Loading...
HomeMy WebLinkAboutCD 2020-0014; JAGUAR LAND ROVER; Consistency Determination (CD)CITY OF CARLSBAD APPLICATION FORM FOR CONSISTENCY DETERMINATION APPLICATION CITY USE ONLY Development Number: b► V W 19 -o'Z, 5 2-- Original Project Number: '7' t>f l "2-0 0 4--Consistency Determination Number: C-D ,1.,,0 2£ .-oo I 'r" PROJECT NAME: -.Jt\-0~ Lftt.C p.cYf12-~t>~ ~ S+J~~('I\ f~~ Assessor's Parcel Number(s) and ,Lu ~ ~ Address: z.11--()l,f)-~2,. ??>~ ~ )>£;1_ ~f":? 1 Description of proposal (add attachment if necessary): ~~ .klrn~--~ ~~ ~rt--fF-eio,tt~o<>;,) 5t12, .9S2.fr. s~ ~rl\OtJ(S-•/•of &:tsfltn:> ~ ~~A~),~ ('16u.t,f t)~ ~ ~12..0tL(~ l)~l.s~ ltA:~.e,.ir1 ____ . ___ _ ; Would you like to orally present your proposal to your assigned staff planner/engineer? ~ B No · Please list the staff members you have previously spoken to regarding this project. If none, please so state. C~~~P'l_S~S~ __ t4_1t-G_U_ff_.J_o_f'4_f?_S ________ . _____ _ J OWNER NAME (Print): MAILING ADDRESS: CITY, STATE, ZIP: TELEPHONE: EMAIL ADDRESS: Theodore William Hoehn Ill P.O. Box 789 Carlsbad, CA 92018 (760) 438-4454 billhoehn@hoehnmotors.com *OWner's signature indicates permission to conduct a prelimlnary review for a development proposal. IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE. I . CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE.---J / . ,,. '-' /./cn,-1---8/7/2020 SIGNATURE DATE APPLICANT NAME (Print): Jo Hannah Hoehn MAILING ADDRESS: P.O. Box 789 ------------------ CITY, STATE, ZIP: Carlsbad, CA 92018 TELEPHONE: (760) 494-5637 EMAIL ADDRESS: jhh@hoehnmotors.com I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. 8/7/2020 DATE · APPLICANT'S REPRESENTATIVE (Print): O~Afl: I?P<fM1 SC> ( BQYt:t,.. ftO SfJE3:'80 ~l~U- MAILING ADDRESS: 2-~'1 t,JWfl+ ST. ()a,_ fv\A1LI Cf:>.; ') 2..0 IL{: CITY, STATE, ZIP: TELEPHONE: EMAIL ADDRESS; OfJAPMso<9-So\~~-alv) Y THAT I AM THE LEGAL REPRESENTATIVE OF THE APPLICANT AND THAT ALL THE ABOVE INFORMATION IS TRUE AND /\Jvi=''-'T TO THE BEST 01= MY KNOWLEDGE. e,-11--1-0 DATE FEE REQUIRED/DATE FEE PAID: RECEIVED BY: ;¥ fv{>~ ·. ~J~e:tJtA--nve AA (be ~,~ la.111ief., P-16 PL--'.) stnJO vN\16\Cto/ fb Page2of2 Revised02/28/18 OfA~Al so0>J36jt.AL,,A1JOSN~-arv\ • Panning Department, City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 August 18, 2020 Re: Consistency Determination Jaguar Land Rover Fac;ade and Showroom Remodel Description of Proposed Revisions Site: (Sheet A-1) 1. New Jaguar/Land Rover specified pavers at existing front row of parking and walkways facing showroom 2. New box hedges at existing planters facing showroom 3. New resin bound gravel walkway at showroom frontage 4. New driveway curb cut for to accommodate additional new car delivery entrance. 5. Add 1 new customer parking space to satisfy additional square footage Facade: (Sheet A-2 and A-4) 6. Extend existing front walkway facade northward -match existing exterior finish, construct new pilasters to support extension. Showroom: (Sheet A-2) 7. Infill existing "breezeway" to add 542 square feet to existing showroom. (5% of existing internal floor area) 8. New storefront glass at Showroom 9. New roll up door on north end to create secondary access into New Car Delivery. Back Dealer's Office (Sheet A-2 and A-4) 10. Add new storefront glass door to create private access to rear parking. Create new concrete walkway. ( City of Carlsbad STORM WATER STANDARDS QUESTIONNAIRE Development Services Land Development Engineering 1635 Faraday Avenue (760} 602-2750 www.carlsbadca.gov E-34 I INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: Hoehn Jaguar Land Rover PROJECT ID: CD 2020-0014 ADDRESS: 5334 Paseo Del Norte APN: 211-060-02 The project is (check one): D New Development f;ZI Redevelopment The total proposed disturbed area is: 696 ft2 ( .02) acres The total proposed newly created and/or replaced impervious area is: __ 542_ ft2 ( __ .01_) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID n/a SWQMP#: n/a Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. NOV i !.) 2020 E-34 er!-r' (;, 0/\ -.. r Pl f I l l1 !