Loading...
HomeMy WebLinkAboutSDP 96-14C; LEGOLAND HOTEL CALIFORNIA; Supplemental Synchro Traffic Analysis; 2008-09-02... .. --... -------------.. .. .. ---------------- ~ CONSULTING RECEIVED SEP O 3 2001 CtTY OF CARUBAO PLANNING 01:PT September 2, 2008 JN 55-100414.001 Mr. Bob Johnson CITY OF CARLSBAD 1635 Faraday Avenue Carlsbad, CA 92008 Subject: Legoland Hotel Project-Supplemental Synchro Traffic Analysis-Near Term (2010) Dear Bob: As you requested, RBF has prepared an operational analysis utilizing the Synchro analysis software to provide supplemental traffic analysis for the proposed Legoland Hotel Project. This supplemental analysis analyzes the signalized intersections for near Term (2010) with and without project conditions. Signal coordination timing sheets were provided by City of Carlsbad staff for most of the study intersections, and input into the Synchro network. Where signal coordination data was not made available, intersections were allowed to run free, utilizing pedestrian times, minimum green times, yellow time and all red times similar to nearby intersections for which signal timing data was provided. The Near Term (2010) intersection operations were evaluated in Synchro using the 2000 HCM Operations methodology. Detailed HCM calculation worksheets are attached to this memorandum. Table 1 summarizes the results of the Near Term (2010) analysis without and with the proposed project. Based on the HCM analysis, most intersections are forecast to operate at acceptable levels of service without and with the addition of the proposed hotel with the exception of the following two study intersection: • Palomar Airport Road/1-5 Northbound Ramps (with project only); and • Palomar Airport Road/Paseo Del Norte (with and without project). Visual simulations are available with the Synchro software that will demonstrate the operations and can be used to discuss this issue further. In addition, queuing analysis is also available through Synchro if requested by City of Carlsbad staff. ... ------------------.. -------- -------- B.Johnson September 2, 2008 Page2 Table 1 JN: 55-100414 Near Term (2010) With and Without Project Peak Hour Intersection LOS -HCM 2010 Without Project 2010 With Project Change in Intersections A.M. P.M. A.M. P.M. Delay Delay LOS Delay LOS Delay LOS Delay LOS A.M. Cannon Rd. / I-5 SB Ramps 25.4 C 18.9 B 25.8 C 19.7 B 0.4 Cannon Rd./ I-5 NB Ramps 21.1 C 16.1 B 21.3 C 16.2 B 0.2 Cannon Rd. / Paseo Del Norte 51.8 D 19.8 B 54.8 D 20.1 C 3.0 Cannon Rd. / Car Country Dr. 21.9 C 18.4 B 22.5 C 18.5 B 0.6 Cannon Rd. / LEGOLAND Dr. 17.2 B 18.5 B 17.3 B 18.5 B 0.1 Palomar Airport Rd. / I-5 SB Ramps 16.5 B 11.7 B 16.7 B 11.8 B 0.2 Palomar Airport Rd. / I-5 NB Ramps 53.6 D 50.9 D 55.1 E 50.8 D 1.5 Palomar Airport Rd. / Paseo Del Norte 45.8 D 61.3 E 45.7 D 62.7 E -0.1 Palomar Airport Rd. / Armada Dr. 16.0 B 41.3 D 16.1 B 41.9 D 0.1 Palomar Airport Rd. / Hidden Valley Dr. 35.2 D 48.3 D 36.1 D 51.7 D 0.9 Notes: Deficient intersections shown in bold . To improve operations at the Palomar Airport Road/I-5 Northbound Ramps study intersection during the a.m. peak hour, the coordinated intersections of Palomar Airport Road/I-5 Northbound Ramps and Palomar Airport Road/Paseo Del Norte should be retimed to have a cycle length of 140 seconds with maximum splits re- optimized with basic signal timing parameters unchanged. Simple modifications to signal timing will result in acceptable operating conditions through the interchange, will reduce queues and improve flow along Palomar Airport Road for all the coordinated traffic signals. In the p.m. peak, signal timing changes may not be sufficient to mitigate the forecast deficient condition. RBF will meet with City staff to discuss possible signal timing modifications to address this condition. However, since the project does not result in a significant impact at this intersection, the project is responsible only for the cumulative impacts and will therefore assist City of Carlsbad in addressing this issue with Caltrans. We would appreciate the opportunity to discuss this issue with you. Please call me at (760) 603-6246 to discuss the findings of this analysis and to schedule a time to review the visual simulations. Sincerely, Dawn L. Wilson, P.E. Project Manager RBF Consulting Enclosure P.M. 0.8 0.1 0.3 0.1 0.0 0.1 -0.1 1.4 0.6 3.4 -----------------Near-Term (2010) No Project Conditions ------------.. -------- Legoland Hotel TIA Supplemental Analysis 1: Cannon Rd & 1-5 SB Off Splits and Phases: 8/15/2008 JW 1: Cannon Rd & 1-5 SB Off Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour Synchro 7 -Report Page 1 Legoland Hotel TIA Supplemental Analysis 1: Cannon Rd & 1-5 SB Off Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour HCM Avera e Control Dela 25.4 HCM Level of Service C ij I ~ Actuated C cle Len th s) 86.2 Sum of lost time s 8/15/2008 JW ·zatioji •ft-f •¥. % Synchro 7 -Report Page 2 Legoland Hotel TIA Supplemental Analysis 2: Cannon Rd & 1-5 NB On C cle Len th: 90 Natural C cle: 90 _ --· j:linated. Maximum vie Ratio: 0.84 lntersec!jpn Sig~aL · ·' l_ntersection Ca~!)'