pressure at the points of connection (at Magnolia connections to Harding and at Carol) from  each of the three scenarios modeled by MCS were used as a starting point for the onsite  modeling. Appendix B shows the MCS computer modeling map and results.  The Environmental Protection Agency’s EPAnet 2.2 program was used to create a computer  model of the proposed onsite water system for the Pacific Wind project. This computer  program uses the Hazen‐Williams equation for determining head‐loss in pipes. The Hazen‐ Williams “C” value used for all pipes is 130.   The water sources for the 255 Pressure Zone are modeled as reservoirs with fixed elevations,  selected to replicate the available pressure. These reservoirs (Reservoir “1”, “2”, and “3”) are  located at the Magnolia Avenue and Jefferson Street intersection, the Magnolia Avenue and Pio  Pico Drive intersection, and the Carol Place proposed cul‐de‐sac, respectively. These reservoirs  use the MCS pressure calculated in each scenario, as noted above.    Computer Model Analysis  Computer modeling on the proposed onsite water system for the Pacific Wind project was  performed to confirm pipe sizes necessary to provide adequate fire protection service. The  water system was analyzed under three scenarios: peak hour demands, max day demand +  1,740gpm, and max day demand + max fire flow.   The fire demands were split evenly between the two private fire hydrants on site and the  domestic flow was applied at node n1. The domestic demand is based on the proposed  development having 87 dwelling units and the CMWD water master plan design criteria of  185gpd per dwelling unit for multi‐family residential. A peak factor of 2.9 was applied for  scenario 1 per CMWD engineering standards.   For modeling purposes, domestic demand is included on the 8” fire service. This will show the  same conditions at the Harding and Carol connections as a separate domestic water system and  thus allows for sizing of those mains. Plumbing calculations on the building plan set  demonstrate adequate domestic flow to the buildings from their dedicated services. Appendix  D provides the map and results for the analysis of the fire system. Appendix E provides the  plumbing plans from the building plan set which contain the domestic water lateral sizing  calculations.    Analysis of Results  The result of this computer modeling analysis (Appendix C) reaches the conclusion that the  proposed 8” fire protection water system for the Pacific Wind project is adequately sized. The  6” mains on Harding and Carol will need to be upsized to 8” to maintain a velocity below the  city maximum of 15fps at the max day demand and max fire flow condition. The results show  that the fire flow can be delivered to the Pacific Wind project with a residual pressure at the  hydrant greater than 20 psi. The minimum residual pressure at the fire hydrants is  approximately 46 psi (max day + max fire).     Scenario Description Minimum Pressure  (psi)  Maximum Velocity  (fps)  1 Peak Hour 72.40 at Junc 9 0.37  2 Max Day Demand + 1,740 GPM Fire  66.53 at Junc FH2 5.77  3 Max Day Demand + Max Available  Fire Flow of 3,240 GPM 46.72 at Junc FH2 10.56  Appendix A SITE PLAN APPENDIX 'A' PACIFIC WIND 'I. I ~ .. ~ I I I . I I I I I . I I I I ' ----. ' / .. --- \ \ --. -. . . ~.(.........__ .. ~·-~----.,..__70 --\ -~ f T T ••Tyy T. -- PACIFIC WIND \ --------~ ., . • .'?. ... ) ------. ' . --- .. , CONSTRUCTION NOTES ...,_ FH ...... • 30 15 0 30 60 90 ---- ' ' --WV • -----iW)-~-=.{j )----, -~---, W)-~•~ SCALE IN FEET GRAPHIC SCALE ., II~ . ------------------- .. ------------------------1 (3) ,?'¥ (rx SMH -------- • ~ <"--, SWS ENGINEERING, INC. C!VIL ENGINEERING ♦ LAND PLANNING ♦ SURVEYING 1635 Lale San Marcos Drive, Suite 200 San Marcos, CA 92018 P: 160-144-0011 SAN DIEGO NASHVILLE -PHOENIX ~TF ,-t I-·,1 .~:c,,· ?.1··1c,c·~ Hcor"~·1rlc::c : /: \_h,.,.'•::c.c,\/·C?I \;'1-1-· :/\-' ?(:l)\J'::::v l,;\'.'/c: kr \'.'·1-11 S_i:pp'-:ri-::i:• __ ,\_,J_,,,~ Appendix B Table 4-2: Water Master Plan Design Criteria Item Criteria Unit Demands Single Family Residential 450 gpd/DU Multi-Family Residential 185 gpd/DU Non-Residential 1,500 gpd/acre Peaking Factors Minimum n;iy/AvP.r.:i!JP. n~y R;itio 0~ Maximum Day/Average Day Ratio 1.6 Maximum Montn/Average Day Ratio 1.4 PeaK Hour/Average Day Ratio 2.9 Piping/Pipelines Maximum Velocity -PeaK Hour 8 fps Maximum Velocity -Max Day + Fire 15 fps Maximum Headloss -desired at peak flow 5 11/1,000 ft Maximum Headloss -allowable at peaK flow 10 11/1,000 ft Maximum lengtn of dead-end pipe 150 ft Maximum No. of hydrants on a dead-end pipe 1 Maximum No. of services off a dead-end pipe 18 Pressure Maximum Static -Desired 125 psi Maximum Static -Allowed 150psi MillilllUlll SlaLit: 60 psi Minimum Residual (Peak Hour) 40 psi Minimum Residual (Max Day+ Fire) 20 psi Maximum desired pressure drop from static 25 psi Table 4-2: Water Master Plan Design Criteria Item Criterria Typical Fire Flows Single Family Residential 1,500 gpm for 2 hOurs Multi-Family Residential 3,000 gpm for 2 hours Non-Residential 4,000 gpm for 4 hours storage Operating Storage 15%MDD Fire Storage Maximum fire flow x duration Emergency Reserve Storag:e (in-zone) 100% MOD Emergency Storage (Planned SDCVI/A shutdown) 10xADD Water Pressure Regulating stations - Minimum Number of Valves 2 Low = Average Capacity High = MOD + Fire FIOW Redundancy Required Yes (by zone) Pressure Relief Valve required at a minimum of one Other station per zone. Pump station - Pumping Period 24 hours Pumping Capacity MOD for all zones served Minimum Number of Pumps 3 (2 duty + 1 standby) Redundancy 1 unit equal to largest duty pump standby Power Generator Notes: fps=feet per second Maximum velocity criteria are industry standard for new construction but may be exceeded under existing performance co111ditions if replacement costs are excessive and not critical to level of service. The fire flow velocity requirement of 10 fps in the 2012 Master Plan was determined to be conservative. It was increased to 15 fps to avoid oversizing small water mains creating water quality issues in the distribution system. Fire flow requirements for areas within Carlsbad that are designated as High and Very High Fire Hazard Severity Zones, shown on Figure 4-1, were reviewed, which in some cases may require higher fire flows . SECTION B8105 FIRE-FLOW REQUIREMENTS FOR BUILDINGS B8105.1 The minimum fire flow and flow duration for school buildings shall be as specified in Table 88105.1. Exception: A reduction in required fire flow of up to 75 percent is allowed when the building is provided with an approved automatic sprinkler system. When a reduction in fire flow is used, fire flow shall not be less than 1500 GPM TABLE 88105.1 MINIMUM REQUIRED FIRE-FLOW AND FLOW DURATION FOR BUILDINGS FIRE AREA (square feet) FIRE-FLOW FLOW DURATION /gallons per (hours) Type IA and 18 a Type HA and IRA a Type IV and V-A a Type BB and /BB a Type V-8 a minute)b 0-22,700 0-12,700 0-8,200 0-5,900 0-3,600 1,500 22,701-30,200 12, 701-17,000 8,201-10,900 5,901-7,900 3, 601-4, 800 1,750 30,201-38,700 17,001-21,800 10,901-12,900 7,901-9,800 4, 801-6, 200 2,000 2 38,701-48,300 21,801-24,200 12, 901-17, 400 9, 801-12, 600 6,201-7,700 2,250 48,301-59,000 24, 201-33, 200 17,401-21,300 12, 601-15, 400 7,701-9, 400 2,500 59,001-70,900 33, 201-39, 700 21,301-25,500 15, 401-18, 400 9,401-11,300 2,750 70,901-83,700 39,701-47, 100 25,501-30, 100 18,401-21,800 11,301-13,400 3,000 83,701-97,700 47, 101-54,900 30, 101-35,200 21,801-25,900 13,401-15,600 3,250 3 41 97,701-112,700 54, 901-63, 400 35, 201-40, 600 25,901-29,300 15, 601-18, 000 3,500 112,701-128,700 63,401-72,400 40, 601-46, 400 29, 301-33, 500 18, 001-20, 600 3,750 128, 701-145, 900 72,401-82, 100 46, 401-52, 500 33,501-37,900 20, 601-23, 300 4,000 145, 901-164, 200 82, 101-92,400 52,501-59, 100 37,901-42,700 23, 301-26, 300 4,250 164, 201-183, 400 92,401-103, 100 59, 101-66,000 42,701-47,700 26, 301-29, 300 4,500 183,401-203, 700 103, 101-114,600 66,001-73,300 47,701-53,000 29, 301-32, 600 4,750 203, 701-225, 200 114,601-126, 700 73, 301-81, 100 53, 001-58, 600 32, 601-36, 000 5,000 225, 201-247,700 126, 701-139,400 81, 101-89,200 58,601-65,400 36, 001-39, 600 5,250 247, 701-271,200 139,401-152,600 89,201-97,700 65,401-70,600 39, 601-43, 400 5,500 271,201-295,900 152,601-166,500 97,701-106,500 70,601-77,000 43,401-47,400 5,750 295, 901-Greater 166, 501-Greater 106,501-115,800 77,001-83,700 47,401-51,500 6,000 4 --115,801-125,500 83,701-90,600 51,501-55, 700 6,250 --125, 501-135, 500 90,601-97,900 55, 701-60,200 6,500 --135, 501-145, 800 97,901-106,800 60, 201-64, 800 6,750 --145,801-156,700 106,801-113,200 64, 801-69, 600 7,000 --156, 701-167, 900 113,201-121,300 69,601-74,600 7,250 --167, 901-179, 400 121,301-129,600 74,601-79,800 7,500 --179,401-191,400 129,601-138,300 79, 801-85, 100 7,750 --191,401-Greater 138,301-Greater 85, 101-Greater 8,000 ... For SI: 1 square foot= 0.0929 m2, 1 gallon per minute "' 3.785 Um, 1 pound per square inch= 6.895kPa. '11111 a. Types of construction are based on the California Building Code b. Measured at 20 psi. Appendix C       October 12, 2021    Matt Spencer  SWS Engineering, Inc.  1635 Lake San Marcos Drive, Suite 200  San Marcos, CA 92078    RE:   Carlsbad Fire Flow Analysis for the Pacific Wind Project    Mr. Spencer,    Thank you for contacting me regarding the proposed Pacific Wind Project. Per our conversation, the  City of Carlsbad (City) has commented on your previous water study  and  you  have  requested  additional modeling information to address these comments.  