Loading...
HomeMy WebLinkAbout2525 EL CAMINO REAL; 110; FPC2017-0246; PermitPERMIT REPORT (7c ity of Carlsbad Print Date: 12/13/2021 Permit No: FPC2017-0246 Job Address: 2525 EL CAMINO REAL, # 110, CARLSBAD, CA 92008-1206 Status: Closed - Finaled Permit Type: FIRE-Construction Commercial Work Class: Fire Sprinklers Parcel #: 1553020900 Track U: Applied: 08/23/2017 Valuation: $1,428,322.10 Lot U: Issued: 09/12/2017 Occupancy Group: Project U: Finaled Close Out: 02/01/2021 #of Dwelling Units: Plan U: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check U: Inspector: Plan Check U: Final Inspection: Project Title: Description: ZARA -SPRINKLER TI >100 HEADS (328) FPContractor: JOHNSON CONTROLS FIRE PROTECTION LP P0 BOX 3042 BOCA RATON, FL 33431-0942 (561) 341-7780 FEE AMOUNT FIRE NFPA 13 or 13R System> 100 heads $634.00 Total Fees: $634.00 Total Payments To Date: $634.00 Balance Due: $0.00 Fire Department Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-4665 1760-602-8561 f I www.carlsbadca.gov HYDRAULIC CALCULATIONS for Job Information Project Name: ZARA at The Shoppes at Carlsbad Contract No. : 600183001 City: Carlsbad, CA 92008 Project Location: 2525 El Camino Real, suite 110 Date: 9/1/2017 Contractor Information Name of Contractor: SimplexGrinnell Address: 3568 Ruffin Road South City: San Diego, CA 92123 Phone Number: 858-633-9125 E-mail: maenglish@simplexgnnnell.com Name of Designer: M. English Authority Having Jurisdiction: City of Carlsbad Fire Prevention Design Remote Area Name 1 Remote Area Location Zara - Suite #110 Occupancy Classification Ord. Hazard 2 Density (gpm/ft2) 0.2 Area of Application (ft') 1500 Coverage per Sprinkler (ft2) 130 Number of Calculated Sprinklers 14 In-Rack Demand (gpm) 0 Special Heads Hose Streams (gpm) 250 Total Water Required (incl. Hose Streams) (gpm) 687 Required Pressure at Source (psi) 74.1 Type of System Wet Volume - Entire System (gal) 1104.7 gal Water Supply Information Date 04-05-2017 Location HYDRANT H60994 Source SRC Notes File: C:\Users\maenglish\appdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 1 Job : ZARA at The Shoppes at Carlsbad Node Labels: Off Pipe Labels: Off Diagram for Design Area : I (Ootimized Hydraulic SimoIified Date 9/1/2017 File: C:\Users\maenglish\appdata\local\temp\FP Zara v5_1_1_9107.sv$ Copyright © 2002-2012 Tyco Fire Protection Products Page 2 Supply 1: SRC Flow (gpm) Pressure (psi) 0 92 6050 42 Supply Analysis Job: ZARA at The Shoppes at Carlsbad Hydraulic Analysis for: I Calculation Info Calculation Mode Demand Hydraulic Model Hazen-Williams Fluid Name Water @ 60F (15.6C) Fluid Weight, (lb/ft3) N/A for Hazen-Williams calculation. Fluid Dynamic Viscosity, (lb.s/ft2) N/A for Hazen-Williams calculation. Water Supply Parameters Static Pressure Residual I Flow I I Available I I Total Demand I Required Pressure Node at Source (psi) I Pressure I (gpm) I I Pressure I (gpm) I I (psi) (psi) i (psi) I SRC 92 42 6050 91.6 687 74.1 Hoses Inside Hose Flow / Standpipe Demand (gpm) Outside Hose Flow (gpm) Additional Outside Hose Flow (gpm) 250 Other (custom defined) Hose Flow (gpm) ------------------------------------------------------------------------------------ Total Hose Flow (gpm) 250 Sprinklers Ovehead Sprinkler Flow (gpm) 437 IriRack Sprinkler Flow (gpm) 0 Other (custom defined) Sprinkler Flow (gpm) 0 ------------------------------------------------------------------------------------ Total Sprinkler Flow (gpm) 437 Other Required Margin of Safety (%) 10 BOR-1 - Pressure (psi) 70 BOR-1 -Flow (gpm) 437 Demand w/o System Pump(s) N/A File: C:\Users\maenglish\appdata\local\temp\FP Zara v51_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 3 Job ZARA at The Shoppes at Carlsbad Hydraulic Analysis for: I Flow, gpm File: C:\Users\maenglish\appdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright ©2002-2012 Tyco Fire Protection Products Page 4 Job ZARA at The Shoppes at Carlsbad Hydraulic Analysis for: I Graph Labels Label Description Values Flow (gpm) Pressure (psi) Si Supply point #1 - Static 0 92 S2 Supply point #2 - Residual 6050 42 Dl Elevation Pressure 0 -0.7 D2 System Demand 437 74.1 D3 System Demand + Add.Out.Hose 687 74.1 Curve Intersections & Safety Margins Curve Name Intersection I I Safety Margin Pressure (psi) Flow (gpm) I Pressure (psi) I I @ Flow (gpm) I Supply 91.5 I 489.3 17 687 Supply; Safety Pressure 82.4 462.6 7.9 687 Open Heads Required ___________ Calculated Head Ref. Head Type Coverage K-Factor Density Flow Pressure Density Flow Pressure (ft2) (gpm/p511/2) (gpm/ft2) (gpm) (psi) (gpm/ft5) (gpm) (psi) Si Overhead 130 5.6 0.2 26 21.6 0.2 26 21.6 Sprinkler Overhead 130 5.6 0.2 26 21.6 0.27 35.1 39.2 Sprinkler Sli Overhead 130 5.6 0.2 26 21.6 0.269 34.9 38.9 Sprinkler S12 Overhead 130 5.6 0.2 26 21.6 0.256 33.2 35.2 Sprinkler S13 Overhead 130 5.6 0.2 26 21.6 0.246 32 32.7 Sprinkler S14 Overhead 130 5.6 0.2 26 21.6 0.248 32.2 33.1 Sprinkler S2 Overhead 130 5.6 0.2 26 21.6 0.207 27 23.2 Sprinkler 53 Overhead 130 5.6 0.2 26 21.6 0.238 30.9 30.5 Sprinkler S4 Overhead 130 5.6 0.2 26 21.6 0.256 33.3 35.3 Sprinkler S5 Overhead 130 5.6 0.2 26 21.6 0.269 34.9 38.9 Sprinkler S6 Overhead 130 5.6 0.2 26 21.6 0.2 26 21.6 Sprinkler S7 Overhead 130 5.6 0.2 26 21.6 0.208 27 23.3 Sprinkler File: C:\Users\maenglish\appdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 5 S8 IOverhead 130 5.6 0.2 26 21.6 0.238 31 30.6 Sprinkler IOverhead 130 5.6 0.2 26 21.6 0.257 33.4 35.6 Sprinkler File: C:\Users\maenglish\appdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 6 Job: ZARA at The Shoppes at Carlsbad Hydraulic Calculations I Fluid Delivery Time Analysis Node Data Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres. Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge gpm/p5i1/2 m ft2 psi psi ft gpm gpm/ft2 psi gpm Si Overhead Sprinkler 5.6 26 130 21.6 21.6 10.83 HEAD Open 0 0.2 0.7 26 S6 Overhead Sprinkler 5.6 26 130 21.6 21.6 10.83 HEAD Open 0.0 0.2 0.7 26 S2 Overhead Sprinkler 5.6 27 130 23.2 21.6 10.83 HEAD Open 1 0.207 0.7 26 S7 Overhead Sprinkler 5.6 27 130 23.3 21.6 10.83 HEAD Open 1 0.208 0.7 26 S3 Overhead Sprinkler 5.6 30.9 130 30.5 21.6 10.83 HEAD Open 4.9 0.238 0.7 26 S8 Overhead Sprinkler 5.6 31 130 30.6 21.6 10.83 HEAD Open 5 0.238 0.7 26 S13 Overhead Sprinkler 5.6 32 130 32.7 21.6 10.83 HEAD Open 6 0.246 0.7 26 S14 Overhead Sprinkler 5.6 32.2 130 33.1 21.6 10.83 HEAD Open 6.2 0.248 0.7 26 S12 Overhead Sprinkler 5.6 33.2 130 35.2 21.6 10.83 HEAD Open 7.2 0.256 0.7 26 S4 Overhead Sprinkler 5.6 33.3 130 35.3 21.6 10.83 HEAD Open 7.3 0.256 0.7 26 S9 Overhead Sprinkler 5.6 33.4 130 35.6 21.6 10.83 HEAD Open 7.4 0.257 0.7 26 S5 Overhead Sprinkler 5.6 34.9 130 38.9 21.6 10.83 HEAD Open 8.9 0.269 0.7 26 Sil Overhead Sprinkler 5.6 34.9 130 38.9 21.6 10.83 HEAD Open 8.9 0.269 0.7 26 S10 Overhead Sprinkler 5.6 35.1 130 39.2 21.6 10.83 HEAD Open 9.1 0.27 0.7 26 0737 Node 25.4 12.42 NODE 0 0759 Node 25.6 12.42 NODE 0 0736 Node 33.5 12.42 NODE 0 0758 Node 33.7 12.42 NODE 0 0789 Node 35.3 12.42 NODE 0 0788 Node 36.1 12.42 NODE 0 0787 Node 39.1 12.42 NODE 0 0735 Node 39.2 12.42 NODE 0 0757 Node 39.4 12.42 NODE 0 0734 Node 42 12.42 NODE 0 0756 Node 42.2 12.42 NODE 0 File: C:\Users\maenglish\appdata\local\temp\FP Zara v5_1_1_91 07.sv$ Date 9/1/2017 Copyright©2002-2O12Tyco Fire Protection Products Page 7 Job ZARA at The Shoppes at Carlsbad Hydraulic Calculations I Fluid Delivery Time Analysis Node Data Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres. Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge gpm/psl1/2 gpm ft2 psi psi ft gpm gpm/ft2 psi gpm 0003 Node 42.8 12.42 NODE 0 0732 Node 48.5 12.42 NODE 0 0731 Node 48.8 12.42 NODE 0 0004 Node 49.1 12.42 NODE 0 0046 Node 54.8 12.42 NODE 0 0048 Node 62.2 12.42 NODE 0 0049 Node 62.5 12.42 NODE 0 0058 Node 63.2 12.42 NODE 0 0059 Node 63.3 12.42 NODE 0 0065 Node 63.5 12.42 NODE 0 0159 Node 64.1 12.42 NODE 0 0087 Node 64.2 17.42 NODE -2.2 0156 Node 64.4 12.42 NODE 0 0075 Node 64.5 12.42 NODE 0 0092 Node 65.6 12.42 NODE 0 0076 Node 165.7 12.42 NODE 0 0083 Node 66.2 12.42 NODE 0 0084 Node 66.2 12.42 NODE 0 0086 Node 66.3 12.42 NODE 0 BOR-O Node 69.7 3.44 NODE 3.9 BOR-I Node 70 3 NODE 4.1 0088-I Node 71.9 17.42 NODE -2.2 0090 Node 74.1 12.42 NODE 0 SRC Supply 437 74.1 12.42 SUPPLY 0 File: C:\Users\maenglish\appdata\local\temp\FP Zara v51_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 8 Job: ZARA at The Shoppes at Carlsbad Hydraulic Calculations PIPE INFORMATION Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor. total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict (Pf) (ft) (gpm/psil/2) (gpm) (in) (It) (It) (psi) (psi) Path No Si 10.83 5.6 26 1 3x(us.90)=6 15.56 120 21.6 0737 12.42 26 1.049 6 0.2108 -0.7 21.56 4.5 0737 12.42 27 1 10.25 120 25.4 0736 12.42 53 1.049 0 0.7876 0 10.25 8.1 0736 12.42 30.9 1.25 11.83 120 33.5 0735 12.42 83.9 1.38 0 0.4856 0 11.83 5.7 0735 12.42 33.3 1.5 6.46 120 39.2 0734 12.42 117.2 1.61 0 0.4255 0 6.46 2.7 0734 12.42 34.9 1.5 lx(us.Tee-Br)=8 1.5 120 42 0732 12.42 152.1 1.61 8 0.6898 0 9.5 6.6 0732 12.42 0 3 9.75 120 48.5 0731 12.42 152.1 3.26 0 0.0222 0 9.75 0.2 0731 12.42 152.5 3 lx(us.90)=9.41 66.21 120 48.8 0046 12.42 304.6 3.26 9.41 0.0804 0 75.62 6.1 0046 12.42 132.4 3 1x(us.Tee-Br)=20.16 27 120 54.8 0048 12.42 437 3.26 20.16 0.1568 0 47.16 7.4 0048 12.42 0 4 6.67 120 62.2 0049 12.42 437 4.26 0 0.0426 0 6.67 0.3 0049 12.42 0 6 4x(us.90)=56 39.74 120 62.5 0058 12.42 437 6.065 56 0.0076 0 95.74 0.7 0058 12.42 0 6 lx(us.90)=17.6 0.84 120 63.2 0059 12.42 437 6.357 17.6 0.0061 0 18.44 0.1 0059 12.42 0 8 ix(us.90)=20.98 45.79 120 63.3 0065 12.42 437 8.329 20.98 0.0016 0 66.77 0.1 0065 12.42 -199.6 4 1x(us.Tee-Br)=26.33 18.92 120 63.5 0159 12.42 237.5 4.26 26.33 0.0138 0 45.25 0.6 0159 12.42 -116.1 4 2x(us.Tee-Br)=52.67 63.4 120 64.1 0075 12.42 121.4 4.26 52.67 0.004 0 116.06 0.5 0075 12.42 199.6 4 1x(us.Tee-Br)=26.33 23.67 120 64.5 0076 12.42 320.9 4.26 26.33 0.0241 0 50 1.2 0076 12.42 116.1 8 ix(coupling)=2.33 25.19 120 65.7 BOR-O 3.44 437 8.329 2x(us.90)=41.96 44.29 0.0016 3.9 69.48 0.1 File: C:\Users\maenglish\appdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 9 Job: ZARA at The Shoppes at Carlsbad Hydraulic Calculations PIPE INFORMATION Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict (Pf) (ft) (gpm/psil/2) (gpm) (in) (ft) (ft) (psi) (psi) Path No: I BOR-O 3.44 0 8 0.44 0 69.7 BFV-N BOR-I 3 437 0 0 0.0365 0.2 *** 0.44 0.0 BOR-I 3 0 8 lx(coupling)=2.33 105.67 120 70 0083 12.42 437 8.329 3x(us.90)=62.94 65.27 0.0016 -4.1 170.94 0.3 0083 12.42 0 8 lx(coupling)=3.52 6.67 140 66.2 0084 12.42 437 8.55 3.52 0.0011 0 10.19 0.0 0084 12.42 0 8 2x(us.90)=50.83 60 150 66.2 0086 12.42 437 7.961 50.83 0.0013 0 110.83 0.1 0086 12.42 0 8 lx(us.90)=31.7 5 140 66.3 0087 17.42 437 8.55 31.7 0.0011 -2.2 36.7 0.0 0087 17.42 0 8 6.42 0 64.2 Wilkins350AD 0088-1 17.42 437 0 0 1.201 0 A 6.42 7.7 ** 0088-1 17.42 0 8 lx(us.90)=31.7 5 140 71.9 0090 12.42 437 855 31.7 0.0011 2.2 36.7 0.0 0090 12.42 0 8 15 150 74.1 SRC 12.42 437 7.961 0 0.0013 0 15 0.0 SRC 74.1 Path No: 2 S6 10.83 5.6 26 1 3x(us.90)=6 15.82 120 21.6 0759 12.42 26 1.049 6 0.2115 -0.7 21.82 4.6 0759 12.42 27 1 10.25 120 25.6 0758 12.42 53 1.049 0 0.7896 0 10.25 8.1 0758 12.42 31 1.25 11.83 120 33.7 0757 12.42 84 1.38 0 0.4867 0 11.83 5.8 0757 12.42 33.4 1.5 6.46 120 39.4 0756 12.42 117.4 1.61 0 0.427 0 6.46 2.8 0756 12.42 35.1 1.5 lx(us.Tee-Br)=8 1.5 120 42.2 0731 12.42 152.5 1.51 8 0.6928 0 9.51 6.6 0731 48.8 Path No: 3 S2 10.83 5.6 27 1 1x(us.Tee-Br)=5 3.85 120 23.2 0737 12.42 27 1.049 2x(us.90)=4 9 0.2257 -0.7 12.85 2.9 0737 25.4 File: C:\Users\maenglish'.appdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright C 2002-2012 Tyco Fire Protection Products Page 10 Job: ZARA at The Shoppes at Carlsbad Hydraulic Calculations PIPE INFORMATION Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict (Pf) (ft) (gpm/ps1½) (gpm) (in) (ft) (ft) (psi) (psi) Path No: 4 S7 10.83 5.6 27 1 lx(us.Tee-Br)=5 4.22 120 23.3 0759 12.42 27 1.049 2x(us.90)=4 9 0.2261 -0.7 13.22 3 0759 25.6 Path No: 5 S3 10.83 5.6 30.9 1 lx(us.Tee-Br)=5 3.52 120 30.5 0736 12.42 30.9 1.049 2x(us.90)=4 9 0.291 -0.7 12.52 3.6 0736 33.5 Path No: 6 S8 10.83 5.6 31 1 lx(us.Tee-Br)=5 