1. THE ARCHITECT/ENGINEER, TETRA TECH, AND REPRESENTATIVES OF THE OWNER,
MUST BE NOTIFIED AT LEAST TWO FULL DAYS PRIOR TO COMMENCEMENT OF
CONSTRUCTION AT (415) 974-1221.
2. DO NOT EXCAVATE OR DISTURB BEYOND THE PROPERTY LINES OR LEASE LINES,
UNLESS OTHERWISE NOTED.
3. DO NOT SCALE BUILDING DIMENSIONS FROM DRAWINGS.
4. ANY DRAIN AND/OR FIELD TILE ENCOUNTERED DURING CONSTRUCTION SHALL BE
RETURNED TO ITS ORIGINAL CONDITION PRIOR TO COMPLETION OF WORK. SIZE,
LOCATION AND TYPE OF ANY UNDERGROUND UTILITIES OR IMPROVEMENTS SHALL BE
ACCURATELY NOTED AND PLACED ON AS-BUILT DRAWINGS BY GENERAL
CONTRACTOR AND ISSUED TO ARCHITECT /ENGINEER AT COMPLETION OF PROJECT.
5. ALL EXISTING UTILITIES, FACILITIES. CONDITIONS, AND THEIR DIMENSIONS SHOWN ON
PLANS HAVE BEEN PLOTTED FROM AVAILABLE RECORDS. THE ARCHITECT /ENGINEER AND
OWNER ASSUME NO RESPONSIBILITY WHATSOEVER AS TO THE SUFFICIENCY OR
ACCURACY OF THE INFORMATION SHOWN ON THE PLANS OR THE MANNER OF THEIR
REMOVAL OR ADJUSTMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING
EXACT LOCATION OF ALL EXISTING UTILITIES AND FACILITIES PRIOR TO START OF
CONSTRUCTION. CONTRACTOR SHALL ALSO OBTAIN FROM EACH UTILITY COMPANY
DETAILED INFORMATION RELATIVE TO WORKING SCHEDULES AND METHODS OF REMOVING
OR ADJUSTING EXISTING UTILITIES.
CONSTRUCTION NOTES
(E) MAINTANCE/SERVICE
ENTRANCE
6. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES BOTH HORIZONTALLY AND
VERTICALLY PRIOR TO START OF CONSTRUCTION. ANY DISCREPANCIES DR DOUBTS
AS TO THE INTERPRETATION OF PLANS SHOULD BE IMMEDIATELY REPORTED TO THE
ARCHITECT/ENGINEER FOR RESOLUTION AND INSTRUCTION, AND NO FURTHER WORK
SHALL BE PERFORMED UNTIL THE DISCREPANCY IS CHECKED AND CORRECTED BY
THE ARCHITECT/ENGINEER. FAILURE TO SECURE SUCH INSTRUCTION MEANS
CONTRACTOR WILL HAVE WORKED AT HIS/HER OWN RISK AND EXPENSE.
CONTRACTOR SHALL CALL LOCAL DIGGER HOT LINE FOR UTILITY LOCATIONS 48
HOURS PRIOR TO START OF CONSTRUCTION.
7. ALL NEW AND EXISTING UTILITY STRUCTURES ON SITE AND IN AREAS TO BE
DISTURBED BY CONSTRUCTION SHALL BE ADJUSTED TO FINISH ELEVATIONS PRIOR
TO FINAL INSPECTION OF WORK.
6. THE BUILDING DEPARTMENT ISSUING THE BUILDING PERMIT SHALL BE NOTIFIED AT
LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK OR AS
STIPULATED BY THE CODE ENFORCEMENT OFFICIAL HAVING JURISDICTION.
9. GRADING OF THE SITE WORK AREA IS TO BE SMOOTH AND CONTINUOUS IN
SLOPE AND IS TO FEATHER INTO EXISTING GRADES AT THE. GRADING LIMITS.
10. ALL TEMPORARY EXCAVATIONS FOR THE INSTALLATION OF FOUNDATIONS, UTILITIES,
ETC., SHALL BE PROPERLY LAID BACK OR BRACED IN ACCORDANCE WITH CORRECT
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REQUIREMENTS.
------
(E) PROPERTY LINE
11. STRUCTURAL FILLS SUPPORTING PAVEMENTS SHALL BE COMPACTED TO 100% OF
MAXIMUM STANDARD PROCTOR DRY DENSITY.
