Loading...
HomeMy WebLinkAboutMS 01-15; THOMPSON SUBDIVISION; Engineering ApplicationC DEP i V APPLICATION I Ii - ...I p I - I qw ,. * 1 V 4 ENGINEERING PLAN CHECK A. Nlk 1. - PROJECT NAME: -i-c'i psci-.I P17rF DATE: PROJECT DESCRIPTION: D/V1.SI0i.I O £ P41ZE(- MIrO Two PROJECT ADDRESS:' 3441' AL-D,Q LOT NO(S).: -c'r ' MAP NO.: APN(S).: W7• 0G'0' 0/ NUMBER OF LOTS: NUMBER OF- ACRES: 'VO S.P. OWNER: 1714V1 t 7?I0MPS0A1 APPLICANT: 17e'1+LA TM,kIZi Mailing Address: '9'P 'liDER. y4VO. Mailing Address: Zøt5 cr &+t,. C4 9vS C.'tts ,4 G4- Phone Number: 10t7 729. 03 Phone Number: 43/. 2i$ii Fax Number: Fax Number: E-Mail: E-Mail: - I certify th am the legal owner d that all the above N - j Signatur Signature: 13/Q CIVIL ENGINEER:k'J?LITif4 L.. FIRM: 1AQ ,8cTE4 PsJ(,1 IJt I L& FIRM: '4 £ P- jci /ç 7 Mailing Address: £/&/J Pq-LJJ7FR_I Mailing Address: 1S4 CM'?$I1410 PL.. 0cL S I PE CA 924* Phone Number: 7,Q c4 3q .zg'O'z_.- Phone Number: 1&P.(-3Ø. 3I_5____ Fax Number: • Lf- .'Z 4 Fax Number: 7CiO. Q.9(. 15. E-Mail: 1d.orr _c. I&..C'h E-Mail: State Registration Number: State Registration Number: ADDITIONAL COMMENTS: IMPROVEMENT VALUATION What water district is the proposed project located in? (check one) tCarlsbad Municipal Water District DOlivenhain jVallecitos If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? 'J4' O'i-JL'-( $.' GRADING QUANTITIES cut ___ cy fill JVP cy remedial cy import cy export SEE REVERSE SIDE U.IfllI (P*AMT PlIISlMASTCPSIânnIjcefinn fnr rnainp.Arina Plan Check T1S O[ -/5 Revised 1/14/02 PROJECT MAP REVIEW COMPLETION The following project maps have been reviewed and are recommended for approval: Project Name: THOMPSON PARCEL MAP Project No.: MS 01-15 Dwg.No.: PM 01-15 Sheets No.: 1 through 2 of 2 DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the review of this project as defined in Section 8703 of the Business and Professions Code to determine that the documents are found to be in substantial compliance with applicable codes and standards. Plan review of these project easements does not relieve the Land Surveyor or Engineer of Work of the responsibilities with state and local ordinances. Helming Engineering Co., Inc. 1650 Linda Vista Drive, Suite 202 San Marcos, CA 92069 (760) 744-9801 Signed__t&z6-D Date Douglas L. Helming, RCE 23874 Expiration Date 12/31/05 LLJ II NO. 2374 kOF C\--/ S PROJECT PLAN REVIEW COMPLETION The following project plan have been reviewed and are recommended for approval: Project Name: THOMPSON PARCEL MAP Dwg.. No.: 412-1A Sheets No.: 1 through 3 DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the plan review of this project as defined in Section 6703 of the Business and Professions Code to determine that the plans are found to be in substantial compliance with applicable codes and standards. Plan review of these project drawings does not relieve the Engineer of Work of the responsibilities with state and local ordinances. Helming Engineering Co., Inc. 1650 Linda Vista Drive, Suite 202 San Marcos, CA 92069 (760) 744-9801 igned 142 Date________ L U 0 Douglas L. Helming, RCE 23874 Expiration Date 12/31/05