September 2, 2008 JN 55-100414.001
Mr. Bob Johnson
CITY OF CARLSBAD
1635 Faraday Avenue
Carlsbad, CA 92008
Subject: Legoland Hotel Project-Supplemental Synchro Traffic Analysis-Near Term (2010)
Dear Bob:
As you requested, RBF has prepared an operational analysis utilizing the Synchro analysis software to provide
supplemental traffic analysis for the proposed Legoland Hotel Project. This supplemental analysis analyzes the
signalized intersections for near Term (2010) with and without project conditions.
Signal coordination timing sheets were provided by City of Carlsbad staff for most of the study intersections, and
input into the Synchro network. Where signal coordination data was not made available, intersections were
allowed to run free, utilizing pedestrian times, minimum green times, yellow time and all red times similar to
nearby intersections for which signal timing data was provided.
The Near Term (2010) intersection operations were evaluated in Synchro using the 2000 HCM Operations
methodology. Detailed HCM calculation worksheets are attached to this memorandum. Table 1 summarizes
the results of the Near Term (2010) analysis without and with the proposed project.
Based on the HCM analysis, most intersections are forecast to operate at acceptable levels of service without
and with the addition of the proposed hotel with the exception of the following two study intersection:
• Palomar Airport Road/1-5 Northbound Ramps (with project only); and
• Palomar Airport Road/Paseo Del Norte (with and without project).
Visual simulations are available with the Synchro software that will demonstrate the operations and can be used
to discuss this issue further. In addition, queuing analysis is also available through Synchro if requested by City
of Carlsbad staff.
... ------------------..
--------
--------
B.Johnson
September 2, 2008
Page2
Table 1
JN: 55-100414
Near Term (2010) With and Without Project Peak Hour Intersection LOS -HCM
2010 Without Project 2010 With Project Change in
Intersections A.M. P.M. A.M. P.M.
Delay
Delay LOS Delay LOS Delay LOS Delay LOS A.M.
Cannon Rd. / I-5 SB Ramps 25.4 C 18.9 B 25.8 C 19.7 B 0.4
Cannon Rd./ I-5 NB Ramps 21.1 C 16.1 B 21.3 C 16.2 B 0.2
Cannon Rd. / Paseo Del Norte 51.8 D 19.8 B 54.8 D 20.1 C 3.0
Cannon Rd. / Car Country Dr. 21.9 C 18.4 B 22.5 C 18.5 B 0.6
Cannon Rd. / LEGOLAND Dr. 17.2 B 18.5 B 17.3 B 18.5 B 0.1
Palomar Airport Rd. / I-5 SB Ramps 16.5 B 11.7 B 16.7 B 11.8 B 0.2
Palomar Airport Rd. / I-5 NB Ramps 53.6 D 50.9 D 55.1 E 50.8 D 1.5
Palomar Airport Rd. / Paseo Del Norte 45.8 D 61.3 E 45.7 D 62.7 E -0.1
Palomar Airport Rd. / Armada Dr. 16.0 B 41.3 D 16.1 B 41.9 D 0.1
Palomar Airport Rd. / Hidden Valley Dr. 35.2 D 48.3 D 36.1 D 51.7 D 0.9
Notes: Deficient intersections shown in bold .
To improve operations at the Palomar Airport Road/I-5 Northbound Ramps study intersection during the a.m.
peak hour, the coordinated intersections of Palomar Airport Road/I-5 Northbound Ramps and Palomar Airport
Road/Paseo Del Norte should be retimed to have a cycle length of 140 seconds with maximum splits re-
optimized with basic signal timing parameters unchanged. Simple modifications to signal timing will result in
acceptable operating conditions through the interchange, will reduce queues and improve flow along Palomar
Airport Road for all the coordinated traffic signals. In the p.m. peak, signal timing changes may not be sufficient
to mitigate the forecast deficient condition. RBF will meet with City staff to discuss possible signal timing
modifications to address this condition. However, since the project does not result in a significant impact at this
intersection, the project is responsible only for the cumulative impacts and will therefore assist City of Carlsbad
in addressing this issue with Caltrans.
We would appreciate the opportunity to discuss this issue with you. Please call me at (760) 603-6246 to discuss
the findings of this analysis and to schedule a time to review the visual simulations.
Sincerely,
Dawn L. Wilson, P.E.
Project Manager
RBF Consulting
Enclosure
P.M.
0.8
0.1
0.3
0.1
0.0
0.1
-0.1
1.4
0.6
3.4
-----------------Near-Term (2010) No Project Conditions
------------..
--------
Legoland Hotel TIA Supplemental Analysis
1: Cannon Rd & 1-5 SB Off
Splits and Phases:
8/15/2008
JW
1: Cannon Rd & 1-5 SB Off
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
Synchro 7 -Report
Page 1
Legoland Hotel TIA Supplemental Analysis
1: Cannon Rd & 1-5 SB Off
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
HCM Avera e Control Dela 25.4 HCM Level of Service C
ij I ~
Actuated C cle Len th s) 86.2 Sum of lost time s
8/15/2008
JW
·zatioji •ft-f •¥. %
Synchro 7 -Report
Page 2
Legoland Hotel TIA Supplemental Analysis
2: Cannon Rd & 1-5 NB On
C cle Len th: 90
Natural C cle: 90
_ --· j:linated.
Maximum vie Ratio: 0.84
lntersec!jpn Sig~aL · ·'
l_ntersection Ca~!)'. y~ilization 60.9%
Ar}alysis Peri_QdJ rriin)'15 ' ~
Splits and Phases:
8/15/2008
JW
2: Cannon Rd & 1-5 NB On
-+-t
Near-Term (2010) No Proj Conditions
Timing Plan : AM Peak Hour
ICU Level of Service B . ,,
Synchro 7 -Report
Page 3
Legoland Hotel TIA Supplemental Analysis
2: Cannon Rd & 1-5 NB On
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
-!t!tllf 1Q · ~~:~ i~:::.2t~&:1'1JJ2~~~?t o~r,:s1s:, ~1''.cf7li · .. g·
RTOR Reduction (vph 0 0 0 0 3 85 0 0 415 0 0 0
l:.ane. Gro · '' O
Turn T e Pro! Perm Perm custom
Protect '\,;_, :f.·,. ~J~5·:-,:.,q--:,11P1<"~':"''~ · · :,4.·· t,~¾:J;t{;'F't,:;' },_~"' o>!.
• . ~V;. , :_ ~*'": .~zy :>s_ .. :'"-('_~~-_;,t ·',--ri1/""-'~-$ -~ JG!: r"~~'-\~¥$-lti~::~"'~ /:$)\'I>, /f rt-'1
Permitted Phases 6 8
HCM Avera e Control Dela
Analysis Period (min) c GJup,,, . ·
8/15/2008
JW
. ~ (s
er. . . ..
15
0.06
0,11 A,,,~ m
21.0
Synchro 7 -Report
Page 4
Legoland Hotel TIA Supplemental Analysis
3: Cannon Rd & Paseo Del Norte
-+
Natural C cle: 90
g_Q[ltr ct
Maximum v/c Ratio: 1.08
ln~s~ctjon Sign~ pelaY,: id
Intersection Capacity Utilization 78.9%
~is ~r)~{fpfnf ts:~r
+-
Splits and Phases: 3: Cannon Rd & Paseo Del Norte
8/15/2008
JW
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
ICU Level of Service D
Synchro 7 -Report
Page 5
Legoland Hotel TIA Supplemental Analysis
3: Cannon Rd & Paseo Del Norte
vement
8/15/2008
JW
,._
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
Synchro 7 -Report
Page 6
Legoland Hotel TIA Supplemental Analysis
4: Cannon Rd & Car Country Dr
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
+-
C cle Len th: 90
'Ji/gth: 85.8~ w"~ N< . ~J~st;
Natural Cycle: 80
~ontrorf 12e: Actua!~d-~ _
Maximum v/c Ratio: 0.92
!nte@ Jgruil ~~l_§!y: 22:fil.