Per the attached results, the City’s existing system can only accommodate up to 1,740 gpm through  the existing 6‐inch connections along Harding St and Carol Pl. Additional fire flow is available from  the two hydrants along Jefferson St, as indicated on the pipe and node map within the results  tables.   The City, for planning purposes, requires a fire flow of 3,000 gpm for multi‐family projects such as  this in the absence of construction information. Based on available information, the largest building  square footage is 28,430 sf and Type VB, which equates to a maximum fire flow of 4,250 gpm for 4  hours before any reduction is applied for sprinklers.  The analyses were performed using the City’s complete hydraulic model that includes the entire  system (pipes 6‐inches and larger) from the connections to the County Water Authority down to the  coast, including all pressure regulating valves and reservoirs. Table 1 below presents the scenarios  analyzed as part of this effort and results summary. Pipe and Node IDs are shown on the attached  figure.  Table 1. Results Summary  Scenario Description Minimum Pressure  (psi) Maximum Velocity  (fps) 1 Peak Hour 71 psi at Node 2500 1.8 fps at Pipe 3200 2 MDD + 1,740 gpm fire on existing 6" only 62 psi at Node J254 10.0 fps at Pipe P1817 3 MDD + Max available fire of 3,240 gpm 50 psi at Node J254 10.0 fps at Pipe P1817   Please feel free to contact me at 619.851.5178 if you have any questions or comments.    Sincerely,        Jennifer Mael, P.E.  Project Manager  Mission Consulting Services WATER SYSTEMS SPECIALISTS MOBILE: 619.851.5178 jmael@missionconsultingsd.com www.missionconsultingsd.com 31853 0 0 0 P 2 7 7 9 3215 3 1 9 0P3 8 9 30 0 53 2 00 3 2 0 5 3 165 3 0 1 5 P 4 0 9 7 P 1 8 1 5 3 1 7 5P40 9 332652 99 5P40913170 3 1 9 5 J254 J250 J248 2520 2510 2500 2495 2380 2375 I- 5 SBI-5 NBPI O PI CO DRI-5 N B O N R A I-5 SB OFF RAT A M A R A C K A VHARDING STMAGNOLIA AV A N CH O R W Y ADAMS ST I -5 NB OFF RAMA D I SON ST C AM E L L IA P L HI B I SCUS CRI-5 S B O N R ACAROL PLVI LLAGE DRPipe & Node Map Fire & Domestic POC to ex 6" Node J252 Additional 500 gpm fire flow available Additional 1,000 gpm fire flow available Pipeline to be abandoned Fire & Domestic POC to ex 6" pipe P1817 ID Demand (gpm) Elevation (ft) Head (ft) Pressure (psi) 2380 13.4 64.0 239.9 76.2 2495 3.8 65.0 240.2 75.9 2515 36.7 64.0 241.1 76.7 2520 12.9 62.0 240.9 77.5 N2122 0.0 64.0 241.1 76.7 N2758 0.0 61.0 240.2 77.6 J248 13.7 64.0 241.1 76.7 J250 13.7 64.6 240.1 76.0 J252 0.7 64.0 241.1 76.7 J254 0.7 64.0 239.9 76.2 2510 6.5 74.0 241.1 72.4 2500 16.4 77.0 239.9 70.6 2375 26.5 62.0 239.8 77.0 Scenario 1 ‐ Peak Hour Node Report RES 2 RES 1 RES 3 ID From Node To Node Length (ft) Diameter (in) Roughness Flow (gpm) Velocity (ft/s) Headloss (ft) HL/1000 (ft/k‐ft) P1817 N2122 J248 45.5 6 115 14.4 0.2 0.0 0.0 P4097 J254 2380 270.1 6 115 ‐0.7 0.0 0.0 0.0 P4091 J248 J252 101.7 6 115 0.7 0.0 0.0 0.0 3195 2515 N2122 39.1 6 112 86.0 1.0 0.0 1.0 P1815 N2122 2520 269.1 6 112 71.7 0.8 0.2 0.7 3005 2375 2380 343.1 8 112 ‐121.9 0.8 0.2 0.5 3215 2535 2520 448.6 8 112 215.5 1.4 0.6 1.4 3190 2515 2510 415.6 6 112 ‐6.6 0.1 0.0 0.0 P4093 J250 2495 204.8 8 112 ‐149.7 1.0 0.1 0.7 3165 2380 J250 259.4 8 112 ‐136.0 0.9 0.2 0.6 P389 J148 2515 444.7 8 108 116.1 0.7 0.2 0.5 3265 2510 J108 571.5 8 112 ‐196.2 1.3 0.7 1.1 P2779 N2758 2400 930.3 8 112 120.7 0.8 0.4 0.5 3170 2495 N2758 56.5 8 112 120.7 0.8 0.0 0.5 3200 2520 2495 319.1 8 112 274.3 1.8 0.7 2.1 3000 2375 2500 924.4 12 112 ‐228.8 0.7 0.2 0.2 3185 2510 2500 1193.5 8 112 181.0 1.2 1.2 1.0 3205 2510 2235 668.3 8 108 2.1 0.0 0.0 0.0 3175 2500 2240 472.0 12 112 ‐64.2 0.2 0.0 0.0 3010 2370 2375 811.0 12 112 ‐151.5 0.4 0.1 0.1 3015 2375 2385 1078.3 10 112 112.4 0.5 0.2 0.1 2995 2315 2375 808.8 8 112 ‐60.4 0.4 0.1 0.1 Scenario 1 ‐ Peak Hour Pipe Report ID Demand (gpm) Elevation (ft) Head (ft) Pressure (psi) 2380 10.6 64.0 225.7 70.1 2495 3.0 65.0 227.5 70.4 2515 29.0 64.0 226.6 70.5 2520 10.2 62.0 227.6 71.8 N2122 0.0 64.0 225.3 69.9 N2758 0.0 61.0 227.5 72.1 J248 10.8 64.0 222.0 68.5 J250 10.8 64.6 226.7 70.2 J252 870.6 64.0 214.7 65.3 J254 870.6 64.0 206.3 61.6 2510 5.2 74.0 229.4 67.3 2500 13.0 77.0 228.6 65.7 2375 20.9 62.0 228.1 72.0 Scenario 2 ‐ Max Day Demand + 1,740 gpm fire on existing POCs Node Report RES 1 RES 2 RES 3 ID From Node To Node Length (ft) Diameter (in) Roughness Flow (gpm) Velocity (ft/s) Headloss (ft) HL/1000 (ft/k‐ft) 3165 2380 J250 259.4 8 112 ‐364.4 2.3 1.0 3.7 3170 2495 N2758 56.5 8 112 ‐197.0 1.3 0.0 0.3 3185 2510 2500 1193.5 8 112 149.3 1.0 0.8 0.7 3005 2375 2380 343.1 8 112 516.7 3.3 2.4 7.1 3195 2515 N2122 39.1 6 112 578.4 6.6 1.3 33.5 3200 2520 2495 319.1 8 112 181.3 1.2 0.1 0.4 3215 2535 2520 448.6 8 112 494.4 3.2 2.9 6.5 3190 2515 2510 415.6 6 112 ‐272.4 3.1 2.8 6.6 P1815 N2122 2520 269.1 6 112 ‐303.0 3.4 2.3 8.4 P1817 N2122 J248 45.5 6 115 881.4 10.0 3.4 73.7 P2779 N2758 2400 930.3 8 112 ‐197.0 1.3 0.3 0.3 P389 J148 2515 444.7 8 108 335.0 2.1 1.5 3.4 P4091 J248 J252 101.7 6 115 870.6 9.9 7.3 72.0 P4093 J250 2495 204.8 8 112 ‐375.3 2.4 0.8 3.9 P4097 J254 2380 270.1 6 115 ‐870.6 9.9 19.4 72.0 3205 2510 2235 668.3 8 108 ‐116.1 0.7 0.2 0.3 3265 2510 J108 571.5 8 112 ‐310.8 2.0 1.6 2.7 3175 2500 2240 472.0 12 112 ‐212.2 0.6 0.1 0.2 3000 2375 2500 924.4 12 112 ‐348.5 1.0 0.4 0.5 2995 2315 2375 808.8 8 112 ‐1.5 0.0 0.0 0.0 3015 2375 2385 1078.3 10 112 ‐20.7 0.1 0.1 0.1 3010 2370 2375 811.0 12 112 169.9 0.5 0.1 0.1 10.0 Scenario 2 ‐ Max Day Demand + 1,740 gpm fire on existing POCs Pipe Report ID Demand (gpm) Elevation (ft) Head (ft) Pressure (psi) 2380 10.6 64.0 199.3 58.6 2495 3.0 65.0 201.9 59.3 2515 29.0 64.0 204.5 60.9 2520 610.2 62.0 202.3 60.8 N2122 0.0 64.0 201.5 59.6 N2758 0.0 61.0 202.2 61.2 J248 10.8 64.0 198.2 58.2 J250 1010.8 64.6 198.9 58.2 J252 870.6 64.0 190.9 55.0 J254 870.6 64.0 179.9 50.2 2510 5.2 74.0 211.3 59.5 2500 13.0 77.0 210.3 57.8 2375 20.9 62.0 209.4 63.9 Scenario 3 ‐ Max Day Demand + maximum fire of 3,240 gpm Node Report RES 1 RES 2 RES 3 ID From Node To Node Length (ft) Diameter (in) Roughness Flow (gpm) Velocity (ft/s) Headloss (ft) HL/1000 (ft/k‐ft) 3165 2380 J250 259.4 8 112 236.3 1.5 0.4 1.7 3170 2495 N2758 56.5 8 112 ‐490.2 3.1 0.3 5.3 3185 2510 2500 1193.5 8 112 158.9 1.0 0.9 0.8 3005 2375 2380 343.1 8 112 1117.4 7.1 10.1 29.6 3195 2515 N2122 39.1 6 112 880.6 10.0 2.9 75.1 3200 2520 2495 319.1 8 112 287.4 1.8 0.4 1.3 3215 2535 2520 448.6 8 112 898.4 5.7 8.8 19.7 3190 2515 2510 415.6 6 112 ‐419.4 4.8 6.8 16.3 P1815 N2122 2520 269.1 6 112 ‐0.8 0.0 0.8 3.0 P1817 N2122 J248 45.5 6 115 881.4 10.0 3.4 73.7 P2779 N2758 2400 930.3 8 112 ‐490.2 3.1 4.9 5.3 P389 J148 2515 444.7 8 108 490.2 3.1 3.1 6.9 P4091 J248 J252 101.7 6 115 870.6 9.9 7.3 72.0 P4093 J250 2495 204.8 8 112 ‐774.5 4.9 3.1 15.0 P4097 J254 2380 270.1 6 115 ‐870.6 9.9 19.4 72.0 3205 2510 2235 668.3 8 108 ‐178.5 1.1 0.5 0.8 3265 2510 J108 571.5 8 112 ‐404.9 2.6 2.4 4.3 3175 2500 2240 472.0 12 112 ‐368.4 1.0 0.3 0.5 3000 2375 2500 924.4 12 112 ‐514.3 1.5 0.9 1.0 2995 2315 2375 808.8 8 112 59.7 0.4 0.1 0.1 3015 2375 2385 1078.3 10 112 ‐121.1 0.5 0.1 0.1 3010 2370 2375 811.0 12 112 443.3 1.3 0.6 0.7 10.0 Scenario 3 ‐ Max Day Demand + maximum fire of 3,240 gpm Pipe Report Appendix D PACIFIC WIND - NODES + LINKS MAP EPANET 2.2 Page 1 n11 p9 ntO p10 8 .:~ •12 p12 pit n13 ••• RES2 111111 2 2 • 11 0 • DCOA2 ►• Network Table - Nodes Elevation Demand Head Pressure Node ID ft GPM ft psi Junc n1 63.5 32.40 241.03 76.92 Junc n7 63.5 0.00 241.03 76.92 Junc n3 63.5 0.00 241.03 76.92 Junc n4 63.5 0.00 241.03 76.92 Junc n5 63.5 0.00 241.03 76.92 Junc n6 63.5 0.00 241.03 76.92 Junc n9 63.5 0.00 241.04 76.93 Junc n10 63.5 0.00 241.04 76.93 Junc n11 63.5 0.00 241.04 76.93 Junc n12 63.5 0.00 241.04 76.93 Junc n13 63.5 0.00 241.04 76.93 Junc n14 63.5 0.00 241.04 76.93 Junc n15 63.5 0.00 241.03 76.92 Junc 3 63.5 0.00 241.04 76.93 Junc 4 63.5 0.00 241.03 76.92 Junc FH2 63.5 0.00 241.03 76.92 Junc 5 63.5 0.00 241.03 76.93 Junc FH1 63.5 0.00 241.03 76.93 Junc 6 63.5 0.00 241.03 76.92 Junc 1 63.5 0.00 241.04 76.93 Junc 2 64.05 0.00 239.90 76.20 Junc 7 63.5 0.00 241.04 76.93 Junc 8 62.05 0.00 240.90 77.50 Junc 9 74 0.00 241.10 72.40 Junc 10 63.5 0.00 241.05 76.93 Resvr RES2 239.9 0.00 239.90 0.00 Resvr RES3 240.9 0.00 240.90 0.00 NODES - SENARIO 1 - PEAK HOUR EPANET 2.2 Page 1 RES 2 'Dummy' RES 1 'Dummy' RES 3 'Dummy' Elevation Demand Head