Loading...
HomeMy WebLinkAbout1 LEGOLAND DR; ; FPC2019-0206; PermitPERMIT REPORT (city of Carlsbad Print Date: 12/02/2020 Job Address: 1 LEGOLAND DR, CARLSBAD, CA 92008-4610 Permit Type: FIRE-Construction Commercial Work Class: Fire Sprinklers Parcel #: 2111000900 Track #: Valuation: $0.00 Lot #: Occupancy Group: Project #: #f Dwelling Units: Plan #: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check #: Plan Check #: Permit No: FPC2019-0206 Status: Closed - Finaled Applied: 09/03/2019 Issued: 10/24/2019 Finaled Close Out: 12/02/2020 Inspector: Final Inspection: Project Title: Description: LEGOLAND 2020 - NEW SPRINKLER SYSTEM FOR NEW AMUSEMENT PARK RIDE (241 HEADS) Applicant: FPContractor: A & D FIRE SPRINKLER INC A AND D FIRE SPRINKLERS INC DEVIN KRENZ 7130 CONVOY CT 7130 CONVOY CT SAN DIEGO, CA 92111-1019 SAN DIEGO, CA 92111-1019 (858) 277-3473 (858) 277-3473 FEE AMOUNT FIRE NFPA 13 System > 100 heads (includes 1 riser) $858.00 FIRE Reinspection (per inspection) $193.00 FIRE Use Fee Manual $474.00 Total Fees: $1,525.00 Total Payments To Date: $1,525.00 Balance Due: $0.00 Fire Department Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov 4 Project Name: LEGOLAND 2020 Location: I LEGOLAND DR., CARLSBAD, CA 92008, Drawing Name: L02-LEGOLAND Design Remote Area Number: L02 AREA I Remote Area Location: RIDE AREA Occupancy Classification: Ordinary Group I Commodity Classification: NONE Pressure: 0.15gpm/ft2 Area of Application: 1500ft2 (Actual 1551ft2) Coverage per Sprinkler: 1301t2 Type of sprinklers calculated: Upright No. of sprinklers calculated: 16 No. of nozzles calculated: 0 In-rack Demand: N/A gpm at Node: Hose Streams: 250.00 at Node: Calculation Date: 8/29/2019 N/A I Type: Allowance at Source Hydraulic Calculations for Total Water Required (including Hose Streams where applicable): From Water Supply at Node 1: 592.06 @ 66.539 (Safety Margin = 57.628 psi) Type of System: WET Volume of Dry or PreAction System: N/A Name of Contractor: A&D FIRE SPRINKLERS Address: 7130 CONVOY CT, SAN DIEGO, CA 92111 Phone Number: Name of designer: DERREK CRIGLER Authority Having Jurisdiction: CARLSBAD FIRE Notes: Automatic peaking results Left: N/A Right: N/A FPC201 9-0206 I LEGOLAND DR LEGOLAND 2020- NEW SPRINKLER SYSTEM FOR NEW AMUSEMENT PARK RIDE (241 HEADS) 2111000900 10/22/2019 FPC20I9-0206 1© M.E.P.CAD, Inc. AutoSPRlNK 2019 v15.1.14.0 L02 AREA 1 8/29/201912:26:23PM Page 1 Job Name: LEGOLAND 2020 Remote Area Number: L02 AREA I 150 135 120 105 90 0 0 45 30 15 A Water Supply Summary Sheet Node: 1 static Pressure 592.06 125.000 124.167 - - 4800.00 @ 85.000 342.06 592.06 :: ¶1 66.539 with Hose Allowance at Source System demand cue ..!utI.I_II_IJ_iIIIIIII 111111111 ilililli lililili 111111111 111111 II 111111 II I I I I I I I 0850 1900 2850 3800 4750 5700 6650 Flow - gpm 7600 9500 8550 4 &,© M.E.P.CAD. Inc. AutoSPRINK 2019 v15.1.14.0 8/29/2019 12:26:25PM Page 2 Hydraulic Graph N 1.85 Date: 8/29/2019 Hydraulic Graph Job Name: LEGOLAND 2020 N 1-85 Remote Area Number: L02 AREA I Date: 8/2912019 BOR L02 Summary Sheet Static Pressure 125.000 120— - - 592.06 @ 124.167 105— 90—-- 4800 00 @ 85.000 60H -- - 45 342.06 92.06 46.998 with Hose Allowance at Source 30 Sy stem demand curve 1: 11111111 IlItIlIll 111111111 0950 1900 2850 3800 IllIltItI lilti lilt Ii 111111 11111111 4750 5700 6650 7600 ________________________ 8550 9500 Flow - gpm ,©M.E.P.CAD. Inc. MIN AutoSPRlNK2O19v15.1.14.0 8/29/2019 12:26:25PM Page 1111 Summary Of Outfiowing Devices Job Number: F650 LEGOLAND Report Description: Ordinary Group I (1-02 AREA 1 Device Actual Flow (ppm) Minimum Flow (ppm) K-Factor (K) Pressure (psi) c Sprinkler 901 19.50 19.50 5.6 12.125 Sprinkler 902 19.61 19.50 5.6 12.265 Sprinkler 903 19.82 19.50 5.6 12.531 Sprinkler 904 20.12 19.50 5.6 12.912 Sprinkler 905 20.20 19.50 5.6 13.012 Sprinkler 906 20.24 19.50 5.6 13.060 Sprinkler 907 20.40 19.50 5.6 13.267 Sprinkler 908 20.49 19.50 5.6 13.383 Sprinkler 909 20.70 19.50 5.6 13.668 Sprinkler 910 21.16 19.50 5.6 14.272 Sprinkler 911 21.19 19.50 5.6 14.311 Sprinkler 912 21.80 19.50 5.6 15.154 Sprinkler 913 21.81 19.50 5.6 15.175 Sprinkler 914 22.56 19.50 5.6 16.225 Sprinkler 915 25.62 19.50 5.6 20.934 Sprinkler 916 26.84 19.50 5.6 22.978 c Most Demanding Sprinkler Data © M.E.P.CAD, Inc. AutoSPRlNK 2019 v15.1.14.0 8/29/2019 12:26:27PM Page 4 'Job Name: LEGOLAND 2020 Remote Area Number: L02 AREA I Date: 8/29/2019 Supply Analysis Node Name Static (psi) Residual Flow (psi) (gpm) Available Total Demand (psi) (gpm) Required Pressure (psi) Water Supply 125.000 85.000 4800.00 124.167 592.06 66.539 Node Analysis Node Number Elevation (Foot) Node Type Pressure at Node (psi) Discharge at Node (gpm) Notes -3-0 Supply 66.539 342.06 901 8-6 Sprinkler 12.125 19.50 902 8-6 Sprinkler 12.265 19.61 903 8-6 Sprinkler 12.531 19.82 904 8-6 Sprinkler 12.912 20.12 905 8'-7 Sprinkler 13.012 20.20 906 8-7 Sprinkler 13.060 20.24 907 8-6 Sprinkler 13.267 20.40 908 8-0 Sprinkler 13.383 20.49 909 8'-6 Sprinkler 13.668 20.70 910 8-6 Sprinkler 14.272 21.16 911 8-0 Sprinkler 14.311 21.19 912 8'-6 Sprinkler 15.154 21.80 913 81-0 Sprinkler 15.175 21.81 914 8-6 Sprinkler 16.225 22.56 915 8'-6 Sprinkler 20.934 25.62 916 8-7 Sprinkler 22.978 26.84 4 -3'-0 66.232 7 -3-0 62.439 f&©M.E.P.CAD, Inc. J1 AutoSPRlNK2019v15.1.14. 8/29/2019 12:26:30PM Paqe5 Job Name: LEGOLAND 2020 Remote Area Number: L02 AREA I Date: 8/29/2019 Node Number Elevation (Foot) Node Type Pressure at Node (psi) Discharge at Node (gpm) Notes 9 0-6 60.813 11 -3-0 63.007 57 8-6 53.761 65 7-6 Gauge 46.998 101 8-6 21.367 102 8-6 24.550 107 8-6 17.474 108 8'-6 17.239 110 8-6 16.106 113 8-6 15.173 114 8-6 14.534 116 8-6 14.109 117 8-6 13.919 119 8'-6 13.868 &®M.E.P.CAD, Inc. @11 AutoSPRINK 2019 v15.1.14. 