Intersection Capacit Utilization 70.2%
~ysis ReriQQ!{bJi
--+
Splits and Phases: 4: Cannon Rd & Car Country Dr
8/15/2008
JW
,.t~r~e~}i l-'~~l.
ICU Level of Service C
Synchro 7 -Report
Page 7
Legoland Hotel TIA Supplemental Analysis
4: Cannon Rd & Car Country Dr
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
L . ,~ a:04 · 60:1t1ftco.9f ~
v/s Ratio Perm 0.01
p.85'~--: 0~27 . xo~i~~0:03,
41 .8 7.5 28.9 28.3
-.-,. ,.,,,,,.,,,l,00~'J bo, ;.,
Incremental Delay, d2 10.3 6.9~,·,pr,:m,·.,.,D"'".!-'47.9 0.1 0.7 0.2
P.ela}'.@ itJL\l!iti,1'J~4,{x< 54.Q ;~-23;~ '9, .,~is:.s
Level of Service D C F A C C
N>JJJQ.tcnJ?}TiY!(~I&•
Approach LOS C B C
ntersectibn Summa
HCM Average Control Delay
HCM i
Actuated C cle Len th s
f ~
Analysis Period min
C Gfi!i9JII Hi]§,
8/15/2008
JW
21 .9 HCM Level of Service C
Synchro 7 -Report
Page 8
Legoland Hotel TIA Supplemental Analysis
5: Cannon Rd & LEGOLAND Dr
Cycle Length: 90 ' 1;;~
Natural C cle: 60
. . ·9}!i~JJncpof9 i'n"ated,~~~
Maximum vie Ratio: 0.79
Intersection Capaci Utilization 52.4%
t\rialysis Peri~,1
Splits and Phases:
8/15/2008
JW
5: Cannon Rd & LEGOLAND Dr
Near-Term (2010). No Proj Conditions
Timing Plan : AM Peak Hour
· lnter_secti . ;· . , , = . ~
ICU Level of Service A
Synchro 7 -Report
Page 9
Legoland Hotel TIA Supplemental Analysis
5: Cannon Rd & LEGOLAND Dr
-+ +-
Lane Gr Ca v h 1441 1210 390 2059 1016 745
Near-Term (2010) No Proj Conditions
Timing Plan : AM Peak Hour
~'co,.o ~o Q~ •
v/s Ratio Perm 0.22 0.01
~9 ~-:· • ~b~5EtJ,.;;;o.3oJ~f
Uniform Delay, d1 21 .2 5.4 34.3 8.6 20.5 14.4
, =~~ ~ ·.oo ;1 ,;t o.9 t1:a
Incremental Dela , d2 2.9 0.3 1.9 0.1 0.1 0.0
-;, : *:1 -~~~
Level of Service C A D A C B
~9.roa -.. ._ __ _,.,.., I'
Approach LOS B B B
HCM Average Control Delay . .. .. . 17.2 8~M VqlurneJQC~Qacity)atiq;l\'flt~~~lf~o:61,,
HCM Level of Service
Actuated C cle Len th s 81 .8 Sum of lost time (s
ITi'iersec Iqn apacI · 11zation· · -52.4% .
Analysis Period min "''"'""'' w,. 15
cfgriti_q~L ", ; . : ? ,:
8/15/2008
JW
B
Synchro 7 -Report
Page 10
Legoland Hotel TIA Supplemental Analysis
7: Palomar Airport Rd & 1-5 SB Off
-+
Lane Configurations ~ Vo1Um1t(Vfih)'~~~~0z; t\<r5o~*~li 7~~;%9334:'.~:33 >1,, •-" '""'" .t:;I<' .,:.:~r~,&'.f.C~,$.~'#: ~ Yi. '¾" # ~~-1..,, ,,,,,.,._,~-{.,i, ,h, .--"(;. ,
Turn T e custom custom r,;ff ~;'?¥!
Permitted Phases
~
Switch Phase
. ~-$5,0" . s:
Minimum Split (s} 20.0 22.0 20.0 20.0 ·•. . ~,~{"'· · · 3"0'"
;litk~ ' ··-';,~ -} , ;1;;~•-
57.1% 57.1% 42.9% 42.9%
rm··•··•,<·_··;
All-Red Time s 1.0 1.0 1.0 1.0
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
[ ''ii'"~ · · ·· · ·· --,~~--,,,,n,,i" , ,. · ~ r ,, 'Jc:' ,,.,,. ,·~t~~~'½!~ t~i~"'Mt ~!t.i''¥i~~~~ '·~ ... ·. ~1t.w~~.J
Total Lost Time s) 5.0 5.0 4.6 4.6
' •·-1.
Lead-Lag Optimize?
~~
Act Effct Green (s) 35.0
Actuated ic}f4!I9 · :
v/c Ratio 0.25
Co trol'Deifu,Jllt~~ -,i,)@i~.,'•!/i,~',~•,1&'],;;&~<ef'k[,'nj","14'';;~0,e1,~K
Queue Dela 0.0
LOS A
Approach LOS A
ntersectiori'Su
C cle Len th: 70
Natural C cle: 45
Maximum v/c Ratio: 0.82
lntersecti
Intersection Ca aci Utilization 65.7%
i"
0.0 0.0 0.0
.. 8
B C A
Splits and Phases: 7: Palomar Airport Rd & 1-5 SB Off
8/15/2008
JW
Synchro 7 -Report
Page 11
Legoland Hotel TIA Supplemental Analysis
7: Palomar Airport Rd & 1-5 SB Off
Flt Protected 1.00
Flt Permitted 1.00
1.00
1.00
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
0.95 1.00
0.95 1.00
Permitted Phases 4 4
~m.,~l lt~~~'-~oJJfljt:tz~cJl;f{-$sJjyttYfit~!~i~~tf~¥i)J~,tll~¥tZ4'P:i~~,t\W!tA~p
Effective Green, g (s) . . . 35.0 . . . . . 35.0 .. 24.0 24.0
I uat~@rRif-ti!ilfo:qJl~~til€li(~lv~J1~~t~o~s1Jj~l,~iii;'~f~~i~1tilaitJgil 9::3~~~1:fMflQ)s
Clearance Time (s 5.0 5.0 4.6 4.6
1 ef\tcle;&xtens1on s:
Approach LOS
8/15/2008
JW
A B A C
Synchro 7 -Report
Page 12
Legoland Hotel TIA Supplemental Analysis
8: Palomar Airport Rd & 1-5 NB On
-+ +-
Permitted Phases
Switch Phase
Approach LOS F A
C cle Len th: 150
l a
Control T e: Actuated-Coordinated
Splits and Phases: 8: Palomar Airport Rd & 1-5 NB On
8/15/2008
JW
t
6
F
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
Synchro 7 -Report
Page 13
Legoland Hotel TIA Supplemental Analysis
8: Palomar Airport Rd & 1-5 NB On
Near-Term (2010) No Proj Conditions
Timing Plan : AM Peak Hour
.,,>
v/s Ratio Perm
Uniform Delay, d1
Incremental Delax, d2 5.6
.... -¥';~~ ;~~~,
Level of Service E
4 .d; '·._.,:.:," -_.,
Approach LOS
HCM Avera e Control Dela
8
0.11
54.4 12.3 12.0 54.5
0 84•, ~ •o·A~lt"~~ J.. ~-..,, .-1!.. ~"~M1' t"!,~.,
'.'ii.
c0.37
0~ .,• !
