Loading...
HomeMy WebLinkAboutCT 2018-0006; LAGUNA DRIVE SUBDIVISION; STORM WATER QUALITY MANAGEMENT PLAN; 2020-06-08RECORD COPY L.. CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR Laguna Drive Subdivision PROJECT ID CT2018-0006 DRAWING No. 521-7A SWQMP No. ENGINEER OF ,oESSIok GORY JONES, PE NoC698O1 CA RCE NO. 69807 06I30I20 OF chi %i PROVIDE WETSIGNARE AND STAMP ABOVE LINE PREPARED FOR: BRETT FARROW ARCHITECT 125 M . CARDIFF-BY-THE-SEA, CA 92007 JL Q 760.230.6851 ,.... L PREPARED BY: CLT.E CORY JONES ENGINEERING 1820 S. EL CAMINO REAL, UNIT A205 ENCINITAS, CA 92024 619.884.0576 DATE: June 8, 2020 TABLE OF CONTENTS Certification Page Project Vicinity Map FORM E-34 Storm Water Standard Questionnaire Site Information FORM E-36 Standard Project Requirement Checklist Summary of PDP Structural BMPs Attachment 1: Backup for PDP Pollutant Control BMPs Attachment Ia: DMA Exhibit Attachment I b: Tabular Summary of DMAs and Design Capture Volume Calculations Attachment I c: Harvest and Use Feasibility Screening (when applicable) Attachment Id: Categorization of Infiltration Feasibility Condition (when applicable) Attachment le: Pollutant Control BMP Design Worksheets /Calculations Attachment 2: Backup for POP Hydromodification Control Measures Attachment 2a: Hyd ro modification Management Exhibit Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels Attachment 2d: Flow Control Facility Design Attachment 3: Structural BMP Maintenance Thresholds and Actions Attachment 4: Single Sheet BMP (SSBMP) Exhibit Attachment 5: Existing Site - Historical Aerial Photos CERTIFICATION PAGE Project Name: Laguna Drive Subdivision Project ID: CT2018-0006 I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order. I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the. plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design. CA RCE No. 69807, Exp. 6/30/2020 Work's Signature, PE Number & Expiration Date Cory Jones, PE, QSD/P, QISP TaR, ENV SP Print Name Cory Jones Engineering Company 06/08/2020 Date PROJECT VICINITY MAP Project Location I C) Laguna Dr. 0 0 L 0 lp,(-p 0 Figure 1 - Vicinity Map (City of STORM WATER STANDARDS Development Services Carlsbad QUESTIONNAIRE Land Development Engineering 1635 Faraday Avenue E-34 (760) 602-2750 www.carlsbadca.gov INSTRUCTIONS:. :. To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. fROJEQIRMATiON :. PROJECT NAME: Laguna Drive Subdivision PROJECT ID: CT2018-0006 ADDRESS: 570 Laguna Drive APN: 155-221-12-00 The project is (check one): 0 New Development E1 Redevelopment The total proposed disturbed area is: 23,868 ft2 (_0.55 ) acres The total proposed newly created and/or replaced impervious area is: 11,858 ft2 ( 0.27 ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP #: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. E-34 Page 1 of 4 REV 02116 :STEP1: .,.- I I TO BE COMPLETED FOR ALL PROJECT To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building 70 IN or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If-you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered "no" to the above question, the project is a development project', go to Step 2. STEP2 - TO BEcOMPLETED FOR AI DEVELOPMENT PROJEcTS, To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; El 0 Designed and constructed to be hydraulically disconnected from paved streets or roads; Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in o accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? 0 EI If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP ..." and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your project is not exempt from POP, go to Step 3. E-34 Page 2 of 4 REV 04/17 STERI COMPLETED FOR MI NEWOR REDEVELOPMENT PROJCTS To determine if your project is a POP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, 0 and public development projects on public or private land. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or ff) El more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and 0 refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside 0 E development project includes development on any natural slope that is twenty-five percent or greater. Is your project a new or redevelopment project that creates and/or replaces 5,000square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is El N a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 0 E1 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands) . Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair El F81 shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land El X and are expected to generate pollutants post construction? Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of - impervious surface or (2) increases impervious surface on the property by more than 10%? (CIVIC FI 0 21.203.040) If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ..." and complete applicant information. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box stating "My project is a 'STANDARD PROJECT'..." and complete applicant information. E-34 Page 3 of 4 REV 04/17 ..:STEp4 O BE- COMPLETED RED EVELQPMENTPROJEGTSTHAT ARE. PRIORITY-DEVELOPMENT PROJECTS (POP) ,:OR ONL-Y Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = 11,207 sq. ft. 0 EI Total proposed newly created or replaced impervious area (B) = 11,679 sq. ft. 104 Percent impervious area created or replaced (B/A)*100 = If you answered 'yes", the structural BMPs required for POP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a POP ..." and complete applicant information. If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 5, check the check the first box stating "My project is a PDP ..." and complete applicant information. . STEP 5 y cHEc HEAPPROPRIATE BOX AND:QMPLETEAPPUCANTINFORMATlPN. 21 My project is a POP and must comply with POP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 0 My project is a 'STANDARD PROJECT' OR EXEMPT from POP and must only comply with STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. 0 My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: Cory Jones Applicant Title: Project Manager, Civil/stormwater 06/08/2020 Applicant Signature: Date: * Environmentally Sensitive Areas include but are not limited to all r..lean water Act Section iUitO) impairsa wajer uuuie, drUdb UbI911dIU Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use On/v ity Concurrence: NO I YES y: ate: Projectt ID: E-34 Page 4 of 4 REV 04/17 SITE INFORMATION CHECKLIST Project Name Laguna Drive Subdivision Project ID CT20180006 Project Address 570-580 Laguna Drive, Carlsbad CA 92008 Assessor's Parcel Number(s) (APN(s)) 155-221-12-00 Project Watershed (Hydrologic Unit) Carlsbad 904 Parcel Area 0.72 Acres (31,344 Square Feet) Existing Impervious Area 0.26 Acres (11,207 Square Feet) (subset of Parcel Area) Area to be disturbed by the project 0.55 Acres (23,868 Square Feet) (Project Area) Project Proposed Impervious Area 0.27 Acres (11,679 Square Feet) (subset of Project Area) Project Proposed Pervious Area 0.28 Acres (12,010 Square Feet) (subset of Project Area) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area. Descrlption of Existing Site CondItionadDraiflage Patterns Current Status of the Site (select all that apply): Existing development 0 Previously graded but not built out Agricultural or other non-impervious use 0 Vacant, undeveloped/natural (refer to aerial photo panels in Attachment 5). Description / Additional Information: \ little under half of the property gently slopes towards Laguna drive and the remainder slopes awards Buena Vista Lagoon, were it steps down a steep bluff incline that his highly vegetated and has been maintained by the current residents. Existing Land Cover Includes (select all that apply): Vegetative Cover Non-Vegetated Pervious Areas Z Impervious Areas Description I Additional Information: The site has an existing single family residence and office building with parking lot. Site is a mix of landscaping, non-maintained and mix of hardscapes. Underlying Sail belongs to Hydrologic Soil Group (select all that apply): o NRCS Type A - Determined via review of on-site Geotechnical Report and verifying materials in NRCS Type B boring logs. 0 NRCS Type C D NRCS Type D Approximate Depth to Groundwater (GW): O GW Depth <5 feet 05 feet < GW Depth < 10 feet 10 feet < GW Depth < 20 feet CE GW Depth > 20 feet Existing Natural Hydrologic Features (select all that apply): O Watercourses 0 Seeps O Springs Wetlands None Description / Additional Information: Site property includes partial inclusion of portion of the Buena Vista Lagoon wetlands with 40 vertical drop bluff. However, the proposed development site has mild slopes along the top of the bluff that splits flow north to the Lagoon and south to Laguna Drive. The proposed infill re-development will include demolition of one structure at 570 Laguna Drive and one SFR structure and garage at 580 Laguna Drive, lot split to accomodate 13 lots to include 13 new SFR buildings. All infill development area is to be designed to drain to the south to Laguna Drive to the existing 36 -inch storm drain and the frontage will drain to the curb and gutter on Laguna Drive. Description of Existing Site Topography and Drainage [How is storm water runoff conveyed from the site? At a minimum, this description should answer whether existing drainage conveyance is natural or urban; describe existing constructed storm water conveyance systems, if applicable; and is runoff from offsite conveyed through the site? if so, describe]: Existing site drainage is to both the street across parking lots/hardscape and infiltration into site. No existing storm water conveyance systems are present. No runoff from off site conveys to site. In general the site is flat where proposed development is to occur. Site has very good infiltration rates per soils report and visible conditions. Asphalt and hardscape areas drain to both the street and existing soil. Project Description / Proposed Land Use and/or Activities: Demolition of existing single family dwelling and garage and existing office. Addition of (13) new detatched single family dwellings. List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): Site contains a single family dwelling with ad hoc drainage, an office building which drains to parking lot, parking lots drain to both Laguna Drive and site. List/describe proposed pervious features of the project (e.g., landscape areas): Site will contain landscape that conveys water to storm drain inlets that drain to a series of two pervious pavement BMPs, excess of water quality volume will drain to the 36-in storm drain in Laguna Drive. Site also contains small landscape planters. Does the project include grading and changes to site topography? ZYes E] No Description /Additional Information: The site will require over-excavation of the building pads and addition imported soil to be mixed with existing top soil prior to recompaction and pad preparation per the Geotechnical Engineer's recommendations. The pad will be elevated approximately 2' from rear to front to provide additional drainage improvements to the site. Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)? ØYes ONo Descriotion I Additional Information: Drainage from the interior of the development flows along the rear of structures along is intercepted by a series of catch basins with filters on each new residence and is conveyed by storm drain piping to the porous pavement subbase (for drainage from the east). Drainage from the frontage of the residences drains to direclty to the porous pavement or is intercepted by an inlet that feeds the porous pavement rock subgrade. The porous pavement system collect the DCV for each of two DMAs. The volume of water greaterthan the DCV drains through porous piping that drains off the property and is tied into the City of Calrsbad's existing 36-inch storm drain pipe within Laguna Drive. urainage from me irontage remains conveyed to me cUFU dilU yUUI diUlly Laguna Drive. Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply): On-site storm drain inlets O Interior floor drains and elevator shaft sump pumps El Interior parking garages O Need for future indoor & structural pest control Landscape/Outdoor Pesticide Use El Pools, spas, ponds, decorative fountains, and other water features O Food service * 1J Refuse areas El Industrial processes O Outdoor storage of equipment or materials J Vehicle and Equipment Cleaning El Vehicle/Equipment Repair and Maintenance o Fuel Dispensing Areas El Loading Docks El Fire Sprinkler Test Water O Miscellaneous Drain or Wash Water Plazas, sidewalks, and parking lots *Note that refuse containers will only be exposed to stormwater on days of trash collection, all other days, containers will be maintained within the interior garages of each individual lot. IdejdIficatioii'ofReciivingwater Pollutants Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable):• Storm water flow for the proposed project is to the gutter along Laguna Drive. Project is at high point of Laguna Drive and drains to gutter. Site drainage is ultimately to Buena Vista Lagoon, (see MS4 Permit Provisions). List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)Istressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: 303(d) Impaired Water Body Pollutant(s)IStressor(s) TMDLs Buena Vista Creek Benthic Community Effects Buena Vista Creek Bifenthrin Buena Vista Creek Selenium Buena Vista Creek Toxicity Buena Vista Lagoon Indicator Bacteria Established Buena Vista Lagoon Nutrients Estimated 150 acres in upper lagoon Buena Vista Lagoon Sedimentation/Siltation Buena Vista Lagoon Toxicity Idefltjfjcatlon of Project Site Pollutants; - Identify pollutants anticipated from the project site based on all proposed use(s) of the site (see BMP Design Manual ADpendix B.6): Pollutant Not Applicable to the Project Site Anticipated from the Project Site Also a Receiving Water-Pollutant of Concern Sediment Nutrients Heavy Metals elenium (a metalloid, not nticioated from siteL Organic Compounds Trash & Debris Oxygen Demanding Substances Oil _&_Grease Bacteria _&_Viruses Pesticides ch ow, Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? flYes, hydromodification management flow control structural BMPs required. ONo, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. LJNo, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides. Description / Additional Information (to be provided if a 'No' answer has been selected above): The area has been identified by the City as appropriate for an exemption by the optional WMAA incorporated into the Water Quality Improvement Plan pursuantto provision B.3.b.(4) of the MS4 permit. - 'Critical Coarse Sediment Yield Areas* *Thus Section only required if hydromodification management requirements apply Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? E] Yes No, No critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed? O 6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite O 6.2.2 Downstream Systems Sensitivity to Coarse Sediment O 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? No critical coarse sediment yield areas to be protected based on verification of GLUs onsite O Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 8 of the SWQMP. O Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion I Additional Information: flow Cofltrolf*r Post -Projèt Runo ' :. -. ThIsSè6tionónIy required If hyd odiflcatlon.rnaflagemehtreqiiirernent apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. Not Applicable. However, the following would define these POCs. POC I would be the outfall to Buena Vista Lagoon to the north. POC 2 would be the discharge to Laguna Drive street curb and gutter. Has a geomorphic assessment been performed for the receiving channel(s)? NOT APPLICABLE, PROJECT IS EXEMPT FROM THESE REQUIREMENTS. No, the low flow threshold is 0.1Q2 (default low flow threshold) E] Yes, the result is the low flow threshold is 0.1Q2 O Yes, the result is the low flow threshold is 0.3Q2 0 Yes, the result is the low flow threshold is 0.5Q2 If a geomorphic assessment has been performed, provide title, date, and preparer: Discussion I Additional Information: (optional) it When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. The most significant site requirement is bluff stability. The soils report performed for the project recommends no drainage or infiltration to or near the bluff. As such the proposed drainage pattern is a combination of storm drain flow lines that drain to planters that drain to subgrade storm drain pipes that drain toa pervious pavement system that is separated from surrounding lateral movement by use of a concrete cut-off wall. Optlàhãl Addltlhállnfàiiátiàn oCótiiüiàtióii'f PiiloüsSeèiioniAiNiede3 - This space provided for additional information or continuation of information from previous sections as needed. The project seeks to improve the existing condition of storm water drainage and protect the bluff. Currently untreated run-off flows from buildings and parking lots to Laguna Drive. Additional run-off also flows to open pervious areas of the site. The new project will both diminish this deleterious condition by treating storm drain water, appropriately locating infiltration locations and reduce the impervious areas of the site by 25%. The project also seeks to reintroduce native habitat to the bluff both enhancing the Buena Vista Lagoon ecology and in the process stabilizing. Outreach to Fish and Game has been made and will be incorporated into the landscape design with an emphasis on correct sourcing for native landscape materials. These measures are part of an overall concept that has the redevelopment of the site actually enhancing Buena Vista Lagoon and improving the environment in general. [Insert City's Standard Project Requirement Checklist Form E-36 (here)] CF, City of Carlsbad STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov Project Information Project Name: Laguna Drive Subdivision Project ID: CT2018-0006 DWG No. or Building Permit No.: 521-7A Source Control BMPs - All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix EA of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix EA of the Model BMP Design Manual. Discussion/justification is not required. "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. "N/A" means the BMP is not applicable at the project site, because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement - Applied? SC-I Prevention of Illicit Discharges into the MS4 ll Yes I 0 No 0 N/A Discussion/justification if SC-i not implemented: SC-2 Storm Drain Stenciling or Signage l!1 Yes 0 No 7O N/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind 0 Yes 0 No lii N/A Dispersal Discussionfjustification if SC-3 not implemented: This single family residential development does not plan to provide outdoor storage areas for long-term nor short-term storage of materials, therefore this source control is not applicable to this development. E-36 . Page 1 of 4 Revised 09/16 Source Control Requirement (continued) Applied? SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal 0 es N 0 o 9 N Discussionljustification if SC-4 not implemented: This single family residential development does not plan to provide outdoor work areas, therefore this source control is not applicable to this development. SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal lJ Yes 0 No 0 N/A Discussion/justification if SC-5 not implemented: SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance). On-site storm drain inlets 9 Yes 0 No 0 N/A Interior floor drains and elevator shaft sump pumps 0 Yes 0 No 11 N/A Interior parking garages 0 Yes 0 No lJ N/A Need for future indoor & structural pest control 0 Yes 0 No 9 N/A Landscape/Outdoor Pesticide Use I H Yes 0 No 0 N/A Pools, spas, ponds, decorative fountains, and other water features 0 Yes 0 No lJ N/A Food service 0 Yes 0 No 9 N/A Refuse areas 0 Yes 0 No 0 N/A Industrial processes 0 Yes 0 No W N/A Outdoor storage of equipment or materials 0 Yes 0 No I1 N/A Vehicle and Equipment Cleaning 0 Yes 0 No M N/A Vehicle/Equipment Repair and Maintenance 0 Yes 0 No N N/A Fuel Dispensing Areas 0 Yes 0 No ll N/A 0 Loading Docks 0 Yes 0 No 9 N/A Fire Sprinkler Test Water 0 Yes 0 No lJ N/A Miscellaneous Drain or Wash Water 0 Yes 0 No Iji N/A 0 Plazas, sidewalks, and parking lots 9 Yes 0 No 0 N/A For "Yes" answers, identify the additional BMP per Appendix E.1. Provide justification for "No" answers. E-36 Page 2 of 4 Revised 09/16 Site Design BMPs All development projects must implement site design BMPs SDi through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following. "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of - the Model BMP Design Manual. Discussion /justification is not required. "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussionljustification may be provided. Site!Design Requirement Applied? SD-I Maintain Natural Drainage Pathways and Hydrologic Features M Yes I 0 No I 0 N/A Discussion/justification if SD-1 not implemented: SD-2 Conserve Natural Areas, Soils, and Vegetation I i Yes- I 0 No I 0 N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area . I l Yes I 0 No I 0 N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction I lii Yes I 0 No I 0 N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion I ii Yes I 0 No I 0 N/A Discussion/justification if SD-5 not implemented: E-36 Page 3 of 4 Revised 09/16 Site Design Requirement (continued) Applied? SD-6 Runoff Collection 9 Yes 0 No 0 N/A Discussionljustification if SD-6 not implemented: SO-7 Landscaping with Native or Drought Tolerant Species I M Yes I 0 No I 0 N/A Discussion/justification if SD-7 not implemented: SD-8 Harvesting and Using Precipitation I 0 Yes I lJ No I 0 N/A Discussion/justification if SD-8 not implemented: See County spreadsheet including calculations used to consider potential for Harvest and Use BMPs. From review of this information, these BMPs are not feasible for this project. E-36 Page 4 of 4 Revised 09/16 SUMMARY OF PDP STRUCTURAL BMPS --PDP' All : All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s). PDP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). POP structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Section 7 of the BMP Design Manual). Use this form to provide narrative description of the general strategy for structural BMP implementation at theproject site in the box below. Then complete the PDP structural BMP summary information sheet for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP). Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP DesignManual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate. All of the Design Capture Volume is contained in a series of BMPs. The BMPs include (2) Pervious Pavement Systems in series. [Continue on next page as necessary.] •• StrUtUal fl [Copy t1us ge pa as needed to provide information for each individual proposed :'. ifruoivaiBM] Structural BMP ID No. I DWG 521-7A, Sheet No. 2 Type of structural BMP: O Retention by harvest and use (HU-l) O Retention by infiltration basin (INF-I) O Retention by bioreténtion (lNF-2) Retention by permeable pavement (INF-3) O Partial retention by biofiltration with partial retention (PR-1) O Biofiltration (BF-1) o Flow-thru treatment control included as pre-treatmentlforebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) O Detention pond or vault for hydromodification management O Other (describe in discussion section below) Purpose: Pollutant control only O Hydromodification control only O Combined pollutant control and hydromodification control O Pre-treatment/forebay for another structural BMP O Other (describe in discussion section below) Discussion (as needed): ••, ;StnicturaJBMPSumrnarylnfcrmation (Copy this page as needed to provide information for each individul proposed * • Structural BMP ID No. 2 DWG 521-7A, Sheet No. 2 Type of structural BMP: E] Retention by harvest and use (HU-1) O Retention by infiltration basin (INF-1) O Retention by bioretention (lNF-2) Retention by permeable pavement (INF-3) O Partial retention by biofiltration with partial retention (PR-1) O Bioflltration (BF-1) O Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) O Detention pond or vault for hydromodification management O Other (describe in discussion section below) Purpose: Pollutant control only O Hydromodification control only E] Combined pollutant control and hydromodification control O Pre-treatmentlforebay for another structural BMP O Other (describe in discussion section below) Discussion (as needed): ATTACHMENT I BACKUP FOR PDP POLLUTANT CONTROL BMPS This is the cover sheet for Attachment I. Check which Items are Included behind this cover sheet: Attachment Contents Checklist Sequence Attachment la DMA Exhibit (Required) Included See DMA Exhibit Checklist on the back of this Attachment cover sheet. (24"x36" Exhibit typically required) Attachment lb Tabular Summary of DMAs Showing D Included on DMA Exhibit DMA ID matching DMA Exhibit, DMA in Attachment la Area, and DMA Type (Required)* Z Included as Attachment I b, separate from DMA Exhibit *Provide table in this Attachment OR on DMA Exhibit in Attachment I Attachment I c Form 1-7, Harvest and Use Feasibility j Included Screening Checklist (Required unless Not included because the the entire project will use infiltration entire project will use infiltration BMPs) 3MPs Refer to Appendix 13.3-1 of the BMP Design Manual to complete Form 1-7. Attachment Id Form 1-8, Categorization of Infiltration EJ Included Feasibility Condition (Required unless Not included because the the project will use harvest and use entire project will use harvest and BMPs) use BMPs Refer to Appendices C and D of the BMP Design Manual to complete Form 1-8; Attachment le Pollutant Control BMP Design DD Included Worksheets I Calculations (Required) 0 Not included. Refer to Appendices B and E of the BMP Design Manual for structural pollutant control BMP design guidelines Attachment la DMA Exhibit Use this checklist to ensure the required information has been included on the DMA Exhibit: The DMA Exhibit must identify: J Underlying hydrologic soil group I Approximate depth to groundwater E1 Existing natural hydrologic features (watercourses, seeps, springs, wetlands) II Critical coarse sediment yield areas to be protected (if present) II Existing topography and impervious areas LI Existing and proposed site drainage network and connections to drainage offsite 1 Proposed grading L Proposed impervious features [Refer to separate Impervious Area Exhibit for clarity.] 1 Proposed design features and surface treatments used to minimize imperviousness J Drainage management area (DMA) boundaries, DMA ID numbers, and DMA areas (square footage or acreage), and DMA type (i.e., drains to BMP, self-retaining, or self- mitigating) I`xI Structural BMPs (identify location and type of BMP) Page Left Intentionally Blank L (NOT A PART) - - I CUT—OFF FWALL A(1 OR imp) APN OO 23181' NOO°4V42'E 277 SF A( 279 SF 11R imp) A(1 2R imp) 279 S Now / S N / JUL N - ---/ / 2 : N I 1 N4N N NN N NHNN N \ N - 6 73 SF N I 673 SF -J, ---- N N N \// / I N N N\ N N N \ \\ \ N N N N N < N N N - - 3 SF \0 A(5Fimp) 673 SF -_______ Ile N NNNN NNNN NNNN 7 N\ \ N N N N N N N N N N N 10' 20' N N N N 1 INCH = 10 FT N - - A(1 3R imp 1,050 SF 41:1:1:1. • - di.u.•r rii. '!rrltl'U!' II /N -5 /7 & N Lf) 'N- U- Hco I LL co \ / / U,- A (2imp) V1 31 SF. / S Lj uJ j) oI U,- 0 cl' H N 0 U- 00)01 0 0) LL H U LL 0) H LL 00 -(I) I 0 A 211 imd) I I :cn il 1 SF J 555VL -.---- /F1 0 ---'— -----v-----••---w------ 0 1 I I 5/IW -_51W__± W ---•---l- W—€- 5/ LL S W - w LL LL 'I K h--LL - A QWY ip) f H 811F U- -7 a LL 0 0 ) C') 'I ii. 0 LL 0 U- r0 LU A 2irn SF~ ) H OH 5 5 C/) S 0 U- 4 0 LL - - w - —1w —N (NOTA PART) APN 155-221-11-00 POR LOT I SECT/ON 1 TI2S R5W SBM 8476'T/7 S(SQO°41'42" W H •••• --5- ..- 2 N IMPERVIOUS AREAS EXHIBIT PflT—C(JTPi iciirmi ikAP 14 IY' / NI A7 -i- U- N ---5 9 0 LU/S 0) /4 5 LN5 NSf --• 0 I) I S U- 0 LL LL 'N 0 ° 0 H LL 0 5 LL 0 I LL C') (I-) SHEET CITY OF CARLSBAD SHEETS ENGINEERING DEPARTMENT F\IVL., \# LEGEND DMA EXHIBIT - IMPERVIOUS AREAS MAP - FOR WQMP 570 LAGUNA DRIVE, CARLSBAD, CA i;.;i;u;i;i;i;i;i;qi;i; PROJECT NO. CT201 8-0006 DRMMNG NO. 2 RECORD COPY INITIAL DATE CORY JONES ENGINEERING 1820 S. EL CAM/NO REAL, A205 ENCINI TA S, CA 92024 (P) 619-884-0576 DATE I INITIAL DATE I OTHER APPROVAL CITY APPROVAL DATE I INITIAL ENGINEER OF ~RK] REVISION DESCRIPTION BMP DESIGN NOTES: BMP NO. BMP TYPE DMA'S THAT DRAIN TO BMP DRAINAGE AREA 851H% PRECIP DCV (WORKSHEET B.1) VOL PROVIDED 1 PERVIOUS PAVEMENT Al, A2, A3 70 033 SF 0.6 IN 250 CF 1,091 CF 2 PERVIOUS PAVEMENT REMAINDER LESS A19 AND A18 13313 SF 0.6 IN 355 CF 1,076 CF CROSS-SECTION .N1N,.N\NNJ 'NT IV N a U.. I _ Ifi:!JWIiIJI, C'I*I — I P IT'i '1;1Ii i.I:1I (s:] 2' ]11IK1SI:]I I IIi iiiiii ii:ii 11 T I11I (on :1I — I;!; ---- — Eel ITi A - ir. ii -'iii ivi. , ERVIOUS PAVERS OF NO.2 WASHED STONE BEDDING LAYER IV _-------------- / I I j OF NO. 57 WASHED STONE CHOKER ROCK HOLES ORIENTED DOWN NOTE, PAVER HATCH PATTERN IS ' 5" MIN ILLUSTRATIVE AND DOES NOT INTEND TO BELOW SHOW MULTIPLE LAYERS OF PAVERS. , 'I C) 0 PERE PIPE N.T.S (NOTA PART) APN 155-221-15-00 30" IN BELOW , POR LOT I SECT/ON 1 ADJACEN1 TI2S R5W SBM BLPG SLURRY MIX NOO°4V42"E NEW 9 _e "__://_--'_jW-"-/-_- - - — - — - — - — -- A11- R Al — Al V\=\\7 U_ DO - N___g(N • • — — V V V\ N N - > LL ry N j720 - \T\CL IN - /J \j92 7, _________ -p1T / ________________ r 7 Al Al / 374 - - UNIT 1 i pJr\iui'1 96 1 424 bRAINS. TO BMP UNIT / B'JIL<iNG\DECK. / I( ØV \i±i9F N \ 110 / 11 0000 - V _1J-NI W k IJNI TI18 I S \ ELEVATED 110, FROM GRADE 3,5501Y ' V N UN I / — 3,057 7 N N N C hNUED NZ N\N \\NNc \\\\7\\\\\\\\\ \ C VM1BT A1 2F 582 NNI'N_- N\ N1 N N \\ UNIT 51V C) V V- ABULAR SUMMARYOF DMA's PER- ATTACH, M EN Ti subDMA ID .AREA (SF N N 7 1/PE 1 : OR 627 RAINS hF 618 DRAINS TO BMP7C. N. N 11R 518 DRAINS TO B M P7 l2F 58 DRAINS TO BMP NN7N N \ N N 12R 5f7 DRAINS 10 BMP N N I zr I J U DAIkIC T(\ DUD N \ I DRAINS I '4 . I %J BMP 1 V\ \ 137 1,436 DRAINS TO BMP 7777 13B, 451 DRAINS TO BMP ___ 374 SELF—MITIGATING 77% 13,057 SELF—MITIGATING 7% 'N _T V\AI VV LL I_ 0 df ILL LL UNIT 13 LJ - -- V 44 Vøø't T /1'. 2 (TO tAGJNtA DR1//SD) Iw h4- VYI-r_ 4i l/N W1OQ =4171.7NFF5 14-14 ci' V ,'iL_jIV I _'0 l0/ f ;F N1ii H0/ STF1EEtT LO1FE= LL VV!!N 4 44IViI H 1%± UL ., w 590 Nj 1346 0 LL - V V , NN1 TrT rTV V: I 7 UNIT VV/ / V'V VV VV A7F 552 UNI N'7N N \ \N7\ I\NNV\NNN\\\NNVN NNNNV N\NN NN11 N V VV \ \ \ \ \ N V \ N \ N )\\\V NN\V \\V NNN \\\\NNN NN\ N\\\\ N NNNNV NN'NNCN N N 0 V V N N N V V V N I N DISCHARGE POINNZN\OR)NVNN NNN7NNNN\f N Q100=0.36 CFS V1 00=0.60 FPS \$7 V7N7 V NN \ V N (EST. AS CHANNEL 11FB=5O'7Z=1O, Sn=O.1)V V\V N V N V \=67%\ V NV V V\ I N Cfl Tabular _Summary Explanation VN N N N NN subDMA ID's 1, 2, and 3 drain DMA 1. DMA 1 drains to BMPN I. VV 7 N V\ N sub DMA ID's 18 and 19 are self—mitigating. N 7 N N N V N sub DMA ID's 5, 7F, 8F, 9F, 10F, hF, 12F, 13F,7R, 8R, 9R, 9B, 1R,11R,N12R, 13RV and 13B all drain DMA 2. DMA \2-,, drains to BMPZ. / N 77c Ar7 0\01,F, V _ zol 284.761 /\ S(0O'.41'42" W / --—.--- C IN (NOTA PART) APN 155-221-11-00 POR LOT I SECTION 1 T125 RSWSBM N N N N 0 10' 20' 7Nj N V LN 1 INCH, = 10 FT N PERVIOUS PAVEMENT BMP 21 'NVVVj CROSS-SECTION N t II1IjIj1j_TIIT I H{T_1-7T11ITj ERVIOUS PAVERS 30" IN VI_.:. "OF NO.2 WASHED STONE BEDDING LAYEI BELOW . -._I_N" OF NO. 57 WASHED STONE CHOKER ROCK V ADJAc. , -8" OF WASHED 314" ROCK BIL G UT-OFF WALL 5" MIN, PERF_ PIPE _SUBDAIN 3-SACK HOLES ORIENTED DOWN NOTE, PAVER HATCH PATTERN IS SLURRY MIX 27" MIN ILLUSTRATIVE AND DOES NOT INTEND TO BELOW SHOW MULTIPLE LAYERS OF PAVERS. PERF PIPE N.T.S UN1kT 1PS 1 - 6ISCKARI;EPoINI1 1 '40e A9B (SOUTH)ILL 42 - Q1001.%59ICFS Y1OO LL.= !2.5 FPSL LL X j) I --HJ --, r LL '" I, 0' BMP NOTES: CERTIFICATION 1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS OR THESE PLANS. PLAN PREPARED BY: 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR NAME CORY JONES, PE APPROVAL FROM THE CITY ENGINEER. 3. NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES SIGNATURE WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. COMPANY CORY JONESENGINEERING 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFF ADDRESS 1820 S. EL CAMINO REAL, A205 HAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTION ENCINITAS,CA 92024 AND INSTALLATION. 