Loading...
HomeMy WebLinkAboutMS 15-13; QUARRY CREEK PA R-1 & R-2; PRELIMINARY WATER STUDY FOR QUARRY CREEK PLANNING AREA R-1/R-2; 2016-03-08B&02 PLANNING ENGINEERING SURVEYING PRELIMINARY WATER STUDY FOR QUARRY CREEK PLANNING AREA R-1/R-2 MS 15-13 I Dwg. No. 484-51) & 484-5F City of Carlsbad, CA PREPARED FOR: CORNERSTONE COMMUNITIES 4365 EXECUTIVE DRIVE, SUITE 600 SAN DIEGO, CA 92121 RECEIVED MAR 0 92016 PREPARED BY: SB&O, INC. 3990 RUFF1N ROAD, SUITE 120 SAN DIEGO, CA 9223 (858)560-1141 SB&O JOB NO. 71820.60 Aaron Parker, PE 68547 Exp: 9/30/2017 March 8, 2016 LAND DEVELOPMENT ENGINEERING NO. 68547 CIV OF C Corporate Office: 3990 Ruffin Road, Suite 120 • San Diego, California 92123 • Phone 858.560.1141 Fax 858.560.8157 41689 Enterprise Circle North, Suite 126 • Temecula, CA 92590 9 Phone 951.695.8900 Fax 951.695.8901 S &0 PLANNING ENGINEERING SURVEYING TABLE OF CONTENTS INTRODUCTION......................................................................................................................1 DESCRIPTION OF WATER SYSTEMS..................................................................................1 2.1 Existing Condition................................................................................................................1 2.2 Proposed Private Water System............................................................................................1 HYDRAULIC ANALYSIS........................................................................................................2 3.1 EPANET...............................................................................................................................2 3.2 Residual Demand Analysis...................................................................................................2 3.3 Results...................................................................................................................................2 WATER METER SIZING .........................................................................................................3 4.1 UPC Demands ......................................................................................................................3 4.2 Meter Sizes ............................................................................................................................3 RECOMMENDATIONS............................................................................................................4 5.1 Pipelines................................................................................................................................4 5.2 Pressure Regulation..............................................................................................................4 5.3 Meters...................................................................................................................................4 EXHIBITS Exhibit A: Vicinity Map Exhibit B: EPANET Results / Site Map D:71822 QC PA 1Repons\Wate,i20I5I 1112, QCRIR2, COMBINED WATER STIJDY.docx B&02 PLANNING ENGINEERING SURVEYING Introduction The Quarry Creek project is located in the City of Carlsbad (City), but is bordered to the east by the City of Oceanside. The project is situated west of College Boulevard, east of Interstate 5 and south of Haymar Drive. The property is divided north and south by the Buena Vista Creek which runs east-to-west across the middle of the site. Planning Area 2 (R-2) is located in the northeastern portion of the site, and consists of 278 residential apartment units located within buildings that vary between two and three stories. R-2 is bound by the Buena Vista Creek to the south, El Salto Falls Road to the west and Haymar Road to the north. This report summarizes our analysis of the proposed public water system within R-2 as well as the main line along street A, for sizing of facilities and verifying adequate working pressures. The water meters from the R-1 project take service from the public main line. R-1 has an internal private 8" system that loops and connects into the public main