38.4
38.9 0.1 0.2 6.8 7.7
·..,;ni,f!FJ 10 5,. i ~f2.70~f;;r½{ ,."'l.}\9'6f.f"j 45:1l· .~~\{~.:;~ ~/4. J;.~,·GJ,, .,~--· :;;¥.;,. f ,,.. •.· ,., ""'A·,,'}fa.l:c:~I:i:~. M
F B B E D
-~¾:!'' .. , "·•t1·,;5ffi&»"'::&4'·''"'''' ·.vr@,,,.., . ;.;:,,,.,,,,,,. ~,,. "~ilT'<At,lii'~ itl~l . 1,1 .5"]?0;w' ~·,~1\!:r;G;F3~4~48. 'l;·\L~1t:~~~~x~w~~
F B D A
Actuated C cle Len th s 150.0 Sum of lost time (s) 14.2
I ~ 1cOJ eveJ of.Seri ·
Analysis Period min) 15
g, Crj J I :tjll'l;:•·'"xi!f~ll'i,}J~e~;;:ti,""'' ~,,;w""""''"':.=
8/15/2008
JW
Synchro 7 • Report
Page 14
Legoland Hotel TIA Supplemental Analysis
9: Palomar Airport Rd & Paseo Del Norte
Permitted Phases
Approach LOS F C
ase 2:EBT and 6:WBT, Start of Green
Splits and Phases: 9: Palomar Airport Rd & Paseo Del Norte
8/15/2008
JW
6
Near-Term (2010) No Proj Conditions
Timing Plan : AM Peak Hour
D D
Synchro 7 -Report
Page 15
Legoland Hotel TIA Supplemental Analysis
9: Palomar Airport Rd & Paseo Del Norte
8/15/2008
JW
---+
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
t
Synchro 7 -Report
Page 16
Legoland Hotel TIA Supplemental Analysis
10: Palomar Airport Rd & Armada Dr
...........
Approach LOS B
Cycle Length : 130
~,~
Splits and Phases: 10: Palomar Airport Rd & Armada Dr
8/15/2008
JW
B
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
C D
Synchro 7 -Report
Page 17
Legoland Hotel TIA Supplemental Analysis
1 0: Palomar Airport Rd & Armada Dr
8/15/2008
JW
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
Synchro 7 -Report
Page 18
Legoland Hotel TIA Supplemental Analysis
11: Palomar Airport Rd & Hidden Valley Rd
Permitted Phases
Approach LOS
8/15/2008
JW
4
D
11 : Palomar Airport Rd & Hidden Valley Rd
C
Near-Term (2010) No Proj Conditions
Timing Plan : AM Peak Hour
D
Synchro 7 -Report
Page 19
Legoland Hotel TIA Supplemental Analysis
11: Palomar Airport Rd & Hidden Valley Rd
8/15/2008
JW
Near-Term (2010) No Proj Conditions
Timing Plan: AM Peak Hour
Synchro 7 -Report
Page 20
Legoland Hotel TIA Supplemental Analysis
1: Cannon Rd & 1-5 SB Off
-+
nte
C cle Len th: 90
=~,__,..,~-gt"ti;,._""'•=10"'-,4~,m:,.~ ~.z;,?
Natural C cle: 55
-~•--ac·c•~ ~"?~ .. ~¾;,
,;<;'?~f '·.~ ~
Maximum v/c Ratio: 0.79
J ~
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
Intersection Ca acit Utilization 58.4% ICU Level of Service B
~Y.fil
Splits and Phases: 1: Cannon Rd & 1-5 SB Off
8/15/2008 Synchro 7 -Report
JW Page 1
Legoland Hotel TIA Supplemental Analysis
1: Cannon Rd & 1-5 SB Off
8/15/2008
JW
Near-Term (2010) No Proj Conditions
Timing Plan : PM Peak Hour
Synchro 7 -Report
Page 2
Legoland Hotel TIA Supplemental Analysis
2: Cannon Rd & 1-5 NB On
Cycle Length: 90
A~tupj~&Yi:~
Natural Cycle: 75
Contri rJYii::~Y~ti[~99r 1na
Maximum v/c Ratio: 0.64
I \
--+ +-t
": ~> . .. . 'Q 8
6 , '5 w
~ h·
"' l nt~rs~ctlcinJ O§/
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
Intersection Ca acity Utilization 58.4% ICU Level of Service B
An~I . )
Splits and Phases:
8/15/2008
JW
2: Cannon Rd & 1-5 NB On
Synchro 7 -Report
Page 3
Legoland Hotel TIA Supplemental Analysis
2: Cannon Rd & 1-5 NB On
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
v/s Ratio Perm
HCM Avera e Control Dela
R
Actuated Cycle Len th (s
I_ . ion
Analysis Period min)
,1&:r . . ., • .,;,;;. :Ji\
8/15/2008
JW
16.1 HCM Level of Service
§~o . -,.
76.7 Sum of lost time (s)
I§f58,Ao/o ~et•.m,. ~ ICU Level ot Servi~i~
15
B
Synchro 7 -Report
Page 4
Legoland Hotel TIA Supplemental Analysis
3: Cannon Rd & Paseo Del Norte
---+
e~rou
Lane Confi urations t.
,, @'.~ ~~Uttfii'.;s'!" 'i-,: 632 ~ "'~ 107~,&;fj 1 101" '' ; M61i~ M..r,, ~'-l~~,.,;,.:~& . , ' ' '• . ,, . ¥
TumT~ P~ m~v
3-1'">:-8i: ,. ~¼iz
2
C cle Len th: 90
"e ~.
Natural C cle: 60
Maximum v/c Ratio: 0.79
l9Je se i i al Del
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
-:a~·
Intersection Capacity Utilization 61.0% ICU Level of Service B
8/15/2008
JW
c3~(illinF
3: Cannon Rd & Paseo Del Norte
Synchro 7 -Report
Page 5
Legoland Hotel TIA Supplemental Analysis
3: Cannon Rd & Paseo Del Norte
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
~dj, F!Qw'. (~p[)Bl\~wA '.~n ~~?t:fq'S°' ,*:;rs89'Jj1~T~4l&~
RTOR Reduction (vph) 71 0 0 0 0 60
Lane Group Fi
HCM Average Control Delay 19.8
'.6t -''
Actuated C cle Len th s 82.1
~ 0% ~-
Analysis Period min 15
p ,Q •·.~
8/15/2008
JW
HCM Level of Service
Sum of lost time s
ICU
B
Synchro 7 -Report
Page 6
Legoland Hotel TIA Supplemental Analysis
4: Cannon Rd & Car Country Dr
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
-+ +-
ane
Lane Conti urations
¥2!!! u~
Cycle Len th : 90
[\ctu= -"""'----~-~""'"'""'-&fi',t
Natural C cle: 60 co jafecl:Oi "'£9filiffh?! ~''. -
Maximum v/c Ratio: 0.74
!ntersection Sig. w..: . . to-· · · 1
• ,;r. ,. ' " • ..,, ,.,.,,, •
Intersection Capacity Utilization 59.2% ICU Level of Service B
MajYJiS Period {min)
Splits and Phases: 4: Cannon Rd & Car Country Dr
8/15/2008
JW
-+ 04
Synchro 7 -Report
Page 7
Legoland Hotel TIA Supplemental Analysis
4: Cannon Rd & Car Country Dr
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
_..,
Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00
Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00
Uniform Delay, d1 37.3 18.8 30.1 13.3 22.1 20.9
e"m'&~ruil~'.9811!&11Q.Q)li~flQIJtft~•tiiw~&1!99~il1:o~Jelf'.'.Qo~'fiJl~:~~-~~l~~
Incremental d2 3.9 1.4 2.6 1.3 1.6 0.5
Level of Service
~~-w""'~ P!Q.8 8£Yi·~
Approach LOS
8/15/2008
JW
D C C B C C
C B C
Synchro 7 -Report
Page 8
Legoland Hotel TIA Supplemental Analysis
5: Cannon Rd & LEGOLAND Dr
......
