Loading...
HomeMy WebLinkAbout1896 RUTHERFORD RD; ; AS150367; Permit10/27/21,10:21 AM AS150367 Permit Data City of Carlsbad Sprinkler Permit 1896 RUTHERFORD Job Address: RD Permit Type: SPRINK Parcel No: 2121203000 Lot #: 0 Permit No: AS150367 Status: ISSUED Applied 12/22/2015 Approved: 12/22/2015 Reference No.: Issued: 12/22/2015 PC #: Inspector: Project Title: SPY OPTICS TI FOR SPY OPTICS Applicant: Owner: P D G CARLSBAD 46 LTD 1825 GILLESPIE WAY #102 EL CAJON CA Fees ($) Add'I Fees ($) Total ($) Balance ($) 213 0 213 0 1/1 0 CARLSBAD FIRE DEPARTMENT Fire Prevention Division 1635 Faraday Avenue - Carlsbad, CA 92008 760.602.4665 WATER AVAILABILITY FORM SECTION A: TO BE COMPLETED BY CUSTOMER PROJECT NAME: Spy Optics SR#: (Assigned upon plan submittal) PROJECT ADDRESS: 1896 Rutherford Rd CITY: Carlsbad PHONE: (760) 310-6122 (Epic Fire Protection, Inc.) FAX NUMBER: (760) 798-0556 Largest Building (ft.2): 38,000 Sprinkled? YES Construction Type: SECTION B: TO BE COMPLETED BY LOCAL WATER COMPANY. CUSTOMER TO PROVIDE RESULTS TO CFD. Water Purveyor: City of Carlsbad Location of test (reference map required): INorth end of Rutherford Rd. (H20366) TEST INFORMATION IS VALID FOR 6 MONTHS FROM DATE PERFORMED Flow Test Results Static pressure: 125 PSI Hydrant Number (if applicable): H20366 Elevation of test: 261 Feet Date/Time of Test': Pitot Tube Reading: PSI Corresponding Flow: GPM Total Flow: 4,650 GPM Residual Pressure 103 PSI At peak demand , this water system is capable of providing a fire flow discharge @ 20 psi of no _le more than8,000GPM,butexceedsmaximumvelocitiesof15fps.Themaximumflowavailableat15fpsis4,650gpm. 'Test to be performed as close as possible to the time the most conservative flows and pressures are expected. Note: If the water availability information was obtained in a manner other than a flow test (i.e. computer modeling), fill out the information above as applicable and check here: Name: JenniferR.Mael,P.E. Eng. Lic. No. (if applicable): C69606 Signature: Title/Org "_jectManager Date: 10/2/2015 PIrz'-2f - -. \¼..J Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. Alidefects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be fl!ied out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature In no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. Property name1 . Date Property address I Va ç1E1Zç t) cAEYR5040 4 ______ Address C - Plans • Installation conforms to accepted plans : : Yes E No Equipment used Is approved Yes E No If no, explain deviations Has person in charge of fire equipnent been instructed as Yes E No to location of control valves and care and maintenance of this new equipment? If no, explain? Instructions Have copies of the following been left on the premises? Yes E No System components instructions Yes No Care and maintenance instructions Yes E No 0 NFPA25 S Yes No Location of system Supplies buildings Year of Orifice Temperature Make Model manufacture size Quantity rating ___ __ ____ Sprinklers kP& €c-t4- Zô _______ I C( 15 CS 0 Pipe and Type of pipe fittings Type of fittings dLLt9 Maximum time to operate Alarm Alarm device through test connection valve or Type Make . Model Minutes Seconds Indicator F. ____________ 0 4!T2 Dry valve Make Model Serial no Make [ Model ___iialno. - pipe • Time to - Time water Alarm '' operating test through test connection1 —\A1r pressuFa'—. Air pressure air pressure reached test outlet1 operated properly. ______ Minutes J Seconds psi psi Minutes Seconds Yes No Without With UReexpIai Operation E Pneumatic E Electric E Hydraulics iQQupervised ED Yes No Detecting media supervised No Does valve rate from the manual trip, remote, or both Yes E No control stations? Deluge and preaction valves Is there an accessible facil "k,~ach It for testing? Circuit -f—no, explain Does each circui rate Does each circuit operate Maximum time to Make Model supervisi ss alarm? valve release? operate release No Minutes Seconds Pressure Locatlo oor ake and model Setting Static pressure Resirpasure (flowIng) Flow rate ___________________ _________ Inlet (psi) Outlet (psi) Inlet (psi) Outlet (psi) F4Qwgpm) Test Hydrostatic: Hydrostatic tests shall be made at not lessthan 200 psi (13.6 bar) for 2 hours or 50 psI (3.4 bar) above static pressure in excess of 150 psi (10.2 bar) for 2 hours. Differential dry-pipe valve clappers shall be left open during the test to prevent damabe. All aboveground piping leakage shall be stopped. description Pneumatic: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 1½ pi (0.1 bar) in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1½psi (0.1 bar) In 24 hours. All piping hydrostatically tested at psi ( bar) for 2 hours Dry piping pneumatically tested Yes No Equipment operates properly . Yes E No If no, state reason Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives of sodium silicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks? Yes No Tests Drain test Reading of gauge located near water supply test connection:110—psi (_bar) Residual pressure with valve in test connection open wide: psi (._._. bar) Underground mains and lead in connections to system risers flushed before connection made to sprinkler piping / Verified by copy of the U Form No. 85B Yes No Other Explain flushed by installer of underground • sprinkler piping E Yes E No If powder-driven fasteners are used in concrete, has F7 Yes No representative sample testing be satisfactorily If no, explain completed? B sting [!ga I Eskets Number used Locations Nrremov Wing Yes No .. If yes. Do you certify as the sprink tractor that welding procedures ply 0 Yes El No with the requirements of at least J? Welding Do you certify that the lding was mod by welders fled In ED Yes E No compliance with the requlrem of at least AWS B2..1 ? Do you c that the welding was carried out in compliance with a documented ED Yes D No: control procedure to ensure that all discs are retrieved, that openings 1n piping are smooth, that slag and other welding residue are removed, and that the internal diameters of piping are not penetrated? • • Cutouts (discs) Do you certify that you have a control feature to ensure that Yes E No all cutouts (discs) are retrieved? * - Hydraulic Nameplate provided If no, explain data nameplate Yes E No Date left in service with all control valves open emarks 'Z2.t - I Name of sprinkler contractor Signatures For property owner (signed) sprinkler Additional explanations nd notes Tests witnessed by Title Date Title Date 'a -