Loading...
HomeMy WebLinkAboutMS 03-01; TRIPOLI MINOR SUBDIVISION; Engineering ApplicationqC r A . ENGINEERING PLAN CHECK' , XL '. J" omplete allappropriate information Wrute N/A when not aplicable' PROJECT NAME: j,l,4 , / DATE: PROJECT DESCRIPTION: Z21'j , PROJECT ADDRESS: //57?- (J4J4 D121 LOT NO(S).: MAP NO.: Ws .'-o,' APN(S).: NUMBER OF LOTS: NUMBER OF ACRES: OWNER: APPLICANT: Mailing Address: v,s &. Mailing Address: 2'9/ 4-rQ i.4sr4 Die. Visr41 ci Vsr-41 C4 9&O8- Phone Number: 72 Phone Number: 76o 6.?o-2 Fax Number: Fax Number: E-Mail: E-Mail: I certify that I am the legal Owner a that all the above Information Is true rl'corr the St of my knowledge. Signature:1 ' Date: Signature: Date: SOILS ENGINEER: FIRM: FIRM: Mailing Address: po Mailing Address: C,g.z.sa4 64 9o/8-3/ Phone Number: Phone Number: Fax Number: Fax Number E-Mail: ' E-Mail: State Registration Number: 5 333ä' State Registration Number: ADDITIONAL COMMENTS: IMPROVEMENT VALUATION What water district Is the proposed project located in? (check one) []Carlsbad Municipal Water District DOlivenhain [Valleatos If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal' Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? ' $ GRADING QUANTITIES cut _______ cy fill cy remedial cy import' cy export _______ cy. SEE REVERSE SIDE 1-75 c3 —O/ u.,nIr, APANT FpIIr .q/MATFPS/Annflrtinn mr Fnninppflno Plan Chpck RevIsed 1114102 CIT" F CARLSBAD - ENGINEERING DEPAR ENT APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. FOR CITY USE ONLY APPLICATION FOR PRO3ECT I DRAWING DEPOSIT/FEES COMMENTS (1 all that apply) I.D.NUMBER I PAID Adjustment Plat (AD]) Certificate of Compliance (CE) Dedication of Easenient (PR) Type:__________________ Type:__________________ Type:__________________ U Encorachment Permit (PR) Final Map (FM) Grading Plancheck (DWG) O Improvement Plancheck (DWG) Parcel Map (PM) O Quitclaim of Easement (PR) Type:_________________ Type:__________________ Type:______________ O Reversion to Acreage (RA) Street Vacation (STV) O Tentative Parcel Map (MS) Certificate of Correction (CCOR) Covenant of Easement (PR) Substantial Conformance Exhibit (SCE) Other APPLICATION ACCEPTED BY: DATE STAMP APPLICATON RECEIVED HJDEVELOPMENT SERVICESIMASTERSIADoIicaUon for Enoineeflnq Plan Check Pane 2 Revised 1/14/02 I CW OF CARLSBAD - ENGINEERING DEPTMENT APPLICATION - ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when. not applicable. PROJECT NAME: T DATE: /-Z3-p 3 PROJECT DESCRIPTION: 17/L'/è/117 /z- e)eI57Y> h41 c /'L7 -f 'rey PROJECT ADDRESS: LOT NO(S).: MAP NO.: APN(S).: ' NUMBER OF LOTS: NUMBER OF ACRES: . , OWNER: c77ri 7-,' ,,./, APPLICANT: Mailing Address: 29/ ,4/, v 47- Mailing Address: oj ?c. Phone Number: ? Phone Number: -• Fax Number: Fax Number: E-Mail: E-Mail: I certify that I am the legal owner and that all the above information is tr d correct th best of my knowledge. Signature, "el ,. Date: 'd'3 Signature: CE 'R:fr/, rn SOILS ENGINEER: FIRM: 4/;//, &J/,,. ,,, FIRM: Mailing Address: pe & Mailing Address: Phone Number: Phone Number: Fax Number: Fax Number: E-Mail: E-Mail: State Registration Number: s 3338 State Registration Number: ADDITIONAL COMMENTS: IMPROVEMENT VALUATION What water district is the proposed project located in? (check one) Carlsbad Municipal Water District f101ivenhain DVa1eCitos If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? S • 0 $ GRADING QUANTITIES cut _______ cy fill _______ cy remedial cy import cy export cy SEE REVERSE SIDE ccosl,rcc,.anorcDc,a...,ui&.,n In, tnnna,inn DI,,, C.P,n,* RevIsed 1/14/02 CITY ARLSBAD - ENGINEERING DEPART11VT APPLICATION ENGINEERING PLAN CHECK Comp!ete all appropriate information Write N/A when not applicable. FOR CITY USE ONLY APPLICATION FOR (/ all that apply) PROJECT DRAWING NUMBER DEPOSIT/FEES PAID COMMENTS LI Adjustment Plat (AD)) El Certificate of Compliance (CE) LI Dedication of Easement (PR) Type:_________________ Type:_________________ Type:_________________ U Encorachment Permit (PR) Final Map (FM) Grading Plancheck (DWG) Improvement Plancheck (DWG) LI Parcel Map (PM) Quitclaim of Easement (PR) Type:_________________ Type:__________________ Type:__________________ fl Reversion to Acreage (RA) El Street Vacation (STV) [ Tentative Parcel Map (MS) ,f6(3_t ,MSO4 7LV El Certificate of Correction (CCOR) LI Covenant of Easement (PR) Substantial Conformance Exhibit (SCE) Other APPLICATION ACCEP)D BY; 12~v~ RECEIVED FEB 07 ZULU ENGINEERING DEPART MEWI DATE STAMP APPLICATON RECEIVED MlflVl APUNT PlI( S/MATPSlAnnIirfirn fnr rnninpprinn PIn r.hp.rk Pnp 7 ' Revised 1/14102 I RECEVED STATEMENT OF AGREEMENT FEB 07 2003 TENTATIVE PARCEL MAP ENGINEERING CITY OF CARLSBAD DEPARTMENT The Subdivision Map Act and the Carlsbad Municipal Code sets a fifty (50) day time restriction on Engineering Department processing. This time limit can only be extended by the mutual concurrence of the Applicant and the City. By accepting applications for Tentative Parcel maps concurrently with applications for other approvals which are prerequisites to the Map (i.e., Environmental Assessment, Environmental Impact Report, Condominium Plan, Planned Unit Development, etc.), the fifty (50) day time limits are often exceeded. If you wish to have your application processed concurrently, this agreement must be signed by the Applicant or his agent. If you choose not to sign the statement, the City will not accept your application for the Tentative Parcel Map until all prior necessary entitlements have been processed and approved. The Undersigned understands that the processing time required by the City may exceed the time limits; therefore, the Undersigned agrees to extend the time limits for City Engineer action and fully concurs with any extensions of time up to one (1) year from the date the application was accepted as complete to properly review all of the applications. t i 774 A~2 Signature Date 7,3dTTA 'TZ iPo L j Name (please print) Relationship to Application (Property Owner/Agent) Statement of Agreement Tentative Parcel Map 0 PROJECT MAP REVIEW COMPLETION The following project maps have been reviewed and are recommended for approval: Project Name: TRIPOLI MINOR SUBDIVISION Project No.: MS 03-01 Dwg. No.: PM 03-01 Sheets No.: I through 2 of 2 DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the easement review of this project as defined in Section 8703 of the Business and Professions Code to determine that the easement documents are found to be in substantial compliance with applicable codes and standards. Plan review of these project easements does not relieve the Land Surveyor or Engineer of Work of the responsibilities with state and local ordinances. Helming Engineering Co., Inc. 1650 Linda Vista Drive, Suite 202 San Marcos, CA 92069 (760) 744-9801 W m, Date 1-403-0.3 Douglas L. Helming, RCE 23874 Expiration Date 12/31/05