C cle Len th: 90
~ '""'·-.... ~· -?~
Natural Cycle: 55
gontro1JYR~~Oncq_orciin~ied]'ili;Jf~
Maximum v/c Ratio: 0.74
I
Intersection Ca acity Utilization 56.0% ri): 1 ~;"'][J.d[~t];'f{
Splits and Phases: 5: Cannon Rd & LEGOLAND Dr
8/15/2008
JW
~ ' ,. "'-"/
Near-Term (2010) No Proj Conditions
Timing Plan : PM Peak Hour
ICU Level of Service B §,~?·1~ li:~li~1t~ · .
Synchro 7 -Report
Page 9
Legoland Hotel TIA Supplemental Analysis
5: Cannon Rd & LEGOLAND Dr
Approach LOS
8/15/2008
JW
-+
C B B
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
Synchro 7 -Report
Page 10
Legoland Hotel TIA Supplemental Analysis
7: Palomar Airport Rd & 1-5 SB Off
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
Lane Confi urations f. '(' v i~~rl'f ;iS4',-\ •95.o:/t::>:·586'<"';:;t15 '½i ~'4§< ~ 1~ ~ ,; * , .. ., ... ~ ' . ". '
Turn T pe custom custom
-~ <~~ "J 'J,'!'-2-~•','<:9;; ~ '; ·1~·
Permitted Phases 4 < ,, ... ;:;~
Switch Phase
Minimum S lit s 20.0 22.0 20.0 20.0
: :6
Total S lit % 60.0% 60.0% 40.0% 40.0%
' ·-------· { j All-Red Time s 1.0 1.0 1.0 1.0
('~':. , .. ,. ·.·o &;'.s•.· ',,"~~"l,',~,,J,\ffli!" __ L ~t: ~.~~> . . .
T~tal ~~t T:e (~~ •r '"' ;., 5.0 5.0 4.6 4.6
~~aq/[~gJJ~g~~
Lead-La O timize?
,_-r..,, -~~-~t 1\'R'§, -~ ', , ' 1 . /ff!f.§if,s ve<[• -~ ,,.;., ,.
Act Effct Green (s) 37.2 37.2 17.3 17.3
.A. f i\ ')'jMJ\",i;~t.'C '~~ ... '.~Wd,;~~ Q ;tB-.-q . ~:.tw~::f· >!, • .:i-£,\;<0?{:~ff~r~~~7Y
v/c Ratio 0.38 0.49 0.66 0.36
,'(:o'"'n 6~li¾'.?\7( 3· ~ ~1·1 .. a1:'111if'1&~'\.:fl$/~,~tl~,,j"J,,?~(1~1.1.tr~' ,,?~~f,~.•.·• ~S_,. ._,..,,, ·A'"-"1' ) ,,~~ ~ -~"iv~ ·,t/'!"lY ~:~'?-:l1i.'iliwkt·,J-:·i-,,~:~~ ~(;~1"~~'-~i~~~-lf:J
Queue Dela -~.,,.,.,,_..,.,.,. 0.0 0.0 0.0 0.0
4,
LOS A A C B
Annr1 ;.t h't!t:1,.;' •\':::;t
Approach LOS A A
o,ters
Cycle Length: 70
8,ctl!_a_!eci Cyg~
Natural C cle: 45
Maximum v/c Ratio: 0.66 ( _.,..,-.~:r:-
lntersection Ca acit Utilization 64.6% ICU Level of Service C
fi:Waly ·• ···· · tJi ""'filfl~{,1t,;~:i~~i~?;,'111'~~1t t" ,-+.:. .. · .. ~. }~,.~.: · ,;;J\B,.:'i~ {}!..! ~ ~•-Y--,...,':.]:: '."-1> . ,; ~1;, .. ~a'-.:~~-~iq~~~0-. ",_,~-
Splits and Phases:
8/15/2008
JW
7: Palomar Airport Rd & 1-5 SB Off
Synchro 7 -Report
Page 11
Legoland Hotel TIA Supplemental Analysis
7: Palomar Airport Rd & 1-5 SB Off
Near-Term (2010) No Proj Conditions
Timing Plan : PM Peak Hour
Effective Green, s -~,,-37.1 t~f,{?%iilJfA}ii:r~~,J1~~~
Clearance Time (s) 5.0 5.0
1/ehic e"Bxtension_ s ' . ,½ '.
Lane Grp Cap (vph
Uniform Dela d1
Incremental Delay, d2
.. ,.1~1:ffl~ • -.'•' -~·~~~!i\\,\l
Level of Service . aT<J1~·,m'-~
Approach LOS
HCM Avera e Control Dela
H
Actuated Cycle Len th s
lr;i_tersection =
Anal sis Period (min) . ·-~= JP~' ·+ C Ql!P>?.\~%1' ' ~-;_/ ·&i:l"~t;
8/15/2008
JW
•. '{,f:.'~~~~
' " 7.1 7.9
0
· 1 iivli!!llsl!t!fiJ 0.
8
A A
Sum of lost time s
U Levei •of
"""1o:N
Synchro 7 -Report
Page 12
Legoland Hotel TIA Supplemental Analysis
8: Palomar Airport Rd & 1-5 NB On
......
Permitted Phases
Switch Phase
Control Type: Actuated-Coordinated
Intersection Si nal Delay: 53.0 ~J'filiol:[a~§-
An aIysis Period (min) 15
Splits and Phases: 8: Palomar Airport Rd & 1-5 NB On
8/15/2008
JW
t
6
Intersection LOS: D
Near-Term (2010) No Proj Conditions
Timing Plan : PM Peak Hour
Synchro 7 -Report
Page 13
Legoland Hotel TIA Supplemental Analysis
8: Palomar Airport Rd & 1-5 NB On
Near-Term (2010) No Proj Conditions
Timing Plan : PM Peak Hour
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
lj),' / ~"if~:o ?074'~:'0J3?J,a: t '9}1-lQIIl!?:'. " '.0:
RTOR Reduction (vph) 0 0 0 0 0 272 0 0 363 0 0 0
HCM Average Control Delay 50.9
' ~="7ITT✓-. 8
Actuated C cle Length (s) 170.0
~-%
Anal sis Period min 15
C,'
8/15/2008
JW
HCM Level of Service D
·6
Synchro 7 -Report
Page 14
Legoland Hotel TIA Supplemental Analysis
9: Palomar Airport Rd & Paseo Del Norte
Approach LOS D
Splits and Phases: 9: Palomar Airport Rd & Paseo Del Norte
f m1
~ m5
8/15/2008
JW
E
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
F F
Synchro 7 -Report
Page 15
Legoland Hotel TIA Supplemental Analysis
9: Palomar Airport Rd & Paseo Del Norte
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
Peak-hour factor, PHF
RTOR Reduction (vph)
Uniform Delay, d1
Incremental Delay, ~2 «•
'. -~&·f~.·.