. y~ilization 60.9% Ar}alysis Peri_QdJ rriin)'15 ' ~ Splits and Phases: 8/15/2008 JW 2: Cannon Rd & 1-5 NB On -+-t Near-Term (2010) No Proj Conditions Timing Plan : AM Peak Hour ICU Level of Service B . ,, Synchro 7 -Report Page 3 Legoland Hotel TIA Supplemental Analysis 2: Cannon Rd & 1-5 NB On Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 -!t!tllf 1Q · ~~:~ i~:::.2t~&:1'1JJ2~~~?t o~r,:s1s:, ~1''.cf7li · .. g· RTOR Reduction (vph 0 0 0 0 3 85 0 0 415 0 0 0 l:.ane. Gro · '' O Turn T e Pro! Perm Perm custom Protect '\,;_, :f.·,. ~J~5·:-,:.,q--:,11P1<"~':"''~ · · :,4.·· t,~¾:J;t{;'F't,:;' },_~"' o>!. • . ~V;. , :_ ~*'": .~zy :>s_ .. :'"-('_~~-_;,t ·',--ri1/""-'~-$ -~ JG!: r"~~'-\~¥$-lti~::~"'~ /:$)\'I>, /f rt-'1 Permitted Phases 6 8 HCM Avera e Control Dela Analysis Period (min) c GJup,,, . · 8/15/2008 JW . ~ (s er. . . .. 15 0.06 0,11 A,,,~ m 21.0 Synchro 7 -Report Page 4 Legoland Hotel TIA Supplemental Analysis 3: Cannon Rd & Paseo Del Norte -+ Natural C cle: 90 g_Q[ltr ct Maximum v/c Ratio: 1.08 ln~s~ctjon Sign~ pelaY,: id Intersection Capacity Utilization 78.9% ~is ~r)~{fpfnf ts:~r +- Splits and Phases: 3: Cannon Rd & Paseo Del Norte 8/15/2008 JW Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour ICU Level of Service D Synchro 7 -Report Page 5 Legoland Hotel TIA Supplemental Analysis 3: Cannon Rd & Paseo Del Norte vement 8/15/2008 JW ,._ Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour Synchro 7 -Report Page 6 Legoland Hotel TIA Supplemental Analysis 4: Cannon Rd & Car Country Dr Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour +- C cle Len th: 90 'Ji/gth: 85.8~ w"~ N< . ~J~st; Natural Cycle: 80 ~ontrorf 12e: Actua!~d-~ _ Maximum v/c Ratio: 0.92 !nte@ Jgruil ~~l_§!y: 22:fil. Intersection Capacit Utilization 70.2% ~ysis ReriQQ!{bJi --+ Splits and Phases: 4: Cannon Rd & Car Country Dr 8/15/2008 JW ,.t~r~e~}i l-'~~l. ICU Level of Service C Synchro 7 -Report Page 7 Legoland Hotel TIA Supplemental Analysis 4: Cannon Rd & Car Country Dr Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour L . ,~ a:04 · 60:1t1ftco.9f ~ v/s Ratio Perm 0.01 p.85'~--: 0~27 . xo~i~~0:03, 41 .8 7.5 28.9 28.3 -.-,. ,.,,,,,.,,,l,00~'J bo, ;., Incremental Delay, d2 10.3 6.9~,·,pr,:m,·.,.,D"'".!-'47.9 0.1 0.7 0.2 P.ela}'.@ itJL\l!iti,1'J~4,{x< 54.Q ;~-23;~ '9, .,~is:.s Level of Service D C F A C C N>JJJQ.tcnJ?}TiY!(~I&• Approach LOS C B C ntersectibn Summa HCM Average Control Delay HCM i Actuated C cle Len th s f ~ Analysis Period min C Gfi!i9JII Hi]§, 8/15/2008 JW 21 .9 HCM Level of Service C Synchro 7 -Report Page 8 Legoland Hotel TIA Supplemental Analysis 5: Cannon Rd & LEGOLAND Dr Cycle Length: 90 ' 1;;~ Natural C cle: 60 . . ·9}!i~JJncpof9 i'n"ated,~~~ Maximum vie Ratio: 0.79 Intersection Capaci Utilization 52.4% t\rialysis Peri~,1 Splits and Phases: 8/15/2008 JW 5: Cannon Rd & LEGOLAND Dr Near-Term (2010). No Proj Conditions Timing Plan : AM Peak Hour · lnter_secti . ;· . , , = . ~ ICU Level of Service A Synchro 7 -Report Page 9 Legoland Hotel TIA Supplemental Analysis 5: Cannon Rd & LEGOLAND Dr -+ +- Lane Gr Ca v h 1441 1210 390 2059 1016 745 Near-Term (2010) No Proj Conditions Timing Plan : AM Peak Hour ~'co,.o ~o Q~ • v/s Ratio Perm 0.22 0.01 ~9 ~-:· • ~b~5EtJ,.;;;o.3oJ~f Uniform Delay, d1 21 .2 5.4 34.3 8.6 20.5 14.4 , =~~ ~ ·.oo ;1 ,;t o.9 t1:a Incremental Dela , d2 2.9 0.3 1.9 0.1 0.1 0.0 -;, : *:1 -~~~ Level of Service C A D A C B ~9.roa -.. ._ __ _,.,.., I' Approach LOS B B B HCM Average Control Delay . .. .. . 17.2 8~M VqlurneJQC~Qacity)atiq;l\'flt~~~lf~o:61,, HCM Level of Service Actuated C cle Len th s 81 .8 Sum of lost time (s ITi'iersec Iqn apacI · 11zation· · -52.4% . Analysis Period min "''"'""'' w,. 15 cfgriti_q~L ", ; . : ? ,: 8/15/2008 JW B Synchro 7 -Report Page 10 Legoland Hotel TIA Supplemental Analysis 7: Palomar Airport Rd & 1-5 SB Off -+ Lane Configurations ~ Vo1Um1t(Vfih)'~~~~0z; t\<r5o~*~li 7~~;%9334:'.~:33 >1,, •-" '""'" .t:;I<' .,:.:~r~,&'.f.C~,$.~'#: ~ Yi. '¾" # ~~-1..,, ,,,,,.,._,~-{.,i, ,h, .--"(;. , Turn T e custom custom r,;ff ~;'?¥! Permitted Phases ~ Switch Phase . ~-$5,0" . s: Minimum Split (s} 20.0 22.0 20.0 20.0 ·•. . ~,~{"'· · · 3"0'" ;litk~ ' ··-';,~ -} , ;1;;~•- 57.1% 57.1% 42.9% 42.9% rm··•··•,<·_··; All-Red Time s 1.0 1.0 1.0 1.0 Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour [ ''ii'"~ · · ·· · ·· --,~~--,,,,n,,i" , ,. · ~ r ,, 'Jc:' ,,.,,. ,·~t~~~'½!~ t~i~"'Mt ~!t.i''¥i~~~~ '·~ ... ·. ~1t.w~~.J Total Lost Time s) 5.0 5.0 4.6 4.6 ' •·-1. Lead-Lag Optimize? ~~ Act Effct Green (s) 35.0 Actuated ic}f4!I9 · : v/c Ratio 0.25 Co trol'Deifu,Jllt~~ -,i,)@i~.,'•!/i,~',~•,1&'],;;&~<ef'k[,'nj","14'';;~0,e1,~K Queue Dela 0.0 LOS A Approach LOS A ntersectiori'Su C cle Len th: 70 Natural C cle: 45 Maximum v/c Ratio: 0.82 lntersecti Intersection Ca aci Utilization 65.7% i" 0.0 0.0 0.0 .. 8 B C A Splits and Phases: 7: Palomar Airport Rd & 1-5 SB Off 8/15/2008 JW Synchro 7 -Report Page 11 Legoland Hotel TIA Supplemental Analysis 7: Palomar Airport Rd & 1-5 SB Off Flt Protected 1.00 Flt Permitted 1.00 1.00 1.00 Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour 0.95 1.00 0.95 1.00 Permitted Phases 4 4 ~m.,~l lt~~~'-~oJJfljt:tz~cJl;f{-$sJjyttYfit~!~i~~tf~¥i)J~,tll~¥tZ4'P:i~~,t\W!tA~p Effective Green, g (s) . . . 35.0 . . . . . 35.0 .. 