Loading...
HomeMy WebLinkAbout2022-06-02; Building Permit Self-Certification Program (Districts - All); Barberio, GaryTo the mempers of the: CITY COUNCIL Date "/--./;;a CA I/ CC _.lL CM-�--ACM i/ DCM'{3) V June 2, 2022 Council Memorandum To: Honorable Mayor Hall and Members of the City Council From: Gary Barberio, Deputy City Manager, Community Services Branch Jeff Murphy, Community Development Director Via: Geoff Patnoe, Assistant City Manager @ Re: Building Permit Self-Certification Program (Districts -All) {city ofCarlsbad Memo ID #2022066 This memorandum provides an overview of the Community Development (CD) Department's new Building Permit Inspection Self-Certification Program (program). Background The city recognizes the amount of time and cost that goes into home improvement projects and is consistently looking for ways to simplify the permitting and inspection processes for customers, while still maintaining the city's high standards and ensuring safe and quality construction. In keeping with the objective, the City Council on May 10, 2022, adopted changes to the city's building code to allow the Building Official to accept reports from licensed professionals certifying that construction was installed consistent with required codes. Discussion Starting June 10, 2022, the CD Department will be launching the new program. This program allows a California-licensed contractor to self-certify inspection of code requirements on select minor residential building permits without city inspections. Projects that are eligible for this program include roof & window replacement, drywall installation, plumbing projects and water heater replacements, just to name a few. Attachment A includes a copy of the informational bulletin that provides additional information on the subject and is available to the public on the CD Department's website.1 City staff estimates that this program can reduce the number of city field inspections performed by as much as 10%, which equates to roughly 1,500 inspections per year. It is expected that this program will help expedite the closing out of permits for customers and free up building inspection staff to spend needed time on more complicated building inspection jobs. 1 https://www.carlsbadca.gov/departments/community-development/departmental-information-bulletins Community Services Branch Community Development Department 1635 Faraday Avenue I Carlsbad, CA 92008 I 442-339-5088 t Council Memo -Building Permit Self-Certification Program (Districts -All) June 2, 2022 Page 2 Next Steps Beginning June 1, 2022, staff will be promoting the start date of the new program, which will officially start on June 10, 2022. Staff will be monitoring implementation of the program, including conducting random inspections to ensure that the work certified complies with required state and city codes and standards, as required under the program. If successful, the CD Department will look into expanding the program to include other inspection types. Attachments: A. Informational-Bulletin and application documents cc: Scott Chadwick, City Manager Celia Brewer, City Attorney Ron Kemp, Assistant City Attorney Tina Ray, Communications & Engagement Director Eric Lardy, Principal Planner Scott Donnell, Senior Planner Sarah Lemons, Senior Program Manager Mike Strong, Assistant Director Jason Pasiut, Building Official ~ Attachment A Building Permit Inspection Self-Certification Program (_ City of Carlsbad Informational Bulletin 18-270 The Carlsbad Building Permit Self-Certification Program (SCP) allows for a California-licensed contractor to certify that certain minor construction projects were completed in compliance with required building codes in-lieu of a city inspection. This Info-Bulletin is intended to outline program requirements and provide links to required processing documents. PURPOSE & AUTHORITY The city recognizes the amount of time and cost that goes into home improvement projects. In response, the city has developed a program that allows a California- licensed contractor to self-certify inspection of code requirements on select minor building permits without Building Division inspections. Carlsbad Municipal Code §18.04.045 and §18.20.050 authorizes the Building Official to accept inspection reports from approved agencies or individuals for work performed under a building permit. The inspection reports shall be in writing and certified by a responsible officer of the approved agency or by the responsible individual. PROJECT ELIGIBILITY Given the nature and complexity of the construction work, the SCP allows for self-certification for work that is conducted on a detached single-family dwelling, accessory structure, or considered minor in scope and scale. Documents Referenced Carlsbad Municipal Code: §18.04 & §18.20 2019 California Code Section; §R109.2 Building Permit Application; B-1 SCP Declaration; B-70A SCP Inspection Checklist; B-70B Eligible Projects • Roof (shingle) replacement (non-structural) • Re-plumbing or re-piping of existing plumbing • HVAC system (new or replacement) • Water heater replacement (except tankless/solar) • Insulation installation • Window replacement, with stucco/siding repair • Exterior siding/ plaster • Interior Drywall • Fence • Commercial sign Minimum Requirements The following requirements must be met in order to participate in the program. • The individual responsible for completing and inspecting work under this program must hold a valid and active credential, as reflected below: o California B-General Building Contractor's license; or, o California C-type Contractor's license, depending upon construction work being completed; or, o State certified civil or structural engineer. • Current worker's compensation insurance or certificate of exemption. PROCESSING STEPS Application Process To participate in the SCP, applicants must complete and submit the following information and application forms. • Building Permit Application (B-1 ) • SCP Declaration Form (B-70A) • Payment of application fee. Community Development Department I 1635 Faraday Ave. I Carlsbad, CA 92008 I www.carlsbadca.gov Applications for the following projects can submitted through the Carlsbad Customer Self Service Portal. • Roof (shingle) replacement (non-structural) • Re-plumbing or re-piping of existing plumbing • HVAC system (new or replacement) • Water heater replacement (except tankless/solar) Applications for the following projects can submitted via e-mail at bu ilding@carlsbadca.gov • Insulation installation • Window replacement, with stucco/siding repair • Exterior siding/ plaster • Interior Drywall • Fence • Commercial sign Once the application has been approved, the applicant will be given a building permit, which will authorize construction. Included with the building permit will be the SCP Inspection Checklist Form (B-70B). Final Inspection Certification Upon completion of the project, the authorized contractor or engineer shall complete the SCP Inspection Checklist (B-70B). It is important that the responsible individual check all applicable items in the checklist confirming that they reviewed and confirmed that they were completed. IB-270_REV: June 2022 Once the checklist has been completed and signed, the form must be sent to the Building Division for processing as reflected below. • For applications submitted using the self service portal, upload the completed form as a .PDF submit it through the Carlsbad Customer Self Service Portal and e-mail bldginspections@carlsbadca.gov to inform staff of the completed inspection. • For all other applications, email the form to bldginspections@carlsbadca.gov. Include the permit number in the subject line of the email, along with the caption "Attention Self-Certification Program." • Once received and processed, all of the forms will be saved and accessible to the public via the Carlsbad Public Records Access portal. • Additionally, the city's permit tracking system will be updated to reflect a "passed" inspection and the permit closed out. • Lastly, an email will be sent informing the applicant that the permit has been approved. If you are requesting to self-certify an eligible inspection that is part of a larger permitted project (e.g., new single-family home), simply e-mail the completed B-70A and B-70B to bldginspections@carlsbadca.gov to inform staff of the completed inspection. At the time of receiving the signed checklist, the city reserves the right to conduct a random inspection to verify that work was completed to plan and building code. If a project is found to not follow approved plans, building codes or certification forms as submitted, the self-certification approval will be revoked, and the contractor or engineer may be reported to the state licensing board and not be eligible for SCP in the future. Re-inspection fees may apply for self-certified permits that fail an audit. YOUR OPTIONS FOR SERVICE To schedule an appointment or to learn more about this process, please contact the Building Division at 442-339- 2719 or via email at Building@CarlsbadCA.gov Page 2 of 2 (City of Carlsbad Minor Building Permit Inspection Self-Certification Declaration B-70A This form is required to participate in the city's Building Permit Inspection Self-Certification Program (SCP), which allows for a California-licensed contractor to self-certify that certain minor building construction projects were completed in compliance with relevant building code standards in-lieu of a final inspection from the city. Refer to Informational Bulletin IB-270 for additional information and requirements. This form is to be completed and submitted with a Minor Building Permit application (form B-1). TO BE COMPLETED BY THE CONTRACTOR/ ARCHITECT /ENGINEER Name License Type and No. Business Address Phone Email Address Permit No. Brief description of work being conducted Declaration I affirm and certify under penalty of perjury that: 1. I have reviewed and understand the requirements of the City of Carlsbad's SCP program as detailed in Informational-Bulletin IB-270 and will comply with those requirements. 2. I have received approval from the property owner to complete the work authorized under the referenced building permit and made them aware that completed work will be self-certified under this program. 3. I am a California-licensed B General Building Contractor with current worker's compensation insurance, C- type Contractor depending on specialty with current worker's compensation insurance, Civil Engineer or Structural Engineer, and my license in active. 