Level of Service
~1,1ro J¼'(s)JlfY< ·
Approach LOS
HCM Avera e Control Dela . !u
Actuated C cle Length (s)
111ter -,:za
0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
~o~ftt211.~)3~,,;,~24·51".t'f~j~.,;)3a r,-3 ~11Jia . ~t,jia~i
0 12 0 0 0 24 0 80 0 0 206 0
'39~2451 · , fd
61 .3 HCM Level of Service E
.89 .• -~--~ -~
170.0 Sum of lost time (s)
.3% 'ivic~ 'f
16.4
15 Analysis Period (min)
P . .,Qrfffp,al .:a~{,toti'R11L '"""""·'•'•"'· .,._
8/15/2008
JW
Synchro 7 -Report
Page 16
Legoland Hotel TIA Supplemental Analysis
10: Palomar Airport Rd & Armada Dr
Splits and Phases: 10: Palomar Airport Rd & Armada Dr
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
8/15/2008 Synchro 7 -Report
JW Page 17
Legoland Hotel TIA Supplemental Analysis
10: Palomar Airport Rd & Armada Dr
Approach LOS
8/15/2008
JW
C C
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
E D
Synchro 7 -Report
Page 18
Legoland Hotel TIA Supplemental Analysis
11: Palomar Airport Rd & Hidden Valley Rd
Approach LOS C
Maximum v/c Ratio: 1.00
lits and Phases:
8/15/2008
JW
11 : Palomar Airport Rd & Hidden Va
E
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour ·
E C
ICU Level of Service D
Synchro 7 -Report
Page 19
Legoland Hotel TIA Supplemental Analysis
11: Palomar Airport Rd & Hidden Valley Rd
HCM Avera e Control Delay 48.3
fl _,_ IY. ratio
Actuated Cycle Length (s 131.3
1 ion ca\?~city uuli ,o/o , ::;
Analysis Period min 15
~" ,CriticaC -~
8/15/2008
JW
Near-Term (2010) No Proj Conditions
Timing Plan: PM Peak Hour
HCM Level of Service
Sum of lost time (s)
0ICU Level of Ser,yip~ii}t,,•;,/j<:
D
11.6
Synchro 7 -Report
Page 20
-----------
-----Near-Term (2010) With Project Conditions
----
----------------
Legoland Hotel TIA Supplemental Analysis
1: Cannon Rd & 1-5 SB Off
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
Lane Configurations
Ysitu~ '[vRfft.~
Turn Type
protect~g_"Phases :
Permitted Phases
Switch Phase
_., +-
"1·.· ·5 o · '"'· 5 "~· 1">,ts··~o·~· , .• s·o::-" .-s· . ' ,\[,,;)%;, ~~ ;J,,i·":' • ,. '
Minimum Split (s) 22.6 22.6 9.2 22.0 20.0 20.0 20.0
~"~~JJrt~.~36.f "~36.2~':t'2[.f2'.-.i,:r4j::,;'5[4 ?' ~39 6'~~f39,5i~39';51'l ·;, ~~"\'YM~,.. WK'iJW, ,, . .,,, 7%'f • , -~~-"' ~ ... '""1; ., . '"'"'if~--"~~,,~,,~ •
Total Split(%) 40.2%. 40.2% 15.8% 56.0% 44.0% 44.0% 44.0%
• . --~~r,~ ·1,w, %!_'>'.'.'ff w·~, "'·t'.Jt"' • /4-~"""W~ 0·~lf"* !t~l?:W'¾?W"' ~~~'t --~-.-j §J~Y::f' > ~,~.2'!.<~i-, 3:,§ "J ~3.f?titi'l'$;.~3.6,tt~wt?,9.A¥,,,~i!~~~>~i~s~~~-
AII-Red Time s 1.0 1.0 1.0 1.0 1.0 1.0 1.0 >' ,,,,"' ·,7,.•·· ,;: • ·-<4< ·t · · , •.. , ·, '&)&'-~ -i~'C' ~. . _ .,, · -~-' ,0};;f';i:0 .. Q~~-o.~r ~-o.q ,;;I"';,,0;9.:~1~0;0~ , , .• ,, .. · ;,.;;t:~ .
Total Lost Time s 4.6 4.6 4.2 4.6 4.6 4.6 4.6
l-~4 9.
Lead-La O timize? Yes Yes Yes
R ,.;..::..;;;.;"""""""' · M :.;. ·
Act Effct Green (s) 32.4 32.4 9.4 46.0 31 .2 31 .2 31.2
13jf~i~~"w~:o.~.1L .. i'it~o. 'f'•
v/c Ratio 0.34 0.06 0.58 0.20 0.82 0.82 0.41
· on o · efa'y·~~l~~u:F: f '.'.'.:,~'f-'f:()o;:l*Xi' .o f&!tb\~Yr~~~t .... ~ . .. . ,~~~~ ~~jj,,:,__,,._,.._ ~"¼¾-:%, "' "'"""'-"""' ~~~)Y.ii£i1?i~~~ ... ,y'"i< ~
Queue Dela 0.0 0.0 0.0 0.0 0.0 0.0 0.0
t(otal Der~· .0
LOS C A D B D D A
~~roach ·
Approach LOS C C
ntersec ·
C cle Length: 90 ,. c ,-' . ·: '
Natural C cle: 60
: = , ]'699rdincoited
Maximum v/c Ratio: 0.82
Intersection Capacity Utiliza~on 61 .6%
Splits and Phases:
8/15/2008
JW
1: Cannon Rd & 1-5 SB Off
Synchro 7 -Report
Page 1
Legoland Hotel TIA Supplemental Analysis
1 : Cannon Rd & 1-5 SB Off
Approach LOS
8/15/2008
JW
B C
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
A
Synchro 7 -Report
Page 2
Legoland Hotel TIA Supplemental Analysis
2: Cannon Rd & 1-5 NB On
~f!YE,!eq, Cy_g~~ngt
Natural C cle: 90
C,Q!ltJ:
Maximum v/c Ratio: 0.85
Intersection Ca acit Utilization 61 .6%
~y§is
-+
Splits and Phases: 2: Cannon Rd & 1-5 NB On
f
v tiq , "
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
ICU Level of Service B
8/15/2008 Synchro 7 -Report
JW Page 3
Legoland Hotel TIA Supplemental Analysis
2: Cannon Rd & 1-5 NB On
Level of Service
Approach LOS
8/15/2008
JW
C C
C
A
A
Near-Term (2010) With Proj Conditions
Timing Plan : AM Peak Hour
A D
C
C
A
Synchro 7 -Report
Page 4
Legoland Hotel TIA Supplemental Analysis
3: Cannon Rd & Paseo Del Norte
-+
Permitted Phases
Switch Phase
2
v/c Ratio 1.09 0.83 0.17 0.15 0.15
LOS F F A C B
Approach LOS F B C
Maximum v/c Ratio: 1.09
3: Cannon Rd & Paseo Del Norte
8/15/2008
JW
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
Synchro 7 -Report
Page 5
Legoland Hotel TIA Supplemental Analysis
3: Cannon Rd & Paseo Del Norte
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
+-/"'
Turn Type Pro!
