HomeMy WebLinkAboutSDP 2020-0006; AMAZON VEHICLE STORAGE; FINAL SOILS REPORT; 2022-01-31 Corona Office Phone: 951.509.7090   GREYSTAR  January 31, 2022  444 South Cedros Avenue  Project No. 1‐0346  Solana Beach, California 92075      Attention: Mr. Beau Brand      Subject: PROJECT GRADING, INFRASTRUCUTRE AND ONSITE REPORT  Palomar Forum Project, Parcel A, 5980 Eagle Drive  City of Carlsbad, California       References: See Appendix A      Dear Mr. Brand:  This report presents a summary of Alta California Geotechnical, Inc.’s (Alta) engineering geology  and soil engineering observations, as well as test results, pertaining to grading, infrastructure  and onsite construction operations for the parking lot associated with the Palomar Forum  Project, Parcel A, located at 5980 Eagle Drive in the City of Carlsbad, California.  In preparing  this report, Alta has utilized the 20‐scale precise grading plans, Sheets 6 and 7 of 10 (Plates 1  and 2), prepared by Excel Engineering.  Soil engineering data pertaining to the subject site is described in the text of this report and the  developed data is presented in Table 1.  The approximate removal bottom elevations, limits of  grading, geologic information, and approximate compaction test locations under the purview of  this report are shown on the accompanying Plates 1 and 2.   Cuts, fills, unsuitable soil removals, and processing of natural ground under the purview of this  report are considered to have been accomplished in general conformance with the project  specifications and governing agency requirements.     ALTA CALIFORNIA GEOTECHNICAL INC, 170 North Maple Street, Suite 108 Corona, CA 92880 www.altageotechnical.com     Project No. 1‐0346  Page 2  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. 1.0 INTRODUCTION  The rectangular shaped, approximately 5.94‐acre is located off the northeast corner of  Eagle Drive and Grey Hawk Court.  The surrounding area is primarily  commercial/industrial developments.    The site was graded to its current sheet‐grade configuration in 2004, under the  observation and testing of Vinje & Middleton Engineering Inc. (Vinje, 2005).  A  geotechnical investigation of the site was conducted by Alta in 2020 (Alta, 2020).  Alta  also prepared additional reports for the subject site which are referenced in Appendix A  (References 1 and 2).  Grading was conducted in general conformance with the  recommendations presented in Reference 3.  2.0 ENGINEERING GEOLOGY  2.1 Geologic Units  Engineered artificial fill placed during previous grading operations were  encountered during grading.  The following is a brief description of this unit.  2.1.1 Artificial Fill Engineered  The engineered fill onsite primarily consists of orange tan to orange  brown, grayish brown, and dark brown, sandy clay and clayey sand in a  dry to slightly moist, dense/stiff to very dense/stiff condition.  2.2 Groundwater  Groundwater was not encountered during grading.  2.3 Conclusions  From an engineering geologic viewpoint, the parking lot and four (4)  bioretention basins associated with the Palomar Forum project, Parcel A, in  the City of Carlsbad, California are considered suitable for their intended  use.        Project No. 1‐0346  Page 3  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. 3.0 SOIL ENGINEERING  Prior to the fill placement reported herein, Alta representatives observed removal  bottoms, and the processing of the natural ground in preparation to receive engineered  fill.  Fill materials were placed and tested under the observation and testing of Alta  personnel.  The following is a summary of our observations.  3.1 Removals  During this phase of grading, the removal of the approximately upper two  (2) feet of existing engineered artificial fill was accomplished to expose  competent material.  Removal bottom elevations were surveyed by the  grading contractor’s GPS system and the shots are shown on the enclosed  Plates 1 and 2.  3.2 Treatment of Removal Bottoms  Prior to compacted fill placement, the exposed surfaces of the removal  bottoms were ripped to a minimum depth of eight inches, moisture  conditioned to above optimum moisture content and compacted in‐place by  heavy earthmoving equipment.    3.3 Compacted Fill Placement  Fill consisting of the soil types indicated in Table I (Appendix B) was placed in  thin lifts (approximately six‐ (6) to eight‐ (8) inches in thickness), moisture  conditioned to optimum moisture content or slightly above, and compacted  to a minimum 90 percent of the laboratory maximum dry density (ASTM:D  1557).  Compaction was accomplished utilizing self‐propelled rubber‐tired  heavy earth moving equipment.  Each succeeding fill lift was treated in a  similar manner.      Project No. 1‐0346  Page 4  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. 3.4 Compaction Test Results  A summary of the compaction test results is presented in Table I (Appendix  B), and the approximate locations of these tests are shown on the enclosed  Plates 1 and 2.  Compaction testing was conducted utilizing Campbell Pacific  Nuclear test gauges (ASTM D 6938).   3.5 Depth of Fill  Compaction testing was performed approximately for each one (1) to two  (2) vertical feet of fill placed.  The approximate maximum vertical depth of  fill placed during this phase of grading is on the order of approximately 6.0  feet within the southeastern section of the site.  4.0 SLOPE AND LOT MAINTENANCE  Positive drainage away from structures and slopes should be provided and maintained.   Design fine grade elevations should be maintained through the life of the development.   If design fine grade elevations are altered, adequate area drains should be installed in  order to provide rapid discharge of water.  The owner is responsible for proper irrigation and for maintenance and repair of  properly installed irrigation systems.  Leaks should be repaired immediately.  Sprinklers  should be adjusted to provide maximum uniform coverage with a minimum of water  usage and overlap.  Over‐watering with consequent wasteful runoff and serious ground  saturation should be avoided.  If automatic sprinkler systems are installed, their use  must be adjusted to account for natural rainfall conditions.         Project No. 1‐0346  Page 5  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. 5.0 FUTURE SITE DEVELOPMENT  Future site work should be performed in accordance with local governing agency  requirements and the recommendations of a qualified geotechnical consultant.   Geotechnical design recommendations for future site development should be based on  additional plan reviews and testing of the site soils by the Geotechnical Consultant  involved in development of the subject lots.    6.0 INFRASTRUCTURE IMPROVEMENTS  The infrastructure improvements listed in Table 6‐1 are covered by this report.  TABLE 6‐1  Utility/Improvement Street Name/Line No.  Sewer Line 1  Sewer Line 2  Storm Drain Line 1  Storm Drain Line 3  Water Parking Lot  Electric Parking Lot  Curb and Gutter Parking Lot  Subgrade Parking Lot Entrances  Aggregate Base Parking Lot  Asphalt Pavement Parking Lot  6.1 Sewer Trenches  Within the areas noted above in Table 6‐1, the backfill material for the sewer  trenches consisted of shading sand and native soils.  Compaction was afforded  by a backhoe operated sheepsfoot roller and equipment wheel rolling.  Periodically, compaction tests were collected in addition to probing of backfills in  random locations, both during and after the completion of compaction  operations. Compaction test results, utilizing a Campbell Pacific Nuclear Density  Gauge (ASTM D 6938) indicated that the areas tested were compacted to a  minimum of 90 percent of the laboratory maximum dry density in accordance  with ASTM Test Method D‐1557.        Project No. 1‐0346  Page 6  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. It is our understanding that verification of line and grade and integrity for the  sewer line was provided by the local governing agency.  6.2 STORM DRAIN TRENCHES  Within the areas noted above in Table 6‐1, the backfill material for the storm  drain trenches consisted of shading sand and native soils.  Compaction was  afforded by a backhoe operated sheepsfoot roller and equipment wheel rolling.  Periodically, compaction tests were collected in addition to probing of backfills in  random locations, both during and after the completion of compaction  operations. Compaction test results, utilizing a Campbell Pacific Nuclear Density  Gauge (ASTM D 6938) indicated that the areas tested were compacted to a  minimum of 90 percent of the laboratory maximum dry in accordance with  ASTM Test Method D‐1557.    It is our understanding that verification of line and grade and integrity for the  storm drain was provided by the local governing agency.  6.3 WATER TRENCHES  Within the areas noted above in Table 6‐1, the backfill material for the water  trenches consisted of shading sand and native soils.  Compaction was afforded  by a backhoe operated sheepsfoot roller and equipment wheel rolling.  Periodically, compaction tests were collected in addition to probing of backfills in  random locations, both during and after the completion of compaction  operations. Compaction test results, utilizing a Campbell Pacific Nuclear Density  Gauge (ASTM D 6938) indicated that the areas tested were compacted to a  minimum of 90 percent of the laboratory maximum dry density in accordance  with ASTM Test Method D‐1557.        Project No. 1‐0346  Page 7  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. It is our understanding that verification of line and grade and integrity for the  water line was provided by the local governing agency.  6.4 ELECTRIC UTILITY TRENCHES  Within the areas noted above in Table 6‐1, the backfill material for the electric  utility trenches generally consisted of shading sand and native soils. Compaction  was afforded by a backhoe operated sheepsfoot roller and equipment wheel  rolling.   