HomeMy WebLinkAboutPD 2020-0017; REAGAN ADU; LID/HYDROLOGY REPORT; 2020-10-21Page 1 LID/HYDROLOGY REPORT Carlsbad, CA PREPARED FOR: Jack Reagan 2451 Torrejon Place Carlsbad, CA 92009 PREPARED BY: Stewart Design and Engineering Inc 23535 Palomino Dr., Suite 303 Diamond Bar, CA 91765 (909) 301-1017 ______________________________________________ Carl Stewart PE License #86681 STEwmilr DESIGN & ENGINEERING Page 2 Table of Contents Section I Introduction ______________________________________________________________________________________ 3 Purpose of Study _________________________________________________________________________________ 3 Section II Proposed Analysis___________________________________________________________________________ _________5-6 Hydraulics________________________________________________________________________________________________7 Section III Conculsion_______________________________________________________________________________________8 Appendices Appendix 1: Vicinity Map Appendix 2: Isohyet Map and Soils Information Appendix 3: Proposed Analysis Appendix 4: Hydraulic Calcs Page 3 Section I Introduction The site of study is located in the City of Carlsbad, County of San Diego, California on Torrejon Place, near Rancho La Costa Reserve. The property is located in a residential area surrounded by single- family homes. The developed land will consist of an Accessory Dwelling Unit along with an existing single family home on the property. The existing terrain of the property slopes to the public right of way. Appendix 1 will illustrate the location of the proposed development. Purpose of Study The purpose of this report is to provide a run-off study based on San Diego County Flood and the City of Carlsbad design criteria. The project is designed to maintain existing drainage patterns. Based on the San Diego County Hydrology Manual, the goal is to provide protection for structures from the 50 year storm. This report will show that onsite drainage will safely convey a 50-year storm event. The rational method was used to calculate the runoff values. Page 4 Section II Proposed Runoff Analysis The rational method was utilized to determine the runoff values for the subject property. As seen in Appendix 3, the proposed site conditions are a partially developed site with a soil type of D. The 25 yr, and 50 yr, storms were analyzed to define the runoff characteristic of the site. Below are the values obtained from the rational analysis PROPOSED CONDITIONS 25 YEAR STUDY DMA Acres Time of Concentration (min) Flow (cfs) Disturbed Area 0.053 5.0 0.12 PROPOSED CONDITIONS 50 YEAR STUDY DMA Acres Time of Concentration (min) Flow (cfs) Disturbed Area 0.053 5.0 0.13 Hydraulics Analysis The onsite and offsite pipes were analyzed to determine if the 50 year storm can be transported safety to the public right of way. The main pipe utilized onsite was a 4” pvc pipe with a slope of 1 percent minimum. The pipe transporting drainage to the curb and gutter is a 3” pipe with a slope of 2 percent. As seen in Appendix 4, the capacity of the 3” pipe is 0.15 cfs and the 4” pipe 0.23 cfs. Page 5 Section III Conclusion As seen in the analysis above, the onsite and offsite drainage facilities can safely convey a 50 year storm event. Page 6 Appendix No. 1 Vicinity Map r Google Maps La Costa Ave I,) I,) \!! 