Loading...
HomeMy WebLinkAboutSDP 16-13; OAK VETERANS HOUSING; FINAL SOILS REPORT; 2022-06-20 4373 Viewridge Avenue, Suite B San Diego, CA 92123 P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite F San Clemente, CA 92673 P: 949.388.7710 GEOTECHNICAL MATERIALS SPECIAL INSPECTION DVBE  SBE  SDVOSB  SLBE Affirmed Housing Group, Inc. June 20, 2022 C/O Micah Spano NOVA Project No.: 4020054 13520 Evening Creek Drive. Suite 160 San Diego, CA 92128 Subject: As-Graded Geotechnical Report Proposed Veteran Housing 965-967 Oak Avenue, Carlsbad CA 92008 Grading Permit No. GR2020-0008 Dear Mr. Spano: This report presents the geotechnical observations and the results of testing performed by NOVA Services, Inc. (NOVA) during grading for the above-referenced project. The report addresses only the geologic and geotechnical considerations associated with the project’s construction. The services described herein were performed by NOVA for Affirmed Housing Group during the period of October 27, 2020 to May 19, 2022. NOVA was retained by Affirmed Housing Group, Inc. as Geotechnical Engineer-of-Record (GEOR) for this work. Based on the observations and testing reported herein, it is the opinion of NOVA that the geotechnical aspects of the grading are in compliance with the approved geotechnical reports and the grading plans. The site is considered geotechnically suitable for its intended purpose. BACKGROUND Location The three-story apartment building is located at 965-967 Oak Avenue in the city of Carlsbad, California. The site is bounded by Oak Avenue to the north and residential developments to the east, west, and south. Project Description The new development consists of a three-story apartment building with parking areas, driveways, underground utilities, hardscapes and associated landscaping features. Permitted Design Documentation Geotechnical Geotechnical reports referenced for the design of the project are: (i) Geotechnical Engineering Report, Proposed Apartments, 965-967 Oak Avenue, Carlsbad, California, Christian Wheeler Engineering, File No. 2160236.01, June 3, 2016 (hereinafter, ‘CWE 2016’). 2 As-Graded Geotechnical Report 965-967 Oak Avenue, Carlsbad, CA NOVA Project No. 4020054 June 20, 2022 (ii) Update Geotechnical Engineering Report, Proposed Three-Story Apartment Building, 965-967 Oak Avenue, Carlsbad, California, NOVA Services, Project No. 3019096, March 11, 2020 (hereinafter, ‘NOVA 2020’). Construction The permitted construction drawings are: (i) Precise Grading Plans, Kettler Leweck Engineering, change update June 5, 2020 (hereinafter, ‘KLE 2020’). (ii) Foundation Plans, Harris & Sloan, June 10, 2020 (hereinafter, ‘H&S 2020’). OBJECTIVES AND SCOPE OF NOVA’S SERVICES Objectives The objectives of the work reported herein were twofold, namely: (i) to observe geologic conditions encountered during grading; and (ii) to document, by testing and observation, that the earthwork/grading was completed in conformance with the requirements of the design documentation listed above. Scope To accomplish the above objectives, NOVA undertook the scope of services abstracted below during construction. 