HomeMy WebLinkAboutMS 03-01; TRIPOLI MINOR SUBDIVISION; Engineering ApplicationqC r
A . ENGINEERING PLAN CHECK' ,
XL
'.
J" omplete allappropriate information Wrute N/A when not aplicable'
PROJECT NAME: j,l,4 , / DATE:
PROJECT DESCRIPTION: Z21'j ,
PROJECT ADDRESS: //57?- (J4J4 D121
LOT NO(S).: MAP NO.: Ws .'-o,' APN(S).:
NUMBER OF LOTS: NUMBER OF ACRES:
OWNER: APPLICANT:
Mailing Address: v,s &. Mailing Address: 2'9/ 4-rQ i.4sr4 Die.
Visr41 ci Vsr-41 C4 9&O8-
Phone Number: 72 Phone Number: 76o 6.?o-2
Fax Number: Fax Number:
E-Mail: E-Mail:
I certify that I am the legal Owner a that all the above
Information Is true rl'corr the St of my knowledge.
Signature:1 ' Date: Signature: Date:
SOILS ENGINEER:
FIRM: FIRM:
Mailing Address: po Mailing Address:
C,g.z.sa4 64 9o/8-3/
Phone Number: Phone Number:
Fax Number: Fax Number
E-Mail: ' E-Mail:
State Registration Number: 5 333ä' State Registration Number:
ADDITIONAL COMMENTS:
IMPROVEMENT VALUATION
What water district Is the proposed project located in? (check one)
[]Carlsbad Municipal Water District DOlivenhain [Valleatos
If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15%
contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal'
Water District only), street, public (median) landscape and irrigation, and drainage improvements
(if applicable)? ' $
GRADING QUANTITIES
cut _______ cy fill cy remedial cy import' cy export _______ cy.
SEE REVERSE SIDE 1-75 c3 —O/
u.,nIr, APANT FpIIr .q/MATFPS/Annflrtinn mr Fnninppflno Plan Chpck RevIsed 1114102
CIT" F CARLSBAD - ENGINEERING DEPAR ENT
APPLICATION
ENGINEERING PLAN CHECK
Complete all appropriate information. Write N/A when not applicable.
FOR CITY USE ONLY
APPLICATION FOR PRO3ECT I DRAWING DEPOSIT/FEES COMMENTS
(1 all that apply) I.D.NUMBER I PAID
Adjustment Plat (AD])
Certificate of Compliance (CE)
Dedication of Easenient (PR)
Type:__________________
Type:__________________
Type:__________________
U Encorachment Permit (PR)
Final Map (FM)
Grading Plancheck (DWG)
O Improvement Plancheck (DWG)
Parcel Map (PM)
O Quitclaim of Easement (PR)
Type:_________________
Type:__________________
Type:______________
O Reversion to Acreage (RA)
Street Vacation (STV)
O Tentative Parcel Map (MS)
Certificate of Correction
(CCOR)
Covenant of Easement (PR)
Substantial Conformance
Exhibit (SCE)
Other
APPLICATION ACCEPTED BY:
DATE STAMP
APPLICATON RECEIVED
HJDEVELOPMENT SERVICESIMASTERSIADoIicaUon for Enoineeflnq Plan Check Pane 2 Revised 1/14/02
I
CW OF CARLSBAD - ENGINEERING DEPTMENT
APPLICATION
- ENGINEERING PLAN CHECK
Complete all appropriate information. Write N/A when. not applicable.
PROJECT NAME: T DATE: /-Z3-p 3
PROJECT DESCRIPTION: 17/L'/è/117 /z- e)eI57Y> h41 c /'L7 -f 'rey
PROJECT ADDRESS:
LOT NO(S).: MAP NO.: APN(S).: '
NUMBER OF LOTS: NUMBER OF ACRES: . ,
OWNER: c77ri 7-,' ,,./, APPLICANT:
Mailing Address: 29/ ,4/, v 47- Mailing Address: oj ?c.
Phone Number: ? Phone Number: -•
Fax Number: Fax Number:
E-Mail: E-Mail:
I certify that I am the legal owner and that all the above
information is tr d correct th best of my knowledge.