Periodically, compaction tests were collected in addition to probing of backfills in  random locations, both during and after the completion of compaction  operations. Compaction test results, utilizing a Campbell Pacific Nuclear Density  Gauge (ASTM D 6938) indicated that the areas tested were compacted to a  minimum of 90 percent of the laboratory maximum dry density in accordance  with ASTM Test Method D‐1557.    It is our understanding that verification of line and grade and integrity for the  electric utility trenches was provided by the local governing agency.  6.5 CURB AND GUTTER SUBGRADE  Within the street areas mentioned above in Table 6‐1, the curb and gutter  subgrade soils were observed and tested by a representative of this firm prior to  the placement of concrete.  Compaction test results, utilizing a Campbell Pacific  Nuclear Density Gauge (ASTM D 6938) indicated that the areas tested were  compacted to a minimum of 95 percent of the laboratory maximum dry density  in accordance with ASTM Test Method D‐1557.    It is our understanding that verification of line and grade for the curb and gutter  subgrade section was provided by the local governing agency.      Project No. 1‐0346  Page 8  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. 6.6 STREET SUBGRADE  Within the limits noted above in Table 6‐1, street subgrade was processed and  compacted using a tandem, smooth‐wheel roller and equipment wheel rolling.   Compaction tests were collected at random locations.  Compaction test results  indicated that the dry in‐situ density of the subgrade soils in the areas tested was  compacted to a minimum of 95 percent of the laboratory maximum dry density  in accordance with ASTM Test Method D‐1557 utilizing a Campbell Pacific  Nuclear Density Gauge (ASTM D 6938).    It is our understanding that verification of line and grade for the street subgrade  section was provided by the local governing agency.  6.7 AGGREGATE BASE  Base materials were compacted utilizing a tandem, smooth, steel‐wheel roller  and equipment wheel rolling.  Compaction tests were collected at random  locations.  Compaction test results indicated that the dry in‐situ density of the  aggregate base material in the areas tested was compacted to a minimum of 95  percent of the laboratory maximum dry density provided by the material  supplier utilizing a Campbell Pacific Nuclear Density Gauge (ASTM D 6938).   Laboratory test results conducted on the aggregate base is presented in  Appendix C.  It is our understanding that verification of line and grade for the street aggregate  base section was provided by the local governing agency.         Project No. 1‐0346  Page 9  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. 6.8 ASPHALT PAVEMENT  Within the street areas noted above in Table 6‐1, placement of the asphalt was  observed and tested by a representative of this firm.  The asphalt was  compacted using smooth, steel wheel rollers.  Compaction tests indicate that the  areas tested were compacted to a minimum of 95 percent of the laboratory  maximum density provided by the material supplier utilizing a Campbell Pacific  Nuclear Density Gauge (ASTM D 6938).     It is our understanding that verification of line and grade for the street asphalt  section was provided by the local governing agency.  7.0 ONSITE CONSTRCUTION  7.1 SIDEWALK SUBGRADE  The sidewalk subgrade soils near the entrance on Eagle Drive were observed and  tested by a representative of this firm.  Test results indicated that the areas  tested were compacted to a minimum of 90 percent of the laboratory maximum  dry density as determined in accordance with ASTM Test Method: D 1557.   Compaction test results and approximate locations of the field density tests are  summarized in the attached Table 1.  Verification of line and grade was provided  by others.  7.2 RETAINING WALL FOOTING EXCAVATIONS  The footing excavation for the retaining wall located in the southwestern corner  of the site was observed by a representative of this firm on November 4, 2021.   At the time of our observations, the footing excavations exposed competent  material and were deemed to be acceptable, from a geotechnical point of view,  for steel reinforcement and concrete placement.  Verification of footing  embedment, dimensions, and reinforcement was provided by the local  governing agency.      Project No. 1‐0346  Page 10  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. 8.0 CLOSURE  This report presents information and data relative to the placement of engineered fill  for the onsite rough grading within the subject site.  Representative(s) of this firm  conducted periodic tests and made observations during the progress of construction in  an effort to determine whether compliance with the project drawings, specifications  and applicable Building Code was being obtained.  The presence of our personnel during  the work progress did not involve any direct supervision of the contractor or his work  forces and does not relieve the contractor of the primary responsibility to perform all  work in accordance with the project specifications and Code requirements.  Professional  and technical advice and suggestions were provided to the owner and/or his designated  representative based upon the results of the tests and observations.  Completed work  under the purview of this report is considered suitable and adequate for the intended  use from a geotechnical point of view.  Conditions of the referenced reports remain  applicable unless specifically superseded herein.  Alta California Geotechnical, Inc., appreciates the opportunity to provide its services.  If you  have any questions or should you require any additional information, please contact the  undersigned.  Sincerely,  Alta California Geotechnical, Inc.    Reviewed By:      _______________________________  FERNANDO RUIZ  Civil Engineering Associate      _______________________________  SCOTT A. GRAY/RGE 2857  Reg. Exp.: 12‐31‐22  Registered Geotechnical Engineer  President            Distribution: (1) Addressee  FR: SAG:  1‐0346, January 31, 2022 (Project Grading, Infrastructure and Onsite, Palomar Forum Project, Parcel A, 5980 Eagle Drive, Carlsbad) ALTA CALIFORNIA GEOTECHNICAL, INC.                       APPENDIX A    References        Project No. 1‐0346  Page A‐1  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. APPENDIX A  References  1. Alta California Geotechnical, Inc., 2021, Summary of Laboratory Test Results, Palomar  Forum Project, 5980 Eagle Drive, City of Carlsbad, California, dated October 12, 2021  (Project No. 1‐0346).  2. Alta California Geotechnical, Inc., Precise Grading Plan Review and Updated  Geotechnical Report, Palomar Forum Project, Parcel A, 5980 Eagle Drive, City of  Carlsbad, California, dated May 6, 2021 (Project No. 1‐0346)  3. Alta California Geotechnical, Inc., 2020, Preliminary Geotechnical Investigation, 5980  Eagle Drive, City of Carlsbad, California, dated September 29, 2020 (Project No. 1‐0346).  4. 2. Vinje & Middleton Engineering, Inc., 2005, As‐Graded Compaction Report for Lots #4,  #5, #6 and #7, Proposed Commercial Industrial Development, Palomar Forum, City of  Carlsbad, California, dated February 16, 2005 (Job #04‐315).  5. Vinje & Middleton Engineering, Inc., 2002, Geotechnical Update and Grading Plan  Review, Palomar Forum Project, Byron Palomar Airport Road, Carlsbad, California, dated  February 6, 2002 (Job #02‐114‐P).  6. Vinje & Middleton Engineering, Inc., 1998, Preliminary Geotechnical Investigation, Byron  White Property, Palomar Airport Road, Carlsbad, California, dated June 24, 1998 (Job  #98‐215‐P).    ALTA CALIFORNIA GEOTECHNICAL, INC.                     APPENDIX B    Laboratory Maximum Density List  Density Test Table – Table 1      Project No. 1‐0346  Page B‐1  January 31, 2022      ALTA CALIFORNIA GEOTECHNICAL, INC. TABLE 1  Laboratory Maximum Density ASTM: D 1557  Soil Type & Description  Optimum  Moisture  Content  (% by dry wt.)  Maximum  Laboratory  Dry Density  (pcf)  A ‐ Gray Brown Clayey Sand 11.9 118.6  B ‐ Gray Brown Clayey Sand 11.4 119.4  C ‐ Yellow Brown Silty Sand – Import 9.9 122.9  D ‐ Class II Base 7.1 136.7  E ‐ Gray Brown Silty Sand ‐ Import 12.5 118.7  F ‐ Aggregate Base 11.0 123.0  G ‐ Asphalt ‐ 151.2*  H ‐ Asphalt ‐ 148.2*  *Plant Max – maximum density provided by supplier    Test Number Legend  Test number without suffix indicates test in engineered fill mass  ‐S indicates compaction test in sewer trench  ‐SD  indicates compaction test in storm drain trench  ‐W  indicates compaction test in water trench  ‐E  indicates compaction test in electric utility trench  ‐CG  indicates compaction test on curb and gutter subgrade  ‐SG  indicates compaction test on street subgrade  ‐B  indicates compaction test on street aggregate base  ‐AC  indicates compaction test on street asphalt  ‐SW indicates compaction test on sidewalk subgrade  ‐R indicates RETEST of a previously failing test    Depth/Elevation Legend  100 Indicates approximate elevation of density test  ‐1 indicates approximate depth below finished grade  SG indicates subgrade elevation  BG indicates aggregate base elevation  BC indicates asphalt base course elevation  CC indicates asphalt cap course elevation    Density Test Type  N  Indicates tests were taken using Campbell Pacific Nuclear Testing Gauge      Project Number 1-0346 January 31, 2022 Page B-2 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. 