4. I shall assume responsibility and liability for the overall installation, inspection, and certification of all work associated with the referenced building permit and will ensure that all work is completed in compliance with all applicable requirements of the California Building Standards Code as adopted and amended by the City of Carlsbad and in accordance with any manufacturer's installation requirements. 5. I have reviewed and understand the requirements set forth in the Self-Certification Inspection Checklist (Form 70-B) and shall complete, sign, and return the form to the city following completion of all work authorized under the above referenced building permit. 6. I understand that the city may randomly audit the construction work for quality assurance, and I agree to provide access to work performed under this program when requested by the City of Carlsbad. Signature Date □ Approved □ Denied Staff Name Date B-70B_REV: June 2022 Page 1 of 1 (city of Carlsbad Minor Building Permit Inspection Self-Certification Inspection List B-70B Completion and return of this form is required in order to complete participation in the city's Building Permit Self- Certification Program. Refer to the Minor Building Permit Inspection Self-Certification Declaration (Form B-70A) that was approved by the city for the building permit requiring final certification. Refer to Informational Bulletin IB-270 for additional information about the program. TO BE COMPLETED BY THE CONTRACTOR/ARCHITECT/ENGINEER The information below must match the same information provided in Form 8-lOA that was approved for this project Name License Type and No. Business Address Phone Email Address Permit No. Brief description of work being conducted Declaration I affirm and certify under penalty of perjury that: 1. The information provided in Form B-70A remains true and accurate (attach a copy of the form). 2. All work authorized under the referenced permit was installed in compliance with approved building permit, plans and manufacturer installation instructions and/or listing. 3. All work authorized under the referenced permit was installed in compliance with relevant state ,and city building code standards. 4. All work authorized under the referenced permit was installed in compliance with relevant requirements listed in checklist that is attached hereto. Signature Date Upload completed form to the Customer Self-Service Portal HERE. E-mail all other completed forms to: bldginspections@carlsbadca .gov. Include the permit number in the subject line ofthe email, along with the caption "Attention Self-Certification Program." After the completed document has been received and processed by the city, the document will be scanned into the city's Laserfiche on line permit history research application, which can be accessed at: https://records.carlsbadca.gov/Weblink/. Additionally, the department's permit tracking system will be updated to reflect a "passed" inspection, an email will be sent to the point of contact on for the building permit notifying them of the determination, and the permit closed out. □ Approved D Denied Form B-70B_REV: June 2022 Staff Name Date Page 1 of 4 INSTALLATION REQUIREMENTS BY PERMIT TYPE Please check the appropriate checkboxes for the work authorized under this program to confirm that the identified installation requirements have been met at the time of work completion. All checkboxes must be filled in order to qualify for self-certification. D Re-roof □ No structural changes □ Removed water-soaked or deteriorated elements and replaced with competent material □ If new roof diaphragm has been installed, code-compliant fasteners installed □ Verified all existing vents were extended through roof per code and painted □ Provided minimum clearances to combustible material for B Vent(s} or Chimney(s} per code □ Installed flashing and counterflashing per code □ Installed underlayment per code □ Installed a class A rated roof □ Installed roof covering per code (include completed waste management form B-59 for concrete tile recycling showing proof of a minimum 65% recyclables} □ If a built-up roof was installed, designed slope to be minimum of 2% per code □ Code-compliant attic ventilation, Wild land Urban Interface compliant □ Cool Roof Rating Council product certification, CF2R forms completed and included as necessary D Re-plumbing/piping □ Installed a listed potable water piping system □ Pipe material is approved for the location installed □ Sized the piping per code □ Secured, insulated, and isolated per code D Reamed all piping D Removed all excess flux □ Thoroughly flushed the system □ Electrically grounded the system (if metallic) □ If plastic water system, affix sticker located at meter main stipulating: "No ground required, plastic water piping." □ Restored the integrity of the firewa II □ Installed an anti-siphon valve at each new hose bib □ Insured that the maximum water pressure does not exceed 80 p.s.i. □ Protected all piping □ Completed all insulation, drywall, taping, mud, and painting D Heating, Ventilation, and Air Conditioning replacement (HVAC) This permit may cover a new or replacement heater and/or air conditioner □ Grounded per