HomeMy WebLinkAboutSUP 92-03; BUENA VISTA PUMP STATION - 2140 JEFFERSON ST; Site PlanNEW 6'-d' CHAIN LINK FENCE ----..
NEW METER VAULT --...
-------
/
/
/
B U E
----
15
10
N A
EXISTING ---/\
PUMP STATION
I
I
I
I
NEW TRANSFORMER AND PAD
.......
cA
SUP 92-3 AND Cl.JP 92-6
PROPOSED BUILDING IMPROVEMENTS
CllY OF' OCEANSIDE ---'~---
CI TY OF' CARLSBAD
~
----~ EXISTING 6'-d' HIGH CHAIN LINK FENCE
_,---BUENA VISTA PUMP STATION ,,, /
PROPERlY BOUNDARY '
I
I
/
/
/
/
I
(
I
I
I
/
/
/
/
LINE OF 1 00 YEAR FLOOD
/ :==~-----::ao--),.=--==:-::=-=~= ---15--~ _,,,,,. -------:: ---------------
V I s T A
----15------
---------------10------
C R E E K
PROJECT NAME: BUENA VISTA SEWAGE Pl-IMP STATION IMPROVEMENTS
CONDITIONAL USE AND SPECIAL USE PERMITS
PERMIT SITE PLAN
APPLICANT /OWNER: CITY OF VISTA
P.O. BOX 1 988
VISTA, CA 92083
SCALE: 1" = 20' CIITY OF CARLSBAD
PLANNING COMMISSION
RESOLUTION NO. 3430, 3431
AND 3432 APPROVED
OCTOBER 7, 1992
ENGINEER: WILSON ENGINEERING
703 PALOMAR AIRPORT ROAD, SUITE 300
CARLSBAD, CA 92009
ATTN: DIANE H. SHAUGHNESSY
WATER DISTRICT: CARLSBAD MUNICIPAL WATER DISTIRICT
5950 EL CAMINO REAL
CARLSBAD, CA 92008
PLAN PREPARED BY
WILSON ENGINEERING
CONSULTING ENGINEERS
703 PALOMAR AIRPORT ROAD, SUITE 300
CARLSBAD, CA 92009 (619) 438-4422
NTS
l~r
PROPERlY LINE ALIGNMENT DATA
NO. 0 BEARING/DELTA LENGTH RADIUS
1 s0e•44•12"E
2 N35'09' 44" E
3 S89'41 '21"E
4 N2744'07"E
5 S83' 44' 48" E
6 66"23' 13"
7 22"22'21"
8 53'04'54"W
9 94'56'41"
91.22'
146.31'
28.02'
60.78'
38.12'
83.42'
25.60'
55.04'
1'19.31'
72.00'
72.00'
72.00'
10 N82"01'44"W 21.02'
11 42"10'51" 53.01'
GENERAL INFORMATION
1. PROJECT ADDRESS: 2140 JEFFERSON STREET
CARLSBAD, CA 92008
ASSESSOR PARCEL NO,
156-301-01 & 02
2. SITE 0.72 ACRES; BUILDING 0.07 ACRES
3. C-2 ZONE: RRI LAND USE
4. EXISTING PUMP STATION MODIFICATION
72.00'
5. TOTAL BUILDING SQUARE FOOTAGE: 5,478 SQ FT
EXISTING -3,770 SQ FT; PROPOSED -1,708 SQ FT
6. MAINTENANCE VEHICLE PARKING ONLY.
NO DESIGNATED SPACES.
7, AVERAGE DAILY TRAFFIC -ONE OPERATIONS VEHICLE;
TWO TIMES PER DAY.
8. EARTHWORK: 30 CY; THE SITE WILL BE GRADED
TO BALANCE, NO EXPORT.
9. FOR MORE DETAIL ON EXISTING AND PROPOSED
FACILITIES SEE THE ATTACHED PIPING, PAVING AND
GRADING PLAN.
10. PERCENT LANDSCAPING -34.8 %
PROJECT
LOCATIO.~N~(:_ _ __..--1r-""'---
PACIFIC
OCEAN
ENCINA
,,11, ....
A •T ••-
WATER POLLUTION .
CONTROL FACILITY '
VICINITY MAP
IMPROVEMENTS TO THE BUENA VISTA SEWAGE PUMP STATION
PERMIT SITE PLAN
REVISION DESCRIPTION BY DATE
DATE PREPARED DHS 7-17-92
1 REVISED 1 00 YEAR FLOOD LINE OHS 8-12-92
2 REVISED LAND USE, ADDEO PERMIT NO.S DHS 8-20-92