Signature, "el ,. Date: 'd'3 Signature:
CE 'R:fr/, rn SOILS ENGINEER:
FIRM: 4/;//, &J/,,. ,,, FIRM:
Mailing Address: pe & Mailing Address:
Phone Number: Phone Number:
Fax Number: Fax Number:
E-Mail: E-Mail:
State Registration Number: s 3338 State Registration Number:
ADDITIONAL COMMENTS:
IMPROVEMENT VALUATION
What water district is the proposed project located in? (check one)
Carlsbad Municipal Water District f101ivenhain DVa1eCitos
If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15%
contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal
Water District only), street, public (median) landscape and irrigation, and drainage improvements
(if applicable)?
S
•
0 $
GRADING QUANTITIES
cut _______ cy fill _______ cy remedial cy import cy export cy
SEE REVERSE SIDE
ccosl,rcc,.anorcDc,a...,ui&.,n In, tnnna,inn DI,,, C.P,n,* RevIsed 1/14/02
CITY ARLSBAD - ENGINEERING DEPART11VT
APPLICATION
ENGINEERING PLAN CHECK
Comp!ete all appropriate information Write N/A when not applicable.
FOR CITY USE ONLY
APPLICATION FOR
(/ all that apply)
PROJECT DRAWING
NUMBER
DEPOSIT/FEES
PAID
COMMENTS
LI Adjustment Plat (AD))
El Certificate of Compliance (CE)
LI Dedication of Easement (PR)
Type:_________________
Type:_________________
Type:_________________
U Encorachment Permit (PR)
Final Map (FM)
Grading Plancheck (DWG)
Improvement Plancheck (DWG)
LI Parcel Map (PM)
Quitclaim of Easement (PR)
Type:_________________
Type:__________________
Type:__________________
fl Reversion to Acreage (RA)
El Street Vacation (STV)
[ Tentative Parcel Map (MS) ,f6(3_t ,MSO4 7LV
El Certificate of Correction
(CCOR)
LI Covenant of Easement (PR)
Substantial Conformance
Exhibit (SCE)
Other
APPLICATION ACCEP)D BY;
12~v~ RECEIVED
FEB 07 ZULU
ENGINEERING
DEPART MEWI
DATE STAMP
APPLICATON RECEIVED
MlflVl APUNT PlI( S/MATPSlAnnIirfirn fnr rnninpprinn PIn r.hp.rk Pnp 7 ' Revised 1/14102
I RECEVED
STATEMENT OF AGREEMENT
FEB 07 2003
TENTATIVE PARCEL MAP
ENGINEERING
CITY OF CARLSBAD DEPARTMENT
The Subdivision Map Act and the Carlsbad Municipal Code sets a fifty (50) day time
restriction on Engineering Department processing. This time limit can only be extended
by the mutual concurrence of the Applicant and the City. By accepting applications for
Tentative Parcel maps concurrently with applications for other approvals which are
prerequisites to the Map (i.e., Environmental Assessment, Environmental Impact
Report, Condominium Plan, Planned Unit Development, etc.), the fifty (50) day time
limits are often exceeded. If you wish to have your application processed concurrently,
this agreement must be signed by the Applicant or his agent. If you choose not to sign
the statement, the City will not accept your application for the Tentative Parcel Map until
all prior necessary entitlements have been processed and approved.
The Undersigned understands that the processing time required by the City may
exceed the time limits; therefore, the Undersigned agrees to extend the time limits for
City Engineer action and fully concurs with any extensions of time up to one (1) year
from the date the application was accepted as complete to properly review all of the
applications.
t i
774 A~2
Signature Date
7,3dTTA 'TZ iPo L j
Name (please print) Relationship to Application
(Property Owner/Agent)
Statement of Agreement Tentative Parcel Map
0
PROJECT MAP REVIEW COMPLETION
The following project maps have been reviewed and are recommended for approval:
Project Name: TRIPOLI MINOR SUBDIVISION
Project No.: MS 03-01
Dwg. No.: PM 03-01
Sheets No.: I through 2 of 2
DECLARATION OF RESPONSIBLE CHARGE
I hereby declare that I have exercised responsible charge over the easement review of this project
as defined in Section 8703 of the Business and Professions Code to determine that the easement
documents are found to be in substantial compliance with applicable codes and standards.
Plan review of these project easements does not relieve the Land Surveyor or Engineer of Work
of the responsibilities with state and local ordinances.
Helming Engineering Co., Inc.
1650 Linda Vista Drive, Suite 202
San Marcos, CA 92069
(760) 744-9801
W m, Date 1-403-0.3
Douglas L. Helming, RCE 23874
Expiration Date 12/31/05