HomeMy WebLinkAbout2605 CARLSBAD BLVD; ; FS130012; PermitApplicant:
NO FIRE INC
825 PATTERSON AVE
GLENDALE, CA 91202
818-640-8770
Owner:
ARMY&NAVY ACADEMY CARLSBAD
CALIFORNIA
P 0 BOX 3000
CARLSBAD CA
City of Carlsbad
Fixed Systems Permit
Permit No: FS130012
Job Address: 2605 CARLSBAD BL
Permit Type: FIXSYS
Parcel No: 2030410200
Lot #: 0
Reference No.:
Status: ISSUED
Applied 4/18/2013
Approved: 7/5/2013
Issued: 7/5/2013
Inspector:
Project Title: ARMY NAVY ACADEMY HOOD & DUCT
Fees ($) Add'l Fees ($) Total ($) Balance ($)
292 0 292 0
FSISOO(2m
Flow Test Record
Test Hydrant
Location 05 Cos1boA L?L,
Hydrant ID No. Size Main
Static................
Residual............
Pressure Drop.. yç (PD! 1).....K factor for PD! 1).63
Flow Hydrant(s)
Hydrant I location c0 c f. o cds It I1tic1. 4, Cqpei Auc
1lydrant 2 location
Hydrant 3 location
Hydrant] Pitot 7. ' PSI GPM: Size of Orifice
Hydrant 2 Pitot PSI GPM: Size of Orifice
Hydrant 3 Pitot PSI GPM: - Size of Orifice__________
Total:______
(Qi)
Calculated test and flow data - 0 x PD2 k = Q2
PDI*k
Static: .....................
Desired Residual ....... 20 11
Pressure Drop (PD 2)G7 K factor PD 2:
x q Aq divided by ' .63 equals_ L4 ~.j GPM at 20 psi residual
Q PD2k PDlk Q2
Comments:
29, /72
Test conducted for:
Conducted by:_A et ______ U-t' Spc)c k
Date: Time:_21OpV\
MAR 27 '2013 farfsbad Municipal Water District
CARLSA
Poble Water Discharge Event Report
Date:
Location:
Reason for Discharge Event: cog SMUCT7,ON --
Type of Event Initial
Dewatering Water Mains _JJ24- Estimated Discharge Flow: ________ GPM
Note: Includes flow testing and flushing
Dewatering Water Mains ..J'AJ2L. Start Time
Unscheduled Water Discharge
Clear flow path of debris, surface
contaminants and/or hazardous
materials; Do not remove native
vegetation.'
Erosion control, i.e.
sandbags, silt fencing, hay bales,
gravel bags, decreasing th
velocity of discharged water;
End Time
Pre-Dechlori nation 'Residual: 1 0
Post-Dechlorination Residual: QQC1
(Less than 0.1 mg/L)
PH within limits of 6.0 and 9.0
Upon completion of dewatering,
ensure that the flow path is free
of all temporary erosion
prevention materials. _/....
Upon completion of dewatéring,
ensure that any sediments or
silted areas are cleared.
Wafer Sampling Performed by:
Comments:
Submitted by: Reviewed by:
(Name & Date) (Name & Date)