( )I\ ~ Page 1 of 4 f)LA1\J1 l \lG Ul 1 ! ' REV 02/16 STEP1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building □ IR] or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered "no" to the above question, the project is a 'development project', go to Step 2. STEP2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP req uirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following : YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; □ IR] b) Designed and constructed to be hydraulically disconnected from paved streets or roads; c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets quidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ ~ accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ Iii If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your project is not exempt from PDP , go to Step 3. E-34 Page 2 of 4 REV 04/17 STEP3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )): YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, □ Iii and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or □ I!] more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and □ Iii refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside □ ~ development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is □ ~ a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project □ Iii site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to " includes flow that is conveyed overland a distance of □ Iii 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair □ ~ shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes □ ~ RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land □ Iii and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC □ Iii 21 .203.040) If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box stating "My project is a 'STANDARD PROJECT' ... " and complete aoolicant information. E-34 Page 3 of 4 REV 04/17 STEP4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = sq. ft. □ □ Total proposed newly created or replaced impervious area (B) = sq. ft. Percent impervious area created or replaced (B/A)*100 = % If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no," the structural BM P's required for PDP apply to the entire development. Go to step 5, check the check the first box stating "My project is a PDP ... " and complete applicant information. STEPS CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION D My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. ~ My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. D My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: OMAR PARAISO, BOKAL AND SNEED Applicant Title: AGENT FOR OWNER Applicant Signature: o~/J~ Date: 11-18-20 .. .. • Environmentally Sens1t1ve Areas include but are not limited to all Clean Water Act Section 303{d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. Th . B fi c·t U O I IS ox or HV se my YES NO City Concurrence: □ □ By: Date: Project ID: E-34 Page 4 of 4 REV 04/17 Development Services Planning Division 1635 Faraday Avenue 760-602-4610 www.carlsbadca.gov PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST P-30 ("city of Carlsbad In September 2015, the City of Carlsbad adopted a Climate Action Plan (CAP) that outlines actions that the city will undertake to achieve its proportional share of state greenhouse gas (GHG) emissions reductions. This checklist contains measures that are required to be implemented on a project-by-project basis to ensure that the specified emissions targets identified in the Climate Action Plan (CAP) are achieved. Implementation of these measures will ensure that new development is consistent with the CAP's assumption for relevant CAP strategies toward achieving the identified greenhouse gas (GHG) reduction targets. In this manner, a project's incremental contribution to a cumulative GHG emissions effect may be determined not to be cumulatively considerable if it complies with the requirements of the CAP, in accordance with CEQA Guidelines Sections 15064(h)(3), 15130(d), and 15183(b). • *City staff are currently not assessing the greenhouse gas impacts of California Environmental Quality Act projects by using the Climate Action Plan as a qualified GHG reduction plan under CEQA section 15183.S(b). Please consult with the Planning Department for further guidance. Additional information may be found on the Climate Action Plan Update and Vehicle Miles Traveled calculations staff report. This checklist is intended to assist project applicants in identifying CAP ordinance requirements and demonstrate how their project fulfills those requirements. This checklist is to be completed and included in applications for new development projects that are subject to discretionary