Loading...
HomeMy WebLinkAboutMS 14-06; SPRAGUE LOT SPLIT; Engineering Application/ APPLICATION Development Services ENGINEERING Land Development Engineering CITY OF PLANCHECK 1635 Faraday Avenue 760-602-2750 CARLSBAD E23 Comolete all aooronriate information. Write N/A when not aoolicable. Project Name:Jack Sprague Lot Split Date: 6-09-2014 Project Description: Sewer and Water Connection fot TPM Lot Split Project Address: Lot No(s).: Map No.: APN(s):167-230-24 & 25 Number of Lots:4 Number of Acres:2.28 Acres Miles of Trails:_________________________ Owner: Jack H. Sprague Applicant: The Kevane Company, Inc Mailing Address: 4800 Williamsburg Lane # 104 Mailing Address: 8480 La Mesa Blvd. La Mesa, Ca. 91942 La Mesa, Ca. 91942 Phone Number: (619) 303-1512 Phone Number: (619) 697-2001 Fax Number: Fax Number: E-mail: E-mail: I certify that I am the legal owner and that all the above information is true and correct to the best of my knowledge. Signature: Date: Signature: Date: Civil Engineer: Larry Walsh Soils Engineer: Firm: Walsh Engineering & Surveying Inc. Firm: Mailing Address: 607 Aldwych Mailing Address: El Caion, Ca. 92020 Phone Number: (619) 588-6747 Phone Number: Fax Number: Fax Number: E-mail: larrywalsh-engineering.com E-mail: State Registration Number: State Registration Number: Additional Comments: IMPROVEMENT VALUATION What water district is the proposed project located in? (check one) DI Carlsbad Municipal Water District [0 Olivenhain [0Vallecitos If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? $ 57.708 GRADING QUANTITIES cut cy fill _______ cy remedial cy import _______ cy export cy RECEiVED JUL 23 2014 4/30/10 LAN REV Page 1 of 2 u ULVcLUrIvI N E-23 ENGlNFrzrq V APPLICATION 4041 Development Services ENGINEERING Land Development Engineering CITY OF PLANCHECK 1635 Faraday Avenue 760-602-2750 CARLSBAD E23 Comnlete all anoronriate information. Write N/A when not annlicahle. APPLICATION FOR (check all that apply) FOR CITY USE ONLY Project ID. Drawing Number Deposit /Fees Paid Comments Adjustment Plat (ADJ) II Certificate of Compliance (CE) Dedication of Easement (PR) Type: Type: 1 Encroachment Permit (PR) DI Final Map (FM) I Grading Plancheck (DWG) LjJ Improvement Plancheck (DWG) k'13 ILl-- O cIj 4ç.3 $4,090 Di Parcel Map (PM) Dl Quitclaim of Easement (PR) Type: Dl Reversion to Acreage (RA) Dl Street Vacation (SW) Di Tentative Parcel Map (MS) Dl Certificate of Correction (CCOR) Dl Covenant of Easement (PR) Substantial Conformance -. Exhibit (SCE) Dl Trails Dl < mile DI > mile Dl Other APPLICATION ACCEPTED BY: DATE STAMP APPLICATION RECEIVED RECEIVED JUL 23 2014 LAND VVLL)rIVILN ENGINEFPIMC E-23 Page 2 of 2 REV 4/30/10 1 2 3 4 5 6 7 8 9 10 11 Jack Sprague Lot Split Utility Connections J.N. 13800 Discription Quantity Units Unit Price Cost 8" Sewer 50 LF. $96.75 $4,838 MH Connection 1 Ea. $1,883.00 $1,000 8" Water 171 LF. $74.24 $12,695 Water Connection 1 Ea. $1,000.00 $500 8" Valve 2 Ea. $1,800.00 $3,600 6" fire 162 LF. $64.00 $10,368 Water Connection 1 Ea. $1,000.00 $500 6" Valve 1 Ea. $1,000.00 $1,000 AC Saw Cut 780 LF. $4.00 $3,120 Trench Resurface 390 SF. $41.25 $16,088 Traffic Control 1 LS $4,000.00 $4,000 Total $57,708 15% Contingency $8,656 Grand Total $66,364 Improvement Plan Deposit ($50k to $lOok Cost Est.) 3.00% of Total $1,731.24 Plus Basic Fee of: $2,195 $3,926.24 < $ 4,090 Mm.