1. Observation and Testing. NOVA performed observation and testing as requested by the contractor during rough grade operations (removals and compaction) and post-grade operations (utility backfill, paving, and flatwork). Quality Assurance (QA) in-place density testing of soils placed as compacted fills and backfills was performed after ASTM D6938 (‘In-Place Density and Moisture by Nuclear Methods’) and ASTM D8167 (‘In-Place Density and Moisture by Non-Nuclear Methods’). Testing of asphalt concrete was performed after ASTM D2950 (‘In-Place Density of Bituminous Concrete by Nuclear Methods’). The approximate locations of the density tests conducted for this work are shown on the attached Plate. The laboratory test results are presented in Table I. The field in-place density test results are summarized in Table II. 2. Laboratory Testing. The field density testing was supported by laboratory testing of representative samples of soils utilized for fills, backfills, and pavement materials. The test results are presented in Table I. The indications of this testing are the basis for NOVA’s judgments regarding the relative compaction of the fills placed. 3. Technical Support. NOVA provided periodic technical support in response to geotechnical-related issues during construction. 3 As-Graded Geotechnical Report 965-967 Oak Avenue, Carlsbad, CA NOVA Project No. 4020054 June 20, 2022 4. Reporting. NOVA provided reporting during the conduct of the work. Preparation of this report completes NOVA’s scope of services. OBSERVED SOIL AND GEOLOGIC UNITS General The adequacy of earthwork was determined in part by observation of earthwork operations by NOVA staff familiar with the requirements for earthwork in the Carlsbad area and familiar with both the specific intent and specific requirements of this project. This observation was the basis for selection by NOVA of locations for testing of density and for recovery of samples for laboratory testing. NOVA’s observations during the grading excavation operations indicate that subsurface conditions within the limits of excavation were generally consistent with those anticipated and described in the approved geotechnical report (CWE 2016). The following subsections provide detailed discussion regarding NOVA’s observations of the geologic units and geologic structure encountered during mapping. Artificial Fill (af) The improvements are built entirely on engineered artificial fill (af). The purpose of the fill is to provide a building pad of engineered soils for development of shallow foundations. Fill extends to a depth of approximately +60 to +66 feet msl. Old Paralic Deposits (Qop) Old paralic deposits were observed to consist of moist, dense, silty sand. No groundwater was encountered. CONSTRUCTION SUMMARY General NOVA performed periodic observation of earthwork operations at times requested by the Contractor. The description of earthwork operations provided in the following subsections reflects observations by NOVA during its presence on-site and may not reflect all work by the Contractor. Construction of relevance to this report was completed during the period of October 27, 2020 to May 19, 2022. The General Contractor for the project’s development was HA Builders, Inc. The specialty earthwork subcontractor was Whillock Contracting. Utilities were installed by Ranbar Plumbing and electric utilities were installed by SCS. Pavement materials were completed by Frank and Son Pavement as well as Xpress Concrete. Hardscapes and respective subgrade and base preparation was completed by Xpress Concrete. 