Pressure Node ID ft GPM ft psi Resvr RES1 241.1 -32.40 241.10 0.00 NODES - SENARIO 1 - PEAK HOUR EPANET 2.2 Page 2 Network Table - Links Length Diameter Flow Velocity Link ID ft in GPM fps Pipe p1 128 8 0.00 0.00 Pipe p3 273.6 8 0.00 0.00 Pipe p4 30.62 8 0.00 0.00 Pipe p5 18.83 8 0.00 0.00 Pipe p8 5.131 8 32.40 0.21 Pipe p9 12.89 8 32.40 0.21 Pipe p10 23.87 8 32.40 0.21 Pipe p11 32.09 8 32.40 0.21 Pipe p12 23.8 8 32.40 0.21 Pipe 3 101.7 8 32.40 0.21 Pipe 4 94.45 8 32.40 0.21 Pipe 5 34.71 8 0.00 0.00 Pipe 6 14.19 8 0.00 0.00 Pipe 7 50.26 8 0.00 0.00 Pipe 8 112.14 8 32.40 0.21 Pipe 9 11.74 8 0.00 0.00 Pipe 10 117.95 8 32.40 0.21 Pipe 11 270.1 8 0.00 0.00 Pipe 2 1 8 0.00 0.00 Pipe 1 1 6 0.00 0.00 Pipe 12 269.1 6 0.00 0.00 Pipe 13 45.5 8 32.40 0.21 Pipe 14 1 6 32.40 0.37 Pipe 15 415.6 6 32.40 0.37 Pipe 16 39.1 8 32.40 0.21 Valve DCDA1 #N/A 8 32.40 0.21 Valve DCDA2 #N/A 8 0.00 0.00 LINKS - SENARIO 1 - PEAK HOUR EPANET 2.2 Page 1 Network Table - Nodes Elevation Demand Head Pressure Node ID ft GPM ft psi Junc n1 63.5 11.18 217.25 66.62 Junc n7 63.5 0.00 217.24 66.62 Junc n3 63.5 0.00 217.71 66.82 Junc n4 63.5 0.00 221.39 68.41 Junc n5 63.5 0.00 221.80 68.59 Junc n6 63.5 0.00 222.05 68.70 Junc n9 63.5 0.00 220.43 68.00 Junc n10 63.5 0.00 220.35 67.96 Junc n11 63.5 0.00 220.16 67.88 Junc n12 63.5 0.00 219.80 67.72 Junc n13 63.5 0.00 219.31 67.51 Junc n14 63.5 0.00 218.95 67.36 Junc n15 63.5 0.00 217.25 66.62 Junc 3 63.5 0.00 220.43 68.00 Junc 4 63.5 0.00 217.24 66.62 Junc FH2 63.5 870.00 217.04 66.53 Junc 5 63.5 0.00 217.25 66.62 Junc FH1 63.5 870.00 217.09 66.55 Junc 6 63.5 0.00 222.05 68.70 Junc 1 63.5 0.00 221.97 68.67 Junc 2 63.9 0.00 225.69 70.10 Junc 7 63.5 0.00 222.66 68.96 Junc 8 61.87 0.00 227.58 71.80 Junc 9 74.07 0.00 229.38 67.30 Junc 10 63.5 0.00 222.81 69.03 Resvr RES2 225.7 -847.57 225.70 0.00 Resvr RES3 227.6 -469.54 227.60 0.00 NODES - SENARIO 2 - MAX DAY DEMAND + 1,740 GPM FIRE EPANET 2.2 Page 1 RES 2 'Dummy' RES 3 'Dummy' RES 1 'Dummy' Elevation Demand Head Pressure Node ID ft GPM ft psi Resvr RES1 229.4 -434.07 229.40 0.00 NODES - SENARIO 2 - MAX DAY DEMAND + 1,740 GPM FIRE EPANET 2.2 Page 2 Network Table - Links Length Diameter Flow Velocity Link ID ft in GPM fps Pipe p1 128 8 22.43 0.14 Pipe p3 273.6 8 -847.57 5.41 Pipe p4 30.62 8 -847.57 5.41 Pipe p5 18.83 8 847.57 5.41 Pipe p8 5.131 8 903.61 5.77 Pipe p9 12.89 8 903.61 5.77 Pipe p10 23.87 8 903.61 5.77 Pipe p11 32.09 8 903.61 5.77 Pipe p12 23.8 8 903.61 5.77 Pipe 3 101.7 8 903.61 5.77 Pipe 4 94.45 8 33.61 0.21 Pipe 5 34.71 8 847.57 5.41 Pipe 6 14.19 8 870.00 5.55 Pipe 7 50.26 8 -22.43 0.14 Pipe 8 112.14 8 903.61 5.77 Pipe 9 11.74 8 870.00 5.55 Pipe 10 117.95 8 33.61 0.21 Pipe 11 270.1 8 847.57 5.41 Pipe 2 1 8 847.57 5.41 Pipe 1 1 6 469.54 5.33 Pipe 12 269.1 6 469.54 5.33 Pipe 13 45.5 8 903.61 5.77 Pipe 14 1 6 434.07 4.93 Pipe 15 415.6 6 434.07 4.93 Pipe 16 39.1 8 434.07 2.77 Valve DCDA1 #N/A 8 903.61 5.77 Valve DCDA2 #N/A 8 847.57 5.41 LINKS - SENARIO 2 - MAX DAY DEMAND + 1,740 GPM FIRE EPANET 2.2 Page 1 Network Table - Nodes Elevation Demand Head Pressure Node ID ft GPM ft psi Junc n1 63.5 11.18 171.96 47.00 Junc n7 63.5 0.00 171.96 47.00 Junc n3 63.5 0.00 173.47 47.65 Junc n4 63.5 0.00 185.36 52.80 Junc n5 63.5 0.00 186.70 53.38 Junc n6 63.5 0.00 187.51 53.74 Junc n9 63.5 0.00 181.71 51.22 Junc n10 63.5 0.00 181.47 51.12 Junc n11 63.5 0.00 180.87 50.86 Junc n12 63.5 0.00 179.77 50.38 Junc n13 63.5 0.00 178.28 49.73 Junc n14 63.5 0.00 177.17 49.25 Junc n15 63.5 0.00 171.97 47.00 Junc 3 63.5 0.00 181.71 51.22 Junc 4 63.5 0.00 171.96 47.00 Junc FH2 63.5 1620.00 171.33 46.72 Junc 5 63.5 0.00 171.97 47.00 Junc FH1 63.5 1620.00 171.45 46.77 Junc 6 63.5 0.00 187.51 53.74 Junc 1 63.5 0.00 186.43 53.26 Junc 2 64.02 0.00 199.26 58.60 Junc 7 63.5 0.00 188.54 54.18 Junc 8 61.92 0.00 202.25 60.80 Junc 9 73.92 0.00 211.25 59.50 Junc 10 63.5 0.00 189.05 54.40 Resvr RES2 199.3 -1597.14 199.30 0.00 Resvr RES3 202.3 -816.54 202.30 0.00 NODES - SENARIO 3 -MAX DAY DEMAND + MAX FIRE OF 3,240 GPM EPANET 2.2 Page 1 RES 2 'Dummy' RES 3 'Dummy' RES 1 'Dummy' Elevation Demand Head Pressure Node ID ft GPM ft psi Resvr RES1 211.3 -837.50 211.30 0.00 NODES - SENARIO 3 -MAX DAY DEMAND + MAX FIRE OF 3,240 GPM EPANET 2.2 Page 2 Network Table - Links Length Diameter Flow Velocity Link ID ft in GPM fps Pipe p1 128 8 22.86 0.15 Pipe p3 273.6 8 -1597.14 10.19 Pipe p4 30.62 8 -1597.14 10.19 Pipe p5 18.83 8 1597.14 10.19 Pipe p8 5.131 8 1654.04 10.56 Pipe p9 12.89 8 1654.04 10.56 Pipe p10 23.87 8 1654.04 10.56 Pipe p11 32.09 8 1654.04 10.56 Pipe p12 23.8 8 1654.04 10.56 Pipe 3 101.7 8 1654.04 10.56 Pipe 4 94.45 8 34.04 0.22 Pipe 5 34.71 8 1597.14 10.19 Pipe 6 14.19 8 1620.00 10.34 Pipe 7 50.26 8 -22.86 0.15 Pipe 8 112.14 8 1654.04 10.56 Pipe 9 11.74 8 1620.00 10.34 Pipe 10 117.95 8 34.04 0.22 Pipe 11 270.1 8 1597.14 10.19 Pipe 2 1 8 1597.14 10.19 Pipe 1 1 6 816.54 9.27 Pipe 12 269.1 6 816.54 9.27 Pipe 13 45.5 8 1654.04 10.56 Pipe 14 1 6 837.50 9.50 Pipe 15 415.6 6 837.50 9.50 Pipe 16 39.1 8 837.50 5.35 Valve DCDA1 #N/A 8 1654.04 10.56 Valve DCDA2 #N/A 8 1597.14 10.19 LINKS - SENARIO 3 -MAX DAY DEMAND + MAX FIRE OF 3,240 GPM EPANET 2.2 Page 1 Appendix E SYlvllOL ABB. DESCRPTION Space Conditioning, Water Heating and Plumbing System Measures: §110.0-§110.3: HVAC equipment, water heaters, showorhoads, faucets and di other regulated opplioncoo ore certified by tho En011JY S ORW SOL, WASrE, OR SEWER Commission. --cwv --cwv COMBINATON WASTE & VEITT §110.3(c)5: Water heating reclrculotlon loops serving multiple dwelllng units and High-Rise residential WI WI l~IRECf WASTE occupancies meet the air release valve, backflow prevention, pump isolation valve, and recirculation loop connection requirements of §110.3(c)5, ------V VEITT ---v---V VEITT BELOW SLAB §110.5: Continuously burning pilot lights en prohbited fer natural gos: fan-tp, central furnaces, tlousehold cooking appliances (oppllmces with on elsctrlcal supply voltage connection with pOot lights that consume less th<11 150 Btu/hr are """"Pt), <11d -cw COLD WATER p~ and opa heators. ------HW HOT WATER §150.0{h}: Heating and/or cooling loads are calculated in accordance with ASHRAE, S~ACNA or ACCA. ------HWR HOT WATER RE1UlN cp FCO FLOOR CLEANOUT §150.0(i): Heating systems ore equipped with thermostats that meet the setback r-equirements of Section 110.2(c). COTO CLEANOUT TO GRADE §150.0(j)1A: Storage gas water heaters rated with an Energy Factor no greater than the federal minimal (").l I wco Wl>I.J..CLEANOLIT standard are externally wrapped with Insulation having an Installed thermal resistance of R-12 or greater. t><l SOI SHUT-OFF V/>J..VE §150.0(j)1B: Unfired storage tanks, such as storage tanks or backup tonks for solar water-heating system, ,, . CV CHECK V/>J..VE or other Indirect hot water tanks have R-12 external Insulation or R-16 internal insulation where the ~ HB HOSE BIBB internal Insulation R-value Is Indicated on the exterior of the tank. L1J RHl RECESSED HOSE BBB §150.ll(D2A: All dameetic hot wot• system piping conditions listed belaw, whether burisd or unburied, must be insulated per TAEI.E 120.3-A. LI' RISER -LI' c:> DN DROP· DOWN I. The first 5 feet (1.5 meters) of hot and cold water pipes from the storage tonk. ~ T/PRV TEMP, & PRESS RELEF V/>J..VE ii. All piping with a nominal diameter of 3/4 inch (19 millimeter) or larger. ABS ACRYI.ONITRILE-BUTADENE-81YRENE iii. All piping associated with a domestic hot water recirculation system regardless of the pipe diameter. Iv. Piping from the heating source to storage tonk or between tonks. ABV ABOVE v. Piping burled below grade. Af' ACESSPAN:1. vi. All hot water pipes from the heating source to the kitchen fixtures. BEH BEHIND §150.0{j)2: Pipe lnsulatlon for steam hydronlc heating systems or hot water systems >15 psi, meets the BEL BELOW requirements of Standards Table 120.J-A. a CAST IRON §150.0(j)3A: Insulation is protected from damage, including that due to sunlight, moisture, equipment CLG CEIJNG maintenance. and wind. EXP El<P06ED FF AN&IED FLOOR GD GRADE ALL WORK SHALL CONFORM TO: E INVERT ELEVATION MIN tdlllMUM • 2019 C.B.C. NIC NOT IN CONTRACT • 2019 ELECTRICAL CODE POC PONT OF CONNECTION • 2019 CALIFORNIA MECHANICAL CODE PVC POLYVINYL Crl.ORIDE • 2019 CALIFORNIA PLUMBING CODE WTR WATER • 2019 CALIFORNIA ENERGY STANDARD CODE WV WASTE A~ VENT VTR VENT THAU ROOF SYMBOLS + ABBREVIA llONS (HJ lllLE-24 ENERGY NOlES + CODES (EJ t Mt hstalatlon aoo use of cp.<: purrlrg rre1orlll pusull1t to 1tis section """I conw v.t1h BRJ1cab1a req.hments of 1tis oodo aoo section 12 of apperdc I of 1tiB code, hstalatlon stardaJd fa-cp.<: SOMri csmented rot aoo cot! wata-- systsns. L'\PMO IS 20-2005. SCHEDULE 40 METALLIC PIPE TABLE 1215.2(1) 2. f'l:)s a W"Q paeorg ttwo.