24.0 24.0 I uat~@rRif-ti!ilfo:qJl~~til€li(~lv~J1~~t~o~s1Jj~l,~iii;'~f~~i~1tilaitJgil 9::3~~~1:fMflQ)s Clearance Time (s 5.0 5.0 4.6 4.6 1 ef\tcle;&xtens1on s: Approach LOS 8/15/2008 JW A B A C Synchro 7 -Report Page 12 Legoland Hotel TIA Supplemental Analysis 8: Palomar Airport Rd & 1-5 NB On -+ +- Permitted Phases Switch Phase Approach LOS F A C cle Len th: 150 l a Control T e: Actuated-Coordinated Splits and Phases: 8: Palomar Airport Rd & 1-5 NB On 8/15/2008 JW t 6 F Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour Synchro 7 -Report Page 13 Legoland Hotel TIA Supplemental Analysis 8: Palomar Airport Rd & 1-5 NB On Near-Term (2010) No Proj Conditions Timing Plan : AM Peak Hour .,,> v/s Ratio Perm Uniform Delay, d1 Incremental Delax, d2 5.6 .... -¥';~~ ;~~~, Level of Service E 4 .d; '·._.,:.:," -_., Approach LOS HCM Avera e Control Dela 8 0.11 54.4 12.3 12.0 54.5 0 84•, ~ •o·A~lt"~~ J.. ~-..,, .-1!.. ~"~M1' t"!,~., '.'ii. c0.37 0~ .,• ! 38.4 38.9 0.1 0.2 6.8 7.7 ·..,;ni,f!FJ 10 5,. i ~f2.70~f;;r½{ ,."'l.}\9'6f.f"j 45:1l· .~~\{~.:;~ ~/4. J;.~,·GJ,, .,~--· :;;¥.;,. f ,,.. •.· ,., ""'A·,,'}fa.l:c:~I:i:~. M F B B E D -~¾:!'' .. , "·•t1·,;5ffi&»"'::&4'·''"'''' ·.vr@,,,.., . ;.;:,,,.,,,,,,. ~,,. "~ilT'<At,lii'~ itl~l . 1,1 .5"]?0;w' ~·,~1\!:r;G;F3~4~48. 'l;·\L~1t:~~~~x~w~~ F B D A Actuated C cle Len th s 150.0 Sum of lost time (s) 14.2 I ~ 1cOJ eveJ of.Seri · Analysis Period min) 15 g, Crj J I :tjll'l;:•·'"xi!f~ll'i,}J~e~;;:ti,""'' ~,,;w""""''"':.= 8/15/2008 JW Synchro 7 • Report Page 14 Legoland Hotel TIA Supplemental Analysis 9: Palomar Airport Rd & Paseo Del Norte Permitted Phases Approach LOS F C ase 2:EBT and 6:WBT, Start of Green Splits and Phases: 9: Palomar Airport Rd & Paseo Del Norte 8/15/2008 JW 6 Near-Term (2010) No Proj Conditions Timing Plan : AM Peak Hour D D Synchro 7 -Report Page 15 Legoland Hotel TIA Supplemental Analysis 9: Palomar Airport Rd & Paseo Del Norte 8/15/2008 JW ---+ Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour t Synchro 7 -Report Page 16 Legoland Hotel TIA Supplemental Analysis 10: Palomar Airport Rd & Armada Dr ........... Approach LOS B Cycle Length : 130 ~,~ Splits and Phases: 10: Palomar Airport Rd & Armada Dr 8/15/2008 JW B Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour C D Synchro 7 -Report Page 17 Legoland Hotel TIA Supplemental Analysis 1 0: Palomar Airport Rd & Armada Dr 8/15/2008 JW Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour Synchro 7 -Report Page 18 Legoland Hotel TIA Supplemental Analysis 11: Palomar Airport Rd & Hidden Valley Rd Permitted Phases Approach LOS 8/15/2008 JW 4 D 11 : Palomar Airport Rd & Hidden Valley Rd C Near-Term (2010) No Proj Conditions Timing Plan : AM Peak Hour D Synchro 7 -Report Page 19 Legoland Hotel TIA Supplemental Analysis 11: Palomar Airport Rd & Hidden Valley Rd 8/15/2008 JW Near-Term (2010) No Proj Conditions Timing Plan: AM Peak Hour Synchro 7 -Report Page 20 Legoland Hotel TIA Supplemental Analysis 1: Cannon Rd & 1-5 SB Off -+ nte C cle Len th: 90 =~,__,..,~-gt"ti;,._""'•=10"'-,4~,m:,.~ ~.z;,? Natural C cle: 55 -~•--ac·c•~ ~"?~ .. ~¾;, ,;<;'?~f '·.~ ~ Maximum v/c Ratio: 0.79 J ~ Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour Intersection Ca acit Utilization 58.4% ICU Level of Service B ~Y.fil Splits and Phases: 1: Cannon Rd & 1-5 SB Off 8/15/2008 Synchro 7 -Report JW Page 1 Legoland Hotel TIA Supplemental Analysis 1: Cannon Rd & 1-5 SB Off 8/15/2008 JW Near-Term (2010) No Proj Conditions Timing Plan : PM Peak Hour Synchro 7 -Report Page 2 Legoland Hotel TIA Supplemental Analysis 2: Cannon Rd & 1-5 NB On Cycle Length: 90 A~tupj~&Yi:~ Natural Cycle: 75 Contri rJYii::~Y~ti[~99r 1na Maximum v/c Ratio: 0.64 I \ --+ +-t ": ~> . .. . 'Q 8 6 , '5 w ~ h· "' l nt~rs~ctlcinJ O§/ Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour Intersection Ca acity Utilization 58.4% ICU Level of Service B An~I . ) Splits and Phases: 8/15/2008 JW 2: Cannon Rd & 1-5 NB On Synchro 7 -Report Page 3 Legoland Hotel TIA Supplemental Analysis 2: Cannon Rd & 1-5 NB On Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour v/s Ratio Perm HCM Avera e Control Dela R Actuated Cycle Len th (s I_ . ion Analysis Period min) ,1&:r . . ., • .,;,;;. :Ji\ 8/15/2008 JW 16.1 HCM Level of Service §~o . -,. 76.7 Sum of lost time (s) I§f58,Ao/o ~et•.m,. ~ ICU Level ot Servi~i~ 15 B Synchro 7 -Report Page 4 Legoland Hotel TIA Supplemental Analysis 3: Cannon Rd & Paseo Del Norte ---+ e~rou Lane Confi urations t. ,, @'.~ ~~Uttfii'.;s'!" 'i-,: 632 ~ "'~ 107~,&;fj 1 101" '' ; M61i~ M..r,, ~'-l~~,.,;,.:~& . , ' ' '• . ,, . ¥ TumT~ P~ m~v 3-1'">:-8i: ,. ~¼iz 2 C cle Len th: 90 "e ~. Natural C cle: 60 Maximum v/c Ratio: 0.79 l9Je se i i al Del Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour -:a~· Intersection Capacity Utilization 61.0% ICU Level of Service B 8/15/2008 JW c3~(illinF 3: Cannon Rd & Paseo Del Norte Synchro 7 -Report Page 5 Legoland Hotel TIA Supplemental Analysis 3: Cannon Rd & Paseo Del Norte Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour ~dj, F!Qw'. (~p[)Bl\~wA '.~n ~~?t:fq'S°' ,*:;rs89'Jj1~T~4l&~ RTOR Reduction (vph) 71 0 0 0 0 60 Lane Group Fi HCM Average Control Delay 19.8 '.6t -'' Actuated C cle Len th s 82.1 ~ 0% ~- Analysis Period min 15 p ,Q •·.