Loading...
HomeMy WebLinkAboutMS 03-02; AVOCADO ACRES; Engineering ApplicationCITY OF CARLSBAD - ENGINEERING DEPARTMENT APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: MS 03-02 DATE: PROJECT DESCRIPTION: Dividing property in two parcels. PROJECT ADDRESS: 1081 Chestnut Avenue, Carlsbad, CA 92008 LOT NO(S).: B MAP NO.: 1855 APN(S).: 205-190-06 NUMBER OF LOTS: _2 NUMBER OF ACRES: 0.497 OWNER: Katherine I. Carcella APPLICANT: Katherine I. Carcella Mailing Address: 1081 Chestnut Avenue Mailing Address: ioai Chestnut Avenue Carlsbad, CA 92008 Carlsbad, CA 92008 Phone Number: (760) 720-2032 - Phone Number: (760) 720-2032 - Fax Number: (760) 434-2459 Fax Number: (760) 434-2459 E-Mail: kcarcellamindspring.com E-Mail: - kcarcellamindspring.com I certify that I am the legal owner and that all the above information is true and correct to the best of my knowledge. Signature u \fl(iO,kcLL/. Date: cQfo Signature (jdk2ct&(L&... Date: CIVIL ENGINEER: Siirvvnr - William E. Billinas -- SOILS ENGINEER: Romolo F. Puertollano FIRM: William E. Billings Surveying - FIRM: RP Engineers, Inc. Mailing Address: pp Box 4231 Mailing Address: 11061 Pnwy Rnrl Carlsbad, CA 92008-4231 Poway, CA 92064 Phone Number: (760) 434-6442 - Phone Number: (858) 486-0490 Fax Number: Fax Number: E-Mail: E-Mail: State Registration Number: LS 3338 State Registration Number: RCE 27246 ADDITIONAL COMMENTS: IMPROVEMENT VALUATION What water district is the proposed project located in? (check one) C.arlsbad Municipal Water District Olivenhain UVallecitos If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? $ GRADING QUANTITIES cut 0 cy fill 0 cy remedial _______ cy import _______ cy export _______ cy SEE REVERSE SIDE H:IDEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check Revised 1/14/02 MS o3-02 IR. CIF CARLSBAD - ENGINEERING DEPARNT APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. APPLICATION FOR (v' all that apply) FOR CITY USE ONLY PROJECT I.D. DRAWING NUMBER DEPOSIT/FEES PAID COMMENTS LI Adjustment Plat (AD)) Certificate of Compliance (CE) Dedication of Easement (PR) Type:___________________ Type:__________________ Type:__________________ LI Encorachment Permit (PR) Final Map (FM) LI Grading Plancheck (DWG) LI Improvement Plancheck (DWG) LI Parcel Map (PM) Quitclaim of Easement (PR) Type:___________________ Type:__________________ Type:__________________ Reversion to Acreage (RA) Street Vacation (STy) Tentative Parcel Map (MS) Certificate of Correction (CCOR) Covenant of Easement (PR) Substantial Conformance Exhibit (SCE) Other APPLI T101AIçEPTEDBY: RECEIVED MAY 08 2006 ENGINEERING DEPARTMENT DATE STAMP APPLICATON RECEIVED H:/DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check Page 2 Revised 1/14/02 CITY OF CARLSBAD - ENGINEERING DE TMENT . APPLICATION ENGINEERING PLAN CHECK / 17 Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: DATE:,dej PROJECT DESCRIPTION: zZLdla IS f 2 f9,9 , 'L L12,L-ec PROJECT ADDRESS: /t2/ LOT NO(S).: /3 —MAP NO.: ,'sc_APN(S).: 2-c&_-c9o-0 , NUMBER OF LOTS: NUMBER OF ACRES: . 917 OWNER: 7_ce//e APPLICANT: ?r?4(I Grcei(i Mailing Address: 4_ ,4v-e. Mailing Address: 1og141'4 Cd_92O C491OOS Phone Number: 'c _710 _ Phone Number: 760 700 -o3 .. Fax Number: io3q- Fax Number: -76.0 - E-Mail: iJ(6 _i-yisprmc _c)1 E-Mail: KuJJ& hru_5pdnq. ci I certify that I am the legal owner and that all the above Information is true and correct to the best of my knowledge. Signature.&L~(~4~ Date: 5/-05' for- Date: —01 SOILS ENGINEER: FIRM: Mailing Address: jc'4—j', FIRM: Mailing Address: C4'-tbeJ_Cl_VZ ''— 4-'Jf Phone Number: ,-q_z Phone Number: Fax Number: Fax Number: E-Mail: . E-Mail: State Registration Number: L S 3338 State Registration Number: ADDITIONAL COMMENTS: IMPROVEMENT VALUATION 1. What water district is the proposed project located in? (check one) Carlsbad Municipal Water District DOlivenhain LJVallecitos .2. If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? $ GRADING QUANTITIES cut cy fill cy remedial cy import cy export cy SEE REVERSE SIDE 1-1:/DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check Revised 1/14/02 RECEIVED MAY 06 Mh ENGINEERING DEPARTMENT PROJECT NAME: 7-c -- DATE: '- 3 PROJECT DESCRIPTION: PROJECT ADDRESS: /i çij- 16W LOT NO(S).: MAP NO.: ______APN(S).: - jgo NUMBER OF LOTS: NUMBER OF ACRES: c7. 