8/29/2019 12:26:30PM Page 6 Job'Name: LEGOLAND 2020 Rethote Area Number: L02 AREA I Date: 8/29/2019 Pipe Information Node I Elev I (Foot) K-Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pf) and shown as n a ' v'1u. ___ j'_____________ Fitting (Foot) __________ Pf Friction Loss Per Unit EIev(Pe) Node 2 Eiev 2 (Foot) Total Flow Actual ID _________ Total (Foot) ______________ Friction(Pf) 901 8'-6 5.6 19.50 1 (See Notes) 10'-6Y2 120 12.125 ••••• Route l••••• Sprinkler, PO(5'-10) 5'-10 0.106311 119 8'-6 19.50 1.0830 16'-4Y2 1.743 119 8'-6 20.20 2% 11-0 120 13.868 Flow (q) from Route 5 0.004590 117 8'-6 39.70 2.7050 111-0 0.050 117 8'-6 19.61 + 20.24 2% 11-5% 120 919 Flow (q)from Route 2 and 6 0.016603 116 8'-6 79.55 2.7050 11'-51h 0.190 116 8'-6 19.82 + 20.40 2% 12'-0 120 109 Flow (q) from Route 3 and 7 0.035395 -0 114 8'-6 119.77 2.7050 17 0.425 114 8'-6 20.12 + 20.70 2% 10'-6 120 14.534 Flow (q) from Route 4 and 9 0.060899 113 8'-6 160.60 2.7050 10'-6 0.639 113 8'-6 20.49 + 21.16 2% 101-0 120 15.173 Flow (q) from Route 8 and 10 0.093293 110 8'-6 202.24 2.7050 101-0 0.933 110 8'-6 21.19 +21.80 2% 8'-6 120 106 Flow(q)from Route 11 and 12 0.133257 108 8'-6 245.22 2.7050 8'-6 1.133 108 8'6 22.56 2% 1-6 120 239 Flow (q) from Route 14 0.156816 107 8'-6 267.78 2.7050 1'-6 0.235 107 8'-6 21.81 2% (See Notes) 12-10% 120 474 17 . Flow (q) from Route 13 2fE(4'-3%) 8'-7 0.181265 101 8'-6 289.60 2.7050 21'-5% 3.893 101 8'-6 25.62 2% 15'-0 120 21. 367 Flow (q) from Route 15 0.212046 102 8'-6 315.22 2.7050 15'-O 3.183 102 8'-6 26.84 2% (See Notes) 47'- 4 120 24. 550 Flow (q) from Route 16 4fE(4'-3%), PO(18'-8%), BV(6- 0), BOR L02 41'-11 0.246656 0.434 65 7'-6 342.06 2.7050 89'-3 22.015 (, © M.E.P.CAD, Inc. Z§jAutoSPRINK 2019 05.1.14.0 L02 AREA 1 8/29/2019 12:26:32PM Page 7 Job Name: LEGOLAND 2020 Remote Area Number: L02 AREA I Date: 8/29/2019 Pipe Information Node I Elev I (Foot) K-Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(Pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (PQ and shown as Fitting (Foot) Pf Friction Loss Per Unit Total (ps Elev(Pe) Node 2 Elev 2 (Foot) Total Flow Actual ID (Foot) _______________ Friction(" 65 7'-6 2/2 (See Notes) 11 10% 120 46.998 2fE(4'-3Y2), Po(18'-81h) 27-4 0.246656 -0.434 57 8'-6 342.06 2.7050 29'-2 7.197 57 8'-6 3 (See Notes) 35'2% 120 53.761 E(5'-O) 5-0 0.089105 3.468 9 0'-6 342.06 3.3340 40'-2Y2 3.583 9 0'-6 6 (See Notes) 101 1% 120 60.813 E(16'-7) 16'-7 0.004080 1.517 7 4-0 342.06 6.2800 26'-81h 0.109 7 4-0 6 (See Notes) 53'8% 150 62.439 EE(5'-9), GV(2'-5Y2), 3E(11'-5V2 42'-7 0.005899 11 4-0 342.06 5.3490 96'-31h 0.568 11 4-0 6 (See Notes) 16'10 120 63.007 3E(16'-7), BFP(-2.953) 49-9 0.004080 4 -3'-O 342.06 6.2800 66-7 3.224 4 4-0 6 (See Notes) 13'7 150 66.232 E(11'-51,4), GV(2'-5%), 5, T(24'- 7) 38-6 0.005899 342.06 5.3490 52'-0Y2 0.307 250.00 66.539 Hose Allowance At Source Total(Pt) Route I 1 592.06 902 8'-6 5.6 19.61 1 (See Notes) 9'-6Y2 120 12.265 ..... Route 2 Sprinkler, Po(5'-10) 5'-10 0.107441 117 8'-6 19.61 1.0830 15'-4% 1.654 13.919 Total(Pt) Route 2 903 8'-6 5.6 19.82 1 (See Notes) I 8'-6'h 120 12.531 Route 3..... Sprinkler, PO(5'-10) 5-10 I 0.109599 116 8'-6 19.82 1.0830 14'-41h 1.578 14.109 Total(Pt) Route 3 904 8-6 5.6 20.12 1 (See Notes) 8'-6% 120 12.912 ••• Route 4 ..... Sprinkler, P0(5-10) 5'-10 0.112674 114 8'-6 20.12 1.0830 14'-4% 1.622 14.534 Total(Pt) Route 4 , © M.E.P.CAD, Inc. AutoSPRINK 2019 v15.1.14.0 L02 AREA 1 8/29/2019 12:26:32PM Page 8 Job-Name: LEGOLAND 2020 Remote Area Number: L02 AREA Date: 8/29/2019 4 Pipe Information Node I Elev I (Foot) K-Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(Pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pf) and shown as Fitting (Foot) Pf Friction Loss Per Unit (psi) Elev(Pe) Node 2 Elev 2 (Foot) Total Flow (Q) Actual ID Total (Foot) Frlction(Pf) 905 8'-7 5.6 20.20 1 (See Notes) 1'5% 120 13.012 "" Route "" Sprinkler, PO(5'-10) 5'-10 0.113481 0.029 119 8'-6 20.20 1.0830 7'-3% 0.827 13.868 Total(Pt) Route 5 906 8'-7 5.6 20.24 1 (See Notes) 1'-5% 1 120 13.060 Route 6 ..... Sprinkler, PO(5'-10) 5'-10 0.113866 0.029 117 8'-6 20.24 1.0830 7'-31h 0.830 13.919 Total(Pt) Route 6 907 8'-6 5.6 20.40 1 (See Notes) 1'-5Y2 120 13.267 .•.. Route 7 ... Sprinkler, PO(5'-1 0) 5'-110 0.115539 116 8'-6 20.40 1.0830 7-3% 0.842 14.109 Total(Pt) Route 7 908 81-0 5.6 20.49 1 (See Notes) 91 0% I 120 13.383 ". Route 8 Sprinkler, E(2'-4), PO(5'-10) 8'2 I 0.116472 -0.217 113 8'-6 20.49 1.0830 17'-3 2.007 15.173 Total(Pt) Route 8 909 8'-6 5.6 20.70 1 (See Notes) 1'-5% 120 13.668 " Route 9 Sprinkler, PO(5'-10) 5'-10 0.118768 114 8'-6 20.70 1.0830 731,4 0.865 14.534 Total(Pt) Route 9 910 8'-6 5.6 21.16 1 (See Notes) 1'5% T 120 14.272 "" Route lO"" Sprinkler, PO(5'-10) 5-10 0.123615 113 8'-6 21.16 1.0830 '% j 0.901 15.173 Total(Pt) Route 10 911 8'-0 5.6 21.19 1 (See Notes) 8'-O% 120 14.311 .'