~ 8/15/2008 JW HCM Level of Service Sum of lost time s ICU B Synchro 7 -Report Page 6 Legoland Hotel TIA Supplemental Analysis 4: Cannon Rd & Car Country Dr Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour -+ +- ane Lane Conti urations ¥2!!! u~ Cycle Len th : 90 [\ctu= -"""'----~-~""'"'""'-&fi',t Natural C cle: 60 co jafecl:Oi "'£9filiffh?! ~''. - Maximum v/c Ratio: 0.74 !ntersection Sig. w..: . . to-· · · 1 • ,;r. ,. ' " • ..,, ,.,.,,, • Intersection Capacity Utilization 59.2% ICU Level of Service B MajYJiS Period {min) Splits and Phases: 4: Cannon Rd & Car Country Dr 8/15/2008 JW -+ 04 Synchro 7 -Report Page 7 Legoland Hotel TIA Supplemental Analysis 4: Cannon Rd & Car Country Dr Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour _.., Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 Uniform Delay, d1 37.3 18.8 30.1 13.3 22.1 20.9 e"m'&~ruil~'.9811!&11Q.Q)li~flQIJtft~•tiiw~&1!99~il1:o~Jelf'.'.Qo~'fiJl~:~~-~~l~~ Incremental d2 3.9 1.4 2.6 1.3 1.6 0.5 Level of Service ~~-w""'~ P!Q.8 8£Yi·~ Approach LOS 8/15/2008 JW D C C B C C C B C Synchro 7 -Report Page 8 Legoland Hotel TIA Supplemental Analysis 5: Cannon Rd & LEGOLAND Dr ...... C cle Len th: 90 ~ '""'·-.... ~· -?~ Natural Cycle: 55 gontro1JYR~~Oncq_orciin~ied]'ili;Jf~ Maximum v/c Ratio: 0.74 I Intersection Ca acity Utilization 56.0% ri): 1 ~;"'][J.d[~t];'f{ Splits and Phases: 5: Cannon Rd & LEGOLAND Dr 8/15/2008 JW ~ ' ,. "'-"/ Near-Term (2010) No Proj Conditions Timing Plan : PM Peak Hour ICU Level of Service B §,~?·1~ li:~li~1t~ · . Synchro 7 -Report Page 9 Legoland Hotel TIA Supplemental Analysis 5: Cannon Rd & LEGOLAND Dr Approach LOS 8/15/2008 JW -+ C B B Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour Synchro 7 -Report Page 10 Legoland Hotel TIA Supplemental Analysis 7: Palomar Airport Rd & 1-5 SB Off Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour Lane Confi urations f. '(' v i~~rl'f ;iS4',-\ •95.o:/t::>:·586'<"';:;t15 '½i ~'4§< ~ 1~ ~ ,; * , .. ., ... ~ ' . ". ' Turn T pe custom custom -~ <~~ "J 'J,'!'-2-~•','<:9;; ~ '; ·1~· Permitted Phases 4 < ,, ... ;:;~ Switch Phase Minimum S lit s 20.0 22.0 20.0 20.0 : :6 Total S lit % 60.0% 60.0% 40.0% 40.0% ' ·-------· { j All-Red Time s 1.0 1.0 1.0 1.0 ('~':. , .. ,. ·.·o &;'.s•.· ',,"~~"l,',~,,J,\ffli!" __ L ~t: ~.~~> . . . T~tal ~~t T:e (~~ •r '"' ;., 5.0 5.0 4.6 4.6 ~~aq/[~gJJ~g~~ Lead-La O timize? ,_-r..,, -~~-~t 1\'R'§, -~ ', , ' 1 . /ff!f.§if,s ve<[• -~ ,,.;., ,. Act Effct Green (s) 37.2 37.2 17.3 17.3 .A. f i\ ')'jMJ\",i;~t.'C '~~ ... '.~Wd,;~~ Q ;tB-.-q . ~:.tw~::f· >!, • .:i-£,\;<0?{:~ff~r~~~7Y v/c Ratio 0.38 0.49 0.66 0.36 ,'(:o'"'n 6~li¾'.?\7( 3· ~ ~1·1 .. a1:'111if'1&~'\.:fl$/~,~tl~,,j"J,,?~(1~1.1.tr~' ,,?~~f,~.•.·• ~S_,. ._,..,,, ·A'"-"1' ) ,,~~ ~ -~"iv~ ·,t/'!"lY ~:~'?-:l1i.'iliwkt·,J-:·i-,,~:~~ ~(;~1"~~'-~i~~~-lf:J Queue Dela -~.,,.,.,,_..,.,.,. 0.0 0.0 0.0 0.0 4, LOS A A C B Annr1 ;.t h't!t:1,.;' •\':::;t Approach LOS A A o,ters Cycle Length: 70 8,ctl!_a_!eci Cyg~ Natural C cle: 45 Maximum v/c Ratio: 0.66 ( _.,..,-.~:r:- lntersection Ca acit Utilization 64.6% ICU Level of Service C fi:Waly ·• ···· · tJi ""'filfl~{,1t,;~:i~~i~?;,'111'~~1t t" ,-+.:. .. · .. ~. }~,.~.: · ,;;J\B,.:'i~ {}!..! ~ ~•-Y--,...,':.]:: '."-1> . ,; ~1;, .. ~a'-.:~~-~iq~~~0-. ",_,~- Splits and Phases: 8/15/2008 JW 7: Palomar Airport Rd & 1-5 SB Off Synchro 7 -Report Page 11 Legoland Hotel TIA Supplemental Analysis 7: Palomar Airport Rd & 1-5 SB Off Near-Term (2010) No Proj Conditions Timing Plan : PM Peak Hour Effective Green, s -~,,-37.1 t~f,{?%iilJfA}ii:r~~,J1~~~ Clearance Time (s) 5.0 5.0 1/ehic e"Bxtension_ s ' . ,½ '. Lane Grp Cap (vph Uniform Dela d1 Incremental Delay, d2 .. ,.1~1:ffl~ • -.'•' -~·~~~!i\\,\l Level of Service . aT<J1~·,m'-~ Approach LOS HCM Avera e Control Dela H Actuated Cycle Len th s lr;i_tersection = Anal sis Period (min) . ·-~= JP~' ·+ C Ql!P>?.\~%1' ' ~-;_/ ·&i:l"~t; 8/15/2008 JW •. '{,f:.'~~~~ ' " 7.1 7.9 0 · 1 iivli!!llsl!t!fiJ 0. 8 A A Sum of lost time s U Levei •of """1o:N Synchro 7 -Report Page 12 Legoland Hotel TIA Supplemental Analysis 8: Palomar Airport Rd & 1-5 NB On ...... Permitted Phases Switch Phase Control Type: Actuated-Coordinated Intersection Si nal Delay: 53.0 ~J'filiol:[a~§- An aIysis Period (min) 15 Splits and Phases: 8: Palomar Airport Rd & 1-5 NB On 8/15/2008 JW t 6 Intersection LOS: D Near-Term (2010) No Proj Conditions Timing Plan : PM Peak Hour Synchro 7 -Report Page 13 Legoland Hotel TIA Supplemental Analysis 8: Palomar Airport Rd & 1-5 NB On Near-Term (2010) No Proj Conditions Timing Plan : PM Peak Hour Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 lj),' / ~"if~:o ?074'~:'0J3?J,a: t '9}1-lQIIl!?:'. " '.0: RTOR Reduction (vph) 0 0 0 0 0 272 0 0 363 0 0 0 HCM Average Control Delay 50.9 ' ~="7ITT✓-. 8 Actuated C cle Length (s) 170.0 ~-% Anal sis Period min 15 C,' 8/15/2008 JW HCM Level of Service D ·6 Synchro 7 -Report Page 14 Legoland Hotel TIA Supplemental Analysis 9: Palomar Airport Rd & Paseo Del Norte Approach LOS D Splits and Phases: 9: Palomar Airport Rd & Paseo Del Norte f m1 ~ m5 8/15/2008 JW E Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour F F Synchro 7 -Report Page 15 Legoland Hotel TIA Supplemental Analysis 9: Palomar Airport Rd & Paseo Del Norte Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour Peak-hour factor, PHF RTOR Reduction (vph) Uniform Delay, d1 Incremental Delay, ~2 «• '. -~&·f~.