49 7 OWNER: ,kr#eern&__rC4c APPLICANT: 7,'6ewE I'C6c4 Mailing Address: ,',,qj _c7-jo- Mailing Address: /OA /_CHES741UT A1cjr 4i&sR/4-D_c _ r Phone Number: 760 7 _ao32 Phone Number: 7607& - ZOI 7 Fax Number: Fax Number: E-Mail: E-Mail: I certify that I am the legal owner and that all the above Information is true and correct to the best of my knowledge. Signature: _ Signature: Zi _1%l#ø'ate: 6-,4_C 11VGS SOILS ENGINEER: FIRM: _ cL'~/AI, FIRM: Mailing Address: ,.1>< Mailing Address: C412Lg;i,'4D r4_9&"._4ai Phone Number: 760_,q_q Phone Number: Fax Number: Fax Number: E-Mail: E-Mail: State Registration Number: State Registration Number: ADDITIONAL COMMENTS: IMPROVEMENT VALUATION What water district is the proposed project located in? (check one) Carlsbad Municipal Water District f101ivenhain UVallecitos If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements, sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? . $ GRADING QUANTITIES cut cy fill _______ cy remedial _______ cy import cy export _______ cy SEE REVERSE SIDE HIDEVELOPMENT SERVICESIMASTERS/Aeolication for Erialneerino Plan Check Revlsexi 1/14/02 CITY ARLSBAD - ENGINEERING DEPART APPLICATION ENGINEERING PLAN CHECK Complete all appropriate information. Write N/A when not applicable. APPLICATION FOR' (/ all that apply) FOR CITY USE ONLY PROJECT I.D 1 DRAWING NUMBER DEPOSIT/FEES PAID COMMENTS El Adjustment Plat (ADJ) El Certificate of Compliance (CE) El Dedication of Easement (PR) Type:_________________ Type:_________________ Type:________________ U Encorachment Permit (PR) El Final Map (FM) S Grading Plancheck (DWG) Improvement Plancheck (DWG) Parcel Map (PM) Quitclaim of Easement (PR) Type:_________________ Type:__________________ Type:__________________ LI Reversion to Acreage (RA) LI Street Vacation (STy) Tentative Parcel Map (MS) 53 , El Certificate of Correction (CCOR) El Covenant of Easement (PR) 0 Substantial Conformance Exhibit (SCE)' El Other ACCEPTED BY: RECEIVED FEB 122003 ENGINEERING DEPARTMT. DATE STAMP APPLICATON RECEIVED H/DEVELOPMENT SERVICES/MASTERS/Application for Engineering Plan Check Page 2 Revised 1/14/02 STATEMENT OF AGREEMENT TENTATIVE PARCEL MAP CITY OF CARLSBAD The Subdivision Map Act and the Carlsbad Municipal Code sets a fifty (50) day time restriction on Engineering Department processing. This time limit can only be extended by the mutual concurrence of the Applicant and the City. By accepting applications for Tentative Parcel maps concurrently with applications for other approvals which are prerequisites to the Map (i.e., Environmental Assessment, Environmental Impact Report, Condominium Plan, Planned Unit Development, etc.), the fifty (50) day time limits are often exceeded. If you wish to have your application processed concurrently, this agreement must be signed by the Applicant or his agent. If you choose not to sign the statement, the City will not accept your application for the Tentative Parcel Map until all prior necessary entitlements have been processed and approved. The Undersigned understands that the processing time required by the City may exceed the time limits; therefore, the Undersigned agrees to extend the time limits for City Engineer action and fully concurs with any extensions of time up to one (1) year from the date the application was accepted as complete to properly review all of the applications. 2 -'I3 Signature Date rThe...). crce Name (please print) Relationship to Application (Property Owner/Agent) Statement of Agreement Tentative Parcel Map C I RECEIVED FEB 1 2 2003 ENGINEERING DEPARTMENT