4 As-Graded Geotechnical Report 965-967 Oak Avenue, Carlsbad, CA NOVA Project No. 4020054 June 20, 2022 EARTHWORK Site Preparation Prior to earthwork operations, debris, topsoil, and vegetation in the areas being improved were removed and disposed of offsite. Operations The grading subcontractor utilized a variety of medium to heavy-duty equipment to perform the earthwork. Equipment included: wheel loaders scrapers, graders, backhoes, tracked excavators, rollers, and sheepsfoot compaction wheels. Manually operated reciprocating hammers and walk behind rollers were used where access to larger equipment was limited. Building Pad Grading Earthwork consisted of remedial grading to prepare a suitable building pad and may be generalized to have included the stepwise sequence of operations described below. 1. Step 1, Over Excavation. The existing engineered fill was excavated to a depth of 60.5 to 66 feet msl and extended laterally about 5 feet outside of the building limits, where feasible. Excavated soils were staged for later replacement. 2. Step 2, Densification. A representative from NOVA approved the bottom of excavations exposed by Step 1. The bottoms of the removals were scarified, moisturized and compacted prior to placing fills. 3. Step 3, Backfill. Excavated soils were backfilled consistent to the material and placement requirements described in CWE 2016. Backfill was moisture conditioned to near optimum moisture content and compacted to at least 90% relative compaction after D1557. Utilities NOVA observed backfilling operations for several utility line trenches. Site sourced or imported characteristically sandy utility backfill was moisture conditioned to near optimum moisture content and compacted to at least 90% relative compaction using manually operated reciprocating hammers and a sheepsfoot wheel attached to a tracked excavator. Flatwork/Pavers Subgrade preparation for flatwork and pavers consisted of scarifying the upper 12 inches of existing soils, and replacing the excavated soils as new fill densified to at least 95% relative compaction. Right-of-Ways Utility tie-in and pavement patches within the city right-of-ways (ROW) were prepared in the general sequence of operations described below. 5 As-Graded Geotechnical Report 965-967 Oak Avenue, Carlsbad, CA NOVA Project No. 4020054 June 20, 2022 1. Step 1, Utility Tie-In Backfill. NOVA observed backfilling operations for several utility line trench tie-ins within the City Right-of-Ways. Characteristically site sourced or imported sandy utility backfill was moisture conditioned to near optimum moisture content and compacted to at least 90% relative compaction using manually operated reciprocating hammers and a sheepsfoot wheel attached to a tracked excavator. 2. Step 2, Subgrade Preparation. Subgrade soils were scarified about 12 inches, moisture conditioned, and compacted to at least 95% relative compaction. 3. Step 3, Base Course. An approximate 6- to 8-inch-thick layer of recycled Class II aggregate base was placed and densified to at least 95% of the material’s maximum density. 