8/25/2021 1 Eastern Portion of Site 420.1 13.2 11.9 118.6 111.5 94 A N 90 Pass N 8/25/2021 2 Eastern Portion of Site 422.9 13.0 11.9 118.6 108.7 91 A N 90 Pass N 8/25/2021 3 Eastern Portion of Site 426 12.1 11.9 118.6 109.4 92 A N 90 Pass N8/26/2021 4 Eastern Portion of Site 422.1 13.7 11.9 118.6 108.2 91 A N 90 Pass N 8/26/2021 5 Eastern Portion of Site 421.7 12.4 11.9 118.6 109.9 92 A N 90 Pass N 8/26/2021 6 Eastern Portion of Site 424.1 12.1 11.9 118.6 109.5 92 A N 90 Pass N 8/27/2021 7 Eastern Portion of Site 421.9 13.2 11.9 118.6 108.3 91 A N 90 Pass N 8/27/2021 8 Eastern Portion of Site 423.6 12.5 11.9 118.6 110.5 93 A N 90 Pass N 8/27/2021 9 Eastern Portion of Site 426.3 12.3 11.9 118.6 110.9 93 A N 90 Pass N 8/27/2021 10 Eastern Portion of Site 424.3 13.0 11.9 118.6 109.3 92 A N 90 Pass N 8/27/2021 11 Eastern Portion of Site 428.7 12.7 11.9 118.6 110.6 93 A N 90 Pass N 8/27/2021 12 Eastern Portion of Site 425.1 12.2 11.9 118.6 110.5 93 A N 90 Pass N 8/27/2021 13 Eastern Portion of Site 423.5 12.6 11.9 118.6 109.4 92 A N 90 Pass N 8/30/2021 14 Western Parking Area 418 12.4 11.9 118.6 108.6 91 A N 90 Pass N 8/30/2021 15 Adj BMP-C 419 13.1 11.9 118.6 108.3 91 A N 90 Pass N 8/30/2021 16 Adj BMP-C 419 12.9 11.9 118.6 109.0 91 A N 90 Pass N 8/30/2021 17 Adj BMP-C 421 12.0 11.9 118.6 108.9 91 A N 90 Pass N 8/31/2021 18 Central Parking Area 423.5 12.1 11.9 118.6 106.9 90 A N 90 Pass N 8/31/2021 19 Adj BMP-C 421.5 12.4 11.9 118.6 107.3 90 A N 90 Pass N 8/31/2021 20 Adj BMP-C 420.5 12.9 11.9 118.6 107.4 90 A N 90 Pass N 8/31/2021 21 Adj BMP-C 417.5 12.0 11.9 118.6 106.8 90 A N 90 Pass N 8/31/2021 22 Parking Area Adj Southern Perimeter 422.5 12.9 11.9 118.6 109.4 92 A N 90 Pass N 8/31/2021 23 Parking Area Adj Southern Perimeter 423.5 13.1 11.9 118.6 110.4 93 A N 90 Pass N 8/31/2021 24 Parking Area Adj Southern Perimeter 424.5 13.4 11.9 118.6 107.0 90 A N 90 Pass N 8/31/2021 25 Parking Area Northern Area 413.5 12.5 11.9 118.6 108.6 91 A N 90 Pass N 8/31/2021 26 Parking Area Northern Area 416.5 12.2 11.9 118.6 108.1 91 A N 90 Pass N 9/1/2021 27 Parking Area Northern Section 420 10.0 9.9 122.9 110.7 90 C N 90 Pass N 9/1/2021 28 Parking Area Northern Section 417 11.0 9.9 122.9 112.1 91 C N 90 Pass N 9/1/2021 29 Parking Area Northern Section 414.5 12.1 9.9 122.9 112.9 91 C N 90 Pass N 9/1/2021 30 Parking Area Northern Section 415.5 11.3 9.9 122.9 111.3 90 C N 90 Pass N 9/1/2021 31 Parking Area Northern Section 421 13.1 9.9 122.9 110.9 90 C N 90 Pass N 9/2/2021 32 Parking Area Northern Section 419 10.7 9.9 122.9 111.7 90 C N 90 Pass N 9/2/2021 33 Parking Area Northern Section 415 11.0 9.9 122.9 112.3 91 C N 90 Pass N TABLE I (Cont'd) Moisture Unit Dry Wt. 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-3 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 9/2/2021 34 Parking Area Northern Section 415 12.4 9.9 122.9 112.8 91 C N 90 Pass N 9/2/2021 35 Parking Area Northern Section 420.5 11.9 9.9 122.9 112.1 91 C N 90 Pass N 9/8/2021 36S Sewer Lat Adj BMP-A -4 12.4 11.9 118.6 108.1 91 A N 90 Pass N9/8/2021 37S Sewer Lat Adj BMP-A -6 13.8 11.9 118.6 111.8 94 A N 90 Pass N 9/8/2021 38S Sewer Lat Adj BMP-A -7 14.3 11.9 118.6 112.1 94 A N 90 Pass N 9/8/2021 39S Sewer Lat Adj BMP-A -2 12.6 11.9 118.6 107.8 90 A N 90 Pass N 9/8/2021 40S Sewer Lat Adj BMP-A -4 13.0 11.9 118.6 109.0 91 A N 90 Pass N 9/8/2021 41S Sewer Lat Adj BMP-A -0.5 13.4 11.9 118.6 107.2 90 A N 90 Pass N 9/8/2021 42S Sewer Lat Adj BMP-A -3 12.1 11.9 118.6 112.8 95 A N 90 Pass N 9/8/2021 43S Sewer Lat Adj BMP-A -1 12.5 11.9 118.6 110.1 92 A N 90 Pass N 9/8/2021 44S Sewer Lat Adj BMP-A -0.5 13.0 11.9 118.6 109.2 92 A N 90 Pass N 9/10/2021 45 Northern Parking Area E Side 419 13.5 11.9 118.6 109.8 92 A N 90 Pass N 9/10/2021 46 Northern Parking Area E Side 420 13.1 11.9 118.6 109.4 92 A N 90 Pass N 9/10/2021 47 Northern Parking Area E Side 421 12.7 11.9 118.6 108.7 91 A N 90 Pass N 9/10/2021 48 Northern Parking Area E Side 422 12.4 11.9 118.6 110.7 93 A N 90 Pass N 9/10/2021 49 Northern Parking Area E Side 423 13.0 11.9 118.6 110.3 93 A N 90 Pass N 9/10/2021 50 Center Parking Area E side 424 14.0 11.9 118.6 111.5 94 A N 90 Pass N 9/10/2021 51 Southern Parking Area E side 425 12.9 11.9 118.6 111.0 93 A N 90 Pass N 9/14/2021 52SD Storm Drain to BMP-C 419 10.3 11.9 118.6 106.9 90 A N 90 Pass N 9/14/2021 53SD Storm Drain to BMP-C 418 11.7 11.9 118.6 111.6 94 A N 90 Pass N 9/14/2021 54SD Storm Drain to BMP-C 417 13.0 11.9 118.6 107.2 90 A N 90 Pass N 9/14/2021 55SD Storm Drain to BMP-C 416 12.4 11.9 118.6 110.0 92 A N 90 Pass N 9/14/2021 56SD Storm Drain to BMP-C 420 12.6 11.9 118.6 108.5 91 A N 90 Pass N 9/14/2021 57 Adj West Entrance 417 13.4 11.9 118.6 109.2 92 A N 90 Pass N 9/14/2021 58 Adj BMP-A 410 12.1 11.9 118.6 109.5 92 A N 90 Pass N 9/14/2021 59 Adj BMP-A 411 12.7 11.9 118.6 110.7 93 A N 90 Pass N 9/14/2021 60 Adj BMP-A 412 14.4 11.9 118.6 112.0 94 A N 90 Pass N 9/14/2021 61SD Storm Drain to BMP-A/BMP-B 415 14.0 11.9 118.6 107.1 90 A N 90 Pass N 9/14/2021 62SD Storm Drain to BMP-A/BMP-B 416 13.0 11.9 118.6 108.7 91 A N 90 Pass N 9/14/2021 63SD Storm Drain to BMP-A/BMP-B 415 12.9 11.9 118.6 107.8 90 A N 90 Pass N 9/14/2021 64SD Storm Drain to BMP-A 415 13.3 11.9 118.6 109.2 92 A N 90 Pass N 9/14/2021 65SD Storm Drain to BMP-A 416 13.8 11.9 118.6 107.4 90 A N 90 Pass N 9/14/2021 66E Electrical Box SE Corner 429 12.8 11.9 118.6 112.7 95 A N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-4 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 9/14/2021 67E SE Corner Electrical Trench 434 12.0 11.9 118.6 107.0 90 A N 90 Pass N 9/14/2021 68E SE Corner Electrical Trench 427 12.3 11.9 118.6 107.3 90 A N 90 Pass N 9/14/2021 69E SE Corner Electrical Trench 428 13.0 11.9 118.6 108.1 91 A N 90 Pass N9/15/2021 70E SE Corner Electrical Trench 426.5 12.9 11.9 118.6 108.5 91 A N 90 Pass N 9/15/2021 71E SE Corner Electrical Trench 427.5 12.5 11.9 118.6 107.6 90 A N 90 Pass N 9/15/2021 72E SE Corner Electrical Trench 429 11.9 11.9 118.6 107.1 90 A N 90 Pass N 9/15/2021 73E SDG2E Box 425.5 12.2 11.9 118.6 112.9 95 A N 95 Pass N 9/17/2021 74E Electrical Trench SE Corner 428.5 12.6 11.9 118.6 108.3 91 A N 90 Pass N 9/17/2021 75E Electrical Trench SE Corner 429.5 11.9 11.9 118.6 107.5 90 A N 90 Pass N 9/17/2021 76E Electrical Trench SE Corner 426 13.8 11.9 118.6 107.9 90 A N 90 Pass N 9/17/2021 77E Electrical Trench SE Corner 425 14.2 11.9 118.6 107.3 90 A N 90 Pass N 9/17/2021 78E Electrical Trench SE Corner 426.5 13.2 11.9 118.6 108.6 91 A N 90 Pass N 9/22/2021 79E Electrical Conduit East Slope 428 12.1 11.9 118.6 107.5 90 A N 90 Pass N 9/22/2021 80E Electrical Conduit East Slope 428 12.9 11.9 118.6 108.4 91 A N 90 Pass N 9/22/2021 81E Electrical Conduit East Slope 431 11.9 11.9 118.6 109.0 91 A N 90 Pass N 9/22/2021 82E Electrical Conduit Southern Boundary 415 12.6 11.9 118.6 107.3 90 A N 90 Pass N 9/22/2021 83E Electrical Conduit Southern Boundary 425 13.1 11.9 118.6 107.9 90 A N 90 Pass N 9/24/2021 84E Electrical Conduit Southern Perimeter 430 13.3 11.9 118.6 107.5 90 A N 90 Pass N 9/24/2021 85E Electrical Conduit Southern Perimeter 429 13.7 11.9 118.6 108.0 91 A N 90 Pass N 9/24/2021 86E Electrical Conduit Southern Perimeter 429 12.9 11.9 118.6 108.3 91 A N 90 Pass N 9/24/2021 87E Electrical Conduit Southern Perimeter 427 13.7 11.9 118.6 107.8 90 A N 90 Pass N 9/27/2021 88E Electrical Conduit Southern Perimeter -3 12.4 11.9 118.6 107.3 90 A N 90 Pass N 9/27/2021 89E Electrical Conduit Southern Perimeter -1 13.1 11.9 118.6 108.1 91 A N 90 Pass N 9/27/2021 90E Electrical Conduit Southern Perimeter -2 12.5 11.9 118.6 107.7 90 A N 90 Pass N 9/27/2021 91E Electrical Conduit Southern Perimeter -2 12.8 11.9 118.6 108.3 91 A N 90 Pass N 9/27/2021 92E Electrical Conduit Southern Perimeter -3 12.9 11.9 118.6 108.8 91 A N 90 Pass N 9/27/2021 93E Electrical Conduit Southern Perimeter -2 13.0 11.9 118.6 107.6 90 A N 90 Pass N 9/27/2021 94E Electrical Conduit Southern Perimeter -1 13.3 11.9 118.6 108.4 91 A N 90 Pass N 9/27/2021 95E Electrical Conduit Southern Perimeter -1 14.0 11.9 118.6 109.1 91 A N 90 Pass N 9/27/2021 96E SW Corner Electrical Trench -3 12.9 11.9 118.6 108.6 91 A N 90 Pass N 9/27/2021 97E SW Corner Electrical Trench -1 13.1 11.9 118.6 107.5 90 A N 90 Pass N 9/27/2021 98E SW Corner Electrical Trench -2 13.4 11.9 118.6 108.7 91 A N 90 Pass N 9/27/2021 99E SW Corner Electrical Trench -3 14.0 11.9 118.6 109.2 92 A N 90 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-5 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 9/30/2021 100W Private Fire Line in between BMP C/B -3 12.3 11.9 118.6 107.5 90 A N 90 Pass N 9/30/2021 101W Private Fire Line in between BMP C/B -1 14.0 11.9 118.6 109.3 92 A N 90 Pass N 9/30/2021 102W Private Fire Line in between BMP C/B -2 13.1 11.9 118.6 108.1 91 A N 90 Pass N9/30/2021 103W Private Fire Line in between BMP C/B -1 12.8 11.9 118.6 107.9 90 A N 90 Pass N 9/30/2021 104W Private Fire Line in between BMP C/B -2 12.6 11.9 118.6 108.6 91 A N 90 Pass N 9/30/2021 105W Private Fire Line in between BMP C/B -2 13.0 11.9 118.6 107.6 90 A N 90 Pass N 9/30/2021 106W Private Fire Line in between BMP C/B -1 13.1 11.9 118.6 108.5 91 A N 90 Pass N 9/30/2021 107W Private Fire Line in between BMP C/B -1 12.6 11.9 118.6 107.8 90 A N 90 Pass N 9/30/2021 108W Private Fire Line in between BMP C/B -3 14.0 11.9 118.6 109.6 92 A N 90 Pass N 9/30/2021 109W Private Fire Line in between BMP C/B -2 13.8 11.9 118.6 108.1 91 A N 90 Pass N 9/30/2021 110W Private Fire Line in between BMP C/B -2 12.8 11.9 118.6 107.9 90 A N 90 Pass N 10/1/2021 111W Private Fire Line in between Parking Lot -2 13.1 11.9 118.6 107.8 90 A N 90 Pass N 10/1/2021 112W Private Fire Line in between Parking Lot -1 13.6 11.9 118.6 108.3 91 A N 90 Pass N 10/1/2021 113W Private Fire Line in between Parking Lot -2 13.9 11.9 118.6 109.0 91 A N 90 Pass N 10/1/2021 114W Private Fire Line in between Parking Lot -2 14.2 11.9 118.6 109.6 92 A N 90 Pass N 10/1/2021 115W Private Fire Line in between Parking Lot -1 13.2 11.9 118.6 108.7 91 A N 90 Pass N 10/1/2021 116W Private Fire Line in between Parking Lot -3 14.4 11.9 118.6 109.8 92 A N 90 Pass N 10/1/2021 117W Private Fire Line in between Parking Lot -1 14.0 11.9 118.6 109.1 91 A N 90 Pass N 10/1/2021 118E SE Corner -2 12.8 