••Route ll••••• Sprinkler, E(2'-4), PO(5'-10) 8'-2 0.123927 -0.217 110 8'-6 21.19 1.0830 16'-3 2.011 16.106 r Total(Pt) Route 11 912 8'-6 5.6 21.80 1 (See Notes) 1'-S% 120 15.154 "" Route 12"" Sprinkler, PO(5'-l0) 5'-10 0.130662 110 8'-6 21.80 1.0830 0.952 16.106 Total(Pt) Route 12 (, © M.E.P.CAD, Inc. AutoSPRINK 2019 v1 5.1.14.0 L02 AREA 1 8/29/2019 12:26:32PM Page 9 Job Name: LEGOLAND 2020 Remote Area Number: L02 AREA I Date: 8I29I2019 Pipe Information Node I Elev i (Foot) K-Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(Pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pt) and shown as v'•• Fitting (Foot) Pf Friction Loss Per Unit Elev(Pe) Node 2 Eiev 2 (Foot) Total Flow (Q) Actual ID Total (Foot) _______________ FrlctIon(Pf _______ 913 ____________ 81-0 _______ 5.6 ____________ 21.81 ________ 1 ________ (See Notes) _________ 11'0V2 ____________ 120 _______________ 15.175 "" Route 13"" Sprinkler, E(2'4), PO(5'-10) 8-2 0.130828 -0.217 107 8'-6 21.81 1.0830 19'-3 2.516 17.474 Total(Pt) Route 13 914 8'-6 5.6 22.56 1 (See Notes) 11-5% 120 16.225 "" Route 14 ..... Sprinkler, PO(5'10) 5'-10 0.139179 108 8'-6 22.56 1.0830 7'-3% 1.014 17.239 Total(Pt) Route 14 915 8'-6 5.6 25.62 11/4 (See Notes) 2-2% 120 20.934 .... Route 15..... Sprinkler, PO(6'-10) 6'-10 0.047417 0.004 101 8'-6 25.62 1.4180 9'-O% 0.429 21.367 Total(Pt) Route 15 916 8'-7 5.6 26.84 1 (See Notes) 2'2% T 120 22.978 " Route 16..... Sprinkler, PO(5'-10) s'-io 0.192030 0.029 102 8'-6 26.84 1.0830 8'-O% 1.543 24.550 Total(Pt) Route 16 (,© M.E.P.CAD, Inc. AutoSPRlNK 2019 v15.1.14.0 L02 AREA 1 8/29/2019 12:26:32PM Page 10 JobName: LEGOLAND 2020 Remote Area Number: L02 AREA I Date: 8/29/2019 of Valves and IC Value Multiplier I Actual Inside Diameter 4.87 Factor Value Of C 100 130 140 150 I \ = Schedule 40 Steel Pipe Inside Diameter ) I Multiplying Factor 0.713 1.16 1.33 1.51 ALV Alarm Valve AngV Angle Valve b Bushing BalV Ball Valve BFP Backfiow Preventer BV Butterfly Valve C Cross Flow Turn 90° cplg Coupling Cr Cross Run CV Check Valve DelV Deluge Valve DPV Dry Pipe Valve E 90° Elbow EE 45° Elbow Eel 11W Elbow Ee2 22W Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90° FireLock(TM) Elbow fEE 45° FireLock(TM) Elbow fig Flange FN Floating Node fT FireLock(TM) Tee g Gauge GloV Globe Valve GV Gate Valve Ho Hose Hose Hose HV Hose Valve Hyd Hydrant LtE Long Turn Elbow mecT Mechanical Tee Noz Nozzle P1 Pump In P2 Pump Out PIV Post Indicating Valve P0 Pipe Outlet PrV Pressure Relief Valve PRV Pressure Reducing Valve red Reducer/Adapter S Supply sCV Swing Check Valve SFx Seismic Flex Spr Sprinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Cap &©M.E.P.CAD, Inc. JAutoSPRINK 2019 05.1.14.0 LO2 AREA 1 8/29/2019 12:26:32PM Page 11 Hydraulic Calculations for Fpt, 2.oi9ozo Calculation Date: 8/29/2019 L03 AREA I ABOVE SCREEN Ordinary Group I NONE "Project Name: LEGOLAND Location:,, Drawing Name: L03-LEGOLAND Design Remote Area Number: Remote Area Location: Occupancy Classification: Commodity Classification: Pressure: Area of Application: Coverage per Sprinkler: Type of sprinklers calculated: No. of sprinklers calculated: No. of nozzles calculated: In-rack Demand: Hose Streams: 0.l5gpm/ft2 1500ft2 (Actual 1541ft2) 130ft2 Upright 17 0 N/A gpm at Node: N/A 250.00 at Node: I Type: Allowance at Source (Safety Margin = 34.387 psi) Total Water Required (including Hose Streams where applicable): From Water Supply at Node 1: 642.69 @ 89.644 Type of System: WET Volume of Dry or PreAction System: N/A Name of Contractor: Address: Phone Number: Name of designer: DERREK CRIGLER Authority Having Jurisdiction: Notes: Automatic peaking results Left: N/A Right: N/A i4© M.E.P.CAD, Inc. 11,1 1AutoSPRINK 2019 v15.1.14.0 L03 AREA 1 8/29/201911:41:54AM Page 1 Hydraulic Graph Job Name: LEGOLAND 1.85 Remote Area Number: L03 AREA I Date: 8/29/2019 Supply 135- ] Summary Sheet Static Pressure 125.000 42.69 124.030 120 105 92.69 89.644 90 642.69 with Hose Allowance at Source 4800.00 @ 85.000 =75H- 60H — System demand curve ::i_________ 0- LI.I.LI.1.IJIttIIIIII 111111111 IllIllIlt 11111111 111111111 111111111 II f 111111 I I I I I I I I 0950 1900 2850 3800 4750 5700 6650 7600 8550 9500 Flow - gpm I lk,©M.E.P.CAD, Inc. AutoSPRINK 20119 05.1.14.0 8/29/2019 11:41:56AM Page 2 HydraulicGraph Job Name: LEGOLAND 1-85 Remote Area Number: L03 AREA I Date: 8/29/2019 I LO3BOR I Summary Sheet Static Pressure 125.000 42.69@124.030_______ 20-: Do - 4800.00 85.000 75 392.69 65.204 642.69 with Hose Allowance at Source H-- SystemSystem demand curve 30 15 f[w1lIlIIIII 111111111 IllIllIll 11111111 11111111 I I I I I I I I I I I I I I I I I I I I 0950 1900 2850 3800 5700 4750 6650 Flow - gpm 7600 8550 9500 ,©M.E.P.CAD, Inc. 401 AutoSPRINK 2019 v15.1.14.0 8/29/2019 11:41:56AM Page 1111Summary Of Outfiowing Devices Job Number: 1. Report Description: Ordinary Group I (1-03 AREA I Device Actual Flow (gpm) Minimum Flow (gpm) K-Factor (to Pressure (psi) c Sprinkler 701 19.50 19.50 5.6 12.125 Sprinkler 702 19.72 19.50 5.6 12.404 Sprinkler 703 19.93 19.50 5.6 12.663 Sprinkler 704 20.62 19.50 5.6 13.556 Sprinkler 705 21.93 19.50 5.6 15.332 Sprinkler 706 22.12 19.50 5.6 15.607 Sprinkler 707 22.24 19.50 5.6 15.773 Sprinkler 708 22.66 19.50 5.6 16.372 Sprinkler 709 23.53 19.50 5.6 17.659 Sprinkler 710 23.27 19.50 5.6 17.266 Sprinkler 711 23.55 19.50 5.6 17.684 Sprinkler 712 23.99 19.50 5.6 18.347 Sprinkler 713 23.87 19.50 5.6 18.176 Sprinkler 714 24.81 19.50 5.6 19.633 Sprinkler 715 24.96 19.50 5.6 19.870 Sprinkler 716 27.96 19.50 5.6 24.925 Sprinkler 717 28.02 19.50 5.6 25.039 c Most Demanding Sprinkler Data © M.E.P.CAD, Inc. AutoSPRINK 2019 v15.1.14.0 8/29/2019 11:41:57AM Page 4 Job Name: LEGOLAND Remote Area Number: L03 AREA I Date: 8/29/2019 Supply Analysis Node Name Static (psi) Residual Flow (psi) @ (gpm) Available Total Demand (psi) (gpm) Required Pressure (psi) Water Supply 125.000 85.000 1 4800.00 124.030 642.69 89.644 Node Analysis Node Number Elevation (Foot) Node Type Pressure at Node (psi) Discharge at Node (gpm) Notes 1 -54 Supply 89.644 392.69 701 30'-3V2 Sprinkler 12.125 19.50 702 30-2 Sprinkler 12.404 19.72 703 30-2 Sprinkler 12.663 19.93 704 30'-2 Sprinkler 13.556 20.62 705 30'-2 Sprinkler 15.332 21.93 706 30-2 Sprinkler 15.607 22.12 707 30-2 Sprinkler 15.773 22.24 708 30-2 Sprinkler 16.372 22.66 709 30'-2 Sprinkler 17.659 23.53 710 30-3% Sprinkler 17.266 23.27 711 30-2 Sprinkler 17.684 23.55 712 30'-2 Sprinkler 18.347 23.99 713 30-2 Sprinkler 18.176 23.87 714 30-2 Sprinkler 19.633 24.81 715 30-2 Sprinkler 19.870 24.96 716 30-2 Sprinkler 24.925 27.96 717 30-2 Sprinkler 25.039 28.02 4 -5'-4 89.248 k@ M.E.P.CAD, Inc. §1 AutoSPRINK 2019 v15.1.14. 