3.84 120 30.6 0758 12.42 31 1.049 2x(us.90)=4 9 0.2915 -0.7 12.84 3.7 0758 33.7 Path No: 7 S13 10.83 5.6 32 1 lx(us.Tee-Br)=5 4.24 120 32.7 0788 12.42 32 1.049 2x(us.90)=4 9 0.3098 -0.7 13.24 4.1 0788 12.42 32.2 1.25 10.25 120 36.1 0787 12.42 64.2 1.38 0 0.2959 0 10.25 3 0787 12.42 33.2 1.5 12.25 120 39.1 0003 12.42 97.5 1.61 0 0.3024 0 12.25 3.7 0003 12.42 34.9 1.5 11.79 120 42.8 0004 12.42 132.4 1.61 0 0.5334 0 11.79 6.3 0004 12.42 0 2 2x(us.Tee-Br)=20 16.21 120 49.1 0046 12.42 132.4 2.067 20 0.158 0 36.21 5.7 0046 54.8 Path No: 8 S14 10.83 5.6 32.2 1 lx(us.Tee-Br)=5 2.35 120 33.1 0789 12.42 32.2 1.049 lx(us.90)=2 7 0.3135 -0.7 9.35 2.9 0789 12.42 0 1.25 9 120 35.3 0788 12.42 32.2 1.38 0 0.0825 0 91 1 0.7 0788 36.1 File: C:\lisers\maenglish\appdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 11 Job ZARA at The Shoppes at Carlsbad Hydraulic Calculations PIPE INFORMATION Path No: 9 S12 10.83 5.61 33.2 1 lx(us.Tee-Br)=5 4.79 120 35.2 0787 12.42 33.2 1.049 2x(us.90)=4 9 0.3321 -0.7 13.79 4.6 0787 39.1 Path No: 10 S4 10.83 5.61 33.3 1 lx(us.Tee-Br)=5 4.8 120 35.3 0735 12.42 33.3 1.049 2x(us.90)=4 9 0.333 -0.7 13.8 4.6 0735 39.2 Path No: 11 S9 10.83 5.6 33.4 1 lx(us.Tee-Br)=5 4.55 120 35.6 0757 12.42 33.4 1.049 2x(us.90)=4 9 0.3351 -0.7 13.55 4.5 0757 39.4 Path No: 12 S5 10.83 5.61 34.9 1 lx(us.Tee-Br)=5 3.31 120 38.9 0734 12.42 34.9 1.049 lx(us.90)=2 7 0.3642 -0.7 10.31 3.8 0734 42 Path No: 13 Sli 10.83 5.61 34.9 1 lx(us.Tee-Br)=5 3.52 120 38.9 0003 12.42 34.9 1.049 2x(us.90)=4 9 0.3645 -0.7 12.52 4.6 0003 42.8 Path No: 14 S10 10.83 5.6 35.1 1 lx(us.Tee-Br)=5 2.9 120 39.2 0756 12.42 35.1 1.049 lx(us.90)=2 7 0.3669 -0.7 9.9 3.6 0756 42.2 Path No: 15 0065 12.42 0 4 lx(us.Tee-Br)=26.33 82.31 120 63.5 0075 12.42 199.6 4.26 26.33 0.01 0 108.65 1.1 0075 64.5 File: C:\Users\maenglishappdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 12 Job: ZARA at The Shoppes at Carlsbad Hydraulic Calculations PIPE INFORMATION Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt) Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES T frict (Pf) (ft) (gpm/psi'/2) (gpm) (in) (ft) (ft) (psi) (psi) Path No: 16 0159 12.42 0 4 3x(us.90)=39.5 58.38 120 64.1 0156 12.42 116.1 4.26 39.5 0.0037 0 97.88 0.4 0156 12.42 0 3 1x(us.Tee-Br)=20.16 63.94 120 64.4 0092 12.42 116.1 3.26 20.16 0.0135 0 84.1 1.1 0092 12.42 0 4 lx(us.90)=13.17 34.17 120 65.6 0076 12.42 116.1 4.26 13.17 0.0037 0 47.33 0.2 0076 65.7 * Pressures are balanced to a high degree of accuracy. Values may vary by 0.1 psi due to display rounding. * Maximum Velocity of 24.03 ft/s occurs in the following pipe(s): (0731-0756) *** Device pressure loss (gain in the case of pumps) is calculated from the device's curve. If the device curve is printed with this report, it will appear below. The length of the device as shown in the table above comes from the CAD drawing. The friction loss per unit of length is calculated based upon the length and the curve-based loss/gain value. Internal ID and C Factor values are irrelevant as the device is not represented as an addition to any pipe, but is an individual item whose loss/gain is based solely on the curve data. File: C:\Users\maenglish\appdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 13 Job ZARA at The Shoppes at Carlsbad Device Graphs Pressure vs. Flow Function Design Area: 1; Supply Ref.: SRC; Supply Name:SRC o 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 cc v 0 0 c' 0 0 0 Cl Cl Cl fl VI 10 Flow, gpm Pressure Loss Function Design Area: 1; BFP Ref.: 1010 (Wilkns350ADA, Size = 8); Inlet Node: 0088-I; Outlet Node: 0087 9.56 8.56 7.56 Ut 0. 6.56 C, I— u 5.56 U) C) 4.56 3.56 2.56 .56 -...- ____ -- 7.7psi @437gpm III - ..............._Th -"*- -- ---- - -1.---. ..,,,-..-L-..........................- IIIIIIIII, 0 07 10 c 01 Cl 0 Cl 0 Flow, gpm File: C:\Users\maenglish'appdata\local\temp\FP Zara v51_1_9107. v$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 14 .799 0.799 0.299 Job ZARA at The Shoppes at Carlsbad Device Graphs Pressure Loss Function Design Area: 1; Valve Ref.: 1009 (BFV-N, Size = 8); Inlet Node: BOR-l; Outlet Node: BOR-O 00 00 00 '0 00 00 00 04 - 0 00 00 00 00 00 00 0' 00 0' 04 04 00 00 00 00 Flow, gpm File: C:\Users\maenglish\appdata\local\temp\FP Zara v5_1_1_9107.sv$ Date 9/1/2017 Copyright © 2002-2012 Tyco Fire Protection Products Page 15 cc FPC20I 7-0246 Fire Protection Products 2525 EL CAMINO REAL Series RFII - 56 K-fa UNITIIO "Royal Flush II" Conc Quick & Standard Response, idnudru%w uv wrczv w General Description The TYCO Series RFll 5.6 K-factor, "Royal Flush II" Concealed Pendent Sprinklers Quick Response (3-mm bulb) and Standard Response (5-mm bulb), are decorative sprinklers fea- turing a flat cover plate designed to conceal the sprinkler. These sprinklers are optimal for architecturally sensi- tive areas such as hotel lobbies, office buildings, churches, and restaurants. Each sprinkler includes a Cover Plate! Retainer Assembly and a Sprinkler! Support Cup Assembly. The separa- ble, two-piece assembly design pro- vides the following benefits: Allows installation of the sprinklers and pressure testing of the fire pro- tection system prior to installation of a suspended ceiling or application of the finish coating to a fixed ceiling. Permits the removal of suspended ceiling panels for access to building service equipment without having to first shut down the fire protection system and remove sprinklers. Provides for 1!2 inch (12,7 mm) of vertical adjustment to allow a measure of flexibility in determining the length of fixed piping to cut for the sprinkler drops. The Series RFll Sprinklers are shipped with a Disposable Protective Cap. The Protective Cap is temporarily removed during installation and replaced to help protect the sprinkler during ceiling installation or finish. The tip of the Pro- IMPORTANT Always refer to Technical Data Sheet TFP700 for the "INSTALLER WARNING" that provides cautions with respect to handling and instal- lation of sprinkler systems and com- ponents. Improper handling and installation can permanently damage a sprinkler system or its