11.9 118.6 108.1 91 A N 90 Pass N 10/1/2021 119E SE Corner -3 13.4 11.9 118.6 108.4 91 A N 90 Pass N 10/1/2021 120E SE Corner -3 13.8 11.9 118.6 108.8 91 A N 90 Pass N 10/1/2021 121E SE Corner -2 12.4 11.9 118.6 107.6 90 A N 90 Pass N 10/1/2021 122E SE Corner -1 13.7 11.9 118.6 108.3 91 A N 90 Pass N 10/1/2021 123E SE Corner -2 12.6 11.9 118.6 107.9 90 A N 90 Pass N 10/7/2021 124CG Eastern Section of Site SG 13.1 11.9 118.6 113.0 95 A N 95 Pass N 10/7/2021 125CG Eastern Section of Site SG 13.4 11.9 118.6 113.6 95 A N 95 Pass N 10/7/2021 126CG Eastern Section of Site SG 13.0 11.9 118.6 113.8 95 A N 95 Pass N 10/7/2021 127CG Eastern Section of Site SG 12.8 11.9 118.6 113.1 95 A N 95 Pass N 10/7/2021 128CG Northwestern Section of Site SG 12.9 11.9 118.6 114.1 96 A N 95 Pass N 10/7/2021 129CG Northwestern Section of Site SG 12.9 11.9 118.6 113.1 95 A N 95 Pass N 10/7/2021 130CG Northwestern Section of Site SG 13.0 11.9 118.6 113.4 95 A N 95 Pass N 10/7/2021 131CG Northwestern Section of Site SG 13.2 11.9 118.6 113.6 95 A N 95 Pass N 10/7/2021 132CG Northwestern Section of Site SG 12.9 11.9 118.6 113.3 95 A N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-6 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 10/7/2021 133CG Northwestern Section of Site SG 13.1 11.9 118.6 114.3 96 A N 95 Pass N 10/7/2021 134CG Northwestern Section of Site SG 12.6 11.9 118.6 113.3 95 A N 95 Pass N 10/7/2021 135CG Northwestern Section of Site SG 13.0 11.9 118.6 114.2 96 A N 95 Pass N10/7/2021 136CG Northwestern Section of Site SG 13.8 11.9 118.6 113.6 95 A N 95 Pass N 10/7/2021 137CG Northwestern Section of Site SG 12.4 11.9 118.6 113.1 95 A N 95 Pass N 10/7/2021 138CG Northwestern Section of Site SG 14.1 11.9 118.6 115.2 97 A N 95 Pass N 10/7/2021 139CG Northwestern Section of Site SG 13.4 11.9 118.6 113.6 95 A N 95 Pass N 10/7/2021 140CG Northwestern Section of Site SG 13.9 11.9 118.6 115.0 96 A N 95 Pass N 10/7/2021 141CG Southwestern Section of Site SG 13.6 11.9 118.6 114.1 96 A N 95 Pass N 10/7/2021 142CG Southwestern Section of Site SG 12.8 11.9 118.6 114.3 96 A N 95 Pass N 10/7/2021 143CG Southwestern Section of Site SG 14.0 11.9 118.6 115.1 97 A N 95 Pass N 10/7/2021 144CG Southwestern Section of Site SG 13.9 11.9 118.6 114.9 96 A N 95 Pass N 10/7/2021 145CG Southwestern Section of Site SG 12.6 11.9 118.6 113.4 95 A N 95 Pass N 10/7/2021 146CG Southwestern Section of Site SG 13.0 11.9 118.6 113.8 95 A N 95 Pass N 10/7/2021 147CG Southwestern Section of Site SG 12.9 11.9 118.6 114.0 96 A N 95 Pass N 10/7/2021 148CG Southwestern Section of Site SG 13.0 11.9 118.6 114.3 96 A N 95 Pass N 10/7/2021 149CG Southwestern Section of Site SG 12.8 11.9 118.6 114.1 96 A N 95 Pass N 10/7/2021 150CG Eastern Section of Site SG 12.5 11.9 118.6 113.7 95 A N 95 Pass N 10/7/2021 151CG Eastern Section of Site SG 13.0 11.9 118.6 114.1 96 A N 95 Pass N 10/7/2021 152CG Eastern Section of Site SG 12.3 11.9 118.6 113.9 96 A N 95 Pass N 10/7/2021 153CG Eastern Section of Site SG 12.8 11.9 118.6 114.5 96 A N 95 Pass N 10/7/2021 154CG Eastern Section of Site SG 12.6 11.9 118.6 114.4 96 A N 95 Pass N 10/12/2021 155E Eastern Section of Site -2 12.1 11.9 118.6 107.8 90 A N 90 Pass N 10/12/2021 156E Eastern Section of Site -1 12.5 11.9 118.6 108.5 91 A N 90 Pass N 10/12/2021 157E Eastern Section of Site -3 12.1 11.9 118.6 107.6 90 A N 90 Pass N 10/12/2021 158E NW Section of Site -2 12.6 11.9 118.6 108.3 91 A N 90 Pass N 10/12/2021 159E NW Section of Site -2 12.4 11.9 118.6 108.6 91 A N 90 Pass N 10/18/2021 160CG SW Section of Site SG 13.4 11.9 118.6 113.6 95 A N 95 Pass N 10/18/2021 161CG SW Section of Site SG 13.8 11.9 118.6 113.9 96 A N 95 Pass N 10/18/2021 162CG SW Section of Site SG 14.0 11.9 118.6 114.0 96 A N 95 Pass N 10/18/2021 163CG SW Section of Site SG 13.6 11.9 118.6 114.1 96 A N 95 Pass N 10/18/2021 164CG SW Section of Site SG 14.2 11.9 118.6 114.7 96 A N 95 Pass N 10/18/2021 165CG SW Section of Site SG 13.0 11.9 118.6 114.3 96 A N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-7 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 10/18/2021 166CG SW Section of Site SG 12.4 11.9 118.6 113.5 95 A N 95 Pass N 10/18/2021 167CG SW Section of Site SG 12.9 11.9 118.6 114.1 96 A N 95 Pass N 10/18/2021 168CG SW Section of Site SG 12.8 11.9 118.6 114.3 96 A N 95 Pass N10/18/2021 169CG SW Section of Site SG 12.3 11.9 118.6 113.4 95 A N 95 Pass N 10/18/2021 170CG SW Section of Site SG 12.5 11.9 118.6 113.9 96 A N 95 Pass N 10/18/2021 171CG SW Section of Site SG 13.2 11.9 118.6 114.7 96 A N 95 Pass N 10/18/2021 172CG SW Section of Site SG 13.0 11.9 118.6 114.3 96 A N 95 Pass N 10/18/2021 173CG SW Section of Site SG 13.6 11.9 118.6 115.1 97 A N 95 Pass N 10/18/2021 174E NW Section of Site -2 12.4 11.9 118.6 106.9 90 A N 90 Pass N 10/18/2021 175E NW Section of Site -2 12.3 11.9 118.6 107.1 90 A N 90 Pass N 10/18/2021 176E NW Section of Site -1 12.6 11.9 118.6 107.4 90 A N 90 Pass N 10/18/2021 177E NW Section of Site -1 12.0 11.9 118.6 107.5 90 A N 90 Pass N 10/18/2021 178E NW Section of Site -1 12.3 11.9 118.6 107.8 90 A N 90 Pass N 10/18/2021 179E NW Section of Site -2 12.5 11.9 118.6 108.3 91 A N 90 Pass N 10/19/2021 180CG Parking Area Middle Section SG 12.8 11.9 118.6 114.5 96 A N 95 Pass N 10/19/2021 181CG Parking Area Middle Section SG 12.5 11.9 118.6 113.8 95 A N 95 Pass N 10/19/2021 182CG Parking Area Middle Section SG 13.0 11.9 118.6 114.0 96 A N 95 Pass N 10/19/2021 184CG Parking Area Middle Section SG 13.8 11.9 118.6 115.3 97 A N 95 Pass N 10/19/2021 185CG Parking Area Middle Section SG 12.7 11.9 118.6 114.8 96 A N 95 Pass N 10/19/2021 186CG Parking Area Middle Section SG 12.5 11.9 118.6 114.3 96 A N 95 Pass N 10/19/2021 187CG Parking Area Middle Section SG 12.6 11.9 118.6 114.7 96 A N 95 Pass N 10/19/2021 188CG Parking Area Middle Section SG 12.4 11.9 118.6 113.9 96 A N 95 Pass N 10/19/2021 189CG Parking Area Middle Section SG 13.5 11.9 118.6 115.3 97 A N 95 Pass N 10/19/2021 190CG Parking Area Middle Section SG 12.5 11.9 118.6 114.0 96 A N 95 Pass N 10/19/2021 191CG Parking Area Middle Section SG 12.3 11.9 118.6 114.1 96 A N 95 Pass N 10/19/2021 192CG Parking Area Middle Section SG 12.1 11.9 118.6 113.8 95 A N 95 Pass N 10/19/2021 193CG Parking Area Middle Section SG 12.6 11.9 118.6 115.0 96 A N 95 Pass N 10/19/2021 194CG Parking Area Middle Section SG 12.7 11.9 118.6 114.5 96 A N 95 Pass N 10/19/2021 195CG Parking Area Middle Section SG 13.4 11.9 118.6 115.4 97 A N 95 Pass N 10/19/2021 196CG Parking Area Middle Section SG 12.6 11.9 118.6 114.7 96 A N 95 Pass N 10/19/2021 197CG Parking Area Middle Section SG 12.8 11.9 118.6 114.3 96 A N 95 Pass N 10/19/2021 198CG Parking Area Middle Section SG 12.5 11.9 118.6 114.1 96 A N 95 Pass N 10/19/2021 199CG Parking Area Middle Section SG 13.5 11.9 118.6 115.2 97 A N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-8 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 10/19/2021 200CG Parking Area Middle Section SG 13.5 11.9 118.6 115.5 97 A N 95 Pass N 10/19/2021 201CG Parking Area Middle Section SG 13.9 11.9 118.6 115.8 97 A N 95 Pass N 10/19/2021 202CG Parking Area Middle Section SG 12.7 11.9 118.6 114.8 96 A N 95 Pass N10/19/2021 203CG Parking Area Middle Section SG 12.5 11.9 118.6 114.5 96 A N 95 Pass N 10/19/2021 204CG Parking Area Middle Section SG 12.6 11.9 118.6 114.9 96 A N 95 Pass N 10/20/2021 205B SW Corner near E Box BG 8.6 7.1 136.7 130.5 95 D N 95 Pass N 10/20/2021 206B SW Corner near E Box BG 8.3 7.1 136.7 130.3 95 D N 95 Pass N 10/20/2021 207B SW Corner near E Box BG 9.1 7.1 136.7 131.6 96 D N 95 Pass N 10/20/2021 208B SW Corner near E Box BG 8.5 7.1 136.7 130.7 95 D N 95 Pass N 10/20/2021 209B SE Corner BG 7.8 7.1 136.7 130.5 95 D N 95 Pass N 10/20/2021 210B SE Corner BG 8.2 7.1 136.7 131.1 95 D N 95 Pass N 10/20/2021 211B SE Corner BG 8.4 7.1 136.7 131.9 96 D N 95 Pass N 10/20/2021 212B SE Corner BG 8.0 7.1 136.7 130.6 95 D N 95 Pass N 10/20/2021 213B SE Corner BG 8.3 7.1 136.7 131.2 95 D N 95 Pass N 10/20/2021 214B SE Corner BG 8.5 7.1 136.7 131.7 96 D N 95 Pass N 10/20/2021 215B SW Corner BG 9.6 7.1 136.7 132.5 96 D N 95 Pass N 10/20/2021 216B SW Corner BG 8.1 7.1 136.7 130.2 95 D N 95 Pass N 10/20/2021 217B SW Corner BG 8.6 7.1 136.7 131.6 96 D N 95 Pass N 10/20/2021 218B SW Corner BG 8.5 7.1 136.7 130.9 95 D N 95 Pass N 10/20/2021 219B SW Corner BG 8.8 7.1 136.7 131.4 96 D N 95 Pass N 10/21/2021 220B Parking Area Middle Section BG 8.0 7.1 136.7 131.2 95 D N 95 Pass N 10/21/2021 221B Parking Area Middle Section BG 8.8 7.1 136.7 131.6 96 D N 95 Pass N 10/21/2021 222B Parking Area Middle Section BG 8.1 7.1 136.7 130.5 95 D N 95 Pass N 10/21/2021 223B Parking Area Middle Section BG 9.0 7.1 136.7 131.9 96 D N 95 Pass N 10/21/2021 224B Parking Area Middle Section BG 8.5 7.1 136.7 131.0 95 D N 95 Pass N 10/21/2021 225B Parking Area Middle Section BG 8.9 7.1 136.7 131.8 96 D N 95 Pass N 10/21/2021 226B Parking Area Middle Section BG 9.3 7.1 136.7 132.1 96 D N 95 Pass N 10/21/2021 227B Parking Area Middle Section BG 8.8 7.1 136.7 131.5 96 D N 95 Pass N 10/21/2021 228B Parking Area Middle Section BG 9.4 7.1 136.7 132.4 96 D N 95 Pass N 10/21/2021 229B Parking Area Middle Section BG 8.6 7.1 136.7 131.0 95 D N 95 Pass N 10/22/2021 230B Parking Area West Side BG 7.6 7.1 136.7 130.1 95 D N 95 Pass N 10/22/2021 231B Parking Area West Side BG 7.8 7.1 136.7 130.9 95 D N 95 Pass N 10/22/2021 232B Parking Area West Side BG 8.1 7.1 136.7 131.2 95 D N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-9 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 10/22/2021 233B Parking Area West Side BG 8.3 7.1 136.7 132.0 96 D N 95 Pass N 10/22/2021 234B Parking Area West Side BG 7.9 7.1 136.7 131.8 96 D N 95 Pass N 10/22/2021 235B Parking Area West Side BG 7.6 7.1 136.7 130.9 95 D N 95 Pass N10/22/2021 236B Parking Area West Side BG 7.9 7.1 136.7 131.2 95 D N 95 Pass N 10/22/2021 237B Parking Area West Side BG 9.4 7.1 136.7 