Loading...
HomeMy WebLinkAboutMS 05-07; EMBASSY SUITES; Engineering ApplicationCITY CARLSBAD ENGINEERING DEPART NT APPLICATION V ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: Embassy Suites Tentative Parcel Map DATE: 3-28-05 PROJECT DESCRIPTION: Subdivision of Parcel.A of Boundary Adjustment 02-05 into 2 (two) Parcels PROJECT ADDRESS: Parcels A of Boundary Adjustment 02-05 Paseo Del Norte-Carlsbad, CA LOT NO(S).: A MAP NO.: Boundary' APN(S).: 211-021-30 NUMBER OF LOTS: z Adjustment 02-05 NUMBER OF ACRES: 9 Acres (Gross). OWNER: CPT/SC Title Holding Corporation APPLICANT: CPT/SC Title Holding Corporation Mailing Address: 533 So. Fremont Mailing Address: 533 So. Fremont Los Angeles, CA 90071 Los Angeles, CA 90071 Phone Number: 213-739-9377 619-669-6688 Phone Number: 213-739-9377 619-669-6688 Fax Number: 619-669-4844 ' Fax Number: '619-669-4844 E-Mail: E-Mail: I certify tt I am the Jeial owner and that afl the above By: Advisers, Inc. ipforniati'WipoeWrrect the best of my knowledge.Its BSt ty Advisers, Inc. FLsleLIL Aset Z ru r1,12 Q( -NJDouglas R. Melchior, PLS P SOILS ENGINEER: I Melchior Land Surveying, Inc. FIRM: Mailing Address: 5731 Palmer Way Suite G Mailing Address: Carlsbad, CA 92009 Phone Number: 760-438-1726 Phone Number: Fax Number: 760-438-3991 Fax Number: E-Mail: mlsi@pacbell.net E-Mail: State Registration Number: PLS 4611 . State Registration Number: ADDITIONAL COMMENTS: Project is to divide 6.96 Acres (net) Parcel in two (2) Parcels Parcel 1 5.36 Acres (net) Parcel 2 1.60 Acres (net) IMPROVEMENT VALUATION What water district is the proposed project located in? (check one) )@ Carlsbad Municipal Water District DOlivenhain flVallecitos If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? '. $ GRADING QUANTITIES cut _______ cy fill cy remedial cy import cy export cy SEE REVERSE SIDE H:/DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check Revised 1/14/02 CITY OF CARLSBAD - ENGINEERING DEPAFVENT . APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. APPLICATION FOR (( all that apply) - FOR CITY USE ONLY PROJECT I.D. 1 DRAWING NUMBER I DEPOSIT/FEES, PAID COMMENTS Adjustment Plat (AD)) Certificate of Compliance (CE) Dedication of Easement (PR) Type:__________________ Type:__________________ Type:_________________ U Encorachment Permit (PR) Final Map (FM) Grading Plancheck (DWG) Improvement Plancheck (DWG) Parcel Map (PM) -. Quitclaim of Easement (PR) Type:_________________ Type:_________________ Type:_________________ U Reversion to Acreage (RA) Set Vacation (STV) IJ"Tentative Parcel Map (MS) p O3o7 CV Certificate of Correction (CCOR) Covenant of Easement (PR) U Substantial Conformance Exhibit (SCE) Other RECEIVED APR 01 2005 ENGINEERING UPIEI DATE STAMP APPLICATON RECEIVED H/DEVELOPMENT SERVICES/MASTERSIAppIIcation for Engineering Plan Check Page 2 1 Revised 1/14102