Loading...
HomeMy WebLinkAboutCUP 2018-0023; BUENA VISTA RESERVOIR SITE (PARK); FOUNDATION PLAN REVIEW BUENA VISTA RESERVOIR SITE; 2019-12-20GEOCON INCORPORATED 4 ow GEOTECHNICAL • ENVIRONMENTAL a MATERIALS Project No. G2225-52-01 December 20, 2019 RECORD COPY Schmidt Design doup, Inc. 1111 Sixth Avenue, Suite 500 San Diego, California 92101 Attention: Mr. Mark Moss Subject: FOUNDATION PLAN REVIEW BUENA VISTA RESERVOIR SITE CARLSBAD, CALIFORNIA 1111001 Date References: 1. Update Geotechnical Investigation, Buena Vista Reservoir Site, Carlsbad,. California, prepared by Geocon Incorporated, dated December 1.8, 2019 (Project No.G2225-52-01). . 2. Landscape Construction Details for: Buena Vista Reservoir Site, City of Carlsbad, California, prepared by Schmidt Design Group, plot dated December 9, 2019 (Sheets LC-2.5 and LC-2.7). Dear Mr. Moss: In accordance with your request, we reviewed the referenced foundation plans for the proposed shade structure and sail shade and subject project. Based on our review of the plans and the information contained within the referenced geotechnical reports, we opine' the plans and details have been prepared in substantial conformance with, recommendations presented in the referenced geotechnical report. Our review was limited to geotechnical aspects of project development and did not include the review of other details on the referenced plans. Geocon Incorporated has no opinion regarding other details found on the referenced plans, civil, structural or otherwise, that do not directly pertain to geotechnical aspects of site development. If you have any questions regarding this letter, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED 7 Ili A. James RCE 79438 KAJ:SFW:dmc 114, -\ ~ ~ 4'*\~ .. A. No. 79438 '") Shawn 271 Foy Weedon. ' GE4 (1/del) Addressee 6960 Flanders Drive IN San Diego, California 92121 N Telephone (858) 558-6900 M Fax (858) 558-6159