12. NEW GRADES NOT IN BUILDING AND DRIVEWAY IMPROVEMENT AREA TO BE/ ACHIEVED BY
FILLING WITH APPROVED CLEAN FILL AND COMPACTED TO 95% OF STANDARD PROCTOR
DENSITY.
13. ALL FILL SHALL BE PLACED IN UNIFORM LIFTS. THE LIFTS THICKNESS SHOULD NOT
EXCEED THAT WHICH CAN BE PROPERLY COMPACTED THROUGHOUT ITS ENTIRE DEPTH
WITH THE EQUIPMENT AVAILABLE.
14. ANY FILLS PLACED ON EXISTING SLOPES THAT ARE STEEPER THAN 1 0 HORIZONTAL TO 1
VERTICAL SHALL BE PROPERLY BENCHED INTO THE EXISTING SLOPE ;,s DIRECTED BY A
GEOTECHNICAL ENGINEER.
15. THE GRADES WITHIN THE FENCED-IN AREA ARE TO BE ACHIEVED BY COMPACTING
CLEAN FILL TO A DENSITY OF 90% OF STANDARD PROCTOR COVERING THE AREA
WITH 6 MIL. VISQUENE ( 1' OVERLAP AT SEAMS) FOR WEED SUPPRESSION, THEN
ACHIEVING FINISH GRADE BY ADDING 6' OF 3/4" CRUSHED STONE-ND FINES.
16, CONTRACTOR SHALL CLEAN ENTIRE SITE AFTER CONSTRUCTION SUCH THAT NO
PAPERS, TRASH, WEEDS, BRUSH OR ANY OTHER DEPOSITS WILL REMAIN. ALL
MATERIALS COLLECTED DURING CLEANING OPERATIONS SHALL BE DISPOSED OF
OFF-SITE BY THE GENERAL CONTRACTOR.
I
PROPOSED STEALTH CHIMNEY
NOTE:
SITE WILL REQUIRE THE USE OF ( 1) PARKING SPACE
1 DAY PER MONTH FOR TEMPORARY PARKING OF FIELD
MAINTENANCE VEHICLES AND/OR FOR THE PLACEMENT OF
A TEMPORARY MOBILE GENERATOR TO BE DEPLOYED IN
EMERGENCY SITUATIONS ONLY.
SCALE: ----1·=40' 0
17. ALL TREES AND SHRUBS WHICH ARE NOT IN DIRECT CONFLICT WITH THE
IMPROVEMENTS SHALL BE PROTECTED BY THE GENERAL CONTRACTOR.
20'
18. DRIVEWAY CONSTRUCTION, GRADING AND DRAINAGE WORK SHALL CONFORM TO
CALIFORNIA STATE DEPARTMENT OF TRANSPORATION "STANDARD SPECIFICATION FOR
THE ROAD AND BRIDGE CONSTRUCTION", LATEST EDITIONS, AND ALL APPLICABLE
PROVISIONS OR LOCAL COUNTY ORDINANCES.
19. ALL SITE WORK SHALL BE CAREFULLY COORDINATED BY GENERAL CONTRACTOR
WITH LOCAL UTILITY COMPANY, TELEPHONE COMPANY, AND ANY OTHER UTILITY
COMPANIES HAVING JURISDICTION OVER THIS LOCATION.
APPROVED
40' 1
2
__._s . ~ ,prmt.
Sprint PCS,.
4683 CHABOT DRIVE, SUITE 100
PLEASANTON, CA 94588
~PROJECT INFORMATION:
AVIARA
SD35XC119A
7100 FOUR SEASONS PT.
CARLSBAD, CA.
SAN DIEGO CO.
:::cuRRENT ISSUE DATE:
I 01/17/01 I
~ISSUED FOR:
I ZONING I .... , -REV DATE ISSUED FOR· BY -_, .. -:-
2 01/17 /01 ZONING (100%) CDG
1 9/20 /00 ZONING (90%) CDG
0 08/30 /00 FEASIBILITY CDG ~. PLANS PREP ARED BY:
TETRA TECH
right Rood, Suite 500 17770 Cartw
Irvine, CA 9
(949) 250-6
2614-5850
788, FAX (949) 250-6775
CONSULTANT:
CHK.: APV.: DRAWN BY:= u DRAWN BY: TB
UC ENSURE:
PAS CDG 11
_SHEET TITLE:::.::.::.::.::.::.::.::.::.::.::.::.::.::.::.::.::.::.::.._~
SITE PLAN .. , .