0 \ ~ !'!-Encinitas Creek I,) ,. ---"n Marcos Cr. ~--~k_____./ ~ Gelson's Market T Takeout• Delivery Leucadia~ Wastewater District T The Broken Yolk Cafe ~ Takeout• Delivery T ~ Chabad at La Costa ~~e ' Bank of America (with Drive-thru ATM) \..-a.co<::>'?:> • El 1,1 Equinox La Costa Takeout U.S. Bank Branch • Mimi's Alterations ft & Tailoring T La Costa Wine I,) • 9 The Beacon La Costa El Escenico Tenace La CosraAve I " LeYanteSt .. Go gl~ <,i La Costa p..ve j J ~.? 9 Costa Pointe Apartments ~aClr 2451 Torrejon Place I " LwanteSt BocaSt ~ f !/I LevantaSt ft Auto Appraisal Network T in San Diego, CA Navarra Dr f LevanteSt La Gran II;., : ~,t, ,.,, ~ ~$''I> .,,. ~,If '-o,.., ~ ~,t, ,1;• .If" ~ Page 7 Appendix No. 2 Isohyet Map and Soils Information San Diego County Hydrology Manual Section: 3 Date: June 2003 Page: 6 of 26 Table 3-1 RUNOFF COEFFICIENTS FOR URBAN AREAS Land Use Runoff Coefficient “C” Soil TypeNRCS Elements County Elements % IMPER. A B C D Undisturbed Natural Terrain (Natural) Permanent Open Space 0* 0.200.250.300.35Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41 Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46 Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49 Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52 Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57 Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 0.57 0.60 Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63 High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71 High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79 Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 0.78 0.79 Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80 0.81 0.82 Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (General I.) General Industrial 95 0.87 0.87 0.87 0.87 *The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area is located in Cleveland National Forest). DU/A = dwelling units per acre NRCS = National Resources Conservation Service 3-6 I Nomograph for Determination of Time of Concentration (Tc) or Travel Time (Tt) for Natural Watersheds SAY 5 MIN .6. E Feet 5000 4000 Tc Tc L .6.E "' -: = EQUATION (1~t)°·385 Time of concentration (hours) Watercourse Distance (miles) Change in elevation along effective slope line (See Figure 3-5) (feet) 3000 2000 400 300 30 20 10 .6.E SOURCE: California Division of Highways (1941) and Kirpich (1940) L Miles Feet . 3000 0.5 ' 2000 1800 1600 1400 1200 1000 900 800 700 600 500 400 300 200 L ' ' ' Tc Hours Minutes 4 3 2 ' ' ' Tc 50 40 30 20 18 16 14 12 10 9 8 7 6 5 4 3 FIGU RE ~ SITE SITE SITE SITE I IJ ii ) .,,_ ..... "-"I I \ • t,_11 V ,__,___.l-H -.- ll .,1 y 1-----1---l---r--- I I\ I\ \ \ \ ' \ 11 II.. ... 1"-~ .., I I/ .._ I j'\ 'i:1'. I~ \ \ 1~ _ ________,I DPW ~GIS S~GIS '.:Xie Have San Diq;o Covered! SITE .. ; " ·.J.k-/4,l l ~ r· .......... .,, > .,,, . \' l'.I /' ~ • lE , · . Y'/,~ ,,.I .~: •' D -D D D D s1.IGIS 'i;i/c Have San Diq;o Covered! SITE .. ; " ·.J.k-/4,l l ~ r· .......... .,, > .,,, . \' l'.I /' ~ • lE , · . Y'/,~ ,,.I .~: •' D -D D D D s1.IGIS 'i;i/c Have San Diq;o Covered! 