Loading...
HomeMy WebLinkAbout2012-05-02; Planning Commission; ; CDP 11-07|CUP 11-02 – HOME PLANT LIFT STATION & FORCE MAIN REPLACEMENT The City of CARLSBAD Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: February 24, 2012 P.C. AGENDA OF: May 2, 2012 Project Planner: Pam Drew Project Engineer: Levy/Biskup SUBJECT: CDP 11-07/CUP 11-02 – HOME PLANT LIFT STATION & FORCE MAIN REPLACEMENT – Request for approval of a Coastal Development Permit and Conditional Use Permit for the construction of a new sewer lift station and associated piping, located at 2359 Carlsbad Boulevard, within a portion of Maxton Brown Park, and within public rights-of-way of Carlsbad Boulevard, State Street, Laguna Drive and Jefferson Street, in the Mello II Segment of the Local Coastal Program within Local Facilities Management Zone 1. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolutions No. 6877 and 6878 APPROVING Coastal Development Permit (CDP 11-07) and Conditional Use Permit (CUP 11- 02) based upon the findings and subject to the conditions contained therein. II. INTRODUCTION The applicant is requesting approval of a Coastal Development Permit (CDP) and Conditional Use Permit (CUP) for the construction of a new sewer lift station and associated appurtenances on a 0.74 acre, previously graded site, located south of Buena Vista Lagoon, west of Carlsbad Boulevard and east of the North County Transit District’s (NCTD’s) railroad right-of-way. The proposed sewer lift station will replace the existing sewer lift station, which was originally constructed in 1963 and rehabilitated in 1991. The existing sewer lift station is in need of replacement to meet current capacity needs and code requirements, enhance the structural integrity and decrease the amount of maintenance required. The applicant also proposes to construct a new 8-inch sewer force main located from the proposed sewer lift station east within the public rights-of-way of Carlsbad Boulevard, State Street, Laguna Drive and Jefferson Street. The new force main will be installed parallel to the existing 10-inch sewer force main to provide redundancy and reduce the amount of low and high points within the pipeline, which will result in increased flow velocities. This portion of the project only requires a CDP, as below grade infrastructure is an allowed use in all zones. III. PROJECT DESCRIPTION AND BACKGROUND As stated above, the project includes the replacement of an existing sewer lift station with a new sewer lift station that will meet the necessary capacity and code requirements. The existing sewer lift station will remain and be modified to function as an emergency storage facility. The existing structure that houses the generator will not be modified and will continue to operate with 3