·. Level of Service ~1,1ro J¼'(s)JlfY< · Approach LOS HCM Avera e Control Dela . !u Actuated C cle Length (s) 111ter -,:za 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 ~o~ftt211.~)3~,,;,~24·51".t'f~j~.,;)3a r,-3 ~11Jia . ~t,jia~i 0 12 0 0 0 24 0 80 0 0 206 0 '39~2451 · , fd 61 .3 HCM Level of Service E .89 .• -~--~ -~ 170.0 Sum of lost time (s) .3% 'ivic~ 'f 16.4 15 Analysis Period (min) P . .,Qrfffp,al .:a~{,toti'R11L '"""""·'•'•"'· .,._ 8/15/2008 JW Synchro 7 -Report Page 16 Legoland Hotel TIA Supplemental Analysis 10: Palomar Airport Rd & Armada Dr Splits and Phases: 10: Palomar Airport Rd & Armada Dr Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour 8/15/2008 Synchro 7 -Report JW Page 17 Legoland Hotel TIA Supplemental Analysis 10: Palomar Airport Rd & Armada Dr Approach LOS 8/15/2008 JW C C Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour E D Synchro 7 -Report Page 18 Legoland Hotel TIA Supplemental Analysis 11: Palomar Airport Rd & Hidden Valley Rd Approach LOS C Maximum v/c Ratio: 1.00 lits and Phases: 8/15/2008 JW 11 : Palomar Airport Rd & Hidden Va E Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour · E C ICU Level of Service D Synchro 7 -Report Page 19 Legoland Hotel TIA Supplemental Analysis 11: Palomar Airport Rd & Hidden Valley Rd HCM Avera e Control Delay 48.3 fl _,_ IY. ratio Actuated Cycle Length (s 131.3 1 ion ca\?~city uuli ,o/o , ::; Analysis Period min 15 ~" ,CriticaC -~ 8/15/2008 JW Near-Term (2010) No Proj Conditions Timing Plan: PM Peak Hour HCM Level of Service Sum of lost time (s) 0ICU Level of Ser,yip~ii}t,,•;,/j<: D 11.6 Synchro 7 -Report Page 20 ----------- -----Near-Term (2010) With Project Conditions ---- ---------------- Legoland Hotel TIA Supplemental Analysis 1: Cannon Rd & 1-5 SB Off Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour Lane Configurations Ysitu~ '[vRfft.~ Turn Type protect~g_"Phases : Permitted Phases Switch Phase _., +- "1·.· ·5 o · '"'· 5 "~· 1">,ts··~o·~· , .• s·o::-" .-s· . ' ,\[,,;)%;, ~~ ;J,,i·":' • ,. ' Minimum Split (s) 22.6 22.6 9.2 22.0 20.0 20.0 20.0 ~"~~JJrt~.~36.f "~36.2~':t'2[.f2'.-.i,:r4j::,;'5[4 ?' ~39 6'~~f39,5i~39';51'l ·;, ~~"\'YM~,.. WK'iJW, ,, . .,,, 7%'f • , -~~-"' ~ ... '""1; ., . '"'"'if~--"~~,,~,,~ • Total Split(%) 40.2%. 40.2% 15.8% 56.0% 44.0% 44.0% 44.0% • . --~~r,~ ·1,w, %!_'>'.'.'ff w·~, "'·t'.Jt"' • /4-~"""W~ 0·~lf"* !t~l?:W'¾?W"' ~~~'t --~-.-j §J~Y::f' > ~,~.2'!.<~i-, 3:,§ "J ~3.f?titi'l'$;.~3.6,tt~wt?,9.A¥,,,~i!~~~>~i~s~~~- AII-Red Time s 1.0 1.0 1.0 1.0 1.0 1.0 1.0 >' ,,,,"' ·,7,.•·· ,;: • ·-<4< ·t · · , •.. , ·, '&)&'-~ -i~'C' ~. . _ .,, · -~-' ,0};;f';i:0 .. Q~~-o.~r ~-o.q ,;;I"';,,0;9.:~1~0;0~ , , .• ,, .. · ;,.;;t:~ . Total Lost Time s 4.6 4.6 4.2 4.6 4.6 4.6 4.6 l-~4 9. Lead-La O timize? Yes Yes Yes R ,.;..::..;;;.;"""""""' · M :.;. · Act Effct Green (s) 32.4 32.4 9.4 46.0 31 .2 31 .2 31.2 13jf~i~~"w~:o.~.1L .. i'it~o. 'f'• v/c Ratio 0.34 0.06 0.58 0.20 0.82 0.82 0.41 · on o · efa'y·~~l~~u:F: f '.'.'.:,~'f-'f:()o;:l*Xi' .o f&!tb\~Yr~~~t .... ~ . .. . ,~~~~ ~~jj,,:,__,,._,.._ ~"¼¾-:%, "' "'"""'-"""' ~~~)Y.ii£i1?i~~~ ... ,y'"i< ~ Queue Dela 0.0 0.0 0.0 0.0 0.0 0.0 0.0 t(otal Der~· .0 LOS C A D B D D A ~~roach · Approach LOS C C ntersec · C cle Length: 90 ,. c ,-' . ·: ' Natural C cle: 60 : = , ]'699rdincoited Maximum v/c Ratio: 0.82 Intersection Capacity Utiliza~on 61 .6% Splits and Phases: 8/15/2008 JW 1: Cannon Rd & 1-5 SB Off Synchro 7 -Report Page 1 Legoland Hotel TIA Supplemental Analysis 1 : Cannon Rd & 1-5 SB Off Approach LOS 8/15/2008 JW B C Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour A Synchro 7 -Report Page 2 Legoland Hotel TIA Supplemental Analysis 2: Cannon Rd & 1-5 NB On ~f!YE,!eq, Cy_g~~ngt Natural C cle: 90 C,Q!ltJ: Maximum v/c Ratio: 0.85 Intersection Ca acit Utilization 61 .6% ~y§is -+ Splits and Phases: 2: Cannon Rd & 1-5 NB On f v tiq , " Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour ICU Level of Service B 8/15/2008 Synchro 7 -Report JW Page 3 Legoland Hotel TIA Supplemental Analysis 2: Cannon Rd & 1-5 NB On Level of Service Approach LOS 8/15/2008 JW C C C A A Near-Term (2010) With Proj Conditions Timing Plan : AM Peak Hour A D C C A Synchro 7 -Report Page 4 Legoland Hotel TIA Supplemental Analysis 3: Cannon Rd & Paseo Del Norte -+ Permitted Phases Switch Phase 2 v/c Ratio 1.09 0.83 0.17 0.15 0.15 LOS F F A C B Approach LOS F B C Maximum v/c Ratio: 1.09 3: Cannon Rd & Paseo Del Norte 8/15/2008 JW Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour Synchro 7 -Report Page 5 Legoland Hotel TIA Supplemental Analysis 3: Cannon Rd & Paseo Del Norte Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour +-/"' Turn Type Pro! P~9tected PQ~ei ~ 3' -?~~;, '( Permitted Phases ~ctuated Gre Clearance Time (s) j Vehicle Extensioiv{~;,t7'i§: Lane Grp Cap {vph 1945 v/s R~g ro!~ v/s Ratio Perm , _,,,.,,,;:,,'$"!'