5. REFER TO MAINTENANCE AGREEMENT DOCUMENT. PHONE NO. 760.274.6678 6. SEE PROJECT SWMP FOR ADDITIONAL INFORMATION. SWMP NO. TBD PARTY RESPONSIBLE FOR MAINTENANCE: NAME BRETT FARROW ADDRESS 125 MOZART AVE. CONTACT CARDIFF, PHONE NO. 760.230.6851 DMA EXHIBIT INFO: UNDERLYING HYDROLOGIC SOIL GROUP: TYPE B SOILS APPROXIMATE DEPTH TO GROUNDWATER = 40—FT± EXIST NATURAL HYDROLOGIC FEATURES: N/A CRITICAL COURSE SEDIMENT YIELD AREAS: N/A EXIST AND PROPOSED TOPO: SEE PLAN VIEW PROPOSED DEMO: SEE PLAN VIEW SHEET FciTy OF CARLSBAD SHEETS 1 ENGINEERINGDEPARTMENT 1 PROJECT: 570-580 LAGUNA DRIVE CARLSBAD VILLAGE Designedby: Designedfor: CLJE BRETT FARROW ARCHITECT, INC. Cory Jones Engineering 1820 S. El Camino Real, A205 125 Mozart Avenue Encinitas, CA 92024 Cardiff-by-the-Sea, CA 92007 cory.laneave@gmail.com brettfarrow@cox.net DMA EXHIBIT FOR WQMP LAGUNA DRIVE SUBDIVISION c018-0006 570 —580 LAGUNA DRIVE, RP2018-0008 CDP2018-0032 CARLSBAD, CA HDP2018-0003 CR 2019-0044 HMP2019-0003 DMA NAME Al T\5-SUBAREA (SF) FLOW DIREC11ON Val FLOW PATH PER SUBAREA DRAINAGE MANAGEMENT AREA (DMA) BOUNDARY PROPOSED GRADING: SEE PLAN VIEW PROPOSED IMPERVIOUS FEATURES: SEE IMPERVIOUS AREA EXHIBIT. PROPOSED DESIGN FEATURES AND SURFACE TREATMENTS: SEE PLAN VIEW DRAINAGE MANAGEMENT AREA BOUNDARIES: SEE PLAN VIEW POTENTIAL POLLUTANT SOURCE AREAS: FUTURE STRUCTURES, PARKING AND DRIVE AISLE STRUCTURAL BMPS: BMP 1 (N. DRIVE AISLE) - PERVIOUS PAVEMENT, BMP 2 (S. DRIVE AISLE) - PERVIOUS PAVEMENT. PROJECT NO. CT201 8— 0006 DRAWING NO. 521-7A RECORD COPY INITIAL DATE DATE I_ INITIAL I DATE I_INITIAL I DATE I ENGINEER OF WORK I_REVISION DESCRIP11ON _OTHER APPROVAL CITY APPROVAL Attachment 1 b Tabular Summary of DMAs Showing DMA ID matching DMA Exhibit, DMA Area, and DMA Type Attachment lb. Tabular Summary of DMAs and Summarized DCV Sub-DMA ID. Area (SF) DMA Type DMA Area DCV 1 1,203 Drains to BMP 1 250 2 2,280 Drains to BMP 1 3 3,550 Drains to BMP 1 5 3,668 Drains to BMP 2 355 7F 552 Drains to BMP 2 711 570 Drains to BMP 2 8F 560 Drains to BMP 2 811 575 Drains to BMP 2 9F 590 Drains to BMP 2 911 1,059 Drains to BMP 2 9B 424 Drains to BMP 2 1OF 610 Drains to BMP 2 1OR 627 Drains to BMP 2 hF 618 Drains toBMP 2 hR 518 Drains to BMP 2 12F 582 Drains to BMP 2 12R 517 Drains to BMP 2 13F 66 Drains to BMP 2 " 13R 1,436 Drains to BMP 2 13B 451 Drains to BMP 2 18 374 1 Self-Mitigating 1 3 N/A 19 13,057 1 Self-Mitigating 1 3 Attachment 1c Form 1-7, Harvest and Use Feasibility Screening Checklist Attachment id Form 1-8, Categorization of Infiltration Feasibility Condition COAST GEOTECHNICAL CONSULTING ENGINEERS AND GEOLOGISTS July 2, 2018 Brett Farrow Brett Farrow Architect 125 Mozart Avenue Cardiff, CA92007 Subject: GEOTECHNICAL REVIEW CATEGORIZATION OF INFILTRATION FEASIBILITY CONDITION (FORM 1-8) Proposed 12 Residential Structures 570-580 Laguna Drive Carlsbad, California Reference: PRELIMINARY GEOTECHNICAL INVESTIGATION Proposed 12 Residential Structures 570-580Laguna Drive Carlsbad, California Prepared by Coast Geotechnical Dated April 4, 2018 Dear Mr. Farrow: We have reviewed the above subjectInfiltration Feasibility Form I-8.and agree with the findings. If you have any questions, please do not hesitate to contact us at (858) 755-8622. Sincerely, COAST GEOTECHNI CERTIFJED *\ ENGINEERING Mark Burwell, '- GEOLOGIST Engineering Geologist Enclosure: Infiltration. Feasibility-Form I-S Vi Ge P.O. BOX 230163 * ENCINITAS, CALIFORNIA 92023 (858) 755-8622 Page Left Intentionally Blank ()COAST GEOTECHMCAL CONSULTING ENGINEERING GEOLOGISTS April 6,2020 Brett Farrow Brett Farrow Architect 125 Mozart Avenue Cardiff, CA 92007 Subject: PERMEABLE PAVER DRIVEWAY Laguna Drive Subdivision 570-580 Laguna Drive Carlsbad, California References: Please see Page 2 Dear Mr. Farrow: In response to the city of Carlsbad, the following item is addressed: W.O. P-686218 Regarding the permeable paver driveway, potential lateral migration of infiltrated. water in the' permeable paver driveway has been mitigated. by subsurface cut-off walls on either side of the driveway and subdrains. An impermeable liner is not required under the proposed permeable driveway section, as currently designed If you have any questions regarding this report, please do .not hesitate. to contact our office. Reference to our Job No. P6862 18 will help, expedite a response to your inquiry. Respectfully submitted, COAST GEOTECHNICAL Mark Burwell, C.E.G. Engineering Geologist CT'-ED ENGtNEENG 1*/I GEOLOGIST ...'S>.J Vithaya Singhanet, P Geotechnical Engine P.O. BOX 230163 • ENCJ.NITAS, CALIFORNIA 92023 (858) 755-8622 Coast Geotechnical April 6, 2020 W.O. P-686218 Page 2 of 3 REFERENCES GEOTECHNICAL UPDATE REPORT 570-580- Laguna Drive Carlsbad, California Prepared by Coast Geotechnical Dated January 23, 2020 RESPONSE TO REVIEW COMMENTS OF GEOTECHNICAL REPORTS Laguna Drive Sübdivisión 570-590 Laguna Drive Carlsbad, California Prepared by Coast Geotechnical Dated January 14, 2020 THIRD GRADING PLAN REVIEW Proposed 13 Residential Structures 570-580 Laguna Drive. Carlsbad, CA 92008 Prepared by Coast Geotechnical Dated December 19, 2019 FOUNDATION PLAN REVIEW PrOposed 13 Residential Structures 570-580 Laguna Drive Carlsbad,. California. Prepared by Coast Geotechnical Dated December 19, 2019 SUPPLEMENTAL RECOMMENDATIONS FOR A 3-STORY -STRUCTURE Proposed 12 Residential Structures 570-580 Laguna Drive Carlsbad, California Prepared by Coast Geotechnical November 21, 2019 April 6, 2020 W.O. P-686218 Page 3 of 3 Coast Geotechñical 6, SECOND GRADING PLAN REVIEW Proposed 1.2 Residential Structures 570680 Laguna Drive Carlsbad, CA 92008 Prepared by Coast etechnical Dated January 14,. 2019 'GRADING PLAN REVIEW Proposed 12 Residential, Structures 570-580 Laguna Drive Carlsbad, CA 92008 Prepared by. Coast Geotëchnical. Dated August 6, 2018 PRELIMINARY GEQTECHNICAL INVESTIGATION Proposed. 12 Resdentiä1.Sthictures 570-580'Laguna Drive Carlbad, CA '92008 Prepared by Cóast:Geotechnical Dated April 4,2018 COAST GEOTECHNICAL CONSULTING ENGINEERS-AND GEOLOGISTS April 4, 2018 Brett Farrow Brett Farrow Architect 125 Mozart Avenue Cardiff, CA 92007 RE: PRELIMINARY GEOTECHNICAL INVESTIGATION Proposed 12 Residential. Structures 570-580 Laguna Drive Carlsbad, CA 92008 Dear Mr.. Farrow: In response to your request and in accordance with our Agreement dated January 16, 2018, we have performed 'a preliminary geótéchñical investigation onthe subject site for the proposed 12 residential structures. The findings of the investigation, laboratory test results, and recommendations for the foundation design are presented in this report. From a geologic and soils engin&riñgpoint of view, it is our Opinion that the site is suitable for the proposed deyelopment, provided the recommendations in this report are implemented during the design and construction phases. However, certain geotechnical conditions will require special consideration during the design and construction phases, as indicated by the following: The existing soil and weathered Paralic Deposits are not. suitable for the support of proposed footings, slabs-on-grade, exterior improvements* or proposed fills in their present condition. Remedial gradingis recommended. P.O. BOX 230163 * ENCINITAS, CALIFORNIA 92023 (858) 7554622 The rear inland bluff is composed, in pail, of friable Paralic Deposits which are susceptible to surficial failure and bluff retreat. Surface drainage should be directed, as much as possible, away from the top of slope. The geologic conditions underlying the rear bluff are such that inflltrate4.yvater developing saturated conditions can adversely affect slope stability. Stormwater infiltration should be significantly limited and if necessary bioretention basins should be located in the' most southern portion of the site. If you have any questions, please do not hesitate to' contact us at (858) 755-8622. This opportuiiity to be of service is appreciated. Respectfully submitted, COAST GEOTECHNICAL Wyatt Bartholomew Project Geologist Mark Burwell, C.E.G. Vithaya Singhanet, P.E. Engineering Geologist Geotechnical Engineer PRELIMINARYGEO1EdHNIcAL INVESTIGATION. Proposed 12 Residential.Structures 570-580 Laguna Drive: Carlsbad, CA 92008 Prepared for: Brett.:Farrow Brett Farrow, Architect. 125 Mozart, Avenue Cardiff; CA 92007 Peparedby COAST QEOTEC}ZCAL P.O.- Box 230.163 Encinitas, CA 92023 April 4, 2018 W.*Om 686218 TABLE OF CONTENTS INTRODUCTION 6 SCOPE OF SERVICES . 6 SITE DESCRIPTION AND PROPOSED DEVELOPMENT .........................7 3.1 Site Description.......................................................... 3.2 Proposed Development ............................................ . ....... 7 SITE INVESTIGATION AND LABORATORY TESTING..........................8 4.1 Site Investigation.........................................................8 4.2 Laboratory Testing and Analysis ............................................8 4.3 Infiltration Testing ....................................................... GEOLOGIC CONDITIONS .................................................... 9 5.1 Regional Geologic Setting .................................................9 5.2 Site Geology ............................................................10 5.3 Expansive Soil ..........................................................11 5.4 Groundwater Conditions .................................................11 GEOLOGIC HAZARDS .....................................................11 6.1 Faulting and Seismicity ................. . .................................. 11 6.2 Landslide Potential .......................................................13 6.3 Liquefaction Potential ..................................................... 14 6.4 Tsunami Potential ........................................................ .15 CONCLUSIONS...........................................................15 RECOMMENDATIONS ....................................................16 8.1 Removals and Recompaction ..............................................16 8.2 Temporary Slopes and Excavation Characteristics ............................... 17 8.3 Foundations .......................................... ..................... 17 8.4 Sulfate and Chloride Tests ................... . ......... ................... .18 8.5 Slabs on Grade (Interior and Exterior) .........................................18 8.6 Lateral Resistance.......................................................19 8.7 Retaining Walls ......................................................... 19 8.8 Dynamic (Seismic) Lateral Earth Pressures ...................................20 8.9 Settlement Characteristics .................................................. 21 8.10 Seismic Considerations.....................................................21 8.11 Preliminary Pavement Design ............................................. 22 8.12 Permeable Interlocking Concrete Payers (PICP) ..............................23 8.13 Utility Trench ...........................................................24 8.14 Drainage ..............................................................24 8.15 Geotechnical Observations ...............................................25 8.16 Plan Review ...........................................................25 LIMITATIONS ......................................................... 25 REFERENCES...............................................................27 COAST GEOTECH1IICAL Brett Farrow W.O. 686218 Page 5 of 28 APPENDIX A Figure 1: Location Map Figure 2: Geotechnical Map Figure 3: Cross Section A-A" Figure 4: Borehole Log No. 1 Figure 5.: Borehole Log No. 2 Figure 6: Regional Fault Map Plate A: Typical Iso1atioü Joints and Re-EntEañt Coiiier Reinforcerñent Plate B: Typical Permeable Paver Detail APPENDIX B Laboratory Test Results Figure 7: Infiltration Test Graph Seismic Design Parameters Design Response Spectrum.. APPENDIX C Slope Stability-Analysis APPENDIX:D Grading Guidelines COAST GEOTECHNICAL Brett..Farrow W.O..686218 Page 6 of 28 INTRODUCTION This report presents the results of our background review, subsurface investigation, laboratory testing, geotechnical analyses, conclusions regarding the conditions at 70-580 Laguna Drive, and recommendations for design and construction. The purpose of this study is to evaluate the nature and characteristics of the earth materials underlying the property, the engineering properties of the surficial deposits and their influence-on the proposed 12 residential structures. SCOPE OF SERVICES The scope of services provided included a review of background data, reconnaissance of the site geology, and engineering analysis with regard to the proposed. The performed tasks specifically included the following: Reviewing geologic and hazard (seismic, landslide, and tsunami) maps, recently published regarding the., seismic potential of nearby faults,, and. a. site plan for the project. All background data is listed in the References portion of this report. Performing a site.reconnaissance, including the observation of geologic conditions and, other hazards, which may impact.the proposed project. Excavation of exploratory borings consisting of excavating, logging, and sampling of earth materials, to evaluate the. subsurface conditions. Performing geotechnical laboratory testing of recovered soil samples. Analyzing data obtained from our research, subsurface exploration, and laboratory and infiltration testing. [ • Preparing this preliminary report. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 7 of 28 3. SITE DESCRIPTION AND PROPOSED DEVELOPMENT 3.1 Site Description The subject site is a partially developed lot on Laguna Drive in the city of Carlsbad (Figure 1). The northwest quadrant of the lot is vacant, the southeast quadrant of the lot is developed with a small building, the northeast and southeast quadrant hosts an existing building and the remainder of the lot is paved with asphalt. The property is a polygonal-shaped area that descends gently to the northwest and is bounded by an inland bluff that descends to Buena Vista Lagoon. The elevation of the lot ranges from approximately 5.0 to 45 feet. The subject site includes an existing residence, existing office building, and two existing AC parking areas. The lot is relatively flat ranging from 40 to 43 feet. as you move north to south along the property. The northern portion of the property is bounded by an inland bluff that descends to the Buena Vista Lagoon at a gradient approaching 1¼:l (horizontal to vertical) for approximately 40 vertical feet. The site is bounded along the north by Buena Vista Lagoon, to the south by Laguna Drive, and to the east and west by developed residential lots. Vegetation on the site consists of trees and shrubs. Drainage is generally by sheet flow to the northwest in .the direction of the inland bluff and Buena Vista Lagoon. 3.2 Proposed Development A topographic plat of the site was prepared by Sampo Engineering. Preliminary architectural plans for the development of the site were prepared by Brett Farrow, Architect. The project is anticipated to include the demolition of the most southeastern existing building, but not the northeastern structure, and the construction of 12 residential structures with one car garages (Figure 2). Grading plans were not available during the assessment of the lot, but due to the relatively flat nature of the existing lot, we presume grading to be minimal. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 8 of 28 4. SITE INVESTIGATION AND LABORATORY TESTING 4.1 Site Investigation Site exploration wasperformed on March 16, 2018. It included a visual reconnaissance of the site and the excavation of two (2) exploratory boreholes (Figures 4-5). The boreholes. were drilled using a truck-mounted hollow-stem auger. Samples were obtained using a modified California Sampler and SPT Sampler. All the borings were extended through the underlying top soil, Old Paralic Deposits and into the underlying Santiago Formation to maximum depths 50 feet inBorehole I an 30 feet in Borehole 2. Earth materials encountered were visually classified and logged by our field project geologist, and sampled for future laboratory testing. Undisturbed, representative samples of earth materials were obtained at selective intervals by driving a thin-walled steel sampler into the desired strata with a 140 pound hammer powered by a cathead and rope system. Bulk samples were also obtained at selected intervals. Samples are retained in waterproof containers and brass rings and transported to Coast Geotechnical Soils Laboratory for testing and analysis.. The site investigation also included a visual observation of the surrounding landscape of the project site. Existing wood retaining walls are in place along the slope into the lagoon. 4.2 Laboratory Testing and Analysis The laboratory tests were performed in accordance with the generally accepted American Society for Testing and Materials (ASTM) test methods or suggested procedures. All lab descriptions and results can be found in the Test Results section of Appendix B of this report. The following tests were preformed: Classification of Soils Grain Size Distribution Moisture/Density COAST GEOTECHNICAL Brett. Farrow W.O. 686218 Page 9 of 28 Maximum Dry Density and Optimum Moisture Content Expansion Index Test Sulfate Ion Content Chloride Ion Content pH Test Field Resistivity Test Shear Test Infiltration Test 4.3 Infiltration Testing Infiltration testing was performed using a Double-Ring Infiltrometer (ASTM D3385). The infiltration test area is located in the southern portion of the' site as indicated on the enclosed Geotechnical Map. The area was prepared by excavating down to the Paralic Deposits. A level pad was established for testing. Infiltration results can befoünd in the Test Rósults section of Appendix B of this report as Figures 7 (infiltration Test Log) and 8 (Infiltration Test Graph). 5. GEOLOGIC CONDITIONS The geologic conditions at the site are based. on our fiCld exploration and review of available geologic andgeotechnical literature. 5.1 Regional Geologic Settings The subject property is located in the Coastal Plains subdivision of the Peninsular Ranges geomorphic province of San Diego. The coastal plain area is characterized by Pleistocene marine terrace landforms. These surfaces are relatively flat erosional platforms that were shaped by wave action along the former coastlines. The step-like elevation of the marine terraces was caused by changes in sea level throughout the Pleistocene and by seismic activity along the Newport-Inglewood Fault Zone located 4.5 miles west of the coastline. The Newport-Inglewood Fault Zone is one of many northwest trending, sub-parallel faults and fault zones that traverse the nearby vicinity. Several COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 10 of 28 of these faults, including the Rose Canyon Fault Zone, are considered active faults. Further discussion of faulting in regards to the site is discussed in the Geologic Hazards section of this report. 5.2 Site Geology Previously published geologic maps conducted by Kennedy and Tan (2008) suggest that the subject property is underlain at depth by the Santiago Formation (Tsa) and Old Paralic Deposits (Qop). Overlying the rocks is lop Soil (Qs). The Old Paralic Deposits are covered by Top Soil (Qs) along the surface of the property site as encountered in Boring Nos. 1 and 2 (B-I and B-2). The general geologic conditions are depicted on cross-section A-A" enclosed on Figure 3. A brief description of the earth materials encountered on the site are as follows: Top Soil (Qs) In Borehole Nos. I and 2 (B-1 and B-2), 2.5. to 2 feet of Top Soil was encountered, respectively. The Top Soil is a reddish dark brown, fine. grained, extremely well, sorted, moderately dense sand and has an organic odor. Old Paralic Deposits (Qop) Approximately 17 feet and 18 feet of Paralic sediments were encountered in Borehole Nos. 1 and 2 (B-i and B-2) respectively. In Borehole I., from 2.5 feet to 11.5 feet and in Borehole 2, from 2 feet to 11.5 feet, the sediments are tan reddish brown, fine and medium grained sandstone, slightly moist and moderately dense. From 11.5 feet to 16 feet in Borehole 1 and 11.5 feet to 15 feet in Borehole 2, the sediments are light brownish tan to red brown fine- grained sandstone, well sorted, dense, slightly moist and contain rounded gray pebbles. It's important to note the gravel layer was penetrated in both boreholes at an approximate depth between 13. to 17 feet. In Borehole 1 from 16 feet to 19 feet and Borehole 2 from 15 feet to 19.5 feet, the sediments encountered were tan to light-orange to red brown coarse to fine- grained sandstone, slightly moist and moderately dense. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 11 of 28 Santiago Formation (Tsa) Underlying the Old Paralic Deposits is the Santiago Formation. This formation of interbedded sands and clays was encountered at a depth of 19 feet in Borehole 1 and 19.5 feet in Borehole 2 and extended to the maximum depths of 50 feet and 30 feet in Boreholes I and 2, respectively. It consists of gray to pale green to white clayey fine to coarse grained sandstone and is very dense and slightly moist. 5.3 Expansive Soil Based on our experience in the area and previous laboratory testing of selected samples, the Paralic deposits reflect an expansion potential in the low range. 5.4 Groundwater conditions No evidence of perched or high groundwater tables were encountered to the depth explored. However, the upper Paralic Deposits are pervious and the underlying Santiago Formation is relatively impervious suggesting that perched groundwater conditions-can develop from infiltration of water. It should be noted that seepage problems can develop after completion of construction. These seepage problems most often result from drainage alterations, landscaping, and over-irrigation. In the event that seepage or saturated ground does occur, it has been our experience that they are most effectively handled on an individual basis. 6. GEOLOGIC HAZARDS 6.1 Faulting and Seismicity The subject site is located within the seismically active Southern. California. region, which is generally characterized by northwest trending, right-lateral strike-slip faults and fault zones. Several of these fault segments and zones are classified as active by the California Geologic Survey (Aiquist-Priolo Erthquake Fault Zoning Act.). As a result, ground shaking is a potential hazard throughout. the region. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 12of28 Based on a review of published geologic maps, no known active faults traverse the site (Figure 6). Thus, ground surface rupture is not likely to occur as a result of an earthquake or seismic event. The nearest active fault to the site is the Newport Inglewood Fault (offshore), located approximately 4.5 miles west of the site. It should be noted that the Newport Inglewood Fault is one of four main fault strands that make up the Newport-Inglewood/Rose Canyon (NIRC) fault system (Treünan, 1984). The four strands form a series of right-stepping en echelon faults situated along the Southern California coastline. A recent study by Sahakian et al (2017) concluded that thegeornetry of the NIRC fault system. may enable rupture along the entire length of the fault zone. The study also modeled several rupture scenarios in light ofthe-newly defined geometry which suggest earthquake ruptures up to magnitudes (M) of 7.4 are possible along the NIRC system. While the models are intriguing, the paper recommends further research and modeling on the NIRC fault geometry to improve our understanding of potential hazards and ground shaking along the Southern California coast. Therefore, the modeled rupture magnitude of M = 7.4 on the Rose Canyon Fault was not used for the recommendations for this investigation. Other nearby faults that may affect the site include the Rose Canyon, Coronado Bank, Temecula and Julian Faults.. The proximity of major faults to the site, and their estimated maximum earthquake. magnitudes and peak site accelerations are enclosed on Table I and were determined by EQFAULT version 3.00 software (Blake, 2000). COAST GEOTEC}ThTICAL Brett Farrow W.O. 686218 Page 13 of 28 Table.!: PrincipalActive.FauIts Fault Name Approximate Distance from site (mi) Maximum EQ Magnitude (Mmax) Peak Site Aced. (g) .Newport-Inglewood 4.5 6.9 0.388 Rose Canyon 4.8 6.9 0.381 Elsinore-Ternecula 20.9 7.4 0.223 Elsinore- Julian 24.1 6.8 0.1.52 Elsinore- Glen Ivy 24.5 7.1 O 174 Palos Verdes 3:3.0 6.8 0.116 Earthquake' Valley 34.9 7.1 0.131 Newport-Inglewood 44.6 6.5 0.072 San 'Jaciñto- Anza 45.0 6.9 0.092 The Rose Canyon Fault is capable of generating a magnitude earthquake which would cause strong ground' motions at the subject site. Further analysis' on seismicity and the site specific seismic parameters are discussed in the Recommendations. chapter of this report. 6.2 Landslide Potential A lanllide is the displacement of a mass of rock, debris, or earth down a slope 'caused, by topographic, geological, geotechnical and/or subsurface' water conditions. Potential landslide hazards for the site were assessed using the review of published' geologic and topographic maps as well as subsurface exploration. According to the Landslide Hazards map, San Luis Ray Quadrangle (Tan and Giffen, 1995), the site is located within Susceptibility Area 3-1 where slopes are generally susceptible. Most slopes in this: area do not contain landslide 'deposits, but they, can be subject to surficial failure and bluff retreat as discussed below. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 14of28 The rear bluff descends at a gradient approaching 11/4: 1 (horizontal, to vertical) for approximately 40 vertical feet and is underlain by two (2) major geologic units with different characteristics. The upper 20 feet of the rear bluff is composed. of Pleistocene-age sediments that are weakly cemented and friable along slope faces. These fine-grained sands are subject to surficial failures and bluff retreat. Wood batter boards have been installed in the slope to retard surficial slippage with limited success. Underlying the coastal'bluff sediments, Eocene-age sedimentary units which have commonly been correlated with the Santiago Formation are present. The sedimentary rock is primarily composed of dense to very dense clayey sandstone. Although claystone units within the Santiago Formation have been associated with landslides, no evidence of deep-seated instability was observed in the exploratory borings or site topographic expression. Slope stability analysis utilizing GSTABL7 with STEDwin suggests the most critical failure surface is primarily within the upper Pleistocene Old Paralic Deposits. Static and Pseudo-static stability analyses are Shown on the enclosed Stability Analysis Appendix C. 6.3 Liquefaction Potential Liquefaction-is a process by which a sand mass loses its shearing strength completely and flows. The temporary transformation of the material into a fluid mass is often associated with ground motion resulting from an earthquake, and high groundwater conditions. The fifty (50) foot deep boring (B-i) suggests that the Paralic Deposits are in a medium-dense to dense condition and the underlying sedimentary units of the Santiago Formation are in a very dense condition. Groundwater was not encountered to a depth of 50 feet, belowexisting ground surface. COAST GEOTECHNICAL Brett FarrOw W.O. 686218 Page 15 of 28 Owing to the moderately dense to very dense nature of the geologic formations and the anticipated depth to groundwater,.' the potential for seismically-induced 'liquefaction and soil instability is considered low. 6.4 Tsunami Potential Tsunamis are large sea waves generated by earthquakes, volcanic eruptions, or landslides that potentially cause the displacement of substantial volumes of'water. The Tsunami Inundation Map, for Emergency Planning: San Luis Ray Quadrangle (California Emergency Management Agency, 2009) suggests that the site is not susceptible to flooding from tsunamis. 7. CONCLUSIONS No geologic hazards such as faulting, liquefaction' or leep-seated instability Which could preclude .development 'were encountered on the site. The rear. slope is composedof friable Pleistocene sediments, which are,,subjectto.erosion, surficial failure and retreat during prolonged rainfall and drainage directed toward the top of the slope. Design plans should consider raising the proposed pad grades such that drainage is. directed to the south away 'from the top of the bluff. The'geOlogiô conditions underlying the rear bluff are-such that infiltrated water developing saturated conditions can adversely affect slope stability. Storm water infiltration should be significantly limited and, if necessary, bioreteñtion basins should be located inn the most southern portion of the site. COAST GEOTECFD4ICAL Brett Farrow W.O. 686218 Page 16 of 28 The existing soil and weathered Paralic Deposits are not suitable for the support of proposed footings; slab-on-grade, exterior improvements or proposed fills in their present condition. These deposits should be removed and replaced as pfoperly compacted fill. Disturbed soils resulting from the demolition of structures and utility lines should be removed and replaced as properly compacted fill. Prior to the double-ring infiltration test, the area was excavated into the Old Paralic Deposits about the 42 foot elevation. Testing in.the area of the site (IF-i) was conducted in the Paralic Deposit and reflected a stabilized infiltration rate approaching that of 2.48 inches per hour. 8. RECOMMENDATIONS 8.1 Removals and Recompaction The existing soil and weathered Old Paralic Deposits in the building pad should be removed and replace as properly compacted fill. Removals in building pads should extend a minimum of 5.0 feet beyond the building footprint or the entire building pad depending upon final designplans. The depth ofrëmóvals are anticipated to be on the order of 3.0 feet in building pads. Most of the existing earth deposits are generally suitable for reuse, provided they are cleared of all vegetation, debris, and thoroughly mixed. PriOr to placement of fill, the base of the removal should be observed by a representative of this firm. Additional overexcavation and recommendations may be necessary at that time. The exposed bottom Should be scarified to a minimum depth of 6.0 inches, moistened as required, and compacted to a minimum of 90 percent the laboratory maximum dry density. Fill should be placed in 6.0 to 8.0 inch lifts, moistened to approximately 1.0-2.0 percent above optimum moisture content and compaction to a minimum of percent the. laboratory maximum dry density. Soil and weathered Paralic Deposits.in areas of proposed concrete flatwork, exterior improvements, and driveways should be removed and replaced as properly compacted fill. Imported fill, if necessary, should consist of non-expansive granular deposits approved by the geotechnical engineer. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 17 of 28 8.2 Temporary Slopes and Excavation Characteristics Temporary excavation, which expose soil and weathered Paralic Deposits should be trimmed to a gradient of 1:1 (horizontal to vertical) or less depending upon conditions encountered during grading. The Old Paralic Deposits may be excavated to a vertical height of 5.0 feet. The temporary slope recommendations assume no surcharges are located or will be placed along the top of the slope within a horizontal distance equal to one half the height of the slope. The Paralic Deposits are dense below the weathered zone. However, based on our experience in the area, the Paralic Deposits are rippable with conventional heavy moving equipment in good working order. -i 8.3 Foundations The following design parameters are based on footings founded into non-expansive approved compacted fill deposits or competent Paralic Deposits. Footings for the proposed structure should be a minimum of 12 inches. and 15 inches wide and founded aminimum of 12 inches and 18 inches below the lower most adjacent subgrade at the time of foundation construction for single-story and two-story structures, respectively. A 12 inch by 12 inch grade beam or footing should be placed across the garage opening. Footings should be reinforced with a minimum of four No. 4 bars, two along the top of the footing and two along the base. Where parallel wall footings occur, the upper footing should be deepened below a 45 degree plane projected up from the base of the lower footing, or the lower wall should be designed for the additional surcharge load from the upper wall. Footing recommendations provided herein are based upon underlying soil conditions and are not intended to be in lieu of the project structural engineer's design. The base of footings should be maintained a minimum horizontal distance of 10 lateral feet to the face of the nearest slope. For design purposes, an allowable bearing value of 2000 pounds per square foot and 2400 pounds per square foot may; be used for foundations at the recommended footing depths for single and two story structures, respectively. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 18 of 28 For footings deeper than 1.8 inches, the bearing value may be increased by 250 pounds per square foot for each additional 6.0 inches of embedment to a maximum of 3000 pounds per square foot. The bearing value may be increased by one-third for the short durations of loading, which includes the effects of wind and seismic forces. The bearing value indicated above is for the total dead and frequently applied live loads. This value may be increased by 33 percent for short durations of loading, including the effects of wind and seismic forces. 8.4 Sulfate and Chloride Tests The results of our, sulfate and chloride tests performed on representative samples are presented on Tables 8 and 9 in Appendix B. The test results suggest a sulfate content of 0.005 (negligible). & 5 Slabs on Grade (Interior and Exterior) Slab on grade should bea minimum of 5.0 inches thick and reinforced in both directions with No. 3 bars placed 18 inches on center in both directions. Exterior slabs on grade should be a minimum of 4.5 inches thick and reinforced with No.3 placed 18 inches on center in both directions. The slab should be underlain by a minimum 2.0-inch coarse sand blanket (S.E. greater. than 30). Where moisture sensitive floors are used, a minimum 10.0-mil Visqueen, Stego, or equivalent moisture barrier should be placed over the sand blanket and covered by an additional two inches of sand (S.E. greater than 30). Utility trenches underlying the slab may be backfihled with on-site materials, compacted to a minimum of 90 percent of the laboratory maximum dry density. Slabs should be reinforced as indicated above the provided with saw cuts/expansion joints, as recommended by the project structural engineer. All slabs should be cast over dense compacted subgrades. At a minimum, interior slabs should be provided with softcut contraction/control joints consisting of sawcuts spaced 10 feet on center maximum each way. Cut as soon as the slab will support the weight of the saw, and operate without disturbing the final finish, which is normally within 2 hours after final finish at each control joint location or 150 psi to 800 psi. The sOftcuts should be a. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 19of28 minimum of 3/4 inch in depth:, but should not exceed 1 inch deep maximum. Anti-ravel skid plates should be used and replaced with each blade to avoid spalling and raveling. Avoid wheeled equipment across cuts for at least 24 hours. Provide re-entrant corner (270 degrees corners) reinforced for all interior slabs consisting of minimum two, 10-feet long No. 3 bars at 12 inches on center with the first bat placed 3 inches from re-entrant corner (see Plate F). Re-entrant corners will depend on slab geometry and/or interior column locations. Exterior slabs should be provided with weakened planejoints at frequent intervals in accordance with the American Concrete Institute (ACI) guidelines. Our experience indicates that the use of reinforcement in slabs and foundations can reduce the potential for drying and shrinkage cracking. However, some minor cracking is considered normal and should be expected as the concrete cures. Moisture barriers can retard, but not, eliminate moisture vapor movement from the underlying soils up through the slab. 8.6 Lateral Resistance Resistance to lateral load may be provided by friction acting at the base foundations and by passive earth pressure. A coefficientof friction of 0.25may be used with dead-load forces. Design passive earth resistance may be calculated from a lateral pressure corresponding to an equivalent, fluid density of 300 pounds per cubic foot with a maximum of 2500 pounds per, square foot. 8.7 Retaining Wails Cantilever walls (yielding) retaining nonexpansive granular soils may be designed for an active-equivalent fluid pressure of 37 pounds per cubic foot for a level surcharge and 45 pounds per cubic foot for a sloping backfill. Restrained walls (nonylelding) should be designed for an "at-rest" equivalent fluid pressure of 60 pounds per cubic foot. Wall footings should be designed in accordance with the foundation design recommendations. All retaining walls should be provided with adequate backdrainage system. A geocomposite blanket drain such as Miradrain 6000 or equivalent is recommended behind walls. The soil parameters assume a level nonexpansive select granular backfill compacted to a minimum of 90 percent of the laboratory maximum thy density. COAST GEOTECHNICAL BrettFarrow W.O. 686218 Page 20 of 28 8.8 Dynamic (Seismic) Lateral Earth Pressures For proposed, restrained walls (non-yielding), potential seismic loading should be considered. For smooth rigid walls, Wood (1973) expressed the dynamic thrust in the following form: AN = k4yH2 (nonyielding) where kh is /2 peak ground acceleration equal to 50 percent of the design, spectral response acceleration coefficient (Sds) divided by 2.5 per C.B.C. (2007), y is equal to the unit weight of backfill, and H is equal to the height of the wall. The pressure diagram for this dynamic component can be approximated as an inverted..trapezoid with stress decreasing with depth. The point of application of the dynamic thrust is at a height of 0.6 above the base of the wall. The magnitude of the resultant is: APe = 20.3 H2 (nonyielding) This dynamic component should be added to the at-rest static pressure for seismic loading conditions. For cantilever walls (yielding), Seed and Whitman (1970) developed the dynamic thrust as: AN = 3/8 kh?H2 (yielding) COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 21 of 28 The prcssure diagram for this dynamic component can be approximated as an inverted trapezoid with stress decreasing with depth and the resultant at a height of *b.6 above the base of the wall. The magnitude of the resultant is: APe = 7.62 H2 (yielding) This 'dynamic component should be added to the static pressure for seismic loading conditions. 8.9 Settlement characteristics Estimated total and differential settlement over a horizontal distance of 30 feet is expected to be on the order of 1.0- inch and 3h inch, respectively. It should also be noted that long term secondary settlement due to irrigation and loads imposed by structures- is anticipated to be./4inch. .8. 10 Seismic considerations Although the likelihood of ground rupture on the site is remote, the property will be óxposed to moderate to high levels of ground motion resulting from the release of energy should an earthquake occur along the numerous known and unknown faults in the region. The Newport-Inglewood (offshore) Fault 'Zone located approximately 45 miles west of the property is the nearest known active fault, and is considered the dósign fault for the site. In addition to the Newport-Inglewood fault, several other active faults may affect the subject site. Seismic design parameters were determined as part of this investigation in accordance with Chapter 16, Section 1613 of the 2016 California Building Code (CBC) and ASCE 7-10 Standard using the web-based United States Geological Survey (USGS) Seismic Design Tool. The generated results for the parameters are presented on Table 2. COAST GEOTECHMCAL Brett Farrow W.O. 686218 Page 22 of 28 Th1 . Rpi-amie fliipn Parimeters Factors Values Site Class D Seismic Design Category 1/111111 Site Coefficient, F. 1.037 Site Coefficient, F 1.556 Mapped Short Period Spectral Acceleration, Ss 1.158 Mapped One-Period Spectral Acceleration, S1 0.444 Short Period Spectral Acceleration Adjusted for Site Class, SMS 1.2019 One-Second Period Spectral Acceleration Adjusted for Site, SMI 0.691 g Design Short Period Spectral Acceleration, SDS 0.800 g Design One-Second Period Spectral Acceleration, SDI 0.461 g :::j & 11 Preliminary Pavement Design The following preliminary pavement section is recommended for proposed driveways: 4.0 inches of asphaltic concrete on 6.0 inches of select base (Class 2) on 12 inches of compacted subgrade soils or 5.5 inches of concrete on 12 inches of compacted subgrade soils Subgrade soils should be compacted to the thiékness indicated in the structural section and left in a condition to. receive base materials. Class 2 base materials should have a minimum R-value of78 and a minimum sand equivalent of 30. Subgrade soils and base materials should be compacted to a minimum of 95 percent of their laboratory maximum dry density. Concrete. should be reinforced with No. 3 bars placed 18 inches on center in both directions. COAST GEOTECI{NCAL Brett Farrow W.O. 686218 Page 23 of 28 The pavement. section should be protected from water sources. Migration of water into subgrade deposits and base materials could result in pavement failure. & 12 Permeable Interlocking Concrete Payers (PICP,) Permeable Interlocking Concrete Payers (PICP), if proposed, shou14 consider.sevçral design aspects. Foundations adjacent to or in close proximity to PICP should be protected by an impervious membrane extending a minimum of 3.0 lateral feet from the foundation under the pavement. section. The intent is to reduce lateral migration of infiltrated drainage and potential impact on footings. However, this approach is considered less desirable from a geotechnical viewpoint than lining the entire section with an impervious liner. Pavement. underdrains are recommended and should be incorporated in the design for proper collection and disposal of filtrated storm water as indicated on Plate G. If subdrains are not allowed for storm water infiltration by reviewing agencies, the long term effects of infiltrated water on structural foundations and slabs cannot be predicted with any degree of certainty. PICP pavement structural section (Driveways) should consist Of 31/8 inch PICP, over aminiErium of 2.0 inches ofASTM No. 8, bedding course/choke stone, over a minimum of 8.0 inches of AS.TM No. 57 stone base course, over a minimum Of 12 inches of 95 percent compacted .subgrade. Bedding course/choke stone and base course stone should also be well compacted, consolidated, and interlocked (avoid crushing the underdrain pipes) with heavy construction equipment. ASTM No. 8, No. 9 or No. 89 should be used for joint materials, depending On the joint size and per manufacturer recommendations. The above stone base section maybe reduced from 12 inches to a minimum of 6.0 inches for walkways and patios, if desired. The gradational requirements are summarized on Table 3. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 24 of 28 Table 3: Gradational Requirements for ASMT No. 57, No. 8, No. 89, and No.9 Sieve Size Percent Passing No. 57 No. 8 No. 89 No. 9 100 -- -- -- 1" .95 to 100 - -- 25 to 60. 100 100 -- -- 85 to 100 90 to 100 100 No.4 0 to 10 10 to 30 20 to 55 85 to 100 No.8 0to5 OtolO 5to30 10to40 No. 16 - Oto 5 0 to 10' Oto 10 No. 50 -- -- 0to5. 0to5 8.13 Utility Trench We recommend that all utilities be bedded in clean sand to at least one foot above the top of the conduit. The bedding should be flooded in place to fill all -the voids, around the conduit. Imported or on-site granular material compacted to at least 90 percent relative compaction may be utilized for backfill above the bedding. The invert of subsutface utility excavations paralleling footings should be located above the zone of influence of these adjacent footings. This zone of inflüeñce is dèfmed as the area below a 45 degree plane projected down from the nearest bottom edge of an adjacent footing. This can be accomplished by either deepening the footing, raising the invert elevation of the utility, or moving the utility or the footing away from one another. 8.14 Drainage Specific drainage patterns should be designated by the project architect or engineer. However, in general, pad water should be directed. away from foundations and around the 'structure to the street. COAST GEOTEC1-INICAL, Brett Farrow W.O. 686218 Page 25 of 28 Roof water should be collected and conducted to the street via non-eEodible devices. Pad water should not be allowed to pond. Vegetation adjacent to foundations should be avoided. If vegetation in these areas is desired, sealed planter boxes or drought resistant plants should be considered. Other alternative may be available, however, the intent is to reduce moisture from migrating into foundation subsoils. Irrigation should be limited to that amount necessary to sustain plant life. All drainage systems should be inspected and cleaned annually, prior to winter rains. 8.15 Geotechnical Observations Structural footing excavations should be observed by a representative of this firm prior to the placement of 'steel and forms. All fill should be placed while a representative of the geotechnical engineering is present to observe and test. - 8.16 Plan Review A copy of the final plans should be submitted to this office for review prior' to the initiation of constructions. Additional recommendations may be necessary at that time. .9. LIMiTATIONS This report is presented with the provision that it is the responsibility of the owner or the owner's representative to bring the information and recommendations given herein to the attention of the. project's architects and/or engineers so that they may be incorporated into the plans. If conditions encountered during construction appear to differ from those described in this report, our office should be notified so that we may consider whether modifications are needed. No responsibility for construction compliance with design concepts, specifications, or recommendations given in this report is assumed unless on-site review is performed during the course of construction. COAST GEOTEHN1CAL Brett Farrow W.O. 686218 Page 26 of 28 The subsurface conditions, excavation characteristics, and geologic structure described herein are based on individual exploratory excavations made on the subject property. The subsurface conditions, excavation characteristics, and geologic structures discussed should in no way be construed to reflect any variations which may occur among the exploratory excavations. Please note that fluctuations in the level of groundwater may occur due to variations in rainfall, temperature, and other factors not evident at the time measurements were made and reported herein. Coast Geotechnical assumes no responsibility for variations which may occur across the site. The conclusions and recommendations of this report apply as of the current date. In time, however, changes can occur on a property whether caused by acts of man or nature on this or adjoining properties. Additionally, changes in professional standards may be brought about by legislation or the expansion of knowledge. Consequently, the conclusions and recommendations of this report may be rendered wholly or partially invalid by event beyond our control. This report is therefore subject to review and should not be relied upon after the passage of two years. The professional judgements presented herein are founded pertly on our assessment of the technical data gathered, partly on our understanding of the proposed construction, and partly on our general experience in the geotechnical field. However, in no respect do we guarantee the outcome of the project. This study has been provided solely for the benefit of the client, and is in no way intended to benefit or extend any right or interest to any third-party. This report is not to be used on other projects or extensions to this project except by agreement in writing with Coast Geotechnical. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 27 of 28 REFERENCES Blake, T. F. (2000). EQFAULT: A Computer Program for the Deterministic Estimation of Peak Acceleration using Three-Dimensional California Faults as Earthquake Sources, Version 3.0, Thomas F. Blake Computer Services and Software, Thousand Oaks, CA. California Building Standards Commission. (January 1, 2016). 2016 California Building Code California Code of Regulations. California Emergency Management Agency, California Geological Survey, and University of Southern California. (2009). Tsunami Inundation Map for Emergency Planning: San Luis Rey Quadrangle, California, San Diego County, Scale 1:24,000. California Geologic Survey, (1994),Fault Activity Map of California, Map Scale 1"=750,00'. Gregory Geotechnical Software, GSTABL7 with STEDwn (1996, 1999). Slope Stability Analysis System. Kennódy, M; P., and Tan, S. S. (2008). California Geological Survey, Regional Geologic Map No. 3, 1:100,000 scale. Sáhaldan, V., et al. (2017). Seismic Constraints on the Architecture ofthe.Newport-Ing1ewood/Rose Canyon Fault: Implications for the Length and Magnitude of Future Earthquake Ruptures. Ameñcan Geophysical Union. DO!: 10.1002/2016JB013467. Sampo Engineering Inc. (2018). Topographic Plat: 570-580 LagunaDrive, Carlsbad, California, Scale 1" = 20'. COAST GEOTECHNICAL Brett Farrow W.O. 686218 Page 28 of 28 REFERENCES (CONT.) Seed, H.B., and Whitman, R.V. (1970). Design of earth retaining structures for dynamic loads. In Proceedings of the ASCE Special Conference on Lateral Stresses, Ground Displacement and Earth Retaining Structure, Ithaca, N.Y., pp. 1.03-147. Tan, S. S., and Giffen, D. G. (1995). Landslide Hazards in the Northern Part of the San Diego Metropolitan Area, San Diego County, Cálifomia,.OFR 95-04, Plate 35D. Treiman, J. A. (1984). The Rose Canyon Fault.Zone: A Review and Analysis, California Division of Mines and. Geology, Fault Evaluation Report 216. Wood, J.H. (1973). Earthquake-induced soil pressures on structures. Ph.D. thesis, the California Institute of Technology, Pasadena, Calififornia. USGS, U. S. Seismic Design Maps, Scale= Variable. https://earthquake.usgs.gov/designmaps/us/appllcation:php APPENDIX A 8 LZ989—d t 80O6 VD 'pqs.ieJ eua 2Un621 08S-OLS 0 10Z() Vi ptqsp) 601 1!flS 33v jd '°!TI 1V3INH3I10219 ISVO3 APPENDIX.B LABORATORY TESTING AND RESULTS Earth materials encountered in the exploratory trenches were closely examined and sampled for laboratory testing. The laboratory tests were performed in accordance with the generally accepted American Society-for Testing and Materials. (ASTM) test methods. or suggested •procedures. Classification: The field classification was verified through laboratory examination, in accordance with.the Unified Soil Classification System. The final classification is shown on the enclosed Exploratory Logs provided in Appendix B. Grain Size Distribution: The grain size distribution of selected soil samples was determined in accordance with ASTM. D6913-04. The test result is presented on Table 4 and is graphically depicted on the following pages. TABLE 4 Sieve Size 1" 's" #4 f #10 1 #20 J #407[#100 1#200 Location Soil Type Percentage Passing BI @5' 1 100 100 100 j 100 1 99.9 1 98.8! 86.3 1 39.9 f 28.4 Expansion Index Test: An Expansion. Test was performed on the selected sample. The test procedure were conducted in accordance with the Uniform Building Code, Standard No. 29-2 and AIvIST D4829. The classification of expansive soil, based on the expansion index, are as indicated in Table.. 29-C of the Uniform Building. Code. The test result is presented on Table 5, Location . Soil Type Expansion Reading Degree of Saturation Uncorrected Expansion Index (El) Corrected El for 50% Saturation B1@1-5' 1 1 -0.01 1 38.6Sm N/A I N/A. Maximum Dry Density. and Optimum Moisture Content: The maximum dry density and optimum moisture content were determined for selected samples of earth materials taken from the site. The laboratory standardrtests were in accOrdance 'with ASTM D-1557-12. Thetestresültispreseiited on Table 6. TABLE 6 Maximum Dry Optimum Moisture Location Soil Type Density (ym-pcf) Content ((opt-%) B! . l'-5' 1 130.0 9.0 Moisture/Density. The field moisture content and dry unit weight were determined for each of the undisturbed soil samples. Test procedures were conducted in accOrdance with ASTM D7263-09 (Method A). This information is useful in proyiding a gross picture of the soil consistency or variation among exploratory excavation. The field moisture content was determined as a percentage of the dry unit weight: The dry unit weight was determined inpounds per cubicfoot.(pcf). The test results are presented on Table 7. Shear Test Shear tests were perfonfied in a strain-control typedirect shear machme The Iaboratoiy standard tests were in accordance with ASTM D3080 The rate of deformati6#-..w'*****as approximately 0025 inches per, minute açh sample was sheared under varying confining loads in order to determineihe Coulomb shear strength parameters, cohes,ion, and ãnglepfrntemal friction Samples were tested in a saturated condition The test results are presented in Table S TABLE 8 smp1eLD Angle of Internal Frictioi :; Ap$reñUohesion; B-I: @ 9' (ring) 291 degrees 70.*psf B-I.@ 30' (ring) 34degiees 350 psf Sulfate and Chloride Tests: A sulfate test was performed on a selected sample in accordance with California Test Method (CTM) 417, and a chloride test was performed on a selected sample in accordance with California Test Method (CTM) 422. The test results are presented on Tables 9 and 10. TABLE 9 SaMple ID Sulfate Content (ppm) Sulfate Content (% by wgt) B-i @ 1-5' 48 0.005 TABLE 10 Sample ID Chloride Content (ppm) Chloride Content (% by wgt) B-I ® 1.5' 21 0.002 infiltration Testing: Infiltration tests were performed in accordance to ASTM D3385-09. This-test method is useful for field measurement of the infilttátion rate of soils. A stabilized infiltration rate of 2.48 inches per hour was established. The results of our testing are graphically shown on Figure 7. The rates indicated above are actual fates measured in the field and do not include a safety factor. An adequate safety factor as recommended by the project engineer should be incorporated. Field Resistivity Test: Afield resistivity test was performed on a selected sample in aôcordance with California Test Method (CT.M) 643. The field resistivity test gives an indication of the quantity of soluble salts in the soil or water to obtain data estimating the service life of culverts. The test results for pH and field resistivity are presented on Table 11. TABLE 11 p11: 7.6 Water Added (ml) Resistivity (ohm-cm) 10 13000 5 7800 5 6700 5 5600 5 5500 5 5200 5 5500 5 5900 60 years to perforation of a 16 gauge metal culvert.. 78 years to perforation of a 14 gauge metal culvert. 108 years to perforation of a 12 gauge metal culvert. 138 years to perforation of a 10 gauge metal culvert. 168 years to perforation of a 8 gauge metal culvert. SMS Geotechnical Solutions, Inc. Sieve Analysis 5931 Sea Lion place, Suite 109 ASTM 0 6913 - 04 Carlsbad, CA 92010 Sample 1 Project Farrow Job # 686218 Supervising Lab Tech f S p Sample Bi @ 1-5' Soil type 1 Supervising Lab Manager MS Date Tech j WB Address 578 Laguna Drive I Sample WetWt. [584.6 grj Sample Dry Wt. 1 563.5 gr Moisture% 1 3.7' I Seive 152 mm 6" 75 inm 3" 50 mm 2"- 37.5 mm 11/2" 25 mm 1" 19 mm 3/4' 12.5 mm 1/2" 9.5 mm 3/8" 4.75 mm #4 2 m #10 0.85 mm #20 0.6 mm #30 0.425 mm #40 0.15mm #100 0.075 mm #200 Pan Specification D.G. Class 2 100 100 90-100 100 87-100 50-100 30-65 25-55 5-35 5-18 0-12 Accum. Wt. (gr) % Retained % Passing 0.1 0.0 100.0 0.8 0.1 99.9 6.6 1.0 98.8 77.4 12.6 86.3 338.4 46.3 39.9 403.6 11.6 28.4 409.5 1.0 USGS Design Maps Detailed Report ASCE 7-10 Standard (33.165410N, 117.352°W) Site Class D - Stiff Soil", Risk Category I/il/Ill Section 11.4.1 - Mapped Acceleration Parameters Note: Ground motion values provided below, are for the direction of maximum horizontal spectral response acceleration. They .have been converted from corresponding geometric mean ground motions computed by the USGS by applying factors of 1.1 (to obtain S5) and 1.3 (to obtain Si). Maps in the 2010 ASCE-? Standard are provided for Site Class B. Adjustments for other Site Classes are made, as needed, in Section 11.4.3. From Figure 22-:11. 111 SS = 1.158 g From Figure 22-2. (21 S1 = 0.444 g Section 11.4.2 - Site Class The authority having jurisdiction (not thE USGS), site-specific geotechnical data, and/or thedefault has classified the site as Site Class D, based on the site soil properties in accordance with Chapter 20. Table 20.3-1 Site Classification Site Class VS SU Hard Rock >5,000 ft/s N/A N/A Rock - 2,500 to 5,000 ft/s N/A N/A Very dense soil and soft rock 1,200 to 2,500 ft/s >50 >2,000p5f Stiff Soil 600 to 1,200 ft/s .15 to 50 1,000 to 2,090 psf Soft clay soil <600 ft/s <15 <1,000 psf Any proflle with more than 10 ft of soil having the characteristics Plasticity index P1 >20, MoIsture content W 2t 40%, and Undrained shear strength; <500 psf F. Soils requiring site response See Section 20.3.1 analysis In accordance with Section 21.1 For ST: lft/s = 0.3048 m/s llb/ft2 = 0.0479 kN/m2 Section 11.4.3 - Site Coefficients and Risk-Targeted Maximum Considered Earthquake Spectral Response Acceleration Parameters Table 11.4-1: Site Coefficient F6 Site Class Mapped MCE a Spectral Response Acceleration Parameter at Short Period Ss --.0.25 SS = 0.50 SS = 0.75 SS = 1.00 S ?_ 1.25 A 0.8 0.8 0.8 0.8 0.8 B 1.0 1.0 1.0 1.0 1.0 E 1.1 1.0 E ' 1.1 E F See Section 11.4.7 of ASCE 7 Note: Use straight-line interpolation for intermediate values of S For Site Class = D and Ss = 1.158 g, F6 = 1.037 Table 11.4-2: Site Coefficient F, Site Class Mapped MCE R Spectral Response Acceleration Parameter at 1-s Period S, :S 0.10 S1 = 0.20 S = 0.30 S1 = 0.40 S1 0.50 A 0.8 0.8 0.8 0.8 0.8 B 1.0 1.0 1.0 1.0 1.0 1.4 E 1.5 ' 1.6 E F See Section 11.4.7 of ASCE 7 Note: Use straight-line interpolation for intermediate values of S1 For Site Class = D and S1 = 0.444 g, F, = 1.556 Section 11.8.3 - Additional Geotechnical Investigation Report Requirements for Seismic Design Categories D through F From Figure 22-7 [41 PGA = 0.460 Equation (11.8-1): PGAM = FPGAPGA = 1.040 x 0.460 = 0.478 9 Table 11.8-1:.Site Coefficient FmA Site Mapped MCE Geometric Mean Peak Ground Acceleration, PGA Class PGA 5 PGA = PGA = PGA = PGA 0.10 0.20 0.30 0.40 0.50 A 0.8 0.8 0.8 0.8 0.8 B 1.0 1.0 1.0 1.0 1.0 C 1.2 1.2 1.1 1.0 1.0 D 1.6 1.4 1.2 1.1 1.0. E 2.5 1.7 1.2 0.9 0.9 F See Section -11.4.7 of ASCE 7 Note: Use straight-line interpolation for intermediate values of PGA For Site Class = P and PGA = 0.460 g, FpG,, = 1.040 Section 21.2.1.1 - Method 1 (from chapter 21 - Site-Specific Ground Motion Procedures for Seismic Design) From Figure 22-17 E51 CRS = 0.940 From Figure 22-18163 CRI = 0.991 Section 11.6 - Seismic Design Category Table 11.6-1 Seismic Desian Cateaory Based on Short Period Resoonce Acceleration *Parameter VALUE OF SOS RISK CATEGORY loril III IV Scs < 0.167g A A A 0.167g S Sos < 0.33g B B C 0.33gSD <0.50g C C D °•509Sos D D D For Risk Category = I and Sos = 0.800g, Seismic Design Category = D Table 11.6-2 Seismic Design Category Based on 1-S Period Response Acceleration Parameter VALUE OF Ss RISK CATEGORY lorli III IV S01 < 0.067g A A A 0.0679 S1 < 0.133g B B C $01 < O.20g !tg C C 0 D S01 D D For Risk Category = I and Sol = 0.461. g, Seismic Design Category = D Note: When S1 is greater than or equal to 0.75g, the Seismic Design Category Is E for buildings in Risk Categories I, II, and III, and F for those In Risk Category IV, Irrespective of the above. Seismic Design Category 'the more severe design category in accordance with Table 11.6-1 or 11.6-2" = D Note: See Section 11.6 for alternative approaches to calculating Seismic Design Category. References Figure 22-1: https://earthquake.usgs.gov/hazards/desjgnrnaps/downioads/pdfs/20jo ASCE-7 Figure 22- 1.pdf Figure 22-2: https ://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2o1o_AscE7Figure22_2.pf figure 22-12: https://earthquake.usgs.gov/hazards/designrnaps/downloads/pdfs/2o1o_AscE 7..Figure....22- 12.pdf Figure 22-7: https://earthquake.usgs.gov/hazards/de5ignmaps/downloads/pdfs/2o1opcE7 Figure 22-7 pdf S. Figure 22-17: https ://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2Q1opcE 7_Figure_22-17.pdf 6. FIgure 22-18: https ://earthquake.usgs.gov/hazards/designrnaps/downloads/pd/2o1oAsc 7_Figure_22- 18.pdf APPENDIX C C:\stedwin\p-686218.OUT Page 1 GSTABL7 *** ** GSTABL7 by Garry If. Gregory, P.E. ** Original Version 1.0, January 1996; Current Version 2.0, September 2001 ** (All Rights Reserved-Unauthorized Use Prohibited) SLOPE STABILITY ANALYSIS SYSTEM Modified Bishop, Simplified Jambu, or GLE Method of Slices. (Includes Spencer & Morgenstern-Price Type Analysis) Including Pier/Pile, Reinforcement, Soil Nail, Tieback, Nonlinear Undrained Shear Strength, Curved Phi Envelope, Anisotropic Soil, Fiber-Reinforced Soil, Boundary Loads, Water Surfaces, Pseudo-Static Earthquake, and Applied Force Options. **V*** ******** **** ******* ********* ***** ********************************V**+* k**** Analysis Run Date: 4/3/2018 Time of Run: 6:09PM Run By: MB/Vs Input Data Filename: C:p-686218. Output Filename: C:p-686218.OUT Unit System: English Plotted Output Filename: C:p-686218.PLT PROBLEM DESCRIPTION: LAGOON P-686218 BOUNDARY COORDINATES 9 Top Boundaries 9 Total Boundaries Boundary X-Left Y-Left X-Right Y-Right Soil Type No. (ft) (ft) (ft) (ft) Below Bnd 1 0.00 25.00 5.00 25.00 2 2 5.00 25.00 11.00 30.00 2 3 11.00 30.00 27.00 40.00 2 4 27.00 40.00 40.00 50.00 1 5 40.00 50.00 57.00 60.00 1 6 57.00 60.00 70.00 62.00 1 7 70.00 62.00 100.00 63.00 1 8 100.00 63.00 136.00 63.00 1 9 136.00 63.00 182.00 64.00 1 ISOTROPIC SOIL PARAMETERS 2 Type(s) of Soil Soil Total Saturated Cohesion Friction Pore Pressure Pier. Type Unit Wt. Unit Wt. Intercept Angle Pressure Constant Surface No. (pcf) (pcf) (psf) (deg) Param. (psf) No. 1 116.0 122.0 70.0 29.0 0.00 0.0 0 2 120.0 128.0 350.0 34.0 0.00 0.0 0 A Critical Failure Surface Searching Method, Using A Random Technique For Generating Circular Surfaces, Has Been Specified. 1250 Trial Surfaces Have Been Generated. 25 Surfaces Initiate From Each Of 50 Points Equally Spaced Along The Ground Surface Between X - 28.00(ft) and X = 45.00(ft) Each Surface Terminates Between X. = 70.00(ft) and X = 110.00(ft) Unless Further Limitations Were Imposed, The Minimum Elevation At Which A Surface Extends Is Y = 0.00(ft) 5.00(ft) Line Segments Define Each Trial Failure Surface. Following Are Displayed The Ten Most Critical Of The Trial Failure Surfaces Evaluated. They Are Ordered - Most Critical First. + * Safety Factors Are Calculated By The Modified Bishop Method " * Total Number of Trial Surfaces Evaluated = 1250 Statistical Data On All Valid FS Values: FS Max 8.025 FS Mm = 1.513 FS Ave = 3.582 Standard Deviation = 1.278 Coefficient of Variation = 35.68 % Failure Surface Specified By 11 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 29.39 41.04 2 34.14 43.38 C:\stedwin\p-686218.OUT Page 2 Factor of safety 1.513 Individual data on the I Water Water Force Force I Weight Top Bot (lbs) (lbs) (lbs) 583.6 0.0 0.0 1675.3 0.0 0.0 568.1 0.0 0.0 1932.8 0.0 0.0 2888.5 0.0 0.0 3144.6 0.0 0.0 3286.6 0.0 0.0 5.6 0.0 0.0 2839.0 0.0 0.0 1858.1 0.0 0.0 831.7 0.0 0.0 16.0 0.0 0.0 24.2 0.0 0.0 re Surface Specified By 11 nt X-Surf Y-Surf (ft) (ft) 28.00 40.77 32.68 42.52 37.33 44.38 41.93 46.33 46.49 48.38 51.00 50.54 55.47 52.78 59.88 55.13 64.25 57.57 68.56 60.10 71.73 62.06 e Center At X = -50.8 ; Y Factor of Safety 1.520 *** ire Surface Specified By 12 nt X-Surf Y-Surf (ft) (ft) 28.69 41.30 33.66 41.88 38.57 42.81 43.41 44.07 48.15 45.67 52.77 47.59 P 57.24 49.83 61.54 52.37 65.66 55.21 69.57 58.33 73.25 61.71 73.64 62.12 .e Center At X = 22.9 ; Y Factor of Safety +4 1.521 Failure Surface Specified By 11 3 38.85 45.08 4 43.49 46.94 5 48.06 48.96 6 52.56 51.13 7 56.99 53.46 8 61.34 55.93 9 65.60 58.54 10 69.77 61.30 11 70.78 62.03 Circle Center At X -13.8 ; Y = 258.3 and Radius, 231.4 Coordinate Points = 112.8 and Radius, 71.7 Coordinate Points = 183.0 and Radius, 147.6 3 slices Tie Tie Earthquake 'orce Force Force Surcharge loris Tan Nor Vex Load (lbs) (lbs) (lbs) (lbs) (lbs) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Coordinate Points 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Slice Width No. (ft) 1. 4.8 2 4.7 3 1.2 4 3.5 5 4.6 6 4.5 7 4.4 8 0.0 9 4.3 10 4.3 11 4.2 12 0.2 13 0.8 Failu Poi No 1 2 3 4 5 6 .7 8 9 10 11 Circi C:\stedwin\p-686218.OUT Page 3 Point X-Surf 1-Surf No. (It) (ft) 1 28.69 41.30 2 33.69 41.32 3 38.67 41.83 .1 43.57 42.83 5 48.34 44.31 6 52.95 46.26 7 57.34 48.66 8 61.46 51.48 9 65.29 54.69 10 68.79 58.27 11 71.81 62.06 Circle Center At X = 31.0 ; I = 91.6 Factor of Safety ** 1.525 *** Failure Surface Specified By 11. Coordinate Point'X-Surf Y-Surf No. (ft) (ft) 1 28.69 41.30 2 33.46 42.82 3 38.17 44.48 4 42.84 46.26 5 47.45 48.22 6 52.00 50.29 7 56.49 52.49 8 60.91 54.82 9 65.27 57.28 10 69.54 59.87 11 72.99 62.10 Circle Center At X -20.6 ; I = 204.1 Factor of Safety *** 1.535 *** Failure Surface Specified By 11 Coordinate Point X-Surf 1-Surf No. (It) (It) 1 29.39 41.84 2 34.39 41.74 3 39.37 42.18 4 44.27 43.15 5 49.05 44.64 6 53.63 46.63 7 57.98 49.09 8 62.04 52.01 9 65.77 55.35 10 69.11 59.06 11 71.27 62.04 Circle Center At X = 32.8 ; I = 88.4 Factor of Safety 1.548 *** Failure Surface Specified By II .Coordinate Point X- Surf Y-Sürf No. (ft) (ft.) 1 28.69 41.30 2 33.39 43.02 3 38.05 44.83 4 42.67 46.75 5 47.25 48.76 6 51.78 50.88 7 56.26 53.09 8 60.70. 55.40 9 65.08 57.80 10 69.41 60.30 11 72.35 62.08 Circle Center At X -48.1 ; 1 259.0 Factor of Safety and Radius, 50.4 Points and Radius, 170.1 Points and Radius, 46.7 Points and Radius, 230.8 C:\stedwin\p-686218.OUT Page 4 1.548 Failure Surface Specified By 12 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 28.35 41.04 2 33.34 41.29 3 38.30 41.93 4 43.19 42.96 5 .47.99 44.35 6 52.67 46.12 7 57.20 48.24' 8 61.55 50.71 9 65.69 53.51 10 69.61 56.61 11 73.28 60.01 12 75.27 62.18 Circle Center At.X = 27.6 ; Y = 105.3 and Radius 64.3 Factor of Safety 4*, 1.567 4*4 Failure Surface Specified By 11 Coordinate Points Point X-Surf Y-S.urf No. (ft) (ft) 1 28.00 40.77 2 32.59 42.75 3 37.16 44.77 4 41.72 46.84 5 46.25 48.95 6 50.76 51.10. 7 55.26 53.29 8 59.73 55.53 9 64.18 57.80 10 68.61 60.12 11 72.28 62.08 Circle Center At X = -183.0 ;'Y 536.1 and Radius, 5.38.4 Factor of Safety *** 1.582 *** Failure Surface Specified By 12 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 29.04 41.57 2 34.04 41.35, 3 39.03 41.63 4 43.97 42.42 5 48.80 43.70 6 53.48 45.47 7 .57.95 47.70 8 62.18 50.37 9 66.11 53.46 10 69.71 56.93 11 72.94 60.75 12. 73.89 62.13 Circle Center At X 33.8 ; = 90.4 and Radius, 49.1 Factor of Safety *** 1.609 END OF GSTABL7 OUTPUT C:\stedwin\p-686218.OuT Page 1 *** GSTABL7 ** ** GSTABL7 by Garry H. Gregory, P.E. ** Original Version 1.0, January 1996; Current Version 2.0, September 2001 ** (All Rights Reserved-Unauthorized Use Prohibited) ********* ********************4****** **************************************** 44*4* SLOPE STABILITY ANALYSIS SYSTEM Modified Bishop, Simplified Janbu, or OLE Method of Slices. (Includes Spencer & Morgenstern-Price Type Analysis) Including Pier/Pile, Reinforcement, Soil Nail, Tieback, Nonlinear Undrained Shear Strength, Curved Phi Envelope, Anisotropic Soil, Fiber-Reinforced Soil, Boundary Loads, Water Surfaces, Pseudo-Static Earthquake, and Applied Force Options. * * 44444 + * 4 * 4 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 4 * * * * * * * * * * * * * * * * * * * * * * Analysis Hurt Date: 4/3/2018 Time of Run: 6:05PM Run By: MB/VS Input Data Filename: C:p-686218. Output Filename: C:p-686218.OUT Unit System: English Plotted Output Filename: C:p-686218.PLT PROBLEM DESCRIPTION: LAGOON P-666218 BOUNDARY COORDINATES 9 Top Boundaries 9 Total Boundaries Boundary X-Left Y-Left X-Right Y-Right Soil Type No. (ft) (ft) (It) (ft) Below and 1 0.00 25.00 5.00 25.00 2 2 5.00 25.00 11.00 30.00 2 3 11.00 30.00 27.00 40.00 2 4 27.00 40.00 40.00 50.00 1 5 40.00 50.00 57.00 60.00 1 6 57.00 60.00 70.00 62.00 1 7 70.00 62.00 100.00 63.00 1 8 100.00 63.00 136.00 63.00 1 9 136.00 63.00 182.00 64.00 1 ISOTROPIC SOIL PARAMETERS 2 Type(s) of Soil Soil Total Saturated Cohesion Friction Pore Pressure Piez. Type Unit Wt. Unit Nt. Intercept Angle Pressure Constant Surface No. (pcf) (pcf) (psf) (deg) Param. (pat) No. 1 116.0 122.0 70.0 29.0 0.00 0.0 0 2 120.0 128.0 350.0 34.0 0.00 0.0 0 A Horizontal Earthquake Loading Coefficient Of0.160 Has Been Assigned A Vertical Earthquake Loading Coefficient OfO.000 Has Been Assigned Cavitation Pressure = O.O(psf) A Critical Failure Surface Searching Method, Using A Random Technique For Generating Circular Surfaces, Has Been Specified. 1250 Trial Surfaces Have Been Generated. 25 Surfaces Initiate From Each of 50 Points Equally Spaced Along The Ground Surface Between X 28.00(ft) and X = 45.00(ft) Each Surface Terminates Between X = 70.00(ft) and X 110.00(ft) Unless Further Limitations Were Imposed, The Minimum Elevation At Which A Surface Extends Is Y = 0.00(ft) 5.00(ft) Line Segments Define Each Trial Failure Surface. Following Are Displayed The Ten Most Critical Of The Trial Failure Surfaces Evaluated. They Are Ordered - Most Critical First. * * Safety Factors Are Calculated By The Modified Bishop Method * * Total Number of Trial Surfaces Evaluated = 1250 Statistical Data On All Valid FS Values: PS Max = 3.436 FS Mm - 1.087 FS Ave - 2.097 Standard Deviation 0.545 Coefficient of Variation = 25.99 % 4 slices Tie Tie Earthquake orce Force Force Surcharge lorm Tan Mor Ver Load lbs) (lbs) (lbs) (lbs) (lbs) 0.0 0.0 149.3 0.0 0.0 0.0 0.0 425.7 0.0 0.0 0.0 0.0 170.9 0.0 0.0 0.0 0.0 467.3 0.0 0.0 0.0 0.0 750.2 0.0 0.0 0.0 0.0 815.7 0.0 0.0 0.0 0.0 794.