compo- nents and cause the sprinkler to fail to operate in a fire situation or cause it to operate prematurely. Page 1 of 4 tective Cap can be used to mark the center of the ceiling hole into plaster board or ceiling tiles by gently pushing the ceiling product against the Pro- tective Cap. When ceiling installa- tion is complete, the Protective Cap is removed and the Cover Plate/Retainer Assembly is installed. As an option, the Series RFII Standard Response (5-mm bulb) "Royal Flush II" Concealed Pendent Sprinklers can be fitted with a silicone Air and Dust Seal. (Refer to Figure 5.) The Air and Dust Seal is intended for sensitive areas where it is desirable to prevent air and dust from the area above the ceiling to pass through the cover plate. LVL.)IL.? The Series RFII Concealed Pendent Sprinklers described herein must be installed and maintained in compliance with this document and with the appli- cable standards of the National Fire Protection Association, in addition to the standards of any authorities having jurisdiction. Failure to do so may impair the performance of these devices. The owner is responsible for maintain- ing their fire protection system and devices in proper operating condition. The installing contractor or sprinkler manufacturer should be contacted with any questions. Sprinkler Identification Number (SIN) 1Y3531 - 3 mm bulb TY3551 - 5 mm bulb APRIL 2016 Technical Data Sprinkler Approvals Approvals apply only to the service conditions indicated in the Design Criteria section. TY3531 (3 mm Bulb) is UL Listed, C-UL Listed and NYC Approved (MEA 353-01-E) as Quick Response. TY3531 (3 mm Bulb) is VdS Approved (Certificate No. G4090007). 1Y3531 (3 mm Bulb) is FM and LPCB Approved (Ref. No. 094a!10) as Standard Response. Note: FM and LPCB do not approve concealed sprinklers for quick response. TY3551 (5 mm Bulb) is UL Listed, C-UL Listed, FM Approved, LPCB Approved (Ref. No. 094a19), and NYC Approved (M EA 353-01-E) as Standard Response. Approvals for Air and Dust Seal UL and C-UL Listed for use with the RFll Standard Response Concealed Sprinkler (TY3551) Maximum Working Pressure Maximum 250 psi (17,3 bar) by UL, C-UL, and NYC Maximum 175 psi (12,1 bar) by FM, VdS, and LPCB Temperature Rating 155°F (68°C) Sprinkler with 139°F (59°C) Plate 200°F (93°C) Sprinkler with 165°F (74°C) Plate Discharge Coefficient K= 5.6 GPM/p5i112 (80,6 LPM/bar"2) TFPI8I SPRINKLER/SUPPORT CUP ASSEMBLY AINER THREAD ,IPLES :CTION 'RING 'TFP181 Page 2 of 4 Adjustment 1/2 inch (12,7 mm) Finishes See the Ordering Procedure section. Physical Characteristics Frame ............................Bronze Support Cup ............Chrome Plated Steel Guide Pins .................. Stainless, Steel Deflector ..........................Bronze Compression Screw ..................Brass Bulb ...............................Glass Cap .....................Bronze or Copper Sealing Assembly. . Beryllium Nickel w/TEFLON Cover Plate .........................Brass Retainer .......... .................. Brass Ejection Spring ..............Stainless Steel Design Criteria The TYCO Series RFII 5.6 K-factor, "Royal Flush II" Concealed Pendent Sprinklers are intended for fire protec- tion systems designed in accordance with the standard installation rules recognized by the applicable Listing or Approval agency; for example, UL Listing is based on NFPA 13 and VdS Approval is based on the CEA 4001. For more information on LPCB and VdS Approvals, contact Tyco Fire Protection Products at the following office: Enschede, Netherlands Telephone: 31-53-428-4444 Fax: 31-53-428-3377 The Series RFII Concealed Pendent Sprinklers are only listed and approved with the Series RFII Concealed Cover Plates having a factory applied finish. Do not use the Series RFII in applica- tions where the air pressure above the ceiling is greater than that below. Down drafts through the Sprinkler/Support Cup Assembly can delay sprinkler operation in a fire situation. Operation When exposed to heat from a fire, the Cover Plate, normally soldered to the Retainer at three points, falls away to expose the Sprinkler/Support Cup Assembly. The Deflector - supported by the Guide Pins - then drops down to its operational position. The glass bulb contains a fluid that expands when exposed to heat. When the rated temperature is reached, the fluid expands sufficiently to shatter the glass bulb, activating the sprinkler and allowing water to flow. 1/2 NPT FRAME SUPPOR CUP WIT[ ROLL FORIV THREAD GUIDE PINS (2) THREAD l SUPPOF CUP UN1 MOUNTI SURFACE FLUSH W CEILIN( SOLDEI. TABS (3) Installation The TYCO Series RFII 5.6 K-factor, "Royal Flush II" Concealed Pendent Sprinklers must be installed in accor- dance with this section. General Instructions Do not install any bulb-type sprinkler if the bulb is cracked or there is a loss of liquid from the bulb. With the sprin- kler held horizontally, a small air bubble should be present. The diameter of the air bubble is approximately 1/16 inch (1,6 mm) for the 155'F (680C) and 3/32 inch (2,4 mm) for the 200°F (93°C) tem- perature ratings. A leak-tight 1/2 inch NPT sprinkler joint should be obtained by applying a minimum to maximum torque of 7 to 14 ft-lbs. (9,5 to 19,0 Nm). Higher levels of torque can distort the sprinkler Inlet with consequent leakage or impairment of the sprinkler. Do not attempt to compensate for insufficient adjustment in the Sprinkler by under- or over-tightening the Sprin- kler/Support Cup Assembly. Re-adjust the position of the sprinkler fitting to suit. Step 1. Install the sprinkler only in the pendent position with the center-line of the sprinkler perpendicular to the mounting surface. Step 2. Remove the Protective Cap. Step 3. With pipe thread sealant applied to the pipe threads, hand- tighten the sprinkler into the sprinkler fitting. Step 4. Wrench-tighten the sprinkler using only the RFII Sprinkler Wrench. (Refer to Figure 3.) Apply the RFII Sprinkler Wrench to the Sprinkler as shown in Figure 3. DEFLECTOR ------------ LECTOR ROPPED POSITION) EALING SEMBLY CAP BULB PRESSION CREW COVER PLATE/RETAINER ASSEMBLY FIGURE 