132.6 97 D N 95 Pass N 10/22/2021 238B Parking Area West Side BG 9.5 7.1 136.7 133.1 97 D N 95 Pass N 10/22/2021 239B Parking Area West Side BG 8.5 7.1 136.7 131.4 96 D N 95 Pass N 10/22/2021 240B Parking Area West Side BG 8.8 7.1 136.7 132.6 97 D N 95 Pass N 10/22/2021 241B Parking Area West Side BG 9.3 7.1 136.7 132.9 97 D N 95 Pass N 10/22/2021 242B Parking Area West Side BG 9.4 7.1 136.7 132.5 96 D N 95 Pass N 10/22/2021 243B Parking Area West Side BG 8.1 7.1 136.7 131.5 96 D N 95 Pass N 10/22/2021 244B Parking Area West Side BG 8.4 7.1 136.7 132.1 96 D N 95 Pass N 10/22/2021 245B Parking Area West Side BG 8.2 7.1 136.7 131.1 95 D N 95 Pass N 10/22/2021 246B Parking Area West Side BG 8.1 7.1 136.7 130.6 95 D N 95 Pass N 10/22/2021 247B Parking Area West Side BG 8.2 7.1 136.7 131.6 96 D N 95 Pass N 10/22/2021 248B Parking Area West Side BG 8.6 7.1 136.7 132.9 97 D N 95 Pass N 10/22/2021 249B Parking Area West Side BG 9.7 7.1 136.7 133.4 97 D N 95 Pass N 10/22/2021 250B Parking Area West Side BG 8.4 7.1 136.7 132.1 96 D N 95 Pass N 10/25/2021 251B Adj to Bike Parking Repair Station BG 7.4 7.1 136.7 130.1 95 D N 95 Pass N 10/25/2021 252B Adj to Bike Parking Repair Station BG 8.0 7.1 136.7 131.2 95 D N 95 Pass N 10/25/2021 253B Adj to Bike Parking Repair Station BG 7.5 7.1 136.7 130.5 95 D N 95 Pass N 10/25/2021 254B Adj to Bike Parking Repair Station BG 8.7 7.1 136.7 132.4 96 D N 95 Pass N 10/25/2021 255B Adj to Bike Parking Repair Station BG 7.7 7.1 136.7 130.8 95 D N 95 Pass N 10/25/2021 256B Adj to Bike Parking Repair Station BG 8.4 7.1 136.7 131.6 96 D N 95 Pass N 10/25/2021 257B Adj to Bike Parking Repair Station BG 8.1 7.1 136.7 131.2 95 D N 95 Pass N 10/25/2021 258 Adj West Entrance 417 12.8 12.5 118.7 107.0 90 E N 90 Pass N 10/27/2021 259 Adj West Entrance 417 12.8 12.5 118.7 107.1 90 E N 90 Pass N 10/27/2021 260 NW Section of Site 419 13.0 12.5 118.7 108.0 90 E N 90 Pass N 10/27/2021 261 NW Section of Site 415 12.9 12.5 118.7 107.6 90 E N 90 Pass N 10/27/2021 262 NW Section of Site 416 12.7 12.5 118.7 107.9 90 E N 90 Pass N 10/27/2021 263 NW Section of Site 417 12.6 12.5 118.7 107.4 90 E N 90 Pass N 10/27/2021 264 NW Section of Site 418 12.6 12.5 118.7 107.3 90 E N 90 Pass N 10/27/2021 265 NW Section of Site 419 13.1 12.5 118.7 108.1 91 E N 90 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-10 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 10/27/2021 266 NW Section of Site 419 12.6 12.5 118.7 107.8 90 E N 90 Pass N 10/27/2021 267CG Adj Bike Parking Repair Station SG 12.3 11.9 118.6 113.4 95 A N 95 Pass N 10/27/2021 268CG Adj Bike Parking Repair Station SG 12.5 11.9 118.6 113.6 95 A N 95 Pass N10/27/2021 269B Parking Area NE Section BG 8.0 7.1 136.7 131.0 95 D N 95 Pass N 10/27/2021 270B Parking Area NE Section BG 8.4 7.1 136.7 131.5 96 D N 95 Pass N 10/27/2021 271B Parking Area NE Section BG 8.1 7.1 136.7 131.1 95 D N 95 Pass N 10/27/2021 272B Parking Area Northern Section BG 8.1 7.1 136.7 131.6 96 D N 95 Pass N 10/27/2021 273B Parking Area Northern Section BG 9.2 7.1 136.7 133.6 97 D N 95 Pass N 10/27/2021 274B Parking Area Northern Section BG 8.8 7.1 136.7 132.3 96 D N 95 Pass N 10/27/2021 275B Parking Area Northern Section BG 7.8 7.1 136.7 130.5 95 D N 95 Pass N 10/27/2021 276B Parking Area Northern Section BG 7.9 7.1 136.7 131.4 96 D N 95 Pass N 10/27/2021 277B Parking Area Northern Section BG 7.4 7.1 136.7 130.2 95 D N 95 Pass N 10/27/2021 278B Parking Area Northern Section BG 7.8 7.1 136.7 130.9 95 D N 95 Pass N 10/27/2021 279B Parking Area Northern Section BG 8.1 7.1 136.7 131.6 96 D N 95 Pass N 10/27/2021 280B Parking Area Northern Section BG 7.8 7.1 136.7 130.5 95 D N 95 Pass N 10/27/2021 281B Parking Area Northern Section BG 8.2 7.1 136.7 131.8 96 D N 95 Pass N 10/27/2021 282B Parking Area Northern Section BG 8.4 7.1 136.7 132.8 97 D N 95 Pass N 10/27/2021 283B Parking Area Northern Section BG 9.0 7.1 136.7 133.1 97 D N 95 Pass N 10/27/2021 284B Parking Area Northern Section BG 8.5 7.1 136.7 132.6 97 D N 95 Pass N 10/27/2021 285B Parking Area Northern Section BG 8.1 7.1 136.7 131.4 96 D N 95 Pass N 10/27/2021 286B Parking Area Northern Section BG 8.0 7.1 136.7 130.9 95 D N 95 Pass N 10/27/2021 287B Parking Area Northern Section BG 8.2 7.1 136.7 131.1 95 D N 95 Pass N 10/27/2021 288B Parking Area Northern Section BG 8.1 7.1 136.7 131.0 95 D N 95 Pass N 10/27/2021 289B Parking Area Northern Section BG 8.4 7.1 136.7 131.7 96 D N 95 Pass N 10/27/2021 290B Parking Area Northern Section BG 8.6 7.1 136.7 132.0 96 D N 95 Pass N 10/27/2021 291B Parking Area Northern Section BG 7.8 7.1 136.7 130.6 95 D N 95 Pass N 10/27/2021 292B Parking Area Northern Section BG 8.5 7.1 136.7 132.1 96 D N 95 Pass N 10/27/2021 293B Adj to Bike Parking Repair Station BG 8.6 7.1 136.7 132.0 96 D N 95 Pass N 10/27/2021 294B Adj to Bike Parking Repair Station BG 8.8 7.1 136.7 132.4 96 D N 95 Pass N 11/1/2021 295CG NW of Site SG 12.3 11.9 118.6 112.9 95 A N 95 Pass N 11/1/2021 296CG NW of Site SG 12.9 11.9 118.6 113.5 95 A N 95 Pass N 11/1/2021 297CG NW of Site SG 13.4 11.9 118.6 114.3 96 A N 95 Pass N 11/1/2021 298CG NW of Site SG 13.6 11.9 118.6 114.6 96 A N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-11 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 11/1/2021 299CG NW of Site SG 13.0 11.9 118.6 113.3 95 A N 95 Pass N 11/1/2021 300CG NW of Site SG 13.2 11.9 118.6 113.8 95 A N 95 Pass N 11/1/2021 301CG NW of Site SG 12.5 11.9 118.6 113.5 95 A N 95 Pass N11/1/2021 302CG NW of Site SG 14.0 11.9 118.6 115.2 97 A N 95 Pass N 11/1/2021 303CG NW of Site SG 13.5 11.9 118.6 114.3 96 A N 95 Pass N 11/1/2021 304CG NW of Site SG 13.1 11.9 118.6 113.1 95 A N 95 Pass N 11/1/2021 305CG NW of Site SG 13.3 11.9 118.6 114.1 96 A N 95 Pass N 11/1/2021 306CG NW of Site SG 13.7 11.9 118.6 114.7 96 A N 95 Pass N 11/1/2021 307CG NW of Site SG 13.3 11.9 118.6 113.9 96 A N 95 Pass N 11/1/2021 308CG NW of Site SG 13.2 11.9 118.6 114.1 96 A N 95 Pass N 11/1/2021 309CG NW of Site SG 13.0 11.9 118.6 114.0 96 A N 95 Pass N 11/1/2021 310CG NW of Site SG 13.3 11.9 118.6 114.2 96 A N 95 Pass N 11/1/2021 311CG NW of Site SG 14.1 11.9 118.6 115.0 96 A N 95 Pass N 11/1/2021 312CG NW of Site SG 12.8 11.9 118.6 113.8 95 A N 95 Pass N 11/1/2021 313CG NW of Site SG 12.4 11.9 118.6 112.9 95 A N 95 Pass N 11/2/2021 314CG NE of Site Adj BMP-D SG 13.1 11.9 118.6 113.3 95 A N 95 Pass N 11/2/2021 315CG NE of Site Adj BMP-D SG 13.2 11.9 118.6 113.3 95 A N 95 Pass N 11/2/2021 316CG NE of Site Adj BMP-D SG 13.7 11.9 118.6 114.3 96 A N 95 Pass N 11/2/2021 317CG NE of Site SG 12.3 11.9 118.6 112.9 95 A N 95 Pass N 11/2/2021 318CG NE of Site SG 13.5 11.9 118.6 113.9 96 A N 95 Pass N 11/2/2021 319CG NE of Site SG 13.6 11.9 118.6 114.1 96 A N 95 Pass N 11/2/2021 320CG NE of Site SG 13.3 11.9 118.6 113.7 95 A N 95 Pass N 11/2/2021 321CG NE of Site SG 13.9 11.9 118.6 114.8 96 A N 95 Pass N 11/3/2021 322CG NW of Parking Lot SG 13.1 11.9 118.6 113.7 95 A N 95 Pass N 11/3/2021 323CG NW of Parking Lot SG 12.8 11.9 118.6 113.1 95 A N 95 Pass N 11/3/2021 324CG NW of Parking Lot SG 13.5 11.9 118.6 114.1 96 A N 95 Pass N 11/3/2021 325CG NW of Parking Lot SG 13.0 11.9 118.6 113.0 95 A N 95 Pass N 11/3/2021 326CG NW of Parking Lot SG 13.6 11.9 118.6 114.3 96 A N 95 Pass N 11/3/2021 327CG NW of Parking Lot SG 13.3 11.9 118.6 113.9 96 A N 95 Pass N 11/3/2021 328B NW of Site Adj BMP-A BG 8.0 7.1 136.7 131.5 96 D N 95 Pass N 11/3/2021 329B NW of Site Adj BMP-A BG 7.8 7.1 136.7 130.6 95 D N 95 Pass N 11/3/2021 330B NW of Site Adj BMP-A BG 8.3 7.1 136.7 132.1 96 D N 95 Pass N 11/3/2021 331B NW of Site Adj BMP-A BG 7.7 7.1 136.7 130.9 95 D N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-12 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 11/3/2021 332B NW of Site BG 7.9 7.1 136.7 131.4 96 D N 95 Pass N 11/3/2021 333B NW of Site BG 9.1 7.1 136.7 132.6 97 D N 95 Pass N 11/3/2021 334B NW of Site BG 8.1 7.1 136.7 131.1 95 D N 95 Pass N11/4/2021 335B NW of Site BG 8.7 7.1 136.7 133.1 97 D N 95 Pass N 11/4/2021 336B NW of Site BG 8.7 7.1 136.7 134.3 98 D N 95 Pass N 11/4/2021 337B NW of Site BG 8.3 7.1 136.7 132.7 97 D N 95 Pass N 11/4/2021 338B NW of Site BG 7.4 7.1 136.7 130.1 95 D N 95 Pass N 11/4/2021 339B NW of Site BG 7.7 7.1 136.7 130.5 95 D N 95 Pass N 11/4/2021 340B NW of Site BG 7.9 7.1 136.7 130.7 95 D N 95 Pass N 11/4/2021 341B NW of Site BG 8.1 7.1 136.7 132.6 97 D N 95 Pass N 11/4/2021 342B NW of Site BG 8.4 7.1 136.7 133.4 97 D N 95 Pass N 11/4/2021 343B NE of Site Adj BMP-D BG 9.0 7.1 136.7 134.1 98 D N 95 Pass N 11/4/2021 344B NE of Site Adj BMP-D BG 9.2 7.1 136.7 133.4 97 D N 95 Pass N 11/4/2021 345B NE of Site Adj BMP-D BG 8.5 7.1 136.7 133.9 97 D N 95 Pass N 11/4/2021 346B NE of Site Adj BMP-D BG 7.5 7.1 136.7 130.3 95 D N 95 Pass N 11/4/2021 347B NE of Site BG 7.3 7.1 136.7 130.9 95 D N 95 Pass N 11/4/2021 348B NE of Site BG 8.1 7.1 136.7 132.3 96 D N 95 Pass N 11/4/2021 349B NE of Site BG 8.2 7.1 136.7 132.5 96 D N 95 Pass N 11/4/2021 350B NE of Site BG 8.8 7.1 136.7 134.7 98 D N 95 Pass N 11/4/2021 351B NE of Site BG 7.8 7.1 136.7 130.6 95 D N 95 Pass N 11/5/2021 352CG SW of Site SG 12.6 11.9 118.6 113.2 95 A N 95 Pass N 11/5/2021 353CG SW of Site SG 12.3 11.9 118.6 112.8 95 A N 95 Pass N 11/5/2021 354CG SW of Site SG 12.5 11.9 118.6 113.0 95 A N 95 Pass N 11/5/2021 355CG SW of Site SG 12.4 11.9 118.6 113.1 95 A N 95 Pass N 11/5/2021 356CG SW of Site SG 12.8 11.9 118.6 114.1 96 A N 95 Pass N 11/5/2021 357CG SW of Site SG 12.5 11.9 118.6 113.6 95 A N 95 Pass N 11/5/2021 358CG SW of Site SG 12.1 11.9 118.6 112.9 95 A N 95 Pass N 11/5/2021 359CG SW of Site SG 12.3 11.9 118.6 113.1 95 A N 95 Pass N 11/5/2021 360CG SW of Site SG 12.4 11.9 118.6 113.4 95 A N 95 Pass N 11/5/2021 361B SW of Site BG 8.2 7.1 136.7 131.4 96 D N 95 Pass N 11/5/2021 362B SW of Site BG 8.7 7.1 136.7 132.7 97 D N 95 Pass N 11/5/2021 363B SW of Site BG 7.6 7.1 136.7 130.5 95 D N 95 Pass N 11/5/2021 364B SW of