-~=~ Uniform Dela d1 ,Ii;, ~ .,..., -=..;,,.,; .v • Incremental Dela d2 Q~~y.,_(§) Level of Service t.J)Qro ch Approach LOS HCM Avera e Control Delay A' atio. Actuated C cle Len th s l rsec aP,pft ,._ !JZatio.n Analysis Period (min 1 ~ f ~ '·--~ ,·~ c, _Critical tan~"@J 8/15/2008 JW ' lf. 0.2 ""·'l>' ~;,] C Sum of lost time (s) ~ • --~·· .... ·• <• . .,,, ICU L~yel·of Service/,, .,• • _ Synchro 7 -Report Page 6 Legoland Hotel TIA Supplemental Analysis 4: Cannon Rd & Car Country Dr Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour Switch Phase v/c Ratio LOS Approach LOS 8/15/2008 JW O.D7 0.93 0.62 0.27 0.12 0.13 D C E A C B C B C 4: Cannon Rd & Car Country Dr Synchro 7 -Report Page 7 Legoland Hotel TIA Supplemental Analysis 4: Cannon Rd & Car Country Dr Lane Util. Factor v/s Ratio Perm Uniform Dela d1 ~ lncre pjg Level of Service Approach LOS 8/15/2008 JW --+ 1.00 0.95 1.00 43.8 16.6 42.0 D C F C +- 0.95 7.5 A B Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour 1.00 29.0 C C 1.00 0.01 28.5 C Synchro 7 -Report Page 8 Legoland Hotel TIA Supplemental Analysis 5: Cannon Rd & LEGOLAND Dr +--+ Permitted Phases 4 Switch Phase Total Lost Time s ""'"--"" " LOS C A Natural Cycle: 60 Maximum v/c Ratio: 0.79 S lits and Phases: 5: Cannon Rd & LEGOLAND Dr 8/15/2008 JW D A C Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour 2 A Synchro 7 -Report Page 9 Legoland Hotel TIA Supplemental Analysis 5: Cannon Rd & LEGOLAND Dr Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour -+ +- Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 ~~~P~i~~~1111:f;f3'~m s~'~Y,$;22~1l~wf61Jffi~s~~j&t-•~ff~'~~~r~~~~~l~~~~~0:&tz1 Turn Type pm+ov Prot pm+ov PX~&t~j1Rf~~.f~lf~~l~~J13BJ~1?:1fm1:t}:2~~J~3Jllil!~l-liffl~¾'!~~~~~-~~1t} Permitted Phases 4 2 a~lJ.~:;gf~l ·· Effective Green, g (s) . .· . 33.3 57.5 ·. 9.4 . 47.7 24.2 33.6 ~t@~afloBtit:YGq,1Jll"'P19:~~:9~'tJ~~:'Q.i§a'Ro~~:Wt11~~4Jifi:f~~{ffllfD1i,')fJ!fi~-~-~~JJ;i~ Clearance Time (s 5.0 5.0 5.0 5.0 5.0 5.0 ~i9Er'Extenslo ·· ,~. ~:~~ Cap :ph) y/;§Bfill~O · v/s Ratio Perm 0.23 0.01 Y~~l!ISQI!~Q;fs)IIJJ ··,r: Uniform Dela d1 21.2 5.5 34.3 8/15/2008 JW Synchro 7 -Report Page 10 Legoland Hotel TIA Supplemental Analysis 7: Palomar Airport Rd & 1-5 SB Off --+ :aneGrou Lane Confi urations tt~ v sid· <,,, . " • Turn T e Permitted Phases Switch Phase +- tt lt '(' \ '575 ';z'(c%9~4'''3'4'"1'3(j5 , ('K, ,, . ...'It,& 4,.. . ...~r . custom custom 4 4 . . All-Red Time s fJi~tlfu'~'<'l~ 1.0 1.0 1.0 1.0 Total Lost Time (s) 5.0 5.0 4.6 4.6 T. """'J" . \ W,}ff.!!<\:4~~~&'.<1':'l'!i!?!i'&'Z:'¼" Cf,'.,\!'Ji'f,";" -~~)J);:'. ..~ b,~a9/L:~g ... J~i'f~~~~\~~1!'«i~~~~mJ1ih~,:' Lead-Lag Optimize? Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour , ·:~None .. "4lt-:~~~~~~ t "':.·~1~'~1:1 -..,.., ...... ._ . ~-Ai -·~-!li~~~f#~~, 3:-,~'t.tit,/t~~ Act Effct Green s 35.1 35.1 24.1 24.1 ~ ;}e::::;:i1c'ix~~;::li.'f1",i;,-rr,';j,'"'f'},1,i,~1t'mt:~~ •~~tz~,,t~,~"!!i,,~, . .,r7 v/c Ratio 0.25 0.34 0.83 0.46 ~~(~j'[o/ 7. ~,~~~~ .... ,. Queue Dela 0.0 0.0 0.0 t LOS --~ A B C '.:. -Approac L A B Maximum v c Ratio: . lnte section SigJl.~ Intersection Capacit Utilization 66.2% ~Jl~l'isis·P~rioj . Splits and Phases: 8/15/2008 JW 7: Palomar Airport Rd & 1-5 SB Off 0.0 d > ,$ ICU Level of Service C Synchro 7 -Report Page 11 Legoland Hotel TIA Supplemental Analysis 7: Palomar Airport Rd & 1-5 SB Off PrQg Incremental Delay, d2 el;a.yJ~I~~ ,-.... .. ...;1;••,,, Level of Service ~Qroaq~~'. Approach LOS HCM Avera e Control Delay . ati Actuated Cycle Length (s) intersection .. ~ap?Cit}'.~YJllizati Analysis Period (min) o'WQntical _L"an¢,.Group~~ . 8/15/2008 JW 16.7 • >;' ~0'.54 ·, 68.7 /' ~6S:2¾r ' 15 Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour Synchro 7 -Report Page 12 Legoland Hotel TIA Supplemental Analysis 8: Palomar Airport Rd & 1-5 NB On -+ Cycle Len th: 150 Ac uateo Offset: 0 Nelli!! . [gi?Jf Control T e: Actuated-Coordinated Intersection Signal Delay: 204.0 t Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour Intersection LOS: F R.e.CilY: 85. :1cu L~vel ; Analysis Period (min) 15 Splits and Phases: 8: Palomar Airport Rd & 1-5 NB On 8/15/2008 JW Synchro 7 -Report Page 1 Legoland Hotel TIA Supplemental Analysis 8: Palomar Airport Rd & 1-5 NB On Lane Gr ~!Bili9 v/s Ratio Perm [l2Bi Approach LOS 8/15/2008 JW 3166 12.4 Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour 1735 373 0.12 12.1 54.5 1200 c0.37 38.6 Synchro 7 -Report Page 2 Legoland Hotel TIA Supplemental Analysis 9: Palomar Airport Rd & Paseo Del Norte Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour --+-+-t sa f+ tt ~~ tf+ ~~ tf+ 816;~~2"11 '::'1:~20s'~'¾Z-;137~:1 j~"::f. 6 , • -:r ~}1 •• .~ ... !f.:~«-~).,'-it , ~i;t;,;,~ """"' ,, Pro! Pro! pm+ov Pro! Pro! 6 Cycle Length: 150 ~to~ted c'""y~""'e-; ""'~"""""',_.,.==--"i· Offset: 51 34% Referenced to phase 2:EBT and 6:WBT Start of Green Control Type: Actuated-Coordinated fviaximum v/c Ratio; Intersection Si nal Dela : 83.0 Intersection LOS: F !D~~tl9 ty,Q" [t8.%.