8/29/2019 11:42:00AM Paqe 5 Job Name: LEGOLAND Remote Area Number: L03 AREA I Date: 8/29/2019 - Node Number Elevation (Foot) Node Type Pressure at Node (psi) Discharge at Node (gpm) Notes 7 -5-4 84.912 9 -1'-10 83.254 11 -5-4 85.645 19 28-10 23.147 23 30'-2 19.957 35 28'-10 23.381 39 30-2 18.478 52 28'-10 24.482 56 30-2 20.198 57 6-2 75.160 68 28-10 26.877 71 30'-2 25.329 304 6-2 73.293 305 17'-8 61.621 306 IV-2 68.770 307 17-8 Gauge 65.204 ,© M.E.P.CAD, Inc. Fijj AutoSPRINK 2019 v15.1.14. 8/29/2019 11:42:00AM Page 6 Job Name: LEGOLAND Remote Area Number: L03 AREA I Date: 8/29/2019 Pipe Information Elev I Flow added Fittings & Length C Factor Total(Pt) Notes Node I (Foot) K-Factor this step Nominal ID Devices (Foot) Fitting/Device (Equivalent Fitting (Foot) Pf Friction Elev(Pe) (q) Equiv. Length) Fixed Pressure Losses, Elev 2 Total Flow Loss Per Unit when applicable, are added Total Friction(Pf) Node 2 (Foot) Actual ID Length (Foot) (MI) directly to (Pt) and shown as (Foot) 701 30'-3% 5.6 19.50 1% (See 91 0 120 12.125 ..... Route 1"" Sprinkler, 11'-3% 0.057 Notes) 702 30'-2 19.50 1.7280 0.010924 2E(5'-7%) 20'-3% 0.222 702 30'-2 5.6 19.72 11,4 (See 6'6 120 12.404 Sprinkler Notes) 703 30'-2 39.22 1.7280 0.039798 6-6 0.259 703 30'-2 5.6 19.93 11,4 (See 106 120 12.663 Sprinkler Notes) 704 30'-2 59.15 1.7280 0.085101 10'-6 0.894 704 30'-2 5.6 20.62 1% (See 120 120 13.556 Sprinkler Notes) 705 30'-2 79.77 1.7280 0.147980 12'-0 1.776 705 30'-2 5.6 21.93 11/2 (See 2'-3% 120 15.332 Sprinkler, 11'-3Y2 Notes) 39 30'-2 101.70 1.7280 0.231913 PO(11'-3%) 13'-7 3.146 39 30-2 23.87 11/2 (See I4 120 18.478 Flow (q) from Route 4 11'-3% 0.578 Notes) 35 28'-10 125.57 1.7280 0.342577 PO(11'-3%) 4.324 35 28'-10 95.62 21/2 10'-O 120 23.381 Flow (q) from Route 3 0.110106 52 28'-10 221.19 2.7050 10,-U 1.101 52 28'-10 115.52 2% 1O'-O 120 24.482 Flow (q) from Route 2 0.239560 68 28'-10 336.71 2.7050 10,-a 2.396 68 28'-10 55.98 2% (See 60'7 120 26.877 Flow (q) from Route 7 4.841 Notes) 305 17'-8 392.69 2.7050 0.318408 P0(18-8%), 2E(4'-3%), BV(6'- 93'-ll 29.902 0) 305 17-8 21/2 (See 0'6% 120 61.621 Notes) 307 17-8 203.45 2.7050 0.094330 PO(18'-81/.), L03 BOR, C(18'-8 38'-0 3.583 1,4) 307 17'8 189.24 3 6'-6 120 65.204 Flow (q) from Route 9 2.818 306 11'-2 392.69 3.3340 0.115026 6'-6 0.748 (, © M.E.P.CAD, Inc. AutoSPRINK 2019 v15.1.14.0 L03 AREA 1 8/29/2019 11:42:02AM Page 7 Job Name: LEGOLAND Remote Area Number: L03 AREA I Date: 8/29/2019 Pipe Information Node I Elev I (Foot) K.Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(Pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pt) and shown as Fitting (Foot) __________ P1 Friction Loss Per Unit (l) Elev(Pe) Node 2 Elev 2 (Foot) Total Flow Actual ID Total (Foot) _______________ Frlction(Pf) 306 11'-2 3 (See Notes) 8'-4Y2 120 68.770 2E(5-O) 101-0 0.128313 2.168 304 6'-2 392.69 3.2600 18'-4% 2.356 304 6'-2 3 (See Notes) 11'21/2 120 73.293 E(5-0) 5-0 0.115026 57 6'-2 392.69 3.3340 16'-2Y2 1.866 57 6'-2 3 (See Notes) 3521,4 120 75.160 E(5-0) 5'-0 0.115026 3.468 9 -1'-10 392.69 3.3340 40'-2% 4.626 9 -1'-10 6 (See Notes) 1011/2 120 83.254 E(16'-7) 16'-7 0.005267 1.517 7 -6-4 392.69 6.2800 26'-8% 0.141 7 -5'4 6 (See Notes) 53'8% 150 84.912 EE(5-9), GV(2-5Y2), 3E(11'-5% 42'-7 0.007615 11 -5'4 392.69 5.3490 96'-31/2 0.733 11 -5'-4 6 (See Notes) 16'-10 120 85.645 3E(16'-7), BFP(-3.252) 0.005267 4 -5'4 392.69 6.2800 66'-7 3.603 4 -5'4 6 (See Notes) 13'7 150 89.248 E(11'-5V2), GV(2'-5Y2), S, T(24- 7) 38'-6 0.007615 1 -5'4 392.69 5.3490 52'-O% 0.396 250.00 89.644 Hose Allowance At Source Total(Pt) Route I 1 642.69 706 30'-2 5.6 22.12 11/2 (See Notes) 12'-0 120 15.607 'Route 2" Sprinkler 0.013797 707 30'-2 22.12 1.7280 12'-O 0.166 707 30'-2 5.6 22.24 1V2 (See Notes) 12'0 120 15.773 Sprinkler 0.049982 708 30'-2 44.36 1.7280 12'-O 0.600 708 30'-2 5.6 22.66 1% (See Notes) 12'0 120 16.372 Sprinkler 0.107233 709 30'-2 67.02 1.7280 12'-O 1.287 , © M.E.P.CAD, Inc. 011 AutoSPRINK 2019 v15.1.14.0 L03 AREA 1 8/29/2019 11:42:02AM Page 8 Job Name: LEGOLAND Reniote Area Number: L03 AREA 1 Date: 8/29/2019 Pipe Information Node I EIev I (Foot) K•Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(Pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pf) and shown as - negative Fitting (Foot) Pf Friction (psi) Loss Per Unit Elev(Pe) Node 2 Elev 2 (Foot) Total Flow (0) Actual ID Total (Foot) Friction(PI) 709 30'-2 5.6 23.53 1% (See Notes) 2'3% 120 17.659 Sprinkler, PO(11'-3%) 11 31,4 0.187115 56 30'-2 90.56 1.7280 13'-7 2.539 56 30'-2 24.96 1% (See Notes) 1'-4 120 20.198 Flow (q) from Route 6 PO(11'-3%) 11'-3V2 0.293574 0.578 52 28'-10 115.52 1.7280 12'-7% 3.706 24.482 Total(Pt) Route 2 710 30'-3% 5.6 23.27 11,4 (See Notes) 13'-0 120 17.266 Route 3 Sprinkler, 2E(5'-7%) 11'-3% 0.015148 0.050 711 30'-2 23.27 1.7280 24'-3% 0.368 711 30'-2 5.6 23.55 1% (See Notes) 12'0 120 17.684 Sprinkler 0.055219 712 30'-2 46.82 1.7280 12-0 0.663 712 30'-2 5.6 23.99 1% (See Notes) 2'3% 120 18.347 Sprinkler, PO(11'-31,4) 11 -3% 0.118696 23 30'-2 70.81 1.7280 13'-7 1.610 23 30'-2 24.81 11,4 (See Notes) 1'4 120 19.957 Flow (q) from Route 5 PO(11'-3%) 11'-3% 0.206927 0.578 19 28'- 10 95.62 1.7280 12-7% 2.612 19 28'-10 2% 101-0 120 23.147 0.023335 35 28'-10 95.62 2.7050 10'-O 0.233 