Loading...
HomeMy WebLinkAboutPD 2019-0015; CARLSBAD INN MITIGATION; RESPONSE TO CITY COMMENTS ROUND 2, ON PLANS DATED 7/23/2019; 2019-08-29SHORING DESIGN GROU RECORD COPY August 29, 2019 Mr. Mark Elliott Elliott Drilling Services, Inc. 1342 Barham Drive San Marcos, CA 92078 Re: Carlsbad Inn Carlsbad, California OCT 012019 LAND DEVELOPMENT ENGINEERING _Q J! Initial - Date - Office (760) 722-1400 Fax (760) 722-1404 JOB #19-109 Subject: Response to City Comments Round 2, on Plans Dated 7/23/2019 Project ID GR2019-020 Dear Mr. Elliott: Shoring Design Group is in receipt of the 2rd plan review comments prepared by Michael Baker International, on behalf of the City of Carlsbad, regarding the above referenced project. In response, Shoring Design Group (SDG) offers the following responses: Response to Comments on Sheet SH8 Please see sheet SH9 for call out of the existing transformer vault. Please see updated sheet call out boundary boxes as requested. Please see updated temporary slope cut adjacent to the pool. Calculations and responses provided by SDG (local) & BWE (global) demonstrate sufficient load carrying capacity of the existing garage structure imposed by the temporary shoring struts. All -. pipe struts have been carefully set to align with the existing building diaphragm to impose the same reactionary force (See BWE 7/2/19 Letter) the building currently withstands and has been designed for. This shoring system will exhibit little to now movement (See Christian Wheeler July CD 5 response letter), and can be installed with necessary limited access equipment. S w Please see Lot lines & property line identifications as requested. CD Please see call out for the existing 5'-0" public easement. Please see the full extent of the existing sidewalk as requested. Additionally, please see call out requiring replacement of any existing sidewalk & or curb (also see sheet SH12). The plot used is a shoring scale (1" = 24') based on the typical soldier beam spacing of 8'-0" (No V changes). Response to Comments on Sheet SH9 The existing transformer, water meter, water line, gas line, and fire line are to remain in place. The contractor (during excavation) shall protect the utilities in place & is noted on sheet SH9. Please see response #4 under "Response to Comments on Sheet 8", regarding the calculations performed for the existing garage. Please see updated note to notify the city inspector as well, in the event that additional shoring is needed for the tree. Response to Comments on Sheet SH10 I. Please see response #4 under "Response to Comments on Sheet 8", regarding the calculations performed for the existing garage. Response to Comments on Sheet SH11 Please see updated plan view that now depicts the temporary 1-1 slope. Please see response #4 under "Response to Comments on Sheet 8", regarding the calculations performed for the existing garage. Please see detail 4/SH16 for the corresponding wall brace details, dimensioning & location of the bearing plate elevations. No matchline is needed per plan. The continuation of the proposed temporary shoring occurs at the 90-deg bend as shown in the profile view. Response to Comments on Sheet SH12 The existing transformer is being re-located adjacent to the garage entrance, as shown on sheet SH8 of the shoring plans. Please see update property line for the adjacent Lots & temporary cut slope in plan. Sheet matchline is not needed; see response to comment 4 above. Please see updated shoring background that now shows the continuation of the existing sidewalk (as provided). Additionally, the extents of sidewalk removal + repair correspond to the alignment of the shoring & temporary grading shown. For clarity, please see updated note that calls for replacement of the existing sidewalk and/or curb, upon completion of the temporary shoring/excavation. S. Please see updated 5'-0" sidewalk easement as requested. Please see response #4 under "Response to Comments on Sheet 8", regarding the calculations performed for the existing garage. Details relating to parking striping are to be provided by others. Response to Comments on Sheet SH13 Response to Detail 1/5H13: Please see updated safety railing added to top of soldier beam (typical). Please see cross section scale call out. Response to Detail 2/SH13: 1. Please see response #4 under "Response to Comments on Sheet 8", regarding the calculations performed for the existing