Site BG 7.9 7.1 136.7 131.9 96 D N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-13 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 11/5/2021 365B SW of Site BG 8.8 7.1 136.7 132.5 96 D N 95 Pass N 11/5/2021 366B SW of Site BG 8.3 7.1 136.7 132.1 96 D N 95 Pass N 11/5/2021 367B SW of Site BG 8.1 7.1 136.7 131.8 96 D N 95 Pass N11/5/2021 368B SW of Site BG 9.2 7.1 136.7 133.4 97 D N 95 Pass N 11/5/2021 369CG East Side of Main Entrance SG 12.4 11.9 118.6 113.5 95 A N 95 Pass N 11/5/2021 370CG East Side of Main Entrance SG 12.8 11.9 118.6 114.5 96 A N 95 Pass N 11/5/2021 371CG East Side of Main Entrance SG 12.3 11.9 118.6 113.0 95 A N 95 Pass N 11/5/2021 372CG East Side of Main Entrance SG 12.5 11.9 118.6 114.2 96 A N 95 Pass N 11/5/2021 373 Main Entrance 428 12.4 11.9 118.6 107.3 90 A N 90 Pass N 11/5/2021 374 Main Entrance 429 12.6 11.9 118.6 107.5 90 A N 90 Pass N 11/5/2021 375 Main Entrance 430 12.8 11.9 118.6 107.7 90 A N 90 Pass N 11/5/2021 376 Main Entrance 431 12.3 11.9 118.6 107.1 90 A N 90 Pass N 11/5/2021 377 Main Entrance 429.5 12.6 11.9 118.6 107.1 90 A N 90 Pass N 11/5/2021 378 Main Entrance 431 12.4 11.9 118.6 106.9 90 A N 90 Pass N 11/5/2021 379 Main Entrance 432 12.7 11.9 118.6 107.3 90 A N 90 Pass N 11/9/2021 380CG Main Entrance SG 12.4 11.9 118.6 112.9 95 A N 95 Pass N 11/9/2021 381CG Main Entrance SG 12.8 11.9 118.6 113.9 96 A N 95 Pass N 11/9/2021 382CG Main Entrance SG 13.0 11.9 118.6 113.1 95 A N 95 Pass N 11/9/2021 383CG Main Entrance SG 13.4 11.9 118.6 113.6 95 A N 95 Pass N 11/9/2021 384CG Main Entrance SG 13.5 11.9 118.6 113.5 95 A N 95 Pass N 11/9/2021 385CG Main Entrance SG 13.8 11.9 118.6 114.1 96 A N 95 Pass N 11/9/2021 386B Main Entrance BG 8.6 7.1 136.7 132.5 96 D N 95 Pass N 11/9/2021 387B Main Entrance BG 7.6 7.1 136.7 131.3 96 D N 95 Pass N 11/9/2021 388B Main Entrance BG 7.9 7.1 136.7 131.9 96 D N 95 Pass N 11/9/2021 389B Main Entrance BG 7.5 7.1 136.7 130.1 95 D N 95 Pass N 11/9/2021 390B Main Entrance BG 8.9 7.1 136.7 132.7 97 D N 95 Pass N 11/9/2021 391B Main Entrance BG 9.0 7.1 136.7 133.2 97 D N 95 Pass N 11/9/2021 392B Main Entrance BG 8.0 7.1 136.7 132.0 96 D N 95 Pass N 11/9/2021 393B Main Entrance BG 8.4 7.1 136.7 132.1 96 D N 95 Pass N 11/9/2021 394B Main Entrance BG 7.8 7.1 136.7 130.9 95 D N 95 Pass N 11/9/2021 395B Main Entrance BG 7.9 7.1 136.7 131.9 96 D N 95 Pass N 11/9/2021 396B Main Entrance BG 7.5 7.1 136.7 131.4 96 D N 95 Pass N 11/24/2021 397CG NW Section of Site SG 12.9 11.9 118.6 114.3 96 A N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-14 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 11/24/2021 398CG NW Section of Site SG 13.1 11.9 118.6 113.8 95 A N 95 Pass N 11/24/2021 399CG NW Section of Site SG 12.3 11.9 118.6 113.1 95 A N 95 Pass N 11/24/2021 400CG NW Section of Site SG 12.1 11.9 118.6 113.4 95 A N 95 Pass N11/24/2021 401CG NW Section of Site SG 12.5 11.9 118.6 112.8 95 A N 95 Pass N 11/24/2021 402CG N Mid Section SG 14.1 11.9 118.6 119.1 100 A N 95 Pass N 11/24/2021 403CG N Mid Section SG 13.5 11.9 118.6 113.9 96 A N 95 Pass N 11/24/2021 404CG NE Section of Site SG 12.8 11.9 118.6 113.7 95 A N 95 Pass N 11/24/2021 405CG NE Section of Site SG 13.9 11.9 118.6 114.5 96 A N 95 Pass N 11/24/2021 406CG NE Section of Site SG 12.5 11.9 118.6 113.5 95 A N 95 Pass N 11/24/2021 407B NW Section of Site BG 8.9 7.1 136.7 132.1 96 D N 95 Pass N 11/24/2021 408B NW Section of Site BG 7.8 7.1 136.7 131.6 96 D N 95 Pass N 11/24/2021 409B NW Section of Site BG 8.5 7.1 136.7 132.6 97 D N 95 Pass N 11/24/2021 410B NW Section of Site BG 9.0 7.1 136.7 132.5 96 D N 95 Pass N 11/24/2021 411B NW Section of Site BG 9.8 7.1 136.7 134.3 98 D N 95 Pass N 11/24/2021 412B N Mid Section BG 7.5 7.1 136.7 130.1 95 D N 95 Pass N 11/24/2021 413B N Mid Section BG 9.7 7.1 136.7 134.1 98 D N 95 Pass N 11/24/2021 414B NE Section of Site BG 8.8 7.1 136.7 133.3 97 D N 95 Pass N 11/24/2021 415B NE Section of Site BG 8.6 7.1 136.7 132.9 97 D N 95 Pass N 11/24/2021 416B NE Section of Site BG 7.9 7.1 136.7 131.9 96 D N 95 Pass N 11/29/2021 417CG West Side of Site Adj Transit Shelter SG 12.6 11.9 118.6 113.5 95 A N 95 Pass N 11/29/2021 418CG West Side of Site Adj Transit Shelter SG 12.3 11.9 118.6 113.0 95 A N 95 Pass N 11/29/2021 419CG West Side of Site Adj Transit Shelter SG 12.4 11.9 118.6 113.7 95 A N 95 Pass N 11/29/2021 420CG West Side of Site Adj Transit Shelter SG 12.5 11.9 118.6 113.3 95 A N 95 Pass N 11/29/2021 421B South East of Site BG 11.9 11.0 123.0 118.4 96 F N 95 Pass N 11/29/2021 422B South East of Site BG 12.0 11.0 123.0 118.7 96 F N 95 Pass N 11/29/2021 423B South East of Site BG 13.1 11.0 123.0 119.1 96 F N 95 Pass N 11/29/2021 424B South East of Site BG 11.4 11.0 123.0 117.1 95 F N 95 Pass N 11/29/2021 425B South East of Site BG 11.6 11.0 123.0 117.5 95 F N 95 Pass N 11/29/2021 426B Middle East P. Lot BG 11.5 11.0 123.0 117.5 95 F N 95 Pass N 11/29/2021 427B Middle East P. Lot BG 13.2 11.0 123.0 119.3 96 F N 95 Pass N 11/29/2021 428B Middle East P. Lot BG 11.3 11.0 123.0 117.2 95 F N 95 Pass N 11/29/2021 429B Middle East P. Lot BG 11.6 11.0 123.0 117.8 95 F N 95 Pass N 11/29/2021 430B Middle South BG 12.0 11.0 123.0 118.5 96 F N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-15 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 11/29/2021 431B Middle South BG 11.9 11.0 123.0 118.1 96 F N 95 Pass N 11/29/2021 432B SW Section of Site BG 12.3 11.0 123.0 118.3 96 F N 95 Pass N 11/29/2021 433B SW Section of Site BG 12.1 11.0 123.0 118.5 96 F N 95 Pass N11/29/2021 434B Middle Section of P Lot Adj BMP-C BG 12.6 11.0 123.0 118.7 96 F N 95 Pass N 11/29/2021 435B Middle Section of P Lot Adj BMP-C BG 12.3 11.0 123.0 118.6 96 F N 95 Pass N 11/29/2021 436B Middle Section of P Lot Adj BMP-C BG 13.0 11.0 123.0 119.0 96 F N 95 Pass N 11/29/2021 437B Middle Section of P Lot Adj BMP-C BG 13.1 11.0 123.0 119.1 96 F N 95 Pass N 11/29/2021 438B Middle Section of P Lot BG 11.9 11.0 123.0 118.7 96 F N 95 Pass N 11/29/2021 439B Middle Section of P Lot BG 11.7 11.0 123.0 118.5 96 F N 95 Pass N 11/29/2021 440B Middle Section of P Lot BG 12.0 11.0 123.0 118.9 96 F N 95 Pass N 11/29/2021 441B Middle Section of P Lot BG 12.8 11.0 123.0 119.1 96 F N 95 Pass N 10/1/2021 442AC Southern Section Adj Gray Hawk Ct BC 0.0 151.2 146.9 97 G N 95 Pass N 10/1/2021 443AC Southern Section Adj Gray Hawk Ct BC 0.0 151.2 145.9 96 G N 95 Pass N 10/1/2021 444AC Southern Section Adj Gray Hawk Ct BC 0.0 151.2 147.7 97 G N 95 Pass N 10/1/2021 445AC Southern Section Adj Gray Hawk Ct BC 0.0 151.2 147.3 97 G N 95 Pass N 10/1/2021 446AC Southern Section Adj Gray Hawk Ct BC 0.0 151.2 146.9 97 G N 95 Pass N 10/1/2021 447AC Southern Section Adj Gray Hawk Ct BC 0.0 151.2 147.6 97 G N 95 Pass N 10/1/2021 448AC Southern Section Adj Gray Hawk Ct BC 0.0 151.2 148.3 98 G N 95 Pass N 10/1/2021 449AC Southern Section Adj Gray Hawk Ct BC 0.0 151.2 148.7 98 G N 95 Pass N 10/1/2021 450AC SW Area Adj BMP-C BC 0.0 151.2 146.7 97 G N 95 Pass N 10/1/2021 451AC SW Area Adj BMP-C BC 0.0 151.2 147.5 97 G N 95 Pass N 10/1/2021 452AC SW Area Adj BMP-C BC 0.0 151.2 144.9 95 G N 95 Pass N 10/1/2021 453AC SW Area Adj BMP-C BC 0.0 151.2 145.8 96 G N 95 Pass N 10/1/2021 454AC SW Area Adj BMP-C BC 0.0 151.2 148.3 98 G N 95 Pass N 10/1/2021 455AC W Middle Section Adj Transit Shelter BC 0.0 151.2 145.3 96 G N 95 Pass N 10/2/2021 456B WS of Site Adj BMP-B BG 8.0 7.1 136.7 131.4 96 D N 95 Pass N 10/2/2021 457B WS of Site Adj BMP-B BG 8.4 7.1 136.7 132.5 96 D N 95 Pass N 10/2/2021 458SW WS of Site Adj BMP-B SW 12.5 11.9 118.6 114.1 96 A N 95 Pass N 10/3/2021 459AC West Middle Section of P-Lots BC 0.0 151.2 145.7 96 G N 95 Pass N 10/3/2021 460AC West Middle Section of P-Lots BC 0.0 151.2 148.9 98 G N 95 Pass N 10/3/2021 461AC West Middle Section of P-Lots BC 0.0 151.2 146.9 97 G N 95 Pass N 10/3/2021 462AC West Middle Section of P-Lots BC 0.0 151.2 145.1 95 G N 95 Pass N 10/3/2021 463AC West Middle Section of P-Lots BC 0.0 151.2 144.9 95 G N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-16 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 10/3/2021 464AC West Middle Section of P-Lots BC 0.0 151.2 147.3 97 G N 95 Pass N 10/3/2021 465AC East Middle Section of P-Lots BC 0.0 151.2 146.3 96 G N 95 Pass N 10/3/2021 466AC East Middle Section of P-Lots BC 0.0 151.2 144.9 95 G N 95 Pass N10/3/2021 467AC East Middle Section of P-Lots BC 0.0 151.2 146.5 96 G N 95 Pass N 10/3/2021 468AC East Middle Section of P-Lots BC 0.0 151.2 148.7 98 G N 95 Pass N 10/3/2021 469AC East Middle Section of P-Lots BC 0.0 151.2 145.1 95 G N 95 Pass N 12/13/2021 569B NW of P-Lot BG 14.1 11.0 123.0 99.6 80 F N 95 Fail N 12/13/2021 570B NW of P-Lot BG 13.0 11.0 123.0 103.9 84 F N 95 Fail N 12/13/2021 571B W of 2nd Entrance BG 11.5 11.0 123.0 105.3 85 F N 95 Fail N 12/13/2021 572B W of 2nd Entrance BG 12.8 11.0 123.0 102.2 83 F N 95 Fail N 12/13/2021 573B E of 2nd Entrance BG 13.5 11.0 123.0 102.9 83 F N 95 Fail N 12/13/2021 574B E of 2nd Entrance BG 12.3 11.0 123.0 104.8 85 F N 95 Fail N 12/13/2021 575B E of 2nd Entrance BG 14.3 11.0 123.0 100.8 81 F N 95 Fail N 12/15/2021 569B-R NW of P-Lots BG 12.4 11.0 123.0 118.3 96 F N 95 Pass N 12/15/2021 570B-R NW of P-Lots BG 11.4 11.0 123.0 117.1 95 F N 95 Pass N 12/15/2021 571B-R W of 2nd Entrance BG 11.7 11.0 123.0 117.7 95 F N 95 Pass N 12/15/2021 572B-R W of 2nd Entrance BG 12.2 11.0 123.0 118.1 96 F N 95 Pass N 12/15/2021 573B-R E of 2nd Entrance BG 12.6 11.0 123.0 118.5 96 F N 95 Pass N 12/15/2021 574B-R E of 2nd Entrance BG 13.4 11.0 123.0 119.7 97 F N 95 Pass N 12/15/2021 575B-R E of 2nd Entrance BG 11.6 11.0 123.0 117.6 95 F N 95 Pass N 12/17/2021 576 N of P Lots -1 13.3 12.5 118.7 108.5 91 E N 90 Pass N 12/17/2021 577 N of P Lots -1 12.8 12.5 118.7 107.4 90 E N 90 Pass N 12/17/2021 578 N of P Lots -1 13.1 12.5 118.7 108.9 91 E N 90 Pass N 12/17/2021 579 N of P Lots -1 14.6 12.5 118.7 109.3 92 E N 90 Pass N 12/17/2021 580 N East of Site Adj