Loading...
HomeMy WebLinkAboutCUP 02-29; CINGULAR WIRELESS BANK OF AMERICA CARLSBAD; Site PlanEXISTING SIGNAGE ( PROPOSED CINGUL.AR WIRELESS ANTENNAS FACADE MOUNTED TO EXISTING BUILDING WALL wm-1 RF TRANSPARENT "TELEFLAGE" ANTENNA SKIRTS ON ALL SIDES AND LNA UNITS MOUNTED INSIDE ATTIC SPACE DIRECTLY BEHIND ANTENNA. ANTENNAS, ANTENNA MOUNTS, CABLE TRAY AND ALL EXPOSED CABLE SHALL BE PAINTED TO MATCH ADJACENT SURFACES. SEE SHEET A-1 FOR ROOF PLAN AND SHEET A-3 FOR EXTERIOR ELEVATIONS \ \ EXISTING CURB, GUTTER AND SIDEWALK TO REMAIN \ \ I ~ I I I I I I I 0 0 EXISTING PACIFIC BELL PEDESTAL (TELCO SERVICE CONNECTION) LA COSTA AVENUE EXISTING BANK OF AMERICA PROPOSED CINGUL.AR WIRELESS ANTENNAS FACADE MOUNTED TO EXISTING BUILDING WALL WITH RF TRANSPARENT "TELEFLAGE" ANTENNA SKIRTS ON ALL SIDES AND LNA UNITS MOUNTED INSIDE Ame SPACE DIRECTLY BEHIND ANTENNA. ANTENNAS, ANTENNA MOUNTS, CABLE TRAY AND ALL EXPOSED CABLE SHALL BE PAINTED TO MATCH ADJACENT SURFACES. SEE SHEET A-1 FOR ROOF PLAN AND SHEET A-3 FOR EXTERIOR ELEVATIONS PROPERTY LINE (TYPICAL) SITE PLAN ?..; t. 1;-r ~: ;;; 'l,,.. . ~ .~ .. r, DRIVEWAY APPROVED IS THE APPROVED TENTATIVE MAP/SITE THIS · "~·ir." "O ~ OF PLANl'<lNG PLAN PER CO~D,Lv""' ~ ~ ..8 / COMlvllSS''.:iN RLSOLU 110,~ NO. 5 1 -,J'/'/,,. • I /11 tf_/ A / , BENCHMARK: COUNTY OF SAN DIEGO BRANCH MARK R1800 149+91 INT. ELEVATION. 16.00' MRAN SEA LEVEL N.G.V.D. 1929 BOUNDARY NOTE: THE PROJECT BOUNDARY SHOWN ON THIS DRAWING IS APPROXIMATE AND IS SHOWN FOR REFERENCE ONLY. A BOUNDARY SURVEY WAS NOT PERFORMED BY CHRISTENSEN ENGINEERING INC. GENERAL SPECIFICATIONS 1. THE LATEST EDITION OF THE AMERICAN INSTITUTE OF ARCHITT:CTS DOCUMENT A201 ~GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION" ARE INCLUDED IN THESE SPECIFlCATIONS AS IF COMPLETELY REPRODUCED HEREIN. 2. THIS FACILITY IS AN UNOCCUPIED PCS TELECOMMUNICATIONS SITE ANO IS EXEMPT FROM DISABLED ACCESS REQUIREMENTS. J. PRIOR TO THE SUB~ISSION OF BIDS, THE CONTRACTORS PARTICIPATING SHALL VISIT THE JOB SITE AND FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT, WITH THE CONSTRUCTION AND CONTRACT DOCUMENTS, FIELD CONDmONS AND CONFIRM THAT THE PROJECT CAN BE ACCOMPLISHED /4S SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION. SHOULD ANY ERRORS, OMISSION. OR DISCREPANCIES BE FOUND, THE GENERAL CONTRACTOR SHALL IMMEDIATELY NOTIFY ClilGlJl.AR WIRELESS CONSTRUCTION MANAGER AND THE ARCHITTCT tN WRmNG. tN THE EVENT OF DISCREPANCIES THE CONTRACTOR SHALL INCLUDE THE MORE COSTLY OR EXTENSIVE WORK IN THE BID, UNLESS SPECIFICALLY DIRECTED OTHERWlSE. IF A DtSCREPANCY EXISTS AND THE PROJECT MANAGER AND ARCHITT:CT ARE NOT NOTIFlED, THE GENERAL CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL COSTS INCURRED TO REPAIR OR CORRECT ALL PROBLEUS THAT RESULT. 4. DRAWINGS SHALL NOT BE SCALED. FIGURED DIMENSIONS HAVE PRECEDENCE OVER DRAWING SCALE AND DETAIL DRAWINGS HAVE PRECEDENCE OVER SMALL SCALE DRAWINGS. CONTRACTOR SHALL CHECK ACCURACY OF ALL DIMENSIONS IN THE FIELD. UNLESS SPECIFICALLY NOTED, DO NOT FABRICATE ANY l,IATERIALS, 00 BEGIN ANY CONSTRUCTION UNTIL THE ACCURACY OF DRAWING DIMENSIONS HAS BEEN VERIFIED AGAINST ACTUAi... FIELD DIMENSIONS. 