P~9tected PQ~ei ~ 3' -?~~;, '(
Permitted Phases
~ctuated Gre
Clearance Time (s)
j
Vehicle Extensioiv{~;,t7'i§:
Lane Grp Cap {vph 1945
v/s R~g ro!~
v/s Ratio Perm , _,,,.,,,;:,,'$"!'-~=~
Uniform Dela d1
,Ii;, ~ .,..., -=..;,,.,; .v •
Incremental Dela d2
Q~~y.,_(§)
Level of Service
t.J)Qro ch
Approach LOS
HCM Avera e Control Delay
A' atio.
Actuated C cle Len th s
l rsec aP,pft ,._ !JZatio.n
Analysis Period (min 1 ~ f ~ '·--~ ,·~ c, _Critical tan~"@J
8/15/2008
JW
'
lf.
0.2
""·'l>' ~;,]
C
Sum of lost time (s)
~ • --~·· .... ·• <• . .,,, ICU L~yel·of Service/,, .,• • _
Synchro 7 -Report
Page 6
Legoland Hotel TIA Supplemental Analysis
4: Cannon Rd & Car Country Dr
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
Switch Phase
v/c Ratio
LOS
Approach LOS
8/15/2008
JW
O.D7 0.93 0.62 0.27 0.12 0.13
D C E A C B
C B C
4: Cannon Rd & Car Country Dr
Synchro 7 -Report
Page 7
Legoland Hotel TIA Supplemental Analysis
4: Cannon Rd & Car Country Dr
Lane Util. Factor
v/s Ratio Perm
Uniform Dela d1
~
lncre
pjg
Level of Service
Approach LOS
8/15/2008
JW
--+
1.00 0.95 1.00
43.8 16.6 42.0
D C F
C
+-
0.95
7.5
A
B
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
1.00
29.0
C
C
1.00
0.01
28.5
C
Synchro 7 -Report
Page 8
Legoland Hotel TIA Supplemental Analysis
5: Cannon Rd & LEGOLAND Dr
+--+
Permitted Phases 4
Switch Phase
Total Lost Time s
""'"--"" "
LOS C A
Natural Cycle: 60
Maximum v/c Ratio: 0.79
S lits and Phases: 5: Cannon Rd & LEGOLAND Dr
8/15/2008
JW
D A C
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
2
A
Synchro 7 -Report
Page 9
Legoland Hotel TIA Supplemental Analysis
5: Cannon Rd & LEGOLAND Dr
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
-+ +-
Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00
~~~P~i~~~1111:f;f3'~m s~'~Y,$;22~1l~wf61Jffi~s~~j&t-•~ff~'~~~r~~~~~l~~~~~0:&tz1
Turn Type pm+ov Prot pm+ov
PX~&t~j1Rf~~.f~lf~~l~~J13BJ~1?:1fm1:t}:2~~J~3Jllil!~l-liffl~¾'!~~~~~-~~1t}
Permitted Phases 4 2
a~lJ.~:;gf~l ··
Effective Green, g (s) . .· . 33.3 57.5 ·. 9.4 . 47.7 24.2 33.6
~t@~afloBtit:YGq,1Jll"'P19:~~:9~'tJ~~:'Q.i§a'Ro~~:Wt11~~4Jifi:f~~{ffllfD1i,')fJ!fi~-~-~~JJ;i~
Clearance Time (s 5.0 5.0 5.0 5.0 5.0 5.0
~i9Er'Extenslo ·· ,~.
~:~~ Cap :ph)
y/;§Bfill~O ·
v/s Ratio Perm 0.23 0.01 Y~~l!ISQI!~Q;fs)IIJJ ··,r:
Uniform Dela d1 21.2 5.5 34.3
8/15/2008
JW
Synchro 7 -Report
Page 10
Legoland Hotel TIA Supplemental Analysis
7: Palomar Airport Rd & 1-5 SB Off
--+
:aneGrou
Lane Confi urations tt~
v sid· <,,, . " •
Turn T e
Permitted Phases
Switch Phase
+-
tt lt '('
\ '575 ';z'(c%9~4'''3'4'"1'3(j5
, ('K, ,, . ...'It,& 4,.. . ...~r .
custom custom
4 4
. .
All-Red Time s fJi~tlfu'~'<'l~ 1.0 1.0 1.0 1.0
Total Lost Time (s) 5.0 5.0 4.6 4.6
T. """'J" . \ W,}ff.!!<\:4~~~&'.<1':'l'!i!?!i'&'Z:'¼" Cf,'.,\!'Ji'f,";" -~~)J);:'. ..~ b,~a9/L:~g ... J~i'f~~~~\~~1!'«i~~~~mJ1ih~,:'
Lead-Lag Optimize?
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
, ·:~None .. "4lt-:~~~~~~ t "':.·~1~'~1:1
-..,.., ...... ._ . ~-Ai -·~-!li~~~f#~~, 3:-,~'t.tit,/t~~
Act Effct Green s 35.1 35.1 24.1 24.1
~ ;}e::::;:i1c'ix~~;::li.'f1",i;,-rr,';j,'"'f'},1,i,~1t'mt:~~ •~~tz~,,t~,~"!!i,,~, . .,r7
v/c Ratio 0.25 0.34 0.83 0.46
~~(~j'[o/ 7. ~,~~~~ .... ,.
Queue Dela 0.0 0.0 0.0
t
LOS --~ A B C
'.:. -Approac L A B
Maximum v c Ratio: .
lnte section SigJl.~
Intersection Capacit Utilization 66.2%
~Jl~l'isis·P~rioj .
Splits and Phases:
8/15/2008
JW
7: Palomar Airport Rd & 1-5 SB Off
0.0
d > ,$
ICU Level of Service C
Synchro 7 -Report
Page 11
Legoland Hotel TIA Supplemental Analysis
7: Palomar Airport Rd & 1-5 SB Off
PrQg
Incremental Delay, d2
el;a.yJ~I~~ ,-.... .. ...;1;••,,,
Level of Service
~Qroaq~~'.
Approach LOS
HCM Avera e Control Delay
. ati
Actuated Cycle Length (s)
intersection .. ~ap?Cit}'.~YJllizati
Analysis Period (min)
o'WQntical _L"an¢,.Group~~ .
8/15/2008
JW
16.7
• >;' ~0'.54 ·,
68.7
/' ~6S:2¾r '
15
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
Synchro 7 -Report
Page 12
Legoland Hotel TIA Supplemental Analysis
8: Palomar Airport Rd & 1-5 NB On
-+
Cycle Len th: 150
Ac uateo
Offset: 0
Nelli!! . [gi?Jf
Control T e: Actuated-Coordinated
Intersection Signal Delay: 204.0
t
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
Intersection LOS: F
R.e.CilY: 85. :1cu L~vel ;
Analysis Period (min) 15
Splits and Phases: 8: Palomar Airport Rd & 1-5 NB On
8/15/2008
JW
Synchro 7 -Report
Page 1
Legoland Hotel TIA Supplemental Analysis
8: Palomar Airport Rd & 1-5 NB On
Lane Gr
~!Bili9
v/s Ratio Perm
[l2Bi
Approach LOS
8/15/2008
JW
3166
12.4
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
1735 373
0.12
12.1 54.5
1200
c0.37
38.6
Synchro 7 -Report
Page 2
Legoland Hotel TIA Supplemental Analysis
9: Palomar Airport Rd & Paseo Del Norte
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
--+-+-t
sa
f+ tt ~~ tf+ ~~ tf+ 816;~~2"11 '::'1:~20s'~'¾Z-;137~:1 j~"::f. 6 , • -:r ~}1 •• .~ ... !f.:~«-~).,'-it , ~i;t;,;,~ """"' ,,
Pro! Pro! pm+ov Pro! Pro!