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 0.0 0.0 740.2 0.0 0.0 0.0 0.0 551.8 0.0 0.0 0.0 0.0 352.8 0.0 0.0 0.0 0.0 27.6 0.0 0.0 0.0 0.0 110.7 0.0 0.0 0.0 0.0 1.4 0.0 0.0 Coordinate Points C:\stedwin\p-686218.OUT Page 2 Failure Surface Specified By 12 Point X-Surf Y-Surf No. (ft) (ft) 1 28.69 41.30 2 33.66 41.88 3 38.57 42.81 4 43.41 44.07 5 48.15 45.67 6 52.77 47.59 7 57.24 49.83 8 61.54 52.37 9 65.66 55.21 10 69.57 58.33 U 73.25 61.71 12 73.64 62.12 Circle Center At X = 22.9 ; Y Factor of Safety *** 1.087 +** Individual data on the Water Water Force Force Slice Width Weight Top Bot No. (ft) (lbs) (lbs) (lbs) 1 5.0 933.3 0.0 0.0 2 4.9 2660.8 0.0 0.0 3 1.4 1067.9 0.0 0.0 4 3.4 2920.3 0.0 0.0 5 4.7 4688.9 0.0 0.0 6 4.6 5098.3 0.0 0.0 7 4.2 4962.5 0.0 0.0 8 0.2 281.2 0.0 0.0 9 4.3 4626.1 0.0 0.0 10 4.1 3448.9 0.0 0.0 11 3.9 2205.0 0.0 0.0 12 0.4 172.8 0.0 0.0 13 3.3 692.0 0.0 0.0 14 0.4 9.0 0.0 0.0 Failure Surface Specified By 11 Point X-Surf Y-Surf No. (ft) (ft) 3. 29.39 41.84 2 34.14 43.38 3 38.85 45.08 4 43.49 46.94 S 48.06 48.96 6 52.56 51.13 7 56.99 53.46 8 61.34 55.93 9 65.60 58.54 10 69.77 61.30 11 70.78 62.03 Circle Center At X -13.8 ; Y Factor of Safety 4** 1.090 *** Failure Surface Specified By 11 Coordinate Points 112.8 and Radius, 71.7 183.0 and Radius, 147.6 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 28.00 40.77 2 32.68 42.52 3 37.33 44.38 4 41.93 46.33 5 46.49 48.38 6 51.00 50.54 7 55.47 52.78 8 59.88 55.13 9 64.25 57.57 C:\stedwin\p-686218.OUT Page 3 10 68.56 60.10 11 71.73 62.06 Circle Center At X = -50.8 ; I = 258.3 and Radius, 231.4 Factor of Safety *** 1.092 *** Failure Surface Specified By 11 Coordinate Points Point X-Surf I-Surf No. (ft) (ft) 1 28.69 41.30 2 33.46 42.82 3 38.17 44.48 4 42.84 46.28 5 47.45 48.22 6 52.00 50.29 7 56.49 52.49 8 60.91 5.4.82 9 65.27 57.28 10 69.54 59.87 11 72.99 62.10 Circle Center At X = -20.6 ; Y = 204.1 and Radius, 170.1 Factor of Safety 1.094 *** Failure Surface Specified By 11 Coordinate Points Point X-Surf X-Surf No. (ft) (ft) 1 28.69 41.30, 2 33.69 41.32 3 38.67 41.83 4 43.57 42.83 S 48.34 44.3.1 6 52.95 46.26 7 57.34 48.66 8 61.46 51.48 9 65.29 54.69 10 68.79 58.27 11 71.81 62.06 Circle Center At •X 31.0 ; I = 91.6 and Radius, 50.4 Factor of Safety *** 1.105 *** Failure Surface Specified By 11 Coordinate Points Point X-Surf I-Surf No. (ft) (ft) 1 28.69 41.30 2 33.39 43.02 3 38.05 44.83 4 42,. 67 46.75 5 47.25 48.76 6 51.78 50.88 7 56.26 53.09 8 60.70 55.40 9 65.08 57.80 10 69.41 60.30 11 72.35 62.08 Circle Center At X = -48.1 ; Y = 259.0 and Radius, 23.0.8 Factor of Safety *** 1.107 *** Failure Surface Specified By 12 Coordinate Points Point X-Surf I-Surf NO. (it) (ft) 1 28.35 41.04 2 33.34 41.29 3 3830 41.93 4 43.19 42.96 5 47.99 44.35 6 5267 46.12 7 57.20 48.24 C:\5tedwin\p-686218.0UT Page 4 8 61.55 50.71 9 65.69 53.51 10 69.61 56.61 11 73.28 60.01 12 75.27 62.18 Circle Center At X 27.6 ; Y = 105.3 and Radius, 64.3 Factor of Safety *** 1.114 Failure Surface Specified By 11 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 29.39 41.84 2 34.39 41.74 3 39.37 42.18 4 44.27 43.15 5 49.05 44.64 6 53.63 16.63. 7 57.98 49.09 8 62.04 52.01 9 65.77 55.35 10 69.11 59.06 11 71.27 62.04 Circle Center At X = 32.8 ; Y = 88.4 and Radius, 46.7 Factor of Safety 1.122 Failure Surface Specified By 11 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 28.00 40.77 2 32.59 42.75 3 37.16 44.77 4 41.72 46.84 5 46.25 48.95. 6 50.76 51.10 7 55.26 53.29 8 59.73 55.53 9 64.18 57.80 10 68.61 60.12 11 72.28 62.08 Circle Center At X = -183.0 ; Y = 536.1 and Radius, 538;4 Factor of Safety ** 1.133 Failure Surface Specified By 11 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 30.08 42.37 2 34.82 43.97 3 39.52 45.66 4 44.19 47.46 5 48.82 49.35 6 53.40 51.34 7 57.95 53.43 8 62.44 55.62 9 66.89 57.90 10 71.29 60.28 11 74.59 62.15 Circle Center At X = -42.2 ; Y = 265.1 and Radius, 234.2 Factor of Safety * 1.149 END OF GSTABL7 OUTPUT '' APPENDIX D Grading Guidelines Grading should be performed to at least the minimum requirements of the local governing agencies, the California Building Code, 2016, the geotechnical report and the guidelines presented below. All of the guidelines may not apply to a specific site and additional recommendations may be necessary during the grading phase. Site Clearing Trees, dense vegetation, and other deleterious materials should be removed from the site. Non-organic debris or concrete may be placed in deeper fill areas under direction of the Soils engineer. Subdrainage During grading, the Geologist and Soils Engineer should evaluate the necessity of placing additional drains. All subdrainage systems should be observed by the Geologist and Soils Engineer during construction and prior to covering with compacted fill. Consideration should be given to having subdrains located by the project surveyors. Outlets should be located and protected. Treatment of Existing Ground All heavy vegetation, rubbish and other deleterious materials should be disposed of off site. All surficial deposits including alluvium and colluvium should be removed unless otherwise indicated in the text of this report. Groundwater existing in the alluvial areas may make excavation difficult. Deeper removals than indicated in the text of the report may be necessary due to saturation during winter months. Subsequent to removals, the natural ground should be processed to a depth of six inches, moistened to near optimum moisture conditions and compacted to fill standards. Fill Placement Most site soil and bedrock may be reused for compacted fill; however, some special processing or handling may be required (see report). Highly organic or contaminated soil should not be used for compacted fill. Material used in the compacting process should be evenly spread, moisture conditioned, processed, and compacted in thin lifts not to exceed six inches in thickness to obtain a uniformly dense layer. The fill should be placed and compacted on a horizontal plane, unless otherwise found acceptable by the Soils Engineer. If the moisture content or relative density varies from that acceptable to the Soils engineer, the Contractor should rework the fill until it is in accordance with the following: Moisture content of the fill should be at or above optimum moisture. Moisture should be evenly distributed without wet and dry pockets. Pre-watering of cut or removal areas should be considered in addition to watering during fill placement, particularly in clay or dry surficial soils. Each six inch layer should be compacted to at least 90 percent of the maximum density in compliance with the testing method specified by the controlling governmental agency. In this case, the testing method is ASTM Test Designation D-1557-91. Side-hill fills should have a minimum equipment-width key at their toe excavated through all surficial soil and into competent material (see report) and tilted back into the hill. As the fill is elevated, it should be benched through surficial deposits and into competent bedrock, or other material deemed suitable by the Soils Engineer. Rock fragments less than six inches in diameter may be utilized in the fill, provided: They are not placed in concentrated pockets; There is a sufficient percentage of fine-grained material to surround the rocks; The distribution of the rocks is supervised by the Soils Engineer. Rocks greater than six inches in diameter should be taken off site, or placed in accordance with the recommendations of the Soils Engineer in areas designated as suitable for rock disposal. In clay soil large chunks or blocks are common; if in excess of six (6) inches minimum dimension then they are considered as oversized. Sheepsfoot compactors mother suitable methods should be used to break the up blocks. The Contractor should be required to obtain a minimum relative compaction of 90 percent out to the finished slope face of fill slopes. This may be achieved by either overbuilding the slope and cutting back to the compacted core, or by direct compaction of the slope face with suitable equipment. If fill slopes are built "at grade" using direct compaction methods then the slope construction should be performed so that a constant gradient is maintained throughout construction. Soil should not be "spilled" over the slope face nor should slopes be "pushed out" to obtain grades. Compaction equipment should compact each lift along the immediate top of slope. Slopes should be back rolled approximately every 4 feet vertically as the slope is built. Density tests should be taken periodically during grading on the flat surface of the fill three to five feet horizontally from the face of the slope. In addition, if a method other than over building and cutting back to the compacted core is to be employed, slope compaction testing during construction should include testing the outer six inches to three feet in the slope face to determine if the required compaction is being achieved. Finish grade testing of the slope, should be performed after construction is complete. Each day the Contractor should receive a copy Of the Soils Engineer's "Daily Field Engineering Report" which would indicate the results of field density tests that day. Fill over cut slopes should be constructed in the following manner: All surficial soils and weathered rock materials should be removed at the cut-fill interface. A key at least I equipment width wide (see report) and tipped at least 1 foot into slope should be excavated into competent materials and observed by the Soils Engineer or his representative. The cut portion of the slope should be constructed prior to fill placement to evaluate if stabilization is necessary, the contractor should be responsible for any additional earthwork created by placing fill prior to cut excavation. Transition lots (cut and fill) and lots above stabilization fills should be capped with a four foot thick compacted fill blanket (or as indicated in the report). Cut pads should be observed by the Geologist to evaluate the need for overexcavation and replacement with fill. This may be necessary to reduce water infiltration into highly fractured bedrock or other permeable zones, and/or due to differing expansive potential of materials beneath a structure. The overexcavation should be at least three feet. Deeper overexcavation may be recommended in some cases. Exploratory backhoe or dozer trenches still remaining after site removal should be excavated and filled with compacted fill if they can be located. Grading Observation and Testing Observation of the fill placement should be provided by the Soils Engineer during the progress of grading. in general, density tests would be made at intervals not exceeding two feet of fill height or every 1,000 cubic yards of fill placed. This criteria will vary depending on soil conditions and the size of the fill. In any event, an adequate number of field density tests should be made to evaluate if the required compaction and moisture content is generally being obtained. Density tests may be made on the surface material to receive fill, as required by the Soils Engineer. Cleanouts, processed ground to receive fill, key excavations, subdrains and rock disposal should be observed by the Soils Engineer prior to placing any fill. It will be the Contractor's responsibility to notify the Soils Engineer when such areas are ready for observation. A Geologist should observe subdrain construction. A Geologist should observe benching prior to and during placement of fill. Utility Trench Backfill Utility trench backfill should be placed to the following standards: Ninety percent of the laboratory standard if native material is used as backfill. As an alternative, clean sand may be utilized and flooded into place. No specific relative compaction would be required; however, observation, probing, and if deemed necessary, testing may be required. Exterior trenches, paralleling a footing and extending below a 1:1 plane projected from the outside bottom edge of the footing, should be compacted to 90 percent of the laboratory standard. Sand backfill, unless it is similar to the inplace fill, should not be allowed in these trench-backfill areas. Density testing along with probing should be accomplished to verify the desired results. Page Left Intentionally Blank Attachment le Pollutant Control BMP Design Worksheets I Calculations 41, BiP I c.S' updated fr' i> 06/08/2020 ?CV.vS 3E:cZc - SE cv, o A,-r '6E of PAJgcS C11tLH3E1 n) ZJV ... S..) • 54D4$ — 2?5' • ?0t. $f2 9it) 2.2A o 0.1 of, cL , ';. 11.. SF oi Fr 11b1Ic 1. 'I () .cse&r 250 CF - h.'i r'''-' "ff. ra SL 2. i?Qr 1 •vS tci5 SF crtJ A-' 5Dkgt F YhJERS (Tkts.a4651 L(.4TID.4') C+$A- se 4,1\0,j AS 46ouE ci (V t 016 6F C,V :. t,cIcsFx oifi1. bCVg EQ 191 (%40&vA ili-er 355 CF V 4t' . R,vi C5 FPf) foe.ft% i-q , 1E 516W (,%(prmmio,J ifrT& /. 24 bg#v4 — 4tIRa *i'll( (Is4u'.E rEeF PIPE) I, 3-(piier) - q ( ç 9se Ar 33') = CAP -L SAavE AS vvPt - Appendix E: BMP Design Fact Sheets Manual Catcgor Infiltration 1-1ov-thru Treatment Control Applicable Performance Standard Pollutant Control Flow Control Primary Benefits Volume Reduction Peak Flow Attenuation Location: Kellogg Park, San Diego, California Description Permeable pavement is pavement that allows for percolation through void spaces in the pavement surface into subsurface layers. The subsurface layers are designed to provide storage of storm water runoff so that outflows, primarily via infiltration into subgrade soils or release to the downstream conveyance system, can be at controlled rates. Varying levels of storm water treatment and flow control can be provided depending on the size of the permeable pavement system relative to its drainage area, the underlying infiltration rates, and the configuration of outflow controls. Pollutant control permeable pavement is designed to receive runoff from a larger tributary area than site design permeable pavement (see SD-SB). Pollutant control is provided via infiltration, filtration, sorption, sedimentation, and biodegradation processes. Typical permeable pavement components include, from top to bottom: Permeable surface layer Bedding layer for permeable surface Aggregate storage layer with optional underdrain(s) Optional final filter course layer over uncompacteci existing suhgradc E-48 February 2016 Appendix E: BMP Design Fact Sheets CURB CLEANOU' (OPTIONAL / I PLAN NOT TO SCALE CURB CLEANOUT (OPTIONAL) PERMEABLE SURFACE LAYER BASED ON PEDESTRIAN/TRAFFIC NEEDS BEDDING LAYER MIN. 6" DIAMETER UNDERDRAIN (OPTIONAL) YIN. 3" AGGREGAT\'YM BELOW UNDERORAIN -' EXISTING UNCOMPACTED SOILS MEDIA LAYER (OPTIONAL). FILTER COURSE FOR MEDIA LAYER SEPARATION (OPTIONAL) YIN, 6" AGGREGATE STORAGE FILTER COURSE (OPTIONAL) SECTION A-A' NOT TO SCALE Typical plan and Section view of a Permeable Pavement BMP Subcategories of permeable pavement include modular paver units or paver blocks, pervious concrete, E-49 February 2016 Appendix E: BMP Design Fact Sheets porous asphalt, and turf payers. These subcategory variations differ in the material used for the permeable surface layer but have similar functions and characteristics below this layer. 'DesIgnA&apIatI,nsfóProjectGoaIs. Site design BMP to reduce impervious area and DCV. See site design option SD-6B. Full infiltration BMP for storm water pollutant control. Permeable pavement without an underdrain and without impermeable liners can be used as a pollutant control BMP, designed to infiltrate runoff from direct rainfall as well. as runoff from adjacent areas that' are tributary to the pavement. The system must be designed with an infiltration storage volume (a function of the aggregate storage volume) equal to the full DCV and able to meet drawdown time limitations. Partial infiltration BMP with flow-thru treatme$r-storm water pollutant control. Permeable pavement can be designed so that a portion pf-tlibCV is infiltrated by providing an underdrain with infiltration storage below the AfaGn invert. The infiltration storage depth should be determined by the volume that can e- infiltrated within drawdown time limitations. Water discharged through the pefain is considered flow-thru 'treatment and is not considered bioulitration treatment-'Sbrage provided above the underdrain invert is included in the flow-thru treatment Flow-thru treatment BMP for storm water pollutant contro1. The system may be lined and/or installed over impermeable native soils with an underdrain provided at the bottom to carry away filtered runoff. Water quality treatment is providedyia-(init treatment processes other than infiltration. This configuration is considered to pyid(flow-thru treatment, not biofiltration treatment. Significant aggregate storage provd4ove the underdrain invert can provide detention storage, which can be controlled via ik eion of an orifice in an outlet structure at the downstream end of the underdrain: PDPs ha.il1 option to add saturated storage to the flow-thru configuration in order to reducee15CV that the BMP is 'required to treat. Saturated storage can be added to this design by inJing an upturned elbow installed at the downstream end of the underdrain or via an internaJ,Tr structure designed to maintain a specific water level elevation. The DCV can be reduced bylr(amount of saturated -storage provided. - Integrated, storm water flow co Lantlollutant control configuration. With any of the above configurations, the sy c-fitr designed to provide flow rate and duration control. This may include having a dpriegatc storage layer that allows for significant detention storage above the Flow-thru treatment control BMP is not an option as a structural BMP. Carlsbad has not adopted an Alternative Compliance Program. E-50 February 2016 Appendix E: BMP Design Fact Sheets underdrain, which can be further controlled via inclusion of an outlet structure at the downstream end of the underdrain. Design Criteria and Considerations Permeable pavements must meet the following design criteria. Deviations from the below criteria may be apptoved at the discretion of the City Engineer if it is determined to be appropriate: Siring and Design Intent/Rationale Placement observes geotechnical recommendations regarding potential hazards (e.g., slope stability, landslides, liquefaction Must not negatively impact existing site zones) and setbacks (c.g., slopes, foundations, gcotechnical concerns. utilities). Selection must be based on infiltration Pull or partial infiltration designs must be feasibility criteria. supported by drainage area feasibility findings. Lining prevents storm water from An impermeable liner or other hydraulic impacting groundwater and/or sensitive 0 restriction layer is included if site constrnts environmental or gcotcchnical features. indicate that infiltration should not be allowed. Incidental infiltration, when allowable, "lot can aid in pollutant removal and groundwater recharge. Permeable pavement is not placed in an area Leaves and organic debris can clog the 13" with significant overhanging trees or other pavement surface. vegetation. For pollutant control permeable pavement, the Higher ratios increase the potential for ratio of the total drainage area (including the clogging but may be acceptable for X. 0 permeable pavement) to the permeable relatively clean tributary areas. IA1 pavement should not exceed 4:1. ç — - Finish grade of the permeable pavement has a Flatter surfaces facilitate increased runoff Tb $- slope 5%. capture. 6 A minimum separation facilitates SKAZO Minimum depth to groundwater and bedrock infiltration and lessens the risk of > 1 fl fr negative groundwater impacts. j/ Contributing tributary area includes effective Sediment can clog the pavement surface. sediment source control and/or pretreatment E-51 February 2016 Appendix E: BMP Design Fact Sheets Siting and Design Intent/Rationale measures such as raised curbed or grass filter strips. Direct discharges to permeable pavement are Roof runoff typically carries Less ,, only from downspouts carrying "clean" roof sediment than runoff from other L_J runoff that are equipped with filters to eemove impervious surfaces and is less likely to gross solids, clog the pavement surface. Permeable Surface Layer Permeable surface layer type is appropriately Pavement miy wear more quickly if not El' chosen based on pavement use and expected durable for expected loads or vehicular loading. frequencies. Permeable surface layer type is appropriate for El' expected pedestrian traffic. Bedding Layer for Permeable Surface Expected demographic and accessibility needs (e.g., adults, children, seniors, runners, high-heeled shoes, wheelchairs, strollers, bikes) requires selection of appropriate surface layer type 'that will not impede pedestrian needs. Porous asphalt requires a 2- to 4-inch layer of asphalt and a 1- to 2-inch layer of choker course (single-sized crushed aggregate, one-half inch) to stabilize the surface. Pervious concrete also requires an aggregate course of dean gravel or crushed stone with a minimum amount of fines. Bedding thickness and material is appropriate Permeable Interlocking Concrete Paver for the chosen permeable surface layer type. requires I or 2 inches of sand or No. 8 aggregate to allow for leveling of the Paver blocks. Similar to Permeable Interlocking Concrete Paver, plastic grid systems also require a 1- to 2-inch bedding course of either gravel or sand. For Permeable Interlocking Concrete Paver and plastic grid systems, if sand is used, a geotcxtile should be used E-52 February 2016 Appendix E: BMP Design Fact Sheets Siting and Desi-n Intent/Rationale between the sand. course and the reservoir media to prevent the sand from migrating into the, stone media. Washing aggregate will, help eliminate , Aggregate used for bedding layer is washed fines that could clog the permeable prior to placement. pavement system aggregate storage layer void spaces or underdrain. Media Layer (Optionl —used between bedding layer and aggregate storage layer to provide pollutant treatment control _ tO',( *-40 0 .b5A t.G1r Media used for BMP design should be a 5 The pollutant removal performance of the shown via research or testing to be PEE. AA 0 media layer is documented by the applicant. appropriate for expected pollutants of A filter course is provided tO separate the 0 media layer from the aggregate storage layer. If a filter course is used, calculations assessing suitability for particle migration prevetition have been completed. concern and flow rates. Migration of media can cause clogging of the aggregate storage layer void spaces or OV undcrdrain. Gradation relationship between layers can evaluate factors (e.g., bridging, permeability, and uniformity) to determine if particle sizing is appropriate or if an intermediate layer is needed. Consult permeable pavement manufacturer to Media must not. compromise. the verify that media layer provides required structural integrity or intended uses of structural support the permeable pavement surface. Aggregate Storage Layer Aggregate used for the aggregate storage layer Washing aggregate will, help eliminate fines that could clog aggregate storage is washed and free of fines. layer void spaces or underdrain. Minimum layer depth is 6 inches and for infiltration designs, the maximum depth is A minimum depth of aggregate provides (j' determined based on the infiltration storage structural stability for expected pavement volume that will infiltrate within a 36-hour loads. drawdown time. Underdrain and Outflow Structures E-53 February 2016 Appendix E: BMP Design Fact Sheets Siting and Design Intent/Rationale - j Underdrains and outflow structures, if used, Maintenance will improve the performance and extend the life of the are accessible for inspection and maintenance. permeable pavement system. A minimal separation from subgrade or linderdrain outlet elevation should be a the liner lessens the risk of fines entering [( minimum of 3 inches above the bottom the underdrain and can improve elevation of the aggregate storage layer. hydraulic performance by allowing perforations to remain unblocked. / Smaller diameter underdrains are prone Minimum underdrain diameter i i s 6nches. to clogging. Slotted underdrains provide greater Underdrains arc made of slotted, PVC pipe i ntake capacity, clog resistant drainage, , conforming to AS TM D 3034 or equivalent or and reduced entrance velocity into the corrugated, HDPE pipe conforming to pipe, thereby reducing the chances of AAsH'ro 252M or equivalent, solids migration. Filter Course (Optional) Washing aggregate will hclp eliminate Filter course is washed and free of fines, fines that could clog subgrade and impede infiltration. 1 1 Determine the areas where pr~eable pavement can be used in the site design to replace traditional pavement to)e(uce the impervious area and DCV. These permeable pavement areas can be creditej,t6ward reducing runoff generated through representation in storm water calculations as piious, not impervious, areas but are not credited for storm water pollutant control. Th1 permeable pavement areas should be designed as self-retaining with the approiafe tributary area ratio identified in the design criteria. Cjkiate the DCV per Appendix B, taking into account reduced runoff from self-retaining ,4ermeable pavement areas. Conceptual Design and Sizing Approach for Storm Water Pollutant Control Only To design permeable pavement for storm water pollutant control only (no flow control required), the following steps should be taken: 1. Verify that siting and design criteria have been met, including placement requirements, maximum finish grade slope, and the recommended tributary area ratio for non-self-retaining permeable pavement. If infiltration is infeasible, the permeable pavement can be designed as E-54 February 2016 Appendix E: BMP Design Fact Sheets flow-thru treatment per the sizing worksheet. If infiltration is feasible, calculations should follow the remaining design steps. Calculate the DCV per Appendix B based on expected site design runoff for tributary areas. Use the sizing worksheet to determine if full or partial infiltration of the DCV is achievable based on the available infiltration storage volume calculated from the permeable pavement footprint, aggregate storage layer depth, and in-situ soil design infiltration rate for a maximum 36-hour drawdown time. The applicant has an option to use a different drawdown time up to 96 hours if the volume of the facility is adjusted using the percent capture method in Appendix B.4.2. Where the DCV cannot be fully infiltrated based on the site or permeable pavement constraints, an undetdrain must be incorporated above the infiltration storage to carry away runoff that exceeds the infiltration storage capacity. The remaining DCV to be treated should be calculated for use in sizing downstream BMP(s). Conceptual Design ànd Sszing Approach when Storm Water Flow :n p. Is Applicable' Control of flow rates and/or durations will typically require significant aggregate storage volumes, and therefore the following steps should be taken prior to determination of storm water pollutant control design. Pre-dcvclopmcnt and allowable post-project flow rates and durations should be determined as discussed in Chapter 6 of the manual. Verify that siting and design criteria have been met, including placement requirements, maximum finish grade slope, and the recommended tributary area ratio for non-self-retaining permeable pavement. Design for flow control can be achieving using various design configurations, but a flow-thru treatment design will typically require a greater aggregate storage layer volume than designs which allow for full or partial infiltration of the DCV. Iteratively determine the area and aggregate storage layer depth required to provide infiltration and/or detention storage to reduce flow rates and durations to allowable limits. Flow rates and durations can be controlled from detention storage by altering outlet structure orifice size(s) and/or water control levels. Multi-level orifices can be used within an outlet structure to control the full range of flows. If the permeable pavement system cannot fully provide the flow rate and duration control required by this manual, a downstream structure with sufficient storage volume such as an : Plow-thru treatment control BMPs is not an option as a structural BMP. Carlsbad has not adopted an Alternative Compliance Program. E-55 February 2016 Appendix E: BMP Design Fact Sheets underground vault can be used to provide remaining controls. 4. After permeable pavement has been designed to meet flow control requirements, calculations must be completed to verify if storm water pollutant control requirements to treat the DCV have been met. E-56 February 2016 ATTACHMENT 2 BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES [This is the cover sheet for Attachment 2.1 Indicate which Items are Included behind this cover sheet: PROJECT IS EXEMPT FROM HYDROMODIFICATIONL1 kE-QUIREMENTS, THEREFORE THIS SECTION .ISEMPTY. Attachm\nt Contents Checklist / Seguence\ Attachment Hydromodification Management \ Exhibit (Required) D Included/ See H cation Management Exhibit on the back of this Attach r sheet. Attachment 2b Mana ment of Critical Coarse 2rai Ex$bit showing project Sedime Yield Areas (WMAA Exhibit Øge boundaries marked on is require additional analyses are N$AA Critical Coarse Sediment optional) field Area Map (Required) See Section 6.2 the BMP Design Optional analyses for Critical Coarse Manual. Sediment Yield Area Determination E] 6.2.1 Verification of Geomorphic Landscape Units )nsite D 6.2.2 Downstream Systems Sensitivity to Coarse Sediment O 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite Attachment 2c Geomorphic Aessment of Receiving 0 Not performed roral) Chann 1NIncluded See 3.4 of the BMP Design Man Attachment 2d Flow ontrol Facility Design and Includ Str tural BMP Drawdown C Iculations (Required) See Chapter 6 and Appendix G of the / BMP Design Manual Use this checklist to ensure the required information has been included on the Hydromodification Management Exhibit: The Hyd ro modification Management Exhibit must identify: El Underlying hydrologic soil group El Approximate depth to groundwater El Existing natural hydrologic features (watercourses, seeps, springs, wetlands) \necessaryi crea cal coarse sediment yield areas to be protected (if present) ting topography ting and proposed site drainage network and connections to drainag offsite osed grading 'sed impervious features pod design features and surface treatments used to minimiz mperviousness t(s) (Compliance (POC) for Hydromoditication Manageme ting anproposed drainage boundary and drainage area t each POC (when ary, creatseparate exhibits for pre-development and po -project conditions) ctural BMPor hydromodification management (identi location, type of BMP, e/detail) \ ATTACHMENT 3 Structural BMP Maintenance Information Use this checklist to ensure the required information has been included in the Structural BMP Maintenance Information Attachment: Preliminary Design/Planning/CEQA level submittal: Attachment 3 must identify: Typical maintenance indicators and actions for proposed structural BMP(s) based on Section 7.7 of the BMP Design Manual Final Design level submittal: Attachment 3 must identify: [91 Specific maintenance indicators and actions for proposed structural BMP(s). This shall be based on Section 7.7 of the BMP Design Manual and enhanced to reflect actual proposed components of the structural BMP(s) How to access the structural BMP(s) to inspect and perform maintenance 91 Features that are provided to facilitate inspection (e.g., observation ports, cleanouts, silt posts, or other features that allow the inspector to view necessary components of the structural BMP and compare to maintenance thresholds) N/AD Manufacturer and part number for proprietary parts of structural BMP(s) when applicable M Maintenance thresholds for BMPs subject to siltation or heavy trash(e.g., silt level posts or other markings shall be included in all BMP components that will trap and store sediment, trash, and/or debris, so that the inspector may determine how full the BMP is, and the maintenance personnel may determine where the bottom of the BMP is. If required, posts or other markings shall be indicated and described on structural BMP plans.) II Recommended equipment to perform maintenance N/AD When applicable, necessary special training or certification requirements for inspection and maintenance personnel such as confined space entry or hazardous waste management Page Left Intentionally Blank BMP OPERATIONS AND MAINTENANCE PLAN (MAJOR WQMP BMP O&M PLAN) FOR PRIORITY PROJECTS PROJECT NAME: 570 LAGUNA DRIVE. CARLSBAD. CA PARCEL NUMBER: 155-221-12-00 PROJECT NUMBER: CT2018-0006 APPLICANT NAME: _BRETT FARROW ARCHITECT DATE: 01/30/2020 Preparedfor: City of Carlsbad Land Development Engineering 1635 Faraday Avenue Carlsbad, CA 92008 Approved by City of Carlsbad Department of Public Works, Environmental Management, Storm Water Protection Program Date: CITY OF CARLSBAD BAIP OI'ERil TIONS AND MAINTENANCE PLAN 570 Logwia Drive, Car/shad, CA Table of Contents Compliance with Stormwater Best Management Practices Maintenance Requirements......................................................................................................I Designation Responsible Parties ......................................................................I Maintenance Personnel .......................................................................2 Organizational Chart............................................................................2 Training................................................................................................2 BMP Maintenance Funding..................................................................3 Ill. Low Impact Development and Site Design BMPs............................................3 IV. Source Control BMPs .........................................................................................4 V. Drainage Areas..................................................................................................15 VI. Stormwater Treatment Control BMPS ............................................................. 