Loading...
HomeMy WebLinkAbout1 LEGOLAND DR; ; FPC2017-0022; PermitPERMIT REPORT Cr'city of Carlsbad Print Date: 12/02/2020 Job Address: 1 LEGOLAND DR, CARLSBAD, CA 92008-4610 Permit Type: FIRE-Construction Commercial Work Class: Parcel #: 2111000900 Valuation: $12,358,470.00 Occupancy Group: #of Dwelling Units: Bedrooms: Bathrooms: Permit No: FPC2017-0022 Status: Closed - Finaled Fire Sprinklers Applied: 01/26/2017 Issued: 05/09/2017 DEV2016-0038 Finaled Close Out: 12/02/2020 Inspector: Final Inspection: Track #: Lot #: Project #: Plan #: Construction Type: Orig. Plan Check #: Plan Check #: Project Title: LEGOLAND EMPLOYEE PKG STRUCTURE Description: LEGOLAND PARKING STRUCTURE SPRINKLER SYSTEM FOR 4 LEVELS. FPContractor: INTELLIGENT TECHNOLOGIES AND SERVICES INC 1150 W CENTRAL AVE, # D BREA, CA 92821-2259 (714) 257-2244 FEE AMOUNT FIRE Expedited Plan Review Per Hour - Overtime $294.00 FIRE NFPA 13 System> 100 heads (includes 1 riser) $832.00 FIRE NFPA 13 System> 100 heads (includes 1 riser) $230.00 FIRE NFPA 13 System> 100 heads (includes 1 riser) $230.00 FIRE NFPA 13 System > 100 heads (includes 1 riser) $230.00 FIRE NFPA 13 System > 100 heads (includes 1 riser) $230.00 FIRE NFPA 13 System > 100 heads (includes 1, riser) $230.00 Total Fees: $2,276.00 Total Payments To Date: $2,276.00 Balance Due: $0.00 Fire Department Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov t4 F P S Specialists in Fire Systems LEGOLAND PARKING STRUCTURE CARLSBAD, CA AREA-1 (TREE) FILE NUMBER: LEGOLAND AREA-1 (TREE).sdf DATE: 02/22/17 -DESIGN DATA- OCCUPANCY CLASSIFICATION: DENSITY: COVERAGE PER SPRINKLER: NUMBER OF SPRINKLERS CALCULATED: TOTAL SPRINKLER WATER FLOW REQUIRED: FLOW AND PRESSURE (@ NODE SP1.2): SPRINKLER K-FACTOR (ORIFICE SIZE): Ordinary Hazard Group 1 .15 /1500 400 sq. ft. (most demanding head) 6 sprinklers 633.7 gpm (incl. 250 gpm hose allowance) 383.7 gpm @ 68.8 psi 14.0 DESIGN/ LAYOUT BY: AUTHORITY HAVING JURISDICTION: WATER FLOW AVAILABILITY DATA: FPS Carlsbad Fire Dept STATIC: 97 psi RESIDUAL: 86 psi FLOW: 2350 gpm SOURCE: Fire Flow Test on 1/22/16 City of Carlsbad CALCULATIONS BY HASS COMPUTER PROGRAM HRS SYSTEMS, INC. ATLANTA, GA SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-1 (TREE).SDF JOB TITLE: LEGOLAND PS AREA-1 (TREE) 9 WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. 8 DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) SRC 97.0 86.0 2350.0 96.0 633.7 84.1 Required pressure is 11.9 psi (12%) less than available pressure. AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 633.7 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 150.0 GPM OTHER HOSE STREAM ALLOWANCES 100.