#1 ctlsd a ro1l:hsd metal sll.ds a )::lets a hllklW Ehel m,scny wal shell be i:rotscled from -dJs to tterrrsJ ~ aoo -~ -a plastl)....,,.. a oarrnsts a other approysd rN81lS. Go1: Nalurol streo,t nllS may have protection at ma><hun 3 feet -ICPC 313.01 Inlet Pmsure: Less than 2 psi .,_,..,.,, 0.5 pal a S1Bs1 pla1s p,oteollCII nl bs --raqnd ~ Ire Ad1listratt.e /l<Jthorlly a section 313.9 of Ire Celforria PI.Jrlrg Specfffc Gravity: Cods. 0.60 Pi• Size Cin.l 4, TJama1 e>qlll1!itr1 may bs provided fa-~ use of e,pensiJn kq>e, oflsets, a cteroes of -(see tabls-1 Nominal: 1/2 3/4 1 1-1/4 1-1/2 2 2-1/2 3 4 5 Actual ID: 0.622 0.824 1.049 1.380 1.610 2.067 2.469 3.068 4.026 5.047 5. Vsrtlcal ~ "1al bs ,q,ported at saoh floor or as spsolflsd ~ Ire dseilJl>d ~ to Blow fa-s,cpanekn'oonlJacllon Lena1h lftl Caoocitv in Cubic Feet of Gas ,._ Hour ~ nl have a md-slay (IJds ICPC 314.0l) 10 172 360 678 1390 2090 4020 6400 11300 23100 -41800 6. Hoolzo11tal ~ 1 nch a srraler srell bs 9lfl)llrtsc at rnBllirun of 3 loot -~ 1-V4 nch a agsr srell bs 20 118 247 456 957 1430 2760 4400 7780 15900 28700 9lfl)llrtsc at • ma><hun of 4 loot i1IErwls. 30 95 199 374 768 1150 2220 3530 6250 12700 23000 40 81 170 320 657 985 1900 3020 5350 10900 19700 7. ~ srell not bs anctaed ~ to a a.ppat. but ralher B8Clllld ..tth en-oolh 1-erv,re a strops tret proli:le fer a deg88 of mowrnent ard tret prevent donv,ge to Ire ppe. 1-largers a strops v.t1h sh!rp a obrasl;e edges stell not bs used ftargers 50 72 151 284 583 873 1680 2680 4740 9680 17500 that ,t,ch Ire ~ shol not bs used 60 60 137 257 528 791 1520 2430 4290 8760 15800 70 60 126 237 486 728 1400 2230 3950 8050 14600 6. Hoss tilbs srell bs ccrnscted arty to rrela1 sys1sm COii IXUll'ils v.tich om adscµ,tely anct'asd to Ire t,.Jci"g slnJollJe. Tt-e 80 56 117 220 452 877 1300 2080 3670 7 .. 0 13600 q,,c plasti) sys1sm "1al 1lrnrete h \\91 90 52 110 207 424 635 1220 1950 3450 7030 12700 9. There """I bs a rrttn.m of elx l1chls of rrelallc ~ bstWeEn Ire 1J1S wat,r tm1'r cansctlon and cp.<: tuttg ~ 100 50 104 195 400 600 1160 1840 3260 8840 12000 shol not bs hstalsd doM stream from any hstataneous we ,..t,r -a closer thin elx l1chls ~ lergth 125 44 92 173 355 532 1020 1630 2890 5890 10600 ~ 100 40 BJ 107 322 482 928 1480 2610 0330 96~0 170 37 77 144 296 443 854 1360 2410 4910 8880 1) A perrreront eg, \11th Ire ~ v.ads "IHs b.ttg has norHTietalc hlerir wat,r p1prg' nl bs faslered on a nek:le Ire 200 34 71 134 275 412 794 1270 2240 4560 8260 nllhelsctri:SS\b!panal 250 30 63 119 244 366 704 1120 1980 4050 7320 Developed Length '"L'" of Expansion Loops Length of Run in Feet (mm) GAS SYSTEM NOTES: 20 ,[6096) 40 (121921 60 (18298) 80 (24384) 100 (30480 ) t l>I.J.. GAS PFINCl FROM GAS METER TO GAS PAESSLflE REClULATOR TO BE SIZED PEA UPC TABLE 1216.2(6). PFINCl FROM FEClUATOR TO APPLIANCES SHALL BE SIZED PEA TABLE 12162(2). Nominal Size 2. GAS METERS TO BE ACCESSIBLE. INSTl>I.J.. WISHJT-OFF V/>J..VE & REGULATOR Af3 REOI.IRED, lncties (mmj Loop Le ngth "L" in Inches (mm) a ALL GAS PIPlt-13 SHALL BE TES I ED AND NSPECTED PER UPC SECTION 1214.0. 4-THE TEST PRESSUE TO BE USED SHAU. BE NO LESS THAN t5 ThtES THE PROPOSED MAXIMUM 1/2 (12.7) 22 {6706) 31 {9449) 38 (11582) 44 (134 111 50 (1524 0) WORKING PAES8U1E, BUT NOT LESS THAN 3 PSI mESPECTIVE OF DESIGN PRESSU1E. :~4 1m 1} )ti {m,a) JI (11"//K} 4ti (1411)1) 0/ ("loH~U) oH (1 /ti/H) ·J (15 4) :JO {8'144) 47 (111\07) ;;;, ( '1:18.'iO) fiO (1R788) fi7 (104;>)) ·1-114 (32) 33 (10058) 47 (14325) 57 ('17374) 66 (3991 7) 74 (22555) 1-112 (30) 36 (4 0973) 51 (15545) 62 (10090) 72 (21946) 00 (24304) 2 (5 1) 11 (12197) 50 (1767m 71 (21611) 02 (2199-1) 91 (27737) SCHED 40 GAS SIZING TABLE ,..... I I I CPVC PIPING NOlES ,,--... I F I PIPE MA lERIALS ~//0, #4-~1ti·~~; ~ ~ ~ -~ . .:,~ ~ ~ ~ :foct-I II ~"'&~V£ ,1·~t)J 1J SERVICES REMARKS ABOVE SLAB X X W /COLD EXPANSION FITTINGS WATER BELOW SLAB X SANITARY ABOVE SLAB X X DRAINAGE BELOW SLAB X X USE MJS/PVC PIPE DUE TO CORROSM: SOIL [1 SANITARY CONCEALED VENT EXPOSED X X INDIRECT INSIDE X WASTE OUTSIDE X PO.O ' PLUMBING SCHEDULES & NOTES INSIDE X ' P0.1 ~MBING DETAILS GAS -O~TSIDE P0.2 PLUMBING CPVC PIPING DETAILS P0.3 PLUMBING FIRE STOPPING SYSTEMS (!)-SCHED 40 ABS IYIN BELOW SLAB PIPING MAY BE ACCEPTABLE WHERE SOIL CONDITION IS CORROSIVE. P1 .0 PLUMBING BUILDING 1 CONTRACTOR TO OBTAIN WRITTEN PERMISSION FROM BUILDING OFFICIAL PRIOR TO INSTALLATION. P2.0 PLUMBING BUILDING 2 1 ST & 2ND FLOOR PLANS P2.1 PLUMBING BUILDING 2 3RD FLOOR PLAN P3.0 PLUMBING BUILDING 3 NOTE: ALL PIPE, TUBE, FIXTURES AND FITTINGS CARRYING WATER USED IN POTABLE WATER SYSTEMS INTENDED TO P3.1 f-PLUMBING BUILDING 6 SUPPLY DRINKING WATER SHALL MEEf THE REQUIREMENTS OF NSF 61 f>/5 FOUND IN TABLE 14-1. ALL MATERIALS -USED IN THE WATER SUPPLY SYSTEMS, EXCEPT VALVES AND SIMILAR DEVICES, SHALL BE OF A LIKE MATERIAL, EXCEPT P4.0 PLUMBING BUILDING 4 P5.0 ' PLUMBING BUILDING 5 1 ST & 2ND FLOOR PLANS WHERE OTHERWISE APPROVED BY THE AUTHORITY HA~NG JURISDICTION. MATERIALS FOR BUILDING WATER PIPING AND P5.1 PLUMBING BUILDING 5 3RD FLOOR PLAN BUILDING SUPPLY PIPING SHALL BE IN ACCORDANCE WITH TABLE 6-4 AND THE STANDARDS IN TABLE 14--1. P6.0 PLUMBING UNIT 1A, 2A & 3A P7.0 PLUMBINGVVASTE & WATER RISERS DIAGRAM HOT WATER PIPE INSULATION SHALL HAVE A MINIMUM WALL THICKNESS OF NOT LESS THAN THE DIAMEfER OF THE I PIPE FOR A PIPE UP TO 2 INCHES IN DIAMETER. INSULATION WALL THICKNESS SHALL BE NOT LESS THAN 2 INCHES LJ FOR A PIPE OF 2 INCHES OR MORE IN DIAMETER (CPC SECTION 609.11.2) -- SHEET INDEX Q) PIPE MATERIAL SCHEDULE ® 1. Provide all materials and equipment and perform all labor required to install complete and operable plumbing systems as indicated on the drawings in addition to state, and local code requirements. 2. Contract document drawings for mec:hcniool & plumbing work are are diagrammatic and ore intended to convey scope and general arrangement only. 3. lnstalfing contractor to submit '"shop drawings• for consultant/owner review and opprovol prior to installation. 4, Plumbing contractor to connect to site sewer at 5 ft from building unless noted or negotiated otherwise. 5. Install all plumbing fixtures, equipment and appurtenances in accordance with manufacturer recommendations, contrcict documents, and applicable codes and regulations. 6. The location of existing underground utllltles ls shown in an approximate way only. the contractor shall verify all deptt,s and determine exact locatlon of all existing utilities before commencing work. 7. Coordinate construction of plumbing pipe and mechanical ductwork with architectural, structural, civil, and electrical plans. Offset in piping to avoid confDcts shall be provided at no additional cost to the owner. B. Where facilities for the handicapped are required in applicable building regulations. the facilities shall be installed according with those regulations. refer to architectural plans for designated handicap dwelling units and make any piping adjustments as necessary. 9. Penetrations into sound roted assemblies shall be sealed, lined, insulated with an approved permanent sound insulatlon material to meet the requirements of cbc 1207.6, 1207.7, 1207.8 & 1207.9. the installing contractor shall toke appropriate measures recommended by the acoustical engineer for sound attenuation of waste & water piping in sound rated wall & ceiling assemblies. 1D. Roof/storm drainage shall meet the requirements of cpc chapter 11. 11. Building soil waste, vent &: stom, drain piping to slope min 1/4• per ft unless noted otherwise. 12. Except for necessary valves, where intermembering or mixing of dissimilar metals occur, the point of connection shall be confined exposed or accessible locations (ope 310,6), 13, All piping poeoln9 under or through walls shall be protected from breakage (cbc 313,1). Sleeves shall be provided to protect oll piping through cancrets or masonry walls (cpc 312.10) unless openings are drilled or bored .. 14. My structural member weakened or lmpolred by cutting, notching or otherwise shall be reinforced, repaired, or replaced so as to be left in a safe structural condition (cpc 312.11). 15. All piping shall be supported in such a manner to maintain alignment and prevent sagging (cpc 313.2). 16. All piping penetrations of fire resistance roted wolls. partitions, floors, floor/ceiling assemblies, roof/ceiling assemblies, or shaft enclosures shall be protected in accordance with the requirements of the building code (cpc 312.7). refer to architectural plans for penetration protection at roted walls. 17. Rxtures having concealed slip joint connections shall be provided with an access panel or utility space at least twelve inches in its least dimension and so arranged without obstructions as to make such connections accessible for inspection arKt repair (cpc 402.11). 1B. Showers & tub-shower combinations shall be provided with individual control valves of the pressure balance, thermostatic, or combination pressure balance/thermostatic mixing valve type that provide scold and thermal shock protection to deliver mixed water setting of 120 f max. Water heater them,ostats shall not be considerl!ld o suitable control for meeting this provision (cpc 4-08.3). 19. The minimum capacity for water heaters shall be in accordance with the first hour rating listed in cpc table 501.1. 