Loading...
HomeMy WebLinkAbout2605 CARLSBAD BLVD; ; FS130012; PermitApplicant: NO FIRE INC 825 PATTERSON AVE GLENDALE, CA 91202 818-640-8770 Owner: ARMY&NAVY ACADEMY CARLSBAD CALIFORNIA P 0 BOX 3000 CARLSBAD CA City of Carlsbad Fixed Systems Permit Permit No: FS130012 Job Address: 2605 CARLSBAD BL Permit Type: FIXSYS Parcel No: 2030410200 Lot #: 0 Reference No.: Status: ISSUED Applied 4/18/2013 Approved: 7/5/2013 Issued: 7/5/2013 Inspector: Project Title: ARMY NAVY ACADEMY HOOD & DUCT Fees ($) Add'l Fees ($) Total ($) Balance ($) 292 0 292 0 FSISOO(2m Flow Test Record Test Hydrant Location 05 Cos1boA L?L, Hydrant ID No. Size Main Static................ Residual............ Pressure Drop.. yç (PD! 1).....K factor for PD! 1).63 Flow Hydrant(s) Hydrant I location c0 c f. o cds It I1tic1. 4, Cqpei Auc 1lydrant 2 location Hydrant 3 location Hydrant] Pitot 7. ' PSI GPM: Size of Orifice Hydrant 2 Pitot PSI GPM: Size of Orifice Hydrant 3 Pitot PSI GPM: - Size of Orifice__________ Total:______ (Qi) Calculated test and flow data - 0 x PD2 k = Q2 PDI*k Static: ..................... Desired Residual ....... 20 11 Pressure Drop (PD 2)G7 K factor PD 2: x q Aq divided by ' .63 equals_ L4 ~.j GPM at 20 psi residual Q PD2k PDlk Q2 Comments: 29, /72 Test conducted for: Conducted by:_A et ______ U-t' Spc)c k Date: Time:_21OpV\ MAR 27 '2013 farfsbad Municipal Water District CARLSA Poble Water Discharge Event Report Date: Location: Reason for Discharge Event: cog SMUCT7,ON -- Type of Event Initial Dewatering Water Mains _JJ24- Estimated Discharge Flow: ________ GPM Note: Includes flow testing and flushing Dewatering Water Mains ..J'AJ2L. Start Time Unscheduled Water Discharge Clear flow path of debris, surface contaminants and/or hazardous materials; Do not remove native vegetation.' Erosion control, i.e. sandbags, silt fencing, hay bales, gravel bags, decreasing th velocity of discharged water; End Time Pre-Dechlori nation 'Residual: 1 0 Post-Dechlorination Residual: QQC1 (Less than 0.1 mg/L) PH within limits of 6.0 and 9.0 Upon completion of dewatering, ensure that the flow path is free of all temporary erosion prevention materials. _/.... Upon completion of dewatéring, ensure that any sediments or silted areas are cleared. Wafer Sampling Performed by: Comments: Submitted by: Reviewed by: (Name & Date) (Name & Date)