23.381 Total(Pt) Route 3 713 30'-2 5.6 23.87 1/2 (See Notes) I 7'-8% 120 18.176 ' Route 4" Sprinkler, PO(11'-3%) 11'..3% 0.015886 39 30'-2 23.87 1.7280 I 191-0 0.302 18.478 Total(Pt) Route 4 714 30'-2 5.6 24.81 11,4 (See Notes) 781 120 19.633 ••••• Route 5••••• Sprinkler, PO(11'-3%) 11'-3% 0.017060 23 30'-2 24.81 1.7280 191-0 0.324 19.957 Total(Pt) Route 5 , © M.E.P.CAD, Inc. AutoSPRINK 2019 v15.1.14.0 L03 AREA 1 8/29/2019 11:42:02AM Page 9 Job Name: LEGOLAND Remote Area Number: L03 AREA I Date: 8/29/2019 Pipe Information Node I Elev I (Foot) K-Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pf) and shown as a ip" Fitting (Foot) Pf Friction Loss Per Unit Elev(Pe) Node 2 Elev 2 (Foot) Total Flow (Q) Actual ID Total (Foot) ________________ Friction(Pf) 715 30'-2 5.6 24.96 11/2 (See Notes) 7'-8% 120 19.870 ..... Route 6 ..... Sprinkler, 11 56 30'-2 24.96 1.7280 0.017250 pO(11'3%) 191-0 0.328 20.198 Total(Pt) Route 6 716 30'-2 5.6 27.96 1% (See Notes) 7'-8% 120 24.925 ••••• Route 7••••' Sprinkler, 11'-3Y 2 71 30'-2 27.96 1.7280 0.021274 Po(11'-3%) 191-0 0.404 71 30'-2 28.02 1% (See Notes) 1'4 120 25.329 Flow (q) from Route 8 11'-3% 0.578 68 28'-10 55.98 1.7280 0.076855 PO(11'-3%) 12-7% 0.970 26.877 Total(Pt) Route 7 717 30'-2 5.6 28.02 1% (See Notes) 2'-3% 120 25.039 ••••• Route 8••••• Sprinkler, 11-3% 71 30'-2 28.02 1.7280 0.021364 PO(11'-3%) 13'-7 0.290 25.329 Total(Pt) Route 8 305 17'-8 2% (See Notes) o-o 120 61.621 ••••• Route 9••••• BV(6'-o) 307 17'-8 189.24 2.7050 0.082500 PO(18'-8%), L03 BOR, C(18'-8 43'-5 3.583 65.204 Total(Pt) Route 9 ,©M.E.P.CAD, Inc. IJAutoSPRINK 2019 v15.1.14.0 LO3 AREA I 8/29/2019 11:42:02AM Page 10 JobName: LEGOLAND Rethote Area Number: L03 AREA I Date: 8/29/2019 Iuivalent Pipe Lengths of Valves and Fittings (C120 only) C Value Multiplier • - Actual Inside Diameter 4.87 Factor Value Of C 100 130 140 150 I \ = Schedule 40 Steel Pipe Inside Diameter / I Multiplying Factor 0.713 1.16 1.33 1.51 ALV Alarm Valve AngV Angle Valve b Bushing BalV Ball Valve BFP Backflow Preventer BV Butterfly Valve C Cross Flow Turn 900 cplg Coupling Cr Cross Run CV Check Valve DeIV Deluge Valve DPV Dry Pipe Valve E 90° Elbow EE 450 Elbow Eel 11140 Elbow Ee2 221/2* Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90° FireLock(TM) Elbow fEE 450 FireLock(TM) Elbow fig Flange FN Floating Node fT FireLock(TM) Tee g Gauge GloV Globe Valve GV Gate Valve Ho Hose Hose Hose HV Hose Valve Hyd Hydrant LtE Long Turn Elbow mecT Mechanical Tee Noz Nozzle P1 Pump In P2 Pump Out PIV Post Indicating Valve P0 Pipe Outlet PrV Pressure Relief Valve PRV Pressure Reducing Valve red Reducer/Adapter S Supply sCV Swing Check Valve SFx Seismic Flex Spr Sprinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Cap , 0 M.E.P.CAD, Inc. AutoSPRINK 2019 05.1.14.0 L03 AREA 1 8/29/2019 11:42:02AM Page 11 Calculation Date: 8/29/2019 L03 AREA 2 RIDE LOADING AREA Ordinary Group I NONE O.l5gpm/ft2 1500ft2 (Actual 1337ft2) 130ft2 Upright, Pendent 17 0 N/A gpm at Node: N/A 0.0 gpm at Node: I Type: Allowance at Source Hydraulic Calculations for -Tm2*M --*2% Project Name: LEGOLAND Location:,, Drawing Name: L03-LEGOLAND Design Remote Area Number: Remote Area Location: Occupancy Classification: Commodity Classification: Pressure: Area of Application: Coverage per Sprinkler: Type of sprinklers calculated No. of sprinklers calculated: No. of nozzles calculated: In-rack Demand: Hose Streams: (Safety Margin = 55.520 psi) Total Water Required (including Hose Streams where applicable): From Water Supply at Node 1: 352.13 @ 69.162 Type of System: WET Volume of Dry or PreAction System: N/A Name of Contractor: Address: Phone Number: Name of designer: DERREK CRIGLER Authority Having Jurisdiction: Notes: Automatic peaking results Left: 65.763 Right: N/A M.E.P.CAD, Inc. AutoSPRlNK 2019 05.1.14.0 L03 AREA 2 8/29/201911:43:54AM Page 1 Job Name: LEGOLAND Remote Area Number: L03 AREA 2 150 135 120 105 90 U) 0. 45 30 15 Supply Sum Sheet Node: I :Static Available Pressure Supply - - NNI 4800.00 85.000 523 im ' :: 69.162 T System demand curve ______ _________ 111111111 111111111 liii 11111 111111111 11111111 I I I I Hydraulic Graph 1-85 Date: 8/29/2019 1900 2850 3800 4750 5700 6650 7600 8550 9500 Flow - gpm &,cM.E.P.CAD, Inc. J AutoSPRINK2019v15.1.14.0 8/29/2019 11:43:56AM Page2 Hydraulic Graph Job Name: LEGOLAND N 1.85 Remote Area Number: L03 AREA 2 Date: 8/29/2019 150- LO3BOR I Summary Sheet 135- Available Supply Static Pressure 125.000 120 352.13 124.681 - 105- - 90- - - 4800.00 @ 85.000 o. 75-i Co - Co - 0 60— 1 1 2.13 4? 47.013 ystem demand curve 15-i 0....1Ulj.LLLLjJIIIIIIIII 111111111 IllItlIll hilt liii CIII 11111 111111 III 111111 II I I C I 0950 1900 2850 3800 4750 5700 6650 7600 8550 9500 Flow - gpm &,M.E.P.CAD, Inc. AutoSPRlNK2019v15.1.14.0 8/29/2019 11:43:56AM Paqe3 1111Summary Of Outfiowing Devices Job Number: I Report Description: Ordinary Group 1(1-03 AREA 2) Device Actual Flow (gpm) Minimum Flow (gpm) K-Factor (K) Pressure (psi) Sprinkler 629 20.72 19.50 5.6 13.692 Sprinkler 630 20.83 19.50 5.6 13.839 Sprinkler 631 21.23 19.50 5.6 14.370 Sprinkler 632 22.05 19.50 5.6 15.509 Sprinkler 633 21.94 19.50 5.6 15.346 Sprinkler 640 19.66 19.50 5.6 12.328 c Sprinkler 641 19.50 19.50 5.6 12.125 Sprinkler 642 19.74 19.50 5.6 12.426 Sprinkler 643 20.13 19.50 5.6 12.917 Sprinkler 644 21.01 19.50 5.6 14.077 Sprinkler 645 20.94 19.50 5.6 13.982 Sprinkler 653 21.68 19.50 5.6 14.982 Sprinkler 662 20.19 19.50 5.6 12.994 Sprinkler 663 20.02 19.50 5.6 12.781 Sprinkler 664 1 20.27 1 19.50 5.6 13.097 Sprinkler 665 20.68 19.50 5.6 13.636 Sprinkler 666 21.55 19.50 5.6 14.813 c Most Demanding Sprinkler