~~r~~i ~~lQtJJe~,fo! seryi~lf~;, '.l<f; Analysis Period (min) 15 Splits and Phases: 9: Palomar Airport Rd & Paseo Del Norte 8/15/2008 JW Synchro 7 -Report Page 15 Legoland Hotel TIA Supplemental Analysis 9: Palomar Airport Rd & Paseo Del Norte ....... ~ Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 2 ·6_9 )SJ!;? . · :§ijjD .t1 ~ RTOR Reduction (vph) 0 4 0 0 0 81 0 126 0 0 97 0 8/15/2008 JW Q Synchro 7 -Report Page 16 Legoland Hotel TIA Supplemental Analysis 10: Palomar Airport Rd & Armada Dr Permitted Phases Approach LOS Splits and Phases: 8/15/2008 JW _., 2 B 10: Palomar Airport Rd & Armada Dr +- B Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour f 6 C D Synchro 7 -Report Page 17 Legoland Hotel TIA Supplemental Analysis 1 0: Palomar Airport Rd & Armada Dr 8/15/2008 JW Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour Synchro 7 -Report Page 18 Legoland Hotel TIA Supplemental Analysis 11: Palomar Airport Rd & Hidden Valley Rd Permitted Phases Approach LOS 8/15/2008 JW 4 D 11: Palomar Airport Rd & Hidden Valley Rd "'"03 115., C Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour 6 D Synchro 7 -Report Page 19 Legoland Hotel TIA Supplemental Analysis 11: Palomar Airport Rd & Hidden Valley Rd Approach LOS 8/15/2008 JW D C Near-Term (2010) With Proj Conditions Timing Plan: AM Peak Hour t D D Synchro 7 -Report Page 20 Legoland Hotel TIA Supplemental Analysis 1: Cannon Rd & 1-5 SB Off Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour -+ +- ane~Grou lntersec_tion fp~:,C}¥Jt:,, 7tt'llt7'~~•~1~~!fit~~~i~:~$Z ICU Level of Service B Splits and Phases: 1: Cannon Rd & 1-5 SB Off Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 1 Legoland Hotel TIA Supplemental Analysis 1: Cannon Rd & 1-5 SB Off Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour Uniform Dela d1 ~----.; Incremental Delay, d2 Delav (s),,~~'l!~~,vq•,.,,.,.n,"'-= , .1-. ~ iiPJi-Js':IJ\.~M <Jl"/,, Level of Service J~w.~ _!im?tsj"4'." Approach LOS B C A fntersec 19.7 HCM Level of Service < '~~~~;.., Sum of lost time (s) HCM Avera e Control Dela Actuated Cycle Length (s in .. _ .. ~ .. -~ ·. ICU Level of Se'fvic~f ~;~"~~r~·~:w ~naIi~is Perioc~Jr,ri.,!!!_L C. G!J e:&rPVP Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW C Synchro 7 -Report Page 2 Legoland Hotel TIA Supplemental Analysis 2: Cannon Rd & 1-5 NB On Near-Term (2010) With Proj Conditions Timing Plan : PM Peak Hour Permitted Phases Switch Phase &1@11[~(@1 Minim ·~.-"! v/c Ratio LOS ~pi![mQe" Approach LOS Maximum v/c Ratio: 0.65 terse 1.0 +-t /"' 6 0.56 0.45 0.65 0.52 0.40 0.32 C B B A D A C B B ICU Level of Service B Splits and Phases: 2: Cannon Rd & 1-5 NB On Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 3 Legoland Hotel TIA Supplemental Analysis 2: Cannon Rd & 1-5 NB On Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 " ~~"'"'' 'ff''Rffl'i fl;'ff~' ~'1:1if?X,,"'\'i»" %3t'fl: ··~ ,,.. '' --~ "..~~=· , ~£ii ~294?.f",~tt~~ ~i:<tOit~i.;. fill§Jl}, 0xv'::~t!~0;,W$~::,.Q RTOR Reduction v h O O O O 35 234 0 0 240 0 0 0 Lane. Group F 0 Turn Type Prot Perm Perm custom Protected Phase ~{~ 1; . Permitted Phases 6 8 1 ~.~--. ~~ ~ ·.~-.,,_" ~=i~==_.,=(s \ 2\,,J,54,4~? $ '!"fi~,. •J Effective Green, g (s) 11 .6 32.8 44.2 44.2 7.5 22.6 t,qtu,ste_g_g(G.,R;iJi.0 0 ' ;'. w~ •iJcVji:ff\,i:Ji,!01!,".0t':.&::.S ~'.~~till]§# '6,2,9~]£•~~ Clearance Time s 4.2 4.6 4.6 4.6 4.6 4.6 Vehicle Exte Jntersec HCM Average Control Delay 16.2 HCM Level of Service HC"'-'-'•==··=:..--: • ~ Actuated C cle Len th s ~~~, Sum of lost time (s) ·1nt " :.icu L~v~i_of .setYJRe.i;, Anal sis Period (min) ·-· G[Q~: Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW B Synchro 7 -Report Page4 Legoland Hotel TIA Supplemental Analysis 3: Cannon Rd & Paseo Del Norte --+ aneSrou 1 Splits and Phases: 3: Cannon Rd & Paseo Del Norte lnterse Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour ICU Level of Service B Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 5 Legoland Hotel TIA Supplemental Analysis 3: Cannon Rd & Paseo Del Norte Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour Incremental Dela , d2 3.6 ;~"':>. Level of Service ~p.r,q~q!LQ.~)af (s) x, .· Approach LOS nte HCM Avera e Control Delay , " _ o YQ'l~ to. Cc!pacity rat Actuated C cle Len th s Jnt . ati Anal sis Period min) "" u +- 20.1 HCM Level of Service :q 82.5 Sum of lost time (s) 5.o/oli "'7 ~, ICl:J Level of.SerVjc' 15 Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW C 14,0 Synchro 7 -Report . Page 6 Legoland Hotel TIA Supplemental Analysis 4: Cannon Rd & Car Country Dr Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour +- C cle Len th: 90 ·-===Y,£1 Natural Cycle: 60 Y.R~JAcf11atecl-u · a~~,~~~ Maximum v/c Ratio: 0. 7 4 _ -~QsI ~l;,; Intersection Ca acit Utilization 60.0% ICU Level of Service B Analy ·,t. Splits and Phases: 4: Cannon Rd & Car Country Dr Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 7 Legoland Hotel TIA Supplemental Analysis 4: Cannon Rd & Car Country Dr Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour -+ J •m• v/s Ratio Perm 0.03 'i/,g Ratio " .. > .·•.~---= ·;~;!'s~ .. 0.'.[!;m "'."t3 ·· ~:: Uniform Dela , d1 37.6 18.8 30.5 13.3 22.5 21 .3 -r~'. &t.si Incremental Dela , d2 4.3 1.4 2.8 1.4 1. 7 0.5 ~ - Level of Service ,., •• ,.,.n!l~t·-vr•~,D C C B C C Approach LOS C B C HCM Avera e Control Dela [CM_ Actuated C cle Len th s L ·--~-·-~-Anal sis Period min &<'1f. Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 • Report Page 8 Legoland Hotel TIA Supplemental Analysis 5: Cannon Rd & LEGOLAND Dr Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour -+ -4-- C cle Len th: 90 & .,,..,,..""""",_,_,.... ~~Jlt·,~ ~( ... ,,\.