15 VII. Inspecting Stormwater BMPs...........................................................................16 Inspection Procedures .......................................................................16 Inspection Report...............................................................................16 Verification of Inspection and Checklist Submittal .............................17 VIII. Maintenance Schedule for Stormwater BMPs, ............................ . ................... 17 IX. Maintaining Stormwater BMPs.........................................................................17 Maintenance Categories .................................................................... 18 Maintenance Forms ............................................................................18 X. Preventative Measures to Reduce Maintenance Costs.................................19 XI. Inspection & Maintenance - Annual Reporting..............................................19 TABLES TABLE 1 Ownership and Maintenance TABLE 2 BMP Operation and Maintenance Funding TABLE 3 Source Control BMPs TABLE 4 Drainage Management Areas TABLE 5 Stormwater Treatment Control BMPs BMP O&M PLAN C177 OF C4RLSBAD BAY OPERA TIONSAND MAINTENANCE PLAN 570 Laguna Drive. Cur/shad, CA ATTACHMENTS Organizational Chart Training Program BMP Operation and Maintenance Funding Supplemental Information LID BMPs Inspection Form Source Control BMP Inspection Form Site Map Plans and Other Operation and Maintenance Requirements Treatment Control BMP Inspection and Maintenance Checklist(s) Maintenance Schedule Service Agreement II. Annual Inspection and Maintenance Reporting Form 12. City of Carlsbad O&M Agreement BMP O&M PLAN CITY OFC4RISI3AD BAlI' OPERA TIONS AND MAINTENANCE PLAN 370 Laguna Drive, Carlsbad. CA COMPLIANCE WITH STORMWATER BEST MANAGEMENT PRACTICES MAINTENANCE REQUIREMENTS All property owners are responsible for ensuring that stormwater best management practices (BMPs) or facilities installed on their property are properly maintained and that they function as designed. Tenants shall be aware of their responsibilities regarding stormwater facility maintenance and need to be familiar with the contents of this Operations and Maintenance Plan (O&M Plan). Property Owners have signed and agreed to proper maintenance of these facilities in a City of Carlsbad Maintenance Agreement (wet-signature copy to be maintained in Attachment 12). In some cases, this maintenance responsibility may be assigned to others through special agreements. All other maintenance agreements between the property owner and their maintenance employees associated with this property shall be included in Attachment 10. DESIGNATION OF RESPONSIBLE PARTIES Responsible parties shall be designated and identified in Table 1. The Responsible BMP Party is individual, party, or parties that shall have direct responsibility for the maintenance of stormwater controls. This individual shall be the designated contact with City inspectors and should sign self-inspection reports and any correspondence with the City regarding verification of inspections and required maintenance. The Duly Authorized Representative is the corporate officer authorized to negotiate and execute any contracts that might be necessary for future changes to operation and maintenance or to implement remedial measures if problems occur. The Designated Emergency Respondent is the party responsible for emergencies such as clogged drains, broken irrigation pipes, etc., that would require immediate response should they occur during off-hours. TABLE 1 OWNERSHIP AND MAINTENANCE Name Address ' Phone I Email Responsible BMP Laguna 125 Mozart Ave., 760.230.6851 Party Project, LP Cardiff-By-the-Sea, (if different than above) CA, 92007 Employees reporting to Brett Farrow 760.230.6851 Responsible BMP Party Duly Authorized Brett Farrow 760.230.6851 Representative ____________ BMP O&M PLAN CITY OF CARlSBAD BA/P OPERA TIONS AND MAINTENANCE PLAN 570 Lagu,ra Drive. Cur/shad, CA Designated Emergency TBD Respondent' 1 The Designated Emergency Respondents phone number must be a cellular phone that is reachable 24 hours a day. Updated contact information must be provided to the City immediately whenever a property is sold and whenever designated individuals or contractors change. Maintenance Personnel Maintenance personnel including Responsible BMP Party, Employees Reporting to Responsible BMP Party, and the Designated Emergency Respondent, must be qualified to properly maintain stormwater BMPs (including treatment and flow- control facilities), especially for restoration or rehabilitation work. Inadequately trained personnel can cause additional problems resulting in additional maintenance costs. Organizational Chart An organization chart showing the relationships of authority and responsibility between the individuals responsible for maintenance is provided in Attachment 1. Training Periodic training is conducted by the responsible BMP party for all personnel affiliated with the maintenance of stormwater BMPs. New staff and/or contractors training regarding the purpose, mode of operation, and maintenance requirements for the site's storm water facilities will be provided by the site. Necessary ongoing training for staff and/or contractors will also be provided. The site's Staff Training Program is described in Attachment 2. - —TABLE 2 Sources of Funding Unit 13 Rental Residence funds Budget Category for Maintenance Budget Expenditures Process for establishing Evaluate costs in prior year, and add estimate Annual O&M Budget addition of any repair or replacements. Process for obtaining TBD unexpected expenditures for major corrective activities BMP O&M PLAN 2 CITY OF CARLSBAD BAll' OPERA 7IONS AND MAINTENANCE PLAN 570 Laguna Drive, Carlsbad. CA D. BMP Maintenance Funding The funding for BMP operation and maintenance shall be described in Table 2, including sources of funds, budget category for expenditures, process for establishing the annual operations and maintenance budget, and process for obtaining authority should unexpected expenditures for major corrective maintenance be required. Any supplemental information, including calculations and documentation shall be included in Attachment 3. Ill. LOW IMPACT DEVELOPMENT AND SITE DESIGN BMPS Low Impact Development (LID) and Site Design BMPs have been incorporated into the project to minimize stormwater impacts. LID BMPs collectively minimize directly connected impervious area and promote infiltration on the project site. Site design BMPs are permanent measures and are similar to LID BMPs. The LID and Site Design BMPs for the project which require maintenance are identified along with their locations, including Drainage Management Areas (DMAs), in Table 22 of the project WQMP. A LID Inspection form for the site is provided in Attachment 4. In the event that a project use should change or maintenance considerations may require the site to become amended, Table 22 should be referenced for original site constraints and design guidelines. BMP O&M PLAN CITY OF CARLSBAD &tIP OPERA TIONS AND MAINTENANCE I'LAN 570 Lugwzu Drive. car/shad. CA IV. SOURCE CONTROL BMPS Source control BMPs have been selected for the project in order to minimize or prevent pollutant generation. Table 4 identifies the potential pollutant sources and corresponding permanent and operational source controls as well as their locations. Source control BMPs should be inspected routinely in order to reduce or prevent pollution from accumulating in these areas. Routine inspections of the site's source controls are discussed in the site's maintenance schedule. Source control inspection forms are in Attachment 5. BMPO&M PLAN 4 CITY OF CARLSBAD BMP OPERATIONS AND MAINTENANCE PLAN 570 Lugww Drive. Carlsbad. CA SOURCE CONTROL BIVIPS Potential Pollutant Sources Description Operational BMPs Location ZOn-site storm drain inlets .-,All.inlets-shalI-bemarkedwith-Cityof Maintain and periodically replace inlet See Site Plan Carlsbad.stormdrainmarkers -(tYPicaI marker- markers, as necessary. shown-below). --Markers-can -be -obtained -from - Review stormwater pollution prevention www.berntsen.com or-fromothervendors. information applicable to the site. Adhere to applicable operational BMPs in Fact Sheet SC-44, "Drainage System Maintenance," in the CASQA Stormwater Quality Handbooks at www.cabmphandbooks.com % M Do not allow anyone to discharge anything to storm drains or to store or deposit materials so as to create a potential 441 discharge to storm drains. []Interior floor drains and Interior floor drains and elevator shaft sump Inspect and maintain drains to prevent Interior of building, elevator shaft sump pumps will be plumbed to sanitary sewer. blockages and overflow, lower floor of rear pumps Regularly clear all associated cleanouts expansion and hand holes. EJlnterior parking garages Parking garage floor drains will be plumbed Inspect and maintain drains to prevent N/A to the sanitary sewer. blockages and overflow. BMP O&M PLAN C/fl' OF CARLSIJA/) liMP OPERA T!OMAND MAINTEiVANCE I'LAN 570 Laguna Drive. car/shad. CA F SOURCE CONTROL BIVIPS Potential Pollutant Sources ' Description Operational BMPs I Location Landscape/ Outdoor Final site landscape plans shall be placed in Maintain landscaping using a minimum Vegetated Swale & Pesticide Use Attachment 7 (following final City permit amount of or no pesticides (consider the rear playground approvals) and shall be used to maintain the use of organic techniques). following: Review and adhere to applicable Preserve existing native trees, shrubs, and operational BMPs in Fact Sheet SC-41, ground cover to the maximum extent "Building and Grounds Maintenance," in possible. the CASQA Stormwater Quality Minimize irrigation and runoff, to promote Handbooks at www.cabmphandbooks.com surface infiltration where appropriate, and Review IMP information and provide to to minimize the use of fertilizers and landscape and maintenance personnel. pesticides that can contribute to stormwater pollution. Where landscaped areas are used to retain or detain stormwater, maintain and replace, as necessary, plants that are tolerant of saturated soil conditions. Consider using pest-resistant plants, especially adjacent to hardscape. To insure successful establishment, select plants appropriate to site soils, slopes, climate, sun, wind, rain, land use, air movement, ecological consistency, and plant- interactions. Use efficient irrigation Employ rain shutoff devices to prevent Inspect irrigation system for leaks and/or Vegetated Swale & systems irrigation after precipitation. malfunctions. rear of facility Design irrigation systems to each landscape Inspect that water usage is consistent with landscaping area's specific water requirements. vegetation requirements. Use flow reducers or shutoff valves triggered Inspect that irrigation shut-off controls by a pressure drop to control water loss in the operate correctly. event of broken sprinkler heads or lines. Employ other comparable, equally effective, BMP O&M PLAN CITY OF CARLSBAD BMP O!'ERATIONSAND MAINTENANCE PLAN 570 Lagw,a Drive, Carlsbad. CA SOURCE CONTROL BIVIPS Potential Pollutant Sources Description Operational BMPs Location methods to reduce irrigation water runoff. DNeed for future indoor & Note building design features that discourage Review Integrated Pest Management N/A structural pest control entry of pests. information and provide to other maintenance personnel. EPools, spas, ponds, Plumb pools to the sanitary sewer in Review and adhere to applicable N/A decorative fountains, and accordance with local requirements. operational BMPs in Fact Sheet SC-72, other water features. "Fountain and Pool Maintenance," in the CASQA Stormwater Quality Handbooks at www.cabmphandbooks.com Food service Describe the location and features of the Trash Bins are kept covered and are Parking area and area designated cleaning area. managed by each residence. adjacent to outdoor Describe the items to be cleaned in this covered walkways facility and how it has been sized to insure that the largest items can be accommodated. BMP O&M PLAN CITY OF CARLSBAD EM!' OPERA TIONS AND MA/NTENA,VE !'LAN 570 Laguna Drive, Car/shad. CA SOURCE CONTROL BMPS —i Potential Pollutant Sources ' Description Operational BMPs Location Refuse areas . State how site refuse will be handled and Provide adequate number of receptacles. Dumpster Area provide supporting detail to what is shown on . Inspect receptacles regularly; repair or designed per City plans. replace leaky receptacles, requirements and Prohibitive signs shall be posted on or near Keep receptacles covered at all times. CASQA SC-34 dumpsters with the words "Do not dump Prohibit/prevent dumping of liquid or www.casqa.org/resour hazardous materials here' or similar. hazardous wastes. ces/bmphandbooks/m Any drains from dumpsters, compactors, and Post and replace, as necessary, " unicipal-bmp- bin areas shall be connected to a grease hazardous materials' signs. handbook. removal device before discharge to sanitary Inspect and pick up litter daily and clean sewer. up spills immediately. Keep spill control materials available on- site. Review Fact Sheet SC-34, "Waste Handling and Disposal" in the CASQA Stormwater Quality Handbooks at www.cabmphandbooks.com Dlndustrial processes. Cover or enclose areas that would be the Review and adhere to Fact Sheet SC-la, N/A most significant source of pollutants; or, "Non- Stormwater Discharges" in the slope the area toward •a dead-end sump; or, CASQA Stormwater Quality Handbooks at discharge to the sanitary sewer system in www.cabmphandbooks.com compliance with the applicable municipal waste water district's requirements (include a copy of the waste acceptance letter from the agency accepting the waste in Attachment 10). Grade or berm area to prevent run-on from surrounding areas. Installation of storm drains in areas of equipment repair is prohibited. Implement other features which are comparable or equally effective. BMP O&M PLAN C/ri' OF CARLSBAD )JM/' Ol'ERAT/ONSAND MAINTENANCE /'LAsV 570 Laguna Drive. Carlsbad. CA Potential Pollutant Sources SOURCE CONTROL BIVIPS Description Operational BMPs I Location DOutdoor storage of Comply with all requirements of local Review and adhere to the Fact Sheets SC- N/A equipment or materials Hazardous Materials Programs for: 31, "Outdoor Liquid Container Storage" Hazardous Waste Generation and SC- 33, "Outdoor Storage of Raw Hazardous Materials Release Response Materials" in the CASQA Stormwater and Inventory Quality Handbooks at California Accidental Release (CalARP) www.cabmphandbooks.com oAboveground Storage Tank Uniform Fire Code Article 80 Section 103(b) & (c) 1991 Underground Storage Tank Storage of non-hazardous liquids shall be covered by a roof and/or drain to the sanitary sewer system, and be contained by berms, dikes, liners, or vaults. Storage of hazardous materials and wastes must be in compliance with the local hazardous materials ordinance and a Hazardous Materials Management Plan for the site. Include a detailed description of materials to be stored, storage areas, and structural features to prevent pollutants from entering storm drains. BMP O&M PLAN CITY OF CARLSBAD EM!' OPERATIONS AND MAINTENANCE I'L4N 570 Lagwiu Drive. Carlsbad, CA IF Potential Pollutant Sources TABLE3 SOURCE CONTROL BMPS Description Operational BMPs Location DVehicle and Equipment If a car wash area is not provided, describe Follow operational measures to implement .N/A Cleaning measures taken to discourage on-site car the following (if applicable): washing and explain how these will be Washwater from vehicle and equipment enforced. washing operations shall not be Equip wash area with a clarifier, grease trap discharged to the storm drain system. or other pretreatment facility, as appropriate Car dealerships and similar may rinse and properly connect to the sanitary sewer. cars with water only. Implement other features which are Review and adhere to Fact Sheet SC- comparable or equally effective 21, "Vehicle and Equipment Cleaning," Commercial/ industrial facilities having in the CASQA Stormwater Quality vehicle/ equipment cleaning needs shall Handbooks at either provide a covered, bermed area for www.cabmphandbooks.com washing activities or discourage vehicle/equipment washing by removing hose bibs and installing signs prohibiting such uses. Washing areas for cars, vehicles, and equipment shall be paved, designed to prevent run-on to or runoff from the area, and plumbed to drain to the sanitary sewer. Commercial car wash facilities shall be designed such that no runoff from the facility is discharged to the storm drain system. Wastewater from the facility shall discharge to the sanitary sewer, or a wastewater reclamation system shall be installed and permitted by proper regulatory authorities (attach permits in Attachment 10, as necessary). BMPO&M PLAN 10 ciry oi CARLSIJAD liMP OPERATIONS AND MAINTENANCE PLAN 570 Laguna Drive. car/shad. (A SOURCE CONTROL BIVIPS Potential Pollutant Sources ' Description Operational BMPs I Location DVehicle/Equipment Repair No vehicle repair or maintenance will be done The following restrictions apply to use the N/A and Maintenance outdoors, or else describe the required site: features of the outdoor work area. No person shall dispose of, nor permit An industrial waste discharge permit will be the disposal, directly or indirectly of obtained. For floor drains connected to the vehicle fluids, hazardous materials, or sanitary sewer; design will meet the rinse water from parts cleaning into permitting agency's requirements. storm drains. An industrial waste discharge permit will be No vehicle fluid removal shall be obtained for tanks, containers or sinks to be performed outside a building, nor on used for parts cleaning or rinsing; design will asphalt or ground surfaces, whether meet the permitting agency's requirements. inside or outside a building, except in Accommodate all vehicle equipment repair such a manner as to ensure that any and maintenance indoors or designate an spilled fluid will be in an area of outdoor work area and design the area to secondary containment. Leaking vehicle prevent run-on and runoff of stormwater. fluids shall be contained or drained from Show secondary containment for exterior the vehicle immediately. work areas where motor oil, brake fluid, No person shall leave unattended drip gasoline, diesel fuel, radiator fluid, acid- parts or other open containers containing batteries or other hazardous containing vehicle fluid, unless such materials or hazardous wastes are used or containers are in use or in an area of stored. Drains shall not be installed within the secondary containment. secondary containment areas. BMP O&M PLAN 11 CITY OF CARLSBAD lIMP OPERA TIONS AND MAINTENANCE PLAN 570 Laguna Drive, Carlsbad, CA Potential Pollutant Sources SOURCE CONTROL BMPS Description Operational BMPs I Location DFuel Dispensing Areas Fueling areas1 shall have impermeable floors The fueling area is to be dry swept N/A (i.e., portland cement concrete or equivalent routinely. smooth impervious surface) that are: Review and adhere to the Business Guide Graded at the minimum slope necessary to Sheet, "Automotive Service—Service prevent ponding Stations" in the CASQA Stormwater Separated from the rest of the site by a Quality Handbooks at grade break that prevents run-on of www.cabmphandbooks.com stormwater to the maximum extent practicable. Fueling areas shall be covered by a canopy that extends a minimum often feet in each direction from each pump. [Alternative: The fueling area must be covered and the covers minimum dimensions must be equal to or greater than the area within the grade break or fuel dispensing area'. The canopy [or cover] shall not drain onto the fueling area. The fueling area shall be defined as the area extending a minimum of 6.5 feet from the corner of each fuel dispenser or the length at which the hose and nozzle assembly may be operated plus a minimum of one foot, whichever is greater. BMP O&M PLAN 12 CITY OF CARLSBAD B/vt!' OPERATIONS AND MAINTENANCE PLAN 570 Lagwsa Drive. Carlsbad. CA Potential Pollutant Sources 1: BIVIPS Description I Operational BMPs I Location OLoading Docks Loading dock areas draining directly to the Move loaded and unloaded items indoors N/A sanitary sewer shall be equipped with a spill as soon as possible. control valve or equivalent device, which shall Review and adhere to Fact Sheet SC-30, be kept closed during periods of operation. 'Outdoor Loading and Unloading," in the Provide a roof overhang over the loading CASQA Stormwater Quality Handbooks at area or install door skirts cowling) at each www.cabmphandbooks.com bay that enclose the end of the trailer. Roof downspouts shall be positioned to direct stormwater away from the loading area. Water from loading dock areas should be drained to the sanitary sewer where feasible. DFire Sprinkler Test Water Provide a means to drain fire sprinkler test Review the note in Fact Sheet SC-41, Drains to sewer in water to the sanitary sewer. 'Building and Grounds interior floor drain. Maintenance,' in the CASQA Stormwater Quality Handbooks at www.cabmphandbooks.com BMP O&M PLAN . 13 Cm' OF CARLSBAD BMI' O!'ERATIONSANL) AMmA'Th,VA,VCE !'LAN 570 Laguna Drive. Carlsbad. CA Potential Pollutant Sources SOURCE CONTROL BIVIPS ' Description Operational BMPs I Location OMiscellaneous Drain or . Boiler drain lines shall be directly or indirectly Condensate drains Wash Water connected to the sanitary sewer system and from rooftop to Boiler drain lines may not discharge to the storm drain system. landscaping from roof Condensate drain lines Condensate drain lines may discharge to drains, then to rear of Rooftop equipment landscaped areas if the flow is small enough building for infiltration Drainage sumps that runoff will not occur. Condensate drain or capture for use as Roofing, gutters, and lines may not discharge to the storm drain landscape irrigation. trim system. Rooftop mounted equipment with potential to New gutters shall not produce pollutants shall be roofed and/or be made of metals. have secondary containment. Any drainage sumps on-site shall feature a sediment sump to reduce the quantity of sediment in pumped water. Avoid roofing, gutters, and trim made of copper or other unprotected metals that may leach into runoff. Plazas, sidewalks, and Plazas, sidewalks, and parking lots shall Routine sweeping parking lots be swept regularly to prevent the occurs monthly. accumulation of litter and debris. Debris from pressure washing shall be collected to prevent entry into the storm drain system. Washwater containing any cleaning agent or degreaser shall be collected and discharged to the sanitary sewer and not discharged to a storm drain. BMP O&M PLAN 14 CITY OF CARLSBAD lIMP OPER.A lIONS AND MAIN1ENANCE PLAN 570 Laguna Drive, Carlsbad, CA DRAINAGE AREAS Table 5 summarizes the drainage management areas (DMAs) on site. Areas are designated as self-treating, self-retaining, draining to self-retaining, and draining to an Integrated Management Practice (IMP). DRAINAGE MANAGEMENT AREAS sub DMA No. I Designation Description 1, 2, 3 Drains to BMP Drains to pervious pavement system. 5, 7F, 8F, 9F, 1OF, Drains to BMP Drains to pervious IOR, hF, IIR, 12F, pavement system. 12R, 13F, 13R, 13B 7R, 8R, 9R, 9B Drains to BMP Drains to pervious pavement system. The site map in Attachment 6 shows the DMAs and their flow patterns. The map indicates, using flow patterns, how the flow from each DMA is routed to the corresponding storm water facility. Impervious and pervious areas are shown on the map. STORMWATER TREATMENT CONTROL BMPS Treatment control BMPs treating runoff from DMAs that could not be routed to properly sized self-treating areas, self-retaining areas, areas draining to self- retaining areas, and/or areas draining to an IMP have been included in the project design and are summarized in Table 6. Treatment Control BMP Type Pervious Payers BMP 1 Pervious Payers BMP2 Description Drains DMAs Al, A2, A3 Drains DMAs A4 to A17 Size or Treatment Control BMP Capacity 1,091 CF PROVIDED 1.076 CF PROVIDED Area Drained or Water Quality Flow DCV 250 CF DCV 355 CF BMP O&M PLAN 15 CITY OF CARlSBAD &t/P OPERA TIONS AND MAINTENANCE P/AN 570 Laguna Drive, Carlsbad, CA The location and type of each of the project's stormwater facilities on site are shown on the site map in Attachment 6. The as-built drawings2, manufacturer's data, cut-sheets, manuals, and specific operation and maintenance requirements for each treatment control BMP shall be provided in Attachment 7. VII. INSPECTING STORMWATER BMPS The quality of stormwater entering the waters of the U.S. or waters of the state relies heavily on the proper operation and maintenance of permanent BMPs. LID, source control, and treatment control stormwater BMPs must be periodically inspected to ensure that they are functioning as designed. Inspections will determine the appropriate maintenance that is required for the facility. Inspection Procedures All stormwater treatment BMPs are required to be inspected a minimum of once per year. Inspections follow the inspection procedures found in the Inspection and Maintenance Checklists provided in the City of Carlsbad's BMP Design Manual document or located on the City's website http:/Iwww.carlsbadca.gov/services/depts/landevllanddev.asp. The Inspection and Maintenance Checklist(s) that is applicable to the site is provided in Attachment 8. Inspection Report The person(s) conducting the inspection activities (Responsible BMP Party. Employees reporting to Responsible BMP Party, or the Designated Emergency Respondent) shall complete the appropriate inspection checklist for the specific facility. All completed checklists are located in Attachment 8. All facilities are to be inspected on an annual basis at a minimum. A copy of each inspection form shall be kept by the property owner a minimum of 5 years. Inspection Scoring For each inspection item, a score is given to identify the urgency for any required maintenance. The scoring is as follows: 0 = No deficiencies identified. 1 = Monitor - Although maintenance may not be required at this time, a potential problem exists that will most likely need to be addressed in the future. This can include items like minor erosion, concrete cracks/spalling, or minor sediment accumulation. This item should be revisited at the next inspection. 2 As-built drawings must be included after construction is complete. BMP O&M PLAN 16 CITY OF CARLSBAD BA /P OPERA TIONS AND MAINTENANCE PLAN 570 Laguna Drive. Carlsbad, CA 2 = Routine Maintenance Required - Some inspection items can be addressed through the routine maintenance program. This can include items like vegetation management or debris/trash removal. 3 = Immediate Repair Necessary - This item needs immediate attention because failure is imminent or has already occurred. This could include items such as structural failure of a feature (outlet, weir, manhole, etc.), significant erosion, or significant sediment accumulation. This score should be given to an item that can Significantly affect the function of the facility. N/A = This is checked by an item that may not exist in a facility. Not all facilities have all of the features identified on the form (outlet, weir, manhole, etc.). Overall Facility Rating An overall rating is given for each facility inspected. The overall facility rating should correspond with the highest score (0, 1, 2, 3) given to any feature on the inspection form. C. Verification of Inspection and Checklist Submittal The Stormwater BMP Inspection and Maintenance Checklist (in Attachment 8) provides a record of inspections and the need for maintenance activities at the facility. Verification of the inspection of the stormwater facilities and the facility inspection checklist(s) shall be provided to the City of Carlsbad Storm Water Protection Program on an annual basis. The verification and the inspection checklist(s) shall be reviewed and submitted by the property owner or Responsible BMP Party, or the Duly Authorized Representative, per Table 1. MAINTENANCE SCHEDULE FOR STORMWATER BMPS A maintenance schedule for the stormwater source control and treatment control BMPs on site is provided in Attachment 9. Attachment 9 includes schedules for routine inspection and maintenance, annual inspection and maintenance, and inspection and maintenance after major storm events. A service agreement with any contractors hired to perform stormwater treatment control BMP maintenance is also provided in Attachment 10. MAINTAINING STORMWATER BMPS Stormwater BMPs must be properly maintained to ensure that they operate correctly and provide the water quality treatment for which they were designed. Routine maintenance performed on a frequently scheduled basis, can help avoid BMP O&M PLAN 17 CITY OF CARlSBAD BA/I' OI'ERATJONSAND MAINTENANCE PLAN 570 Laguna Drive, Carlsbad. CA more costly rehabilitative maintenance that results when facilities are not adequately maintained. Maintenance Categories Stormwater BMP maintenance programs are separated into three broad categories of work: routine, restoration, and rehabilitation. The categories are separated based upon the magnitude and type of the maintenance activities performed. A description of each category follows: Routine Work This work includes items such as the removal of debris/material that may be clogging the outlet structure well screens and trash racks. It also includes activities such as road and parking lot sweeping, weed control, mosquito treatment, and algae treatment. These activities normally will be performed numerous times during the year. These items can be completed without any prior correspondence with the City of Carlsbad Storm Water Protection Program; however, inspection and maintenance forms shall be completed with the information also being reported on the annual report forms and submitted to the City. Restoration Work This work consists of a variety of isolated or small-scale maintenance and work needed to address operational problems. Most of this work can be completed by a small crew, with minor tools, and small equipment. These items do not require prior correspondence with City of Carlsbad Storm Water Protection Program. However, completed maintenance forms are required to be submitted to City of Carlsbad Storm Water Protection Program with the annual report forms. Rehabilitation Work This work consists of large-scale maintenance and major improvements needed to address failures within the stormwater BMP. This work requires consultation with the City and may require an engineering design with construction plans to be prepared for review and approval by the City. Maintenance Forms The Stormwater BMP Inspection and Maintenance Form provides a record of maintenance activities and includes general cost information to assist in budgeting for future maintenance. Maintenance Forms for each facility type are provided in Attachment 3. Maintenance Forms shall be completed by the responsible BMP party. The form shall then be reviewed by the property owner BMP O&M PLAN 18 CITY OF CARLSBAD JiM!' OPERA TIONS AND MAINTENANCE PLAN 570 Lagww Drive. Carlsbad, CA or an authorized agent of the property owner and made available for review upon inspection by the City of Carlsbad. X. PREVENTATIVE MEASURES TO REDUCE MAINTENANCE COSTS The most effective way to maintain a stormwater quality facility is to prevent pollutants from entering the facility. Common pollutants include sediment, trash & debris, chemicals, pet wastes, runoff from stored materials, illicit discharges into the storm drainage system and many others. This maintenance program includes measures to address these potential contaminants at the source and save time and money in the long run. The maintenance program will consider the following: Educate employees and patrons to be aware of how their actions affect water quality and how they can help reduce maintenance costs. Keep properties, streets, gutters, and parking lots free of trash, debris, and lawn clippings. Ensure the proper use, storage, and disposal of hazardous wastes and chemicals. Promptly clean up spilled materials and dispose of properly. Plan landscape care to minimize and properly use chemicals and pesticides. Sweep paved surfaces and put the sweepings back on the lawn. Be aware of automobiles leaking fluids. Use absorbents such as cat litter to soak up drippings - dispose of properly. Encourage pet owners to clean up pet wastes. Re-vegetate disturbed and bare areas to maintain vegetative stabilization. Clean any private storm drainage system components, including inlets, storm drains, and outfalls. Do not store materials outdoors (including landscaping materials) unless properly protected from runoff. XI. INSPECTION & MAINTENANCE - ANNUAL REPORTING The tenant is responsible for providing verification that the stormwater treatment control BMPs have been properly inspected and maintained unless otherwise noted. Verification includes records of inspections and maintenance performed on site. Any maintenance required will be identified and described. Annual written verification of effective operation and maintenance of each approved source and treatment control BMP by the responsible party is required to be submitted to the City of Carlsbad Storm Water Protection Program prior to each wet season (October 1) of each year. A standard annual reporting form is provided in Attachment 11. BMPO&M PLAN 19 CITY OF CARLSBAD BA/P OPERA TIOMAND MAbVTENANCE PLAN 570 Lugww Drive, Carlsbad, CA BMP O&M PLAN 20 CITY OF CARLSBAD Bit/P OPERA TIONS AND MAINTENANCE PLAN 570 Lagwza Drive, Carlsbad. CA ATTACHMENT 1- ORGANIZATIONAL CHART See Table I, updates to be provided herein. CITY OF CARLSBAD BAll' OPERA TIOJ\AND MAINTENANCE PLAN 570 Loguna Drive, Carlsbad, CA ATTACHMENT 2- TRAINING PROGRAM Training to be provided by SWQMP author following approval of documents and following certification of construction. Following said, training all training documents are to be kept in this location of the O&M Plan. CITY OF CARLSBAD 1W? OPERA 770N5 AND MAINTENANCE PLAN 570 Laguna Drive, Carlsbad, CA ATTACHMENT 3- BMP OPERATION AND MAINTENANCE FUNDING SUPPLEMENTAL INFORMATION Funding to be provided