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 383.7 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) SRC 0.0 SOURCE 84.1 483.7 DIP -4.0 - - - - 85.3 - - - RPI 3.0 - - - - 82.1 - - - 3.0 - - - - 75.1 .RPO FDC 3.0 - - - - 75.1 - - - PVC -4.0 - - - - 77.9 - - - SWP -4.0 - - - - 77.0 - - - A -4.0 - - - - 77.0 - - - B 2.0 - - - - 74.3 - - - SP1 4.0 HOSE STREAM 73.0 100.0 SP1.2 13.2 - - - - 68.8 - - - TOR 19.0 - - - - 63.4 - - - 1 19.0 - - - - 62.4 - - - 2 19.0 - - - - 55.6 - - - 3 19.0 - - - - 53.9 - - - 4 19.0 - - - - 52.3 - - - 5 19.0 - - - - 50.7 - - - 6 19.0 - - - - 49.2 - - - 7 19.0 - - - - 47.7 - - - 8 19.0 - - - - 46.1 - - - 9 19.0 - - - - 44.6 - - - 10 19.0 - - - - 43.0 - - - ii 19.0 - - - - 38.4 - - - 12 19.0 - - - - 31.1 - - - 13 19.0 - - - - 26.9 - - - 14 19.0 - - - - 26.1 - - - 15 19.0 - - - - 59.3 - - - 16 19.0 - - - - 55.0 - - - 17 19.0 - - - - 53.7 - - - 18 19.0 - - - - 52.2 - - - 19 19.0 - - - - 50.7 - - - .20 19.0 - - - - 49.2 - - - 21 19.0 - - - - 47.7 - - - 22 19.0 - - - - 46.2 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-1 (TREE) .SDF JOE TITLE: LEGOLAND PS AREA-1 (TREE) NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 23 19.0 - - - - 44.6 - - - 24 19.0 - - - - 43.1 - - - 25 19.0 - - - - 39.1 - - - 101 19.0 K=14.00 24.7 69.6 102 19.0 K=14.00 24.7 69.6 103 19.0 K=14.00 19.8 62.2 104 19.0 K14.00 18.4 60.0 105 19.0 K=14.00 19.8 62.2 106 19.0 K=14.00 18.4 60.0 301 19.0 - - - - 44.6 - - - 302 19.0 - - - - 44.6 - - - 303 19.0 - - - - 43.1 - - - 304 19.0 - - - - 43.1 - - - 305 19.0 - - - - 43.1 - - - 306 19.0 - - - - 43.1 - - - I SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-1 (TREE).SDF JOB TITLE: LEGOLAND PS AREA-1 (TREE) PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: UG1 483.7 5.914 PL 40.00 PF 0.6 SRC 0.0 SRCE 84.1 (N/A) 5.6 150 FTG TG PE 1.7 DIP -4.0 0.0 85.3 0.0 0.007 TL 84.10 PV Pipe: UG2 483.7 6.400 PL 7.00 PP 0.1 DIP -4.0 0.0 85.3 0.0 4.8 140 FTG L PH -3.0 RPI 3.0 0.0 82.1 0.0 0.005 TL 22.55 PV Pipe: UG3 FIXED PRESSURE LOSS DEVICE RPI 3.0 0.0 82.1 0.0 7.0 psi, 483.7 gpm RPO 3.0 0.0 75.1 0.0 Pipe: UG4 483.7 6.400 PL 2.00 PF 0.0 RPO 3.0 0.0 75.1 0.0 4.8 140 FTG ---- PE 0.0 FDC 3.0 0.0 75.1 0.0 0.005 TL 2.00 PV Pipe: UG5 483.7 6.400 PL 7.00 PF 0.3 FDC 3.0 0.0 75.1 0.0 4.8 140 FTG T PE 3.0 PVC -4.0 0.0 77.9 0.0 0.005 TL 58.84 PV Pipe: UG6 483.7 5.914 FL 72.00 PP 0.8 -4.0 0.0 77.9 0.0 5.6 150 FTG 4L PE 0.0 S PVC SWP -4.0 0.0 77.0 0.0 0.007 TL 120.11 PV Pipe: UG7 483.7 6.357 PL 6.00 PF 0.0 SWP -4.0 0.0 77.0 0.0 4.9 150 FTG ---- FE 