5. CONTRACTOR SHALL NOTIFY THE CINGllAR Wat Lt'.SS CONSTRUCTION MANAGER ANO THE ARCHITECT IF ANY DETAILS ARE CONSIDERED IMPRACTICAL, UNSUITABLE, UNSAFE, NOT WATERPROOF, OR NOT WITHIN CUSTOMARY TRADE PRACTICE. IF WORK IS PERFORMED, IT WILL BE ASSUMED THAT THERE IS NO OBJECTION TO ANY DET,'JL DETAILS ARE INTENDED TO SHOW THE END RESULT OF THE DESIGN. MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB CONDITIONS, AND SHALL BE INCLUDED AS PART OF THE WORK. 6. EXISTING ELEVATIONS AND LOCATIONS TO BE JOINED SHALL BE VERIFlED BY THE CONTRACTOR BEFORE CONSTRUCTION. IF THEY DIFFER FROM THOSE SHOWN ON THE PLANS, THE CONTRACTOR SHALL NOTIFY THE CIIGUl.M WIRELESS CONSTRUCTION MANAGER AND THE ARCHITECT SO THAT MODIFlCATIONS CAN BE MADE BEFORE PROCEEDING WITH THE WORK. 7. ALL SYMBOLS ANO ABBREVIATIONS USED ON THE DRAWINGS ARE CONSlDERED CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING THEIR EXACT MEANING, THE ONGULAR WIRELESS CONSTRUCTION MANAGER AND THE ARCHITECT SHALL BE NOTJFlED FOR ClARIFlCATION BEFORE THE CONTRACTOR PROCEEDS WITH THE WORK. 8. THE CONTRACTOR SHALL OBT,'JN AND PAY FOR PER~ITS, LICENSES AND INSPECTIONS NECESSARY FOR PERFORMANCE OF THE WORK ANO INCWDE THOSE IN THE COST OF THE WORK TO CINGUlAR WlRELESS 9. THE CONTRACTOR SHALL SUPERVISE AND DIRECT ALL WORK, USING HIS BEST SKILL AND ATTENTION. HE SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, PROCEDURES AND SEQUENCES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. 10. WORKMANSHIP lHROUGHOUT SHALL BE OF THE BEST QUALITY OF THE TRADE INVOLVED, AND SHALL MEET OR EXCEED THE FOLLOWING M1NIMUU REFERENCE STANDARDS FOR QUALITY AND PROFESSIONAL CONSTRUCTION PRACTICE: NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATlON 0°HARE INTERNATIONAL CENTER 10255 W. HIGGENS ROAD, SUITE 600 ROSEMONT, IL 60018 SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION 4201 LAFAYETTE CENTER DRM: CHATILLY, VA 22021-1209 ITLP INTERNATIONAL INSTITUTE FOR LAlH AND PL.ASTER 820 TRANSFER ROAD ST. PAUL MN 5511-4-1406 NJ.A ADHESfVE MANUFACTIJRERS ASSOCIATION 401 NORTH MICHIGAN AVENUE, SUITE 2400 CHICAGO, IL 60611 11. THE CONTRACTOR SHALL VERIFY, COORDINATE, ANO PROVIDE ALL NECESSARY BLOCKING, BACKING, FRAMING, HANGERS OR OTHER SUPPORTS FOR ALL ITEMS REQUIRING THE SAME. 12. THE CONTRACTOR AND AU. SUBCONTRACTORS SHALL COMPLY WITH ALL LOCAL CODES, REGULATIONS, AND ORDINANCES AS WELL AS STATE DEPARTMENT OF INDUSTRIAL REGULATIONS AND DIVISION OF INDUSTRIAL SAFETY (OSHA) REQUIREMENTS. 13. THE CONTRACTOR SHALL PROTECT THE PROPERTY OWNERS, AND aNGU1.AR WREl.£SS PROPERTY FROM DAMAGE WHICH MAY OCCUR DURING CONSTRUCTION. ANY DAMAGE TO NEW AND EXISTING CONSTRUCTION, STRUCTURE, LANDSCAPING, CURBS, STAIRS, OR EQUIPMENT, ETC. SHALL BE IMMEDIATELY REPAIRED OR REPLACED TO THE SATISFACTION OF ctNGULAR WIRELESS, OR THE PROPERTY OWNER, OR THE OWNER'S REPRESENTATIVE, AT THE EXPENSE OF THE CONTRACTOR. 1-4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR, AND SHALL REPLACE OR REMEDY. ANY FAULTY, IMPROPER, OR INFERIOR l,IATERIALS OR WORKMANSHIP OR ANY DAMAGE WHICH SHALL APPEAR WITHIN ONE YEAR AFTER THE COMPLETION AND ACCEPTANCE OF THE WORK BY CINGULAR AZ I iSS UNDER THIS CONTRACT. 