4. Step 4, Wearing Surface. An approximate 5- to 6-inch-thick section of the asphaltic wearing surface within Oak Avenue was placed in lifts and densified by a vibratory roller. Pavement surface asphalt patches were eventually milled about 2 to 3 inches and repaved with new hot mix asphalt concrete densified to at least 95 percent relative compaction. Foundations NOVA observed soils exposed during excavation for both isolated and continuous foundations for the support of the planned structure and for ancillary site walls with exception of property boundary walls. At the time of observation, the foundation excavations were observed to be minimally dimensioned with the geotechnical recommendations and embedded into a proper bearing stratum comprised of compacted fill observed and testing by NOVA. CONCLUSIONS AND LIMITATIONS Conformance with Design Based on the observations and testing reported herein, NOVA certifies that the soil engineering and engineering geologic aspects of the grading have been completed in conformance with the requirements of the approved geotechnical reports and the grading plans (Drawing#523-5A). Limitations Testing and Observation This report presents opinions, information, and data relative to the earthwork at the subject site. Representatives of NOVA conducted testing and made observations as requested during the progress of the construction to evaluate conformance with the project requirements. The testing by NOVA indicates that the earthwork observed conformance with the project requirements for placement and densification. 6 As-Graded Geotechnical Report 965-967 Oak Avenue, Carlsbad, CA NOVA Project No. 4020054 June 20, 2022 Results presented herein are only representative of the samples and areas tested. As with any manufactured product, there are statistical variations in the uniformity of an earth fill and in the accuracy of the test used to measure its qualities. As compared with other manufactured products, earthwork has usually wider fluctuations in both the product and the test results. Variations in material properties are inherent in any earthwork operation and should be expected. Survey References to elevations and locations herein were based on surveyors or grade checker stakes in the field and from the project grading plans prepared by KLE 2020. NOVA did not provide construction surveying services. NOVA has no opinion regarding the accuracy of the elevations or surface geometry with respect to the approved plans. Supervision The presence of NOVA personnel during the work progress did not involve any direct supervision of the contractor or his work forces. Professional and technical advice and recommendations were periodically provided to the owner during the conduct of the work, based upon NOVA’s observations and evaluations. CLOSURE NOVA appreciates the opportunity to be of service to Affirmed Housing Group on this project. Should you have any questions or comments, please do not hesitate to contact the undersigned at 949.388.7710. Sincerely, NOVA Services, Inc. __________ ______ Chelsea Jaeger, CEG Jesse D. Bearfield, PE Project Geologist Senior Engineer Attachments: Plate 1. As Graded Geotechnical Map Table I. Laboratory Test Results and Description of Terms Table II. Summary of Field In-Place Density