6
Cycle Length: 150
~to~ted c'""y~""'e-; ""'~"""""',_.,.==--"i·
Offset: 51 34% Referenced to phase 2:EBT and 6:WBT Start of Green
Control Type: Actuated-Coordinated
fviaximum v/c Ratio;
Intersection Si nal Dela : 83.0 Intersection LOS: F
!D~~tl9 ty,Q" [t8.%.~~r~~i ~~lQtJJe~,fo! seryi~lf~;, '.l<f;
Analysis Period (min) 15
Splits and Phases: 9: Palomar Airport Rd & Paseo Del Norte
8/15/2008
JW
Synchro 7 -Report
Page 15
Legoland Hotel TIA Supplemental Analysis
9: Palomar Airport Rd & Paseo Del Norte
....... ~
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
2 ·6_9 )SJ!;? . · :§ijjD .t1 ~
RTOR Reduction (vph) 0 4 0 0 0 81 0 126 0 0 97 0
8/15/2008
JW
Q
Synchro 7 -Report
Page 16
Legoland Hotel TIA Supplemental Analysis
10: Palomar Airport Rd & Armada Dr
Permitted Phases
Approach LOS
Splits and Phases:
8/15/2008
JW
_.,
2
B
10: Palomar Airport Rd & Armada Dr
+-
B
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
f
6
C D
Synchro 7 -Report
Page 17
Legoland Hotel TIA Supplemental Analysis
1 0: Palomar Airport Rd & Armada Dr
8/15/2008
JW
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
Synchro 7 -Report
Page 18
Legoland Hotel TIA Supplemental Analysis
11: Palomar Airport Rd & Hidden Valley Rd
Permitted Phases
Approach LOS
8/15/2008
JW
4
D
11: Palomar Airport Rd & Hidden Valley Rd
"'"03 115.,
C
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
6
D
Synchro 7 -Report
Page 19
Legoland Hotel TIA Supplemental Analysis
11: Palomar Airport Rd & Hidden Valley Rd
Approach LOS
8/15/2008
JW
D C
Near-Term (2010) With Proj Conditions
Timing Plan: AM Peak Hour
t
D D
Synchro 7 -Report
Page 20
Legoland Hotel TIA Supplemental Analysis
1: Cannon Rd & 1-5 SB Off
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
-+ +-
ane~Grou
lntersec_tion fp~:,C}¥Jt:,, 7tt'llt7'~~•~1~~!fit~~~i~:~$Z
ICU Level of Service B
Splits and Phases: 1: Cannon Rd & 1-5 SB Off
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 1
Legoland Hotel TIA Supplemental Analysis
1: Cannon Rd & 1-5 SB Off
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
Uniform Dela d1 ~----.;
Incremental Delay, d2
Delav (s),,~~'l!~~,vq•,.,,.,.n,"'-= , .1-. ~ iiPJi-Js':IJ\.~M <Jl"/,,
Level of Service
J~w.~ _!im?tsj"4'."
Approach LOS B C A
fntersec
19.7 HCM Level of Service
< '~~~~;..,
Sum of lost time (s)
HCM Avera e Control Dela
Actuated Cycle Length (s
in .. _ .. ~ .. -~ ·. ICU Level of Se'fvic~f ~;~"~~r~·~:w
~naIi~is Perioc~Jr,ri.,!!!_L
C. G!J e:&rPVP
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
C
Synchro 7 -Report
Page 2
Legoland Hotel TIA Supplemental Analysis
2: Cannon Rd & 1-5 NB On
Near-Term (2010) With Proj Conditions
Timing Plan : PM Peak Hour
Permitted Phases
Switch Phase
&1@11[~(@1
Minim ·~.-"!
v/c Ratio
LOS
~pi![mQe"
Approach LOS
Maximum v/c Ratio: 0.65
terse 1.0
+-t /"'
6
0.56 0.45 0.65 0.52 0.40 0.32
C B B A D A
C B B
ICU Level of Service B
Splits and Phases: 2: Cannon Rd & 1-5 NB On
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 3
Legoland Hotel TIA Supplemental Analysis
2: Cannon Rd & 1-5 NB On
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
" ~~"'"'' 'ff''Rffl'i fl;'ff~' ~'1:1if?X,,"'\'i»" %3t'fl: ··~ ,,.. '' --~ "..~~=· , ~£ii ~294?.f",~tt~~ ~i:<tOit~i.;. fill§Jl}, 0xv'::~t!~0;,W$~::,.Q
RTOR Reduction v h O O O O 35 234 0 0 240 0 0 0
Lane. Group F 0
Turn Type Prot Perm Perm custom
Protected Phase ~{~ 1; .
Permitted Phases 6 8 1
~.~--. ~~ ~ ·.~-.,,_" ~=i~==_.,=(s \ 2\,,J,54,4~? $ '!"fi~,. •J
Effective Green, g (s) 11 .6 32.8 44.2 44.2 7.5 22.6
t,qtu,ste_g_g(G.,R;iJi.0 0 ' ;'. w~ •iJcVji:ff\,i:Ji,!01!,".0t':.&::.S ~'.~~till]§# '6,2,9~]£•~~
Clearance Time s 4.2 4.6 4.6 4.6 4.6 4.6
Vehicle Exte
Jntersec
HCM Average Control Delay 16.2 HCM Level of Service
HC"'-'-'•==··=:..--: • ~
Actuated C cle Len th s ~~~, Sum of lost time (s)
·1nt " :.icu L~v~i_of .setYJRe.i;,
Anal sis Period (min)
·-· G[Q~:
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
B
Synchro 7 -Report
Page4
Legoland Hotel TIA Supplemental Analysis
3: Cannon Rd & Paseo Del Norte
--+
aneSrou 1
Splits and Phases: 3: Cannon Rd & Paseo Del Norte
lnterse
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
ICU Level of Service B
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 5
Legoland Hotel TIA Supplemental Analysis
3: Cannon Rd & Paseo Del Norte
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
Incremental Dela , d2 3.6 ;~"':>.
Level of Service
~p.r,q~q!LQ.~)af (s) x, .·
Approach LOS
nte
HCM Avera e Control Delay
, " _ o YQ'l~ to. Cc!pacity rat
Actuated C cle Len th s
Jnt . ati
Anal sis Period min)
"" u
+-
20.1 HCM Level of Service
:q
82.5 Sum of lost time (s)
5.o/oli "'7 ~, ICl:J Level of.SerVjc'
15
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
C
14,0
Synchro 7 -Report .
Page 6
Legoland Hotel TIA Supplemental Analysis
4: Cannon Rd & Car Country Dr
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
+-
C cle Len th: 90
·-===Y,£1 Natural Cycle: 60
Y.R~JAcf11atecl-u · a~~,~~~
Maximum v/c Ratio: 0. 7 4 _ -~QsI ~l;,;
Intersection Ca acit Utilization 60.0% ICU Level of Service B
Analy ·,t.