BMP-D -1 14.3 12.5 118.7 109.1 91 E N 90 Pass N 12/17/2021 581 N East of Site Adj BMP-D -1 12.7 12.5 118.7 107.9 90 E N 90 Pass N 12/17/2021 582 N East of Site Adj BMP-D -1 13.9 12.5 118.7 108.9 91 E N 90 Pass N 12/18/2021 583B NW of Site BG 12.8 11.0 123.0 120.1 97 F N 95 Pass N 12/18/2021 584B NW of Site BG 13.1 11.0 123.0 119.3 96 F N 95 Pass N 12/18/2021 585B N of P Lots BG 12.3 11.0 123.0 118.3 96 F N 95 Pass N 12/18/2021 586B N of P Lots BG 12.9 11.0 123.0 118.5 96 F N 95 Pass N 12/18/2021 587B NE of P Lots Adj BMP-D BG 13.0 11.0 123.0 119.1 96 F N 95 Pass N 12/18/2021 588B NE of P Lots Adj BMP-D BG 11.8 11.0 123.0 117.6 95 F N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-17 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 12/18/2021 589B NE of P Lots Adj BMP-D BG 12.6 11.0 123.0 118.5 96 F N 95 Pass N 12/18/2021 590B NE of Site BG 12.9 11.0 123.0 119.6 97 F N 95 Pass N 12/20/2021 591AC East of 2nd Entrance BC 0.0 151.2 145.6 96 G N 95 Pass N12/20/2021 592AC East of 2nd Entrance BC 0.0 151.2 144.7 95 G N 95 Pass N 12/20/2021 593AC East of 2nd Entrance BC 0.0 151.2 147.8 97 G N 95 Pass N 12/20/2021 594AC West of 2nd Entrance BC 0.0 151.2 143.9 95 G N 95 Pass N 12/20/2021 595AC West of 2nd Entrance BC 0.0 151.2 147.2 97 G N 95 Pass N 12/20/2021 596AC N of P Lots BC 0.0 151.2 145.3 96 G N 95 Pass N 12/20/2021 597AC N of P Lots BC 0.0 151.2 146.1 96 G N 95 Pass N 12/20/2021 598AC N of P Lots BC 0.0 151.2 145.9 96 G N 95 Pass N 12/20/2021 599AC N of P Lots BC 0.0 151.2 144.1 95 G N 95 Pass N 12/20/2021 600AC NE of Site BC 0.0 151.2 146.3 96 G N 95 Pass N 12/20/2021 601AC NE of Site BC 0.0 151.2 147.8 97 G N 95 Pass N 12/20/2021 603SG Entrance at Eagle Dr.SG 13.1 12.5 118.7 113.1 95 E N 95 Pass N 12/21/2021 604AC NW of site BC 0.0 151.2 147.9 97 G N 95 Pass N 12/21/2021 605AC NW of site BC 0.0 151.2 148.1 97 G N 95 Pass N 12/21/2021 606AC N of P-Lots BC 0.0 151.2 144.9 95 G N 95 Pass N 12/21/2021 607AC N of P-Lots BC 0.0 151.2 146.7 97 G N 95 Pass N 12/21/2021 608AC N of P-Lots BC 0.0 151.2 147.3 97 G N 95 Pass N 12/21/2021 609AC N of P-Lots Adj BMP-D BC 0.0 151.2 145.9 96 G N 95 Pass N 12/21/2021 610AC N of P-Lots Adj BMP-D BC 0.0 151.2 146.1 96 G N 95 Pass N 12/21/2021 611AC N of P-Lots Adj BMP-D BC 0.0 151.2 144.8 95 G N 95 Pass N 12/21/2021 612AC NE of Site BC 0.0 151.2 148.3 98 G N 95 Pass N 12/21/2021 613AC NE of Site BC 0.0 151.2 145.6 96 G N 95 Pass N 1/7/2022 614W Fire Line W. Side -3 12.8 12.5 118.7 107.3 90 E N 90 Pass N 1/7/2022 615W Fire Line W. Side -1.5 13.1 12.5 118.7 107.6 90 E N 90 Pass N 1/19/2022 617AC S of Site Adj Gray Hawk Ct.CC 0.0 148.2 142.5 96 H N 95 Pass N 1/19/2022 618AC S of Site Adj Gray Hawk Ct.CC 0.0 148.2 140.7 94 H N 95 Fail N 1/19/2022 618AC-R S of Site Adj Gray Hawk Ct.CC 0.0 148.2 141.3 95 H N 95 Pass N 1/19/2022 619AC S of Site Adj Gray Hawk Ct.CC 0.0 148.2 141.1 95 H N 95 Pass N 1/19/2022 620AC S of Site Adj Gray Hawk Ct.CC 0.0 148.2 140.0 94 H N 95 Fail N 1/19/2022 620AC-R S of Site Adj Gray Hawk Ct.CC 0.0 148.2 140.9 95 H N 95 Pass N 1/19/2022 621AC S of Site Adj Gray Hawk Ct.CC 0.0 148.2 141.6 95 H N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-18 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 1/19/2022 622AC S of Site Adj Gray Hawk Ct.CC 0.0 148.2 142.6 96 H N 95 Pass N 1/19/2022 623AC S of Site Adj Gray Hawk Ct.CC 0.0 148.2 141.9 95 H N 95 Pass N 1/19/2022 624AC S of Site Adj Gray Hawk Ct.CC 0.0 148.2 142.6 96 H N 95 Pass N1/19/2022 625AC S of Site Adj Gray Hawk Ct.CC 0.0 148.2 142.1 95 H N 95 Pass N 1/19/2022 626AC SE Section of Site CC 0.0 148.2 141.8 95 H N 95 Pass N 1/19/2022 627AC SE Adj BMP-C CC 0.0 148.2 139.8 94 H N 95 Fail N 1/19/2022 627AC-R SE Adj BMP-C CC 0.0 148.2 141.2 95 H N 95 Pass N 1/19/2022 628AC SE Section of Site CC 0.0 148.2 140.9 95 H N 95 Pass N 1/19/2022 629AC SE Adj BMP-C CC 0.0 148.2 142.9 96 H N 95 Pass N 1/19/2022 630AC Adj to 2nd Entrance Eagle Dr.CC 0.0 148.2 142.6 96 H N 95 Pass N 1/19/2022 631AC Adj to 2nd Entrance Eagle Dr.CC 0.0 148.2 143.2 96 H N 95 Pass N 1/20/2022 632AC Near 2nd Entrance Adj BMP-B CC 0.0 148.2 143.6 96 H N 95 Pass N 1/20/2022 633AC NW of Site Adj BMP-H CC 0.0 148.2 142.9 96 H N 95 Pass N 1/20/2022 634AC Adj to Bike Parking Repair Station CC 0.0 148.2 141.6 95 H N 95 Pass N 1/20/2022 635AC Adj to Bike Parking Repair Station CC 0.0 148.2 139.3 93 H N 95 Fail N 1/20/2022 635AC-R Adj to Bike Parking Repair Station CC 0.0 148.2 141.0 95 H N 95 Pass N 1/20/2022 636AC Parking Lots Adj BMP-C CC 0.0 148.2 141.9 95 H N 95 Pass N 1/20/2022 637AC Parking Lots Adj BMP-C CC 0.0 148.2 142.1 95 H N 95 Pass N 1/20/2022 638AC Parking Lots Adj BMP-C CC 0.0 148.2 142.3 96 H N 95 Pass N 1/20/2022 639AC Parking Lots Adj BMP-C CC 0.0 148.2 141.8 95 H N 95 Pass N 1/20/2022 640AC Parking Lots CC 0.0 148.2 140.5 94 H N 95 Fail N 1/20/2022 640AC-R Parking Lots CC 0.0 148.2 142.3 96 H N 95 Pass N 1/20/2022 641AC Parking Lots CC 0.0 148.2 142.7 96 H N 95 Pass N 1/20/2022 642AC Parking Lots CC 0.0 148.2 143.9 97 H N 95 Pass N 1/20/2022 643AC Parking Lots CC 0.0 148.2 143.5 96 H N 95 Pass N 1/20/2022 644AC Parking Lots CC 0.0 148.2 139.1 93 H N 95 Fail N 1/20/2022 644AC-R Parking Lots CC 0.0 148.2 141.5 95 H N 95 Pass N 1/20/2022 645AC East Side of Parking Lots CC 0.0 148.2 142.6 96 H N 95 Pass N 1/21/2022 646AC NW of Site CC 0.0 148.2 141.6 95 H N 95 Pass N 1/21/2022 647AC NW of Site CC 0.0 148.2 142.0 95 H N 95 Pass N 1/21/2022 648AC NW of Site CC 0.0 148.2 142.5 96 H N 95 Pass N 1/21/2022 649AC NW of Site CC 0.0 148.2 142.9 96 H N 95 Pass N 1/21/2022 650AC NW of Site CC 0.0 148.2 142.1 95 H N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade Project Number 1-0346 January 31, 2022 Page B-19 Depth* Test or Rel Soil Test Proj.RockDateNumberTest Location Tract Elev Field Opt.Max.Field Comp.Type Type Spec.Pass/Fail Corr. TABLE I (Cont'd) Moisture Unit Dry Wt. 1/21/2022 651AC North Middle of Site CC 0.0 148.2 142.6 96 H N 95 Pass N 1/21/2022 652AC North Middle of Site CC 0.0 148.2 142.9 96 H N 95 Pass N 1/21/2022 653AC North Middle of Site CC 0.0 148.2 141.3 95 H N 95 Pass N1/21/2022 654AC North Middle of Site Adj BMP-D CC 0.0 148.2 143.2 96 H N 95 Pass N 1/21/2022 655AC NE of Site CC 0.0 148.2 141.9 95 H N 95 Pass N 1/21/2022 656AC NE of Site CC 0.0 148.2 141.7 95 H N 95 Pass N 1/22/2022 657SG NE of Main Entrance SG 18.9 11.9 118.6 113.8 95 A N 95 Pass N 1/22/2022 658SG NE of Main Entrance SG 12.8 11.9 118.6 113.2 95 A N 95 Pass N 1/22/2022 659B 2nd Entrance BG 8.7 7.1 136.7 130.8 95 D N 95 Pass N 1/22/2022 660B Main Entrance BG 9.3 7.1 136.7 131.2 95 D N 95 Pass N 1/22/2022 661B Main Entrance BG 8.4 7.1 136.7 131.6 96 D N 95 Pass N 1/22/2022 662AC 2nd Entrance CC 0.0 148.2 143.8 97 H N 95 Pass N 1/22/2022 663AC NE of Site CC 0.0 148.2 141.7 95 H N 95 Pass N 1/22/2022 664AC NE of Site CC 0.0 148.2 142.3 96 H N 95 Pass N 1/22/2022 665AC NE of Site CC 0.0 148.2 143.1 96 H N 95 Pass N 1/22/2022 666AC NE of Site CC 0.0 148.2 144.6 97 H N 95 Pass N 1/22/2022 667AC Main Entrance CC 0.0 148.2 143.7 96 H N 95 Pass N 1/22/2022 668AC Main Entrance CC 0.0 148.2 142.1 95 H N 95 Pass N 1/24/2022 669SG Grayhawk Driveway SG 12.5 11.9 118.6 113.7 95 A N 95 Pass N 1/25/2022 670B Grayhawk Driveway BG 8.4 7.1 136.7 131.4 96 D N 95 Pass N 1/25/2022 671SG Eagle Driveway SG 12.8 11.9 118.6 114.1 96 A N 95 Pass N 1/25/2022 672B Eagle Driveway BG 8.7 7.1 136.7 132.3 96 D N 95 Pass N 1-0346, January 31, 2021, Sheet1 *Approximate Depth (In Feet) Below Finished Grade ALTA CALIFORNIA GEOTECHNICAL, INC.                     APPENDIX C    Laboratory Testing      (!) z in ~ I-z UJ (.) a:: UJ Cl.. "'tJ ~ -I m )> ASTM SIEVE NUMBERS 11,12" 3/~" I I I I I 100 • \ '\\ II \ \\ I I I I II \ \, I I I I 90 \ \ I \ \ \ I I I \ \ \ I I \ \ \ 80 I \ II \ I I I I II 11 I I I II II \ I I r,,,,~, ~, .. , \ \ -- 70 II I I I II I I I\ I I I II I I I I 60 I I I I \ ,, I I ', II I \ \ I I I 50 II I I I I II II I I\ '' I ~ II I I ' I II I I ..... I '-I 40 II I \ I '-' ,, ..... " " II I ,, I ...... I II I I I '-I 30 ' ...... I'-,...._ I 'I I I I ' I ' 20 / ' II I I I 'J I / I ,, L,vv,:, Llllm 1or 11 -I I 10 II I I I I II I I I I II I I I I 0 II I I I I #1,00 #2,00 I I I I I I I I I I I I I I JI I I I I I I I I I I I I I I I I I I I I I I I I I I I ,, I I ' ,.. ' I I ' I I '--' I I " I ....... ,, I ....... ' ' I -I -I .._ l --I T ~--I n 0 10 20 30 40 Cl UJ z ~ UJ 50 a:: I-z UJ (.) a:: 60 UJ Cl.. 70 80 90 Sieve Percent Specified Size Finer Operating Range 1" 100 100 3/4" 99 90-100 No.4 47 35-60 No.30 22 10-30 No. 200 8 2-9 Density Test Results (ASTM D-1557) Maximum Density Optimum Moisture 136.7psf 7.1% 100 8 6 4 2 10 8 6 4 2 1 8 6 4 2 0.1 8 6 4 2 100 0.01 GRAIN SIZE IN MILLIMETERS CRUSHED AGGREGATE BASE, 3/4" MAXIMUM CAL TRANS CLASS 2 AGGREGATE BASE SAMPLE NUMBER: D SAMPLE LOCATION: 5980 Eagle Drive, Carlsbad, CA DATE SAMPLED: AGGREGATE BASE TEST SUMMARIZATION Quality Requirements Results Individual Test Resistance (R-Value) (Calif. 301) 79 78 Min. Sand Equivalent (Calif. 