20. Water heaters shall be anchored or strapped to resist horizontal displacement due to earthquake motion. strapping shall be provided within the upper &: lower 1 /3 of its vertical dimension, (cbc 507.2), 21, All gos vents eholi extend through the roof flashing, roof jack, or roof thimble ond terminate with o lieted cap a< listed roof assembly (cpc 509.6). Termination per fig. 509.6.2 and not less than 8 ft from o vertical W<lll or similar obstructions. 22. A mechanical draft venting system of other than direct-vent type shall terminate at least 4 ft below, 4 ft horizontal from, or 1 ft above any door, operable window, or gravity air inlet into any building. the bottom of vent tem,inal shall be located at least 12 inches above grade (cpc 509.8.1). 23. Potable water supply shall be protected from lawn sprtn~ers and irrigation oyetems (cpc 603.5.6). 24. Potable water outlets with hose attachments shall be protected by o non-removable hose-bibb type backflow preventer, a non-removable hose-bibb type vacumn breaker, or by an atmospheric vacuum breaker installed at least six (6) inches above the highest point of usage located on the discharged side of the valve (cpc 603.5.7). 25. In multi-family dwelling units, one (1) or more shutoff valves shall be provided in each dwellin unit. Valve shall be accessible in the dwelling unit that it control, (cpc 606.3), 26. Where local static water pressure is in excess of 80 psi, an oppraved type pressure regulator preceded by an adequate stroiner shall be installed and the static pressure reduced to 80 psi or less (cpc 608.2). 27. Storage water heater shall be provided with an approved, listed, odequotely sized combination t&p relief valve (upc 608.3). Relief valve shall be provided with drain and terminate at approved locations (cpc 608.5). 28. Where a hot-water storage tonk or an indirect water heater is located at on eleY<1tion above the fixture outlets in the hot water system, a V<1cuum relief valve shall be Installed on the storage tonk or heater (cpc 608.7). 29. Upon completion of a section or of the entire hot and cold water supply system, it shall be tested and proved tight under water pressure not less than the working pressure under which it is to be used. the water used for tests shall be obtained from a potable water source of supply. Except for plastic piping, fifty psi air pressure may be substituted for the water test (cpc 609.4). 30. Cleanauts to be installed per cpc. 707.0 & 719.0. Cleanouts ore required on horizontal waste branch lines over 5 ft from main line and on horizontal sink and urinals. 31. Where a fixture is installed on a floor level that is lower than the next upstream manhole cover of the public or priV<lte sewer, serving such drainage piping, shall be protected from backflow of sewage by installing on approved type of backwater valve. Rxtures on floor levels above such elevation shall not discharge through the backwater valve (cpc 710, 1). 32. Suds relief shall meet the requiremens of cpc 711.0. 33. Unless prohibited by structural conditions, eoch plumbing vent shall rise vertically to a point not less than 6 Inches obove the flood rim level of the fixture served before offsetting horizontally. vent less than 6 inches above the flood rim level shall be Installed with approved drainage fittings, material and grade to the drain (cpc 905.3). 34. Plumbing vent shall terminate not less than 10 ft from, or at least 3 ft above any openable window, door, opening, air intake, or Yent shaft, nor less than 3 ft in every direction from any lot line, alley & street excepted (cpc 906.2). 35. Vent pipes for outdoor installations shall extend at least 10 ft above the surrouding ground and shall be securely supported (cpc 906.4). 36. All plumbing fixtures shall be certlfoed by the California Energy Commission: Water Closet 1.28 GPF Urinal: 0.125 GPF Lavatories: 1.2 GPM Shower Head and Kitchen Sink: 1.75 GPM 37. Plumbing systems shall be installed in compliance with 2019 California Plumbing Code (CPC) and all applicable local, state codes and regulations (latest edition). 38.ABS and PvC OWV piping installations shall be rnstalled In accordance lwth oppllcolbe standards reference in Tobie 1701.1 of the Plumbing Code, and the Building Code, 39. An approved backwater valve is required for drainage piping serving fixtures located below the elevation of the next upstream manhole cover. Fixtures above usch elevation shall not discharged through the backwater valve. Cleonouts for drains tho pass thraugh the backwater volve shall be clearly identified with o permanent label stating -SOckwoter Valve Downstream•. 40. New or repaired potable water systems shall be disinfected prior to use according to the method set in Section 609.9 of the Plumbing Code. 41. Domestic hot water piping shall be insulated in compliance with Section 609.11 of the Plumbing Code. 42. Usted mechoncial water hammer arresters shall be installed for quick-acting valves. Location and method of installation shall comply with the manufacturer's specifications. 43. Building drain and vent piping materials shall comply with Colifamia Plumbing Code Section 701.0 <1nd 903.0. 44. All sanitary system materials shCIII be listed by an approved agency. GENERAL NOlES @ PLUMBING FIXTURE SCHEDULE MANUFACTURER AND MODEL l'IANG CONNECTIONS TO FIXTURE MARK TYPE REMARKS Shall be certified by C.E.C cw HW WASTE VENT llAYION SEIF-RIMMING MODEL KS-1 KITCHEN SINK GE233224 W/MOEN FAUCET 3/4" 3/4" 2· 2· SUPPLY W/IN SINK ERA.TOR BADGER 5 1/2 H.P. WASTE MODEL 67425 DISPOSER W/CORD AND 1.5 GPM AERATOR VORTENS FIRENZE MODEL LAV-1 LAVATORY 3526 PRO'YIDE W/MOEN 1/2"· 1/2"· 1-1/2" 1-1/2" :OUNTER MOUNT FLCW IS LIMITED TO 1.5 GPM FAUCET MODEL 66410, 66411 IEF-1 REFRIGERATOR SEE OWNER SPECIFICATION 1/2"' N/A N/A N/A PRO'IIDE W/ICEMAKER ONLY AT COMWUNllY CENTER 1UH BOOTZ ALOHA PORCEl>JN ON SUPPLY W/MOEN 62320 (CC) AND TLl83 THIM W/CFG TUB 1 SIEEL 60"X 32" 3/4" 3/4" 2· 2· 40124 SHOWER W/SUDE BIR 11.&-2 BOOTZ ALOHA PORCEl>JN ON SUPPLY W/MOEN 62320 (CC) AND TL183 THIM TUB 2 STEEL 60"X 32" 3/4" 3/4" 2· 2· W/1.75 GPM SHOWER HEAD. SUPPLY W/MOEN 62320 (CC) AND TL182 THIM IH-1 SHOWER SEE OWNER Sl'IECIFICATION 3/4" 3/4" 2" 2" W/1.75 GPM SHOWER HEAD. VORTEN LORETTO ROUND BOWL WC-1 WATER CLOSET 1 1.28 GPF MOML 3213-3475 0 3/4" N/A 3• 2· Sll'PLY W/CENTOCO 700 ROUND SEAT EQUAL VORTEN LORETTO ADA HET BOWL WC>-2 WATER CLOSET 2 1.28 GPF MODEL 3213-3475 0 3/4" N/A 3• 2" Sll'PLY W/CENTOCO 500CC OPEN FRONT LlSS COVER EQUAL ELONGATID S£AT PROFLO MODEL PFZ199624 MB-1 MOP SINK W/SER'IICE FAUCET MODEL 3/4" 3/4" 2· 2· PF1118 WM-1 NASHING MACHINE SEE OWNER SPECIFICATION 3/4" 3/4" 2· 2· HOSE IEB SHALL BE EQUIPPED WITH AN te-1 HOSE BIBB SEE OWNER Sl'IECIFICATION 1/2' ---APPRO'JED NON-REMOVABLE VACUUM BR"'1<ER (UMC 603.4.7). IWIGE-1 ELECTRIC RANGE SEE OWNER SPECIFICATION N/A N/A N/A N/A FD-1 FLOOR DRAIN MIFAB FD1100C OR EQUAL 1/2" N/A 2· 2· PROVIDE AT PUBLIC RESTROOIIS & LAUNDRY IOUX CHIEF 695-Y52 OR -TRAP PRIMER ~ 1/2" N/A N/A N/A PROVIDE AT PUBLIC RESTROOMS NOTE: 1. THE MAXIMUM HOT WATER TEMPERATURE DISCHARGING FROM THE BATHTUB SHALL BE LIMITED TO 12CTF. THE WATER HEATER THERMOSTAT SHALL NOT BE CONSIDERED A CONTROL FOR MEETING THIS PROVISION. 2. ALL PLUMBING FIXTURES SHALL BE CERTIFIED TO NSF STANDARD 61 ANNEX G. FIXTURES SHALL BEAR A LISTING NOTE STATING "PRODUCT ALSO CERTIFIED TO NSF/ANSI STANDARD 61, ANNEX G (WEIGHTED AVERAGE LEAD CONTENT OF S:0.25%) AND IS IN COMPLIANCE WITH CALIFORNIA'S HEAL TH & SAFETY CODE SECTIDN 116875.) 3. PLUMBING FIXTURES SHALL MEEf THE 20 PERCENT REDUCED FLOW RATE SPECIFIED IN CALIFORNIA GREEN BUILDING CODE TABLE 4.303.2. 4. PLUMBING FIXTURES AT THE COMMUNITY CENTER SHALL COMPLY WITH CGBC TABLE 5.30J.2. 5. INSTAUER OR THIRD PARTY SHALL PROVIDE PROOF FOR VERIFICATION OF INSTALLATION. (1) NJ SMITH CYCLONE Mxi BTH-120A COMMERCIAL INDOOR GAS WAlER ® WATER HEATER, 120.000 MBTUH INPUT. 114,000 MBTUH OUTPUT. 95,i: EFF., 154 HEATER GPH RECOVERY AT 90"F TEMP. RISE, WT, = 251 LBS. PROVIDE (BLDG. 3 OR 6) W/HEATER-MOUNTED T&P RELIEF VALVE & 3• CONCENTRIC VEITT KIT. ELECTRICAL: 120V, SINGLE PHASE. 60HZ, 15 AMPS: (1) AO SMITH CYCLONE Mxi BTH-150A COMMERCIAL INDOOR GAS WATER WATER HEATER, 150,000 MBTUH INPUT. 