Splits and Phases: 4: Cannon Rd & Car Country Dr
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 7
Legoland Hotel TIA Supplemental Analysis
4: Cannon Rd & Car Country Dr
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
-+
J •m•
v/s Ratio Perm 0.03
'i/,g Ratio " .. > .·•.~---= ·;~;!'s~ .. 0.'.[!;m "'."t3 ·· ~::
Uniform Dela , d1 37.6 18.8 30.5 13.3 22.5 21 .3
-r~'. &t.si
Incremental Dela , d2 4.3 1.4 2.8 1.4 1. 7 0.5
~ -
Level of Service ,., •• ,.,.n!l~t·-vr•~,D C C B C C
Approach LOS C B C
HCM Avera e Control Dela
[CM_
Actuated C cle Len th s
L ·--~-·-~-Anal sis Period min &<'1f.
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 • Report
Page 8
Legoland Hotel TIA Supplemental Analysis
5: Cannon Rd & LEGOLAND Dr
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
-+ -4--
C cle Len th: 90 & .,,..,,..""""",_,_,.... ~~Jlt·,~ ~( ... ,,\.~~'"'
Natural C cle: 55 q "-"""""""""'""""'"""""'-"""
Maximum v/c Ratio: 0.74
IQ!filsectloll.§.ig
Intersection Ca acit Utilization 56.9%
~najys §~~.pf,,~
Splits and Phases: 5: Cannon Rd & LEGOLAND Dr
lnt
ICU Level of Service B
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 9
Legoland Hotel TIA Supplemental Analysis
5: Cannon Rd & LEGOLAND Dr
-+ +-
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 10
Legoland Hotel TIA Supplemental Analysis
7: Palomar Airport Rd & 1-5 SB Off
• c uat~9£y£!i'tl.
Natural C cle: 45
Maximum v/c Ratio: 0.66 ---~=
--+
Intersection Ca aci Utilization 75.7%
+-
' ,. ,,.....-,,,w,,;,,~a·,v,,_-,
I
Splits and Phases: 7: Palomar Airport Rd & 1-5 SB Off
--+ 1112
421 ···• ··,
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
lon LQ~1t
ICU Level of Service D
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 11
Legoland Hotel TIA Supplemental Analysis
7: Palomar Airport Rd & 1-5 SB Off
-+
Lane Util. Factor 0.91
Permitted Phases
+-
0.95
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
t
0.97 1.00
4 4
Lane 936 432
Ylt:..=:.':GU.=-'U.JWJ
v/s Ratio Perm
Approach LOS A A
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
A C
Synchro 7 -Report
Page 12
Legoland Hotel TIA Supplemental Analysis
8: Palomar Airport Rd & 1-5 NB On
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
t
Cycle Length: 170
' . . . """"""""'""'"' . ~~,r~~]:f<'• Actuateo Cycl " · ~~~~~~, ~~t,,i~;:~
Offset O 0% , Referenced to hase 2:EBT and 6:WBT, Start of Green, Master Intersection
N t. .· ~r~~ . ; : J-]!!t... . SlB~
Control T e: Actuated-Coordinated
Intersection Signal Delay: 54.3
_nter~tion CaE!gfity Utilization _69.0%
Analysis Period (min) 15
Splits and Phases: 8: Palomar Airport Rd & 1-5 NB On
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 13
Legoland Hotel TIA Supplemental Analysis
8: Palomar Airport Rd & 1-5 NB On
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
t
NBTc ~:NBR
v/s Ratio Perm ·''-"""'"":~,.,,....,, 0.31 0.12
Uniform Dela d1 .,,._,~"""'._,..." . ..,.....,0...,,,_, 23.4 57.2 27.2 , .~=-?•,.,,..,.,.""""""'""""'
Incremental Dela¥., d2 48.0 16.3 0.6 0.5 2.0 0.5
Dela't'('s)_,~~~ ~*;;;;'Ef, . ~'t!';'fi;-,i~~-· : '0; .;?,':#??'Sf ,,.,,,."' .. ,·L~ .. :"',z"\'""\""',~\"",,_,r,,,~
w -1.J · ~:4%,.. <~7~<· x:, ,J~~ · ~W"l: ... ~ .SZ¾-l'~~
Level of Service F E D D E C · (~Irn,~ ;'l;,i!K=i'ii;JiY&i.ffl'.•r,c:4<½,'r""'' , ~ ~Jl!½t'4 ~-,;<,IMiJ~!.#,., ' :'s: •
Approach LOS F D
HCM Average Control Dela 50.8 HCM Level of Service
HCM Volume 19 Cc! _ _iw.,;1;1,,--~-""'
Actuated Cycle Len th s 170.0 Sum of lost time (s
Intersection C vel of S~(vi
Anal sis Period min 15
c . ""_ai\l ·. · .
. ·.~"~ . '·" ~
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
C
D
A
Synchro 7 -Report
Page 14
Legoland Hotel TIA Supplemental Analysis
9: Palomar Airport Rd & Paseo Del Norte
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
....... +-t
lntersectiott Summary
Cycle Len th: 170
~ctuate , Length: 1 io . ;c,, •& • ; ···· . ~~,,~~~~ r,.,;;;],5}l~]lfi;~ii;~~J~~ ~
of Green
N ~~~1'.i~~~·. ':.• ;
Control Type: Actuated-Coordinated
Maximum v/c Ratio;J ,01 }i:}'~11' ~ t.1J~··: .. ~"1 ·;.x~~.,,,:Scs'.<Jl
Intersection Si nal Delay: 66.2 Intersection LOS: E
¥'~--, . """'"''' ·~~y; 'M'"·= .,,.. '<¥ ',. ,,...,.,~lo:'~I>'¼'> .~"""'kl ''\Ir J}rr R~~i!Y JJtilizatiQ.Q ~?~-~o/o ~ I.Glltieyel of Servl(e,F ~.<1; ;;~v~l~~t'l ·'
Analysis Period (min) 15
Splits and Phases: 9: Palomar Airport Rd & Paseo Del Norte
'f 01
a5.6s ', ;ii!I,,
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 15
Legoland Hotel TIA Supplemental Analysis
9: Palomar Airport Rd & Paseo Del Norte
Intersection Sammazy
HCM Average Control Delay 62.7
.8
Actuated C cle Length (s 170.0
9o/c
Anal sis Period min 15
C ~t
Near-Term (2010) With Proj Conditions
Timing Plan : PM Peak Hour
HCM Level of Service E
Sum of lost time (s) 16.4 ,,
J
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 16
Legoland Hotel TIA Supplemental Analysis
1 0: Palomar Airport Rd & Armada Dr
--+
Permitted Phases 2
Maximum v/c Ratio: 0.92
Splits and Phases: 10: Palomar Airport Rd & Armada Dr
..... '1l2 rag~
+-
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
6 4
ICU Level of Service E
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page17
Legoland Hotel TIA Supplemental Analysis
10: Palomar Airport Rd & Armada Dr
Approach LOS C D
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
E D
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 18
Legoland Hotel TIA Supplemental Analysis
11: Palomar Airport Rd & Hidden Valley Rd
Approach LOS
Cycle Length: 130
~filYa~Y.Q:!k,fil29L
D
S lits and Phases: 11 : Palomar Airport Rd & Hidden Valle Rd
E
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
E C
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 19
Legoland Hotel TIA Supplemental Analysis
11: Palomar Airport Rd & Hidden Valley Rd
vement·
Near-Term (2010) With Proj Conditions
Timing Plan: PM Peak Hour
Legoland Hotel TIA Supplemental Analysis 8/14/2008 Near-Term (2010) With Proj Conditions
JW
Synchro 7 -Report
Page 20
-----------...
-----Improved Near-Term (2010) With Project Conditions ----
-
-----------