217) 42 25Min. Durability Index (ASTM D3744) 35Min. AL TA CALIFORNIA GEOTECHNICAL, INC. 170 N. MAPLE STREET, SUITE 108, CORONA, CA (951) 509-7090 P.N. 1-0346 afe afe 342B 313CG 312CG341B 652AC 403CG 413B 310CG 599AC 402CG 578 340B309CG 412B 585B 265B 608AC 26 132CG 653AC 308CG 598AC 339B 401CG411B 337B 305CG 55SD 410B 649AC 400CG 307CG 338B 577 264B30 263B606AC 177E 54SD 576 650AC176E 336B 178E 304CG 409B 597AC303CG 399CG 302CG301CG 334B 647AC 335B 179E333B 596AC 300CG 332B 299CG 398CG407B 408B 262B 397CG331B 646AC 298CG 58604AC 633AC 297CG 330B 65SD 44S40S 64SD 42S 39S 43S 38S 63SD 37S41S36S 25569B569BR 605AC 648AC 33 326CG 323CG 324CG60 34 635AC635ACR 21455AC 329B 260B 59 295CG 322CG 417CG 62SD 595AC 267CG 634AC594AC 294B456B 632AC 571B571BR 415.2 416.0 412.5 413.5 412.4 435B 268CG 101W 293B 103W102W 141CG 257B 142CG256B 631AC 259B 418CG 659B 672B 662AC 615W 419CG 671SG 359CG57 458SW367B 420CG 457B 593AC 368B 360CG 572B572BR 258B 415.4 573B573BR 592AC 366B630AC 358CG 144CG 254B 628AC 253B 145CG 105W 451AC 146CG 591AC 147CG 627AC627ACR 574B574BR 106W 250B 251B 148CG 448AC 107W 149CG 249B 449AC 625AC 624AC 432B 447AC 172CG 95E219B 173CG 218B 94E 23 92E217B 171CG 91E216B 109W 15 446AC 204CG 110W 430B 622AC 215B 170CG 244B 431B 623AC 108W 201CG 243B 118E 119E 120E 121E 575B575BR364B 355CG 626AC 352CG 363B 354CG 362B 361B 122E 123E 353CG 255B 453AC 104W 14 434B 238B 454AC 636AC 195CG237B 196CG 239B 629AC 236B 56SD 194CG 197CG 16 460AC 235B 638AC 438B 193CG 450AC 198CG 241B 199CG 242B 200CG433B 22 452AC 436B 459AC 291B 52SD 462AC 439B 461AC 637AC437B 20 639AC 234B 233B192CG 232B 191CG 440B 231B 246B 202CG245B 203CG 247B 248B 17 464AC 190CG 230B 570B570BR 327CG 175E29 292B139CG 138CG53SD174E290B 140CG 288B 137CG 289B 32 640AC640ACR 35 28 19 128CG130CG131CG282B 158E 463AC 129CG 280B 579 586B 281B 441B 283B 607AC 287B 134CG 286B 285B 159E 284B 133CG 296CG 328B 61SD 603SG 614W 100W 325CG 261B 583B 584B 306CG 311CG 266B 651AC 135CG 136CG 240B 143CG 252B 356CG365CG 357CG 93E 170 N. MAPLE STREET, STE 108, CORONA, CA 92880TELEPHONE: (951) 509-7090 ALTA CALIFORNIA GEOTECHNICAL, INC.PLATE 1See Plate 2 for Legend \ AP, . " . •, -.. --,·/ .• , ' L 0 20 40 60 80 PROJECT NUMBER, 1-0346 • ' ' DATE:J □n. 31, 2022 • -----•---- ' ' ' • ' ' ,. ' • • ' ~ N895!.'!£:'E -1'75..4~--= ---AP1t=f.2F 880c=/tt --PROPERTY1!!VF: • • • APN.· 22!--08-00 'CEZ '.4' COC . DOC 2006-055734! !'(5!,.;;j ~~ ~~ / / / ""2 &r?.?,-:: /f / / / • • . // / / a a_ • • • • SURFACE IMPROVEMENTS (SEE SHEET O! FOR SPEC!RCAllONS} S!-O!I 4" AC OVER 45" CLASS 2 BAS£ s1-021 7" PCC OVER 7" CLASS 2 BASE SI-OJI 6" CURB S/-041 6" CURB & CUTTER S/-051 4" PCC SIDEWALK Sl-061 RIBBON CUTTER Sl-071 TRENCH ORAIN Sl-081 CURB CUT S/-091 PEDESTRIAN RAMP s1-101 RET,4/NINC WALL S!-!!I PARK/NC LICHT s1-12I 8/0FIL !RATION BASIN S!-!JI /YATER OUAL!TY S/CN Sl-141 DISABLED PARMNC STALL EXIST/NC EASEMENTS COVENANTS; CONDITIONS, RESTRICTIONS ANO EASEMENTS IN THE DOCUMENT RECORDED JANUARY !O, 2003 AS INSTRUMENT NO. 200J-OOJ5!44 OF OFFICIAL RECORDS, SAID DOCUMENT PRO/I/DES FOR A LANDSCAPE EASEMENT. ABUTTERS RIGHTS OF INGRESS ANO £CRESS TO OR FROM EACLE OR/VE ANO CREY HAif!( COURT, E%CEPT AT ACCESS OPENINGS HA VE BEEN OED/CA TEO OR REZINOUIS/fEO ON THE MAP OF CARLSBAD TRACT NO. 99-06, MAP NO. !48J! OF TRACT MAPS RECORDED JUNE 29, 2004 EASEMENTS SHOIIN OR OED/CA TEO ON MAP NO. !48J! RECORDED JUNE 29, 2004 AS CARLSBAD TRACT NO. 99-06, PALOMAR FORUU G) PRIVATE ORA/NACE ANO INCIDENTAL PURPOSES @ S/CHT DISTANCE CORRIDOR ANO !NCIOENT,4L PURPOSES AN EASEMENT IN FA WR OF SAN 0/ECO CASANO EZECTR!C COMPANY FOR PUBLIC UTIL/1/ES ANO INCIDENTAL PURPOSES, RECORDED SEPTEMBER 27, 2004 AS INSTRUMENT NO. 2004-09!!006 OF OmCIAL RECORDS. THE TERMS, PR0/1/S/ONS ANO EASEMENT(S) CONT,4/NEO IN THE DOCUMENT ENT/TIED "RECIPROCAL EASEMENT ANO MAINTENANCE AGREEMENT RECORDED OCTOBER 06, 2005 AS INSTRUMENT NO. 2005-0865774 OF OFFICIAL RECORDS. AN EASEMENT IN FA vVR OF CARLSBAD MUNICIPAL /YATER DISTRICT FOR /YA TERI/NE PURPOSES ANO INCIDENTAL PURPOSES, RECORDED JANUARY JO, 2006 AS INSTRUMENT NO. 2006-0065489 OF OFFICIAL RECORDS. AN EASEMENT IN FAVOR OF COUNTY OF SAN 0/ECO FOR A /I/CA T!ON ANO INCIDENTAL PURPOSES, RECORDED MARCH 23. 2006 AS INSTRUMENT NO. 2006-0/99920 OF OFFICIAL RECORDS [NOT PI.OTTABLE] *EXIST/NC WATER SERVICE NOT£' CONTRACTOR MUST POTHOLE THE CROSS OR TEE AT THE PROPERTY LINE TO DETERMINE THE COVER DEPTH FROM THE FINISHED SURFACE ELEVATION TO THE TOP OF PIPE. IF THE SER/I/CE IS NOT IN ACCORDANCE 111TH CITY OF CARLSBAD vVL. 2, CH. LJ.8.A. ! -42 INCHES COVER FROM TOP OF PIPE TO FINISHED CRAOE EZEVA TION, THE SER/I/CE SHALL BE ABANDONED PER CMMJ STANDARD SPECIF/CATIONS !5000-J. !! ANO A NEIY SER/I/CE SHALL BE INSTALLED FROM THE MAIN TO PROPERTY LINE PER STANDARD ORAIIINCS /Y-22 ANO FIIRN!SHEO 111TH NEW TEE ANO VALVES. OfESSiOAJ,;, ¢-D. Dlf ff '1 ~ No. 45629 o E><p.12-31 -22 Ci \\. 11 AS RCE __ _ EXP , ___ _ DATE REVJE\,/ED BY , INSPECTOR DATE t----+--+-------------+---+---+---+--t ~ cr1r!N£ENG CD¾,~R¼~~AD ~ LlQ_J '<1----+--+-----------------+---+----jf---f---l GRADING PLANS FOR: / PALOMAR FORUM PARCEL 'A' ~/ PREPARED UNDER MY SUPER/1/S/ON, BY_==~~==~~~~~=~OATE:·==~~~~1---j------j--------------------t------t----t----t-----J ROBERT O DENTINO R.CE. NO.: 45629 £)(P/RATION: !2-J!-22 >---+----,>-------------------+-----+----+----+----< FIRM: £%CEZ ENC/NEER/NC ADDRESS: 440 STA TE PLACE CITY, ST.: ESCONDIDO, CALIFORNIA TELEPHONE.· (760) 745-8!!8 DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL PRECISE GRADING PLAN -WEST GR2021-XXXX CUP2020-0011 APPROVED: JASON S. GELDERT CITY ENGINEER RCE 63912 EXPIRES 09 30 22 DATE OWN BY: PROJECT NO. DRAWING NO. CHKD BY: __ _ RVWD BY: SDP 2020-0006 XXX-XX afe afe 314CG343B 587B 344B 315CG 588B 345B 317CG 663AC 347B 318CG 600AC 348B 319CG 320CG 349B 590B 601AC 416B406CG 2 321CG422.7 419.1 420.8 418.1 404CG 611AC 31 580 46 610AC 581 346B 609AC 278B 277B 124CG 126CG 157E 127CG279B 414B 405CG 415B 49 656AC 589B 180CG 665AC 613AC 664AC 351B 666AC 657SG 386B 369CG6381CG 391B 392B 382CG 270B 645AC 612AC 269B 117W 421B 655AC45 48 150CG151CG 272B 271B152CG273B 155E 467AC 27 275B 156E 153CG 47 428B 643AC641AC 125CG 276B 465AC 429B 18 188CG 229B 50642AC 466AC 228B 185CG 227B 223B 184CG222B 186CG 187CG 444AC 112W220B189CG 621AC 221B 111W 445AC 24 169CG 83E 214B 90E 213B 89E 425B 82E 88E 77E 168CG 78E 76E 87E 86E212B167CG 620AC620ACR 424B 12 183CG 224B 113W 51 618AC618ACR 443AC 226B 225B 114W 422B 442AC 617AC 115W 423B 8 210B85E 165CG 69E70E 84E209B 10 72E 208B 5 162CG 207B 67E 96E 97E 98E99E 73E 68E 396B 395B 385CG 378 670B 379 372CG 390B 394B 658SG668AC 384CG661B 376 389B 669SG206B 81E 667AC 377 388B 374 371CG7469AC 116W 80E 205B 111 161CG 420.0 166CG619AC 160CG 79E 393B 660B 387B 370CG 373 654AC 316CG 181CG13 426B 644AC 468AC 644ACR 1 182CG 582 154CG 274B 427B 9 211B 71E 164CG 74E 75E 66E 3 426.4 433.4 432.4 431.9 431.6 383CG 375 430.0 430.0 426.9 426.9 380CG 350B 4 163CG 170 N. MAPLE STREET, STE 108, CORONA, CA 92880 TELEPHONE: (951) 509-7090 ALTA CALIFORNIA GEOTECHNICAL, INC.PLATE 2 ARTIFICIAL FILL-ENGINEERED APPROXIMATE LOCATION OF COMPACTION TEST APPROXIMATE REMOVAL BOTTOM ELEVATION LIMIT OF FILL LIMIT OF REMOVAL LEGEND afe 101 420.0 JO" HOPE STORA! DRAIN (owe J99-4A)-APN· 221-880-/6- (TO REMAIN) -=~!!!~-r:!~~~1~~~~~~~:~~~5!i;~~~;~iiilii!lii~~~ii;ii.~~~iilii[i~i~ij~:~~i -PROPERTYt:!NE -N 89'5!'l6"E -77546'--- ~,,,' , ~, , T '?4220 RIAi) ----- -,---~--~ SURFACE /AIPROVEAIEN!S (SEE SHEET 01 flJH SPEC/flCAllONS) s1-01I 4" AC OvER 4.5" CLASS 2 8ASE s1-02I 7" PCC OvER 7" CLASS 2 BASE Si-OJI 6" CURB I I ,,,.,. I I • t l .l§!L_ -------~--- 1 I • SCALE· 1"=20' -------0 20 40 60 80 /8' HOPE STORA! DRAIN (OWC. J99-4A) (TO BE REAIOvEO) s-"·~ .,:,Y"'..9 --1'-, v> "' ~ . -'&> /2,J'i ~c,. u' • -OJ 1// --'----...'..__- ___ !_ ____ _ • -- -_I _____ -------- - • ~ ~ SI-OJ • • • ~i \\s . iili"~i • /, I I ________ & "'-AA r=== APN-221-0/5-07 S/-04I 6" CURB & CUTTER S!-05I 4" PCC SIDEWALK S/-06I RIBBON CUTTER Sl-07I TRENCH DRAIN S/-08I CURB CUT S/-09I PEDESTRIAN RAMP • s1-10I RET,4/NINC WALL SI-II I PARK/NC LICHT C) s1-12I BIOF/L !RA /lON BASIN ---- S!-JJI WATER QUALITY S/QV Sl-14I DISABLED PAR!(!NC STALL EXIS17NC EASEAIEN!S COvENANTS, CONO!llONS, RESTRIC/lONS ANO EASEMENTS IN 1/fE DOCUMENT RECORDED JANUARY /0, 200J AS INSTRUMENT NO. 200J-O.OJ5/44 OF OfflCIAL RECORDS. SAID DOCUMENT PR0/1/JES FOR A LANDSCAPE EASEMENT. -ABUTTER's RICHTS OF INGRESS ANO £CRESS TO OR FROM EACLE OR/vE ANO CREY HAM< COURT, E%CEPT AT ACCESS OPENINGS HA vE BEEN OED/CA TEO OR RELINQUISHED ON 1/fE MAP OF CARLSBAD TRACT NO. 99-06, MAP NO. l48J/ OF TRACT MAPS RECORDED JUNE 29, 2004. PREPARED UNDER MY SUPERl1S/ON, / / ! I I I I ( / I / / / / / EASEMENTS SHOIW OR OED/CA TEO ON MAP NO. l48J/ RECORDED JUNE 29, 2004 AS CARLSBAD TRACT NO. 99-06, PALOMAR FORUM. (v PRIVATE ORA/NACE ANO INCIDENTAL PURPOSES @ SICHT 0/SlANCE CORRIDOR ANO !NCIOEN!AL PURPOSES AN EASEMENT IN FAVOR OF SAN 0/ECO CASANO ELECTRIC COMPANY FOR PUBLIC U/lL/1/ES ANO INCIDENTAL PURPOSES, RECORDED SEPTEMBER 27, 2004 AS INSTRUMENT NO. 2004-0911006 OF omCIAL RECORDS. T/IE TERMS, PROl1S/ONS ANO EASEMENT(S) CONTAINED IN 1/fE DOCUMENT EN/lTlEO "RECIPROCAL EASEMENT ANO MAINTENANCE ACREEMENr RECOROEO OCTOBER 06, 2005 AS INSTRUMENT NO. 2005-0865774 OF OfflCIAL RECORDS. AN EASEMENT IN FAVOR OF CARLSBAD MUNICIPAL WATER DISTRICT FOR WATERLINE PURPOSES ANO INCIDENTAL PURPOSES, RECORDED JANUARY JO, 2006 AS INSTRUMENT NO. 2006-0.065489 OF Off/CIAL RECORDS. AN EASEMENT IN FAVOR OF COUNTY OF SAN 0/ECO FOR A t1CA 1/0N ANO INCIDENTAL PURPOSES, RECORDED MARCH 2J, 2006 AS INSTRUAIENT NO. 2006-0/99920 OF OFFICIAL RECORDS [NOT PI.OTTA81.Ej *EXIST/NC WATER SERVICE NOT£' CONTRACTOR AIUST P01/fOLE 1/fE CROSS OR TEE AT 1/fE PROPERTY LINE TO DETERMINE 1/fE COvER OEP1/f FROM 1/fE FINISHED SURFACE ELEVA1/0N TO 1/fE TOP OF PIPE IF 1/fE SERl1CE IS NOT IN ACCORDANCE M1/f CITY OF CARLSBAD VOL. 2, Cl/. J.J.8.A. I -42 INCHES COvER FROM TOP OF PIPE TO FINISHED CRAOE ELEVA 1/0N, 1/fE SERl1CE SHALL BE ABANDONED PER CM/IV STANDARD SPEC/f/CA1/0NS !5000-.J.// ANO A NEW SERl1CE SHALL BE INSTALLED FROM 1/fE AIA!N TO PROPERTY LINE PER STANDARD ORAMNCS W-22 ANO FURNISHED M1/f NEW TEE ANO VAL vES. BY OATE:==~~~~t------t---t------------------t---t---t---t---J -R=o.=l'l='ER=T~o=_-O~'E,=N=11M~'O~R.~.~C.~E~M~o.= .. -. -45,=6.="2~'9~EXPIRA1/0N· l2-J/-22 >---+---+----------------+----+---+---+---I FIRM: E%CEL ENC/NEER/NC ADDRESS.· 440 STA TE PLACE Cl TY, ST.: ESCONDIDO, CALIFORNIA mEPHONE.-(760) 745-8118 DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL PROJECT NUMBER: 1-0346 DATE:Jan. 31, 2022 11 AS BUIL T 11 RCE __ _ EXP, ___ _ DATE REVIE\,/ED BY, GRADING PLANS FOR: PALOMAR FORUM PARCEL 'A' PRECISE GRADING -EAST GR2021-XXXX CUP2020-001 I APPROVED: JASON S. GELDERT CITY ENGINEER RCE 63912 EXPIRES 09/30/22 DATE DWN BY: IV PROJECT NO. DRAWING NO. CHKD BY: __ _ RVWD BY: SDP 2020-0006 XXX-XX