147,000 MBTUH OUTPUT, 98ll EFF., 261 ~ HEATER GPH RECOVERY AT 90"F TEMP. RISE, WT. -251 LBS. PROVIDE (BLOG. 4) W/HEATER-MOUNTED T&P RELIEF VALVE & 3" CONCENTRIC VEITT KIT. ELECTRICAL: 120V, SINGLE PHASE, 60HZ, 15 AMPS; (1) AO SMITH CYCLONE Mxl BTH-199A COMMERCIAL INDOOR GAS WATER WATER HEATER, 200,000 MBTUH INPUT, 194,000 MBTUH OUTPUT, 97,i: EFF., 198 ~ HEATER GPH RECOVERY AT 90"F TEMP. RISE, WT. -553 LBS. PROVIDE (BLDG. 5) W/HEATER-MOUNTED T&P RELIEF VALVE & 3" CONCENTRIC VENT KIT. ELECTRICAL: 120V, SINGLE PHASE, 60HZ, 15 AMPS; (1) NJ SMITH CYCLONE Mxi BTH-500A COMMERCIAL INDOOR GAS WAlER ~ WATER HEATER, 500,000 MBTUH INPUT, 459,90B MBTUH OUTPUT, 95,i: EFF., 619 HEATER GPH RECOVERY AT 90"F TEMP. RISE, WT. = 1420 LBS. PROVIDE (BLDG. 2) W/HEATER-MOUNTED T&P RELIEF VALVE & 4" CONCENTRIC VEITT KIT. ELECTRICAL: 120V, SINGLE PHASE, 60HZ, 15 AMPS; (7¥) EXPANSION "AMTROL, INC." THERM-X-TROL MODEL NO. ST-12VC. 6.4 TANK GALLON OR APPROVED EQU/>J.. (BLDG. 3-6) (XJ) EXPANSION "AMTROL, INC." THERM-X-TROL MODEL NO. ST-30VC. 14 TANK GALLON OR APPROVED EQU/>J.. (BLDG. 2) (er) PROVIDE ENNOVATIVE AUTOHOT SYSlEM. GRUNFOS UP 99 SERIES PUMP 115V, CIRCULATING PUMP 1.8 AMPS, 1 /6 H.P. ® CIRCULATING PROVIDE ENNOVATIVE AUTOHOT SYSlEM. GRUNFOS UP 150 SERIES PUMP 115V, PUMP 3.5 AMPS. 1/6 H.P. PLUMBING FIXTURE SCHEDULES r~ A BUILDING DOMESTIC WATER PIPE SIZING TABLE BULlllNG WATER DEMAJIIJ 35t5 WSRJ OR 95 GPM AVAILABLE PAESSlff AT PR\/ 79 PSI (e) LOSS THAU 2-1/2' RPP IM.KINS 500XI. \'SBA SIZE: 2-112" LOSS 7 7 lb) LOSS THAU SUBIMETEA SIZE: 314• LOSS 5 5 (cl LOSSES DLE ELEVATION DIFF: 3lFT XA33= 130 (d) RESIDUAL PS AT FURTI-EST FIXTURE FLUSH TANK 20 (e) tdXING V/>J..VE tdXING V/>J..VE 5 (!) TOT/>J.. PRESSURE DROP ~fl 500 (g) PRESSURE AVAi.ABLE FOR ffiCOON LOSS (PSI) (e) -(g) 290 &ll TDL O MAX LENGTH + 25'11, FOR RTTlNG LOSSES 200 FT X 20'lr --2'10FT. PIPE FRICTION LOSS CALCUATION (PSO avalabls PSI: = ~ X '00= 121 psJf100lt TDLof ~ 240 COLD & HOT WATl=R SIZING; PRESSURE LOSS 12.10 PSI PER 10□ FT. CPVC MAX. VELOCITY 8.00 FT/S PER 100 FT, Hazen-Williams Coefficient= 150 PIPE SIZE ID GPM FUiFT FU/FV VEL. (fl:ls:) :::-1/2" 0.489 3.2 3 N/A 5.5 I 3/4" 0.715 8.8 11 N/A 7.0 i!!i 1" 0.921 17.1 24 N/A B.2 "' SDR-11 C 1-1/4" 1.125 24.8 40 8 8.0 ~ 1-1/2" 1.329 '4.7 64 19 B.0 != 2" 1.739 00.2 170 7J B.0 2-1/2" 2.289 103.1 39' 263 B.0 SCH. 80 - :i! s COLD & HOT WATER SIZING ~ bl PRESSURE LOSS 12.10 PSI PER 100 FT. UPONORPEX. I MAX. VELOCITY 8.00 FT/S PER 100 FT. Hazen-WIiiiams Coe.fflclent = 1!:0 PIPE SIZE ID GPM FU/FT FUJFV va.iru~ 1/2" 0.475 3.0 3 NIA 5.4 3/4" 0.671 '.4 8 NIA ,., 1" 0.862 14.4 20 NIA 7.9 PEX 1·1/4" 1.054 21.9 34 5 B.0 1-1/2" 1.244 30.3 54 n B.O 2" 1.62!;.l 52.1 135 82 B.0 I I I I I PEX WATER SIZING UP TO 2' Pl'E DOMESTIC WATER PIPE SIZING ® -t)I) C . ..... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FOR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING SCHEDULES AND NOTES PO.O JOB NUMBER: ~ -z => ' CL w L 1- ( 1-112·c (16 FU) FLEX / CHILDREN'S LEARNING 12'-I" CLG-. -. I I I ! fEH I I ·cw-~; 1-1L2"CW lJJ • • ll'l-1 ~ FU) cc I < i> Isl ~ ' ' ' ' .. '-'--' I ( ~I l.2'-1" C.LG-. fP'j l:j ·~ <p <1-><!> ADULT LEARNING / READING 22'-4" C-LG. A HALL 12'-I" C-LG. C 0 ' ' ' ' ' ' ' ' SUPPLES 'S-NRAfJE--" r-----------1 12'-I" CL.G. □ I 12'-I" GLG. I ' ' ' ' ' ' rr====='===""'==~;;;;:;;;;:;:;"t --==!E==='---'='-,-r==------,J I L) -----) PROPERTY ~ LOBBY _,/ MANAGEMENT 22'-4" CLG-. OFFICE l:2'-1" C.LGi. WATER PIPING 0 0 ~ 3/4""G 50 CFH li'~~ ... -~ SEE SHEET P4.0 "\._ roR CONT. I / • ct,-1-1/4-0 P.E. 150 CFH ya-----1 "G P.E. 100 CFH W/GNS TIIER (hP. or 3) (NO~ER) 12"-I" CL<;;. <,Ya> 1/2"r)// 1.5 FUl - I -1/2"CW (2.5 FU) ill:I----? ",/4"CW (4 FU) 1---------------.. --"~:ii:---------- -1;2·cw I 112" CW TO DRINKING FOI.NTAN OR "TRAP PRMER 1-V4' CW DOWN TO WATER CL08ET OR l.ffW. WN/ATER HAMMEi< AfftS I ER INSTA-HOT WATER tEATER U~ LAVATORY CHIONOMIIE MOila t.t-2lll../208 (20 At.f'S. 'i!!JfN. 41l<1M COMMUNITY ROOM 2 12'-I" CLG. I I I I HB-1 il n n n n r---~~--~~---~r--++--~~ r---~~--~~---LL---+--+---~~ ----1----1---rr---t--t------t---t ·--~-L:zr:~ ~N~ ' ' ' A ' ' ' ' ' ' (J~ A D ' ' r --1-1---LL ---1--1-----1-1 ' ' ' ' ' ' ' ' I I I I I I I I I I I I I I I ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' WATER SER\IICE P.0.C 2' SER\IICE LATERAL WSF.U. = 38 Fil (--46 GPMJ ~ • • c!.J ,, ... •-~ 50 aa, ,-Isl--' i ~ i I 1C>J I L__ __j 1:2'-l"C::.~. ~DULT LE ftRNING / FlEADING I cb----4-S I 31 RJ F3==-'= LOBBY :2;2'-4" c:;.LG,, PORCH , • 12'-'' GL~-~ 1i~ HALL 1.2'-I' C.LG. I ---------r --------------------------,,, ' t3' ~ llZl:0:J,---------t~-~ ~--------------------- 4' SEWER P.OC TOTAL D.F.U = 31 IE. t!J-e' BELOW FF. ____ 2'8_ FLEX / 2 RJ CHILDREN'S LEARNING 12'-I" C-LG. COMMUNITY SERVICES OFFICE 12'-I" C-LIS. '' '' '' '' '' '' -----------7 ' ' ' ' SUPPLES S-NR-A-GE--" ,---,-' ll2IEJ I l _______ j 12'-I" C-LIS. □ -----------7 1.2'-I" C.L6. I ' ' ' ___________ _J PROPERTY MANAGEMENT OFFICE V'lVUTR ROOM 12'-I" CL(;:>. 1----------------1-------------- COMMUNITY ROOM 1 1:2'-I" C-LG. COMMUNITY ROOM 2 1.2'-I" C-LG. WASTE & VENT PIPING BLDG. 1 FDmJ1E WC LAV Lfl R..00R DRAIN KS DF BLDG. 1 FDmJ1E WC LAV ' ' ' ' ' ' Lfl KS DF tfj ----11--17---rr--Tr--,, ----++--~~---~~--+~--++ ----,,--,,---,,--,,--,, ----++--~~---~~--+~--++ ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' Tf1il:LL S 1d-b" cu~. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ----11--17---rr--Tr--11 ----++--~~---~~--+~--++ ----,,--,,---,,--,,--,, ----++--~~---~~--~~--++ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I BUILDING DRAIN DRAINAGE FIXTlRE UNrfS PER STI.B D.Fll TOTAL 5 4 20 2 1 2 1 2 2 2 2 4 1 2 2 2 05 1 D.Fll TOTALS■ 31 WATER SERVICE WAlER SUPRY FIXTlRE UNrfS PER STI.B WSF.U. TOTAL 6 6 25 2 1 2 1 5 5 1 15 15 2 05 1 2 25>1 as WSF.U. TOTALS,. 311() ;):1-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------~----------~-----I w ---' ~ BUILDING 1 FLOOR PLAN SCALE: 1/4"=1'-0" 1 -t)I) C ...... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FDR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING BUILDING 1 P1.0 JOB NUMBER: UNIT 1A 1 P6.0 UNIT 1AR 1 P6.0 UNIT 3B 3 P6.0 UNIT 3BR 3 P6.0 UNIT 1AR 1 P6.0 LAUNDRY 4 P6.0 UNIT 3BR 3 P6.0 UNIT 3B 3 P6.0 UNIT 1B 1 P6.0 UNIT 1BR 1 P6.0 UNIT 3D 3 P6.0 UNIT 3DR 3 P6.0 UNIT 1BR 1 P6.0 UNIT 3CR 3 P6.0 UNIT 3C 3 P6.0 UNIT 1B 1 P6.0 ~ -z => ' CL w L r----, ' ' ' ' I I L ____ _J r----, ' ' ' ' I I L----.J r----, ' ' ' ' I I □ L ____ _J □ r----, i i ' ' L----.J [J[J [J[J r, r, ,.,~ ;:=======;i'" :::::::::::::::'J [J r, r, L.JL.J ' ' [J r, r, L.J L.J r----, ' ' i i L ____ .J r----, ' ' ' ' ' ' ' ' L ____ .J [J[J [J[J r, r, '"r;=======:;i'" [J r, r, L.J L.J [J r, r, L.JL.J SECOND FLOOR PLAN RJ I CcJ· t 6" SEWER P.0.C. TOTAL D.F.U = 320 IE "4'--0" BELOW F,F, I I T~RJ I I l' · '"i r --1 :-.. : H""'::-1·' ' ' ' ' ' ' ' ' ' -' ' --------,- • C~J ! ! ' ' L ____ J " ' ~--! i L'==',E==l====E===f~~".ft----· a •~=c========c====J L _________________________ J I : f----: I I 1 1 I I I I I : : 1~-1, : I '' ::~==~:: '' b ------c-,,---Q r----, ' ' i i L ____ _J r----, ' ' ' ' ' ' ' ' L ____ _J ,----7 i i L----.J [J[J [J[J r, ~ '"r;=======:;i"'" [J r, r, L.J L.J _d L'::::::::::::::: '' [J r, r, L.JL.J LAUNDRY ROOM 9'-1" ~LG. r----, ' ' ' ' I : L ____ .J r----, □ i ! ' ' L----.J [1] 2• GAS MEIER: 850 CFH, TDL = 70' PIPE SIZE PER CPC TABLE 1215.2(1) [ 1 OJ DRYERS AT 35 CFH [1] WH AT 500 CFH EACH RE SPRINKLER DRAIN EE DETAIL ON SHEET 0.1 2-1/2" S.O.V. W/H.B. AND PRV ON RISE WATER 8ERVCE P.0.C 2-112' 8ERVCE LATERAL WSFU = 361 FU (-il6 GPM) BUILDING 2 FIXTURE I QTY. D.F.U. TOTAL W.S.F.U. TOTAL WC r 35 3 105 2.5 87.5 L~ 35 1 35 1 35 23 0 46 4 92 T~ £ KS ' 23 0 46 3 69 " SH 12 0 24 2 24 " WM 10 6-60 4 40 FD 1 2 2 LT 1 2 2 1.5 1.5 320 351.5 N01ES; t REFER TO SHEET P-00 FOR GENERI\L NOTES, MATEAIAL6, Afl[) FIXT\ff RECllffMENTS. 2 REFER TO ARCHTECILRAL DRAWINGS FOR LOCAIDNS OF ACCESSBL£ UNTS AND MAKE NECESSARY Pl.BG AD..UITMENTS. 3. CLEANOUTS SHALL BE INSTALL£D PER UP.C. 7fTTD & 719.a 4 a..EANOUTS ARE REOJRED ON ALL HORZONTAL WASTE UNES OVER fi-{1' FROM lHE MAIN Uf'E AND ON HORZONTAL St,IK AND URINALS 5. EACH Pl.BG VENT SHALL TERMNATE NOT L£SS THAN 10 FEET OR AT L£AST 3 FT i'&J,/E N-N OPENNGS NTO BULDING, FRESH AR INTAKE OR VENT SHAFrS. 6. ALL Pf'ING PEl'ETRATING lHRU STUDS REOURE PROTECTION FROM DAMAGE USING 1t16" STEB. PLATE 7. BULDING ORAN AND VENT Pf'ING MATERALS SHALL COf.f'L Y WITH SECTIONS 70to AND 903.0 OF lHE CALFORNIA PLUMBING CODE. SCALE: 3/16"=1 '-0" 2 ;):1-------------------------------------------------------------------------------------------------------------------------------------------------------------------------~---------~-----I w -' -~ FIRST FLOOR PLAN SCALE: 1/8"=1'-0" 1 -t)I) C ...... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FDR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING BUILDING 2 1ST & 2ND FLOOR PLANS P2.0 JOB NUMBER: UNIT 1A 1 P6.0 UNIT 1A 1 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 1A 1 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 1A 1 P6.0 '" ' m ' rn ~ -z => ' CL w L I UNIT 1BR I □ □ I UNIT 1B1 r7r, r,r, L.JL.J L.JL.J ~ r, c.•,; ======::;"lu ::::::::::::::C:J [J r, r, uLJ [] luNIT 3□R I □ " □ luN1T 3□1 r-----, ' [J[J [J[J [J [J ,;=======;1 -----------,------r lrnll I ' ' ' ' ' _____ J -----, ' ' ' ' ' -. ' ' ' ' ' ' ' ' L ____ _ ,----- ' ' ' ' ' ' ' ' ' ' ' r-----, ' ' L_ ____ J r-----, ' . ' ' ' . L_ ____ J L.,,,_CCJ: •••• :: irQ:;1'==!;:J.Jii~~~L~~I [J r, r• L_J LJ [J r, r, L_JLJ !UNIT 3CI □ " , :x ' ' □ !UNIT 3CR I [][] [J[J I I '',;======:::;i'' UN IT 1 B [J [J[J Ir------- [J r, r, LJ LJ r------, ' ' L_ ____ J I UNIT 1BR I □ □ BUILDING 2 FIXTURE I QTY. D.F.U. TOTAL W.S.F.U. TOTAL WC l -35 3 105 2.5 87.5 LAV 35 1 35 1 35 TIJ~ _ _f 23 2 46 4 92 KS 23 2 46 3 69 SH 12 2 24 2 24 256 307.5 I N01ES; t REFER TO SHEET P-0.0 FOR GENERI\L NOTES, MATEAIAL6, All[) FIXT\ff RECllffMENTS. 