Loading...
HomeMy WebLinkAboutSUP 92-03; BUENA VISTA PUMP STATION - 2140 JEFFERSON ST; Site PlanNEW 6'-d' CHAIN LINK FENCE ----.. NEW METER VAULT --... ------- / / / B U E ---- 15 10 N A EXISTING ---/\ PUMP STATION I I I I NEW TRANSFORMER AND PAD ....... cA SUP 92-3 AND Cl.JP 92-6 PROPOSED BUILDING IMPROVEMENTS CllY OF' OCEANSIDE ---'~--- CI TY OF' CARLSBAD ~ ----~ EXISTING 6'-d' HIGH CHAIN LINK FENCE _,---BUENA VISTA PUMP STATION ,,, / PROPERlY BOUNDARY ' I I / / / / I ( I I I / / / / LINE OF 1 00 YEAR FLOOD / :==~-----::ao--),.=--==:-::=-=~= ---15--~ _,,,,,. -------:: --------------- V I s T A ----15------ ---------------10------ C R E E K PROJECT NAME: BUENA VISTA SEWAGE Pl-IMP STATION IMPROVEMENTS CONDITIONAL USE AND SPECIAL USE PERMITS PERMIT SITE PLAN APPLICANT /OWNER: CITY OF VISTA P.O. BOX 1 988 VISTA, CA 92083 SCALE: 1" = 20' CIITY OF CARLSBAD PLANNING COMMISSION RESOLUTION NO. 3430, 3431 AND 3432 APPROVED OCTOBER 7, 1992 ENGINEER: WILSON ENGINEERING 703 PALOMAR AIRPORT ROAD, SUITE 300 CARLSBAD, CA 92009 ATTN: DIANE H. SHAUGHNESSY WATER DISTRICT: CARLSBAD MUNICIPAL WATER DISTIRICT 5950 EL CAMINO REAL CARLSBAD, CA 92008 PLAN PREPARED BY WILSON ENGINEERING CONSULTING ENGINEERS 703 PALOMAR AIRPORT ROAD, SUITE 300 CARLSBAD, CA 92009 (619) 438-4422 NTS l~r PROPERlY LINE ALIGNMENT DATA NO. 0 BEARING/DELTA LENGTH RADIUS 1 s0e•44•12"E 2 N35'09' 44" E 3 S89'41 '21"E 4 N2744'07"E 5 S83' 44' 48" E 6 66"23' 13" 7 22"22'21" 8 53'04'54"W 9 94'56'41" 91.22' 146.31' 28.02' 60.78' 38.12' 83.42' 25.60' 55.04' 1'19.31' 72.00' 72.00' 72.00' 10 N82"01'44"W 21.02' 11 42"10'51" 53.01' GENERAL INFORMATION 1. PROJECT ADDRESS: 2140 JEFFERSON STREET CARLSBAD, CA 92008 ASSESSOR PARCEL NO, 156-301-01 & 02 2. SITE 0.72 ACRES; BUILDING 0.07 ACRES 3. C-2 ZONE: RRI LAND USE 4. EXISTING PUMP STATION MODIFICATION 72.00' 5. TOTAL BUILDING SQUARE FOOTAGE: 5,478 SQ FT EXISTING -3,770 SQ FT; PROPOSED -1,708 SQ FT 6. MAINTENANCE VEHICLE PARKING ONLY. NO DESIGNATED SPACES. 7, AVERAGE DAILY TRAFFIC -ONE OPERATIONS VEHICLE; TWO TIMES PER DAY. 8. EARTHWORK: 30 CY; THE SITE WILL BE GRADED TO BALANCE, NO EXPORT. 9. FOR MORE DETAIL ON EXISTING AND PROPOSED FACILITIES SEE THE ATTACHED PIPING, PAVING AND GRADING PLAN. 10. PERCENT LANDSCAPING -34.8 % PROJECT LOCATIO.~N~(:_ _ __..--1r-""'--- PACIFIC OCEAN ENCINA ,,11, .... A •T ••- WATER POLLUTION . CONTROL FACILITY ' VICINITY MAP IMPROVEMENTS TO THE BUENA VISTA SEWAGE PUMP STATION PERMIT SITE PLAN REVISION DESCRIPTION BY DATE DATE PREPARED DHS 7-17-92 1 REVISED 1 00 YEAR FLOOD LINE OHS 8-12-92 2 REVISED LAND USE, ADDEO PERMIT NO.S DHS 8-20-92