Data , © M.E.P.CAD, Inc. Mjj AutoSPRINK 2019 v15.1.14.0 8/29/2019 11:43:57AM Page 4 Job Name: LEGOLAND Remote Area Number: L03 AREA 2 Date: 8/29/2019 Supply Analysis Node Name Static (psi) Residual Flow (psi) @ (gpm) Available Total Demand (psi) (gpm) Required Pressure (psi) Water Supply 125.000 85.000 1 4800.00 124.681 352.13 69.162 Node Analysis Node Number Elevation (Foot) Node Type Pressure at Node (psi) Discharge at Node (gpm) Notes I Supply 69.162 352.13 629 30-2 Sprinkler 13.692 20.72 630 30'-2 Sprinkler 13.839 20.83 631 30-2 Sprinkler 14.370 21.23 632 30-2 Sprinkler 15.509 22.05 633 30-2 Sprinkler 15.346 21.94 640 20'-8 Sprinkler 12.328 19.66 641 20-8 Sprinkler 12.125 19.50 642 20-8 Sprinkler 12.426 19.74 643 20-8 Sprinkler 12.917 20.13 644 20-8 Sprinkler 14.077 21.01 645 20-8 Sprinkler 13.982 20.94 653 20-8 Sprinkler 14.982 21.68 662 20-8 Sprinkler 12.994 20.19 663 20-8 Sprinkler 12.781 20.02 664 20-8 Sprinkler 13.097 20.27 665 20-8 Sprinkler 13.636 20.68 666 20'-8 Sprinkler 14.813 21.55 4 -5-4 68.838 Ik,©M.E.P.CAD, Inc. AutoSPRlNK 2019 v15.1.14. 8/29/2019 11:44:00AM Page Job Name: LEGOLAND Remote Area Number: L03 AREA 2 Date: 8/29/2019 Node Number Elevation (Foot) Node Type Pressure at Node (psi) Discharge at Node (gpm) Notes 7 -5-4 64.943 9 -1'-10 63.310 11 -5'-4 65.542 57 6-2 56.061 78 28-10 19.959 81 30-2 16.177 115 30-2 12.088 118 30-2 12.199 120 30-2 12.595 121 30-2 13.243 122 28'-10 20.087 125 30-2 15.473 126 30-2 14.771 127 30'-2 14.646 156 30-2 12.947 157 30-2 13.064 158 30-2 13.480 159 30-2 14.190 160 28-10 21.308 164 30-2 16.481 165 30-2 15.738 167 30-2 15.606 304 6'-2 54.535 .,© M.E.P.CAD, Inc. AutoSPRINK 2019 05.1.14. 8/29/2019 11:44:00AM Page 6 Job Name: LEGOLAND Remote Area Number: L03 AREA 2 Date: 8/29/2019 Node Number Elevation (Foot) Node Type Pressure at Node (psi) Discharge at Node (gpm) Notes 305 17-8 44.084 306 11 -2 50.442 307 17-8 Gauge 47.013 &©M.E.P.CAD, Inc. i1AutoSPRINK 2019 v15.1.14. 8/29/2019 11:44:00AM Page Job Name: LEGOLAND Remote Area Number: L03 AREA 2 Date: 8I29I209 Pipe Information Node I Elev I (Foot) K-Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(Pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pt) and shown as Fitting (Foot) __________ Pf Friction Loss Per Unit (I) Elev(Pe) Node 2 Elev 2 (Foot) Total Flow ) Actual ID Total (Foot) _______________ Friction(PI) 641 20'-8 5.6 19.50 1 (See Notes) T-11 120 12.125 ••"• Route l••••• Sprinkler, 2E(2'-4), PO(5'-10), fd(21'-O) 31'-6 0.106311 -4.119 118 30'-2 19.50 1.0830 39'-5 4.192 118 30'-2 19.66 1% 10'-O 120 12.199 Flow (q) from Route 2 0.039684 120 30'-2 39.16 1.7280 10'-O 0.397 120 30'-2 19.74 1% 7'-8 120 12.595 Flow (q) from Route 3 0.084443 121 30'-2 58.90 1.7280 7'-8 0.647 121 30'-2 20.13 11/2 (See Notes) 4'0% 120 13.243 Flow (q) from Route 5 PO(11'-31/2) 11'-3% 0.145453 125 30'-2 79.03 1.7280 15'4 2.230 125 30'-2 41.95 11/2 (See Notes) '4 120 15.473 Flow (q) from Route 10 PO(11'-31h) 11'-3Y2 0.319767 0.578 122 28'-10 120.98 1.7280 12'-7% 4.036 122 28'-10 106.77 21/2 10'-6 120 20.087 Flow (q) from Route 9 0.116228 160 28'-10 227.75 2.7050 10'-6 1.220 160 28'-10 124.38 21/2 (See Notes) 35'7 120 21.308 Flow (q) from Route 4 P0(18-8%), 2E(4'-3%), BV(6- 0) 0.260261 4.841 305 17'-8 352.13 2.7050 68'-ll 17.935 305 17'-8 2% (See Notes) 0'-6% 120 44.084 PO(18'-8%), L03 BOR, C(18'-8 0.077103 307 17'-8 182.44 2.7050 38'-0 2.929 307 17'-8 169.69 3 6'-6 120 47.013 Flow (q) from Route 15 0.094020 2.818 306 11'-2 352.13 3.3340 6'-6 0.611 306 11'-2 3 (See Notes) 8'4% 120 50.442 2E(5'-O) io'-o 0.104880 2.168 304 6'-2 352.13 3.2600 18'-4% 1.926 304 6'-2 3 (See Notes) 11'2% 120 54.535 E(5'-O) 5-0 0.094020 57 6'-2 352.13 3.3340 16'-2% 1.525 f, © M.E.P.CAD, Inc. ffl AutoSPRINK 2019 v15.1.14.0 L03 AREA 2 8/29/2019 11:44:02AM Page 8 Job Name: LEGOLAND Remote Area Number: L03 AREA 2 Date: 8/29/2019 Pipe Information Node I Elev I (Foot) K-Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(Pt) Notes FittinglDevice (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pf) and shown as nfl.•Irn Fitting (Foot) Pt Friction Loss Per Unit Total (ps Elev(Pe) Node 2 Elev 2 (Foot) Total Flow Actual ID (Foot) Frlction(Pf) _______ 57 ____________ 6'-2 _______ ____________ _________ 3 _________ (See Notes) __________ 35'2% _____________ 120 ________________ 56.061 E(5'-O) 5'-0 0.094020 3.468 9 -1'-10 352.13 3.3340 40'-2% 3.781 9 -1'-10 6 (See Notes) 101 1% 120 63.310 E(16-7) 16'-7 0.004305 1.517 7 -5'-4 352.13 6.2800 26'-8% 0.115 7 -5'-4 6 (See Notes) 53'8% 150 64.943 EE(5'-9), GV(2'-5Y2), 3E(11'-5% 42'-7 0.006224 11 -5'4 352.13 5.3490 96'-3% 0.599 11 -5'-4 6 (See Notes) 16'10 120 65.542 3E(16'-7), BFP(-3.009) 0.004305 4 -5'-4 352.13 6.2800 66'-7 3.296 4 -5'-4 6 (See Notes) 13'-7 150 68.838 E(11'-5Y2), GV(2'-5%), S, T(24'- 7) 38'-6 0.006224 1 -5'-4 352.13 5.3490 52'-0Y2 0.324 0.00 69.162 Hose Allowance At Source Total(Pt) Route I 1 352.13 640 20'-8 5.6 19.66 1 (See Notes) 7'-ll 120 12.328 "' Route 2" Sprinkler, 3E(2'-4), fd(21'-O) 28'-0 36-110.107953 -4.119 115 30'-2 19.66 1.0830 3.878 115 30'-2 1v2 101 0 120 12.088 0.011093 118 30'-2 19.66 1.7280 10,-0 0.111 12.199 Total(Pt) Route 2 642 20'-8 5.6 19.74 1 (See Notes) 7'-ll 120 12.426 Route 3 Sprinkler, 2E(2'-4), P0(5-10), fd(21'-O) 31'-6 0.108748 -4.119 120 30'-2 19.74 1.0830 39'-5 4.288 12.595 Total(Pt) Route 3 663 20'-8 5.6 20.02 1 (See Notes) 7'-ll 120 12.781 1 • •' Route 4 " Sprinkler, 2E(2'-4), PO(6-10), fd(21'-O) 31'-6 0.111619 -4.119 1 157 30'-2 20.02 1.0830 39'-5 4.401 , © M.E.P.CAD, Inc. jj AutoSPRINK 2019 v15.1.14.0 L03 AREA 2 8/29/2019 11:44:02AM Page 9 Job Name: LEGOLAND Remote Area Number: L03 