1 MODEL RFII CONCEALED SPRINKLER ASSEMBLY I I - --z V MANUFACTURER DEFLECTOR COVER PLATE PRESET GAP IN DROPPED RETAINER 3/32 (2,4 mm) POSITION ASSEMBLY COVER PLATE DIAMETER DIMENSION A 3/16 to 11/16 (4,8 to 17,5 mm) REFERENCE COVER PLATE PROFILE DEPTH DIMENSION B 3-1/4 inches (82,6 mm) C: 2-3/8 to 2-5/8 inches (60,3 to 66,7 mm) 3/16 inches (4,8 mm) D: 1-3/4 to 2-1/4 inches (44,5 to 57,2 mm) FIGURE 2 SERIES CONCEALED SPRINKLER INSTALLATION DIMENSIONS TFP18I Page 3 of 4 FACE OF SPRINKLER FITTING SPRINKLER SUPPORT CUP ASSEMBLY 1/2 (12,7 mm) THREADED D ADJUSTMENT FACE OF CEILING, RETAINING RING MOUNTING SURFACE CLEARANCE HOLE - DIAMETER DIMENSION Step 5. Replace the Protective Cap by pushing it upwards until it bottoms out against the Support Cup. (Refer to Figure 4.) The Protective Cap helps prevent damage to the Deflector and Arms during ceiling installation and/or finish. You can also use the Protective Cap to locate the center of the clear- ance hole by gently pushing the ceiling material up against the center point of the Protective Cap. LL.)tL.1 As long as the Protective Cap remains in place, the system is considered "Out of Service". Step 6. After the ceiling has been completed with the 2-1/2 inch (63,5 mm) diameter clearance hole and in preparation for installing the Cover Plate/Retainer Assembly, remove and discard the Protective Cap. Verify that the Deflector moves up and down freely. If the Sprinkler is damaged and the Deflector does not move up and down freely, replace the entire Sprinkler. Do not attempt to modify or repair a damaged sprinkler. Step 7. When installing an Air and Dust Seal; refer to Figure 5; otherwise, proceed to Step 8. To attach the Air and Dust Seal, verify the angle of the outside edge of the seal is oriented according to Figure 5. Start the edge of the Retainer in the grooved slot of the Air and Dust Seal and continue around the retainer until the entire Air and Dust Seal is engaged. TFP18I Page 4 of 4 SUPPORT SPRINKLER FACE OF ORIENT CUP CEILING -\ ' SEAL BEVEL AS COVER PLATE W/Ex/R RETAINER ASSEMBLY SHOWN AIR AND DUST LIP OF COVER SEAL RETAINER PLATE FIGURE 5 OPTIONAL AIR AND DUST SEAL FOR SERIES RFII (TY3551) Step 8. Screw on the Cover Plate! Retainer Assembly until the Retainer (shown in Figure 2) or the Air and Dust Seal (shown in Figure 5) contacts the ceiling. Do not continue to screw on the Cover Plate/Retainer Assembly so that it lifts a ceiling panel out of its normal position. If you cannot engage the Cover Plate/Retainer Assembly with the Support Cup or you cannot engage the Cover Plate/Retainer Assembly suf- ficiently to contact the ceiling, you must reposition the Sprinkler Fitting. Care and Maintenance The TYCO Series RFII 5.6 K-factor, "Royal Flush II" Concealed Pendent Sprinklers must be maintained and serviced in accordance with this section. Before closing a fire protection system main control valve for maintenance work on the fire protection system that it controls, obtain permission to shut down the affected fire protection system from the proper authorities and notify all personnel who may be affected by this action. Absence of the Cover Plate/Retainer Assembly can delay sprinkler opera- tion in a fire situation. When properly installed, there is a nominal 3/32 inch (2,4 mm) air gap between the lip of the Cover Plate and the ceiling, as shown in Figure 2. This air gap is necessary for proper operation of the sprinkler. If the ceiling requires repainting after sprinkler installation, ensure that the new paint does not seal off any of the air gap. Do not pull the Cover Plate relative to the Enclosure. Separation may result. Sprinklers which are found to be leaking or exhibiting visible signs of corrosion must be replaced. Automatic sprinklers must never be painted, plated, coated, or other- wise altered after leaving the factory. Modified sprinklers must be replaced. Sprinklers that have been exposed to corrosive products of combustion, but have not operated, should be replaced if they cannot be completely cleaned by wiping the sprinkler with a cloth or by brushing it with a soft bristle brush. Care must be exercised to avoid damage to the sprinklers - before, during, and after installation. Sprin- klers damaged by dropping, striking, wrench twist/slippage, or the like, must be replaced. Also, replace any sprin- kler that has a cracked bulb or that has lost liquid from its bulb. (Ref. Installa- tion Section.) Exercise care to avoid damage to sprin- klers before, during, and after instal- lation. Replace sprinklers damaged by dropping, striking, wrench twist- ing, wrench slipping, or the like. Also, replace any sprinkler that has a cracked bulb or that has lost liquid from its bulb. (Refer to the Installation section.) If you must remove a sprinkler, do not reinstall it or a replacement without reinstalling the Cover Plate/Retainer Assembly. If a Cover Plate/Retainer Assembly becomes dislodged during service, replace it immediately. The owner is responsible for the inspection, testing, and maintenance of their fire protection system and devices in compliance with this document, as well as with the applicable standards of the National Fire Protection Asso- ciation (e.g., NFPA 25), in addition to the standards of any other authorities having jurisdiction. Contact the install- ing contractor or sprinkler manufac- turer regarding any questions. Automatic sprinkler systems should be inspected, tested, and maintained by a qualified Inspection Service in accor- dance with local requirements and/or national code. Limited Warranty For warranty terms and conditions, visit www.tyco-fire.com. Ordering Procedure Contact your local distributor for availability. When placing an order, indicate the full product name. Sprinkler/Support Cup Assembly Specify: Series RFII (specify SIN), K=5.6, "Royal Flush II" Pendent Sprin- klers (specify) temperature rating and (specify) finish, P/N* (specify): 155°F (68°C) 200°F (93°C) TY3531 51-792-1-155 51-792-1-200 TY3551 51-790-1-155 51-790-1-200 Use Suffix °I° for ISO 7-1 connection; for example, 51-792-1-155-I Separately Ordered Cover Plate/ Retainer Assembly: Specify: (temperature rating from below) Series RFII Concealed Cover Plate with (finish), P/N (specify). 