garage. Response to Comments on Sheet SH14 Response to Detail 1/SH14: Please see the updated property line between lots 1 & 2. Please see response #4 under "Response to Comments on Sheet 8", regarding the calculations performed for the existing garage. Response to Comments on Sheet SH16 Response to Detail 1/SH16: 1. Please see response #4 under "Response to Comments on Sheet 8", regarding the calculations performed for the existing garage. Response to Comments on Sheet SH17 Please see maximum lagging/backfill duration of 8-hrs, specified for cantilevered & internally braced soldier beams. Please see the updated geotechnical response letter under Design Criteria. Please see the March 19, 2019 report & July 5, 2019 response review, for the corresponding temporary shoring load values. Should you have any additional questions or comments regarding this matter, please advise. Sincerely, SHORING DESIGN GROUP, P. C 80503 0 kExp. 3/31/21 ) Roy P. Reed, P.E. Project Engineer Enclosed: Existing Wall Finite Element Analysis (Local Analysis) Christian Wheeler Response to Geotechnical Review - Dated July 5, 2019 BWE Response to Plan Review Comments - Dated July 2, 2019 Shoring Design Group Carlsbad Inn 7755 Via Francesco #1 Eng: RPR Sheet _of_ San Diego, CA 92129 Date: 7/2212019 CMU Wall Properties "Typical Strut Reaction (Max. Load)" CMU Wall Properties H:= loft = Maximum height of retained cmu wall tw:= 12-in = Masonry wall thickness b:= 1-ft = Width of cmu (for analysis / ft) fm' := 2000. psi = Masonry wall compressive strength Em := 900-fm' = Modulus of elasticity ,u:= 0.20 = Poisson's ratio for fully grouted cmu fr:= 150-psi Modulus of rupture Em = 259200000. psf - Units for finite analysis consistency WALL STRESS OUTPUT (SEE LISA FINITE ANALYSIS) Mu := 1087-lb-ft = Maximum bending moment per analysis Vu := 9774. lb = Maximum shear per analysis Nominal Cracking Moment Nominal Shear in Masonry fr tI2 r ( Mu M := V :=I4—l.75I .tw.b.'fm'.psi. cr 6 m L LVu.dv)] 0.90•Mcr = 3240 ft. lb 0.70Vm = 16978.8 lb Wall cracking & shear not exceeded ---> Okay CMU Propertles.xmcdz Shoring Design Group Carlsbad Inn 7755 Via Francesco #1 Eng: RPR Sheet _of_ San Diego, CA 92129 Date: 7/22/2019 CMU Wall Properties "Strut Reaction at Elevator Shaft" CMU Wall Properties H:= loft tw:= 12-in b:= 1-ft fm' := 2000. psi Em:= 900-fm' v:= 0.20 = Maximum height of retained cmu wall = Masonry wall thickness = Width of cmu (for analysis I ft) = Masonry wall compressive strength = Modulus of elasticity = Poisson's ratio for fully grouted cmu 150-psi = Modulus of rupture Em = 259200000. psf - Units for finite analysis consistency WALL STRESS OUTPUT (SEE LISA FINITE ANALYSIS) Mu:= 3081-lb-ft = Maximum bending moment per analysis Vu := 6708. lb = Maximum shear per analysis Nominal Cracking Moment Nominal Shear in Masonry fr tVl2 [ 1 Mu Mcr := Vm - 1.75.1 I . tw• b. fm'. psi 6 Vu dv)] 0.90•Mcr = 3240 ft. lb 0.70•Vm = 13683.6 lb Wall cracking a shear not exceeded --- > Okay CMU Properties - Max Span.xmcdz BNVE .I R( 1(1 tJIAI I.NGINF I.RIN(I • C IVU I NLitN[ I. RING *SURVEYING • I AND Pt ANNINli RESPONSE TO PLAN REVIEW COMMENTS Date: July 02, 2019 Project: Carlsbad Inn Water Intrusion Project Phases 2-4 2906,3075 Carlsbad Boulevard Carlsbad, CA BWE Project No.: 12945A.3.0 To: Keith Whaley with KM Consulting Group, LLC RJCEJVEr) LAND DEVELOPMEN ENGINEERING Per your request, we have reviewed the plan check comments that have been marked up on the EXCEL Engineering/Elliott Drilling Services Inc/Shoring Design Group submittal drawings, sheets I and 10 through 19. These sheets specifically pertained to the temporary shoring required for this project. Given our scope of work, we reviewed the comments for those that applied to structural engineering. On sheet 1, there is a list of notes adjacent to the title block. Note 4 states: Attaching shoring to adjacent buildings is not acceptable unless the structural designer and geotechnical engineer of record provide calculations showing that the adjacent buildings are not affected in anyway by BWE response: The shoring is not attached to the existing, adjacent building. The strut shown on sections 1 and 2 I Sheet 18, delivers the reaction from the top of the shoring wall directly to the existing concrete diaphragm via compression in the strut. The lateral load delivered to the existing diaphragm via the strut is identical to the load delivered to the diaphragm via