review or require a building permit. APPLICATION SUBMITTAL REQUIREMENTS • The completed checklist must be included in the project submittal package or building permit application. Application submittal procedures can be found on the City of Carlsbad website. This checklist is designed to assist the applicant in identifying the minimum CAP-related requirements specific to their project. However, it may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. • If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum requ ired by ordinance, an explanation must be provided to the satisfaction of the Planning Division or building official. • The requirements in the checklist will be included in the project's conditions of approval or issuance of building permit . • Details on CAP ordinance requirements are available on the city's website. P-30 Page 1 of7 Revised 02/20 City of Carlsbad Climate Action Plan Consistency Checklist STEP 1: LAND USE CONSISTENCY The first step in determining CAP consistency for discretionary development is to assess the project's consistency with the growth projections used in the development of the CAP. This section allows the city to determine a project's consistency with the land use assumptions used in the CAP. Projects found not to be consistent with the CAP's land use assumptions and that are projected to emit at or above the CAP screening threshold of 900 metric tons of CO2 equivalent (MTCO2e) GHG will be subject to a project-specific analysis of GHG emissions' impact on the environment in accordance with the requirements of the California Environmental Quality Act (CEQA). This may result in GHG-reducing mitigation measures applied as a condition of project approval in addition to compliance with the CAP ordinance requirements identified in Step 2 of this checklist. (Check the appropriate box and provide an explanation and supporting documentation for your answer) A. Is the proposed project consistent with the existing General Plan land use and specific/master plan or zoning designations? OR, If the proposed project is not consistent with the existing land use plan and zoning designations, does the project include a land use ~an and/or specific plan, master plan or zoning designation amendment that would result in an equivalent or less GHG-intensive project when compared to the existing designatlons? No □ If ''Yes', proceed to Step 2 of the checklist. For the second option under Question A above, provide estimated project-related GHG emissions under both existing and proposed designation(s) for comparison. GHG emissions must be estimated in accordance· with the City of carlsbad Guidance to Demonstrating Consistency with the Oimate Action Plan. If "No», proceed to Question B. B. The CAP established a screening threshold of 900 MTCO2e/year for new development projects to assist in determining consistency with the CAP. The types and sizes of typical projects listed below have been determined to correspond to the CAP screening threshold. Will the proposed land use change result in the construction of less than any one of the following? Single-Family Housing: SO dwelling units Multi-Family Housing: 70 dwelling units Office: 35,000 square feet Retail Store: 11,000 square feet Grocery Store: 6,300 square feet Other: If the proposed project is not one of the above types, provide a project-specific GHG emissions analysis to determine whether it is below the 900 MTCOze/year screening threshold. If ''Ye~, proceed to Step 2 of the checklist. □ □ If "No", the project's GHG impact is potentially significant and must be analyzed in accordance with CEOA. Applicant must prepare a Self-developed GHG emissions reduction program in accordance with the City of Carlsbad Guidance to Demonstrating Consistency with the Climate Action Plan to demonstrate how it would offset the increase in emissions over the existing designations. The project must incorporate each of the applicable measures identified in Step 2 to mitigate cumulative GHG emissions impacts unless the decision maker finds that a measure is infeasible in accordance with califomia Environmental Quality Act Guidelines Section 15091. Mitigation in lieu of or in addition to the measures in Step 2 may be required, depending on the results of the project-specific GHG impact analysis. Proceed and complete a project-specific Self-developed GHG emissions reduction program and Step 2 of the Checklist. P-30 Page 2 of 7 Revised 02/20 ' City of Carlsbad Climate Action Plan Consistency Checklist STEP 2: CAP ORDINANCE COMPLIANCE REQUIREMENTS Completion of this checklist will document a project's compliance with CAP ordinances, and in turn, demonstrate consistency with the applicable measures and actions of the CAP. The compliance requirements in this Step 2 apply to development projects that require a building permit. All other development projects shall implement all emissions-related mitigation measures from the General Plan Update EIR. Project No./Name: ' Property Address/APN: S3?