Loading...
HomeMy WebLinkAboutSDP 00-10; THE PAVILION-THE FORUM; DRAINAGE STUDY FOR CALLE BARCELONA WIDENING; 2002-03-061cr ' 59 f 0° DRAINAGE' STUDY PAVILION at LA COSTA "CALLE BARCELONA WIDENING" City of Carlsbad San Diego County Prepared For: Fourth Quarter Properties XXX, LLC 300 Village Green Circle, Suite 200 Smyrna, GA 30080 (770) 801-8222 Prepared By: RS & ASSOCIATES I 'Civil Engineering, Inc. PLANNING • ENGINEERING. SURVEYING 19 Spectrum Pointe Drive, Suite 609 Lake Forest, CA 92630 (949) 599-0870 office (949) 599-0880 fax http://www.mayerscivil.com PPôc -ic RECEIVED MAR 152002 ENGINEERING DEPARTMENT Drainage Study FOR Calle Barcelona Widening CITY OF CARLSBAD Date Prepared: _________ ES Sj0's. PREPARED UNDER THE SUPERVISION OF: GI No. 50318 FOR PLAN CHECK ONLY Exp.6!3O5 )X. ) $C1 It- 4/ Gary A. Martin, R.C.E. 50318 Exp. 6/30/05 Date: OF C P.. TABLE OF CONTENTS INTRODUCTION................................................................................................... 2 Purpose...........................................................................................................2 Methodology...................................................................................................2 Discussion.......................................................................................................2 CATCH BASIN CALCULATIONS ..................................................................... HYDRAULIC CALCULATIONS ......................................................................... EXISTING HYDROLOGY MAP .......................................................................... INTRODUCTION Purpose The purpose of this report is to provide a study for the off-site improvements for the Pavilion @ La Costa located within the City of Carlsbad in San Diego County. Methodology This report draws upon the existing drainage study titled "Green Valley Crossing Volumes I & II". Minor modifications to the existing study are indicated within this report. Discussion As a result of this project the existing Calle Barcelona will be widened along the northerly boundary. This will require the lengthening of storm drain "EE" and the addition of a curb inlet at the proposed new entry at approximately 25+50. The curb inlet for storm drain "EE" will be revised to accommodate the entry at the NE'ly corner of the project. The following is a prorating of the flow rate to storm drain "EE" to determine the new flow rates to the new inlet and the revised "EE" inlet. Line Area (AC) Flow Rate (cfs) Main Line Adj. Existing "EE" 0.77 7.89 7.5 Revised "EE" 0.31 3.19 3.0 New Inlet 0.46 4.70 4.5 These flow rates were used to determine the new and revised inlet sizing and to create revised hydraulic caics. The Main line adjustment is the difference between the upstream and downstream flow rate at the junctions. II. CATCH BASIN CALCULATIONS The catch basin calculations have been prepared utilizing the "Design and Construction of Public Works Improvements" guidelines. The catch basin calculations are contained in this section of the report. III. HYDRAULIC CALCULATIONS The hydraulic control for the proposed storm drain 'connections was obtained from the existing report for the storm drain in Calle Barôelona. The HGL of 75.5 feet is equal to the spillway of the existing water quality basin. This report contains the hydraulic calculations to support the design of the proposed storm drain improvements for the The Pavilion at La Costa project. The hydraulic calculations were prepared utilizing the L.A. County Public Works "W.S.P.G." computer software. The storm drain system has been designed to convey the 100-year storm peak discharges. IV. EXISTING HYDROLOGY MAP The existing hydrology map for Green Valley Crossing is included herein. The markings in red indicate the revised drainage areas. / smzj i!!. TYf' ERS & ASSOCIATES I l Civil Engineering, Inc. DATE: 03/03/02 PLANNING • 101NEERIN; • .RVEyINu BY: M. Miller New Inlet Curb Opening (Interception) Given: (a) discharge Q = 4.7 c.f.s. street slope So = 0.0140 6" curb half street width = Solution: Q/(So)A1/2 = 39.72 Therefore y = a S = 0.33 L = QJ0.7(a+y)A3/2 = 11.97 '(L for total interception) Try: Lp = 12.00' 0.35' VIfrERS & ASSOCIATES Civil Engineering, Inc. DATE. 03/03/02 PLANNING. ENGINEERING. SURVEYING BY: M. Miller Revised Inlet SD "EE" Curb Opening (Interception) Given: (a) discharge Q = 3.2 c.f.s. street slope So = 0.0200 6" curb half street width = Solution: OJ(So)M/2 = 22.63 Therefore y = a = 0.33 L = QJ0.7(a+y)A3/2 = 9.14 '(L for total interception) Try: Lp = 10.00' 0.3' - I - N / - I ' N 3 3 I - - - - - I 3 - - 4 1 - - j - _ I ' - ________ : r -.i ••• - - - I - - - - / I \ 1 ; :.::: i ,.l....j .... . :.': .. .•4 I j I -- \ N / - S. --'S-S I / ___ - C N I $ / \ \F'4 "I S. : / - - ___ - I - - ..\. f,;;"/ 1 . :.!'..:'/r ::..• •-•. . ... . .. . ., . ............ ... .• . .. .. . ::.. ..•. . J I 3 - II I - - - - / - - - - - - BAIN II : f. . .: . . . •...... 1. . . . . ... . - .••• .: . . _ ...r N '/1 JI3/ / _ _ _ _ .....\ '. ......... T (i:VVJ . ..... . __ I / / 952O ___ I ..... .. __ I ..•. .... . .,.... - - - - - - SCALE - 0=248 CFS - -. - -' - - - - -: - - - - 1" = 200' - - -- .• ............... S ...-- . . 100 >1? FLOW ('cFS,) AREA (AC.) STREET SUB-BA SIN NODES BASIN BOUNDARY SUB-BASIN BOUNDARY SUB-BASIN 100 YR PLOW (Cr5) PREPARED BY: I'1 P&D CONSUL TANTS Ii 40! VEST '4" S7REE1 5U17E 2500 r SAN DIEGO, CAL IFORNIA 921O iat ('619,) 232-4466 FAX 234-3022 SHEET I SHEETS 1. PREPARED FOR . . INTERIM CONDITION HYDROLOGY MAP CITY OF. CARLSBAD . .. EXHIBIT 'C." ENGINEERING. DEPARTMENT . . . GREEN. VALLEY PROJECT NO. CT 92-08 GREEN VALLEY - CARLSBAD TRACT 92-08 DATE: • 7/28/97 UWNAMF ( r'AW .