2.2 25 3.8 57.9 2.2 5 5.8 100 9.0 8.0 7.0 ... ::, 0 .c -;;; Q) .c 6.0 5.0 4.0 3.0 2.0 g 1.0 ~09 ·~o.s ~07 0.6 0.5 0.4 0.3 0.2 0.1 r-.... ' "'-.. ' ...... , ... ~ ... , ... ""'" _ r-,. r-.... ... . ' ... , "', I"', I"', I' .... ' ... ,, • r-. "i-,. ~ , .. r-... ' .... .. ~ .. -... , I"" "r-,. I' ... ~ . ' '"'" 1 ..... "~ .. ... ' • ~ r-.... ~ ... ..., "i-r-,.., ~ ~ ['-. ' 'r-. .. ~ .. ~ .... 1 ..... r-....r-. ... , ~ I' ... , ~ ~' • r-. .... ~ . ' ' ' 'i-~ .. ~ ... "r-. .. ~ .... .... ... ' ~ ~ "'r-..., l"'i' "i,. ..... ~, ' • r-. ~ ' ~ .. ' "', I' ~ ' 1 .. .., ~ '"'" .. ~ "'r-. 'i-,. ~ ... , ..... ~ .. 5 6 7 8 9 10 15 20 30 Minutes ~ ~ ~ "~ ~ .... ~ ~ ~ .. ~ ~ .. ~ ~ ~ ~ ~ ~ "~ ' ~ ~ .. '~ .. ~ ~ .. ~ ~ ~ .... ~ 40 50 Duration EQUATION I = 7.44 P6 D-0.645 I = Intensity (in/hr) p6 = 6-Hour Precipitation (in) D = Duration (min) ,, ... ' ... 'I', ' ,r-. i-,.1", ... r-. I• ...... .. ' r-. I' ..... .. "~~ 'I' I• i,..._ ~~ ~ ... ...... .., 'r-. .. .. ~~ ~ ,, ,, ~ ,. "" ~~ "r-. ... .. ~ ~ ..... ... ' I'' ~ ,, ... 'i,. ~ I• '" r-. ...... ', ~ I'' "r-~ ... ,, r-, ~ r-. ~~ ~ I• .. ~ ', .. 'I' ~~ ~ 2 3 4 Hours 5 6 9' I 0 !:; "t) al n 6.0 -g 5.5 ~ 5.0 g 4.5 '§' n 4.o l 3.5 ~ 3.0 2.5 2.0 1.5 1.0 Intensity-Duration Design Chart -Template Directions for Application: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: (a) Selected frequency ___ year p (b) P5 = --in., P24 = --'P 6 = %(2) 24 (c) Adjusted P6<2) = __ in. {d) Ix= __ min. (e) I = __ in./hr. Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. I PG 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 ~---Duration I I I I I I I I 1 I I 5 2.63 3.95 5.27 6.59 7.90 9.22 10.54 11 .86 13.17 14.49 15.81 7 2.12 3.18 4.24 5.30 6.36 7.42 8.48 9.54 10.60 11.66 12.72 10 1.68 2.53 3.37 4.21 5.05 5.90 6.74 7.58 8.42 9.27 10.11 15 1.30 1.95 2.59 3.24 3.89 4.54 5.19 5.84 6.49 7.13 7.78 20 1.08 1.62 2.15 2.69 3.23 3.77 4.31 4.85 5.39 5.93 6.46 25 0.93 1.40 1.87 2.33 2.80 3.27 3.73 4.20 4.67 5.13 560 30 0.83 1.24 1.66 2.07 2.49 2.90 3.32 3.73 4.15 4.56 4.98 --;fa 0.69 1.03 1.38 1.72 207 2.41 2.76 3.10 3.45 3.79 4.13 1.19 1.49 1.79 2.09 2.39 2.69 ... 3.28 3.58 50 0.60 0.90 2.98 -60 0.53 0.80 1.06 1.33 1.59 1.86 2.12 2.39 2.65 2.92 3.18 90 0.41 0.61 "o.82 1.02 TI3 T43 1.63 1.84 2.04 T25 2 .45 120 0.34 0.51 0.68 0.85 1.02 1.19 1.36 1.53 1.70 1.87 2.04 0.29 0.59 0.73 -1.03 -1.32 ~ f--150 0.44 0.88 1.18 1.47 1.62 1,76 180 0.26 0.39 0.52 0,65 0.78 0.91 1.04 1.18 1,31 1.44 1.57 240 0.22 0.33 0.43 0.54 0.65 0.76 0.87 0.98 1.08 1.19 130 300 0.19 0.28 0.38 0,47 0.56 0.66 0.75 0.85 0.94 1.03 1.13 360 0.17 0.25 0.33 0.42 0.50 0.58 0.67 0.75 0.84 0.92 1.00 2.3 50 4.3 53 2.3 5 6.0 0 10. 9. 8. 7, 6, 5, 4. 3. 2. 0. 0, 0, 0. 0. 0. r-.... 0 "" ~ 0 0 r-.... ... -r--.. u ...... I'-,. 0 ,.... r-.... 0 r-.... r-. 0 ... ""'r-..., 0 0 9 8 7 6 5 4 3 2 1 "" • ' r-.: ' • ' ' "'-.. ' ...... , ' ""' " """ ' .... , "' ,1"""' "" ,, ' .... ""' ' I"" ' ' ...... ~ .... , ' ' ~ .... "" ' i"-1',. ' ' i'-, "" ' l"'i' ' "', ' , .... 5 6 7 8 9 10 _ r-,. i',,I""' ... I' ..... • r-. "i-. ~ ..... .. ~ .. ""r-,. I' ... ... 1 ..... "~ .. ~ • "" "i-r-,.., ~ 'r-. .. ~ .. ~ 1 ..... I' ...... ~ • r-. ..... ~ 'r--. > ~ .. ~ ""r-. "r-. ... 'i.. ' .. ~ ~ ""i,. ..... ', • r-. ~ ~ .. ~ I' 1 .. .., ~ ..