~ ~~ ~ ~ 7-ll-6ft:,D -OJ- Applicant Name/Co.: JC> ~tr :\tffe1tN Applicant Address: Contact Phone: Contact information of person completing this checklist (if different than above): Name: Contact Phone: 6<Sc:i-~8 / -8 -Z... </ i Company name/address: ~'{-At,. ktJ(J s~ ~ Contact Email: O'P~~<>@ 66\C-M---/l'\ODS~_ ~ ~~ '1¼ <;,t . Qtt_. rv\t1'tl-l e,p,. ~'tel i Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. If your project includes alterations or additions to an existing building, please contact the Carlsbad Building Division for assistance in estimating building permit valuation, by phone at 760-602-2719 or by email at building@carlsbadca.gov. Estimated Building Permit Valuation (BPV): $_tj?J;;___O+--oP_O _____ _ Alterations: 0 BPV :2': $60,000 0 BPV :2': $60,000 D Electrical service panel upgrade 0 BPV ~ $200,000 D ew construction Cf}1 Alterations: P-30 lA lA and 4A 4A lA and 4A Page 3 of7 All residential alterations 1-2 family dwellings and townhouses with attached garages only Multi-family dwellings only where interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed Revised 02/20 City of Carlsbad Climate Action Plan Consistency Checklist / ref BPV 2'! $200,000 or additions ~ 18,5 1,000 square feet D BPV 2'! $1,000,000 18, 28 and 5 Building alterations of~ 75% existing gross floor area D ?:: 2,000 sq. ft. new roof addition 28 and 5 18 also applies if BPV 2'! $200,000 Please refer to Carlsbad Ordinance No. CS-347 and the California Green Building Standards Code (CALGreen) for more infon,ition when completing this section. A. 0 Residential addition or alteration l!! $60,000 building permit valuation. .0/N/A __________ _ See Ord. CS-347,Section 8. □ Exception: Home energy score~ 7 Year Sulit Single-family Requirements D Before 1978 Select one: D Ductsealing D Attic insulation D Cool roof D 1978 and later Select one: D Lighting package □ Water heating package D Between 1978 ard 1!!ll D 1991 and later / / B. ~ Nonresidentiar new construction or alterations ~ $200,000 building permit valuation, or additions l!! 1,000 square feet. See CALGreen Appendix AS, Discussion AS.2, as amended in CS-347, Section 3. AS.2_9i!.l.1.l o6utdoor lighting: .90 Allowed Outdoor Lighting Power AS.203.1.1.2 0 Restaurant service water heating (comply with California Energy Code Section 140.5, as amended) AS.203.1.2.1 Choose one as applicable: 0 .95 Energy budget □ .90 Energy budget AS.211.1.** D On-site renewable energy AS.211.3** D Green power (if offered by local utility provider, 50% minimum renewable sources) AS.212.1 D Elevators and escalators / AS.29-.1 Steel framin P-30 Page4 of 7 (attach certification) Multi-family Requirements □ Attic insulation Select one: D Attic insulation □ Duct Sealing D Cool roof Select one: □ Lighting package D Water heating package 0 N/A _________ _ □ N/A ifNJA f(¼ M~\>1 \ ~U'(l. ~ / G'y(Sfl.,! <t, P!N/A ~~ ~1 l)J Ptk.e- ✓ N/A lv\)tJ ~ Revised 02/20 City of Carlsbad Climate Action Plan Consistency Checklist □ N/A • lndudes hotels/motels and high-rise residential buildings ** For alterations ~ $1,000,000 BPV and affecting > 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with California Energy Code section 120.10 instead. A. D Residential new construction (for buildlng permit applications submitted after 1/1/20). Refer to 2019 Carrfomla Energy Code section 150.l(c) 14 for requirements. Note: if project Includes Installation of an electric heat pump water heater pursuant to cartsbad ordinance CS-348, inaease system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u, Calculated kWdc* sheets if necessary) Total System Size: kWdc = (CFAx.572) / 1,000 + {1.15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. Exception □ □ □ □ kWdc 8. 