by owner of Unit 13 Multi-Family Rental Residences with funds that are currently earmarked for routine maintenance of the proposed BMPs. CITY OF CARLSBAI) B4t 1? OI'ERA7I0NS AND MAINTENANCE PLAN 570 Laguna Drive. Carlsbad. CA ATTACHMENT 4- LID BMPS INSPECTION FORM CITY OF CARLSIJA/.) BMI' OPERA TIONS AND MAINTENANCE PLAN 570 Laguna Drive, Car/shad, CA LID BMP INSPECTION FORM I Inspector: I 'Weather: Reason for Inspection: Comments: LID BMP Type Description Location Operational BMPs Maintenance Required Maintenance Performed/Comments DBioretention / Vegetated Swale []Regularly weed and water during plant establishment phase -]No 0 Yes I:jArea is free of litter and excess sediment DNo 0 Yes DArea free of erosion and stabilized [-]No 0 Yes []Plants are healthy and thriving [:]No 0 Yes DPlant types are those from original design [-]No 0 Yes flFilter Strips ORegularly weed and water during plant L3No 0 Yes establishment phase OPlants are healthy and thriving [-]No 0 Yes DArea free of erosion and stabilized DNo 0 Yes [-]Area is free of litter and excess sediment [-]No 0 Yes flPlant types are those from original design [:]No 0 Yes OFlow spreader is free of debris and is not clogged []No 0 Yes 1 NA ____ BMP O&M PLAN (717 OF CARLS/IAD liMP OPERA TIONS AND MAINTE,VANCE PLAN 570 Laguna Drive. Car/shad, CA LID BMP INSPECTION FORM Date: I Inspector: I I Weather: Reason for Inspection: I Comments: LID BMP Type Description Location Operational BMPs Maintenance Required Maintenance Performed/Comments []Vegetated Buffers DRegularly weed and water during plant EJNo 0 Yes establishment phase ElPlants are healthy and thriving [-]No 0 Yes DArea free of erosion and stabilized [-]No o Yes DArea is free of litter and excess sediment [:]No El Yes DPlant types are those from original design []No 0 Yes []Flow spreader is free of NA debris and is not clogged ElNo El Yes OBiofiltration Basin BMPs Biofiltration Basin (BMP3) SW of lot 9 Regularly weed and water during plant establishment phase [-]No 0 Yes Plants are healthy and thriving ONo El Yes Area free of erosion and stabilized DNo El Yes Plant types are those from original design [:]No El Yes Overflow is clean of debris [:]No 0 Yes Verify infiltration drawdown rates at observation port ElNo El Yes BMP O&M PLAN - CITY OF CARLSBAD 13/VIP OI'ERATIOA'SAND MAINTENANCE PLAN 570 Lagwia Drive. Carlsbad. CA LID BMP INSPECTION FORM Date: i inspector: Weather: Reason for inspection: Comments: LID BMP Type I Description Location Operational BMPs Maintenance Required Maintenance Performed/Comments ZPorous Pavement Parking Area and Drive Aisles Parking Area and Drive Aisles NPavement is free of debris and sediment LJNo LI Yes Pavement is swept monthly []No LI Yes Pavement is in good condition and stabilized DNo 0 Yes Area is dry swept regularly [:]No LI Yes Soil Structure Enhancement (use of compost) LIArea is protected from compaction []No LI Yes NA DLimited foot traffic [:]No 0 Yes NA 02 to 1 ratio of compost soil and existing soil is ElNo LI Yes NA present BMP O&M PLAN C/fl' OF CARLSBAD liMP OPERA TIONS AND MA IN lENA NCE PLAN 570 Laguna Drive. ear/shad. CA ATTACHMENT 5- SOURCE CONTROL BMP INSPECTION FORM CITY OF CARLSBAD BMI' OPERA lIONS AND MAINTENANCE I'LAN 570 Lugwsa Drive, Carlsbad. CA SOURCE CONTROL :MP JINSPECTIONI a.]i Date: Inspector I Weather: Reason for Inspection: Comments: Potential Pollutant Sources Location Operational BMPs Maintenance Required Maintenance Performed/Comments NOn-site storm drain inlets ZMaintain and periodically replace inlet DNo o Yes markers, if necessary. Review stormwater pollution prevention information applicable to DNo F1 Yes the site. ZAdhere to applicable operational BMPs in Fact Sheet SC-44, "Drainage System Maintenance," in the CASQA DNo 0 Yes Stormwater Quality Handbooks at www.cabmphandbooks.com Do not allow anyone to discharge anything to storm drains or to store or LJNo 0 Yes deposit materials so as to create a _discharge _to potential storm drains. Dlnterior floor drains and Dlnspect and maintain drains to prevent [:]No 0 Yes elevator shaft sump pumps blockages and overflow. Dlnterior parking garages []inspect and maintain drains to prevent ONo 0 Yes blockages and overflow. Landscape/ Outdoor NMaintain landscaping using minimum [:]No 0 Yes Pesticide Use or no pesticides. - Review and adhere to applicable operational BMPs in Fact Sheet SC- 41, '"Building and Grounds []No DYes Maintenance," in the CASQA Stormwater Quality Handbooks at www.cabmphandbooks.com BMP O&M PLAN CITY OF CA RLSIJA 1) liMP OI'ERATIONSAND MAINTENANCE PLAN 570 Lagwia Drive. Carlsbad, CA SOURCE CONTROL BMP INSPECTION FORM Date: J Inspector: I Weather: Reason for Inspection: Comments: Potential Pollutant Sources Location Operational BMPs Maintenance Required Maintenance Performed/Comments Landscape/Outdoor pesticide Z Review IMP information and provide to Use Continued landscape and maintenance DNo 0 Yes personnel. ZUse efficient irrigation Ninspect irrigation system for leaks ElNo El Yes systems and/or malfunctions. []Need for future indoor & []Review Integrated Pest Management structural pest control information and provide to other ElNo 0 Yes maintenance personnel. ElPools, spas, ponds, DReview and adhere to applicable decorative fountains, and operational BMPs in Fact Sheet SC- other water features. 72, "Fountain and Pool Maintenance," in the CASQA Stormwater Quality ONo 0 Yes Handbooks at www.cabrnphandbooks.com DFood service [-]Grease traps cleaned, as necessary. DNo 0 Yes []See Refuse Areas. Refuse areas Refuse containers are to NProvide adequate number of [:]No El Yes be maintained in each receptacles. Zinspect receptacles regularly; repair or ElNo El Yes lot's garage. Containers will be moved to curb for replace leaky receptacles. Keep receptacles covered at all times. [:]No El Yes pickup only on trash collection days. Prohibit/prevent dumping of liquid or flNo 0 Yes Maintenance is the responsibility of each lot hazardous wastes. Post "no hazardous materials" signs. DNo 0 Yes owner/lessee. BMP O&M PLAN CITY OF CARLSBAD !JMI' OPERA TIONS AND MAINTENANCE PLAN 570 Lagwsa Drive. Carlsbad. CA SOURCE CONTROL BMP iINSPECTIONiFORM Date: Inspector: Weather: Reason for Inspection: Comments: Potential Pollutant Sources Location Operational BMPs Malntenandce Require Maintenance Performed/Comments Refuse areas- Continued M inspect and pick up litter daily and No El Yes clean spills _up_ _immediately. Keep spill control materials available on- site. Review Fact Sheet SC-n34, "Waste Handling and Disposal" in the DNo 0 Yes CASQA Stormwater Quality Handbooks at www.cabmphandbooks.com fllndustnal processes. DReview and adhere to Fact Sheet SC- 10, "Non- Stormwater Discharges" in the CASQA Stormwater Quality [:]No [1 Yes Handbooks at www.cabmphandbooks.com DOutdoor storage of DReview and adhere to the Fact Sheets equipment or materials SC-31, "Outdoor Liquid Container Storage" and SC- 33 "Outdoor Storage DNo 0 Yes• of Raw Materials" in the CASQA Stormwater Quality Handbooks at www.cabmphandbooks.com OVehicle and Equipment Cleaning Follow operational measures to implement the following (if applicable): DWashwater from vehicle and equipment washing operations shall not be discharged to the storm drain DNo 0 Yes system. BMP O&M PLAN CITY OF CARLSBAD JiM!' OPERA TIONSAND MAINTENANCE PLAN 570 Lugww Drive. Car/shad. CA 1 SOURCE CONTROL :1I2INSPECTIONFORM Date: Inspector: Weather: Reason for Inspection: Comments: Potential Pollutant Sources Location Operational BMPs Mauntenandce Require Maintenance Performed/Comments DCar dealerships and similar may rinse cars with potable water only. Any excess water shall be drained through [-]No D Yes landscaping and dechlorinated prior to discharge to the storm drain system. DReview and adhere to Fact Sheet SC- 21, "Vehicle and Equipment Cleaning," in the CASQA Stormwater Quality [:]No D Yes Handbooks at www.cabmphandbooks.com DVehicle/Equipment Repair The following restrictions apply to use the site: and Maintenance DNo person shall dispose of, nor permit the disposal, directly or indirectly of vehicle fluids, hazardous materials, or [:]No D Yes rinse water from parts cleaning into storm drains. DNo vehicle fluid removal shall be performed outside a building, Nor on asphalt or ground surfaces, whether inside or outside a building, except in such a manner as to ensure that any DNo LI Yes spilled fluid will be in an area of secondary containment. Leaking vehicle fluids shall be contained or drained from the vehicle immediately. BMP O&M PLAN CITY OF CARLSIJAD HMP O!'ERATIONSAND MAINTENAiVCE PLAN 570 Lagww Drive. Carlsbad. CA SOURCE CONTROL BMP INSPECTION FORM i Date: (inspector: Weather: Reason for inspection: Comments: Potential Pollutant Sources Location Operational BMPs Maintenance Required Maintenance Performed/Comments Vehicle/Equipment Repair DNo person shall leave unattended drip and Maintenance parts or other open containers of Continued chemicals such as vehicle fluid, unless DNo 0 Yes such containers are in use or in an area of secondary containment. LjFuel Dispensing Areas []The fueling area is to be dry swept routinely. 0No LI Yes DReview and adhere to the Business Guide Sheet, "Automotive Service— Service Stations" in the CASQA [—]No 0 Yes Stormwater Quality Handbooks at www.cabmphandbooks.com DFuehng areas are covered by a [-]No 0 Yes DThe canopy does not drain onto the []No 0 Yes fueling area. []Grading of the area prevents run-on of stormwater to the maximum extent DNo 0 Yes practicable. []Loading Docks DMove loaded and unloaded items No D Ye S indoors as soon as possible. Loading Docks flReview and adhere to Fact Sheet SC- Continued 30, "Outdoor Loading and Unloading," in the CASQA Stormwater Quality DNo 0 Yes Handbooks at www.cabmphandbooks.com BMP O&M PLAN CITY OF CARLSBAD JiM!' OPERA TIONS AND MAINTENANCE PLAN 570 Laguna Drive. Carlsbad, CA SOURCE CONTROL BMP INSPECTION FORM Date: --7 inspector: Weather: Reason for Inspection: Comments: Potential Pollutant Sources Location Operational BMPs Maintenance Required Maintenance Performed/Comments OFire Sprinkler Test Water DReview the note in Fact Sheet SC-41, Building and Grounds Maintenance,' in the CASQA Stormwater Quality DNo 0 Yes Handbooks at www.cabmphandbooks.com DMiscellaneous Drain or Wash Water Boiler drain lines Condensate drain lines Na 0 Y es Rooftop equipment Drainage sumps Roofing, gutters, and trim Plazas, sidewalks, and ZPIazas, sidewalks, and parking lots parking lots shall be swept regularly to prevent the accumulation of litter and debris. Debris from pressure washing shall be collected to prevent entry into the storm drain system. Washwater DNo El Yes containing any cleaning agent or degreaser shall be collected and discharged to the sanitary sewer and not discharged to a storm drain. BMP O&M PLAN Page Left Intentionally Blank CITY OF CARLSBAD RMP OPERA TIONSAND MAINTENANCE PLAN 570 Laguna Drive, Carlsbad, CA ATTACHMENT 6- SITE MAP Page Left Intentionally Blank Page LeftIntentionally Blank CITY OF CA RLSBA I) &.IP OPERA TIONS AND MAIN7ENANCE PLAN 570 Laginu Drive, Carlsbad, CA ATTACHMENT 7- AS-BUILT DRAWINGS Note, current plan set is currently included until final as-built drawings are available to replace these place-holder plans. Page Left Intentionally Blank GRADING NOTES STREET NOTES (INADDITION TO THE REQUIREMENTS OF CHAPTER 15.16 OF THE CARLSBAD MUNICIPAL CODE) 30. THE CONTRACTOR SHALL VERIFY THE LOCATION OFALL EXISTING FACILITIES (ABOVE GROUND AND UNDER 1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLYAPPROVED BY THE CITY OF CARLSBAD GROUND) WITHIN THE PROJECT SITE SUFFICIENTLYAHEAD OF GRADING TO PERMIT THE REVISION OF THE 1. ACTUAL STRUCTURAL SECTIONS WILL. BE DETERMINED AFTER "R" VALUE TESTS HAVE BEEN CONDUCTED BYA REGARDING GRADING SHOWN ON THIS SET OF PLANS, GRADING PLANS IF IT IS FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT WITH THE PROPOSED WORK. PROFESSIONAL ENGINEER OF THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF 2. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE CARLSBAD 31. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT LEAST 2 FULL WORKING APPLIED SOIL MECHANICS, ON THE PREPARED BASEMENT SOIL. THE "if' VALUE TESTS AND THE ENGINEERED STRUCTURAL SECTION MUST BE SUBMITTED TO THE ENGINEERING INSPECTOR FOR REVIEW AND APPROVAL A MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. THE DAYS PRIOR TO STARTING GRADING NEAR THEIR FACILITIES AND SHALL COORDINATE THE WORK WITH A MINIMUM OF TWO (2) CITY WORKING DAYS BEFORE THE WORK BEGINS. ENGINEER IN RESPONSIBLE CHARGE SHALL REVISE THESE PLANS WHEN NON-CONFORMANCE IS COMPANY REPRESENTATIVE STREET LIGHTS SHALL BE INSTALLED AS SHOWN ON THESE PLANS, UNDERGROUND CONDUIT RUNS, SERVICE DISCOVERED, UNDERGROUND SERVICEALERT (DIG ALERT) (800) 422-4133 /811 POINTS AND HAND-HOLES SHALL BE SHOWN ON THE "AS-BUILT" PLANS. NO DIRECT BURIAL STREET LIGHT CITYAPPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER-OF- WORK FROM SDG&E (800)411-7343 AT&T (619) 237-2787 FOUNDATIONS WILL BE ALL LUMINAIRES SHALL BE "CUT OFF" TYPE ALLOWED. 3. ALL UNDERGROUND UTILITIES AND LATERALS SHALL BE INSTALLED PRIOR TO CONSTRUCTION OF CURBS, RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING SPECTRUM CABLE (800) 227-2600 CROSS GUTTERS OR SURFACING OF STREETS. CONSTRUCTION. ALL PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER COX COMMUNICATIONS (619)262-1122 4. WHERE AN EXISTING PIPE LINE IS TO BE ABANDONED IT SHALL BE REMOVED WITHIN TWENTY FEET OF FOR APPROVAL. CITY OF CARLSBAD (STREETS & STORM DRAIN) (760) 434-2980 BUILDING OR STREET AREAS AND REPLACED WITH PROPERLY COMPACTED SOILS, IN OTHER AREAS THE PIPE 4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY WORK IN THE CITY OF CARLSBAD (SEWER, WATER & RECLAIMED WATER) (760) 438-2722 WILL BE PLUGGED WITH CONCRETE OR REMOVED AS APPROVED BY THE CITY ENGINEER. PUBLIC RIGHT OF WAY. PRIOR TO PERMIT ISSUANCE, A CERTIFICATE OF INSURANCE AS WELL AS 32. PERMIT COMPLIANCE REQUIREMENTS: 5. WHEELCHAIR RAMPS SHALL BE INSTALLED PER REQUIREMENTS OF TITLE 24, CALIFORNIA ADMINISTRATIVE CODE. ADDITIONAL INSURED ENDORSEMENT MUST BE FILED NAMING THE CITY OF CARLSBAD AS AN A. FOR CONTROLLED GRADING - THE APPLICANT HIRES A CIVIL ENGINEER, SOILS ENGINEER, AND/OR GEOLOGIST 6. STREET TREES SHALL BE INSTALLED PER SECTION VI OF THE CITY OF CARLSBAD LANDSCAPE MANUAL. ADDITIONAL INSURED ON THE PERMITTEE'S POLICY IN THE MINIMUM AMOUNT OF $1,000,000.00 TO GIVE TECHNICAL ADVICE, OBSERVE AND CONTROL THE WORK IN PROGRESS 15.16.120 A.8 CARLSBAD 7. FIRE HYDRANT MARKERS SHALL BE PLACED IN THE STREET WITHIN THE LIMITS OF WORK OF THIS PLAN PER FOR EACH OCCURRANCE OF LIABILITY. THE INSURANCE COMPANY WRITING THE POLICY MUST MUNICIPAL CODE SDRSD DWG M19. HAVEA RATING OF "A-" OR BETTER AND A SIZE CATEGORY OF CLASS VII OR BETTER AS ESTABLISHED BY "BESTS" KEY RATING GUIDE B. PRIOR TO COMPLETION OF GRADING WORK- THE FOLLOWING REPORTS MUST BE SUBMITTED TO THE CITY 8. ALL SURVEY MONUMENTS AND POINTS THAT ARE DISTURBED BY THIS WORK SHALL BE REESTABLISHED, ENGINEER VIA THE PROJECT INSPECTOR PER SECTION 15.16.120 OF THE CARLSBAD MUNICIPAL CODE: PERPETUATED, AND DOCUMENTED PER THE PROFESSIONAL LAND SURVEYORS ACT. 5. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM THE CITY AND (1) FINAL REPORT BYSUPERVISING GRADING ENGINEER STATING ALL GRADING IS COMPLETE ALL EROSION 9. TWO (2) SETS OF SURVEY(CUT) SHEETS SHALL BE PROVIDED TO THE CITY ENGINEERING INSPECTOR, OTHER APPROPRIATE AGENCIES. CONTROL, SLOPE PLANTING AND IRRIGATION ARE INSTALLED IN CONFORMANCE WITH CITY CODE AND THE 10. STREET LIGHTS SHALL BE 5,500 LUMEN (40 WATT) OR 13,700 PUPIL LUMEN (100 WATT) HIGH EFFICIENCY 6. APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOTAUTHORIZE ANY WORK OR APPROVED PLANS (OBTAIN SAMPLE OF COMPLIANCE LETTER FROM CITY ENGINEERING DEPARTMENT). INDUCTION LIGHTS. GRADING TO BE PERFORMED UNTIL THE PROPERTY OWNER'S PERMISSION HAS BEEN OBTAINED AS-BUILT GRADING PLAN, AND A VALID GRADING PERMIT HAS BEEN ISSUED. REPORT FROM THE SOILS ENGINEER, WHICH INCLUDES RECOMMENDED SOIL BEARING CAPACITIES, A BASIS OF BEARINGS 7. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE APPROPRIATE SHEET OF THE PLANS STATEMENTAS TO THE EXPANSIVE QUALITY OF THE SOIL, AND SUMMARIES OF FIELD AND LABORATORY TESTS. THE REPORT SHALL ALSO INCLUDE A STATEMENT BY THE SOILS ENGINEER THAT THE GRADING WAS THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA COORDINATE SYSTEM, NAD 83 (CCSB3) EPOCH 1991.35, AND THE TITLE SHEET. DONE IN ACCORDANCE WITH THE REQUIREMENTS AND RECOMMENDATIONS OUTLINED IN THE ZONE 6, AS DETERMINED LOCALLY BYA LINE BETWEEN FIRST ORDER CONTROL STATIONS 128 (CLSB-128) AND 139 PRELIMINARY SOILS REPORTAND ANY SUPPLEMENTS THERETO. (5-50.7) BEING A GRID BEARING OF N28°25'24"EAS DERIVED FROM GEODETIC VALUES SHOWN ON RECORD OF SURVEY 8. ORIGINAL DRAWINGS SHALL BECOME THE PROPERTY OF THE CITY UPON BEING SIGNED BY THE REPORT WITH AS-BUILT GEOLOGIC PLAN, IF REQUIRED BY THE CITY. 17271, CITY OF CARLSBAD SURVEY CONTROL, FILED ON FEBRUARY 8, 2002 AS FILE NUMBER 2002-0112862 IN THE CITY ENGINEER. PERMANENT STRUCTURAL BMP INSTALLATION CERTIFICATE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY 9. THE ORIGINAL DRAWING SHALL BE REVISED TO REFL EC T AS-B UIL T CONDITIONS BY THE (6) PERMITTED WALL FINAL INSPECTION REPORT. ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE CITY. 33. UNLESS A GRADING PERMIT FOR THIS PROJECT IS ISSUED WITHIN ONE (1) YEAR AFTER THE CITY ENGINEER'S QUOTED BEARINGS FROM REFERENCE MAPS OR DEEDS MAY OR MAY NOT BE IN TERMS OF SAID SYSTEM. 10. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE PROJECT APPROVAL, THESE PLANS MAYBE REQUIRED TO BE RESUBMITTED FOR PLANCHECK. PLANCHECK FEES WILL BE SITE ATALL TIMES DURING CONSTRUCTION. REQUIRED FOR ANY SUCH RECHECK. 11. WHERE TRENCHES ARE WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED OF: (A) SUMMARY 34. IN ACCORDANCE WITH THE CITY STORM WATER STANDARDS, ALL STORM DRAIN INLETS CONSTRUCTED BY THIS SHEET, (B) LABORATORY WORK SHEETS AND (C) COMPACTION CURVES, SHALL BE SUBMITTED BY PLAN SHALL INCLUDE "STENCILS" BE ADDED TO PROHIBIT WASTEWATER DISCHARGE DOWNSTREAM, STENCILS A PROFESSIONAL ENGINEER OF THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE SHALL BE ADDED TO THE SATISFACTION OF THE CITY ENGINEER. SOURCE OF TOPOGRAPHY FIELD OF APPLIED SOILS MECHANICS, THE SOILS REPORT WILL BE SUBMITTED TO THE CITY ENGINEERING INSPECTOR WITHIN TWO WORKING DAYS OF THE COMPLETION OF FIELD TESTS, TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERATED BY FIELD SURVEY METHODS FROM INFORMATION 12. A SOILS COMPACTION REPORTAND COMPLIANCE VERIFICATION REGARDING ADHERENCE TO EROSION CONTROL NOTES GATHERED ON: 10/17/2019 BY: PASCO, LARET, SUITER & ASSOCIATES RECOMMENDATIONS OUTLINED IN THE SOILS REPORT IS REQUIRED PRIOR TO THE ISSUANCE OF IN CASE EMERGENCY WORK IS REQUIRED, CONTACT BRETT FARROWAT 760-230-6851. ALONG WITH TOPOGRAPHY PROVIDED BY METROPOLITAN MAPPING AND SAMPO ENGINEERING, A BUILDING PERMIT. ALL CONTROLLED GRADING SHALL BE DONE UNDER THE DIRECTION OFA EQUIPMENTAND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY TOPOGRAPHY SHOWN HEREON CONFORMS TO NATIONAL MAP ACCURACY STANDARDS. PROFESSIONAL ENGINEER OF THE STATE OF CALIFORNIA PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. ALL FILL OR FUTURE FILL AREAS SHALL BE CONSTRUCTED SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FACILITATE PROJECT LOCATION IN ACCORDANCE WITH THE CITY OF CARLSBAD STANDARD SPECIFICATIONS AND THE" RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMINENT. EARTHWORK SPECIFICATIONS "ATTACHED TO THE PRELIMINARY SOILS INVESTIGATION, DAILY FOR PROJECTS COVERED BY STATE S WPPP/WDID, IN ACCORDANCE WITH THE CONSTRUCTION ORDER ISSUED BY THIS PROJECT IS LOCATED WITHIN ASSESSORS PARCEL NUMBER(S): 155-221-12-00 FIELD COMPACTION REPORTS WILL BE SUBMITTED TO THE PROJECT INSPECTOR. THE CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, THE QUALIFIED SWPPP PRACTITIONER (QSP) SHALL THE CALIFORNIA COORDINATE INDEX OF THIS PROJECT IS: N 2005 E 6225 13, A PRECONSTRUCTION MEETING SHALL BE HELD AT THE SITE PRIOR TO THE BEGINNING OF UPDATEAND MAINTAIN THE WATER POLLUTION CONTROL PLAN (WPCP) TO ADDRESS UPDATED SITE CONDITIONS WORKAND SHALL BE ATTENDED BYALL REPRESENTATIVES RESPONSIBLE FOR OF THE PROJECT. THE UPDATED WPC PLAN AND UPDATED SWPPP SHALL BE KEPTAT THE PROJECT SITE AND MADE CONSTRUCTION, INSPECTION, SUPERVISION, TESTING AND ALL OTHER ASPECTS OF THE AVAILABLE TO THE CITY INSPECTOR. ADDITIONAL CONSTRUCTION BMP'S BEYOND THE ORIGINAL APPROVED MITIGATION MONITORING AND REPORTING PROGRAM (MMRP) NOTES WORK. THE CONTRACTOR SHALL REQUESTA PRECONSTRUCTION MEETING BY CALLING THE SWPPP SHALL BE PROVIDED TO ADDRESS SITE CONDITIONS NOTANTICIPA TED. THE QSP SHALL REPORT BMP INSPECTION LINE AT (760) 438-3891 AT LEAST FIVE(5) WORKING DAYS PRIOR TO STARTING DEFICIENCIES TO THE CITY INSPECTOR. THE QSP SHALL OBTAIN APPROVAL FROM THE QUALIFIED SWPPP NOISE-I: CONSTRUCTION. THE CONTRACTOR WILL THEN BE CONTACTED BY THE PROJECT INSPECTOR TO DEVELOPER AND THE CITY INSPECTOR REGARDING ANY SIGNIFICANT CHANGES TO BMP DEPLOYMENT. CONSTRUCTION ACTIVITIES SHALL TAKE PLACE DURING THE PERMITTED TIME AND DAY PER CARLSBAD MUNICIPAL COORDINATE A DATE AND TIME FOR THE PRECONSTRUCTION MEETING. APPROVED DRAWINGS 4, THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION CODE CHAPTER 8.48. THE APPLICANT SHALL ENSURE THAT CONSTRUCTION ACTIVITIES FOR THE PROPOSED PROJECT MUST BE AVAILABLE PRIOR TO SCHEDULING, THE GRADING PERMIT WILL BE PROVIDED BY THE OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL, ARE LIMITED TO THE HOURS FROM 7A.M. TO 6P.M. MONDAY THROUGH FRIDAY, AND 8A.M. TO 6P.M. ON SATURDAYS; PROJECT INSPECTOR AT THE MEETING, 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAYBE REQUIRED BY THE CITY NO WORK SHALL BE CONDUCTED ON SUNDAYS OR ON FEDERAL HOLIDAYS, THIS CONDITION SHALL BE LISTED ON THE 14. ALL INSPECTION REQUESTS OTHER THAN FOR PRECONSTRUCTION MEETING WILL BE MADE ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MA YARISE PROJECT'S FINAL DESIGN TO THE SATISFACTION OF THE CITY OF CARLSBAD LAND DEVELOPMENT ENGINEERING BY CALLING THE ENGINEERING 24-HOUR INSPECTION REQUEST LINE AT (760) 438-3891. DIVISION. INSPECTION REQUEST MUST BE RECEIVED PRIOR TO 2:00 P.M. ON THE DAY BEFORE THE 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC INSPECTION IS NEEDED. INSPECTIONS WILL BE MADE THE NEXT WORKDAY UNLESS YOU TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION. SEE EROSION CONTROL PLAN ON SHEET4 FOR BIO-3,4, & 5 MITIGATION MEASURES, REQUEST OTHERWISE. REQUESTS MADE AFTER 2:00 P.M. WILL BE SCHEDULED FOR TWO FULL 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED SWPPP AND/OR EROSION CONTROL PLAN WORK DAYS LATER. SHALL BE INCORPORATED HEREON, 15, THE OWNER AND/OR APPLICANT THROUGH THE DEVELOPER AND/OR CONTRACTOR SHALL 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPEAT THE DESIGN, CONS TRUCTAND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE CONCLUSION OF EACH WORKING DAY. SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATEAND FEDERAL SAFETYAND HEALTH STANDARDS, LAWS AND REGULATIONS. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN 16, THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING A DETAIL THE FIVE (5) DAYRAIN PROBABILITY FORECASTEXCEEDS FIFTY PERCENT (50%). SILTAND OTHER DEBRIS SHALL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING THE DESIGN OF SHORING, BE REMOVED AFTER EACH RAINFALL. BRACING SLOPING OR OTHER PROVISIONS TO BE MADE OF WORKER PROTECTION FROM THE 10. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGRATE. HAZARD OF CAVING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR 11. SHOULD GERMINATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFECTIVE COVERAGE OF GRADED SLOPES DURING THE PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES (90% COVERAGE) PRIOR TO NOVEMBER 15, THE SLOPES SHALL BE STABILIZED BY PUNCH STRAW INSTALLED IN FIVE FEET (5) OR MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED ACCORDANCE WITH SECTION 35.023 OF THE EROSION AND SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT AGENCY PRIOR TO EXCAVATION, IF THE PLAN VARIES FROM THE SHORING SYSTEM OF CONSERVATION, STATE OF CALIFORNIA. STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8 CALIFORNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BYA REGISTERED ENGINEER AT THE CONTRACTORS EXPENSE A COPY OF THE OSHA EXCAVATION PERMIT MUST BE SUBMITTED SOILS ENGINEER'S CERTIFICATE TO THE INSPECTOR PRIOR TO EXCAVATION. 17, NO BLASTING SHALL BE PERFORMED UNTIL A VALID BLASTING PERMIT HAS BEEN OBTAINED FROM I, VITHAYA SINGHA NET, G.E., A REGISTERED CEO TECHNICAL ENGINEER OF THE STATE OF CALIFORNIA, PRINCIPALLY THE CITY OF CARLSBAD, SUBMITAPPLICATION FOR BLASTING PERMIT WELL IN ADVANCE OF THE DOING BUSINESS IN THE FIELD OFAPPLIED SOILS MECHANICS, HEREBY CERTIFY THATA SAMPLING AND STUDY OF THE SCHEDULING OF BLASTING OPERATIONS. SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON APRIL 4, 2018. TWO IFANYARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORKAREA DURING COPIES OF THE SOIL REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO CONSTRUCTION, OPERATIONS WILL CEASE IMMEDIATELY, AND THE PERMITTEE WILL NOTIFY THE THE OFFICE OF THE CITY ENGINEER. CITY ENGINEER, OPERATIONS WILL NOT RESTART UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM THE CITY ENGINEER TO DO SO, SIGNED:________________________________ VITHAYA SINGHANET, GE ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS, EARTHMOVING EQUIPMENT, G.E/P.E. NO.:_782 GE/23485 PE CONSTRUCTION EQUIPMENTAND ANY OTHER ASSOCIATED GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN 7:00A.M. AND 6:00 P.M. EACH DAY, MONDAY THRU FRIDAYAND DATE:___________________________________ NO EARTHMOVING OR GRADING OPERATIONS SHALL BE CONDUCTED ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTMENT LICENSE EXPIRATION DATE:12-31-2021 COUNTER.) OWNER'S CERTIFICATE ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CITY ENGINEER FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF WORK. I (WE) HEREBY CERTIFY THATA REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO IMPORT MATERIAL SHALL BE OBTAINED FROM, AND WASTE MATERIAL SHALL BE DEPOSITED AT, A SIGNED: 1 SUPERVISE OVER-ALL GRADING ACTI VITYAND ADVISE ON THE COMPACTION AND STABILITY OF THIS SITE IF THIS SITE APPROVED BY THE CITY ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MARK B UR WELL, CEG PROJECT/DEVELOPMENT IS SUBJECT TO A STATE-REGULATED SWPPP, I (WE) ALSO AGREE A QUALIFIED SWPPP DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTES OR ADJACENT STREETS AS A G.EJP.E. NO.: 2109 PRACTITIONER QSP HAS BEEN OR WILL BE RETAINED TO SUPERVISE IMPLENTATION OF THE SWPPP IN ACCORDANCE RESULT OF THE GRADING OPERA TION . WITH THE CALIFORNIA CONSTRUCTION ORDER AND MUNICIPAL PERMIT, LATEST VERSION. BRUSH SHALL BE REMOVED ONLY WITHIN THE AREA TO BE GRADED. NO TREES ARE TO BE DATE:___________________________________ REMOVED UNLESS SPECIFICALLY NOTED ON THE PLAN. ALL AREAS SHALL BE GRADED TO DRAIN. GRADING RESULTING IN THE PONDING OF WATER IS NOT LICENSE EXPIRATION DATE: 5-31-2020 PERMITTED. ALL EARTHEN S WALES AND DITCHES SHALL HAVEA MINIMUM ONE PERCENT SLOPE -- SIGNATURE DATE THESE PLANS ARE SUBJECT TO A SIGNED AND APPROVED SWPPP AND/OR SET OF EROSION BRETT FARROW CONTROL PLANS, EROSION CONTROL SHALL BEAS SHOWN AND AS APPROVED BY THE CITY FOR: LAGUNA PROJECT, LP ENGINEER ORAS DIRECTED BY THE PROJECT INSPECTOR. ALL SLOPES SHALL BE TRIMMED TO FINISH GRADE TO PRODUCEA UNIFORM SURFACEAND DECLARATION OF RESPONSIBLE CHARGE (SHEETS 1-5) CROSS SECTION. THE SITE SHALL BE LEFT IN A NEATAND ORDERLY CONDITION. ALL STONES, I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT /HAVE EXERCISED ROOTS OR OTHER DEBRIS SHALL BE REMOVED AND DISPOSED OFATA SITE APPROVED OF BY RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECTAS DEFINED IN SECTION 6703 OF THE BUSINESS AND THE CITY ENGINEER. PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. 26, ALL SLOPES SHALL BE IRRIGATED, STABILIZED, PLANTED AND/OR HYDROSEEDED WITHIN TEN (10) I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE CITY OF CARLSBAD ñ(C MfYr Drlr/r nir AC CM/Nklrro rr IAIrbIf cr ilivbrCr,PbAICIDII ITICIL, Eltlo no Ir ri Al -- WORK TO BE DONE \ / 0 ep ui 00. LAGUNAL /K THE GRADING WORK SHALL CONSIST OF THE CONSTRUCTION OF ALL CUTS AND FILLS, REMEDIAL GRADING, DRAINAGE FACILITIES, EROSION CONTROL FACILITIES, AND PLANTING OF PERMANENT LANDSCAPING AND PREPARATION OF AS-BUILT GRADING PLANS, AS-BUILT GEOLOGIC MAPS AND REPORTS, ALL AS SHOWN OR REQUIRED ON THIS SET OF PLANS AND THE CITY STANDARDS, SPECIFICATIONS, REQUIREMENTS, RESOLUTIONS AND ORDINANCES CITED ON THESE PLA NS. THE GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER. CARLSBAD MUNICIPAL CODE 10, CALIFORNIA COASTAL COMMISSION DEVELOPMENT CITY OF CARLSBAD ENGINEERING STANDARDS PERMIT CONDITIONS DATED 9/10/2019 THIS SET OF PLANS 11. ENVIRONMENTAL APPROVAL DOCUMENTS RESOLUTION NO 7341 DATED 7/17/2019 DA TED NIA RESOLUTION NO 7342 DATED 7/17/2019 12, STORM WATER POLLUTION PREVENTION PLAN (TIER 2) RESOLUTION NO. 2019-169 DATED 9/10/2019 PREPARED BY: PLSA THE STANDARD SPECIFICATIONS FOR PUBLIC 13. STORM WATER QUALITY MANAGEMENT PLAN PREPARED WORKS CONSTRUCTION (GREEN 900K) BY: WE DATED: 05/2020 SOILS REPORT AND RECOMMENDATIONS BY 14. CALIFORNIA STORM WATER QUALITYASSOCIATION BMP COAST GEOTECHNIGAL DATED 01/23/2020. CONSTRUCTION HANDBOOKAND CAL TRANS CONSTRUCTION VICINITY MAP '1' N.T.S. N THE SAN DIEGO REGIONAL STANDARD DRAWINGS SITE BMP MANUAL AND AS MAYBE MODIFIED BY THE CITY OF CARLSBAD STANDARDS, PROJECT ADDRESS 570-580 LACUNA DRIVE CARLSBAD, CA 92008 REFERENCE DRAWINGS CARLSBAD DWG. NO. 153-9 CARLSBAD DWG. NO. 457-4J INDEX OF SHEETS 1 GRADING PLAN TITLE SHEET 2 GRADING PLAN 3 SECTIONS AND DETAILS 4 TIER 2 SWPPP TITLE SHEET 5 TIER 2SWPPP EROSION CONTROL PLAN 6 SINGLE SHEET BMP SITE PLAN OWNER/DEVELOPER NAME: LACUNA PROJECT, LP CONTACT: BRETT FARROW (MANAGER) ADDRESS: 125 MOZARTAVE CARDIFF, CA 92007 PHONE NO.: (760)230-6851 ABBREVIATED LEGAL DESCRIPTION APN: 155-221-12-00 THAT PORTION OF LOT 1, SECTION 1, TOWNSHIP 12 SOUTH, RANGE 5 WEST, SAN BERNARDINO BASE AND MERIDIAN, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO UNITED STATES GOVERNMENT SURVEY APPROVED JUNE 22,1883, AS DESCRIBED IN GRANT DEED ON NOVEMBER 2, 2012 AS DOCUMENT NO. 2012-0684749, OF OFFICIAL RECORDS IN THE OFFICE OF THE SAN DIEGO COUNTY RECORDER. BENCH MARK - DESCRIPTION: CADT 5-50.7 -CONTROL POINT 139 LOCATION: FD. CADT DISK IN SOUTH SIDEWALK NEAR THE EAST END OF LAS FLORES DRIVE BRIDGE OVER INTERSTATE 5 PER ROS 17271 RECORDED: 2002 ELEVATION: 82.221 DATUM: NGVD 29 EARTHWORK QUANTITIES CUT: 3601 CY IMPORT: 60± CY FILL: 420± CY EXPORT: 0 CY REMEDIAL: 1350 CY DISTURBED AND IMPERVIOUS AREA TOTAL NETAREA 31,351SF10720 AC (THIS AREA IMPROVEMd STAGING Ad DESCRIPTION STD. SYMBOL QUANTITY SUBDIVISION BOUNDARY - RIGHT OF WAY PROPOSED SETBACKS EXISTING EASEMENT CENTERLINE OF ROAD - EXISTING CONTOUR LINE -47-- - PROPOSED CONTOUR LINE 47 DRAINAGESWALE SAWCUTOFEX!STINGAC PAVEMENT I_I 120 LF PRIVATE 6" PVC STORM DRAIN - 120 LF PRIVATE PERFORATED PVC STORM DRAIN 120 LF PVT I8"X 18" GRATED INLET BROOKS BOX 2 EA TRAFFIC RATED PVT. I2"X 12" CATCH BASIN NDS OR EQUAL 9 EA LANDSCAPED TREE WELL DETAIL, SHEET 200 SF 6" PCC CURB & GUTTER SDRSD G2* 120 LF TRENCH RESURFACING CITY OF CARLSBAD GS-26 120 LF MASONRY RETAINING WALL SDRSD C-03 -_----- 400 SF PERMEABLE PAVER BMP DETAIL SHEET 2500 SF 60" REINFORCED PCC (IMPERVIOUS) PER PLAN SEE 2000 SF I I. DETAIL, SHEET 3 40" PCC WALK (IMPERVIOUS) 2000 SF SDRSD G-0 7* 4 4 4"AC PVMT OVER 4"AB (MIN) DETAIL, SHEET 3 240 SF L 2"AC GRIND & OVERLAY L//2Y/-//>//1 600 SF SEWER MANHOLE (PVC LINED) CITY OF CARLSBAD S-IA, S-2 I EA A-4 STORM CLEANOUT SDRSD D-09 u I EA PVT. 4" PVC SEWER LATERAL CITY OF CARLSBAD S-7 S 200 LF WiTH WYE CLEANOUT 6" PVC SEWER MAIN CITY OF CARLSBAD S-5 s I EA PROPOSED 2" WATER SERVICE CMWD W-4, W-20 ----------------D----® I EA PROPOSED 1"IRRIGATION SERVICE CMWD W-3, W-20 I EA PROPOSED 4" FIRE SERVICE CMWD W-22 I EA PCC DRIVEWAYAPRON SDRSD G14A* A_N 220 SF *AS MODIFIED BY CITY OF CARLSBAD STANDARDS TOTAL REP TOTAL PRO ui1U Ur il-it I lMt VVt1t1Y t/4L.I-1 LUI-'b l bt(ULILtlI IL) C1-(/4Ub / ."IlUVVN UN 11-lb /WI-'IiUVbU iJJL..J I(t.'I S'.LLJL V L IVIL, tJ l..I YL7IIWLLt 'Jr VVIJflr LU IVH fL7UiJIVQICflLI I IIQ FL% rrWJICL, I IJCQI(.IV. GRADING PLANS. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR THIS PROJECT, DRA WING NO, BY: DATE: 5/22/2020 AND/OR AS DIRECTED BY THE CITY ENGINEER OR PLANNING DIRECTOR, TYLER G. LAWSON, R.C.E. THE OWNER/APPLICANT SHALL INSURE THATALL CONTRACTORS SHALL COORDINATE THE WORK OF THESE GRADING PLANS WITH THAT SHOWN ON BOTH THE LANDSCAPEAND IRRIGATION R.C.E. NO.: 80356 co Z3 No. 80356 PLANS AND THE IMPROVEMENT PLANS AS REQUIRED FOR THIS WORK IN ACCORDANCE WITH THE REGISTRATION EXPIRATION DA 12-31-2020 LANDSCAPE MANUAL TIME REQUIREMENTS. Exp. 2/31/20 ' WHERE AN EXISTING PIPE LINE IS TO BE ABANDONED AS A RESULT OF THE GRADING FIRM: PASCO, LARET, SUITER, AND ASSOCIATES, INC. OPERATION, IT SHALL BE REMOVED WITHIN TWENTY FEET OF BUILDING OR STREETAREAS AND ADDRESS: 535 NORTH HIGHWAY 101, SUITE A REPLACED WITH PROPERLY COMPACTED SOILS, IN OTHER AREAS THE PIPE WILL BE PLUGGED - - MTV TATiAM AU A 0fl7 STRUCTURAL (POST- CONSTRUCTION)BMP TABLE STORM WA TER REQUIREMENTS THAT APPLY: EXEMPT FROM HYDROMODIFICA TION? STANDARD STORM WA TER REQUIREMENTS YES (SEE SWMP FOR DOCUMENTATION) PROJECT REQUIREMENTS F7PRIORITY NO TYPE DESCRIPTION OWNERSHIP MAINTENANCE SHEET NO. MAINTENANCE AGREEMENT FREQUENCY PERMEABLE PERMEABLE PRIVATE N/A 2 REFER TO PAVEMENT PAVEMENT (INF-3) PROJECT SWQMP - WITH CONCRETE OR REMOVED AS APPROVED BY THE CITY ENGINEER. _ TELEPHONE (858) 259-821 TOTAL GRC TOTAL DISI SS AREA = 32551SFIO.747AC 7JRBED AREA = 23,000 SF/0.528AC NTS AND TEMPORARY DISTURBANCE SUCH AS VEHICLE AND EQUIPMENT ?EAS,CONSTRUCTION TRENCHES, BACKFILL CUTS AND SLOPE KEYWAYS) LACED IMPERVIOUS AREA = 11,207 SF INCLUDES BUT IS NOT LIMITED TO OFF-SITE WORK INCLUDING PUBLIC POSED IMPERVIOUS AREA = 11,858SF "AS BU I LT" RCE_______ EXP.