and Moisture Content Test Results 7 As-Graded Geotechnical Report 965-967 Oak Avenue, Carlsbad, CA NOVA Project No. 4020054 June 20, 2022 ATTACHMENT 1 PLATE 1 As-Graded Geologic and Geotechnical Conditions 965-967 Oak Avenue Carlsbad, California Grading Permit No. GP2020-0008 65.0'65.0'66.0'65.0'65.0'65.0'64.0'64.5'64.5'64.5'67.0'42afQop1234567891011121314151617181920212223242526272829303132353639404143444546474850515253545556575859606162636466686971727374757677787980818283848586878889909192939495969798991001011021031041051061071081091101111121131141151161171181191201211221231241251261271281291301311321331341351361371381391401411421431441451461471481491501511521531541551561571581591601611621633334373865677060.5'4967.0'67.0'64.5'67.0'65.0'KEY TO SYMBOLSafQopARTIFICIAL FILLOLD PARALIC DEPOSITS, CIRCLED WHERE BURIED020'40'APPROXIMATE LOCATION OF IN-PLACE DENSITY TESTS163APPROXIMATE ELEVATION AT EXCAVATION BOTTOMAPPROXIMATE LIMITS OF REMEDIAL GRADING4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710NOVA965-967 OAK AVENUECARLSBAD, CALIFORNIAGEOTECHNICALMATERIALSSPECIAL INSPECTIONSBEDVBEwww.usa-nova.comPROJECT NO.:DATE:DRAWN BY:REVIEWED BY:4020054JUNE 2022DTWJDBAS-GRADEDGEOTECHNICAL MAPDRAWING TITLE:SCALE:1"=20'PLATE NO.1 OF 1SDVOSB SLBE N W E N S60.5'APPROXIMATE AREA OF DEEPENED EXCAVATION• \ \ \ \ -\ l /\'-J -t:; 30' • I, :1 1, en :1 6 ~ Q 02: ~ 1, a E!S : Q Vj ~ "' 11 ~ . I • /\ CY :s: I\ / I ' ' ,v c=J CJ (o "-,_' /\ ,+ \ \ )( 215"27'46' t1}58' • • • ( FF=69.55) • • CJ EL.T B2 B113 ~ • • • • • • • • • • CJ • ( FF=69.55) CJ • \)'-J-\P N 2 01t~-J-J-,h:_t)-J + <( • • • CJ • • <( CJ • • '~ • ~' • ( GFF =69. 55 ) PARCEL f ~ ~ Pl ~ • • PORTION OF LOl • OF • • • MAP NO.1744 • B C) • CJ • CJ • CJ • • • • • J-\PN ITIIC~~EIADll'TI r:~1EffiRANS !HOUSING: I 'illll IKi5o-&l5 •Dd: .1.t!lrtm L7"= -•S:.QllJIEIITI S!lllii:ii: l!cSliiii!llal'= El:=11 ........... , 00. ,~~ 91P !1.6-lli 8 As-Graded Geotechnical Report 965-967 Oak Avenue, Carlsbad, CA NOVA Project No. 4020054 June 20, 2022 ATTACHMENT 2 TABLES As-Graded Geologic and Geotechnical Conditions 965-967 Oak Avenue Carlsbad, California Grading Permit No. GP2020-0008 965-967 Oak AvenueCarlsbad, CA June 2022NOVA Project No. 4020054 Maximum Optimum Dry Density Moisture Material ID Material Description (pcf)(%) A Brown Silty Sand 123.8 10.3 B Class II Recycled Base (Superior, Mission Gorge) 121.0 10.5 C Class II Recycled Base (Moody's, Oceanside)121.2 10.8 D Class II Recycled Base (Moody's, Oceanside)121.2* 9.9* Maximum Wet Material ID Material Description Density AC-1 203 3B3 PG64-10 (Vulcan, Carroll Canyon)140.8 AC-2 203 3B3 PG64-10 (Vulcan, Carroll Canyon)149* AC-3 203 3C3 PG64-10 (Vulcan, Carroll Canyon)148* *Values provided by material supplier Test Type Test Description MG Remedial Grading S Sewer Line Trench W Water Line Trench FL Fire Line Trench SD Storm Drain Trench E Electrical Trench SG Subgrade B Aggregate Base AC Asphalt Concrete TABLE I LABORATORY DENSITES AND TESTING TERMINOLOGY Laboratory Maximum Density (ASTM D1557) 965-967 Oak Avenue Carlsbad, CA June 2022 NOVA Project No. 4020054 Test Test Approx. Matl.Rel. Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail 10/27/20 1 MG Building Pad 67.0 A 123.8 10.3 119.1 5.7 96% Pass 2 MG Building Pad 67.0 A 123.8 10.3 115.9 5.7 94% Pass 3 MG Building Pad 67.0 A 123.8 10.3 121.9 6.1 98% Pass 4 MG Building Pad (FG)68.5 A 123.8 10.3 117.3 7.2 95% Pass 5 MG Building Pad (FG)68.5 A 123.8 10.3 118.9 6.8 96% Pass6MG Building Pad (FG)68.5 A 123.8 10.3 115.7 6.3 93% Pass 10/28/20 7 MG Building Pad 67.0 A 123.8 10.3 116.0 6.0 94%Pass8 MG Building Pad 67.0 A 123.8 10.3 116.6 6.4 94%Pass9 MG Building Pad 67.0 A 123.8 10.3 117.5 6.1 95%Pass10 MG Building Pad (FG)68.5 A 123.8 10.3 115.2 5.9 93%Pass11 MG Building Pad (FG)68.5 A 123.8 10.3 115.1 5.8 93%Pass12 MG Building Pad (FG)68.5 A 123.8 10.3 115.2 5.7 93%Pass 10/29/20 13 MG Building Pad 66.0 A 123.8 10.3 117.6 6.7 95%Pass14 MG Building Pad 66.0 A 123.8 10.3 119.2 8.0 96%Pass15 MG Building Pad 66.0 A 123.8 10.3 117.7 6.5 95%Pass16 MG Building Pad 68.0 A 123.8 10.3 113.0 5.0 91%Pass17 MG Building Pad 68.0 A 123.8 10.3 119.6 5.1 97%Pass18 MG Building Pad 68.0 A 123.8 10.3 119.7 8.0 97%Pass19 MG Building Pad (FG)68.5 A 123.8 10.3 117.4 7.3 95%Pass20 MG Building Pad (FG)68.5 A 123.8 10.3 119.2 8.1 96%Pass 10/30/20 21 MG Building Pad 66.0 A 123.8 10.3 117.1 8.0 95%Pass22 MG Building Pad 66.0 A 123.8 10.3 116.5 7.6 94%Pass23 MG Building Pad 66.0 A 123.8 10.3 117.8 8.1 95%Pass24 MG Building Pad 66.0 A 123.8 10.3 118.9 8.4 96%Pass25 MG Building Pad 66.8 A 123.8 10.3 117.0 7.7 95%Pass26 MG Building Pad 66.8 A 123.8 10.3 112.9 8.1 91%Pass27 MG Building Pad (FG)68.5 A 123.8 10.3 117.0 7.7 95%Pass28 MG Building Pad (FG)68.5 A 123.8 10.3 113.8 8.1 92%Pass29 MG Building Pad (FG)68.5 A 123.8 10.3 118.9 9.6 96%Pass30 MG Building Pad (FG)68.5 A 123.8 10.3 122.3 8.2 99%Pass 11/2/20 31 MG Building Pad 66.0 A 123.8 10.3 116.2 7.6 94%Pass32 MG Building Pad 66.0 A 123.8 10.3 117.0 8.3 95%Pass33 MG Building Pad 63.0 A 123.8 10.3 117.2 9.3 95%Pass34 MG Building Pad 66.0 A 123.8 10.3 116.5 8.7 94%Pass 11/3/20 35 MG Building Pad (FG)68.5 A 123.8 10.3 117.7 7.5 95%Pass36 MG Building Pad (FG)68.5 A 123.8 10.3 120.8 7.0 98%Pass37 MG Building Pad (FG)68.5 A 123.8 10.3 118.6 7.1 96%Pass38 MG Building Pad (FG)68.5 A 123.8 10.3 117.6 7.0 95%Pass39 MG Building Pad (FG)68.5 A 123.8 10.3 119.2 7.1 96%Pass40 MG Building Pad (FG)68.5 A 123.8 10.3 121.5 7.6 98%Pass41 MG Building Pad (FG)68.5 A 123.8 10.3 120.9 7.1 98%Pass42 SG HardscapeSGA123.8 10.3 121.2 8.1 98%Pass43 SG HardscapeSGA123.8 10.3 120.5 7.8 97%Pass44 SG HardscapeSGA123.8 10.3 119.0 8.0 96%Pass45 SG HardscapeSGA123.8 10.3 121.1 8.0 98%Pass46 SG HardscapeSGA123.8 10.3 119.5 8.2 97%Pass47 SG HardscapeSGA123.8 10.3 119.6 8.1 97%Pass48 SG HardscapeSGA123.8 10.3 117.5 9.0 95%Pass49 SG HardscapeSGA123.8 10.3 117.1 8.0 95%Pass 11/24/20 50 SD Storm Drain Trench 66.0 A 123.8 10.3 114.1 5.8 92%Pass51 SD Storm Drain Trench 66.0 A 123.8 10.3 113.2 6.1 91%Pass52 SD Storm Drain Trench 65.5 A 123.8 10.3 115.6 5.9 93%Pass53 SD Storm Drain Trench 65.5 A 123.8 10.3 115.2 6.3 93%Pass54 SD Storm Drain Trench 65.5 A 123.8 10.3 116.8 6.4 94%Pass55SDStorm Drain Trench 65.5 A 123.8 10.3 115.6 6.1 93%Pass Laboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 965-967 Oak Avenue Carlsbad, CA June 2022 NOVA Project No. 4020054 Test Test Approx. Matl.Rel. Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 11/23/20 56 SD Storm Drain Trench 68.0 A 123.8 10.3 116.8 5.9 94%Pass57 SD Storm Drain Trench 68.0 A 123.8 10.3 117.8 5.8 95%Pass58 SD Storm Drain Trench 68.0 A 123.8 10.3 114.2 5.9 92%Pass59 SD Storm Drain Trench 68.0 A 123.8 10.3 114.6 5.7 93%Pass 12/4/20 60 SD Storm Drain Trench 68.0 A 123.8 10.3 112.6 6.0 91%Pass61 SD Storm Drain Trench 68.0 A 123.8 10.3 118.3 7.0 96%Pass62 SD Storm Drain Trench 68.0 A 123.8 10.3 115.3 7.1 93%Pass63 SD Storm Drain Trench 68.0 A 123.8 10.3 117.6 10.8 95%Pass64 SD Storm Drain Trench 68.0 A 123.8 10.3 115.8 9.6 94%Pass65 SD Storm Drain Trench 67.0 A 123.8 10.3 111.4 11.5 90%Pass 12/7/20 66 SD Storm Drain Trench 67.0 A 123.8 10.3 114.2 8.8 92%Pass67 SD Storm Drain Trench 67.0 A 123.8 10.3 118.7 7.0 96%Pass68 SD Storm Drain Trench 67.5 A 123.8 10.3 116.2 7.0 94%Pass69 SD Storm Drain Trench 68.0 A 123.8 10.3 121.5 7.2 98%Pass70 SD Storm Drain Trench 68.0 A 123.8 10.3 121.5 7.9 98%Pass71 SD Storm Drain Trench 66.0 A 123.8 10.3 115.3 7.3 93%Pass72 SD Storm Drain Trench 68.0 A 123.8 10.3 116.1 7.5 94%Pass 12/8/20 73 SD Storm Drain Trench 64.0 A 123.8 10.3 117.3 7.2 95% Pass74 SD Storm Drain Trench 66.0 A 123.8 10.3 114.2 6.9 92% Pass75 SD Storm Drain Trench 64.0 A 123.8 10.3 115.1 7.3 93% Pass76 SD Storm Drain Trench 66.0 A 123.8 10.3 116.1 7.0 94% Pass77 SD Storm Drain Trench 68.0 A 123.8 10.3 115.2 8.1 93% Pass 12/15/20 78 SD Storm Drain Trench 67.0 A 123.8 10.3 116.7 8.2 94% Pass79 SD Storm Drain Trench 67.0 A 123.8 10.3 118.2 9.1 95% Pass 1/8/21 80 S Sewer Line Trench 68.5 A 123.8 10.3 119.5 7.0 97% Pass81 S Sewer Line Trench 68.5 A 123.8 10.3 119.7 6.3 97% Pass82 S Sewer Line Trench 68.5 A 123.8 10.3 117.8 7.3 95% Pass83 S Sewer Line Trench 68.5 A 123.8 10.3 118.4 6.5 96% Pass 1/19/21 84 S Sewer Line Trench 64.5 A 123.8 10.3 118.3 7.0 96% Pass85 S Sewer Line Trench 64.5 A 123.8 10.3 117.5 6.7 95% Pass86 W Water Line Trench SG A 123.8 10.3 121.0 8.6 98% Pass87 W Water Line Trench SG A 123.8 10.3 120.5 8.3 97% Pass88 S Sewer Line Trench 66.5 A 123.8 10.3 119.3 7.5 96% Pass89 S Sewer Line Trench 66.5 A 123.8 10.3 120.6 7.8 97% Pass90 S Sewer Line Trench 67.0 A 123.8 10.3 118.0 8.9 95% Pass91 S Sewer Line Trench 67.5 A 123.8 10.3 119.3 9.1 96% Pass92 S Sewer Line Trench 67.5 A 123.8 10.3 120.3 9.3 97% Pass 1/21/21 93 W Water Line Trench 67.0 A 123.8 10.3 114.7 9.4 93%Pass 1/26/21 94 S Sewer Line Trench 63.0 A 123.8 10.3 114.8 9.0 93%Pass 95 S Sewer Line Trench 63.0 A 123.8 10.3 112.1 11.5 91%Pass 96 S Sewer Line Trench 64.5 A 123.8 10.3 118.0 8.3 95%Pass97 S Sewer Line Trench 64.5 A 123.8 10.3 115.6 7.4 93%Pass 98 S Sewer Line Trench 64.5 A 123.8 10.3 114.3 8.8 92%Pass 1/27/21 99 S Sewer Line Trench 66.5 A 123.8 10.3 120.7 8.1 97%Pass 100 S Sewer Line Trench 66.5 A 123.8 10.3 122.0 7.7 99%Pass101 S Sewer Line Trench 66.5 A 123.8 10.3 121.6 8.3 98%Pass 102 S Sewer Line Trench 66.5 A 123.8 10.3 119.5 8.0 97%Pass 2/4/21 103 S Sewer Line Trench 68.5 A 123.8 10.3 118.8 6.7 96%Pass 104 S Sewer Line Trench 68.5 A 123.8 10.3 119.5 7.6 97%Pass 105 S Sewer Line Trench 68.5 A 123.8 10.3 117.7 6.1 95%Pass106 S Sewer Line Trench 68.5 A 123.8 10.3 117.8 6.3 95%Pass 107 S Sewer Line Trench 68.5 A 123.8 10.3 117.9 7.0 95%Pass 108 S Sewer Line Trench 68.5 A 123.8 10.3 121.0 6.9 98%Pass 965-967 Oak Avenue Carlsbad, CA June 2022 NOVA Project No. 4020054 Test Test Approx. Matl.Rel. Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 2/9/21 109 SG Oak Avenue SG A 123.8 10.3 119.6 10.5 97%Pass 110 SG Oak Avenue SG A 123.8 10.3 122.2 8.9 99%Pass 111 B Oak Avenue Base B 121.0 10.5 115.3 13.2 95%Pass 112 B Oak Avenue Base B 121.0 10.5 115.5 14.6 95%Pass 113 B Oak Avenue Base B 121.0 10.5 115.1 13.1 95%Pass114 B Oak Avenue Base B 121.0 10.5 116.1 14.1 96%Pass 115 B Oak Avenue Base B 121.0 10.5 116.0 12.5 96%Pass 116 AC Oak Avenue AC AC-1 140.8 N/A 137.9 N/A 98%Pass117ACOak Avenue AC AC-1 140.8 N/A 137.1 N/A 97%Pass 118 AC Oak Avenue AC AC-1 140.8 N/A 139.5 N/A 99%Pass 119 AC Oak Avenue AC AC-1 140.8 N/A 137.8 N/A 98%Pass120ACOak Avenue AC AC-1 140.8 N/A 138.6 N/A 98%Pass 2/10/21 121 AC Oak Avenue AC AC-1 140.8 N/A 137.7 N/A 98%Pass 122 AC Oak Avenue AC AC-1 140.8 N/A 138.0 N/A 98%Pass 4/16/21 123 FL Fire Line Trench 69.0 A 123.8 10.3 119.9 7.8 97%Pass 124 FL Fire Line Trench 69.0 A 123.8 10.3 114.0 10.7 92%Pass 125 FL Fire Line Trench 69.0 A 123.8 10.3 119.6 10.0 97%Pass126 FL Fire Line Trench 68.0 A 123.8 10.3 120.9 11.5 98%Pass 4/19/21 127 FL Fire Line Trench 69.0 A 123.8 10.3 122.3 8.5 99%Pass 9/2/21 128 SG Sidewalk SG A 123.8 10.3 118.6 13.1 96%Pass 129 SG Sidewalk SG A 123.8 10.3 119.1 14.2 96%Pass130 SG Sidewalk SG A 123.8 10.3 118.9 13.8 96%Pass 131 B Sidewalk Base C 121.2 10.8 115.2 N/A 95%Pass 132 B Sidewalk Base C 121.2 10.8 114.8 N/A 95%Pass 133 B Sidewalk Base C 121.2 10.8 114.6 N/A 95%Pass 11/1/21 134 E Electrical Line Trench 68.5 A 123.8 10.3 121.3 8.1 98%Pass 135 E Electrical Line Trench 66.5 A 123.8 10.3 119.0 9.2 96%Pass 136 E Electrical Line Trench 68.5 A 123.8 10.3 120.3 8.7 97%Pass137 E Electrical Line Trench 66.5 A 123.8 10.3 119.2 8.3 96%Pass 138 E Electrical Line Trench 68.5 A 123.8 10.3 119.8 9.1 97%Pass 139 E Electrical Line Trench 66.5 A 123.8 10.3 119.6 8.9 97%Pass140 E Electrical Line Trench 68.5 A 123.8 10.3 120.1 9.8 97%Pass 11/2/21 141 E Electrical Line Trench 68.5 A 123.8 10.3 120.2 10.8 97%Pass 142 E Electrical Line Trench 68.5 A 123.8 10.3 111.4 11.0 90%Pass 143 E Electrical Line Trench 68.5 A 123.8 10.3 111.5 10.9 90%Pass 1/14/22 144 SG Driveway Entrance and Parking SG A 123.8 10.3 122.6 6.9 99%Pass 145 SG Driveway Entrance and Parking SG A 123.8 10.3 122.1 9.1 99%Pass146 SG Driveway Entrance and Parking SG A 123.8 10.3 121.4 8.4 98%Pass 147 SG Driveway Entrance and Parking SG A 123.8 10.3 118.2 7.2 95%Pass 148 SG Driveway Entrance and Parking SG A 123.8 10.3 120.8 6.9 98%Pass149 SG Driveway Entrance and Parking SG A 123.8 10.3 121.6 6.1 98%Pass 150 SG Driveway Entrance and Parking SG A 123.8 10.3 120.5 6.5 97%Pass 5/2/22 151 G Gas Line Trench SG A 123.8 10.3 118.4 12.4 96%Pass 152 SG Gutter SG A 123.8 10.3 117.9 11.9 95%Pass 153 SG Gutter SG A 123.8 10.3 120.1 10.9 97%Pass 154 B Gas Line Trench Base D 121.2 9.9 115.2 12.1 95%Pass 155 B Gutter Base D 121.2 9.9 116.1 11.4 96%Pass156 B Gutter Base D 121.2 9.9 115.9 11.8 96%Pass 157 AC Gas Line Trench AC AC-2 149.0 N/A 142.3 N/A 96%Pass 5/16/22 158 AC Oak Avenue AC AC-3 148.0 N/A 142.4 N/A 96%Pass 159 AC Oak Avenue AC AC-3 148.0 N/A 141.0 N/A 95%Pass160ACOak Avenue AC AC-3 148.0 N/A 140.6 N/A 95%Pass 161 AC Oak Avenue AC AC-3 148.0 N/A 142.0 N/A 96%Pass 162 AC Oak Avenue AC AC-3 148.0 N/A 141.1 N/A 95%Pass 163 AC Oak Avenue AC AC-3 148.0 N/A 142.0 N/A 96%Pass