0 Nonresidential new construction or alterations ~1,000,000 BPV and affecting ~75% existing floor area, or addition that increases roof area by U,000 square feet. Please refer to Carlsbad Ordinance CS-347, Section 6 when completing this section. Choose one of the following methods: 0 Gross Floor Area (GFA) Method GFA: □ If< 10,000s.f. Enter: 5 kW de Min. System Size: ___ kWdc □ If~ 10,000s.f. calculate: 15 kW de x (GFNl0,000) •• ••Round building size factor to nearest tenth, and round system size to nearest whole number. D Time-Dependent Valuation Method Annual TDV Energy use:••• x .80= Min. system size: ___ kWdc •••Attach calculation documentation using modeling software approved by the California Energy Commission. P-30 Page 5 of7 Revised 02/20 City of Carlsbad Climate Action Plan Consistency Checklist A. D Residential and hotel/motel new construction Please refer to Carlsbad Ordinance CS-347 and CS-348 when completing this section. D For systems serving individual dwelling units choose one: D Heat pump water heater AND compact hot water distribution AND drain water heat recovery (low-rise residential only) D Heat pump water heater AND PV system .3 kWdc larger than required in CA Energy Code Section 120.10 (for high rise residential hotel/motel) or 150.l(c) 14 (for low-rise residential) D Heat pump water heater meeting Tier 3 or higher NEEA Advanced Water Heating Specification D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors D Except ion: D For systems serving multiple dwelling units, install a central water-heating system with all of the following: D Gas or propane water heating system D Recirculation system per CS-347 (high-rise residential, hotel/motel) or CS-348 (low-rise residential) D Solar water heating system that is elther: D .60 solar savings fraction or 40 s.f. solar collectors D .40 solar savings fraction, plus drain water heat recovery D Exception: B. D Nonresidential new construction Please refer to Carlsbad Ordinance CS-347 when completing this section. D Water heating system derives at least 40% of its energy from one of the following (attach documentation): D Solar-thermal D Photovoltaics D Recovered energy D Water heating system is (choose one): D Heat pump water heater D Electric resistance water heater(s) D Solar water heating system with .40 solar savings fraction D Exception: A. D Residential New construction and major alterations* Please refer to Carlsbad Ordinance CS-349 when completing this section. D One and two-family residential dwelling or townhouse with attached garage: □ One EVSE ready parking space required · D Exception : □ Multi-family residential: D Exception • Total Parking Spaces EVSESpaces Proposed Capable I Ready I Cakulations: Total EVSE spaces= .10 x Total parking (rounded up to nearest whole number) EVSE Installed= Total EVSE Spaces x .SO (rounded up to nearest whole number) EVSE other= Total EVSE spaces -EVSE Installed (EVSE other may be "capable,• "Ready" or "Installed.") I I Installed I I Total P-30 Page 6 of 7 Revised 02/20 City of Carlsbad Climate Action Plan Consistency Checklist *Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation t? $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation t? $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. B D Nonresidential new construction (indudes hotels/motels) □ Exception · Total Parking Spaces EVSE Spaces Proposed Capable Ready Installed Total Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces □ 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 □ 101-150 12 6 □ 151-200 17 9 □ 201 and over 10 percent of total 50 percent of Required EV Spaces A. List each proposed nonresidential use and gross floor area (GFA) allocated to each use. 8. Employee ADT /1,000 square feet is selected from the Oty of Carlsbad Employee ADTTable. Use Employee ADT/1,000 S.F. Total Employee ADT Total If total employee ADT is greater than or equal to 110 employee ADT, a TOM plan is required. *NOTE: Notwithstanding the 110 employee ADT threshold above, General Plan Mobility Element Policy 3-P.11 requires new development that adds vehicle traffic to vehicle LOS-exempt street facilities to implement TOM and transportation system management strategies. Please consult with City of carlsbad Land Development Engineering (LOE) staff to determine whether this policy applies to your project. TOM plan required: Yes D No/ LOE Staff Verification: O _____ (staff initials) P-30 Page 7 of 7 Revised 02/20