__________ DATE REVIEWED BY: INSPECTOR DATE CITY OF CARLSBAD SHEETS I ENGINEERINGDEPARTMENT 6 GRADING PLANS FOR LAGUNA ROW RP2018-0008 570-580 LAGUNA DRIVE GR 2019-0044 TITLE SHEET HMP2OI8-0003 APPROVED: JASON S. GELDERT CITYENGINEER _RCE63912 EXPIRES 9/30/20DATE CJB DWN By.. PROJECT NO.DRAWiNG NO RVWD BY: _____ CT 2018-0006 521-7A DATE INI11AL REVISION DESCRIPTiON DATE INITIAL DATE INIllAL ENGINEER OF WORK 01HER APPROVAL CITY APPROVAL I \) / (NOTA PART) PUBLIC CURB DATA TABLE I APNI55-221-15-OO STA 5+25,-20 / BEARING DISTANCE NOTE I PORLOT±SECT!ON1-- TI2S R5W SBM I I 7 I END IMPROVEMENTS \ MATCH EXISTING CONDITION \ (45 15 TC/44 65 FL) \ - \ i I Lo LI N 89°2434" W 5488' 6" TYPE 'G' C&G PER G-2 L2 N 89°24'34" W 2600' CURB OPENING PER G I4A L3 N 89°2434" W 39.1Z 6" TYPE 'G' C&G PER G-2 445FG _,_,"(461&) (45.2FG) (45.2 FG) (45.3FG) (45.3FG) (45.25 FG) ) 231.81' \ N 00°4142 E r 45.1 FG - A A A 44FG- - A r X - A I90 PVT SEWER LATERAL DATA TABLE - ___*__f -®- 451 FG LA .95 TG /N=35 E-42 -510FG 4505 TG 44 96 TG (.J_ LA I 1 46.31 FS \: OIE . -cj- '. -r .+ A' ao-j':-u- LLJ uj oc I 7 7 ___ '-45 60 FG R460 46 18F LA 45 75 FG_\\ 45 55 FG_\ LA 4535FG_\8 34 LA I PR! VA TE ROAD CENTERLINE DATA I__ UNIT -1 GARAGE' GE 17 JIt c - \'' UNIT 13 4551 S -7)y r 1 ' CL BEARING DISTANCE NOTE S53°5454W 7709' 6PVC 2 NOO°38'04"E 116.97' 6PVC BEARING DISTANCE I S89°17'59"E 901' 2 N53°54'54E 6646' 3 NOO°35'26"E 83.10' I LX-Th Jb b2)T 4" - - - 2.0% PAD: 45.60 / \ \( \- \ FF:45.53 42.75 !6 I I PAD. 45 4510 MI \ I I W RAISED WOOD FLOOR Si 4 "SEWER LATERAL -3 U 00 \\__-,__ \ _,•# .O8FS\r i -i I FF47.34 1 IE=37.84 LA \'-45.75FG UNIT 10 5.55 FIG UNITII \-5.35FG 'ç"-45.10G V - T . I I LL **PRIVATE WATER NOTE** I / PAD: 45.75 PAD. 45.55 PAD: 4535 45.51 FS 44.86 ONSITE PRIVATE WATER UTILITIES AND FACILITIES 4 SEWER - ,- ' :\\\\O FS V WATER TOP= 39.$ SHOWN HEREON FOR REFERENCE ONLY. REFER I LATERAL Q 45.46 / UTIL X-ING CTO PROJECT ONSTRUCTION SEPARATE MEP PLAN FOR IE= 3771 , 20 19 LOT I \ 22 4410 TG FS LA II 12 /" ' T 3; " WATER IE= 39 0 LN V . -- Z I WA TER IE= 39, 0 UNIT 2 SEWER LATERAL NOTE UNIT10GARAG cp cp, UNIT 12 GARA UNIT 13 GARAGE, BACKWATER VALVES REQUIRED FOR UNITS 7, 8, 9 11, (43.7FG) V 4"SEWER FF:45.60 \ FF:45.40 FF:45.20 PAD: 45.60 FF:44.95 I 42.50 V V fl-ING 12,& 13; REFER TO PROJECT SEPARATE MEP PLAN ' ..* \ LATERAL Q_ PAD: 44.85 PAD: 44.65 PAD: 44.45 PAD: 44.2i0 LI , / WATER IE=39.Ow - V 11 ° \, c IE= 3737 - / - \ SSFM TOP- 32.2 .- O, SEWER LATERAL NOTE V 4" SEWER 4 SEWER LATERAL 4 SEWELATERAL 0 R - 4 20 FS 28 29 - PROPERTY UNKNOWN; LATERAL TO BE LOCATED IN FF: 46.18 1 35.65 ... .. I EXISTING SEWER LATERAL LOCATION SERVING -UNIT 3 c,' 12 G - IEz 42.40 V I I CONNECT TO EX 10" WTR 0 ~ FIELD AND SERVICE TO BE CAPPEDATPROPERTYLINE ' (43.9FG FAD: 45.43 V IE V \\ : . LA . LA LA LA W / - STA4+75.50-11.1'RT /4% '\ ' 45IFS' 21 /4.4 1 30 V 6'HOTTAPTOEXIO"VTTR STATIONING It' NOTE - LATERAL / , (9>11!45.26F§-.l I 0 4496 FS I 44 79 FS " ' FS 9 STA 4+6853111 RT ii-iiii.iivuvtivw '. -' !E=37.02 - \-3\ S l4r3gFs I I - 'H 1. 44FS - V STA1O+3435 ' EXWATERSERVICE CENTERLINE STATIONING FOR LAGUNA DRIVE '*- 3- \WT "NV W -_ w - w --.-- q ._,__ , -- PROP A-4 SDCO I TO BE KILLED AT MAIN (STAI+00)TOBEGINATINTERSECTIONOFLAGUNA I 33l -_RIM=4430_ - DRIVEAND STATE STREET \ UNIT4Wpw __ V VJ'7VV IE \\' LOT2 V FF:46.O1 6 UTILITIES ARE KNOWN TO EXIST IN THE AREA. ' PROPOSED OPENSPACE-.. " (43.4 FG) PAD. 45.267 \\ L1 INFORMATION SHOWN HEREON IS PER BEST S NO GRADING TO OCCUR AVAILABLE RECORD INFORMATION. EXACT HORIZONTAL AND VERTICAL LOCATION OF \ r r 4" SE WER EXISTING UTILITIES UNKNOWN. CONTRACTOR TO '. \.. - V loj FIELD VERIFY LOCATION OF EXISTING UTILITIES 'V V V V V V \\ UNIT 5 IE= 36.68 ' \ V 5' r I \ STA 4 +53.55 -9.0' LT EUGNTOEXSD - - L2 -V - - s/N 18" !E=$O. 18 Sm 4+&00 -20.0 L T 0\'D1 (36" MAIN !E=28.68) STA d+s&oo LACUNA DR 33 21 N -V STA 10+00 PRIVATE DRIVE I '-i JJJ / STA 4+57.48 N \'N \N\NtTN PROP DROP SSMH IN aj7_'T> 4432 __- L1 34J E347TTL V_ .444.."liful I .__J__ .I LATERAL t.•57 3N3[V PRIOR TO ORDERING MATERIALS AND 46 3 STA 4+57.48 SILT CONSTRUCTION. CONTRACTOR SHALL NOTIFY PAD: 45.0 <4t ~~5~, Pmr- I STA 4+57.48 ENGINEER OF WORK OF ANY DISCREPANCIES 4 45.1 (IE=2~9.44) 39 BETWEENACTUAL LOCATION AND PLAN LOCATION 414+~ OF UTILITIES UPON DISCOVERY OF DISCREPANCY 14 1 vrs UTIL X.Wr, I 00, LA 4" SEWER ABBREVIATION LEGEND LATERAL LATERAL 38 4 BS=ELEVAT!ONATBOTTOMOFSTAIR LI\\N \\ \ - \ \N L LI!!t F RADING FF4567 LATERAL V !E-35.49 IE=35.03 Lu iE-3. SSLAT BW- BOOM OF WALL ELEVATION N\\\ N N \N \N\\\ V \ MATHEXGRADE TYP N\ PAD: 44.92 UNIT7 1E= 36. 12 I 12 23 TOP 3i.9± 36" SD EG EXISTING GRADE N N ' N \ ' 430 FG V b1 F. 45.44 UNIT 8 UTIL -NO FSF!NISHEDSURFACE N \ \ N" '> V - 7 \ PAD: 44.69 7 \ / FF. 45.15 7 UNIT 36 - : L3 2"GSIE=40.8 FG -FINISHED GRADE N \ N N I N PAD: 44.40 FF:44.66 SSTTOP=33.4 FL = FLOWLINE N ' N - \ N - N- N I I PAD: 43.91 V 15 FF = FINISHED FLOOR N \ N N ' - \ ' V ' V 7 12 V I GF = GARAGE FACE \ \ N \ 77 N \ N \ N - 41- \I I IE INVERT ELEVATION 'V \ \ \ \ \ N - N - - ' N N - ' / -. - V ,-0'7 LA = LANDSCAPE AREA ' - 4 ' W 1 I [I PVT =PRIVATE \ N \ -\ N - N N \ - 7 N ' N - 0 .5 , . TG = TOP OF GRATE ELEVATION \\N N \\\ \\\\ \ \ 7\ \\ N N -' 1 N \ SETB K- \ o V 20' I 20' I TYP = TYPICAL 44\7TWlBe LA RIM = TOP OF RIM ELEVATION TS ELEVATION AT TOP OF STAIR 7 7 N \ N N N N N N N N \ - ) (42 G) 4440 TO 23 N 22 11 TO ,, N I 22 4345 G 1 34 22 43 10 LA TG - / (=TOPOF WALL ELEVATION \ N \\ \N N N NV BW) 7 \22 42.90- 44.40 FG 42601E 91F 42.30! \ - - 41.951E 411- (42.2 I / PRI"ESE'A/EPLATERATABE 3.45 FG) I V 11 I V V I Ii 7 U- \3, UNIT P VT RD STATION LA TERALATMA IN IEAT MAIN DISTANCE FROM MA IN TO SSCO DROP ATMAIN LATERAL IEcSSCO LATERAL SLOPE SSCO RIM EL COVER AT SSCO GFF UPSTREAM MHRIM ELEV BACKWATER VALVE REQD I PVT RD 8+19.43 36.52 4.7 1.2 37.81 2% 46.24 8.43 46.35 45.55 NO 2 PVT RD 8+23.35 36.34 7.2 1.2 1 37.68 2% 46.21 8.53 46.35 45.55 NO 3 PVT RD 8+40.60 36.00 7.2 1.2 37.34 2% 46.1 8.76 46.18 45.55 NO 4 PVT RD 8+57.85 35.65 7.2 1.2 36.99 2% 45.91 8.92 46.01 45.55 NO 5 P VT RD 8+75.10 35.31 7.2 1.2 36.65 1 2% 45.74 9.09 45.84 45.55 NO 6 PVT RD 8+89.43 34.91 12.4 1.2 36.36 2% 45.59 9.23 45.67 45.55 NO 7 PVT RD 9+02.66 34.65 11.6 1.2 36.08 2% 45.38 9.30 45.44 45.55 YES 8 PVT RD 9+35.36 33.99 13.5 1.2 35.46 2% 45.08 9.62 45.15 45,55 YES 9 PVT RD 9+57.77 33.54 13.1 1.2 35.00 2% 44.6 9.60 44.66 45.55 YES 10 PVT RD 8+97.19 34.76 22.5 1.2 36.41 2% 45.55 9.14 45.6 45.55 NO 11 PVT RD 9+16.30 34.37 22.1 1.2 36.01 2% 45.33 9.32 45.4 45.55 YES 12 PVT RD 9+36.72 33.97 22.4 1.2 35.62 2% 45.1 9.48 45.2 45.55 YES 13 PVT RD 9+54.95 33.60 21.8 1.2 35.24 2% 44.85 9.61 44.95 45.55 YES BMP TABLE TYPE SIZE OWNERSHIP 1,212 SF PERMEABLE PAVERS PER INF-3 PRIVATE 1,195 SF 100 SF TREE WELL PER SD-A, SD-F PRIVATE 100 SF FESS/ j" - "AS B U I LT" co DATE 43.6 TIN A .43.33 FIG / APN 155-221-11-00 ( I 4335 TCI 42 85 FL) N L:NNNN -N POR LOT I SECTION I I1- N. U- N N N N N \ TI2S R5W SBM ii r I 1 ADDITIONAL SITE NOTES PLAN VIEW- GRADING PLAN STREET TREE SIGHT DISTANCE NOTE I ALL UTILITIES SHOWN HEREON PER BESTA VAILABLE RECORD INFORMATION SCALE 1' =10 HORIZONTAL 0 10 20 30 CONTRACTOR TO POTHOLE OR FIELD VERIFY UTILITY CROSSING INFORMATION ALL PROPOSED STREET TREES IN PUBLIC RIGHT-OF-WA Y LOCATED WITHIN CAL TRANS SIGHT AND CONNECTION INVERT ELEVATIONS PRIOR TO CONSTRUCITON ACP WATER NOTE DISTANCE TRIANGLES SHALL HAVE CLIPPINGS MAINTAINED A MINIMUM OF 6'ABOVE FINISHED SURFACE SO AS TO NOT IMPEDE VIEW CORRIDORS; REFER TO SEPARATE LANDSCAPE PLAN FOR GRAPHIC SCALE. I - 10 2 ALL EXISTING ONSITE STRUCTURES TO BE DEMOLISHED NO CUTTING OF ASBESTOS CEMENT PIPE (ACP) IS PERMITTED, CONTRACTOR SHALL REMOVED ACP STREET TREE LOCATIONS AND INFORMATION 3 ALL EXISTING ONSITE TREES TO BE REMOVED UNLESS OTHERWISE NOTED rONEAREAST COUPLING AND INSTALL ACP XPVC ADAPTORS AND THE NECESSARY PVC SIZE AND CLASS PIPE TO INSTALL THE TEE AT THE STATION. 4. ALL PROPOSED ONSITE RETAINING WALL FINISH MATERIAL AND COLOR TO BE - NATURAL GRAYMEDIUM WEIGHT SPLIT FACE BLOCK. CONSTRUCTION NOTES (I) EXISTING CURB, GUTTER, AND SIDEWALK TO REMAIN. PROTECT IN PLACE. (~D PROPOSED RETAINING WALL. HEIGHT PER PLAN. VERSA-LOK STANDARD PROPOSED 6- STORM DRAIN CLEAN OUT, RIMAE PER PLAN. PROPOSED TRANSFORMER & PAD PER SEPARATE SDG&E WORK ORDER. MODULAR CONCRETE UNITS WITHOUT REINFORCEMENT, OR APPROVED EQUAL. (i EXISTING BACKFLOW TO REMAIN. PROTECT IN PLACE. ( PROPOSED 18" RCP STORM DRAIN. PROPOSED ELECTRICAL CONDUIT BY OTHERS. MAINTAIN 5.0' SEPARATION (TYP). PROPOSED SA WCUT LINE ® EXISTING TELECOM CABINET TO REMAIN, PROTECT IN PLACE INSTALL NEW 2- WATER SERVICE, METER, AND BA KFLOWPRE VENT/ON DEVICE ® PROPOSED DOWNSPOUT PER ARCHITECTURAL PLANS (TYP. .-.. -----...-. ® PROPOSED AC RESURFACING PER DETAIL, SHEET 3. PER CMWDW-4, W-20.24"MAX SEPARATION METER TO BACKFLOW. - -- - j ) EXISTING I KU! I KL± / C) KbMAllV. I-'KU I b I IN PLAC~. TRENCH RESURFACING WITH AC PAVEMENT PER CITY OF CARLSBAD GS-25. Q INSTALL 1-IRRIGATION SERVICE LINE AND 3/4"METER WITH BACKFLOW (3) PROPOSED ABOVE-GRADE DECK PER ARCHITECTURAL PLANS (TYP). NOTE: SEE SHEET 6 FOR FULL BMP PLAN AND TABLE REVIEWED WbL) BY: OF EXISTING LIGHT TO REMAIN PROTECT IN PLACE PREVENTION DEVICE PER CMWD W-3, W-20.24" MAX SEP METER TO BACKFLOW PROPOSED RAISED WOOD FLOOR PER ARCHITECTURAL PLANS (TYP) (J D INSTALL 20' WIDE PCC DRIVEWAY PER SDRSD G 14A STATIC PRESSURE =90 PSI MAX IRRIGATION FLOW= 11 GPM SEE SECTION SHEET 3 INSPECTOR DATE EXISTING SURVEY MONUMENT (L&D MARKED "LS 2789'9 TO BE DESTROYED AND REPLACED PER MAP 2019-0009. PROPOSED IMPERVIOUS 60 REINFORCED PCC SIDEWALK SEE DETAIL, SHEET 3 (TYP) INSTALL 4" PVC FIRE SERVICE LINE WITH DOUBLE DETECTOR CHECKASSEMBL Y PROPOSED LOT LINE PER CT 2018 0006 SEE SHEET 3 - SHEET CITY OF CARLSBAD SHEETS EMPTY WATER METER BOX TO 13E REMOVED. REMOVE SERVICE IF FOUND. SHEET 3 DETAIL,(7) Q~) PROPOSED 9" CUTOFF WALL, SEE PER CMWD W-22; CONNECT TO EXISTING WATER MAIN WITH 6" HOT TAP, 6" GATE 6 2 ENGINEERING DEPARTMENT - E-28 FORM & SUBMIT TO INSPECTOR FOR HOT TAP PRIOR TO WORK S . EXISTING STREET TREE TO BE REMOVED. PROPOSED PERMEABLE PAVEMENT BMP, SEE BMP 2 PROFILE, SHEET 3 (TYP). PROPOSED CONSTRUCTION LIMIT PER SHEET 5. CONSTRUCT SILT FENCE TO - INSTALL PVC LINED SEWER DROP MANHOLE PER CITY OF CARLSBAD S-IA, S-2. DELINEATE IMPACT FOOTPRINT. SEE DETAIL, SHEET 5, (J EXISTING 15" WATER SERVICE AND METER TO BE REMOVED FROM RIW TO MAIN PROPOSED 60" REINFORCED PCC DRIVEWAY OVER 12" COMPACTED SUBGRADE SEE DETAIL, SHEET 3 (TYP). INSTALL 6" PVC PRIVATE SEWER LATERAL PER CITY OF CARLSBAD S-7; CONNECT PROPOSED FDC W/4" STANDPIPE. SEE SEPARATE FIRE PROTECTION PLAN. EXISTING 4" SEWER LATERAL TO BE REMOVED. CUT LATERAL AT MAIN. TO ONSITE PRIVATE 6" PVC SEWER LATERAL; INSTALL 4" SEWER CLEANOUT PER PROPOSED CATCH BASIN BYNDS WITH FILTER INSERT PER DETAIL SHEET 3 (TYP) CITY OF CARLSBAD S 7AT GARAGE FACE ® PROPOSED TREE WELL BMP 6" BELOW ADJACENT FS WITH AMENDED SOILS (jD PROPOSED 6" PCC TYPE 'G' CURB AND GUTTER PER SDRSD G-2. PER DETAIL, SHEET 3. GRADING PLANS FOR. - CT2018-0006 LAGUNA ROW RP2018-0008 570-580 LAGUNA DRIVE CDP2018-0032 F% A r KI PLAN P20180003 GR 2019-0044 jr',wIi'i LJWI - V ____________________________________________ - _______ ______ ______ ______V APPROVED JASON S GELDERT (,3) PROPOSED 6" SOLID WALL PVC STORM DRAIN (TYP). (3) INSTALL 6" SEWER CLEANOUT WI 10" CAST IRON LID PER CITY OF CARLSBAD S-7. ______ __________________________________________ ______ ______ _____ I CITY ENGINEER RCE 63912 EXPIRES 9/30/20 DATE I ( PROPOSED 4" PCC SIDEWALK PER SDRSD G-7. (TYP) PROPOSED TRAFFIC RATED I8"X18" BROOKS BOX WITH FILTER PER DETAIL ON V PROPOSED 6" PERFORATED PVC PIPE (TYP) PROPOSED FENCE PER SEPARATE ARCHITECTURAL PLANS (TYP) SHEET 3. CONNECT TO STORM DRAIN DATE INIllAL DATE I INITiAL DATE I INIllAL DWN D6 "Y PROJECT NO DRAWiNG NO () PROPOSED 4- PERFORATED PVC PIPE (TYP). () PROPOSED USPS MAILBOX. SEE ARCHITECTURAL PLANS. () PROPOSED 6" PVC SWING CHECK VALVE ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL IRVMWD BY: CT 2018-0006 521-7A / BUENA / VISTA LAGOON I I 3.0 MIN / VARIES 4.0' 8.0' 8.0' 4.0' VARIES I COLD PLANE AND OVERLAY - - - / VARIES 4.0' 8.0' 8.0' 4.0' VARIES 2.0' MIN / DRIVEWAY WALK DRIVE DRIVE WALK LANDSCAPE / --- Ti ii DRA,`E DRIVE 89-2453-E / 'i ? / / / / / / / / ,/rSMOOTH TRANSITION UNIT 3 1 (REINFORCED PCC) (REINF. PCC) (PERMEABLE PAVERS) (PERMEABLE PAVERS) (REINF PCC) LANDSCAPE WALK WALK DRIVEWAY (REINF.PCC) (PERMEABLE PA VERS) (PERMEABLE PAVERS) (REINF.PCC) (REINFORCED PCC) 25.22'10T 1 UNIT 7 UNIT 10 14 1 SAWCUT-\ / ,,[PAVEMENT FF=46.18 _-46.FS %(45.96Fs MIN EXISTINGAC • 72 FS 45.95 FS /FF475 FF45.44 / 45.36FS 2W 45.17FS 1% MIN 45.46FS-45.56 FS /FF=460 LINE 4 PE ep CONDUIT CONDUIT `17 2"ELECJ 2"ELEC-J L 6" STRUCTURAL SECTION INSTAL , 1 1 v I m TYPE G PCC 4"AC OVER 6" CLASS I/ AB 41.14 BS 1"PERF SD SERVICE / LOT 1 4AP 242 / L SEE PERVIOUS c&G PER OVER NATIVE SUBGRADE IE= 43.97 PAVER SYSTEM 40.3OBS ?EfERF SD SEE PERVIOUS // / I / \ SDRSD G-2 COMPACTED TO 95% REL.COMP. -. 2" WATER DETAIL, THIS SHEET cli SERVICE - 6" PERF SD 6"PERF SD - SEDETAIL, THIS EET SEE STREET NOTE / EXTEND BASE ' SHEET . 6" SS IE= 41.50 IE= 42.20 / 6"BEHIND CURB LATERAL IE= 35.81 LA TERAL 34.70 DETAIL -ACRESURFACING NOTE. MINIMUM BEDDING & BASE COURSE NOTE. MINIMUM BEDDING& BASE COURSE / SEE CONSTRUCTION NOTE 15 NOT TO SCALE DEPTH SHOWN. ADDITIONAL DEPTH TO BE SECTION A T S TA8+50.00 SECTION AT S TA9+00.00 DEPTH SHOWN. ADDITIONAL DEPTH TO BE SPECIFICATIONS FROM THE MANUFACTURER PROPOSED TREE NOT TO SCALE Xx NOT TO SCALE SPECIFICATIONS FROM THE MANUFACTURER. 3NMULCH & ROOT BALL 27E E C ONDUI tOT2 ADDED IF NEEDED TO CONFORM TO PAVER ADDED IF NEEDED TO CONFORM TO PAVER PER LSCAPE / /4OPJ SP(CE)' K / PROPOSEDt P W 4 ,/ I / 9" WIDE CUTOFF WALL 120 CF MIN (f I 24" ROOT CONTROL I AMENDED SOIL 3-1/8" PERVIOUS I BARRIER PER SDRSD L-06 4" ASTM #8 BEDDING / INTERLOCKING PAVERS / - 4.5" REINFORCED PCC / / 7/ / / / / / / N / / / I V PtV 3-1/8" PER VIOUS AMENDED SOIL TO REMAIN- ' SEE NOTE BELOW BEDDING _j V, C) INFLUENCE FROM FTG J - DETAIL TREE WELL 8"ASTM#57BASE f PAVERS 4"ASTM# UNDER DRAIN 46.07 FS 11% ________I SDCO SEE NOTE, BELOW PROP. 6/ IDEjITOFF WALL NOT TO SCALE SEE NOTE BELOW _I _ PIPE @ 15'0. C. LIMIT OF 100-FT \y, IN 05 f"IXt,~< TO CONNECT C4/, WE L(.) V_ - PER PLAN PROP 1E VARIES TLANDSETBACK v PER PLAN 314ff CRUSHED ROCK---, GRAVEL LAYERS ~191TOF- 17 95% COMPACTED GRADING NATIVE SUBGRADL- 44.25 pth PVC PIPE_ 8" ASTM #57 BASE _______ I NOTE: MINIMUM BEDDING & BASE COURSEIELOW TOP OF Bi 2.5 I//12/ 'UNDERDRAM DEPTH SHOWN. ADDITIONAL DEPTH TO BE / \/ \/ \/ \/ \/ \/ \/ \/ \/ \/ \/ "/ AT TOP OF STORAGE 7 IE= 44.O5 \ f \" " \/ \'"-<"--r' -' -" 4 4 'L. \2 7( '\/ 7 1 A-4 SDCO ADDED IF NEEDED TO CONFORM TO PAVER "3/4" CRUSHED ROCK \/ \ 6" PERF SD (TYP) \./ \/ \/ 'Jç7- ç/-çV -z/ / '/ 'L \L \.4\4'\7 \/ \/ \/ '/ \/ \/\ J/ 7 PER PLAN SPECIFICATIONS FROM THE MANUFACTURER. L IE-42.50 6 PERF PRVAMP IE= 42.15 IE= 42.10 DETAIL - PER VIOUSPAVERSYSTEM , i /V ____ I ________________________________________________________________________________ CRUSHED ROCK DISPERSION PIPE PROP. 18" SEE CONSTRUCTION NOTE 20 NOT TO SCALE - I 2 BO1TOM OF STORAGE BOTTOM OF STORAGE-' 6" PERF SO IE= 41.50 @ 0.0% - RCP SD 712/V EL 41,14 BMPIPROFILE EL=41.14 IE= 40.80 )1 / / Ii i/ . \\_ ..J -9"WIDECUTOFFWALL /32 -/ / / ii '? I .. 9 WIDE CUTOFF WALL ALONG DRIVE CENTERLINE BOTTOM OF STORAGE BOTTOM OF STORAGE 560-C-3250 2 // j Lo CID O0TOM58F WELL EL = 40.42 NOT TO SCALE BOTTOM OF WALL----' EL =40.30 BMP2PROFILE EL -40.30 '1.. ROW I / / 1,4 44-I a NOTE: MINIMUM BEDDING & BASE COURSE EL- 37.80 ALONG DRIVE CENTERLINE BOTTOM OF WALL 60.0' DEPTH SHOWN. ADDITIONAL DEPTH TO BE NOT TO SCALE EL- 37.80 / / I ' ADDED IF NEEDED TO CONFORM TO PAVER SPECIFICATIONS FROM THE MANUFACTURER. vv ,' /()/v /7 LOT / / ) / I LINE i V I I I I 2 RAISED I UNIT 4 DECK WOOD FLOOR VARIES -5' FF. 4 6. 01 1-3 ARCH'L FF-46.01 I I PAD: 45.26 "A/8 LOT STRUCTURAL 2 2Y. MIN PER PLAN ,~4 Cot PROPOSED, PER 'N I 5' PER SOILS ENGINEER - I I El BEYOND PAD - - - - - 0 SECTION NEARUNIT4 2_ ;: _ NOT TOSCALE 10.0'DEDIcATION j / PER DOC 93-118828" 2 RECORDED 2J2519,3' 2125/93 GRATE NOTES: '-N ID i i / FRAME 1. EXISTING SOILS SHOULD BE EVALUATED TO ________ LAGUNAi.ri ji v,- DRIVE -, ENSURE PROPER STRUCTURAL AND FILTER BAG PERMEABILITY PROPERTIES. N jL.JLJ/ 2. INSTALLATION TO BE COMPLETED IN SPECIFICATIONS I - ---------- 4. THIS DRAWING IS INTENDED FOR USE BY (NOTA PART) CATCH BASIN ARCHITECTS, ENGINEERS, CONTRACTORS, APN 203-101-37 0 20 40 60 1W_'/ CONSUL TANTSAND DESIGN PROFESSIONALS 7777-7-7-7-1 --- 10ft / / I 88S8S1 /'fJ FOR PLANNING PURPOSES ONLY. / I 5. ALL INFORMATION CONTAINED HEREIN WAS / CURRENT AT THE TIME OF DEVELOPMENT I ISOMETRIC FILTER BAG BUT MUST BE REVIEWED AND APPROVED BY EASEMENT NOTES OVERALL SITE PLAN THE PRODUCT MANUFACTURER TO BE - CONSIDERED ACCURATE. LIII PROPOSED 25' EASEMENT IRREVOCABLE OFFER OF DEDICATION FOR PUBLIC SCALE: 1"- 20' ACCESS PER DOC. NO REC. _/_/_ CATCH BASIN INLET FILTER PROPOSED SHARED PRIVATE DRIVEWAY WITH MUTUAL MAINTENANCE, SEE CONSTRUCTION NOTES 22,46 NOT TO SCALE UTILITYAND ACCESS EASEMENT PER DOC. NO REC. ACCORDANCE WITH MANUFACTURER'S 3, DO NOT SCALE DRAWING. ____ 30.0' 0.1. 30.0' EXISTING AC PROJECT 10.0' PARKWAY 200' TO CURB FACE PAVEMENT SITE 0 r TO REMAIN 1 5.51 I I PCC SLAB-----_ MAX VARIES VARIES NO, 3 BARS X DIRECTIONS) INSTALL 6" TYPE G por IVI EXISTING PCC CURB, GU PER SD SD G-2 T GUTTER & SIDEWALK SAND (S.E.40) EXISTING CURB CUT LOCATIONS, SEE DETAIL, UPPER LEFT 90UMIR 'EX 10"AC WATER CO AC ED K- 4"AC OVER 6"GLASS!IAB (MIN); SEE STREET NOTE #1 EX 36" RCP EX 8" HOPE SSFM DETAIL - REINFORCED CONCRETE SLAB SAWCUTEXISTINGAC STORM DRAIN PAVEMENT, PROPOSED SEE CONSTRUCTION NOTES: 18,21 NOT TO SCALE 2"AC GRIND & OVERLAY TYPICAL SECTION - LAGUNA DRIVE NOT TO SCALE PASCO LARET SUITER "AS BUILT" '& ASSOCIATES ((( No.80356 CIVIL ENGINEERING + LAND PLANNING + LAND SURVEYING Exp. 12/31/20 ).JJ RCE_______ EXP._________ DATE 535 North Highway 101, Ste A, Solana Beach, CA 92075 ph 858.2598212 I ft 858.259.4812 plsaenglneering.com REVIEWED BY: INSPECTOR DATE SHEET CITY OF CARLSBAD SHEETS 3 ENGINEERING DEPARTMENT 6 GRADING PLANS FOR LAGUNA ROW 570-580 LACUNA DRIVE GR2019-0044 SEC11ONS & DETAILS HMP20I8-0003 DATE I INITIAL ENGINEER OF WORK REVISION DESCRIP11ON ICIlY ENGINEER RCE DWN BY: CJB DATE INITIAL DATE INITIAL CHKD BY: O1HER APPROVAL CITY APPROVAL RVWD BY: I PLSA 3218 1 1. TIER 2 CITY STORM WATER POLLUTION PREVENTION PLAN ( TIER 2 SWPPP) STORM WATER POLLUTION PREVENTION NOTES MITIGATION MONITORING AND REPORTING PROGRAM (MMRP) NOTES GENERAL SITE MANAGEMENT REQUIREMENTS EROSION CONTROL HYDROSEEDING, PLANTING AND IRRIGATION BIO-3: CLEARING AND GRADING ACTIVITIES SHOULD BE AVOIDED DURING THE BIRD BREEDING SEASON (FEBRUARY 15 THROUGHAUGUST3I FOR MOST SPECIES, AND JANUARY 1 THROUGHAUGUST3I FOR RAPTORS) THE FOLLOWING GENERAL SITE MANAGEMENT REQUIREMENTS SHALL BEADHERED TO THROUGHOUT THE 1. ALL PERMANENTAND TEMPORARYEROSION CONTROL PLANTING AND TO REDUCE INDIRECT IMPACTS TO NESTING BIRDS THAT MAYBE PRESENT WITHIN THE CONSTRUCTION FOOTPRINT DURATION OF THE CONSTRUCTION WORK (YEAR ROUND). IRRIGA TIOA' SHALL BE INS TALLED AND MAINTAINED AS REQUIRED IN SECTION OR RESTORATION AREAS, OTHER CONSTRUCTION ACTIVITIES SHOULD ALSO BE AVOIDED DURING I. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT: BRETT FARROW, LAGUNA PROJECT LP, AT (760) 212 OF THE STANDARD SPECIFICA TIONS AND THE FOLLOWING: THE BIRD BREEDING SEASON, IF FEASIBLE. IF THIS CANNOT BE AVOIDED, THE FOLLOWING MEASURES SHALL BE 230-6851 TAKEN: 2. DEVICES SHOWN ON CI7YAPPROVED PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE A HYDROSEEDING SHALL BEAPPL lED TO: A. NESTING BIRD SURVEYS SHALL BE CONDUCTED BYA QUALIFIED BIOLOGIST INAPPROPRIATE HABITAT APPROVAL OF THE ENGINEERING INSPECTOR, I ALL SLOPES THA TARE GRADED 6:1 (HORIZONTAL TO VERTICAL) OR FOR NESTING RAPTORS AND MIGRATORY BIRDS AND WITH, IN 500-FOOT SURVEY BUFFER WITHIN THREE (3) 3. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE STEEPER WHEN THEYARE: DAYS OF CONSTRUCTION. SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. a. THREE FEET OR MORE IN HEIGHTANDADJA CENT TO PUBLIC B. IF NESTS OF LISTED BIRDS, MIGRA TORY BIRDS, RAPTORS, OR OTHER SPECIAL-STATUS SPECIES ARE LOCATED, THESE AREAS SHALL BE FENCED WITHA PROTECTIVE BUFFER OFAT LEAST 500 FEET FROM 4. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAYBE REQUIRED BY WALL OR STREET ACTIVE NESTS OF LISTED SPECIES, AND 300 FEET FROM OTHER SPECIAL-STATUS BIRD SPECIES. THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORSEEN CIRCUMSTANCES b. ALL SLOPES 4 FEET OR MORE IN HEIGHT C. ALL CONSTRUCTION ACTIVITY SHALL BE PROHIBITED WITHIN THIS AREA. REDUCED BUFFERS CAN BE WHICH MAYARISE, 5. THE CONTRACTOR SHALL BE RESPONSIBLEAND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT 2 AREAS GRADED FLATTER THAN 6:1 WHENANYOF THE REQUESTED FROM THE CITY IF THE PROJECT BIOLOGIST CAN DEMONSTRATE THAT THE NESTING SUCCESS PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION. FOLLOWING CONDITIONS EXIST: WILL NOT BE AFFECTED. 6. GRADING AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT a. IS/OTSCHEDULED FOR IMPROVEMENTS (CONSTRUCTION OR BI04: THE POTENTIAL FOR SIGNIFICANT INDIRECT IMPACTS DURING CONSTRUCTION SHALL BE MITIGATED THE CONCLUSION OF EACH WORKING DAY. GENERAL LANDSCAPING) WITHIN 60 DAYS OFROUGH GRADING. THROUGH IMPLEMENTATION OF THE FOLLOWING MEASURES PRIOR TO ISSUANCE OFA GRADING PERMIT OR 7. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN b. IDENTIFIED BY THE PARKS AND RECREA TION DIRECTOR AS DURING GRADING ACT! VITYAS APPROPRIATE FOR THE MEASURE: FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%% %). SILTAND OTHER DEBRIS HIGHLY VISIBLE TO THE PUBL IC. A. THE FOOTPRINT OF DISTURBANCE SHALL BE SPECIFIED IN THE CONSTRUCTION PLANS. CONSTRUCTION SHALL BE REMOVED AFTER EACH RAINFALL. c. HA VEANYSPECIAL CONDITION IDENTIFIED BY THE CITY LIMITS SHALL BE DELINEATED WITH ORANGE FENCING, AND IN AREAS POTENTIALLY SUBJECT TO PROJECT 8. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGA TE, ENGINEER THAT WARRANTS IMMEDIATE TREA TMENT RELATED RUNOFF, SILT FENCING SHALL BE USED TO DELINEATE THE IMPACT FOOTPRINT. ALL FENCING 9, ALL EXPOSED DISTURBED AREAS MUST HAVE EROSION PROTECTION BMPs PROPERLY INSTALLED, THIS SHALL BE MAINTAINED UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES, AT WHICH TIME ALL INCLUDES ALL BUILDING PADS, UNFINISHED ROADS, AND SLOPES B HYDROSEEDING AREAS SHALL BE IRRIGA TED INACCORDANCE WITH THE FENCING SHALL BE REMOVED. ALL CONSTRUCTION PERSONNEL AND ASSOCIATES SHALL BE INSTRUCTED 10. ADEQUATE PERIMETER PROTECTION BMPs MUST BE INSTALLED AND MAINTAINED AND WILL BE FOLLOWING CRITERIA: THAT THEIR ACTIVITIES, VEHICLES, EQUIPMENT, AND CONSTRUCTION MATERIALS ARE RESTRICTED TO THE UPGRADED, IF NECESSARY, TO PROVIDE SUFFICIENT PROTECTION FROM RUNOFF DURING RAIN EVENTS. 1 ALL SLOPES THA TARE GRADED 6:1 OR STEEPERAND THA TARE: PROPOSED PROJECT FOOTPRINT, DESIGNATED STAGING AREAS, AND ROUTES OF TRAVEL. IFANY IMPACTS 11. ADEQUATE SEDIMENT CONTROL BMPs MUST BE INSTALLED AND MAINTAINED. a. THREE TO EIGHTFEETIN HEIGHT SHALL BE IRRIGATED BYHAND SHALL OCCUR BEYOND THE APPROVED IMPACT FOOTPRINT, ALL WORK IN THE IMMEDIATE VICINITY SHALL 12. ADEQUATE BMPs TO CONTROL OFFSITE SEDIMENT TRACKING MUST BE INSTALLED AND MAINTAINED. WATERING FROM QUICK COUPLERS/HOSE BIBS ORA CEASE UNTIL THE DISTURBANCE LIMIT BREACH HAS BEEN ADDRESSED TO THE SATISFACTION OF THE CITY. 13. A MINIMUM OF 125% OF THE MATERIAL NEEDED TOO INSTALL STANDBY BMPs TO PROTECT THE EXPOSED CONVENTIONAL SYSTEM OFLOWPRECIPITA TION SPRINKLER B. THE QUALIFIED PROJECT BIOLOGIST SHALL REVIEW GRADING PLANS (E.G., ALL ACCESS ROUTES AND AREAS FROM EROSION AND PREVENT SEDIMENT DISCHARGES, MUST BE STORED Oft/SITEE, AREAS HEADS PROVIDING 100% COVERAGE. STAGING AREAS), AND MONITOR CONSTRUCTION ACTIVITIES THROUGHOUT THE DURATION OF ALREADY PROTECTED FROM EROSION USING PHYSICAL STABILIZATION OR ESTABLISHED VEGETATION b. GREA TER THAN 8 FEET/N HEIGHT SHALL BE WA TERED BYA GRADING/GROUND DISTURBANCE ASSOCIATED WITH THE PROJECT TO ENSURE THATALL PRACTICABLE STABILIZATION BMPs ARE NOT CONSIDERED TO BE "EXPOSED" FOR PURPOSES OF THIS REQUIREMENT. CONVENTIONAL SYSTEM OFLOWPRECIPITA TION SPRINKLER HEADS MEASURES ARE BEING EMPLOYED TO AVOID INCIDENTAL DISTURBANCE OF HABITATAND ANY TARGET 14. THE 0 WNER/DEVELOPERICONTRACTOR MUST FOLLO W "WEATHER TRIGGERED" ACTION PLAN AND BE PROVIDING 100% COVERAGE. SPECIES OF CONCERN OUTSIDE THE PROJECT FOOTPRINT. ABLE TO DEPLOY STANDBY BMPs TO PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS C. ANYHABITAT THAT IS IMPACTED THAT IS NOT IN THE IDENTIFIED PROJECT FOOTPRINT SHALL BE OFA PREDICTED STORM EVENT (A PREDICTED STORM EVENT IS DEFINED AS A 40% CHANCE OF RAIN 2 AREAS SLOPED LESS THAN 6:1 SHALL BE IRRIGA TED ASAPPRO VED BY DISCLOSED IMMEDIATELY TO THE CITY, UNITED STATES FISH AND WILDLIFE SERVICE (USFWS), CALIFORNIA WITHIN A 5-DAY NATIONAL WEATHER SERVICE FORECAST). ON REQUEST, THE THE CITY ENGINEER, PRIOR TO HYDROSEEDING. THE DEVELOPER SHALL DEPARTMENT OF FISH AND WILDLIFE (CDFW), AND CALIFORNIA COASTAL COMMISSION (CCC); AND SHALL BE OWNER/DEVELOPER/CONTRACTOR MUST PROVIDE PROOF OF THIS CAPABILITY. SUBMITA PROPOSED SCHEME TO PROVIDE IRRIGA TION TO THE CITY COMPENSATED ATA MINIMUM RATIO OF 5:1. 15. DEPLOYMENT OF PHYSICAL OR VEGETATION EROSION CONTROL BMPs MUST COMMENCE AS SOON AS ENGINEER. THE PROPOSAL SHALL BE SPECIfiC REGARDING THE NUMBERS, D. CONSTRUCTION EMPLOYEES SHALL LIMIT THEIR ACTIVITIES, VEHICLES, EQUIPMENT, AND CONSTRUCTION SLOPES ARE COMPLETED, THE OWNER/DEVELOPER/CONTRACTOR MAY NOT RELY ON THE ABILITY TO TYPE, AND COSTS OF THEELEMENTS OF THE PROPOSED SYSTEM MATERIALS TO THE FENCED PROJECT FOOTPRINT. DEPLOY STANDBY BMP MATERIALS TO PREVENT EROSION OF SLOPES THAT HAVE BEEN COMPLETED, E. EQUIPMENT STORAGE, FUELING, AND STAGING AREAS SHALL BE LOCATED ON DISTURBED UPLAND SITES 16. THE AREA THAT CAN BE CLEARED, GRADED, AND LEFT EXPOSED ATONE TIME IS LIMITED TO THE AMOUNT 3 IRRIGATION SHALL MAINTAIN THE MO/S TURE LEVEL OF THE SOIL AT THE WITH MINIMAL RISK OF DIRECT DRAINAGE INTO RIPARIAN AREAS OR OTHER SENSITIVE HABITATS, AND AT OFACREAGE THAT THE CONTRACTOR CAN ADEQUATELY PROTECT PRIOR TO A PREDICTED RAIN EVENT. OPTIMUM LEVEL FOR THE GRADING OF THE HYDROSEEDED GROWTH. LEAST 100 FEET FROM WATERS OF THE UNITED STATES. THESE DESIGNATED AREAS SHALL BE LOCATED IN FOR LARGER SITES, GRADING SHOULD BE PHASED. IT MAYBE NECESSARY TO DEPLOY EROSION AND SUCH A MANNER AS TO PREVENTANY RUNOFF FROM ENTERING SENSITIVE HABITAT. ALL NECESSARY SEDIMENT CONTROL BMPs IN AREAS THA TARE NOT COMPLETED, BUTARE NOTACTI VELY BEING C HYDROSEEDING MIX SHALL CONSIST OFALL OF THE FOLLOWING: PRECAUTIONS SHALL BE TAKEN TO PREVENT THE RELEASE OF CEMENT OR OTHER TOXIC SUBSTANCES INTO WORKED BEFORE ADDITIONAL GRADING IS ALLOWED TO PROCEED, AT THE DISCRETION OF THE CITY I SEED MIX SHALL CONSIST OF NO LESS THAN: SURFACE WATERS. ALL PROJECT RELATED SPILLS OF HAZARDOUS MATERIALS SHALL BE REPORTED TO THE INSPECTOR. 20 lbs. PERACRE OF ROSE CLOVER CITYAAID SHALL BE CLEANED UP IMMEDIA TEL Y A ND CONTAMINATED SOILS REMOVED TO APPROVED 17, ALL DISTURBED AREAS THA TARE NOT COMPLETED AND/OR NOT BEING ACTIVELY GRADED MUST BE 20 lbs PERACRE OFZORRO FESCUE DISPOSAL AREAS. FULLY PROTECTED FROM EROSION IF LEFT FOR 14 OR MORE DAYS. THE ABILITY TO INSTALL BMP C. 3Ibs PERACRE OFE SCHOOL CIA CALIFORNICA F. LIGHTING IN OR ADJACENT TO THE PRESERVE SHALL NOT BE USED, EXCEPT WHERE ESSENTIAL FOR MATERIALS WA PROMPT MANNER IS NOT SUFFICIENT. BMPs NEED TO BE INSTALLED IN THESE AREAS. d. 4 lbs PERACRE OFACHILLEA MILLEFOLIA ROADWAY, FACILITY USE, AND SAFETY. IF NIGHTTIME CONSTRUCTION LIGHTS ARE NECESSARY, ALL 18. BMPs MUST BE STOCKPILED AT VARIOUS LOCATION THROUGHOUT THE PROJECT SITE THROUGHOUT THE a. 3Ibs PER ACRE OFAL YSSUM (CARPET OF SNOW) LIGHTING ADJACENT TO NATURAL HABITAT WILL BE SHIELDED AND/OR DIRECTED AWAY FROM HABITAT. YEAR. WHENEVER THERE IS 40% CHANCE OR GREATER OFA RAIN WITHIN A THREE (3) DAY FORECAST, f 1121b. PERACRE IFDIMORPHOLECA G. FUGITIVE DUST SHALL BEA VOIDED AND MINIMIZED THROUGH WATERING AND OTHER APPROPRIATE THE INSPECTOR WILL VERIFY THAT BMPs ARE ADEQUA TEL Y STOCKPILED. BMPs MUST BE STOCKPILED g. ITEMS c, d, e, AND f OF THIS SUBSECTION MA YBE OMITTED ON MEASURES. AND READY FOR DEPLOYMENT WHEN THERE IS 50%%% CHANCE OF RAIN WITHIN A 48 HOUR FORECAST VISIBLE FROM EITHER A PUBLIC STREET OR RESIDENTIAL H. EXOTIC SPECIES THAT PREY UPON OR DISPLACE TARGET SPECIES OF CONCERN SHOULD BE FAILURE TO COMPLY WITH THIS REQUIREMENT COULD RESULTIN THE ISSUANCE OFA STOP WORK STRUCTURES. PERMANENTLY REMOVED FROM THE SITE. NOTICE OR OTHER ENFORCEMENTACTION. h. ITEM a OF THIS SUBSECTION MUSTBE INOCULA TED WITHA I. TO A VOIDA1TRACTING PREDATORS OF THE NATIVE WILDLIFE SPECIES, THE PROJECT SITE SHALL BE 19, ALL TREATMENTAND EROSION CONTROL BMPs MUST BE INSPECTED WEEKLYAND PRIOR TO A NITROGEN FIXING BACTERIA AND APPLIED DRYEITHER BY KEPTAS CLEAN OF DEBRIS AS POSSIBLE, ALL FOOD RELATED TRASH ITEMS SHALL BE ENCLOSED IN SEALED FORECASTED RAIN EVENT OF GREATER THAN 50%%%, AND AFTER A RAIN EVENT, IN ADDITION, DRILLING OR BROADCA SING BEFORE HYDROSEEDING, CONTAINERS AND REGULARLY REMOVED FROM THE SITE(S). PETS OF PROJECT PERSONNEL SHALL NOT BE TREATMENT CONTROL BMPs MUST BE SERVICED AS NEEDED THROUGHOUT THE YEAR. I. ALL SEED MA TERIALS SHALL BE TRANSPORTED TO THE JOBSITE ALLOWED ON SITE WHERE THEY MAY COME INTO CONTACT WITH ANY NA TIVE SPECIES. 20. IF SELECTED BMP FAILS DURING A RAIN EVENT, IT MUST BE REPAIRED OR IMPROVED OR REPLACED WITH IN UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT J. THE CITY OF CARLSBAD HAS THE RIGHT TO ACCESS AND INSPECTANY SITES OFAPPROVED PROJECTS AN ACCEPTABLE AL TERNATE AS SOON AS IT IS SAFE TO DO SO. THE FAILURE OFA BMP INDICATES IT WAS OF FOOD AND A GRICUL TURE CERTIFICA TJON TAGA TTACHED TO, INCLUDING ANY RESTORATION/ENHANCEMENTAREA FOR COMPLIANCE WITH PROJECTAPPROVAL NOTADEQUATE FOR THE CIRCUMSTANCES IN WHICH IT WAS USED. REPAIRS AND REPLACEMENT MUST OR PRINTED ON SAID CONTAINERS. CONDITIONS INCLUDING THESE BEST MANAGEMENT PRACTICES. THE USFWS AND CDFW MAYACCOMPANY THEREFORE PUTA MORE ROBUST BMP MEASURE IN PLACE. / I/ON-PHYTO-TOXIC WETTING AGENTS MA YBEADDED TO THE CITY REPRESENTATIVES ON THIS INSPECTION, 21. ALL CONSTRUCTION EMPLOYEES MUST BE TRAINED ON THE IMPORTANCE OF STORM WATER POLLUTION HYDROSEED SLURRYA T THE DISCRETION OF THE CONTRACTOR. K. GRADING ACTIVITY SHALL BE PROHIBITED DURING THE RAINY SEASON: FROM OCTOBER 1ST THROUGH PREVENTION AND BMP MAINTENANCE. APRIL ISTOF EACH YEAR. 2 TYPE I MULCHAPPLIEDA T THEM TE OFNO LESS HAN2000 lbs PER L. ALL GRADED AREAS SHALL BE LANDSCAPED PRIOR TO OCTOBER 1ST OF EACH YEAR WITH EITHER ACRE. TYPE 6 MULCH (STRAW) MAYBE SUBSTITUTED, WHEN STRAW/S TEMPORARY OR PERMANENT LANDSCAPING MATERIALS, TO REDUCE EROSION POTENTIAL. SUCH WEATHER TRIGGERED ACTION PLAN USED, ITMUSTBEANCHORED TO THE SLOPE BYMECHAMCALL YPUNCHING LANDSCAPING SHALL BE MAINTAINED AND REPLANTED IF NOT WELL-ESTABLISHED BY DECEMBER 1ST NO LESS THAN 50% IF THE STRA WINTO THE SOIL. FOLLOWING THE INITIAL PLANTING. THE DEVELOPER SHALL DEPLOY STANDBY BEST MANAGEMENT PRACTICE MEASURES TO COMPLETELY M. THE OCTOBER 1ST GRADING SEASON DEADLINE MAYBE EXTENDED WITH THE APPROVAL OF THE CITY PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OFA PREDICTED STORM EVENT (A 3 FERTILIZER CONSISTING OFAMMONIUMPHOSPHA TE SULFATE, 16-20-0 ENGINEER SUBJECT TO IMPLEMENTATION BY OCTOBER 1ST OF SPECIAL EROSION CONTROL MEASURES PREDICTED STORM EVENT IS DEFINED AS A FORECASTED, 40%%% CHANCE OF RAIN BY THE NATIONAL WITH 15% SULPHUR APPLIED A T THE RATE OF 500 lbs. PERACRE. DESIGNED TO PROHIBIT DISCHARGE OF SEDIMENTS OFF-SITE DURING AND AFTER THE GRADING OPERATION, WEATHER SERVICE), IN ADDITION TO BMPs IMPLEMENTED YEAR-ROUND INCLUDING PERIMETER CONTROL, EXTENSIONS BEYOND NOVEMBER 15TH MAYBE ALLOWED IN AREAS OF VERYLOW RISK OF IMPACT TO WIND EROSION CONTROL, TRACKING, NON-STORM WATER CONTROL, WASTE MANAGEMENT, AND D AREAS TO BE HYDROSEEDED SHALL BE PREPARED PRIOR TO HYDROSEEDING: SENSITIVE COASTAL RESOURCES AND MAYBE APPROVED EITHER AS PART OF THE ORIGINAL COASTAL MATERIALS POLLUTION CONTROL, I ROUGHENING THE SURFACE TO BE PLANTED BYANYORA DEVELOPMENT PERMIT OR AS AN AMENDMENT TO AN EXISTING COASTAL DEVELOPMENT PERMIT COMB/NA TION OF: N. IF ANY OF THE RESPONSIBLE RESOURCE AGENCIES PROHIBIT GRADING OPERATIONS DURING THE THE NATIONAL WEATHER SERVICE FORECAST SHALL BE MONITORED AND USED BY THE DEVELOPER ON A TRACK WALKING SLOPES STEEPER THAN 6:1. SUMMER GRADING PERIOD IN ORDER TO PROTECT ENDANGERED OR RARE SPECIES OR SENSITIVE DAILYBASIS, IF PRECIPITATION IS PREDICTED (40% %% CHANCE OF RAIN), THEN THE NECESSARY WATER HARROWING AREAS 6:1 OR FLATTER THA TARE SUFFICIENTLY ENVIRONMENTAL RESOURCES, THEN GRADING ACTIVITIES MAYBE ALLOWED DURING THE WINTER BYA POLLUTION CONTROL PRACTICES SHALL BE DEPLOYED WITHIN 48 HOURS AND PRIOR TO THE ONSET OF FRIABLE. COASTAL DEVELOPMENT PERMIT OR PERMITAMENDMENT, PROVIDED THATAPPROPRIATE BEST THE PRECIPITATION. 