~~'"' Natural C cle: 55 q "-"""""""""'""""'"""""'-""" Maximum v/c Ratio: 0.74 IQ!filsectloll.§.ig Intersection Ca acit Utilization 56.9% ~najys §~~.pf,,~ Splits and Phases: 5: Cannon Rd & LEGOLAND Dr lnt ICU Level of Service B Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 9 Legoland Hotel TIA Supplemental Analysis 5: Cannon Rd & LEGOLAND Dr -+ +- Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 10 Legoland Hotel TIA Supplemental Analysis 7: Palomar Airport Rd & 1-5 SB Off • c uat~9£y£!i'tl. Natural C cle: 45 Maximum v/c Ratio: 0.66 ---~= --+ Intersection Ca aci Utilization 75.7% +- ' ,. ,,.....-,,,w,,;,,~a·,v,,_-, I Splits and Phases: 7: Palomar Airport Rd & 1-5 SB Off --+ 1112 421 ···• ··, Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour lon LQ~1t ICU Level of Service D Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 11 Legoland Hotel TIA Supplemental Analysis 7: Palomar Airport Rd & 1-5 SB Off -+ Lane Util. Factor 0.91 Permitted Phases +- 0.95 Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour t 0.97 1.00 4 4 Lane 936 432 Ylt:..=:.':GU.=-'U.JWJ v/s Ratio Perm Approach LOS A A Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW A C Synchro 7 -Report Page 12 Legoland Hotel TIA Supplemental Analysis 8: Palomar Airport Rd & 1-5 NB On Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour t Cycle Length: 170 ' . . . """"""""'""'"' . ~~,r~~]:f<'• Actuateo Cycl " · ~~~~~~, ~~t,,i~;:~ Offset O 0% , Referenced to hase 2:EBT and 6:WBT, Start of Green, Master Intersection N t. .· ~r~~ . ; : J-]!!t... . SlB~ Control T e: Actuated-Coordinated Intersection Signal Delay: 54.3 _nter~tion CaE!gfity Utilization _69.0% Analysis Period (min) 15 Splits and Phases: 8: Palomar Airport Rd & 1-5 NB On Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 13 Legoland Hotel TIA Supplemental Analysis 8: Palomar Airport Rd & 1-5 NB On Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour t NBTc ~:NBR v/s Ratio Perm ·''-"""'"":~,.,,....,, 0.31 0.12 Uniform Dela d1 .,,._,~"""'._,..." . ..,.....,0...,,,_, 23.4 57.2 27.2 , .~=-?•,.,,..,.,.""""""'""""' Incremental Dela¥., d2 48.0 16.3 0.6 0.5 2.0 0.5 Dela't'('s)_,~~~ ~*;;;;'Ef, . ~'t!';'fi;-,i~~-· : '0; .;?,':#??'Sf ,,.,,,."' .. ,·L~ .. :"',z"\'""\""',~\"",,_,r,,,~ w -1.J · ~:4%,.. <~7~<· x:, ,J~~ · ~W"l: ... ~ .SZ¾-l'~~ Level of Service F E D D E C · (~Irn,~ ;'l;,i!K=i'ii;JiY&i.ffl'.•r,c:4<½,'r""'' , ~ ~Jl!½t'4 ~-,;<,IMiJ~!.#,., ' :'s: • Approach LOS F D HCM Average Control Dela 50.8 HCM Level of Service HCM Volume 19 Cc! _ _iw.,;1;1,,--~-""' Actuated Cycle Len th s 170.0 Sum of lost time (s Intersection C vel of S~(vi Anal sis Period min 15 c . ""_ai\l ·. · . . ·.~"~ . '·" ~ Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW C D A Synchro 7 -Report Page 14 Legoland Hotel TIA Supplemental Analysis 9: Palomar Airport Rd & Paseo Del Norte Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour ....... +-t lntersectiott Summary Cycle Len th: 170 ~ctuate , Length: 1 io . ;c,, •& • ; ···· . ~~,,~~~~ r,.,;;;],5}l~]lfi;~ii;~~J~~ ~ of Green N ~~~1'.i~~~·. ':.• ; Control Type: Actuated-Coordinated Maximum v/c Ratio;J ,01 }i:}'~11' ~ t.1J~··: .. ~"1 ·;.x~~.,,,:Scs'.<Jl Intersection Si nal Delay: 66.2 Intersection LOS: E ¥'~--, . """'"''' ·~~y; 'M'"·= .,,.. '<¥ ',. ,,...,.,~lo:'~I>'¼'> .~"""'kl ''\Ir J}rr R~~i!Y JJtilizatiQ.Q ~?~-~o/o ~ I.Glltieyel of Servl(e,F ~.<1; ;;~v~l~~t'l ·' Analysis Period (min) 15 Splits and Phases: 9: Palomar Airport Rd & Paseo Del Norte 'f 01 a5.6s ', ;ii!I,, Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 15 Legoland Hotel TIA Supplemental Analysis 9: Palomar Airport Rd & Paseo Del Norte Intersection Sammazy HCM Average Control Delay 62.7 .8 Actuated C cle Length (s 170.0 9o/c Anal sis Period min 15 C ~t Near-Term (2010) With Proj Conditions Timing Plan : PM Peak Hour HCM Level of Service E Sum of lost time (s) 16.4 ,, J Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 16 Legoland Hotel TIA Supplemental Analysis 1 0: Palomar Airport Rd & Armada Dr --+ Permitted Phases 2 Maximum v/c Ratio: 0.92 Splits and Phases: 10: Palomar Airport Rd & Armada Dr ..... '1l2 rag~ +- Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour 6 4 ICU Level of Service E Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page17 Legoland Hotel TIA Supplemental Analysis 10: Palomar Airport Rd & Armada Dr Approach LOS C D Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour E D Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 18 Legoland Hotel TIA Supplemental Analysis 11: Palomar Airport Rd & Hidden Valley Rd Approach LOS Cycle Length: 130 ~filYa~Y.Q:!k,fil29L D S lits and Phases: 11 : Palomar Airport Rd & Hidden Valle Rd E Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour E C Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 19 Legoland Hotel TIA Supplemental Analysis 11: Palomar Airport Rd & Hidden Valley Rd vement· Near-Term (2010) With Proj Conditions Timing Plan: PM Peak Hour Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions JW Synchro 7 -Report Page 20 -----------... -----Improved Near-Term (2010) With Project Conditions ---- - -----------