HomeMy WebLinkAboutMS 01-15; THOMPSON SUBDIVISION; Engineering ApplicationC DEP
i V APPLICATION I Ii
- ...I p I - I qw
,. * 1 V 4 ENGINEERING PLAN CHECK A.
Nlk 1.
-
PROJECT NAME: -i-c'i psci-.I P17rF DATE:
PROJECT DESCRIPTION: D/V1.SI0i.I O £ P41ZE(- MIrO Two
PROJECT ADDRESS:' 3441' AL-D,Q
LOT NO(S).: -c'r ' MAP NO.: APN(S).: W7• 0G'0' 0/
NUMBER OF LOTS: NUMBER OF- ACRES: 'VO S.P.
OWNER: 1714V1 t 7?I0MPS0A1 APPLICANT: 17e'1+LA TM,kIZi
Mailing Address: '9'P 'liDER. y4VO. Mailing Address: Zøt5
cr &+t,. C4 9vS C.'tts ,4 G4-
Phone Number: 10t7 729. 03 Phone Number: 43/. 2i$ii
Fax Number: Fax Number:
E-Mail: E-Mail:
- I certify th am the legal owner d that all the above
N - j
Signatur Signature: 13/Q
CIVIL ENGINEER:k'J?LITif4 L..
FIRM: 1AQ ,8cTE4 PsJ(,1 IJt I L& FIRM: '4 £ P- jci /ç 7
Mailing Address: £/&/J Pq-LJJ7FR_I
Mailing Address: 1S4 CM'?$I1410 PL..
0cL S I PE CA 924*
Phone Number: 7,Q c4 3q .zg'O'z_.- Phone Number: 1&P.(-3Ø. 3I_5____
Fax Number: • Lf- .'Z 4 Fax Number: 7CiO. Q.9(. 15.
E-Mail: 1d.orr _c. I&..C'h E-Mail:
State Registration Number: State Registration Number:
ADDITIONAL COMMENTS:
IMPROVEMENT VALUATION
What water district is the proposed project located in? (check one)
tCarlsbad Municipal Water District DOlivenhain jVallecitos
If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15%
contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal
Water District only), street, public (median) landscape and irrigation, and drainage improvements
(if applicable)? 'J4' O'i-JL'-( $.'
GRADING QUANTITIES
cut ___ cy fill JVP cy remedial cy import cy export
SEE REVERSE SIDE
U.IfllI (P*AMT PlIISlMASTCPSIânnIjcefinn fnr rnainp.Arina Plan Check T1S O[ -/5
Revised 1/14/02
PROJECT MAP REVIEW COMPLETION
The following project maps have been reviewed and are recommended for approval:
Project Name: THOMPSON PARCEL MAP
Project No.: MS 01-15
Dwg.No.: PM 01-15
Sheets No.: 1 through 2 of 2
DECLARATION OF RESPONSIBLE CHARGE
I hereby declare that I have exercised responsible charge over the review of this project as
defined in Section 8703 of the Business and Professions Code to determine that the documents
are found to be in substantial compliance with applicable codes and standards.
Plan review of these project easements does not relieve the Land Surveyor or Engineer of Work
of the responsibilities with state and local ordinances.
Helming Engineering Co., Inc.
1650 Linda Vista Drive, Suite 202
San Marcos, CA 92069
(760) 744-9801
Signed__t&z6-D Date
Douglas L. Helming, RCE 23874
Expiration Date 12/31/05
LLJ II NO. 2374
kOF C\--/
S
PROJECT PLAN REVIEW COMPLETION
The following project plan have been reviewed and are recommended for approval:
Project Name: THOMPSON PARCEL MAP
Dwg.. No.: 412-1A
Sheets No.: 1 through 3
DECLARATION OF RESPONSIBLE CHARGE
I hereby declare that I have exercised responsible charge over the plan review of this
project as defined in Section 6703 of the Business and Professions Code to determine
that the plans are found to be in substantial compliance with applicable codes and
standards.
Plan review of these project drawings does not relieve the Engineer of Work of the
responsibilities with state and local ordinances.
Helming Engineering Co., Inc.
1650 Linda Vista Drive, Suite 202
San Marcos, CA 92069
(760) 744-9801
igned 142 Date________
L
U 0
Douglas L. Helming, RCE 23874
Expiration Date 12/31/05