Loading...
HomeMy WebLinkAboutPIP 05-16; OPUS POINT LOT 25; Engineering ApplicationS Aur18-2005 11032i Prci-0'DAY CNSULTANT3 I: t!nnItf4I!! iII:in S vvv 7605818660 LBAP' A4PPLicnXr3N:' I • TNE'PLA cHECK 1-155 P.001/003 F-421 PO)EtrNAME OPtAS'14j7- 41s 25 DATES PROME$IPTION:.. . PROJTADPRS: iJ e14 LOT NO(S).1. 25 MAP NO.:).ç5/ APN(s).: NUMUER OF LO. I - NUMBER or ACRES: OWNER • Fs78A) APPtICANT MIng Ad*#5 - 75? s 41y .a.. MiUng Addre: C't Q•• Phone Numbar Ii) Phone Number, Fax Number: — iii Fax Number: 4PL 4J,S? 4., _2 '1w c-I /' I'm - 9'?) — s-Mail: I I am n4 thaM the above Tnrrn*on ic trim WW coml# b the best of my Aew 519nature Az!fk~0a T Snature; 4L1 te:i(éa CML NIR / '7 i-. SQTL.S NGINeER FM: ______________________ P1R4: iiggggaov *iJø44 MMng Address %ja 'c&4 4'6. ea.' Mailing Mdiss: oo i'S ag. 84 g 4 gIb, d.4 MGM Number; (vto\ CF— 71 Phone Number: &s)!ç55Q Fax Number; (?5o) '—P5 F Number: (J&) CIP E.Mfl! 'Mfl: 1n ReØaDon Numbe - - St R5on Number; - (30 ADDrT2ONAi. coMMw4T; IMPROWP1ENT VALUATION 1. What water dicz is the propamd prqjed located 10 (dwk ore) $Iat1sbad ftoodpal %Afatw D1b OOUvwhn owneavw 2.11 in the Ci1sbad Munidpal Water what is the tl coat *timta, trchldlnO the 19% condngancy fee, for water alTd redamed water improvement, aewer (for crLbad MubtcIgu1 VMW Ma= nnly3r atree, ptmnc Cmedlan) 1andpe and IrrigbdoN and dvuTnae improvements (iFacab1e)? $—" i44V GRADING QUANTITIES a.st 700o fii( cy rened _t4%- qr import_ A/4 cy cy se v2 SWC ,c,0cV44T gpod iI1G2 Ra.Ivw Aug6-2005 11!30ae From- To-Q'DAY CONSULTANTS Pa;. 002 P-PP, i5-/La /c'ad Cv O iO /1/ 9 I PROJECT PLAN REVIEW COMPLETION The following project plan have been reviewed and are recommended for approval: Project Name: OPUS POINT, LOTS 25 Project No.: PIP 05-16 Dwg.. No.: 434-6A Sheets No.: 1 through 7 DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the plan review of this project as defined in Section 6703 of the Business and Professions Code to determine that the plans are found to be in substantial compliance with applicable codes and standards. Plan review of these project drawings does not relieve the Engineer of Work of the responsibilities with state and local ordinances. Helming Engineering Co., Inc. 1650 Linda Vista Drive, Suite 202 San Marcos, CA 92078 (760) 744-9801 Date 7-/9-2h Douglas L. Helming, RCE 23874 Expiration Date 12/31/07 PROJECT PLAN REVIEW COMPLETION The following project plan have been reviewed and are recommended for approval: Project Name: OPUS POINT, LOTS 25 Project No.: PIP 05-16 Dwg.. No.: 434-6 Sheets No.: 1 through 5 DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the plan review of this project as defined in Section 6703 of the Business and Professions Code to determine that the plans are found to be in substantial compliance with applicable codes and standards. Plan review of these project drawings does not relieve the Engineer of Work of the responsibilities with state and local ordinances. Helming Engineering Co., Inc. 1650 Linda Vista Drive, Suite 202 San Marcos, CA 92078 (760) 744-9801 Date Douglas L. Helming, RCE 23874 Expiration Date 12/31/07