Loading...
HomeMy WebLinkAboutCD 11-08; ROBERTSON RANCH PA-14; Consistency Determination(xii) 85.7 ©2011 O'Day Consultants, Inc. @ 87.J ~ ~ S.r 81.5 PLAN-REVISED LOTS 4. 8. 10. 11 AND 14-16 SCALE: 1 " = 40' ••••· '. IBµ,\ (fl ... NOTE!! ELECTRONIC DATA f/LES ARE FOR REHR£NC£ ONLY ANO ARE NOT TO BE USED FOR HORIZONTAL OR VER TlCAL SUR VEY CONTROL o· 10· 40' 5 20 80' SHEET I OF I SHEETS CD 11-08 CONSISTENCY DETERMINATION EXHIBIT FOR ROBERTSON RANCH EAST VILLAGE PLANNING AREA 14 REVISED LOTS 4, 8, 10, 11, AND 14-16 P. U.D. 07-02 C.T. 07-03 G.P.A. 08-01 SCALE: 1" = 40' M.P. 02-03(A) PLANNING AREA 14 UNIT SUMMARY COMPARABLE ANALYSIS PLAN ORIGINAL H OF UNITS PROPOSED # OF UNITS DIFFERENCE PLAN I (ONE STORY) J '18.8%) J '18.8%. NO CHANGE PLAN IX (BONUS ONE STORY) I 6.2%) J 18.8%. INCREASED BY 2 PLAN 2 (TWO STORY. 6 31.5%) 5 31.3%. DECREASED BY I PLAN J (TWO STORY. 61 31.5%) 5 (31.3%. DECREASED 8 Y I PLANNING AREA 14 LOT SUMMARY COMPARABLE ANALYSIS ORIGINAL PROPOSED LOT # LOT AREA PAD AREA PLAN 1 PLAN I 1171 SF 1171 SF 38 N/A 2 5150 SF 5150 SF 28 N/A J 5699 SF 5699 SF /CR N/A 4 6105 SF 6105 SF 2AR 2AR• 5 6441 SF 6441 SF JA N/A 6 5961 SF 5961 SF IA N/A 1 5852 SF 5852 SF 2CR N/A 8 5384 SF 5153 SF 2BR IXBR 9 5461 SF 5170 SF JAR N/A 10 6232 SF 5921 SF 2A 2C ff 6129 SF 5871 SF 38 IXA 12 5866 SF 5545 SF 18 N/A /J 6322 SF 6028 SF JC N/A 14 6021 SF 5406 SF 2C 2A' 15 6001 SF 5388 SF IXB IXC 16 7200 SF 6420 SF JC JB NOTES: I. 'R" IND/CA TES REVERSED flOORPLAN 2 • IND/CA TES REVISED FRONT YARO TO ADO A COUR TYARO. J. BUILDING COVERAGE (NO CHANG£) PLAN I = 2632 SF PLAN IX = 2634 SF PLAN 2 2A/B = 2230 SF 2C = 2250 SF PLAN J JA = 2196 SF JB = 2199 SF JC = 2216 SF 5. AVERAGE FRONT YARD SETBACK FOR PA/4 (16 UNITS}= fl.I' ORIGINAL PAD PROPOSED PAD COVERAGE COVERAGE 28.3% N/A 43.3% N/A 46.2% N/A 36.5% 36.5% 34.1% N/A 44.2% N/A 38.4% N/A 43.3% 51.1% 425% N/A 31.6% 38.0% 31.5% 44.9% 41.5% N/A 36.8% N/A 41.6% 41.3% 48.9% 48.9% 34.5% 34.3% 6. FRONT YARD SETBACK ON PLAN 2A' IS TO THE COLUMN AT THE WALL. 1. ff OF TH£ 16 LOTS (690%} IN PA/4 MEET THE 8.5' SETBACK REQUIREMENT. BENCHMARK: DESCRIPTION: STANDARD M-10 STREET CENTERLINE llf'LL MONUMENT LOCATION: CENTERLINE OF EL CAMINO REAL AT ENGINEER's STA 1/0N 454-1-92 PER R.S 1800-1 RECORD FROM: COUNTY BENCH LEVELS (NO. COUNTY VERT. CONTROL DA TA) ELEVATION: 68.419 OAT/JM: IJ.S.C. &: C.S. G: 011 14 0114TCD01.dwg Jun D7, 2011 1:52pm MAY JI, 2011 2710 Loker Ave. West Suite 100 Carlsbad, California 92010 760-931-7700 Fox: 760-931-8680 www.odoyconsultants.com ORIGINAL FRONT YARD SETBACK 51.8 J/.4' IJ.9' 15.1' 14. 9' 17.8' 22.5' /6,/' 16.J' 17.5' 14.0' 10.0' 12.6' IJ.7' 10.0' 11.4' PROPOSED ORIGINAL PROPOSED AVERAGE AVERAGE FRONT YARD SIDE YARD SIDE YARD SETBACK 6 SETBACK SETBACK N/A 34./' N/A N/A 9.J' N/A N/A 6. 4' N/A 10.0' 92' 9,2' N/A /J.9' N/A N/A 12.2' N/A N/A 15. 4' N/A 11.4' 9,8' 6. 4' N/A 8.8' N/A 17.6' 93' 90' 10.J' 8. 7' 6. 4' N/A 6. 4' N/A N/A 13.2 N/A 10.0' 9,J' 9, 1' 10.J' 6,4' 6. 4' 12 I' 24.9' 24.6' CONSISTENCY DETERMINATION EXHIBIT ~ ...._ ?R PROJECT NO PllD.06-I 2(Al ~ n.<,! ""'' '7. /c,. 1, L Dnn Nc:u. l'l.wning Director ¥-~ · ROBERTSON RANCH PA-14 Civil Engineering Planning Processing Surveying SHEET I OF 1 SHEETS DESIGNED BY: ~N=.F·~-DATE: MAY 2011 DRAWN BY: N.F. SCALE: 1' = 40' PROJECT MGR.: G.0, JOB NO.: 081245 DATE:~ /I Ellli W. HANSEN RCE: 60223 Xrefs: 0114BSTR; 0114BUTL; 01147UTL; 0114TCD; 0114Bgrd; 0114TP-G; 0114BMAP; 0114gstr; 0114ggrd; 0114gutl; 0114gmop; 0114QGRD; 0114Tpfp; 0114mpfp; 0114tgrd; 0114tmop; 0114tutl; 0114tstr I