the existing basement wall. Sheet 18 is not available', as the plan set récélved onfairFs 17 she Reference the sheet of current plans when responding to comments. Shoring attached to existing buildings for support is not an acceptable construction practice without a comprehensive structural analysis for each existing structure Prior to developing such an analysis, a written agreement from the owner of each affected building should be obtained and submitted to the City of Carlsbad, as part of a future permit submittal. Page 1 of 1 9449 Hall ma Aw-i,iu. • Stiii /70 • 5" I)iciji • (A • 92124 P i1 )9' '' • F t I999 '93'1 9 tVWW hWPMJ (OlD 'N CHRISTIAN WHEELER ENGINEERING July 5, 2019 Grand Pacific Resorts, Carlsbad Inn 3075 Carlsbad Boulevard Carlsbad, California 92008 Attention: Keith Whaley CWE 2190062.04 Subject: Response to Geotechnical Review Project ID PD2019-0015, GR2019-020, DWG 518-3A Proposed Parking Garage Shoring Carlsbad Inn, 3075 Carlsbad Boulevard, Carlsbad, California References: 1) Michael Baker International, Shop Drawing Review, Proposed Parking Garage, May 31, 2019, Project No. 139000 Grading Plans For: Carlsbad Inn Water Intrusion Mitigation Project, Phase 2-4, prepared by Excel Engineering, undated (Sheets I through 9) Temporary Shoring Plans for Carlsbad Inn Water Intrusion Mitigation Plan, prepared by Shoring Design Group, dated April 8, 2019 (Sheets 10 through 19) Report of Limited Geotechnical Investigation, Proposed Parking Garage Shoring, Carlsbad Inn, 3075 Carlsbad Boulevard, Carlsbad, California, CWE Report 2190062.01, dated March 19, 2019. Ladies and Gentlemen: In accordance with your request, we have prepared this report to present additional information required by the City of Carlsbad regarding the geotechnical issues at the site. The comments in the referenced geotechnical review letter and our responses to the comments in the referenced memorandum within our purview are presented below. Reviewer Comment 1: Geotechnical Engineer to determine by analysis the maximum vertical and lateral soil displacement introduced to the adjacent structures, induced by 1" (Max) of lateral deflection (measured at the top of the shoring). 3980 Home Avenue s San Diego, CA 92105 s 619-550-1700 + FAX 619-550-1701 CWE 2190062.04 July 5, 2019 Page No. 2 CWE Response: The shoring located adjacent to structures will be braced; therefore, the lateral deflction is expected to negligible. Reviewer Comment 2: It is suggested that the maximum shoring deflection at the top of the pile/wall (to be tolerated by any structure adjacent to the proposed shoring system) shall not exceed /4". CWE Response: The shoring located adjacent to structures will be braced; therefore, the lateral deflection at the top of the shoring wall is expected to negligible. se possibility of deflection. This condition is present on a few locations, where the shoring is relying on adjacent structures for support (shoring is physically attached to adjacent structures). CWE Response: It can be assumed that retained soils having a level surface behind shoring that is restrained at the top will exert a lateral pressure equal to that developed by a fluid with a density of 50 pounds per cubic foot. Reviewer Comment 4: Attaching shoring to adjacent buildings is not acceptable unless the structural designer and geotechnical engineer of record provide calculations showing that the adjacent buildings are not affected in any way by the loads imposed directly by the proposed shoring. CWE Response: Such evaluation/calculation will need to be provided by the structural engineer. If you have any questions regarding this letter, please do not hesitate to contact this office. Christian Wheeler Engineering appreciates this opportunity of providing professional services for you for the subject project. Respectfully submitted, CHRISTIAN WHEELER ENGINEERING Shawn Caya, R.G.E. #2 govy Soilson, C. .G. #2 4551 SCC:sccdjf TROY S. 0 Ui E2748 / I WILSON O cc:kwhaley®kmcgroup-llc.com (cr ( No. 2551 ) BNVE STRUCTURAL • CIVIL • SURVEY • LAND PLANNING 9449 Balboa Avenue, Suite 270 • San Diego, CA 92123 Phone (619) 299-5550 • Fax (619) 299-9934 www.bwesd.com ENGINEER: mbb DATE: August 23, 2019 PROJECT NUMBER: 12945A.01 STRUCTURAL CALCULATIONS FOR Shoring Affect Check CARLSBAD INN BEACH RESORT CARLSBAD, CALIFORNIA August 27, 2019 Prepared for GRAND PACIFIC RESORTS, INC. 5900 PASTEUR CT, #200 CARLSBAD, CALIFORNIA