AREA 2 Date: 8/29/2019 Pipe Information Node I Elev I (Foot) K-Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(Pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pf) and shown as Fitting (Foot) ___________ Pf Friction Loss Per Unit Elev(Pe) Node 2 Elev 2 (Foot) Total Flow (Q) Actual ID Total (Foot) Friction(Pf) 157 30'-2 20.19 1 Y2 10'-0 120 13.064 Flow (q) from Route 6 0.041665 158 30'-2 40.21 1.7280 10'-O 0.417 158 30'-2 20.27 1/2 81-0 120 13.480 Flow (q) from Route 7 0.088656 159 30'-2 60.47 1.7280 0.709 159 30'-2 20.68 11/2 (See Notes) 38h/2 120 14.190 Flow (q) from Route 8 Po(11'-3v2) 0.152764 164 30'-2 81.15 1.7280 15'-0 2.291 164 30'-2 43.23 11/2 (See Notes) 1'4 120 16.481 Flow (q) from Route 12 PO(11'-3Y2) 1131,4 0.336596 0.578 160 28'-10 124.38 1.7280 12'-7% 4.249 21.308 Total(Pt) Route 4 643 20'-8 5.6 20.13 1 (See Notes) 7'-11 120 12.917 ••••• Route 5••••• Sprinkler, 2E(2'-4), PO(5'-110), fd(21'-O) 31'-6 0.112716 -4.119 121 30'-2 20.13 1.0830 39'-5 4.444 13.243 Total(Pt) Route 5 662 20'-8 5.6 20.19 1 (See Notes) 7'111 120 12.994 •••. Route 6..... Sprinkler, 3E(2'-4), fd(21'-O) 28'-0 0.113338 -4.119 156 30'-2 20.19 1.0830 35'-11 4.072 156 30'-2 11/2 101-0 120 12.947 0.011646 157 30'-2 20.19 1.7280 10'-O 0.116 13.064 Total(Pt) Route 6 664 20'-8 5.6 20.27 1 (See Notes) 7-11 120 13.097 ..... Route 7 Sprinkler, 2E(2'-4), PO(6-10), fd(21'-O) 31'-6 0.114170 -4.119 158 30'-2 20.27 1.0830 39'-5 4.502 13.480 Total(Pt) Route 7 665 20'-8 5.6 20.68 1 (See Notes) 7'11 T 120 13.636 Route 8••.•• Sprinkler, 2E(2'-4), P0(5-10), fd(21'-0) 31'-6 t 0.118504 4.119 159 30'-2 20.68 1.0830 4.673 14.190 Total(Pt) Route 8 , © M.E.P.CAD, Inc. AutoSPRINK 2019 v15.1.14.0 L03 AREA 2 8/29/2019 11:44:02AM Page 10 Job Name: LEGOLAND Rmote Area Number: L03 AREA 2 Date: 8/29/2019 Pipe Information Node I Elev I (Foot) K-Factor Flow added this step (q) Nominal ID Fittings & Devices Equiv. Length (Foot) Length (Foot) C Factor Total(Pt) Notes Fitting/Device (Equivalent Length) Fixed Pressure Losses, when applicable, are added directly to (Pt) and shown as Fitting (Foot) Pt Friction Loss Per Unit (psi) Elev(Pe) Node 2 Elev 2 (Foot) Total Flow (Q) Actual ID Total (Foot) _______________ Friction(M) 629 30'-2 5.6 20.72 1% (See Notes) 120 120 13.692 Route 9"... Sprinkler 0.012224 630 30'-2 20.72 1.7280 12'-O 0.147 630 30'-2 5.6 20.83 1% (See Notes) 120 120 13.839 Sprinkler 0.044284 631 30-2 41.55 1. 7280 12'-O 0.531 631 30'-2 5.6 21.23 i1/2 (See Notes) 7'-8'h 120 14.370 Sprinkler, PO(11'-3%) 11'-31h 0.095020 81 30'-2 62.78 :1.7280 191-0 1.807 81 30-2 43.99 1½ (See Notes) 1'4 120 16.177 Flow (q) from Route 14 PO(11'-3%) 11'-3% 0.253791 0.578 78 28'-10 106.77 1.7280 12'-7% 3.204 78 28'-10 2% 4'-6 120 19.959 0.028619 122 28'-10 106.77 2.7050 4'-6 0.129 20.087 Total(Pt) Route 9 645 20'-8 5.6 20.94 1 (See Notes) 7'11 120 13.982 " Route 10..... Sprinkler, 2E(2'-4), PO(6-10), fd(21'-O) 31-6 0.121288 -4.119 127 30'-2 20.94 1.0830 39'-5 4.782 127 30'-2 1% 101-0 120 14.646 0.012463 126 30'-2 20.94 1.7280 1O'-O 0.125 126 30'-2 21.01 1% (See Notes) 4'3% 120 14.771 Flow (q) from Route 11 P0(11-3%) 11-3% 0.045069 125 30'-2 41.95 1.7280 L15'-7 0.702 15.473 Total(Pt) Route 10 644 20'-8 5.6 21.01 1 (See Notes) I 7'-11 120 14.077 ..... Route ll••••• Sprinkler, 2E(2'-4), P0(5-10), fd(21'-0) 31-6 0.122047 -4.119 126 30'-2 21.01 1.0830 I 39'-5 4.812 14.771 Total(Pt) Route 11 666 20'-8 5.6 21.55 1 (See Notes) I 7-11 120 14.813 1 ..... Route 12••••• Sprinkler, 1 2E(2'-4), P0(5-10), fd(21'-0) 31-6 0.127936 -4.119 165 30'-2 21.55 1.0830 I 39'-5 5.044 (,©M.E.P.CAD, Inc. AutoSPRlNK 2019 05.1.14.0 LO3 AREA 2 8/29/2019 11:44:02AM Page 11 Job Name: LEGOLAND Remote Area Number: L03 AREA 2 Date: 8129120i9 Pipe Information Elev I Flow added Fittings & Length C Factor Total(Pt) Notes Node I (Foot) K-Factor this step Nominal ID Devices (Foot) Fitting/Device (Equivalent Fitting (Foot) Pf Friction Elev(Pe) (q) Equiv. Length) Fixed Pressure Losses, Elev 2 Total Flow Loss Per Unit when applicable, are added Total Friction(Pf) Node 2 (Foot) (Q) Actual ID Length (Foot) (l) directly to (N) and shown as (Foot) 165 30'-2 21.68 1% (See 4'3% 120 15.738 Flow (q) from Route 13 11'-3% Notes) 164 30'-2 43.23 1.7280 0.047642 PO(11'-3%) 16-7 0.742 16.481 Total(Pt) Route 12 653 20'-8 5.6 21.68 1 (See 7-6 120 14.982 "" Route 13 ..... 29-2 -4.119 Notes) Sprinkler, 167 30'-2 21.68 1.0830 0.129291 E(2-4), PO(5'-10), fd(21'-O) 36'-8 4.742 167 30'-2 11/2 101-0 120 15.606 0.013285 165 30'-2 21.68 1.7280 10'-O 0.133 15.738 Total(Pt) Route 13 633 30'-2 5.6 21.94 1% (See 12'0 120 15.346 "Route 14..... Notes) Sprinkler 632 30'-2 21.94 1.7280 0.013584 12'-O 0.163 632 30'-2 5.6 22.05 11/2 (See 2'-3Y2 120 15.509 Notes) Sprinkler, 11 31/ 81 30'-2 43.99 1.7280 0.049209 PO(11'-3%) 13'-7 0.668 16.177 Total(Pt) Route 14 305 17'-8 2% (See 01 0 120 44.084 ... ••Route l5••••• Notes) BV(6'-O) 307 17'-8 169.69 2.7050 0.067434 P0(18-8%), L03 BOR, C(1 8'-B 43'-5 2.929 47.013 Total(Pt) Route 15 &@ M.E.P.CAD, Inc. J AutoSPRINK 2019 v15.1.14.0 L03 AREA 2 8/29/2019 11:44:02AM Page 12 Job Name: LEGOLAND R@mote Area Number: L03 AREA 2 Date: 8/29/2019 [!Equivalent Pipe Lengths of Valves and Fittings (C=120 only) IC Value Multiplier I Actual Inside Diameter 4.87 Factor Value Of C 100 130 140 150 I \ = k Schedule 40 Steel Pipe Inside Diameter ) I Multiplying Factor 0.713 1.16 1.33 1.51 ALV Alarm Valve AngV Angle Valve b Bushing BalV Ball Valve BFP Backflow Preventer BV Butterfly Valve C Cross Flow Turn 90° cplg Coupling Cr Cross Run CV Check Valve DelV Deluge Valve DPV Dry Pipe Valve E 90° Elbow EE 450 Elbow Eel 111/4* Elbow Ee2 