~ "'r-. "'i-. ~ ..... .... ~ .. 15 20 30 Minutes ~ ~ ~ "~ ~ .... ~ ~ ~ .. ~ ~ .. ~ ~ ~ ~ ~ ~ '"~ ~ ~ .. .. ~ ~ .. ~ ~ ~ .... ~ 40 50 Duration EQUATION I = 7.44 P6 D-0.645 I = Intensity (in/hr) p6 = 6-Hour Precipitation (in) D = Duration (min) ,, .... '""' ,r--. ' ,r-. i"'i-,. ... r-. I• ...... .. ' r-. I' ...... ... "~~ 'I' I• r,., ~~ ~ ... ...... .. ... 'r-. ... ..~~ ~ ,, ... ... ~ ,. "" ~~ ""r-. ... .. ~ ~ "",, I' ... ~ ' ""~ "i,. ~ I• 'r-. ...~ .. ~ I' ... ' ~ ... ..... ~ ~ r-. ~~ I•, ~ ', ... 'I' ~~ ~ 2 3 4 Hours 5 6 9' I 0 !:; "t) al n 6.0 -g 5.5 ~ 5.0 g 4.5 '§' n 4.o l 3.5 ~ 3.0 2.5 2.0 1.5 1.0 Intensity-Duration Design Chart -Template Directions for Application: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: (a) Selected frequency ___ year p (b) P5 = --in., P24 = --'P 6 = %(2) 24 (c) Adjusted P6<2) = __ in. {d) Ix = __ min. (e) I = __ in./hr. Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. I PG 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 ~---Duration I I I I I I I I 1 I I 5 2.63 3.95 5.27 6.59 7.90 9.22 10.54 11 .86 13.17 14.49 15.81 7 2.12 3.18 4.24 5.30 6.36 7.42 8.48 9.54 10.60 11.66 12.72 10 1.68 2.53 3.37 4.21 5.05 5.90 6.74 7.58 8.42 9.27 10.11 15 1.30 1.95 2.59 3.24 3.89 4.54 5.19 5.84 6.49 7.13 7.78 20 1.08 1.62 2.15 2.69 3.23 3.77 4.31 4.85 5.39 5.93 6.46 25 0.93 1.40 1.87 2.33 2.80 3.27 3.73 4.20 4.67 5.13 560 30 0.83 1.24 1.66 2.07 2.49 2.90 3.32 3.73 4.15 4.56 4.98 --;fa 0.69 1.03 1.38 1.72 207 2.41 2.76 3.10 3.45 3.79 4.13 1.19 1.49 1.79 2.09 2.39 2.69 ... 3.28 3.58 50 0.60 0.90 2.98 -60 0.53 0.80 1.06 1.33 1.59 1.86 2.12 2.39 2.65 2.92 3.18 90 0.41 0.61 "o.82 1.02 TI3 T43 1.63 1.84 2.04 T25 2 .45 120 0.34 0.51 0.68 0.85 1.02 1.19 1.36 1.53 1.70 1.87 2.04 0.29 0.59 0.73 -1.03 -1.32 ~ f--150 0.44 0.88 1.18 1.47 1.62 1,76 180 0.26 0.39 0.52 0,65 0.78 0.91 1.04 1.18 1,31 1.44 1.57 240 0.22 0.33 0.43 0.54 0.65 0.76 0.87 0.98 1.08 1.19 130 300 0.19 0.28 0.38 0.47 0.56 0.66 0.75 0.85 0.94 1.03 1.13 360 0.17 0.25 0.33 0.42 0.50 0.58 0.67 0.75 0.84 0.92 1.00 Page 8 Appendix No. 3 Proposed Analysis Rational Method Calculations Q = CIA Per the Runoff Coef Table - C = 0.41 Intensity for the 25 yr = 5.8 in/hr Intensity for the 50 yr = 6.0 in/hr Distrubed Area = 2344 sf = 0.054 Acres Q = 0.41 X 6.0 X 0.054 = 0.13 Page 9 Appendix No. 4 Hydraulic Calculations Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Oct 21 2020 3 INCH PIPE Circular Diameter (ft)= 0.25 Invert Elev (ft) = 100.00 Slope (%)= 2.00 N-Value = 0.011 Calculations Compute by:Q vs Depth No. Increments = 10 Highlighted Depth (ft)= 0.23 Q (cfs)= 0.157 Area (sqft)= 0.05 Velocity (ft/s)= 3.38 Wetted Perim (ft) = 0.63 Crit Depth, Yc (ft) = 0.23 Top Width (ft)= 0.15 EGL (ft)= 0.40 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) --,-, -' I Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Oct 21 2020 4 INCH PIPE Circular Diameter (ft)= 0.33 Invert Elev (ft) = 100.00 Slope (%)= 1.00 N-Value = 0.011 Calculations Compute by:Q vs Depth No. Increments = 10 Highlighted Depth (ft)= 0.30 Q (cfs)= 0.233 Area (sqft)= 0.08 Velocity (ft/s)= 2.88 Wetted Perim (ft) = 0.83 Crit Depth, Yc (ft) = 0.28 Top Width (ft)= 0.20 EGL (ft)= 0.43 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) --.., ~ / -" -' ' ~ _/