2 REFER TO ARCHTECILRAL DRAWINGS FOR LOCAIDNS OF ACCESSBL£ UNTS AND MAKE NECESSARY Pl.BG AD..UITMENTS. 3. CLEANOUTS SHALL BE INSTALL£D PER UP.C. 7fTTD & 719.a 4 a..EANOUTS ARE REOJRED ON ALL HORZONTAL WASTE UNES OVER fi-{1' FROM lHE MAIN Ul'E AND ON HORZONTAL St-lK AND URINALS 5. EACH Pl.BG VENT SHALL TEAMNATE NOT L£SS THAN 10 FEET OR AT L£AST 3 FT i'&J,/E N-N OPENNGS NTO BULDING, FRESH AR INTAKE OR VENT SHAFrS. 6. ALL Pf'ING PEl'ETRATING lHRU STUDS REOURE PROTECmN FROM DAMAGE USING 1/'16' STEB. PLATE 7. BULDING ORAN AND VENT Pf'ING MATERALS SHALL COf.f'L Y WITH SECTIONS 70to AND 903.0 OF lHE CAI..FORNIA PLUMBING CODE. ;):1--------------------------------------------------------------------------------------------------------------------------------------------------------------~~--------~-----I w ---' -~ THIRD FLOOR PLAN SCALE: 1/8"=1'-0" 1 -t)I) C ...... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FDR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING BUILDING 2 3RD FLOOR PLAN P2.1 JOB NUMBER: UNIT 1BR 1 P6.0 UNIT 3D 4 P3.0 UNIT 3DR 3 P6.0 UNIT 1B 1 P6.0 UNIT 1BR 1 P6.0 UNIT 3D 3 P6.0 UNIT 3DR 3 P6.0 UNIT 1B 1 P6.0 UNIT 1AR 1 P6.0 UNIT 3B 3 P6.0 UNIT 3BR 3 P6.0 UNIT 1A 1 P6.0 ~ -z => ' CL w L I ' 2"S DN. 1-1 2"V I r----, ' ' ' ' ' ' ' ' L ____ .J 1/2" (2.5 ~ -::-:,1 ""' r7r7 r7r7 L.J L.J L.J L.J r7 r7 '"re==--"==-~'" L'::======= ~ MANAGER'S UNIT [J""==--r==-=[J r,r, r,r, L.J L.J L.J L.J THIRD FLOOR PLAN ,1,1t--3/4"CW(4 FU) 3/4"HW(4 FU) r ,----7 I I I I I I I I 0 FU) .-,,;,. ~ .-.. -,,,,.:-· I r----7 ' ' ' ' l ____ J r----, ' ' ' ' ' ' ' ' L----.J (4 FU) (4 FU) KB-1 • ilGGI ~-------f __________ _ ---------------- ~~ SCALE: 3/16"= 1 '-0" 3 []] J/4" GAS METER: 120 CFH, TDL • 50' PIPE SIZE PER CPC TABLE 1215.2(1) [1] WH AT 120 CFH EACH :r WIH VENT TO ROOF WA TEA SER\,1CE P.0.C 2' SERVcr LATERAL WSFU = li55 Fil Hill GPM) D • • ,#,t-::1/4'G 120CFH • 2"S UP D r----, I I ' ' ' ' L ____ .J r----, ' ' ' ' ' ' ' ' L ____ .J r----, ' ' ' ' ' ' ' ' L ____ .J r----, ' ' ' ' I : L----.J [J [] [J [] [Jt-.======:::;i[J _____ ) 0 0 µ..SiJeL-"'~·=··=·-1==· §:= L ____ J t::: 0 0 --, [] [] [] SECOND FLOOR PLAN ,-----,,----------- ' t:JGJI . . r----, ' ' ' ' ' ' L ____ J r----, ' ' ' ' ' ' ' ' L----.J r----7 t 4' SEWER P.0.C. TOTAL D.FU = 135 IE. '8-e' BELOW F.F. t= : : I ' ' ' ' j '-----,01 I I 4'8:---"f, ru I r----7 ' ' ' ' l ____ J I I I I I I I I ~4'8 I BUILDING 3 FIXTURE ~ QTY. D.F.U. TDTAL W.S.F.U. TOTAL WC 18 3 54 2.5 45 LA\1_[ 18 1 18 1 18 TUB I 12 2 24 4 48 KS • 12 2 24 3 36 -~12 SH 6 2 2 12 WM 1 3 3 4 4 135 163 N01ES; t REFER TO SHEET P-0.0 FOR GENERI\L NOTES, MATEAIAL6, Afl[) FIXT\ff RECllffMENTS. 2 REFER TO ARCHTECILRAL DRAWINGS FOR LOCAIDNS OF ACCESSBL£ UNTS AND MAKE NECESSARY Pl.BG AD..UITMENTS. 3. CLEANOUTS SHALL BE INSTALLED PER UP.C. 7fTTD & 719.a 4 a..EANOUTS ARE REOJRED ON ALL HORZONTAL WASTE UNES OVER fi-{1' FROM lHE MAIN Ul'E AND ON HORZONTAL St,IK AND URINALS 5. EACH Pl.BG VENT SHALL TERMNATE NOT L£SS lHAN 10 FEET OR AT L£AST 3 FT i'&J,/E N-N OPENNGS NTO BULDING, FRESH AR INTAKE OR VENT SHAFrS. 6. ALL Pf'ING PEl'ETRATING lHRU snos REOURE PROTECTION FROM DAMAGE USING 1/16' STEB. PLATE 7. BULDING DRAIN AND VENT Pf'ING MATERALS SHALL COf.f'L Y WITH SECTIONS 70to AND 903.0 OF lHE CAI..FORNIA PLUMBING CODE. SCALE: 3/16"=1 '-0" 2 ;):1--------------------------------------------------------------------~--------~----+--------------------------------------------------------------------~--------~----I w ---' -~ UNIT 3D MANAGER UNIT SCALE: 1/4"=1'-0" 4 FIRST FLOOR PLAN SCALE: 1/8"=1'-0" 1 -t)I) C ...... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FDR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING BUILDING 3 FLOOR PLANS P3.0 JOB NUMBER: UNIT 1AR 1 P6.0 UNIT 3B 3 P6.0 UNIT 3BR 3 P6.0 UNIT 1A 1 P6.0 UNIT 1BR 1 P6.0 UNIT 3D 4 P3.0 UNIT 3DR 3 P6.0 UNIT 1B 1 P6.0 UNIT 1BR 1 P6.0 UNIT 3D 3 P6.0 UNIT 3DR 3 P6.0 UNIT 1B 1 P6.0 f--z => ' CL w L r----, ' ' ' ' ' ' ' ' L ____ .J r7r7 r7r7 L.J L.J L.J L.J r7 r7 '"c=========;i'" ~ LJ"=====c====cJ r,r, r,r, L.J L.J L.J L.J THIRD FLOOR PLAN ,----7 ' ' ' ' L ____ J r----, ' ' ' ' ' ' ' ' L----.J SCALE: 3/16"= 1 '----0" 3 [1] 3/4" GAS ~ETER: 120 CFH, lDL = 50' PIPE SIZE PER CPC TABLE 1215.2(1) [1] WH AT 120 CFH EACH CP EXP 1 FIRE SPRINKLER DRAI SEE DETAIL ON P0.1 a' WIH VENT lOROOF WATER EEFMOE P.0.0 2' SEFMJE LATERAL WSFJJ = 1lt5 FU (--57 GPM) D • • ,#c0-::114'G 120CFH • • 1 1 " I I, ii • i! I I 2· s.o.v. W/H.B. I AND PRV ON RISE I D ti2Wi----tf" I I .. ,1 I 4' SEWER PO.C. l TOTAL DF.U. = tl2 ,P-- LE. '3-6' BB.OW FF. r----, : : ' ' ' ' L ____ .J r----, ' ' : : ' ' L ____ .J r----, ' ' ' ' : : L ____ .J r----, ' ' ' ' ' ' ' ' L ____ .J ~ L ____ J r7 r, L.J L.J LJi-;:::======;iu 0 0 _;;...a.;_i;:: 0 0 C §:= t::: Ir------- ' --, SECOND FLOOR PLAN 5-_cc,-_·ccc -------a : : ,~~, : : i i lc------11 .· I I 1 I · I 1 r-------------------------7 1 I ,~~, ' , I I ,, "-~I ,, , , , , 1'f-----ll 1c='""'==1=====;i ~ ' " ,X_i ·_;;""_;;f-"' ---:;;.= L ____ J L _________________________ J ' I I I I ---------------- f---'----f r~-.,,~ ~~-'---1 '' ,~~, '' I I I I ', lc------11 , ' ii lc--CI ·•I I I 11 '' :~==~: '' tt __ c ___ ~ ------_-Q] r----7 ' ' ' ' ' ' L ____ J r----, ' ' ' ' ' ' ' ' L----.J r----, ' ' ' ' ' ' ' ' L----.J □ r----7 ' ' ' ' ' ' L ____ J BUILDING 6 FIXTURE I QTY. D.F.U. TOTAL W.S.F.U. TOTAL WC C 18 3 54 2.5 45 LAV i 18 1 18 1 18 TIJ~ _ _f 12 2 24 4 48 KS 12 2 24 3 36 SH 6 2 12 2 12 132 159 I N01ES; t REFER TO SHEET P-00 FOR GENERI\L NOTES, MATEAIAL6, Afl[) FIXT\ff RECllffMENTS 2 REFER TO ARCHTECILRAL DRAWINGS FOR LOCAIDNS OF ACCESSBL£ UNTS AND MAKE NECESSARY Pl.BG AD.UITMENTS, 3. CLEANOUTS SHALL BE INSTALL£D PER UP.C. 7fTTD & 719.a 4 a..EANOUTS ARE REOJRED ON ALL HORZONTAL WASTE UNES OVER fi-{1' FROM lHE MAIN Ul'E AND ON HORZONTAL St,IK AND URINALS 5. EACH Pl.BG VENT SHALL TEAMNATE NOT LESS THAN 10 FEET OR AT L£AST 3 FT i'&J,/E N-N OPENNGS NTO BULDING, FRESH AR INTAKE OR VENT SHAFrS. 6. ALL Pf'ING PEl'ETRATING lHRU STUDS REOURE PROTECTION FROM DAMAGE USING V'l6" STEB. PLATE 7. BULDING ORAN AND VENT Pf'ING MATERALS SHALL COf.f'L Y WITH SECTIONS 70to AND 903.0 OF lHE CAI..FORNIA PLUMBING CODE. SCALE: 3/16"=1 '-0" 2 ;):1---------------------------------------------------------------------------------------+-----------------------------------------------------------------------~~--------~-----I w ---' -~ FIRST FLOOR PLAN SCALE: 1/8"=1'-0" 1 -t)I) C ...... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FDR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING BUILDING 6 FLOOR PLANS P3.1 JOB NUMBER: D.W.D.W.REF.REF.PAN.PAN.PAN.PAN.D.W.D.W.REF.REF.PAN.PAN.D.W.D.W.REF.REF.OPEN TOBELOWOPEN TOBELOWOPEN TOBELOWOPEN TOBELOWSTORAGE STORAGESTORAGE STORAGESTORAGESTORAGEACACACACACACDN16 RDN16 RDN16 RDN16 RREF.D.W.PAN.LINENPAN.LINENREF.D.W.ACACUNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 ~ -z => ' CL w L r----, ' ' ' ' L ____ J r----, ' ' ' ' ' ' L ____ J r----, ' ' ' ' ' ' ' ' L ____ .J J COTG J r----, ' ' I I ' ' L ____ .J r7r7 r7r7 uu uu r7 r, ··~~==ii'' 0 0 [J r, r, L.J L.J r----, r----, ' ' ' ' ' ' ' ' ' ' L ____ J L ____ J L ____ J r----, r----, ' ' ' ' ' ' ' ' ' ' ' ' L ____ J L ____ J SECOND FLOOR PLAN I +-rRJ I RJ I I L _________________________ J ! ! ~"==t L'=c;i l===========c'J I I I 1 ' , 11----,11 " : ' 11----,11 " m;JI._ -----".::.c·cc_·c·_g r----, ' ' ' ' ' ' ' ' L ____ _J r----, ' ' I I ' ' L ____ .J D D t 4' SEWER P.O.C. TOTAL D.FU = 200 IE. "4'--0" BELOW FF, I I I 9-' I I I I .. jl I I '-I-' I r----, ' ' ' ' ' ' ' ' L ____ _J 4"S r7r7 r,r, uu uu ~ r, ''ii=~~=ir·· 2'S BRJ . . . . ------------, I I I rt I I I 4 [J r, r, L.J L.J --, ' i 2 2 : :.. 1 I I I " ili'=:,::=:iJi-I ' L _________________________ J I I I I " . llf-----ill I I I I · llf----,JI ' : [itl-c---c.-c· ------llJI r----, ' ' i i L ____ .J r----, ' ' I I ' ' L ____ .J r----, ' ' I : ' ' L----.J ,:;J BUILDING 4 FIXTURE QTY. D.F.U. TOTAL W.S.F.U. TOTAL WC 28 3 84 2.5 70 LAV 28 1 28 1 28 TUB 16 2 32 4 64 KS 16 2 32 3 48 SH 12 2 24 2 24 200 234 I N01ES; t REFER TO SHEET P-00 FOR GENERI\L NOTES, MATEAIAL6, Afl[) FIXT\ff RECllffMENTS. 2 REFER TO ARCHTECILRAL DRAWINGS FOR LOCAIDNS OF ACCESSBL£ UNTS AND MAKE NECESSARY Pl.BG AD..UITMENTS. 3. CLEANOUTS SHALL BE INSTALL£D PER UP.C. 7fTTD & 719.a 4 a..EANOUTS ARE REOJRED ON ALL HORZONTAL WASTE UNES OVER fi-{1' FROM lHE MAIN Ul'E AND ON HORZONTAL St,IK AND URINALS 5. EACH Pl.BG VENT SHALL TEAMNATE NOT L£SS THAN 10 FEET OR AT L£AST 3 FT i'&J,/E N-N OPENNGS NTO BULDING, FRESH AR INTAKE OR VENT SHAFrS. 