line in two locataions, therefore, the demand from R-1 has been taken into account in the analysis of the public main line. This report is preliminary and may be revised due to changes that occur in the fmal design stage of the project. Description of Water Systems 2.1 Existing Condition A water system analysis for the Quarry Creek Master Plan was prepared by Dexter Wilson Engineering, dated March 2012. The Quarry Creek water system is connected to the 580 pressure zone near the intersection of Tamarack Avenue and Simsbury Court. A pressure reducing station reduces all the Quarry Creek main lines to the 330 pressure zone. 2.2 Proposed Private Water System The R-2 area contains private driveways, private sewer and a public domestic and reclaimed water system. The internal 8" PVC public water main line is looped through the site, and connected at two locations to the existing public water main along Haymar Road and El Salto Falls Road. The layout of the domestic water system and the Points of Connection (POCs) are illustrated in Exhibit A. Each building shall receive a single water service. D:71822 QC PA flRepofls\Wtci20I3I II 12. QCRIR2, COMBINED WATER STUDY.docx 1 &02 PLANNING ENGINEERING SURVEYING 3. Hydraulic Analysis (R-1 and R-2) 3.1 EPANET EPANET (v2.00.12) is a computer program that performs extended period simulation of hydraulic and water quality behavior within pressurized pipe networks. EPANET can be used for many different kinds of applications in distribution systems analyses. A network consists of pipes, nodes (pipe junctions), pumps, valves, and storage tanks or reservoirs. EPANET tracks the flow of water in each pipe, the pressure at each node, and the height of water in each tank, throughout the network during the simulation period comprised of multiple time steps. 3.2 Residual Demand Analysis In accordance with the City's Design Requirements, Section 3.2.1, the following demand profiles shall apply to the combined hydraulic analysis of the 64 residential multi-family units from the R-1 project and the 278 residential multi-family units and recreation building from the R-2 site. Average Daily Demand (ADD) = 85,500 gallons per day (gpd) =59 gallons per minute (gpm) Maximum Daily Demand (MDD) = 141,075 gpd =98 gpm Peak Hour Demand (PHD) = 247,950 gpd = 172 gpm Max Day + Fire= 141,075 gpd= 98 gpm + 3,000 gpm-- 3,098 gpm Per City's Design Requirements, Section 2.3, the minimum residual pressure shall meet the following criteria: 40 PSI at PHD 20 PSI at design fire flow plus MDD 3.3 Results The results of the PHD analysis is summarized in the table below and Exhibit B. SIMULATION ALLOWABLE Max. Velocity (FPS) 0.71 8 Hazen-Williams Roughness Coef. "C" 120 - Max. Residual Pressure (PSI) 93.85 - Mm. Pressure (PSI) 90.88 40 D:71822 QC PA lRepons\Wate,i20I3I 1112. QCRIR2, COMBINED WATER STUDV.docx 2 BB&02 0 PLANNING ENGINEERING SURVEYING The results of the MDD+Fire analysis is summarized in the table below and Exhibit B. SIMULATION ALLOWABLE Max. Velocity (FPS) 12.92 - Hazen-Williams Roughness Coef. "C" 120 - Max. Residual Pressure (PSI) 83.70 - Mm. Pressure (PSI) 80.34 20 4. Water Meter Sizing (R-2 Only) 4.1 UPC Demands The demands for each unit and building were calculated based upon the amount of fixture units in each. Using chart A-2 (Appendix B) of the UPC, the fixture units are converted to flow demand in gpm. There are a total of 278 units. Since the water main is public, there will be 11 meters between 3/4" and 2" servicing the buildings 4.2 Meter Sizes Bldg Fixture Units GPM MTR SIZE 1 502 120 2" 2 249 70 15" 3 284 75 15" 4 152 55 15" 5 249 70 15" 6 385 100 2" 7 152 55 15" 8 481 117 2" 9/10 88 37 1" 11/12 88 37 1" REC 12 20 3/4" D.%71822 QC PA IRepot,\Watei\20I5I 11 12, QCRIR2, COMBINED WATER STUDY.docx 3 &02 PLANNING ENGINEERING SURVEYING 5. Recommendations 5.1 Pipelines The main lines within the project should be constructed with 8" PVC (DR-18, HG 330) pipe or equivalent, and in accordance with the City's Water Design & Construction Manual. 