139°F (59°C)(a) 165°F (74°C)(b) Grey White (RAL9002) .... 56-792-0-135 56-792-0-165 Brass..........56-792-1-135 56-792-1-165 Pure White (c) (RAL9010) .... 56-792-3-135 56-792-3-165 Signal White (RAL9003) .... 56-792-4-135 56-792-4-165 Jet Black (RAL9005) .... 56-792-6-135 59-792-6-165 Brushed Chrome........56-792-8-135 56-792-8-165 Chrome ........56-792-9-135 56-792-9-165 Custom ........56-792-X-135 56-792-X-165 For use with 155°F (68°C) sprinklers. For use with 200°F (93°C) sprinklers. Eastern Hemisphere sales only. Sprinkler Wrench Specify: RFII Sprinkler Wrench, P/N 56-000-1-075 Air and Dust Seal Specify: Air and Dust Seal, P/N 56-908-1-001 GLOBAL HEADQUARTERS 11400 Pennbrook Parkway, Lansdale, PA 19446 1 Telephone +1-215-362-0700 Copyright © 2016 Tyco Fire Products, LP. All rights reserved. tqco TEFLON is trademark of The DuPont Corporation Fire Protection Products tqco Fire Protection Products Worldwide Contacts I www.tyco-fire.com Series TY-FRB, 56 K-factor Upright, Pendent, and Recessed Pendent Sprinklers Quick Response, Standard Coverage General Description The TYCO Series TY-FRB, 5.6 K-factor, Upright (TY313) and Pendent (TY323) Sprinklers described in this data sheet are quick response, standard coverage, decorative 3 mm glass bulb-type spray sprinklers designed for use in light or ordinary hazard, commercial occupan- cies such as banks, hotels, and shop- ping malls. The recessed version of the Series TY- FRB Pendent Sprinkler, where applica- ble, is intended for use in areas with a finished ceiling. This recessed pendent sprinkler uses one of the following: A two-piece Style 15 Recessed Escutcheon with recessed adjust- ment up to 5/8 inch (15,9 mm) from the flush pendent position. A two-piece Style 20 Recessed Escutcheon with recessed adjust- ment up to 1/2 inch (12,7 mm) from the flush pendent position. The adjustment provided by the Recessed Escutcheon reduces the accuracy to which the fixed pipe drops to the sprinklers must be cut. Intermediate level versions of Series TY-FRB Sprinklers are described in Technical Data Sheet TFP357. Sprin- kler guards and shields are described in Technical Data Sheet TFP780. IMPORTANT Always refer to Technical Data Sheet TFP 700 for the "INSTALLER WARNING" that provides cautions with respect to handling and instal- lation of sprinkler systems and com- ponents. Improper handling and installation can permanently dam- age a sprinkler system or its compo- nents and cause the sprinkler to fail to operate in a fire situation or cause it to operate prematurely. Page 1 of 4 FROTM The TYCO Series TY-FRB Sprinklers described herein must be installed and maintained in compliance with this doc- ument, as well as with the applicable standards of the National Fire Protec- tion Association, in addition to the stan- dards of any other authorities having jurisdiction. Failure to do so may impair the performance of these devices. The owner is responsible for maintain- ing their fire protection system and devices in proper operating condition. The installing contractor or sprinkler manufacturer should be contacted with any questions. Sprinkler Identification Number (SIN) TY313 .......Upright 5.6K, 1/2" NPT TY323 ......Pendent 5.6K, 1/2" NPT Technical Data Approvals UL and C-UL Listed FM, LPCB, and VdS Approved CE Certified Sprinklers with Polyester Finish are UL and C-UL Listed as. Corrosion-Resis- tant Sprinklers. Maximum Working Pressure 175 psi (12.1 bar) 250 psi (17.2 bar)* *The maximum working pressure of 250 psi (17.2 bar) only applies to the listing by Un- derwriters Laboratories, Inc. (UL). Discharge Coefficient K=5.6 GPM/psi1/2 (80,6 LPM/bar1'2) FEBRUARY 2014 Temperature Rating 135°F (57°C) 155°F (68°C) 175°F (79°C) 200°F (93°C) 286°F (141°C) Finishes Sprinkler: Refer to Table A Recessed Escutcheon: White Coated, Chrome Plated, or Brass Plated Physical Characteristics Frame ...................Bronze Button..............Brass/Copper Sealing Assembly .........Stainless Steel w/TEFLON Bulb ......................Glass Compression Screw........Bronze Deflector ................ .Bronze TFPI72 TFPI72 Page 2 of 4 4 - Bulb 5 - Compression Screw Components: 1 - Frame 2 - Button 3 - Sealing Assembly * Temperature rating is ** Pipe thread connections per ISO 7-1 indicated on Deflector. can be provided on special request. STYLE 15or20 1/2 7/16 (11,1 mm) RECESSED NPT** NOMINAL MAKE-IN ESCUTCHEON ESCUTCHEON PLATE 6 - Deflector* DFFL ECTOR * SEATING SURFACE _ \ I 7/16 I (11,1 mm) NOMINAL MAKE-IN _____ 2 I yt1 2 (50,8 mm) 1-3/8 (50,8 mm) (34,9 mm) 1/2 NPT** 2-7/8 (73,0 mm) DIA. DEFLECTOR * CROSS SECTION UPRIGHT PENDENT RECESSED PENDENT FIGURE 1 SERIES TY-FRB UPRIGHT (TY313) AND PENDENT (TY323) SPRINKLERS 5.6 K-FACTOR, 1/2 INCH NPT, QUICK RESPONSE Operation The glass bulb contains a fluid which expands when exposed to heat. When the rated temperature is reached, the fluid expands sufficiently to shatter the glass bulb, allowing the sprinkler to activate and water to flow. Design Criteria The TYCO Series TV-FR B, 5.6 K-factor, Upright (TY313) and Pendent (TY323) Sprinklers are intended for fire protec- tion systems designed in accordance with the standard installation rules rec- ognized by the applicable Listing or Approval agency (such as, UL Listing is based on the requirements of NFPA 13, and FM Approval is based on the requirements of FM's Loss Prevention Data Sheets). Only the Style 15 or Style 20 Recessed Escutcheon is to be used for recessed pendent installations. Installation The TYCO Series TY-FRB, 5.6 K-factor, Upright (TY313) and Pendent (TY323) Sprinklers must be installed in accor- dance with this section. General Instructions Do not install any bulb-type sprinkler if the bulb is cracked or there is a loss of liquid from the bulb. With the sprin- kler held horizontally, a small air bub- ble should be present. The diameter of the air bubble is approximately 1/16 inch (1,6 mm) for the 135°F (57°C) and 3/32 inch (2,4 mm) for the 286°F (141°C) temperature ratings. A leak-tight 1/2 inch NPT sprinkler joint should be obtained by applying a min- imum to maximum torque of 7 to 14 ft-lbs. (9,5 to 19,0 Nm). Higher levels of torque can distort the sprinkler Inlet with consequent leakage or impairment of the sprinkler. Do not attempt to compensate for insufficient adjustment in the Escutch- eon Plate by under—or over-tightening the sprinkler. Re-adjust the position of the sprinkler fitting to suit. Upright and Pendent Sprinklers The Series TY-FRB Upright and Pen- dent Sprinklers must be installed in accordance with the following instructions. Step 1. Install Pendent sprinklers in the pendent position. Install upright sprin- klers in the upright position. Step 2. With pipe-thread sealant applied to the pipe threads, hand- tighten the sprinkler into the sprinkler fitting. / RCH RECESS (USE ONLY FIGURE 2 W- TYPE 6 SPRINKLER WRENCH WRENCH RECESS PUSH WRENCH IN TO ENSURE ENGAGEMENT WITH SPRINKLER WRENCHING AREA FIGURE 3 W-TYPE 7 RECESSED SPRINKLER WRENCH TFPI72 Page 3 of 4 Step 3. Tighten the sprinkler into the sprinkler fitting using only the W-Type 6 Sprinkler Wrench (Figure 2). With ref- erence to Figure 1, apply the W-Type 6 Sprinkler Wrench to the wrench flats. Torque sprinklers 7 to 14 ft.-lbs. (9,5 to 19,0 Nm). Recessed Pendent Sprinklers The Series TY-FRB Recessed Pendent Sprinklers must be installed in accor- dance with the following instructions. Step A. After installing the Style 15 or Style 20 Mounting Plate over the sprin- kler threads, and with pipe-thread sealant applied to the pipe threads, hand-tighten the sprinkler into the sprinkler fitting. Step B. Tighten the sprinkler into the sprinkler fitting using only the W-Type 7 Recessed Sprinkler Wrench (Figure 3). With reference to Figure 1, apply the W-Type 7 Recessed Sprinkler Wrench to the sprinkler wrench flats. Torque sprinklers 7 to 14 ft.-lbs. (9,5 to 19,0 Nm). Step C. After ceiling installation and fin- ishing, slide on the Style 15 or Style 20 Closure over the Series TY-FRB Sprin- kler and push the Closure over the Mounting Plate until its flange comes in contact with the ceiling. Care and Maintenance The TYCO Series TY-FRB, 5.6 K-factor, Upright (TY313) and Pendent (TY323) Sprinklers must be maintained and ser- viced in accordance with this section. Before closing a fire protection system main control valve for maintenance work on the fire protection system that it controls, obtain permission to shut down the affected fire protection systems from the proper authorities and notify all personnel who may be affected by this action. Absence of the outer piece of an escutcheon, which is used to cover a clearance hole, can delay sprinkler operation in a fire situation. The owner must assure that the sprin- klers are not used for hanging any objects and that the sprinklers are only cleaned by means of gently dusting with a feather duster; otherwise, non- operation in the event of a fire or inad- vertent operation may result. Sprinklers which are found to be leak- ing or exhibiting visible signs of corro- sion must be replaced. Automatic sprinklers must never be painted, plated, coated, or other- wise altered after leaving the factory. Modified sprinklers must be replaced. Sprinklers that have been exposed to corrosive products of combustion, but have not operated, should be replaced if they cannot be completely cleaned by wiping the sprinkler with a cloth or by brushing it with a soft bristle brush. Care must be exercised to avoid dam- age to the sprinklers before, during, and after installation. Sprinklers damaged by dropping, striking, wrench twist/ slippage, or the like, must be replaced. Also, replace any sprinkler that has a cracked bulb or that has lost liquid from its bulb. (Ref. Installation Section.) The owner is responsible for the inspection, testing, and maintenance of their fire protection system and devices in compliance with this document, as well as with the applicable standards of the National Fire Protection Associa- tion (e.g., NFPA 25), in addition to the standards of any other authorities hav- ing jurisdiction. Contact the installing contractor or sprinkler manufacturer regarding any questions. Automatic sprinkler systems are rec- ommended to be inspected, tested, and maintained by a qualified Inspec- tion Service in accordance with local requirements and/or national codes. 2-7/8 DIA. (73,0 mm) 2-1/4 DIA. FACE OF (57,2 mm) SPRINKLER FITTING 5/8 (15,9 mm) FLUSH 3/8±5/16 (9,5±7,9 mm) / 1/8 J SURFACE / \ (3,2 mm) / CLOSURE SERIES MOUNTING 1-3/8' (34,9 mm) TY-FRB PLATE 3/4" (19,1 mm) FIGURE 4 SERIES TY-FRB RECESSED PENDENT SPRINKLER ASSEMBLY (TY323) WITH TWO PIECE 5/8 INCH TOTAL ADJUSTMENT STYLE 15 RECESSED ESCUTCHEON - 2-7/8" DIA. (73,0 mm) FACE OF SPRINKLER 2-1/4" DIA. FITTING (57,2 mm) 5/16±1/4 (7,9±6,4 mm) \ - I 1/2"(127mm) FLUSH MOUNTING (32 mm) I SURFACE \H/ \ CLOSURE SERIES MOUNTING 1-3/8 (34,9 mm) TYFRB PLATE 7/8" (22,2 mm) FIGURE 5 SERIES TY-FRB RECESSED PENDENT SPRINKLER ASSEMBLY (TY323) WITH TWO PIECE 1/2 INCH TOTAL ADJUSTMENT STYLE 20 RECESSED ESCUTCHEON * TFP172 Page 4 of 4 P/N* 77 - XXX - X - XXX SPRINKLER TEMPERATURE FINISH RATINGS SIN 1 NATURAL BRASS 370 5.6K UPRIGHT (1/2NPT) 1Y313 -'- PURE WHITE (RAL9010)°° POLYESTER 371 5.6K PENDENT (1/2 NPT) 1Y323 Use suffix 1° for ISO 71 connection; 4 SIGNAL WHITE (RAL9003) POLYESTER 9 CHROME PLATED for example, 77-370-4-175-I 'Eastern Hemisphere sales only 135 135-F (57-C) 155 155°F(68°C) 175 175°F(79°C) 200 200°F (93°C) 286 286°F (141°C) TABLE A SERIES TY-FRB UPRIGHT AND PENDENT SPRINKLERS PART NUMBER SELECTION Limited Warranty For warranty terms and conditions, visit www.tyco-fire.com. Ordering Procedure Contact your local distributor for avail- ability. When placing an order, indicate the full product name and Part Num- ber (P/N). Sprinkler Assemblies with NPT Thread Connections Specify: Series TY-FRB Upright or Pen- dent (specify) Sprinkler, SIN (specify), K=5.6, Quick Response, (specify) tem- perature rating, (specify) finish, P/N (specify, refer to Table A). Recessed