Loading...
HomeMy WebLinkAboutPD 2021-0033; GARST RESIDENCE; FINAL SOILS REPORT; 2022-07-19Project No. FC-21-07-145 July 19, 2022 Dr. Shane Garst DNAP, CRNA The Sydekicks Real Estate 3357 Adams Street Carlsbad, CA 92008 SM§ GEOTECHNICAL SOLUTIONS, INC. Consulting Geotechnical Engineers 5931 Sea Lion Place, Suite 109 Carlsbad, California 92010 760-602-7815 smsgeosol.inc@gmail.com Final As-Graded Soils Report And Amendment to Geotechnical Engineering Observations And Compaction Testing Report Dated March 25, 2022 , 3357 Adams Street, Carlsbad, California 92008 (Project No. PD2021-0033, Drawing No. 533-2A) ~ accordance with your request we have revisited the site and observed the completed PCC driveway construction at the above-referenced project site. The approximate limits of the subsequently completed PCC driveway the property are delineated on the enclosed Approximate Compaction Tests Location Map, Figure 1. Remainder of the project remedial pad grading for new building addition and covered carport were performed under engineering observations and compaction testing services intermittently provided by this office from August 2, 2021 through February 14, 2022. A summary report of our geotechnical engineering observations and compaction testing, entitled "Report of Geotechnical Engineering Observations And Compaction Testing, Remedial Pad Grading For New Building Addition And Covered Carport, 3357 Adams Street, Carlsbad, California 92008 (Project No. PD2021-0033, Drawing No. 533-2A)," dated March 25, 2022 was prepared and submitted. The referenced report is on file with our firm and copies can be obtained upon request. The approximate locations of compaction tests are transferred and are shown on attached Figure 1. Field compaction test results are tabulated in the Compaction Test Results table, included as Figure 3 in the referenced report. The subsequent PCC driveway construction was completed prior to our recent site visit and destructive testing will be required to perform subgrade compaction testing. However, based on the photos and information provided to us, PCC driveway construction procedure consisted of preparations and compaction of the subgrade soils and placing a minimum 6 inches of compacted Class 2 base materials. The PCC section apparently consisted on minimum 6 inches thick concrete reinforced with #4 bars placed at 16 inches on centers each way. Based on the photos and information provided us, recent site visit and relying on the noted Laboratory Maximum Dry Density & Optimum Moisture Content List (ASTM D1557) PROJECT NO: FC-21-07-145 PROJECT NAME: Garst Residence LOCATION: 3357 Adam Street, Carlsbad REPORT DATED: March 2022 Test Results: Soil Type (1): Maximum Dry Density: Optimum Moisture: Soil Type (2): Maximum Dry Density: Optimum Moisture: Tan-Brown Silty Sand (On-Site Mix.). 126.0 pcf 9.6% Green-Brown Silty Sand (SE 30, Import). 138.0 pcf 6.7% FIGURE 2 COMPACTION TEST RESULTS PROJECT NO: PROJECT NAME: FC-21-07-145 Garst Residence PROJECT LOCATION: 3357 Adam Street, Carlsbad March 2022 REPORT DATED: FIELD COMPACTION TEST RESULTS (ASTM D6938): Approximate Approximate Test Test Date No. Test Elevation Location (MSL)(ft) 08/02/2021 I Building Pad Area 106.5'± 08/02/2021 2 Building Pad Area 106.5'± 08/02/2021 3 Building Pad Area 107.5'± 08/02/2021 4 Building Pad Area 107.5'± 08/03/2021 5 Building Pad Area 109'± 08/03/2021 6 Building Pad Area 109'± 08/05/2021 7 Building Pad Area 110'± 08/05/2021 8 Building Pad Area 110'± 08/05/2021 9 Building Pad Area 110'± 08/09/2021 10 Building Pad Area 110.5'± 08/09/2021 I I Building Pad Area 110.5'± 08/09/2021 12 Building Pad Area 110.5'± 02/14/2022 13 Covered Carport Pad Area 110'± 02/14/2022 14 Covered Carport Pad Area Rough Finish Grade 02/14/2022 15 Building Pad Area Rough Finish Grade 02/14/2022 16 Building Pad Area Rough Finish Grade Field Field Soil Moisture Dry Type (%) Density(pcf) 9.2 116.4 I 11.1 113.5 I 10.9 113.9 I 11.3 113.4 I 10.8 115.1 1 9.3 116.3 1 5.8 125.7 2 5.9 127.9 2 6.4 125.8 2 6.2 128.8 2 7.0 129.3 2 6.6 129.1 2 5.6 130.3 2 5.1 129.5 2 5.5 127.9 2 5.7 128.4 2 SMSGeotechnical Solutions, Inc. Max. Dry Density(pcf) 126.0 126.0 126.0 126.0 126.0 126.0 138.0 138.0 138.0 138.0 138.0 138.0 138.0 138.0 138.0 138.0 Relative Compaction Comments (%) 92 Bottom of Over-ex.@ 105.5'± 90 90 90 91 92 91 93 91 93 94 93 94 Bottom of Over-ex.@ 108.0'± 94 93 93 FIGURE3