5.2 Pressure Regulation This water system does not require any pressure regulators or reducers for the on-site public water system. The individual buildings will require pressure reducers, to be determined by the building plumbing engineer. 5.3 Meters The domestic water system shall be looped and connected at two POCs to the offsite public main lines. Each building will receive an individual meter. Building's 9-12 will be combined with one meter supplying two buildings. D:7I822 QC PA I\Reports\W&1ct20I5I II 12, QCRIR2, COMBINED WATER STUDY.docc 4 BB&02 PLANNING ENEINEERINE SURVEYING Exhibit A: Vicinity Map EL CAM/NO COUNTRY CLUB VISTA fc . MIRA Cl) COSTA COLLEGE WAY SITE 1*l \\ M4RRON VICINITY MAP NOT TO SCALE rHoMAS BROTHERS PG. 1107, GRID A-2 2006 EDIT/ON Vz. HAYMAR OR. AIARRON 4 RD. D \71822 QC PA l\Reports\Waer\20I SI! 12. QCR1R2, COMBINED WATER STUDY.docx 03[93&9)2 PLANNING ENGINEERING SURVEYING Exhibit B: EPANET Results & Site Map D:7I822 QC PA IRcpofls\Wate620I5I II 12, QCRIRZ COMBINED WATER STUDY.doix Page 1 11/12/2015 2:10:06 PM * E P A N E T * * Hydraulic and Water Quality * *Analysis for Pipe. Networks * * Version 2.0 * Input File: 20151030, PHD.net Link - Node Table: Link Start ----------------------------------------------------------------------- End Length Diameter ID Node Node ft in 1 2 ---------------------------------------------------------------------- J1 301 8 2 .Jl J2 .210 8 3 J2 J3 486 8 4 J3 J4 108 8 5 J4 J6 398 8 6 J1 J5 443.5 8 7 J5 J6 354.5 8 10 J6 J7 145.2 8 11 J7 1 887.82 8 Node Results: Node Demand Head Pressure Quality ID GPM. ----------------------------------------------------------------------- ft psi J1 14.70 329.89 93.85 0.00 J2 38.80 329.87 92.80 0.00 J3 18.10 329.86 90.88 0.00 J5 33.70 329.87 93.49 0.00 J4 12.10 329.86 91.37 0.00 J7 20.10 329.88 92.67 0.00 J6 39.30 329.87 92.96 0.00 1 -66.05 330.00 0.00 0.00 Reservoir 2 -110.75 330.00 0.00 0.00 Reservoir Link Results: Link Flow VelocityUnit Headloss Status ID GPM ---------------------------------------------------------------------- fps ft./Kft 1 110.75 0.71 0.36 Open 2 56.23 0.36 0.10 Open 3 17.43 0.11 0.01 Open 4 -0.67 0.00 0.00 Open 5 -12.77 0.08 0.01 Open 6 39.82 0.25 0.05 Open 7 6.12 0.04 0.00 Open I Page Link Results: (continued) -------------------------------------------------------------- Link Flow VelocitytJnit Headloss Status I ID GPM fps ft/Kft ---------------------------------------------------------------------- 10 -45.95 0.29 0.07 0peri 11 -66.05 0.42 0.14 Open Page 1 11/12/2015 2:05:10 PM * E P A N E T * * Hydraulic and Water Quality * * Analysis for Pipe Networks * * Version 2.0 . ********************************************************************** Input File: 20151030, MDD+FIRE.NET Link - Node Table: Link Start ---------------------------------------------------------------------- End. Length Diameter ID Node Node ft in 1 2 Ji 301 8 2 J1 J2 210 8 3 J2 J3 486 8 4 J3 J4 108 8 5 J4 J6 398 8 6 J]. is 443.5 8 7 J5 J6 354.5 . 8 10 J6 J7 145.2 8 11 J7 1 887.82 8 Node Results:. Node Demand ------------------------------------------------------------------------ Head Pressure Quality ID GPM ft psi Ji 1508.40 306.46 . 83.70 0.00 J2 22.10 306.15 82.52 0.00 J3 10.30 305.54 80.34 0.00 J5 19.20 305.59 82.97 0.00 J4 6.90 305.41 80.77 0.00 J7 11.50 308.44 83.38 0.00 JG 1522.30 304.99 82.18 0.00 1. -1076.47 330.00 0.00 0.00 Reservoir 2 -2024.23 330.00 . 0.00 0.0.0 Reservoir Link Results: Link Flow ----------------------------------------------------------------------- VelocityUnit Headloss Status ID GPM fps ft/Kft 1 2024.23 ---------------------------------------------------------------- 12.92 78.20 Open 2 239.37 1.53 . 1.50 Open 3 217.27 1.39 1.25 Open 4 206.97 1.32 1.15 Open 5 200.07 . 1.28 1.08 . Open 6 276.46 1.76 1.96 Open 7 . 257.26 1.64 1.71 Open Page Link Results: (continued) ----------------------------------------------------------------------- Link Flow Velocityunit Headloss Status ID GPM fps. ft/Kft ---------------------------------------------------------------------- 10 -1064.97 6.80 23.80 Open 11 -1076.47 6.87 24.28 Open