2 AREAS GRADED FLATTER THAN 6:1 WHENANYOF THE FOLLOWING MANAGEMENT PRACTICES ARE ADOPTED. CONDITIONS EXIST: THE DEPLOYMENT OF THE BMPS SHALL INCLUDE BUT NOT BE LIMITED TO GRAVEL BAGS AND SILT FENCES. ADJUSTING THE SURFACE SOIL MOISTURE TO PRO VIDE A DAMP BIO-5: TO PREVENT IMPACTS OF THE PROPOSED DEVELOPMENT ON THE HMP PRESERVEAREA OFF SITE AND A MINIMUM OF 125% OF THE MATERIAL NEEDED TO INSTALL STANDBY BEST MANAGEMENT PRACTICES BITNOTSA TIJRA TED SEEDBED, TO THE NORTH AND NORTHWEST OF THE PROJECT SITE, THE PROJECT SHALL COMPLY WITH THE FOLLOWING MEASURES TO PROTECT THE EXPOSED AREAS FORM EROSION AND PREVENT SEDIMENT DISCHARGES THEADDITION OF SOIL AMENDMENTS, PH ADJUS TMENT, LEACHING ADJACENCY STANDARDS: MUST BE STORED ON-SITE AREAS THAT HAVE ALREADY BEEN PROTECTED FROM EROSION USING COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR A. FIRE MANAGEMENT -EXISTING NON-NATIVE PLANTS SHALL BE REMOVED AND REPLACED WITH NATIVE PHYSICAL STABILIZATION OR ESTABLISHED VEGETATION STABILIZATION BMPS AS DETERMINED BY THE GROWTH. SPECIES. A FUEL MANAGEMENTZONE B-3 SHALL BE ESTABLISHED FROM THE STRUCTURES OUTWARD AND CITY OF CARLSBAD ARE NOT CONSIDERED TO BE "EXPOSED" FOR THE PURPOSES OF "WEATHER SHALL BE MAINTAINED TO BE CLEAR OF DEAD AND DYING COMBUSTIBLE MATERIALS. TRIGGERED ACTION PLAN". AN ADEQUATE SOURCE OFEQUIPMENTAND WORKERS SHALL BEAVAILABLE E HYDROSEEDINGAREJ4S SHALL BE MA INTAINED TO PRO VIDEA VIGOROUS GROWTH EROSION CONTROL -STANDARD BEST MANAGEMENT PRACTICES (BMPS) SHALL BE IMPLEMENTED TO FOR DEPLOYMENT OF "WEATHER TRIGGERED BMPS" UNTIL THE PROJECT IS PERMANENTL YL4NDSCAPED OR, FOR AREAS WHERE SLOW SURFACE FLOWAND DAMPEN INITIAL PRECIPITATION FLOW WITHIN THE DE VELOPMENTAREA. NO NEW HYDROSEEDING IS THE PERMA NENTLANDSCA PING, UNTIL THE PROJECT/S SURFACE DRAINAGE SHALL BE DIRECTED INTO THE OPEN SPACE AREAS. COMPLETEDANDALL BONDS RELEASED. LANDSCAPE RESTRICTIONS -LANDSCAPE PLANTING PALETTES FOR THE PROPOSED PROJECT SHALL 2. ALL SLOPES SHALL HA VEIRRIGA TION INSTALLED AND BE STABILIZED, PLANTED PROHIBIT NON-NA TIVE, INVASIVE PLANT SPECIES IN THE AREAS ADJACENT TO THE RIPARIAN OR UPLAND HABITAT OR ADJACENT TO THE HMP PRESERVE LOCATED 'OFF SITE TO THE NORTH AND NORTHWEST, IN AND/OR HYDROSEEDED WITHIN TEN (10) DAYS OF THE TIME WHEN EACH SLOPE ADDITION, BECAUSE THE SITE IS WITHIN THE COASTAL ZONE, NO INVASIVE PLANT SPECIES SHALL BE USED IS BROUGHT TO GRADEAS SHOWN ON THEAPPROVED GRADING PLANS. IN THE LANDSCAPING OF THE DEVELOPMENT IRRIGATION OF THE LANDSCAPING SHALL BE DESIGNED AND SCHEDULED TO AVOID RUNOFF INTO THE PROPOSED OPEN SPACE AREAS. THE WETLAND BUFFER SHALL BE 3. SHOULD GERMINATION OFHYDROSEEDED SLOPES FAIL TO PRO VIDE EFFICIENT RESTORED WITH NATIVE HABITAT IN ACCORDANCE WITH MITIGATION MEASURE BI0-2 LISTED ABOVE. COVERAGE OF GRADING SLOPES (90% COVERAGE) PRIOR TO OCTOBER 1, THE D. FENCING, SIGNS AND LIGHTING -TO DISCOURAGE ENTRY INTO THE RIPARIAN HABITAT BY PEOPLE AND SLOPES SHALL BE STABILIZED BYANAPPROPRIA TEEROSION CONTROL MATTING PETS, THE OPEN SPACE AREA SHALL BE FENCED IN ACCORDANCE WITH REQUIREMENTS OF THE CITYAS MA TERIAL APPROVED BY THE PUBLIC WORKS INSPECTOR. APPROPRIATE. EXTERIOR RESIDENTIAL LIGHTING ADJACENT TO THE OPEN SPACE AREAS SHALL BE OFA MINIMUM NECESSARY FOR SAFETYAND SECURITY AND SHALL BE SHIELDED AND/OR DIRECTED AWAY TO 4. LANDSCAPING SHALL BEACCOMPLISHED ONALL SLOPESAND PADSAS REQUIRED THE MAXIMUM EXTENT PRACTICABLE TO AVOID INCREASING NIGHTTIME LIGHT INPUT INTO THE OPEN SPACE. BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR PROJECT CC&RS SHALL INCLUDE SUCH LIGHTING RESTRICTIONS. THIS PROJECT OR AS DIRECTED BY THE CITYENGINEER OF PLANNING DIRECTOR. E. PREDATOR AND EXOTIC SPECIES CONTROL -THE PROPERTY OWNER OF THE PROPOSED DEVELOPMENT SHALL ALERT FUTURE RESIDENTS OF THE POTENTIAL EFFECTS DOMESTIC ANIMALS MAY HAVE ON THE 5. THE OWNER/APPLICANTSHALL ENSURE THA TALL CONTRACTORS SHALL NATIVE FAUNA AND FLORA, PROJECT CC&RS SHALL INCLUDE TEXT TO EDUCATE HOMEOWNERS REGARDING COORDINATE THE WORK OF THIS CONSTRUCTION SWPPP SHOWN ONANY RESPONSIBLE PET OWNERSHIP (E.G., KEEPING PETS INDOORS, SPA YING/NEUTERING PETS, PROHIBITING GRADING PLANS, LANDSCAPEAND IRRIGATION PLANS, AND IMPROVEMENT THE RELEASE OF PETS INTO THE WILD, ETC.). PLA NS A SREQUIRED FOR THIS PROJECT WORK R Ir /\\ VICINITY MAP N.T.S. N / SHEET INDEX OWNER/APPLICANT SHEET4 TIER 2 SWPPP TITLE SHEET NAME -LAGUNA PROJECT, LP SHEETS TIER 2 SWPPP EROSION CONTROL PLAN AIJDRESS - 125 MOZARTA yE, CARDIFF CA 92007 TELEPHONE NO.: (760) 230-6851 APN: 155-221-12-00 EMERGENCY CONTACT: NAME: - BRE7TFARROW, MA NA CER A TLAGUNA PROJECT, LP SITE ADDRESS: ADDRESS:- 125 MOZ4RTA VE, CARDIFF CA 92007 570-580 LACUNA DRIVE TELEPHONE NO (760)230-68S1 CARLSBAD, CA 92008 OWNER'S CERTIFICATION: AREA OF DISTURBANCE I UNDERSTAND AND ACKNOWLEDGE TI-/AT/MUST: (I) IMPLEMENT AREA OF DISTURBANCE 23,868 S.F. BESTMA NA CEMENT PRACTICES (BMPs) DURING CONS TRUCTIONACTI VI TIES TO THE MAXIMUM EXTENTPRACTICABLE TO AVOID THE MOBIL IZA TION OF (THIS AREA INCLUDES BUT IS NOT LIMITED TO POLLUTANTS SUHAS SED/MENTAND TOA VOID THE EXPOSURE OF STORM OFFSITE WORK IA/CL UDING PUBLIC IMPROVEMENTS WATER TO CONSTRUCTION RELATED POLLUTANTS; AND (2) ADHERE TO, AND AND TEMPORARY DISTURBANCE SUCHAS VEHICLE A TALL TIMES, COMPLY WITH THIS CITYAPPROVED TIER 2 CONSTRUCTION SWPPP AND EQUIPMENTSTAGINGAREAS, CONSTRUCTION THROUGHOUT THE DURA TION OF THE CONS TRUC TIONACTI VI TIES UNTIL THE WORKER FOOT TRAFFIC, SOIL/GM VEL PILES, UTILITY CONSTRUCTION WORK IS COMPLETEAND SIGNED OFF BY THE CITY OF CARLSBAD. TRENCHES, BACKFILL CUTS AND SLOPE KEYWA YS) BRETTFARROW, LAGUNA PROJECT, LP CONSTRUCTION THREAT: OWNER(S)/OWNERAGENTNAME (PRINT) DATE CONSTRUCTION THREAT TO STORM WATER QUALITY (CHECKBOX) : EM HIGH D MEDIUM OWNER(S)/OWNER'S AGENTNAME (SIGNA TURE) DATE BEST MANA GEMENT PRACTICES (BMP) SELECTION TABLE Erosion control Sediment Control BMPs Tracking Non-Storm Water Waste Management and Materials BMPs Control BMPs Management BMPs Pollution Control BMPs Z O .0 0 -i.-. . C' ci C' 0 C6 co Best Management Practice* . (BMP) Description - - -JC' C' X E - C' E E C'EE ') e o - C' - > C' _ L -Q .E - . C' (':) - C' (1) - o -b C' C' -I--. L. L . C' : 0 ,., C' L C' ..'.. _Z Z3 C' C'- 0 -+... C' - c'.. o C' N C C' C' 0 C' C' LjC: (i) Cr) Cr) 1( CL ( (i co (i1 (I)-E U)C Q.. Q0 CL U) ')Zi E CASQA Designation - r. c ,-. r N D T CJ ? r Construction Activity Grading/SoilDisturbance _77 V V 7 _ _ _ _iIIiJ_ 111111 / Trenchin g/Excovat ion V v' /Stockpiling - - -- - V Drilling/Boring , Concrete/Asphalt Sawcutting - - ,1 V - / Concrete Flatwork V V V V V /Paving ------- VVV v V /Conduit/PipeInstallation - -- v' V / Stucco/Mortar Work V / Waste Disposal ------ _LLL V V I /Staging/Lay Down Area Equipment Maintenance and Fueling / Hazardous Substance Use/Storage /V Dewatering Site Access Across Dirt Other (list): Instructions: Check the box to the left of all applicable construction activity (first column) expected to occur during construction. Located along the top of the BMP Table is a list of BMP 's with it's corresponding California Storm water Quality Association (CASQA) designation number. Choose one or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project. PASCO LARET SUITER A~ 1 & ASSOCIATES No, 80356 rn CIVIL ENGINEERING + LAND PLANNING + LAND SURVEYING \ Exp. 12/31/20 )JJ 535 North Highway 101, Ste A, Solana Beach, CA 92075 ph 858 259.8212 I ft 858.259.4812 I p1lueng1neertng.cont - CITY OF CARLSBAD SHEETS 4 ENGINEERING DEPARTMENT 6 GRADING PLANS FOR LAGUNA ROW RP2018-0008 570-580 LAGUNA DRIVE GR2019-0044 TIER 2 SWPPP TITLE SHEET HMP20I8-0003 APPROVED JASON S GELDERT CITY ENGINEER RCE 63912 EXPIRES 9/30/20 DATE DWN BY: ' PROJECT NO. DRAWING NO. CHKD BY. CT 2018-0006 521-7A DATE INITIAL RE',ISION DESCRIP11ON DATE INITIAL DATE INITIAL ENGINEER OF WORK OTHER APPROVAL CITY APPROVAL PLSA 3218 At 23, LEGEND 3 EC-4, HYDROSEEDING + + + 6:000 SF / 1 5 H UA A A -1,7 ' 231.8V. 'NOO°4V42'E N SE-1, SILT FENCE 600 L __-14 MFU 11 1TsvkR'_7 SC-5FIBERROLLS FR 600 L x x JzJ ____ ____ ____ ____ ____ M ____ ____ ____ _____ ____ ____ ____ H I I ________ SE6,GRAVELBAG 600 EA TRA STABILIZED x x x fx x x x x UNI1GARAGE - - I CONSTRUCTION ENTRANCE 800 SF ] < x >< x x x x x x x x x x x x x x X FF. 46.35 H / / I UNIT 13 STREET SWEEPING AND I x X X X X X X X X X X X X X X X X X X PAD. 45.60 V / FF. 45.53 VACUUMING PER SE 7 SS V k x X X X X X X ) X X X X x x x x PAD:45.10 - 284, IS 00041'42"W ] X X X X X X X X X X X X ' X X X X X / UNIT 10 1 SCHEDULING PER EC-1 SCH XXX XX X XXX XX LL X XX X UNJT11N \ >< < >< x x x x x x x x x >< x < x FF:46.50 FF. 46.30 H, UNIT12 LWM STKPL MATERIAL DELI VERYAND III 3 ( \( X X X X X X X X X X )< X X X X / PAD: 45.75 PAD: 45.55 k FF. 46.10 VEF MNGM / / STORAGE PER WM-1 x x x x x x x x x x x x x / PAD: 45.35 SCHPG 6 6 1 x \x x x x x 1 . / /7 K CSM SWM ® CWM Mum MATERIAL USE MANAGEMENT MUM xx x x x x x x x x x x x \X x / PER WY-2 I I x'x x x x x x x x x x x x x x I ii I U, ) 7 >< x x x7 x x x x x x x x / A I I I STOCKPILE MANAGEMENT PER MT X\ X XX XXX X XXX X XX UNIT AS \ 1!\ \I WV-3 N /NN X NX X X X X X X X X X X X FF:46.35 A NI I N N \x' x x x x x x x x x x x I >< PAD: 45.60 V " UNIT 10 GARAGE U)VIT 11 GARAGE UNIT 12 GARAGE UNIT 13 GARAGENS LI. LL SPILL PREVENTION AND >< < < < < >< >< < >< >< >< < FF. 45.60 FR 45.40 FF. 45.20 FF. 44.95 I A I I CONTROL PER WM4 N >< >< < >< >< >< >< >< < < >< < >< PAD: 44.85 PAD: 44.65 PAD: 44.45 PAD: 4420 \ A I X N\X x x X x X X X X X X X N X X X / VA A N A N v u/ I SOLID WASTE MANAGEMENT N N x \ x x x X\ X x x x x x x X\ x x x x P / / A A N / / PER WM-5 X\XX/XXXX MANAGEMENT PER WM-6 / xx XX N / K " N I V , / HAZARDOUS WASTE X" UNIT 3 N \ N X\7X X X ' x x x x x XN X/\ /0 7 / 4 /' / iA MANAGEMENTPERWM-8 7 \ N \ X \X X X X X X x x x x X x x ( / I - P 6 \ \ \/ Hi N N N x x x x X / X X X X x x x x V~ X U' V A P A A A A • "' A A A P A / N H,\N / ,I SANITARY/ SEPTIC WASTE ,~,VVn I . I MANAGEMENT PER WM-9 E3 -L ' I V . 4 X"NNX xA';xx x x x x x x x x • \ NU \\\\ >N X X"OPERATIONS PER NS-3 X </NX 'X X X X x X"NX X X - UW14 A \, 7/rN I S 7 A AN N PAWNG AND GRINDING PG x PAD: 45.26 UNIT 5 X X X / X X X X X X X X A A A A I - V X ' X N X X X HXI X X , X X S A A V A I I L!J INSTALL SILT FENCE PER CA BMP HANDBOOK FACT SHEET X X \X(N/X X X X X X X I ' SE-IANDPERDETAILTHISSHEET. X X X XH, X X X X X X X ¶ S • x x >< H, X X X X X X X X / j ) A V A A A A A V I APPLY HYDROSEED MIXAS NEEDED AS PER CA BMP X X X X X X X X X X X UNIT 6 A A V VA I I I HANDBOOK FACTSHEETEC-4. IV X~ r3 INSTALL STORM DRAIN INLETPROTECTION PER CA, BMP >< X X X EF: 4544 V UNIT 7 UNIT 8 5 II A ' SSV 1PER SE 7 PAD: 44.92 HANDBOOK FACT SHEET SE- WAND PER DETAIL THIS SHEET. Xx UNIT 9 INSTALL TEMPORARY STABILIZED CONSTRUCTION ENTRANCE Lu 5 X xX x X\ i PAD: 43.91 A A FF: 44.66 11 V I PER DETAIL THIS SHEET. N \ N \ N\ N N N N N N N>/ N ' N N ' ' N N N H x x x < S A A I INSTALL GRAVEL BAG BERM PER CA BMP HANDBOOK FACT V V A A p I I SHEET SE-6. INSTALL GRAVEL BAG CHEVRONS PER GA BMP HANDBOOK N N NN\ NN N\\\NNNNNNNN\NNN N N N N N N H, S K ) N / A V / FACTSHEETSE. LL A Az 71 LL LL LL J. \NKNNU \NNU NNN/\\VNN/S \ H, N N I N N 1 7N' N N 5 EEYI 5 II ! \VNNN\N\\\NN \N NN 7/ N N IRL N FILLED BAGS Cr N \ GRAVEL BAG ROW SPACING TABLE GRADE INTERVAL LESS THAN 2% 100' 2% TO 4% 50' 4ZT06Z 40 6% TO 8% 25' ) PLAN VIEW- GRADING PLAN SCALE: 1"=10'HORIZONTAL 0 10 20 30 GRAPHIC SCALE I"= 10 RUNOFF TWO LAYERS OF GRAVEL BAGS WITH I SET POSTS AND EXCAVATE 2 STAPLE WIRE FENCING TO GRAVEL BAG CHEVRONS GAP BETWEEN BA GS ENDS OVERLAPPED 4 BY4 IN (10 BY 10CM) THE POSTS ACISAS SPILL WAY TRENCH UPSLOPE FROM AND NO SCALE S ALONG THE LINE OF POSTS. --,-,-r,--r-r- - - • -- • • • -- I , S GRAVEL BAG DETAIL NO SCALE LI CO ff No .80356 Exp. 12/31/20 ;) CIVs%- 'OF c" IJAbr,PU LAKF.1 bU1 ILK ' & ASSOCIATES CIVIL ENGINEERING + LAND PLANNING + LAND SURVEYING 535 North Highway 101, Ste A, Solana Beach, CA 92075 ph 858.2598212 I ft 858.259.4812 I pJ.sunglneering.com 12" MIN.T PROFILE EXISTING GROUND DRIVE AISLE 4 IN (10 CM) 3. ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE THE WIRE FENCE AND EXTEND IT EXCAVATED SOIL. INTO THE TRENCH. S I I FILTER FABRIC - 1w lam- SILT FENCE NO SCALE DIRECTION OF FLOW DIRECTION OF FLOW "m 1~w No GRAVEL BAGS I NOTE: 1. ALL PROVISIONS OF BMP GRAVEL BAGS WIDE DETAIL SE-10 SHALL BE I GRAVEL BAG HIGH APPLIED. INLET OPENING STORM DRAIN INLET PROTECTION NO SCALE PER CASQA BMP FACT SHEET SE-10 -. 16'MIN. PLAN PROVIDE APPROPRIATE TRANSITION BETWEEN STABILIZED CONSTRUCTION ENTRANCE AND PUBLIC RIGHT-OF- WAY STABILIZED ZCONSTRUCTIO N ai iiE.J a NO SCALE CITY OF CARLSBAD SHEETS 5 - ENGINEERING DEPARTMENT 6 - - - - GRADING PLANS FOR: rQni CT201800Q6 LAGUNA S Pt LIINPt ROW -- RP2018-0008 1 570-580 LAGUNA DRIVE GR 2019-0044 EROSION CONTROL PLAN HMP20I8-0003 - - - - - APPROVED: JASON S. GELDERT CITY ENGINEER RCE 63912 EXPIRES 9/30/20 DATE DWN BY CJB PROJECT NO DRAWNG NO RVWD ] CT 20 18-0006 5217' DATE INITIAL REVISION DESCRIP11ON DATE INIllAL DATE INITIAL ENGINEER OF WORK OTHER APPROVAL an' APPROVAL -J ,, r'A ::'4fl PERVIOUS PAVEMENT BMP 1 CROSS-SECTION BELOW I 9 MIN, PERF PIPE SUBDRAIN L._. 3-SACK HOLES ORIENTED DOWN SLURRY Mix I I 8" MIN L. BELOW PERVIOUS PAVEMENT BMP 2 - BMP CONSTRUCTION AND INSPECTION NOTE: CROSS-SECTION THE EOW WILL VERIFY THAT PERMANENT BMPs ARE CONSTRUCTED AND OPERATING IN COMPLIANCE NTH THE APPLICABLE " REQUIREMENTS. PRIOR TO OCCUPANCY, THE EOW MUST PROVIDE: I \ o ) TITTITTT1 i 'TT'T5'Ti ERVIOUS PAVERS E OF NO. 2 WASHED STONE BEDDING LAYER RVIOUSPAVERS 3 BELOW OF NO. 57 WASHED STONE CHOKER ROCK 5 OF 2 WASHED — PHOTOGRAPHS OF THE INSTALLATION OF PERMANENT POLLUTION CONTROL BMPs PRIOR TO CONSTRUCTION, DURING OF NO 57 WASHED STONE CHOKER ROCK ADJACEN OF WASHED 3/4 ROCK CONSTRUCTION, AND AT FINAL INSTALLATION. INOTA PART) UT-OFF WALL UT-OFI` WALL r — A WET STAMPED LETTER VERIFYING THAT PERMANENT BMPs ARE CONSTRUCTED AND OPERATING PER THE REQUIREMENTS APN '' >< / 0) \ / ___________ 9" MIN, PERF PIPE SUBORAIN OF THE APPROVED PLANS. POR LOT ISE 5 -00 3-SA K / / ) / SLURRY MIX 2 HOLES ORIENTED DOWN — PHOTOGRAPHS TO VERIFY THE PERMANENT WATER QUALITY TREATMENT SIGNAGE HAS BEEN INSTALLED. BELOW TI2S R5WSBM N.T.S.PEREPB N.T.S. PRIOR TO RELEASE OF SECURITIES, THE DEVELOPER IS RESPONSIBLE FOR ENSURING THE PERMANENT BMPs HAVE NOT BEEN REMOVED OR MODIFIED BY THE NEW HOMEOWNER OR HOA WITI-OUT THE APPRO 1pF THE CITYNcR. 0 I I _ — — — — — / 23 25 27— UL 00 ILL Im LL co 40 F GRADE ?o 41 / / 0 N N N N N\ \ V0 VIV -. , V __ \ N N NN N \ \ \\ I 1 V. - 0 1 kA f 202, wi: / 70 I \ N 1 81 / / LOL U-- -VAr _Ii 4 mw LL NNNNN N N\\ \ \\ N F 54) 0 U- 14 - / F V V V V 0) NN77 N7 // V V V V V %V V V V F I V V V 55 LLI LL YC N\\N\\NN\\\N NJ I V IV n N U7 V W01 N\ \\N \\\\\ NN\\/\ N N \\/NJ \N\ \\ N / V V V 20 LU LL -- \ \ \ \ \ \ \ \ \ \' \ \ 0 STD. MAINTENANCE INDICATORS AND ACTIONS:"'~~'~' Uj WASH, IF CONTINUES, REMOVE AND REPLACE PAVERASTONES AND CONFER 'WITH\M~NUFACTURER'~ ST 'PRACTICES Ck DRAIN INLET INSERT FILTER — NOTICEABLE LAYER 6RSEDiMb~t, DEBRO 'P S\ S( HOW TO ACCESS: PERVIOUS PAVEMENT — BY VEHICLE N N \N\N\N \ N N N N N N N N N \ N N N \ \ \ ) N \ \ \ \ V \ V 0 DRAIN INLET INSERT ALTER — BY FOOT FEATURES TO FACILITATE INSPECTION: LL V V 19 PERVIOUS PAVEMENT — OBSERVA11ON PORTS AVAILABLE VIA H`YDR bC ~Y \CON4~CTED \C \tCH BASINS.\ 17 L DRAIN INLET INSERT ALTER — OBSERVATION BY REMOVAL OF IN\ GRA \\ N N N N N N N N N N N N N NJ 44 - V V MANUFACTURER AN&PAR-1NUMOR: — — _____ - — JN N \\ NN.\\NNJ — JIIJ T_iNNNv N\ 45 LULL DRAIN INLET INSERT: NDS 900FF 9" CATCH BASIN FILTER (OR NbSOôB\LKIT\9X,'CTftNN N N7NT _____ - - _____ - - ____ i I - BASIN KIT WITH NDS 981 BLACK ATRIUM GRATE /\N N \N\N\N N/N\:\ \N\ \\ 'N N 'N -00 - N\ 28416' SpO41'42"W - W —J--- W OR \ \\ N N N \N \ N N (NOTAPAR I I / NDS 1200FF CATCH BASIN ALTER (OR APPROVED EQUAL) IN NDS 1200\N BkIijz"Xi2 TCH"B)SiN WE\TH NDS N 'N APN 155-221-11-00 r / 1208 PLUG FOR INLETS NTH ON STORM DRAIN CONNECTION AND NDS 1 BLA6\1~ ATRIUM GRATE MAINTENANCE THRESHOLDS: SEE TABLE BELOW. ' N \ 77 7 "- N 'N ________ TI2S R5W SBM - — N LL RECOMMENDED EQUIPMENT TO PERFORM MAINTENANCE: " \\ \N \ 7N N N \ PAVERS: STREET SWEEPER, HOSE FOR PRESSURE WASHING N N N N 0 N 10' 20' DRAIN INLET INSERT FILTER: CONTRACTOR THICK TRASH BAG FOR COLLEC116H OF'SEDIMENT, DEBRI \AND OTHER N " N ___________________ CERTIFICATION GROSS SOLIDS AND TRANSPORT TO APPROVED COLLECTION FACILITIES. N BMP NOTES: SPECIAL TRAINING FOR MAINTENANCE: N/A N N N N N N \ 1, THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'S N N N N N 1 INCH\ — — 10 FT ' RECOMMENDATIONS OR THESE PLANS. N N N N N N N i I A I A fl fl N N N I ,OESSf —LAN ,<< C11) C", ñí\ \ II L,J I No.tKcflT I r' IIcI ILyfi /3o/2 1/30/2020 cf' L C!Vi2p N SIGN DETAIL rLIAVI rrwrtrwu DL L. NO GHAINGES IL) Iht PROPOSEDMUN THIS SHEET WiIIIOUI F'KIOF( * NAME CORY JONES, PE APPROVAL FROM THE CITY ENGINEER. CHOOSE FROM THE LIST ______________________________________ STORM 3 NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES BELOW FOR COMPLETING THE FIELDS IN THE ,,'- WATER MANAGEMENT BEST LIJ PARTY RESPONSIBLE FOR MAINTENANCE:_______________________ SIGNATURECq INSPECTIONS & MANAGEMENT PRACTICE: M NAME LAGUNA PROJECT, LP (D.B.A. "LAGUNA ROW-) COMPANY CORY JONES ENGINEERING 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFF MAINTENANCE INLETFILTERS& $ CONTACT BRETT FARROW ADDRESS 1820 S.REAL, EL CAMINO A205 HAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTION FRENQUENCY COLUMNS: PERVIOUS PAVEMENT ADDRESS 125 MOZART AVE. ENCINITAS, CA 92024 AND INSTALLATION. ANNUAL CARDIFF_CA92007 5 REFER TO MAINTENANCE AGREEMENT DOCUMENT SEMI-ANNUALLY QUARTERLY THESE BMP'S IS TO BE MAINTAINED PER PHONE NO 760 230 6851 PHONE NO 760 274 6678 6 SEE PROJECT SWMP FOR ADDITIONAL INFORMATION BIMONTHLY THE SPECIFICATIONS PROVIDED IN THE MONTHLY STORM WATER QUAUTY MANAGEMENT PLAN OPERATIONS AND MAINTENANCE PLAN AS SHEET CITY OF CARLSBAD AS NEEDED IrS HEETS 6 NONE APPROVED BY THE CITY OF CARLSBAD. CA Uj ENGINEERINGDEPARTMENT ______ BMP TABLE N ~~ BMP I BMP TYPE F SYMBOL I CASQA NO. QUANTITY DRAWING~NJO SHEET NO.( S --- -T) INSPECT\ION FREQUENCY MIAINTEN'A CE IENt FREQUEN Y. TREATMENT CONTROL PERVIOUS cD ® I PAVEMENT J IC 10 _____ 521_7A [_ 2 3j_SEMI-ANNUALLY EMIANNUALLYANNUALLY ANNUALLY LOWIMPACT DESIGN (L.LD.) TREE - ® N/A 100 521-7A 2,3 SEMI-ANNUALLY ANNUALLY WELLS ROOF DRAIN To LANDSCAPING 0 SD-1 1 13 521-7A 2 - ANNUALLY ANNUALLY SOURCE CONTROL - TRASH ENCLOSURE - El Jill - - SD-32 - 13 Arch Plan - Arch Site Plan - WEEKLY - WEEKLY STENCILS & INLET FILTERS D I?N PdEGAN 9 521-7A 2 MONTHLY QUARTERLY BMP SIGN I —IVN/A 2 SINGLE SHEET BMP SITE PLAN SINGLE SHEET BMP SITE PLAN ANNUAL ANNUAL [GRADING PLANS FOR I CT2018-0006 I LAGUNA DRIVE SUBDIVISION RP2018-0008 I CDP2018-0032 I 570-580 LAGUNA DRIVE HDP2018-00031 GR 2019-0044 SINGLE SHEETBMP SITE PLAN HMP2O19-00031 7IPR0VED: JASON S. GELDERT I I TIME PER YEAR 2 TIMES PER YEAR 3 TIMES PER YEAR 4 TIMES PER YEAR ** NOTE, BMP ID'S 7,9, 11, 13, AND 15 ARE NOT USED. WEEKLY THIS FACILITY IS DESIGNED TO IMPROVE THE STORM WATER RUNOFF QUALITY PRIOR TO DISCHARGE OFF THIS PROPERTY AND DRAINING TO DOWNSTREAM WATER BODIES INCLUDING BUENA VISTA LAGOON AND THE NOTES PACIFIC OCEAN. SIGN SHALL BE CONSTRUCTED OF A MIN. 0.062 THICK ALUMINUM. LETTERING, SYMBOL AND BORDER SHALL BE REFLECTROIZED WHITE, ON A BLUE BACKGROUND. LETTERING SHALL BE 1 AND 2 HIGH. SET SIGN ON SDRSD M-45 SIGN POST. DATE INITIAL PROJECT: 570-580 LAGUNA DRIVE CARLSBAD VILLAGE Designed by: Designed for: Ff T BRETT FARROW ARCHITECT, INC. Cory Jones Engineering 1820 S. El Camino Real, A205 125 Mozart Avenue Encinitas, CA 92024 Cardiff-by-the-Sea, CA 92007 cory.laneave@gmail.com brettfarrow@cox.net REVISION DESCRIP11ON NO IL I KAl-1 (.X)N IAINEF(S ONLY MOVED OUTSIDE TO CURB ON COLLECTION DAYS, OTHERWISE THEY REMAIN COVERED WITHIN EACH UNIT. ENGINEER OF WORI DATE I INITIAL DATE OTHER APPROVAL CITY APPROVAL 1fN BY: JCLJ PROJECT NO. 11DRAWING NO. I I CHKD BY: CT 2018-0006 521-7A R'VLWD BY: Gin' OF C4RLSBAD BA/i' Oi'ERATiONS AND MAINTENANCE PLAN 570 Lagwia Drive. Gur/shad, CA ATTACHMENT 8- TREATMENT CONTROL BMP INSPECTION AND MAINTENANCE CHECKLIST(S) Page Left Intentionally Blank Pervious Pavement INSPECTION AND MAINTENANCE CHECKLIST Property Address: 570 Laguna Drive, Carlsbad, CA Property Owner: Laguna Project, LP Treatment Measure No.: Date of Inspection: Type of Inspection: 0 Monthly 0 Pre-Wet Season 0 After heavy runoff 0 End of Wet Season Inspector(s): Overall Facility Score*: 0 Other:____________________________ Conditions When Maintenance Comments (Describe maintenance Results Expected Date Defect Maintenance Is Needed Score" completed and if needed When Maintenance Is Complete maintenance was not conducted, Performed I Initial note when it will be clone) Sediment, trash Sediment, trash and debris I I Sediment, trash and and debris accumulated in the debris removed from accumulation pervious pavement valley pervious pavement and gutter and downstream catch basin and catch basin. Pavement disposed of properly. does not drain as Pavement drains per specified. design specifications. Standing water Pervious Pavement does Clogs removed from not drain within three days pervious pavement. after rainfall. Pavement drains per design specifications. Sediment Evidence of sedimentation Material removed so in Pervious Pavement, that there is no clogging or blockage. Material is disposed of properly. Mosquitoes Evidence of mosquito Clogs removed from larvae in Pervious pervious pavement. Pavement. Pavement drains per I design specifications. BMP Operation and Maintenance Plan Page 1 of 2 Pervious Pavement - Inspection and Maintenance Checklist Date of Inspection:______________ Property Address: 570 Laguna Drive. Carlsbad, CA Treatment Measure No.:_____________ 5. Miscellaneous Any condition not covered above that needs attention in order for the non- proprietary media filter to function as designed. *0 rail Facility Score = Worst Score from all Defect Items Noted. Scores: 0= OK, 1 = Monitor, 2 = Routine Maintenance, 3= Immediate Repair Necessary. Meet the design specifications. BMP Operation and Maintenance Plan Page 2 of 2 CITY OF CAR/SHAD BAY OPERATIONS AND MA/WrENANCE PLAN 570 Laguna Drive, Cur/shad, CA ATTACHMENT 9- MAINTENANCE SCHEDULE Schedule to be assigned by maintenance staff following results of manufacturer's recommended maintenance schedule for permeable pavement systems. Page Left Intentionally Blank C/fl' OF CARLSBAD Bit!? OPERA 7'IONSAND MAINTENAN('E PLAN 570 Laguna Drive, Car/shad, CA ATTACHMENT 10- SERVICE AGREEMENT To be attached when completed. CITY OF CARLSBAD Bit'!!' OPERA TIONS AND MAINTENANCE PLAN 570 Lagwia Drive, Cur/shad, CA CITY OF C4RLSBAD BMP OPERA TIONS AND MAINTENANCE PLAN 370 Logwa Drive, Carlsbad, CA ATTACHMENT 11- ANNUAL INSPECTION AND MAINTENANCE REPORTING FORM Page Left Intentionally Blank CITY OF CARLSBAD B/VIP OPERA TIONS AND MAINTENANCE PLAN 570 Lagzuw Drive. Carlsbad. CA STORMWATER MITIGATION PLAN REPORTING FORM ANNUAL INSPECTION AND MAINTENANCE OF TREATMENT CONTROL BMPS (SIDE A) Responsible Party for Inspection Maintenance: Signature:__________________ Date:______________ Print Name/Title Facility Name: Laguna Project, LP BMP Type Location Lat./Lon Date or Inlet # of Construction Inspection Date(s) Condition of BMP Indicate whether the BMP is present and in working condition, requires cleaning or replacement. *Maintenance required? (Y/N) If yes, complete I reverse side. .. I * Maintenance is to be carried out as needed and in accordance with the City approved Operation and Maintenance Plan. A copy of this inspection report must be provided to the City's Storm Water Protection Program by September 15 of each year. Submissions can be made via email, fax or through regular mail. For assistance completing this form, contact City of Carlsbad Storm Water Protection Program at (760) 602-2799. BMP O&M PLAN CuT OF CARLi/3AD liMP Ol'ERA TIONS ANt) MAINTENANCE PLAN 570 Laguna Drive. Carlsbad, CA URBAN STORM WATER MITIGATION PLAN REPORTING FORM ANNUAL INSPECTION AND MAINTENANCE OF TREATMENT CONTROL BMPS (SIDE B) If applicable, Description of BMP Location Date of Maintenance describe any BMP Type maintenance (IaUlon or Inlet #) Activity additional work performed required. * Maintenance is to be carried out as needed and in accordance with the City approved Operation and Maintenance Plan. A copy of this inspection report must be provided to the City's Storm Water Protection Program by September 15 of each year. Submissions can be made via email, fax or through regular mail. For assistance completing this form, contact City of Carlsbad Storm Water Protection Program at (760) 602-2799. BMPO&M PLAN 2 CITY OF CARLSBAD B1l' OPERA TIONS AND MAINTENANCE PLAN 570 Laguna Drive. (jar/shad. CA ATTACHMENT 12- CITY OF CARLSBAD O&M AGREEMENT Page Left Intentionally Blank C/fl' OF CARLSBAD &tI1' OPERA TIONSAND MAINTENANCE PLAN 570 Logunc. Drive. CurI.vbcsd, CA MAINTENANCE NOTIFICATION AGREEMENT FOR CATEGORY 1 STORMWATER STRUCTURAL BMP's THIS AGRFFMFNT is made nn the day of____________________ 20 . Laguna Project. LP the Owner(s) of the hereinafter described real property: Address 570 Laguna Drive l'ost Office Carlsbad, CA - Zip Code 92008 Assessor Parcel No. (s) _155-221-12-00 List, identify, locate (plan/ drawing number) and describe the Structural BMP's: Pervious Pavement Systems (BMP # 1 and 2) - Located across the parking lot and drive aisle. Owner(s) of the above property acknowledge the existence of the storm water Structural Best Management Practice on the said property. Perpetual maintenance of the Structural BMP(s) is the requirement of the State NPDES Permit, Order No. R9-2015-0001, Section E.3.e.(1)( c) and the City of Carlsbad Storm Water Protection Ordinance (WPO) Ordinance No. 15-12, and City BMP Design Manual (BMP DM) Chapters 7 & 8. In consideration of the requirement to construct and maintain Structural BMP(s), as conditioned by Discretionary Permit, Grading Permit, and/or Building Permit (as may be applicable), I/we hereby covenant and agree that: I/We are the owner(s) of the existing (or to be constructed concurrently) premises located on the above described property. I/We shall take the responsibility for the perpetual maintenance of the Structural BMP(s) as listed above in accordance with the maintenance plan and in compliance with City's self- inspection reporting and verification for as long as I/we have ownership of said property(ies). I/We shall cooperate with and allow the City staff to come onto said property(ies) and perform inspection duties as prescribed by local and state regulators. I/We shall inform future buyer(s) or successors of said property(ies) of the existence and perpetual maintenance requirement responsibilities for Structural BMP(s) as listed above and to ensure that such responsibility shall transfer to the future owner(s). I/We will abide by all of the requirements and standards of Chapter 15-12 Municipal Code (or renumbering thereof) as it exists on the date of this Agreement, and which hereby is incorporated herein by reference. This Agreement shall run with the land. If the subject property is conveyed to any other person, firm, or corporation, the instrument that conveys title or any interest in or to said property, or any portion thereof, shall contain a provision transferring maintenance responsibility for Structural BMP(s) to the successive owner according to the terms of this Agreement. Any violation of this Agreement is grounds for the City to impose penalties upon the property owner as prescribed in City Code of Regulatory Ordinances, Title 1, Division 8, Chapter 1 Administrative Citations §18.101-18.116. CITY OF CARLSBAD BA-111 OPERA TJONS AND MAINTENANCE PLAN 570 Laguna Drive. Carlsbad. CA MAINTENANCE NOTIFICATION AGREEMENT FOR CATEGORY 1 STORMWATER STRUCTURAL BMP's Owner(s) Signature(s) Print Owner(s) Name(s) and Title STATE OF CALIFORNIA CITY OF CARLSBAD On before me, Notary Public, personally appeared _________________________________who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/ their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Include Exhibits that illustrate: the Project Site Vicinity; the Project Site Map; and a map for each BMP and it's Drainage Management Area BMP O&M PLAN ATTACHMENT 4 City standard Single Sheet BMP (SSBMP) Exhibit [Use the City's standard Single Sheet BMP Plan.] Page Left Intentionally Blank PERVIOUS PAVEMENT BMP 1 PERVIOUS PAVEMENT BMP 2 BMP CONSTRUCTION AND INSPECTION NOTE: N CROSS-SECTION THE EOW WILL VERIFY THAT PERMANENT BMPs ARE CONSTRUCTED AND OPERATING IN COMPLIANCE WITH THE APPLICABLE N CROSS-SECTION REQUIREMENTS. PRIOR TO OCCUPANCY, THE EOW.MUST PROVIDE: I \ ki I TV rr--r—r 1TrTTV I I S PAVERS IL. PERVIOUS PAVERS I 'q1 I ill I II I IJ PERVIOU 304.iIN 1h1h1h1.Li N II'III'I_ OF NO.2 WASHED STONE BEDDING LAYER W OF NO. 57 WASHED STONE CHOKER ROCK BELOW OF 57 WASHED STONE CHOKER ROCK - PHOTOGRAPHS OF THE INSTALLATION OF PERMANENT POLLU11ON CONTROL BMPs PRIOR TO CONSTRUC11ON, DURING \ AOJAOEN1 OF WASHED OF WASHED 3/4 ROCK BL UT-OFF WALL CONSTRUCTION, AND AT FINAL INSTALLATION. 'NOTA PART / 0 / BL WALL - A WET STAMPED LETTER VERIFYING THAT PERMANENT BMPs ARE CONSTRUCTED AND OPERATING PER THE REQUIREMENTS APN 155 -221-15-00 X / \ 9 MIN, \ PERF PIPE SUBDRAIN ..J L I HOLE$ORIENTDDOWN ..-. OF THE APPROVED PLANS. POR LOT I SECTION 1 / / SLURRY MIX L BELOW HOLES ORIENTED DOWN SLURRY MIX L 27" MIN - PHOTOGRAPHS TO VERIFY THE PERMANENT WATER QUALITY TREATMENT SIGNAGE HAS BEEN INSTALLED. TI2S R5WSBM -/' 8 MIN BELOW NT S PERF PIPE N.T.S. / PERF PIPE PRIOR TO RELEASE OF SECURITIES, THE DEVELOPER IS RESPONSIBLE FOR ENSURING THE PERMANENT BMPs HAVE NOT BEEN REMOVED OR MODIFIED BY THE NEW HOMEOWNER OR HOA WITHOUT THE APPRO11pF THE CITYN ?cR. C,) Ljj L A 23 25 CO co 1NGECK / N . N \ N e I33 41 I LL .. I Q n22 V, VV %UTJ w —T W W -0- LL FN 0 LL 0 LL LL 104, U 0 / NN \\NN\ 0 // NN N NNNNN \N NNN\ NN\ 'V MCL 20 N N N \ \\N\\ \ \ N \\\N \N\\N \\ N V LL I CITY STD. SINGLE SHEET BMP EXFO: N \N NN\\\N N N N N 77 7 DRAIN INLET INSERT FILTER - BY FOOT 0 U- STD. MAINTENANCE INDICATORS AND ACTIONS: 'EN P61N\ PERVIOUS PAVEMENT - MAINTAIN WATER DRAINAIX-;WH \CL6 G\\ 6CCIO~, \8;TREE1-\SW4P\ A~\E \ ~~RtSSURE WASH, IF CONTINUES, REMOVE AND REPLACE PAVER--STONES AND CONFER WITH\MANU\FkT6RER1 tE)S\T P0,0C 1\iCES DRAIN INLET INSERT FILTER - NOTICEABLE LAYER bF,§EPIM&~t, DEB\Rl$,,OR 'OTHER\ f,\ROSS~ SOLIDS HOW TO ACCESS: PERVIOUS PAVEMENT - BY VEHICLE FEARES TO FACILITATE INSPECTION: N N N N N \ N N N N N N N N \ N N V \ \ \ N 7 \ \ 7 7 7 V V V PERVIOUS PAVEMENT - OBSERVATION PORTS AVAILABLE VIA '1YDRA!bC DRAIN INLET INSERT FILTER 1\ 4 ALLNY CONNCTED \CAtQA BAS!NS.N N N \\,\\ /N N N N N N N N O ---( V V V V OBSERVATION BY REMOVAL OF MANUFACTUReR AtD PAR-1NUMOER: - - ____ - - ,\ \._. N \N N N7\\N V ____ N N ____ \ N\ z/ - - V (9 IL LL E -x DRAIN INLET INSERT. NDS 90OFF 9" CATCH BASIN FILTER (OR APP BASIN KIT WITH NDS 981 BLACK ATRIUM GRATE N \N \N\N\N \ \\ NN \ \ \ N N N N N N (NOTA PAR 284.76 S41'42" W W _ NDS 1200FF CATCH BASIN FILTER (OR APPROVED EQUAL) IN NDS 1200\NB1<12"Xi ATCHBAS1N WI\TH NDS N N ( I APN 155-221-11-00 / . 1208 PLUG FOR INLETS WITH ON STORM DRAIN CONNECTION AND NDS 1 12 x1 2 BLACK\ ATRIUM GRATE N N N N POR LOT I SECTION 1 - N U- \ N MAINTENANCE THRESHOLDS: SEE TABLE BELOW. \ \ \N N N N N N N N --- \ TI2S R5W SBM I N I IL /V\ RECOMMENDED EQUIPMENT TO PERFORM MAINTENANCE: N N \N \ N N N N N N PAVERS: STREET SWEEPER, HOSE FOR PRESSURE WASHING \ N N N N N o N N 10' 20' 1/ -- _____ ___________________-__________ DRAIN INLET INSERT FILTER: CONTRACTOR THICK TRASH BAG FOR COLLEC11öF4 QFNSEDIMENT, DEBRI \AND OThERN N\ N ___________________ BMP NOTES: CERTIFICATION GROSS SOLIDS AND TRANSPORT TO APPROVED COLLECTION FACILITIES. N N L -r 1 SPECIAL TRAINING FOR MAINTENANCE: N/A 7 N N N N N — \ 1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'S N N N N N 1 INCH\ — 10 FT RECOMMENDATIONS OR THESE PLANS. N N N N N N N N N N PLAN PREPARED BY: 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR N N I(N Ut. I AIL I NAME CORYJ'NS PE APPROVAL FROM THE CITY ENGINEER. *CHOOSE FROM THE LIST - - NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES BELOW FOR COMPLETING THE FIELDS IN TH9 STORM WATER MANAGEMENT BEST PARTY RESPONSIBLE FOR MAINTENANCE SIGNATURE WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER INSPECTIONS & MANAGEMENT PRACTICE: L..._ M NAME LAGUNA ,, ,, PROJECT, LP (D.B.A.LAGUNA RO) COMPANY CORY JONES ENGINEERING NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFF MAINTENANCE INLET III TIDC CONTACT BRETT FARROW ADDRESS 1820 S. EL CAMINO REAL, A205 HAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTION FRENQUENCY COLUMNS: I ADDRESS MOZART AVE. CA 92024 AND INSTALLATION. ANNUAL PERVIOUS PAVEMENT CARDIFF, CA92007 REFER TO MAINTENANCE AGREEMENT DOCUMENT. SEMI-ANNUALLY Iq PHONE NO 760 230 6851 PHONE NO 760 274 6678 6 SEE PROJECT SWMP FOR ADDITIONAL INFORMATION QUARTERLY THESE BMP'S IS TO BE MAINTAINED PER BIMONTHLY THE SPECIFICATIONS PROVIDED IN THE S2 __ MONTHLY STORM WATER QUALITY MANAGEMENT PLAN SHEET CITY OF CARLSBAD SHEETS AS NEEDED OPERATIONS AND MAINTENANCE PLAN AS NONE APPROVED BY THE CiTY OF CARLSBAD, CA -_____ ENGINEERING____________________________________ N NBMP TABLE N NNN NNN ** BMP ID # BMP TYPE SYMBOL CASQA NO. QUANTITY DRAWING NO. T I SHEET NO.(S) INSPECTION * FREQUENCY MAINTEIA CE * FREQUENCY, TREATMENT CONTROL ') ® I TC 10 ]_ 521-7A J 2,3 SEMI-ANNUALLY ANNUALLY LOW IMPACT DESIGN (L.I.D.) TREE . - _______ N/A ° : 521-7A 2,3 SEMI-ANNUALLY ANNUALLY ® WELLS ® ROOF DRAIN TO LANDSCAPING 0 SDII 13 521-7A 2 - ANNUALLY ANNUALLY SOURCE CONTROL D TRASH ENCLOSURE [tJLi1 SD 32 13 Arch Plan - Arch Site Plan WEEKLY WEEKLY 0 -0 STENCILS & INLET FILTERS NO DUMNG DRAINS TO dAN SD-13 :i: & 9 521-7A 2 MONTHLY QUARTERLY BMP SIGN N/A 2 SINGLE SHEET BMP SITE SINGLE SHEET BMP SITE PLAN ANNUAL ANNUAL [GRADING PLANS FOR: I CT2018-0006 I LAGUNA DRIVE SUBDIVISION RP2018-0008 I 570-580 LAGUNA DRIVE P200003 [a019—o044 SINGLE SHEET BMP SITE PLAN HMP2019-0003 RECORD COPY PROJECT NO. CT201 8-0006 DRAWING NO. 521-7A REVISION DESCRIPTION INITIAL PROJECT: 570-580 LAGUNA DRIVE CARLSBAD VILLAGE Designed by: Designed for: BRETT FARROW . J ,J ARCHITECT, INC. Cory Jones Engineering 1820 S. El Camino Real, A205 125 Mozart Avenue Encinitas, CA 92024 Cardiff-by-the-Sea, CA 92007 cory.laneave@gmail.com brettfarrow@cox.net DATE NOTE: TRASH CONTAINERS ONLY MOVED OUTSIDE TO CURB ON COLLECTION DAYS, OTHERWISE THEY REMAIN COVERED WITHIN EACH UNIT. 'i I iiiiir.i •'Y'u OTHER APPROVAL CITY APPROVAL I TIME PER YEAR 2 TIMES PER YEAR 3 TIMES PER YEAR 4 TIMES PER YEAR ** NOTE, BMP ID'S 7,9, 11, 13, AND 15 ARE NOT USED. THIS FACILITY IS DESIGNED TO IMPROVE 0 THE STORM WATER RUNOFF QUALITY PRIOR Z TO DISCHARGE OFF THIS PROPERTY AND DRAINING TO DOWNSTREAM WATER BODIES INCLUDING BUENA VISTA LAGOON AND THE NOTES PACIFIC OCEAN. SIGN SHALL BE CONSTRUCTED OF A MIN. 0.062 THICK ALUMINUM. LETTERING, SYMBOL AND BORDER SHALL BE REFLECTROIZED WHITE, ON A BLUE BACKGROUND. LETTERING SHALL BE 1 AND 2R HIGH. SET SIGN ON SDRSD M-45 SIGN POST. DATE INITIAL ENGINEER OF WORK Page Left Intentionally Blank 01 Date: 1990 Date: 1938 hTr I I VA I y U Date 1 IJ r - -: Date: 1930 Date: 1967 570 Laguna Attachment 5: Existing Site Conditions - Historical Aerial Photos and Geotracker 1000-ft Radius Historical Aerial Photos Source: NETR Historical Aerials website 4-.. C S -' geotracker raterboaeds.ca.gov Er. .- - •- . GEOTRrC Ibd CA - 9 ---- . ' o ---- 6- HAWTI4ORtk[tkEt4T-IT SERVICE (T0073OO461 - LtJSTCIaokkpSrt tEJ "k-k Ctaa,,p Status Care,plf.d - Case Closed RS Case 9tfT1596 Lo, Case I H037Jd 002 • 61 6-16- 66 (,rtrr: 9 ill 66-p 61 rr6t-r.r - (- C i -. r. geotracker.*at&boar; ca.go G EOTRACKER cw U L~ Case H13790 007 4* 4"" p -au' Cm'p'etd Case Closed R" Call T1043 0 GEO'ACKER t k A 9 H 0IIIT$ERVIETO6O81I24 6) ('1T I