221/2* Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90° FireLock(TM) Elbow fEE 45° FireLock(TM) Elbow fig Flange FN Floating Node fT FireLock(TM) Tee g Gauge GloV Globe Valve GV Gate Valve Ho Hose Hose Hose HV Hose Valve Hyd Hydrant LtE Long Turn Elbow mecT Mechanical Tee Noz Nozzle P1 Pump In P2 Pump Out PIV Post Indicating Valve P0 Pipe Outlet PrV Pressure Relief Valve PRV Pressure Reducing Valve red Reducer/Adapter S Supply sCV Swing Check Valve SFx Seismic Flex Spr Sprinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Cap , © M.E.P.CAD, Inc. AutoSPRINK 2019 v15.1.14.0 L03 AREA 2 8/29/2019 11:44:02AM Page 13 Pcao —n:)((; Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owners representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no way prejudices any daim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. Property name Lego Land 2020 Date 1/22/2020 Property address 1 Lego Land Drive, Carlsbad, Ca. 92008 Accepted by approving authorities (names) Address Plans Installation conforms to accepted plans I Yes No Equipment used is approved Yes No It no, explain deviations Has person in charge of tire equipment been instructed as Yes No to location of control valves and care and maintenance of this new equipment? If no, explain Instructions Have copies of the following been left on the premises? 12] Yes D No System components intruction Yes No Care and maintenance imtriuctions Yes No NFPA25 Yes No Location of system Supplies buildings Year of Orifice Temperature Make Model mani4acture Size Quantity rating Viking VK300 2019 5.6 188 200 Sprinklers Tyco 1Y3531 2019 5.6 52 200 Tvco TY3332 2019 5.6 1 175 Pipe and Type of pipe Eddy-Thread fittings Type of fillings Victaulic Grooved fittings - Ductile threaded fittings Maximum time to operate Alarm valve or flow indicator Alarm device Type Make Model through test oonnection Minutes Seconds Flow Potter VSR 5$' Dry valve 0.0. D. Make Model Serial no. Make Model Serial no. Dry pipe operating test Time to trip through test oonneclton1'2 Water pressure Air pressure Trip point air pressure Time water reached test outlet1'2 Alarm operated properly Minutes Seconds psi psi psi Minutes Seconds Yes No Without With QOD. If no, explain I Measured from time inspector's test connection is opened 2 NFPA 13 only requires the 60-second imitation in specific sections Form 1 Operation Pneumatic E Electric E Hydraulics Piping supervised ED Yas D No Detecting media supervised Yes iNo Does valve operate from the manual trip, remote, or both E Yes E No control stations? Deluge and preaction valves Is there an accessible facility in each circuit for testing? flYes No If no, explain Does each circuit operate Does each circuit operate Maximum time to Make Model supervision loss alarm? valve release? operate release Yes No Yes No Minutes Seconds Location Make and Setting Static pressure Residual pressure Flow rate Pressure and floor model (flowing) reducing valve test Inlet (psi) Outlet (psi) Inlet (psi) Outlet (psi) Row (gpm) I Hydrotati Hydrostatic tests shalt be made at not less than 200 psi (1.6 bar) for 2 hours or 50 psi (3.4 bar) above static pressure in excess. of 150 psi (12 bar) for 2 hours. Differential dry-pipe valve clappers shall be left Test open dwing the tesi to prevent damage. All aboveqround piping leakage shall be stopped. description Pneumatic: Establish 40 psi (2.7 bar) air pressure: and measure drop, which shall not exceed 1½ psi (0.1 bar) in 24 hours Test pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 11.72 psi (0.1 bar) in 24 hour All piping hydrostatically tested at 200 psi (_ bar) for L_. hours If no, state reason Dry piping pneumatically tested D Yes No Equipment operates properly Yes No Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives of sodm silicate, brine, or other corrosive chemicals were not used for testing systems or stopping teaks? IZ] Yes D No Drain Reading of gauge located near water Residual pressure with valve in test Tests test supply lest connection: psi (__. bar) connection open wide: 7 psi (_bar) Underground mains and lead-in connections to system risers flushed before connection made to 5b sprinkler piping Verilied by copy of the Conhactors Material and Test 12] Yes E No Other Explain Certificate for Underground Piping Rushed by installer of underground sprinkler piping E Yes No It powder-driven fasteners are used in concrete, Yes No If no, explain has representative sample testing been satislactorily completed? Post Drilled anchors Blank testing Number used Locations Number removed gaskets Welding piping [?1 Yes D No If yes. Do you certify as the sprinkler contractor that welding procedures comply 12] Yes C] No with the requirements of at least AWS B2,1' Welding e g Do you certify that the welding was performed by welders qualified in [2] Yes C] No compliance with the requirements of at least AWS B2.11 Do you certify that the welding was carried old in compliance iMth a IZI Yes [:] No documented quality control procedure to ensure that all discs are retrieved, that openings in piping are smooth, that slag and other welding residue are removed, and that the internal diameters of piping are not penetrated? Cutouts (discs) Do you certify that you have a control feature to ensure that 12] Yes C] No all cutouts (discs) are retrieved? Form 1 Hydraulic data nameplate Nameplate provided Yes C] No If no, explain Remarks Date left in servIce with all control valves open Signatures Name of sjrinkler contractor A&D Fire Sprinklers Tests witnessed by For property owner (signed) Title Date For sprinkle contracto:r (signe Title Date Additional explanations and notes Form 1