code □ No new gas or electric lines are being installed □ Fused correctly per manufacturers name plate □ Liquid tight conduit secured □ Line set 3/4" wall insulation, UV-resistant exterior or protected Form B-70B_REV: June 2022 Page 2 of 4 □ Disconnect and circuit sized per name plate rating and installed per code □ Condenser set on a level and secure platform □ Code required working clearances (30" wide x 36" deep) for electrical disconnect □ Openings into building sealed □ CFlR, CF2R, CF3R registered forms completed and included as necessary □ Exterior refrigerant service ports fitted with tamper-resistant locking cap □ Condenser installed outside of required side or rear yard setbacks D Water Heater This permit shall only cover replacement of existing storage tank water heaters. This permit does not cover installation of a tankless or solar type water heater. □ 18" raised platform or per manufacturer's listing □ P/T drain to exterior as per code □ Water lines insulated for 5' minimum or to wall □ Shut off valve installed on cold water side □ Gas line secure with sediment trap □ New gas flexible connector and sized correctly □ Flue vent intact, secured, still serviceable □ Flue cap and diverter in place □ Code compliant flue vent clearances □ Clearances for replacement water heater per manufacturer □ Combustion air vents properly sized and located per code □ Evaluated other exhaust systems for possible draw down of flue gases in vent. □ Earthquake strapping per code □ Vacuum relief valve for attic installs □ Drain pan with separate discharge for attic installations or as required by manufacturer □ Access, walkway, working space and headroom for attic installs □ Switched lighting for attic installations □ No "pit" situations where LPG could pool □ Expansion tank or listed device as required is installed □ CFlR, CF2R, CF3R registered forms completed and included as necessary Additional items specific to electric water heater: □ Electrical disconnect sized and installed per code, hard wired with correct conductors, conduit and properly grounded □ Minimum 18" platform □ Applicable code requirements that apply to gas type water heaters D Insulation Installation □ All insulation material, including facing, such as vapor barrier or breather paper installed within floor- ceiling assemblies, walls, crawl spaces or attics, shall have a Flame spread rating not to exceed 25 and a smoke density not to exceed 450. □ Check all clearances from B vents, flues, combustible air chases, ducts and ventilation. Form B-70B_REV: June 2022 Page 3 of 4 □ Seal all floor sill plates and exterior openings. Make sure all surfaces are clean prior to sealing. □ Minimum R-38 attic insulation installed □ Rough frame inspection approved prior to insulation installation □ Insulation is installed at roof, walls, and floors at the thickness indicated per prescriptive or mandatory requirements unless superseded by the approved plans D Window Replacement □ Windows shall not reduce egress from existing conditions □ Windows fitted to existing opening only □ Windows full tempered where closer than 18" to floor and over 9 feet square □ Full tempered glass where within 24" arc of door and within 60" of floor □ Guard rail where windowsill is greater than 6 feet above grade and less than two feet above floor □ Wildland Urban Interface compliant, dual pane glazing with one pane tempered □ Windows comply with Title 24 requirements, CF2R completed and included as necessary D Exterior Siding and Plastering □ Code-compliant approved paper and lathing □ Code-compliant backing for lath □ Double paper for existing sheer □ Code compliant flashing of windows and doors □ Installation of drip screed per code with compliant clearances from finished grade □ Installed corner rite or bead for all edges □ Listed caulking for all tears and penetrations □ Scratch coat, brown and color to achieve 7 /8" approximate stucco or per listing of alternate product · □ Installed paper backed ribbon lath for all soffit location D Interior Drywall □ These permits shall only cover drywall replacement within an existing permitted structure. □ Installed correct size and type of drywall with approved fasteners per code □ Fastening pattern for multiple layers was verified and rated walls were appropriately fire caulked □ Completed all taping, mud, and painting D Fence meets all applicable setbacks, including, but not limited to, the □ Installation meets applicable City of Carlsbad Municipal Code □ Installed on owner's property meeting all applicable setbacks (within setback may not be self-certified) □ Maximum height matches the approved plans □ fence and pool/ spa gate installed according to the swimming pool safety act □ Material matches the approved plans □ No electrical; no luminaries; no retaining walls over 4 ft. in height (otherwise, may not be self-certified) D Commercial Sign □ The sign, it's fasteners and electrical components are installed in compliance with local codes and ordinances and in accordance with the approved plans □ UL listed equipment was used for the sign installation □ Wall penetrations were adequately sealed □ The grounding and bonding system was verified back to the main electric source Form B-70B_REV: June 2022 Page 4 of 4