6. ALL Pf'ING PEl'ETRATING lHRU STUDS REOURE PROTECmN FROM DAMAGE USING 1/16' STEB. PLATE 7. BULDING ORAN AND VENT Pf'ING MATERALS SHALL COf.f'L Y WITH SECTIONS 70to AND 903.0 OF lHE CAI..FORNIA PLUMBING CODE. SCALE: 3/16"=1 '-0" 2 □ r2-1/2" S.O.V. W/H.B. AND PRV ON i ~W-~_I_ER_SERVIC--E-R-,00--~ • -• 2-1fl' SERVICE LATERAL. -I ® WSflJ. = 236.5 FU (-72 GPMl ~~ffi FIRE SPRINKLER DRAIN "1'111-~_._JsEE DETAIL ON P0.1 [1] GAS MITTR: 300 CFH, TDL = 25' • PIPE SIZE PER CPC TABLE 1215.2(1) ol • 1. [1] WH AT 150 CFH EACH [J] BBQ AT 50 CFH EACH ~V4'GPE. Bl CFH, TDL = Bl FT, TO 8BQ'S AT BlOO 1 SEE 9-EET PUl FOR CONT. Pl'E TO BE Bl.RED IE 'e' BELOW <IWEW/TRACJ'G\\fE ;):1--------------------------------------------------------------------------------------------------------------------------------------------------------------~~--------~-----I w ---' -~ FIRST FLOOR PLAN SCALE: 1/8"=1'-0" 1 -t)I) C ...... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FDR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING BUILDING 4 FLOOR PLANS P4.0 JOB NUMBER: UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 ~ -z => ' CL w L r----7 ' ' ' ' ' ' ' ' L ____ _J r----, ' ' ' ' ' ' ' ' L----.J ~ ff SEWER P.O.C. TOTAL DF.U = 264 1£ "4'-6' BELOW FF. r7r-r7r7 LJU UU [Jr-;=======:;i[J [J r, r-u L_ [J r7 r7 L_JLJ ~~·~·q : I : : : I" · I: I I • I I r----, ' ' ' ' ~ ' ' ' ' L----.J r----, ' ' : : L ____ J SECOND FLOOR PLAN r------------------------, I I . . I I r;==c='lcE====q!,=i======'"'I ==''='=;-i--j----------7 ,-r;='"'===1=====t=cE====>====;-i a ' I [1] 3[4' GAS METER: 200 CFH, TDl = 25' PIPE SIZE PER CPC TABLE 1215.2(1) r----, ' ' ' ' I I L ____ _J [1] WH AT 200 CFH,~""----,~,--: I. 3/4'1l FIRE SPRINKLER DRAIN--.. 200 CFH SEE DETAIL ON PO 1 ___ 4'6 __ ~ :J' WIH VENT- TO ROOF WATER SERVICE P,OC 2-V2' SERVICE LAIBW. WSFU = 3205 FU Hl8 GPM) □ 2-112· s.o.vf!!J W/H.B. AND PRV ON 4'8 'f I I I 1--- 6'S 264RJ f--11 : : r-"""71 : : I l:;c;c:;;;;;j' ' ,~ ' ' ---1. ! ' ' _______ · L ____ · L_ -2'1... .....c: ~ r----, ' ' ' ' L ____ J r----, ' ' ' ' ' ' ' ' DD DD r----, ' ' ' ' ' ' ' ' L----.J r----, ' ' ' ' ' ' L ____ J r----, ' ' i i L----~ ~ ~ r-----, ' ' L_ ____ J r-----, ' r7r7 r,r, L_JLJ uu [Jr-;=======:;i"[J :m L_ ____ J .. ===;===--1 ... L.J L.J [J[J [J[J -L ...... --- I 12~_____.., I I I 3 -&- RJ -,------,-------,-: : -------1 ' ' 1 : /=_~ __ 9.,-1 : ·,. : I ' ' ·: [If---, ~ ~ i : If---, ========~-> C ···-+L=;c;=r=====~= ! ! ! ! L _________________________ J I 1 1 I I I I I I 1 1 I b ...... ~.=111==t:D r----, : : ' ' ' ' L ____ .J r----, ! i ' ' L----.J SJil □ □ BUILDING 5 FIXTURE QTY. D.F.U. TOTAL W.S.F.U. TOTAL WC 36 3 108 2.5 90 LAV 36 1 36 1 36 TUB 24 2 48 4 96 KS 24 2 48 3 72 SH 12 2 24 2 24 264 318 I N01ES; t REFER TO SHEET P-00 FOR GENERI\L NOTES, MATEAIAL6, All[) FIXT\ff RECllffMENTS. 2 REFER TO ARCHTECILRAL DRAWINGS FOR LOCAIDNS OF ACCESSBL£ UNTS AND MAKE NECESSARY Pl.BG AD..UITMENTS. 3. CLEANOUTS SHALL BE INSTALL£D PER UP.C. 7fTTD & 719.a 4 a..EANOUTS ARE REOJRED ON ALL HORZONTAL WASTE UNES OVER fi-{1' FROM lHE MAIN Ul'E AND ON HORZONTAL St,IK AND URINALS 5. EACH Pl.BG VENT SHALL TEAMNATE NOT L£SS THAN 10 FEET OR AT L£AST 3 FT i'&J,/E N-N OPENNGS NTO BULDING, FRESH AR INTAKE OR VENT SHAFrS. 6. ALL Pf'ING PEl'ETRATING lHRU STUDS REOURE PROTECmN FROM DAMAGE USING 1/16' STEB. PLATE 7. BULDING ORAN AND VENT Pf'ING MATERALS SHALL COf.f'L Y WITH SECTIONS 70to AND 903.0 OF lHE CAI..FORNIA PLUMBING CODE. SCALE: 3/16"=1 '-0" 2 ;):1-------------------------------------------------------------------------------------------------------------------------------------------------------------------------~---------~-----I w ---' -~ FIRST FLOOR PLAN SCALE: 1/8"=1'-0" 1 -t)I) C ..... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FDR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING BUILDING 5 1ST & 2ND FLOOR PLANS P5.0 JOB NUMBER: UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 3A 3 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 UNIT 2A 2 P6.0 ~ -z => ' CL w L r----, ' ' ' ' ' ' L ____ J (8 ( f l1WR Cl18F 2-WOII~ t!28 F 2-W 11W }V4" rHW 3/11' H'>\fl ~ ~ r7r-r,r, L.J L.J L.J L.J r, r, "'r-;:=======;i"" . ' ._._, "' rnLJ ------------- [J r, r· LJ L. [J r7 r7 L_JL_J r----, ' ' ' ' ~ ' ' L ____ J ~ r----, r----, ' ' ' ' I I ' ' ' ' L ____ J L ____ J l_ ____ J r,r, r,r, L.J L.J L.J L.J r, r, "'r-;:=======;i"' ' ,_ rF-----' le ~aj L [CJ['] ---__ ... ------- [CJ • j -------... __ --- ,.L====;::===--1.,. L_J L_J r7r, r,r7 UU ULJ r----, ' ' ~ I I L ____ J r----, ' ' ' ' I I L ____ .J BUILDING 5 FIXTURE QTY. D.F.U. TOTAL W.S.F.U. TOTAL WC 36 3 108 2.5 90 LAV 36 1 36 1 36 TUB 24 2 48 4 96 KS 24 2 48 3 72 SH 12 2 24 2 24 264 318 I N01ES; t REFER TO SHEET P-00 FOR GENERI\L NOTES, MATEAIAL6, All[) FIXT\ff RECllffMENTS. 2 REFER TO ARCHTECILRAL DRAWINGS FOR LOCAIDNS OF ACCESSBL£ UNTS AND MAKE NECESSARY Pl.BG AD..UITMENTS. 3. CLEANOUTS SHALL BE INSTALL£D PER UP.C. 7fTTD & 719.a 4 a..EANOUTS ARE REOJRED ON ALL HORZONTAL WASTE UNES OVER fi-{1' FROM lHE MAIN Ul'E AND ON HORZONTAL St,IK AND URINALS 5. EACH Pl.BG VENT SHALL TEAMNATE NOT L£SS THAN 10 FEET OR AT L£AST 3 FT i'&J,/E N-N OPENNGS NTO BULDING, FRESH AR INTAKE OR VENT SHAFrS. 6. ALL Pf'ING PEl'ETRATING lHRU STUDS REOURE PROTECmN FROM DAMAGE USING 1/16' STEB. PLATE 7. BULDING ORAN AND VENT Pf'ING MATERALS SHALL COf.f'L Y WITH SECTIONS 70to AND 903.0 OF lHE CAI..FORNIA PLUMBING CODE. ;):1--------------------------------------------------------------------------------------------------------------------------------------------------------------~~--------~-----I w ---' -~ THIRD FLOOR PLAN SCALE: 1/8"=1'-0" 1 -t)I) C ..... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FDR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING BUILDING 5 3RD FLOOR PLAN P5.1 JOB NUMBER: '" ' ~ ' ~ w e- ~ R e- D J ~ e--z => ' ~ ' rn '1/ -. 1, ,n .. _._. · !2. FU) ~ ~ ,----7 I I I I I I I I L ____ _J ~ F·..-i•=:='"'""t· ... f-'"''.'".'"'."".'"".'"''-f"::' r:: ··:::I.. -----7·:.l! r:::-::-::::-::::::-::::-:r:::-'. ::t , lll-f I L ____ _J I··-· 1 da¾t-t-1/2"CW(3 FU) : 1 /2"HW(3 FU) KS-1 7-------r ---------------- UNIT 3B-3E ARE SIMILAR UNIT 3A FLOOR PLAN SCALE: 1/4"=1 '-0" 3 ,-----7 I I I I I I I I ' i I ~~-----~ I , ~='="==E===:3:::===::1 I -------------+-i I I I -------------7 I ' 1· -------------~ I ! I -------------1 : . . : ------· ------7 I ~-------------7 I ' ' I ~-------------~ I ' ' -------------+-~ --------------";-~ l----~-~-L ______ L II LAUNDRY ROOM 9•.1• CLG. I :.:-~EBf ~~,tEACH~_l ••.• -----·I I I /:/:i L ____ _J (10 qo ' " ' " ' " ' " [1] 2" GAS METER; J 850 CFH, TDL -70' PIPE SIZE PER CPC TABLE 1215.2(1) [10) DRYERS AT 35 CFH [1] WH AT 500 CFH EACH LJ " '-, II ' " ',~ II , ffl"tr2"G -- (1.5 FU) 1/2"CW -t--1jcj,I ( 1.5 FU) 1/2"HW ···(])· ., ,.,. "" ., '., ....... ,;,-'., ., ,.,. "., '., ., .,. . ., ., ., , .... ,. "'"' 850 CFH [X . I ..,., r~-112· s.o.v. W/H.B. AND PRV ON RISE 2 ........................ _._. ... _. r·-=·=·=..:..:.:7 :r~r~-~--~-~-~-~--~---1:~~~::1 I I ld.lti-t1/2"CW(3 'Ftlj---J 1/2"HW(3 FU) I 1 : ·,O J KS-1 IGJG:Jli -----------1-------~ ---------------- .... ·1: .. 'If. ' 'I ::,: :: :t: " 1"CW (10.5 FU) 3/4"HW(B FU) ,----7 I I I I I I I I L ____ _J UNIT 2A FLOOR PLAN ~==,;--;::::E:::::::::::::::::i=::E:::::::::::::::i=; ,-1c--=i r----7 I I I I I I I I L ____ _J " -------...,----------7 1 ..... . 1--·· k;s: I:::::· I ... 1--·· I:-::··· I::. UNIT 2B IS SIMILAR SCALE: 1/4"=1 '-0" 2 w OCCURS AT BLDG. 2 "1--------------------------------------------------r--------.-----l-------------------------------------------------r--------,r------i z UNIT 1 B IS SIMILAR w J -~ LAUNDRY ROOM SCALE: 1/4"=1 '-0" 4 UNIT 1 A FLOOR PLAN SCALE: 1/4"=1 '-0" 1 DRAINAGE FIXTURE UNIT UNIT W2A AXTURE QUANT. D.Fll TOTAL PER UNIT D.F.U. WC 1 3 3 LAV 1 1 1 TUB 1 2 2 KS 1 2 2 TOTAL 8 WATER SERVICE FIXTURE UNIT UNIT W2A AXTURE QUANT. COLD F.U. TOTAL HOT F.U. TOTAL PER UNIT COLD F.U. PER UNIT HOT F.U. WC 1 25 25 -- LAV 1 1 1 1 1 TUB 1 4 4 4 4 KS 1 3 3 3 3 TOTAL 10.5 8 DRAINAGE FIXTURE UNIT UNT:lA AXTURE QUANT. D.F.U TOTAL PER UNIT D.F.IJ. WC 2 3 6 LAV 2 1 2 TUB 1 2 2 SH 1 2 2 KS 1 2 2 TOTAL 14 WATER SERVICE FIXTURE UNIT UNT:JA AXTURE QUANT. COLD F.U. TOTAL HOT F.U. TOTAL PER UNIT COLD F!J. PER UNIT HOT F.U. WC 2 25 5 -- LAV 2 1 2 1 2 TUB 1 4 4 4 4 SH 1 2 2 2 2 KS 1 3 3 3 3 TOTAL 16 11 DRAINAGE FIXTURE UNIT UNIT 3D (MGR) AXTURE QUANT. D.F.U TOTAL PER UNIT D,F.U, WC 2 3 6 WM 1 3 3 LAV 2 1 2 TUB 1 2 2 SH 1 2 2 KS 1 2 2 TOTAL 17 WATER SERVICE FIXTURE UNIT UNIT 3D (MGR) AXTURE QUANT. COLD F.U. TOTAL HOT F.U. TOTAL PER UNIT COLD F.U, PER UNIT HOT Fil WC 2 25 5 -- LAV 2 1 2 1 2 TUB 1 4 4 4 4 WM 1 4 4 4 4 SH 1 2 2 2 2 KS 1 3 3 3 3 TOTAL 20 15 KEYNOTES: [D-PROVIDE W/COLD SHUT-OFF VALVE, WITH ACCESS PANEL (fil---PROVIDE 1/2" CW & HW DOWN IN WALL TO SERVE LAV AND KITCHEN. (B--PROVIDE 1/2" CW DOWN IN WALL TO WATER CLOSET. ffi--PROVIDE 1/2" CW & HW DOWN IN WALL TO SERVE TUB/SHOWER. @}--3/4" PRIMARY CONDENSATE DOWN TO SIOUX CHIEF OX BOX. PROVIDE W / ACCESS PANEL AND OVERFLOW SHUT-OFF IN LIEU OF SECONDARY DRAIN LINE -t)I) C ...... I > INNOVATIVE HOUSING OPPORTUNITIES 1 ST PLAN CHECK Date: 9/08/21 REVISIONS DRAWINGS ISSUED FDR BID PRIOR TO AGENCY APPROVAL MAY INCLUDE REVISIONS DUE TO ENGINEERING AND ARCHITECTURAL BACK CHECK AND / OR AGENCY REVIEW AND APPROVAL PACIFIC WIND CARLSBAD, CA. PLUMBING UNIT lA, 2A & 3A FLOOR PLANS P6.0 JOB NUMBER: