EXISTING BANK
:I' --E
" I ___,
,. --=:;-<~, kl. -,-,-
'-_ __,, ,-,-
L 8 orn act
q SPACES • 8.5'x20' • 11,'-f,• -rf'.:-T.· :F>;5'.}:~~ .. -i
'·3'
7
l.J
-
REMAINING PARCEL C
114,660.09 SF
---
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
L7
r _J
I
I
I
I
I
I
I
I
I
I
:◊
-
I
I
I
MS-1202 PUD 12-04 CUP 12-06 CUP 12-05
OCCUPANCY TYPE:
CONSTRUCTION TYPE: V-A (FULLY-SPRINKLERED)
NO. OF GUESTROOMS: 133 ROOMS
ALLOWABLE BLDG HEIGHT (PER 21.34.070): 3 STORIES/ 35'-D"
__ PR()l'Ol,_E_tl BUJL[JJNG__J:ilclG~_T: 3 STORIES
34'·0" TOP OF ROOF AT OUTSIDE EDGE
TOTAL BUILDING AREA
FIRST FLOOR 33,875.08 SF
SECOND FLOOR 24,449.69 SF
THIRD FLOOR 25,368.45 SF
TOTAL HOTEL BUILDING AREA 83,693.22 SF
SAFETY ZONE 2 • BUILDING AREA
FIRST FLOOR 20,323.04 SF
SECOND FLOOR 1 D,835.61 SF
THIRD FLOOR 11,754.36 SF
TOTAL BUILDING AREA IN SAFETY ZONE 2 42,913.01 SF
SAFETY ZONE 2 • FAR CALCULATIONS ........ , , .. ,., .. ,.. ---. .. ------
PER ALUCP TABLE 111-2 = 134,410.61 X 0.32 FAR 43,D11.4DSF
FAR PROVIDED 0.32
ANCILLARY USES
PER ALUCP 3.4.?(c}: As a condition for acceptability In a particular safety
zone may have up to 10% of the floor space devoted to an ancillary use cl
13n~ther ty_p~~ eve.!' _a __ u~e:-~ith a __ hi~h_er occupancy load_ fac_t_?"·
10% OF TOTAL BUILDING AREA IN SAFETY ZONE 2 4,291.30 SF
MEETING ROOM AREA: 3,585.87 SF (8.36%}
TOTAL ANCILLARY AREA: 3,585.87 SF (8.36%} < 4,291.30 SF (10%} ALL ORA WINGS AND
WRITTEN MATERIAL
INTENSITY LEVEL/LOT COVERAGE IN SAFETY ZONE 2 • NOT APPLICABLE APPEARINQ HEREIN
PER ALUCP 3:4, 14: Relalionship of Maximum FAR lo Maximum Intensity and CONSITTUTE ORIGINAL
Lot Coverage Limits: In Tabla 111-2, maximum allowabie FARs ara i~dlcai~d for AND UNPUBUSHED WORK
1-_s_o_mc-e _co_n-:-di_Uo_n~al~u_se~•-· ~ln_th_o_s~• ~ca_se~•~· ~eilh=er~(~1 )~lh~•~m~axi~·~m~um=F'-'AR=or'--'('"2)'-'lh"'a'----1 J:y WJT ":~~h ~.
maximum intensi and lot covera e fimils shall appl • USED OR DISQ.OSED
OPTION (1) MAXIMUM FAR WAS FOLLOWED WllHOUT WRITTEN
PARKING SUMMARY
HOTEL (1.2 spaces_por guestroom)_ 159.8 SPACES
MEETING ROOM (1 :5 seats, or 1 :100 SF, whichever is greater) 40.4 SPACES
15% Common Parking Reduction (C.M.C. 21.44.090B) -30 SPACES
TOTAL PARKING REQUIRED 170 SPACES
STANDARD (8'-6" X 20')
.. HANDICAP (9' • 20') .
TOTAL PARKING PROVIDED:
JOINT USE PARKING AGREEMENT WITH PARCEL B
157 SPACES
6 SPACES
163 SPACES
7 SPACES
CONSTRUCTION TYPE: V-A (FULLY-SPRINKLERED)
NO. OF GUESTROOMS: 106 ROOMS
ALLOWABLE BLDG HEIGHT (PER 21.34.070): 3 STORIES I 35'-D"
PROPOSED BUILDING HEIGHT: 3STORIES
33'·0" TOP OF ROOF AT OUTSIDE EDGE
TOTAL BUILDING AREA
FIRST FLOOR 24,741.06 SF
SECOND FLOOR 24,312.41 SF
CONSENT OF ARCHITECT.
LO r--0
() ~
...J co
...J~
111
I
I
I
1••1~
~1'\
1----\1 { ~fTJJJJJJirr•n~1 =t=-'-t=T I ::::+===;;=:I l~;:::=;:::::l I ~I 1 l==i=i=DT0 71 I 11 ITTIT-1.1-
1
I I c1-IJJJ
THIRD FLOOR 24,683.60 SF
TOTAL HOTEL BUILDING AREA 73,737.07 SF
SAFETY ZONE 2 • BUILDING AREA
FIRST FLOOR 11,751.96 SF
al
•-Ill +-' ro co > ~ Oo C Cl)
C,... _o I I I
I
I I
I I
"
□ SITE PLAN KEYNOTES
KEYNOTES USTED BELOW PERTAIN TO lHE PLANS ON lHIS SHEET ONLY.
No. DESCRIPTION
@ I.Alu..cAPINe (Aloo See Laid9G(.\?O DHgO)
D
I
I
=l:L --1 I
@ A5PHALT WNGRE11: PAVINe /Pill' Soil$ RBport e GlbJ ol Ca-I51:>ad 51:aidards/(5oe GMI Drawings}
@ PAINTED PARKINS STRIPES (4' I-Ida, ltiilll Traffic Paint)
@ LleHT STANDAAIIS (20' H. Llg,t. I I.alp, 3.20H 1-f', ~V) Manufocllrllt' e Modol Pill' Arohitoa
@ PAINTED CURB/5TRIPINS, 't+::l PARKINS • FIRE I.Ate {Red Traffic Pal:t 1-11111 5' tall Hlite Lettering}
(Text 5hall t,,, loroted at 25' tit«valt on lop of dosl!Jl<llod cwtmgl
@ PAINTED HAHDIGAP PARKINS 5TALL i-llTII 'INTERNATIONN.. SYMOOL a' K..CE55' (6111,9 Traffic Paint)
@ PAINTED CURB/5TRIPINS AT HANDICAP PARKINS 5f'/oGES (4' I-Ida, lll"'9 Traffic Paint)
@ GONCRElf 5IDEHALK W E><panslon Jo!Jlt.5 I 20'--0' or,. llld Control Johl:5 • 5'-0" O,G. (4' lhlG.lc./ (SH GMI Drawings}
@ GONCRETI: CURil (See GMI DrOHhgs}
@ GONCRETI: HAHDIGAP RAl-1' ld2 MAX 5lDf'E (P.,,-Gll:Jj ol Ca-lsbad 51:am-do) (See GMI Drc:a.lng,}
CD ZERO CURil FAGf (Wllll Tn.flUl!ed Dome• Along Entl"e Hk:1111 e DepW
@ AC.GESSllll.E PATIi a' "TRAVB.