15. IT SHALL BE THE RESPONSIBILITY OF" THE GENERAL CONTRACTOR TO LOCATE ALL EXISTING UTILITIES, WHETHER SHOWN HEREIN OR NOT. AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSES FOR REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED IN CONJUNCTION WITH THE EXECUTION OF WORK. HS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITf Of THE PROJECT SITE WHILE THE JOB IS IN PROGRESS AND UNTIL THE JOB IS COMPLETED AND ACCEPTED BY CINGI 9 AR WVlC ESS 17. THE CONTRACTOR SHALL PROVIDE TEMPORARY WATER, POWER AND TOILET FACILITIES AS REQUIRED BY THE PROPERTY OWNER. CffllU AR '#PRC\ :::::S, AND THE CnY OR GOVERNING AGENCY. 18. THE LATEST EDITION OF ALL PERMITTED AND APPROVED PlANS PERTAINING TO THIS PROJECT SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY WORKERS. ALL CONSTIRUCTION SETS SHALL REFLECT THE SAME INFORMATION. THE CONTRACTOR SHALL ALSO MAINTAIN IN GOOD CONDITION, ONE COUPLETE SET OF PLANS WITH ALL REVISIONS, ADDENDA AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES. THESE ARE TO BE UNDER THE CARE OF THE JOB SUPERINTENDENT. 19. THE CONTRACTOR SHALL REMOVE ALL RUBBISH AND WASTE MATERIALS ON A DAILY BASIS, AND SHALL EXERCISE STRICT CONTROL OVER JOB CLEANING THROUGHOUT CONSTRUCTION, INCLUDING FINAL Cl.B.N-UP UPON COMPLETION OF WORK. ALL AREAS ARE TO BE LETT IN A BROOM Cl.EA.N CONDITION AT THE END OF EACH DAY. 20. THE GENERAL CONTRACTOR MUST PERFOR~ WORK DURING PROPERTY OWNER"S PREFERRED HOURS TO AVOID DISRUPTION OF NORMAi.. ACTMTY. 21. ALL EXPOSED ~ETAL SHALL BE HOT -DIPPED GALVANIZED. :%2. SEAL ALL PENETRATIONS THROUGH FIRE-RATED AREAS WITH U.L LISTED OR FlRE MARSHALL APPROVED MATERlALS IF AND WHERE APPLICABLE TO THIS F.-CIUTY AND PROJECT SITE. 23. PROVIDE A PORTMJLE FlRE EXTNGUISHER WITI-l A RATING OF NOT LESS THAN 2-A OR 2-A10BC WITHIN 75 FEET TRAVEL DISTANCE TO AL1. PORTIONS OF THE PROJECT AREA CONSTRUCTION, 2-4. ELECTRICAL POWER SYSTEti.1 SHALL BE GROUNDED PER NEC ARTICLES 250 AND 810. 25. ALL NEW OPENINGS IN THE EXTERIOR ENVELOPE OF CONDITIONED SPACES SUCH AS AT WALL AND ROOF PENETRATIONS SHALL BE CAULKED OR SEALED TO LIMIT INFILTRATION OF AIR AND MOISTURE. 26. UPON COMPLETON OF CONSTRUCTION, CINGUlAR WRELESS CONSTRUCTION MANAGER SHALL CONDUCT A WALK-THRU WITH PROPEERTY OWNER OR REPRESENTATWE OF PROPERTY OWNER PROPRIETARY INFORMATION THE INFORMATION CONTAINED IN THIS SET OF DESIGN DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CJNGULAR WIRELESS IS STRICTLY PROHIBITED. ARCHITECTURE PLANNING WILLll'lf'I l'I. BOOTH . .4P.CHITECT P.OBEP.T J SUIIP.EZ. IIP.CHITECT ~.O. BOX -4651. Cll!USD.4D, CA. 9'2018 (760) -43-4-&~7~ .. .. PREPARED FOR :-: cingular-- WIRELESS 6170 CORNERSTONE CT., SUITE 180 SAN DIEGO, CA 92121 R.f. .. .. APPROVALS DATE ZONING DATE CONSTRUCTION DATE SITE ACQUISITION DATE OWNER APPROVAL DATE ========= :: ========= PROJECT NAME BANK OF AMERICA CARLSBAD PROJECT NUMBER SD-744-02 7700 EL CAMINO REAL, SUITE C CARLSBAD, CA 92009 SAN DIEGO == ========= DRAWING DATES 6/5/02 6/12/02 6/19/02 7/3/02 11/19/02 3/21/03 PRELIM ZD REVIEW FINAL ZD REVIEW ZD SUBMITTAL FINAL CD REVIEW (row) ZD SUBMITTAL REVISIONS ZD SUBMITTAL REVISIONS 2 •• •• SHEET TITLE SITE PLAN & GENERAL SPECIFICATIONS •• •• PROJECTS\ olngular\ 02039zd\ 02039zAO. DWG •• •• A-0