Escutcheon Specify: Style 15 Recessed Escutcheon with (specify*) finish, P/N (specify*) Specify: Style 20 Recessed Escutch- eon with (specify*) finish, P/N (specify*) * Refer to Technical Data Sheet TFP770 Sprinkler Wrench Specify: W-Type 6 Sprinkler Wrench, P/N 56-000-6-387 Specify: W-Type 7 Sprinkler Wrench, P/N 56-850-4-001 GLOBAL HEADQUARTERS 1 1400 Pennbrook Parkway, Lansdale, PA 19446 1 Telephone +1 -215-362-0700 Copyright © 2014 Tyco Fire Products, LP. All rights reserved. -- - -- tqco TEFLON is trademark of The DuPont Corporation. Fire Protection Products EXISTING - FOR REFERENCE ONLY I -1--- r% Z) PFFIr %Q FEATURES Sizes: U 2 1/2 U 3" U 4" U 6" U 8" U 10" U 12" Maximum working water pressure 175 PSI Maximum working water temperature 140°F Hydrostatic test pressure 350 PSI End connections (Grooved for steel) AWWA C606 (Flanged) ANSI 1316.1 Class 125 OPTIONS (suffixes can be combined) U - with OS & Y gate valves (standard) U L - less shut-off valves (flanged body connections) U LM - less water meter U - with remote reading meter U - with gpm meter (standard) U CFM - with cu ft/min meter U G - with groove end gate valves U FG - with flanged inlet gate connection and grooved outlet gate connection U P1 - with Post Indicator Gate Valve (3-10') ACCESSORIES U Repair kit (rubber only) U Thermal expansion tank (Model XT) U OS & Y Gate valve tamper switch (OSY-40) U Test Cock Lock (Model TCL24) TION SLnrflAL SHEET APPLICATION Designed for installation on potable water connections in fire sprinkler systems to protect against both backsiphonage and backpressure of polluted water into the potable water supply. Model 350DA shall provide protection where a potential health hazard does not exist. Incorporates metered by-pass to detect leaks and unauthorized water use. STANDARDS COMPLIANCE (Sizes 2 112"-10" Horiz. & Vert.) (12" Horizontal Only) ASSE® Listed 1048 (Sizes 2 1/2" thru 12') CSA® Certified 1364.5 (Sizes 2 1/2" thru 8") AWWA Compliant C510 (Sizes 2 1/2" thru 12') UL® Classified (Sizes 2 1/2" thru 12") C-UL® Classified (Sizes 2 1/2" thru 12") FM® Approved (Sizes 2 1/2" thru 10') NYC MEA 147-99-M Vol 4 (2-1/2" - 10) Approved by the Foundation for Cross Connection Control and Hydraulic Research at the University of Southern California (Sizes 2 1/2" thru 10") MATERIALS Main valve body Ductile Iron ASTM A 536 Grade 4 Access covers Ductile Iron ASTM A 536 Grade 4 Coatings FDA Approved fusion epoxy finish Internals Stainless steel, 300 Series NORYLTM, NSF Listed Fasteners Stainless Steel, 300 Series Elastomers EPDM (FDA approved) Buna Nitrile (FDA approved) Polymers NORYL, NSF Listed Springs Stainless Steel, 300 Series Attention: Model 350DA (flange body) and Model 350ADA (grooved body) have different lay lengths. A A MODEL 350DAG SHOWN ABOVE DIMENSIONS & WEIGHTS (do not include pkg.) DIMENSION _(approximate) WEIGHT MODEL 350DA SIZE in. mm A in. mm B LESS GATE in. mm VALVES OS&Y C in. I mm D in. I mm '-' in. I mm E OS&Y CLOSED in. mm F in. mm WITHOUT GATES VALVES lbs. kg WITH OS&Y GATE VALVES lbs. kg 21/2 65 31 787 157/8 403 33/4 95 9 229 163/8 416 137/8 352 31/2 89 68 30.9 178 80.8 3 80 32 813 157/8 403 33/4 95 9 229 187/8 479 155/8 397 31/2 89 1 68 30.9 198 90 4 100 375/8 956 191/2 495 41/2 114 9 229 223/4 578 181/4 464 6 152 1 106 48 296 134.4 6 150 443/4 1137 23 1/2 597 51/2 140 101/2 267 301/8 765 233/4 603 7 178 180 1 81.7 480 217.9 8 200 603/4 1543 373/4 959 10 254 12 305 373/4 959 29 1/4 743 81/2 216 374 170 850 385.9 10 250 633/4 1619 373/4 959 10 254 12 305 453/4 1162 353/8 899 81/2 216 404 183 1222 1 554.8 12 300 66114 1683 38 965 10 1254 12 305 531/8 1349 405/8 1032 87/8 226 463 210 1623-F73672 1 Page 1 of 2 WILKINS a Zurn Company, 1747 Commerce Way, Paso Robles, CA 93446 Phone:805/238-7100 Fax:805/238-5766 In Canada: ZURN INDUSTRIES LIMITED, 3544 Nashua Dr., Mississauga, Ontario L4V 1L2 Phone: 905/405-8272 Fax:905/405-1292 Product Support Help Line: 1-877-BACKFLOW (1-877-222-5356) Website: http:/Iwww.zurn.com FLOW CHARACTERISTICS MODEL 350DA 2 1/2",3" & 4" (STANDARD & METRIC) FLOW RATES (Its) 0.0 12.6 25.2 37.9 15 U) 0 -J 10 CL U) W a. 0 0 0.0 Cn 15 U) 0 10 Fn r LU CL 200 400 600 FLOW RATES (GPM) MODEL 350DA 6" & 8" (STANDARD & METRIC) FLOW RATES (us) 31.5 63.1 94.6 126.2 0 500 1000 1500 2000 2500 3000 3500 FLOW RATES (GPM) 4000 VERTICAL INSTALLATION 0 500 1000 FLOW RATES (GPM)1500 MODEL 350DA 10" & 12" (STANDARD & METRIC) FLOW RATES (us) 0.0 31.5 63.1 94.6 126.2 157.7 189.3 TYPICAL INSTALLATION Local codes shall govern installation requirements. Unless other- wise specified, the assembly shall be mounted at a minimum of 12" (305mm) and a maximum of 30' (762mm) above adequate drains with sufficient side clearance for testing and maintenance. The installation shall be made so that no part of the unit can be submerged. Capacity thru Schedule 40 Pipe (GPM) Pipe size 5 ft/sec 7.5 ft/sec 10 ft/sec 15 ft/sec 2 1/2" 75 112 149 224 115 173 230 346 198 298 397 595 6" 450 675 900 1351 8" 780 1169 1559 2339 10" 1229 1843 2458 3687 12' 1763 2644 3525 5288 50.5 103 0) 0 69 -J 34 0) W 0. 0 800 157.7 : 103 III 69 -. —1 a CL l34 CL 2500 283.9 103 69 —1 o CL —I D I34 Cn 0 Of 4500 OUTDOOR INSTALLATION d - 2000 220.8 252.4 SPECIFICATIONS The Double Check Detector Backflow Prevention Assembly shall be ASSE® Listed 1048, and supplied with full port gate valves. The main body and access cover shall be epoxy coated ductile iron (ASTM A 536 Grade 4), the seat ring and check valve shall be NoryV (NSF Listed), the stem shall be stainless steel (ASTM A 276) and the seat disc elastomers shall be EPDM. The first and second check valves shall be accessible for maintenance without removing the device from the line. The Double Check Detector Backflow Prevention Assembly shall be a WILKINS Model 350DA. WILKINS a Zurn company, 1747 Commerce Way, Paso Robles, CA 93446 Phone:805/238-7100 Fax:8051238-5766 In Canada: ZURN INDUSTRIES LIMITED, 3544 Nashua Dr., Mississauga, Ontario L4V 11_2 Phone:905/405-8272 Fax:905/405-1292 Product Support Help Line: 1-877-BACKFLOW (1-877-222-5356) Website: http://www.zurn.com Page 2 of 2