@ 6' PIA:ll.lG FIRE H1'PAANT (Hllll PGG Pad P"' 5lalda"d H'-0I !Irv H'-OSJ
@ 'HAHDIGAP PARKJNa" STALL SIGH
(V 'HANDICAP PARKINe • VAA >GGESSl!ll.E' STALL 5IGH
CJD II;/ 'LI-IAIITHORIZED VEHICU:5 -TOH-AW-.Y' zote SIGH
(]) PAIHlED 1!0-HAY' TRAFFIC ARROH {Willi, Traflt; Paint)
@ SYMOOL a' 1\CGE551ll1Ll1Y AT l1i: PRIMARY' lllJILDINe ENTRANGE
@ IN1ERNAI.L Y' I1..U!MINA TED MOHJl1:NT SIGH,
TO llE REVIB-ED AND APPROVBI UNDER SEPARA 11: PERMIT
(!}-==============S=IT=E=P~LA~N
1"=40'-0"
EXISTING COMMERCIAL BUILDING
@ PROl'ER1Y LIit:
@ DECORATIVE STAI-ff!;) GOI.ORED ~ PAYINe
@ KNOX aox • YERl'l' 5121; LOCATION AND TYPE i-llTII Tii: ~ FIRE DEPARTM:NT
@ TRASH ~ (Per (,il!j af C<rl!bad ~ Hllli 11' GOl(;RfT1: PNJ Ill FRONT
@ 1RAN5FORH;RGOJt;RfTf PMJ LOCATION
@ MJA-GOlfl.lAIIT TREl: 6RAlE5
@ lllORElf)ITION (See GMI tlrGH!ngs}
@ PROP05ED PROPERTY LIit:
@ EXI5TINS OFF-Sile FIRE H1'PAANT
@ EXISTINel TRAFFIC SIGNAL
@ EXl5TINS !:i!REET U6HT
@NOT~
@ ~ Af/.fA, 34 TOTAi. OGGlf'ANTS
ZOlt: 2 Afl.fA, &1S SF/50 OGG = I& OGGlf'ANTS
ZOI-E 6 AAfAt 000 SF/50 OGG = 16 OCGUPANTS
@ ffiRlf COGlt:RE GI.EAR HEl6HT AT I2'-0'
@ W.11:R i'£1l:R W 5PRINKl.ER ~ PREVENTER
(W PGG Pad por staid<rd lf-0I !Irv H'-OS}
@ DETECTOR GHEGK VAI.Vf. A55EMBLY' FOR FIRE RISER
(W PGG Pad por sta>clcrd H'-01 !Irv H'-OSJ
H015
I. SEE GML DRAJ,,UNGS FOR VERTIGX. WNlROI...
2 SEE SOILS FOR EAR®t,RK AND PAVINS Rf(l)IREM:lll5.
O' 40' 80'
APPROVED
THIS IS THE APPROVED 'l'ENTATNE MAP/SITE
PLAN FOR PROJECT NOO!Pt'l-Qk PER CONDITION
NO. '2 OF PLANNING COMMISSION
NORTH
RESOLUTION NO. 7000
ALPS INNOVATION LLC
621 South Highway 101
Solana Beach, CA 92075
(858)350-0111
Conlact: Sharad Khandwala
Email: sharad@alpsgroupinc.com
OMEGA ENGINEERING CONSULTANTS
9517 Grossmont Summ~ Drive
La Mesa, CA 91941
(619) 741-9456
Conlact Andrew Kann, R.C.E. 50940
Email: andrew@omega-consullanls.com
EXISTING
COMMERCIAL
BUILDING
□-
EXISTING
COMMERCIAL
SECOND FLOOR
THIRD FLOOR ·~---------------·
TOTAL BUILDING AREA IN SAFETY ZONE 2
SAFETY ZONE 2 • FAR CALCULATIONS
PER ALUCP TABLE 111-2 = 112,847.97 X 0.32 FAR
FAR PROVIDED
11,681.63 SF
11,751.96 SF
35, 195.55 SF
38,111.35SF
D.31
INTENSITY LEVEULOT COVERAGE IN SAFETY ZONE 2 • NOT APPLICABLE
PERALUCP 3.4,14: Relationship of Maximum FAR_ lo_ Maximum Intensity and
Lot Coverage Limits:-ln Tabla 111-2, maximum an~~bla FARs are ind1~~ted"for
\' ::,,.,,,.,
: .. t:.-::<·:fa::r::~;rk~ ji/:1f 'Uf~81 !i:::i:)]::·_:
Pl (PLANNED INDUSTRIAL maximum intensity and lot coverage limils shall apply.
';,i";ft~(~-Ri" -P-· · Al ·r t>.a10Ji!llt._-_J_. __ ;,_•_•_ ';_--.•.•-•. ~~~'-': cc'' B,;l'.\\PMAR \WO~.~[t . ~~,,,..,~R.,·--·
· · ZONE: P-C (PLANNED COMMUNITY) OPTION (1) MAXIMUM FAR WAS FOLLOWED J f 1---'!"~"'E~~:"csR .. 1 ~"s~~"::~"'.'~TY"'MAS~z~o>_!.TN'=,E:~, _i:PLA~N~Zc':O~N'."'E::_: _ _i:P-~M"..'(.i:P~LA~N~N'."'Ee_LJDc1_l~~i~i,!,:~;~~!!'':"=~L_f----;;PA'"R°'K"IN'"G""S"UM"M"AR.;;;Y,----------------i
J TOTAL SITE AREA: 400,792 SF (9.19 ACRES} HOTEL (1.2 spaces par guestroom} 127.2 SPACES
ROBERT F. TUTTLE ARCHITECTS, INC.
33533 Pebble Brook Circle
Temecula, CA 92592
(951) 302-5444
Conlact Robert F. Tuttle, President
Emait robert.tuttle@rftarch.com
R. DALE HADFIELD LANDSCAPE ARCHITECT
27601 Forbes Road, Suite 51
Laguna Niguel, CA 92677
(949) 367-9275
Conlact Dale Hadfield
Email: Dale@rdhla.com
{j/ MEETING ROOM (1 :s seats, or 1 :1D0SF ,whichever is greater} 7.29 SPACES--
TOTAL BUILDING GROUND FLOOR AREA:
Wit•iw,, BUILDING COVERAGE: .,I--~======-=== MAX LOT COVERAGE: (PER ALUCP TABLE 111-2) 50.00 %
"SAFETY ZONE AREA IS BASED ON THE SITE GROSS AREA INCLUDING THE STREET RICHT-OF-WAY,
AVERAGE DAILYTRAFFIC:: (7 PlcRClUESTl<QQM}_ .. 13~_•7_= 931 ADT ---'' ........ _ , __ _
PRIME GROUP CONSTRUCTION NG GROUND FLOOR AREA: 24,741.06 SF
3045 Wilson Road ,___B_u~,L-D-IN-G=CO~\/ERAGE: 19.09 ¾
Bakersfield, CA 93304 MAX LOT COVERAGE: (PER ALUCP TABLE 111-2) SD.DD %
(661) 832-1790 TOTAL PARKING AREA: 45,901.71 SF (35.41%)
Conlact Joey Blagg, Director of Construction l---'LAc-=N::-DCCSC-c'AP~E==AREA.;..;;:,:.:.A;;.T_:P~ARK:;,:.:1:-:N::-G~: =~------=1.o,2,ec36:'.'.7.:!.6'"1_,,S,_F.;,(2,,,6c:.9:c.4'~¼,)L__
Email: joeyblagg.prlmegroup@gmall.com (MIN 3% OF PARKING AREA= 1,377.05}
License No: 304700 TOTAL LANDSCAPE AREA:
TOTALHARDSCAPEAREA:
SAFETY ZONE' 2 SITE AREA: =~-----
31,108.20 SF (24.07%)
11,218.42 SF (8.65%)
--~1~12,~47,97 ~F
'SAFETY ZONE ARE.A IS BASED ON THE SITE GROSS AREA INCWDING THE STREET RIGHT-OF-WAY.
AVERAGE DAILY TRAFFIC: 7 PER GUESTROOM 106, 7 = 742 ADT
TOTAL PARKING REQUIRED 135 SPACES
SEWER DISPOSAL:
GAS I ELECTRIC:
WATER SERVICE -(760) 602-2420
CARLSBAD WASTEWATER DIVISION
SEWER SERVICE • (760) 438-2722
SAN DIEGO GAS & ELECTRIC
BUSINESS SERVICE -1-llD0-338-7343
LOT 1 OF CARLSBAD TRACT CT-08-20 IN THE CITY OF CARLSBAD,
COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP
THERE OF NO. 15630, FILED IN THE OFFICE OF lHE COUNTY
RECORDER OF SAN DIEGO COUNTY ON OCTOBER 11, 2007.
APN 213-262-11-DD
,...
Holiday Inn
Staybridge
SITE PLAN
DATE LAST EDllED:
April 17, 2013
SHEET NO,
A1 .1
OF SHEETS IN SERIES