0.0 A -4.0 0.0 77.0 0.0 0.005 TL 6.00 PV Pipe: SF1 483.7 6.357 PL 6.00 PF 0.1 A -4.0 0.0 77.0 0.0 4.9 150 FTG L FE -2.6 B 2.0 0.0 74.3 0.0 0.005 TL 23.10 PV Pipe: SP2 483.7 6.357 PL 6.58 PF 0.4 B 2.0 0.0 74.3 0.0 4.9 120 FTG TL PE -0.9 SF1 4.0 H.S. 73.0 100.0 0.007 TL 55.62 PV Pipe: SF3 383.7 6.357 PL 9.42 PF 0.3 SP1 4.0 H.S. 73.0 100.0 3.9 120 FTG TB PE -4.0 SF1.2 13.2 0.0 68.8 0.0 0.005 TL 59.71 PV Pipe: RISER 383.7 4.310 PL 5.83 PF 2.8 SF1.2 13.2 0.0 68.8 0.0 8.4 120 FTG TLCB FE -2.5 TOR 19.0 0.0 63.4 0.0 0.032 TL 89.45 PV Pipe: MAIN1 383.7 4.310 PL 14.50 PP 1.0 TOR 19.0 0.0 63.4 0.0 8.4 120 FTG 2L FE 0.0 1 19.0 0.0 62.4 0.0 0.032 TL 31.22 PV Pipe: MAIN2 215.4 2.703 FL 46.08 PP 6.8 S i19.0 0.0 62.4 0.0 12.0 120 FTG T FE 0.0 2 19.0 0.0 55.6 0.0 0.105 TL 64.73 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-1 (TREE).SDF JOB TITLE: LEGOLAND PS AREA-1 (TREE) S PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: MAIN3 204.1 2.703 PL 18.00 PP 1.7 2 19.0 0.0 55.6 0.0 11.4 120 FTG ---- PE 0.0 3 19.0 0.0 53.9 0.0 0.095 TL 18.00 PV Pipe: MAIN4 197.3 2.703 PL 18.00 PF 1.6 3 19.0 0.0 53.9 0.0 11.0 120 FTG ---- PE 0.0 4 19.0 0.0 52.3 0.0 0.089 TL 18.00 PV Pipe: MAIN5 193.7 2.703 PL 18.00 PF 1.6 4 19.0 0.0 52.3 0.0 10.8 120 FTG ---- PE 0.0 5 19.0 0.0 50.7 0.0 0.086 TL 18.00 PV Pipe: MAIN6 192.3 2.703 PL 18.00 PF 1.5 5 19.0 0.0 50.7 0.0 10.7 120 FTG ---- FE 0.0 6 19.0 0.0 49.2 0.0 0.085 TL 18.00 PV Pipe: MAIN7 191.9 2.703 PL 18.00 PF 1.5 6 19.0 0.0 49.2 0.0 10.7 120 FTG ---- PE 0.0 7 19.0 0.0 47.7 0.0 0.085 TL 18.00 PV Pipe: MAIN8 191.9 2.703 PL 18.00 PP 1.5 7 19.0 0.0 47.7 0.0 10.7 120 FTG ---- PE 0.0 8 19.0 0.0 46.1 0.0 0.085 TL 18.00 PV Pipe: MAIN9 192.4 2.703 FL 18.00 PF 1.5 8 19.0 0.0 46.1 0.0 10.8 120 FTG ---- PE 0.0 9 19.0 0.0 44.6 0.0 0.085 TL 18.00 PV Pipe: MAIN10 194.2 2.703 FL 18.00 PF 1.6 9 19.0 0.0 44.6 0.0 10.9 120 FTG ---- FE 0.0 10 19.0 0.0 43.0 0.0 0.087 TL 18.00 PV Pipe: MAINii 198.3 2.703 PL 51.00 PP 4.6 10 19.0 0.0 43.0 0.0 11.1 120 FTG ---- PE 0.0 11 19.0 0.0 38.4 0.0 0.090 TL 51.00 PV Pipe: MAIN13 198.3 2.703 FL 62.50 PP 7.3 ii 19.0 0.0 38.4 0.0 11.1 120 FTG T FE 0.0 12 19.0 0.0 31.1 0.0 0.090 TL 81.15 PV Pipe: MAIN14 383.7 3.314 FL 15.00 PF 4.2 12 19.0 0.0 31.1 0.0 14.3 120 FTG T PE 0.0 13 19.0 0.0 26.9 0.0 0.113 TL 36.84 PV Pipe: MAIN15 244.5 3.314 FL 18.00 PP 0.9 13 19.0 0.0 26.9 0.0 9.1 120 FTG ---- FE 0.0 14 19.0 0.0 26.1 0.0 0.049 TL 18.00 PV Pipe: MAIN16 168.3 3.314 FL 125.00 PF 3.1 1 19.0 0.0 62.4 0.0 6.3 120 FTG ---- FE 0.0 15 19.0 0.0 59.3 0.0 0.025 TL 125.00 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-1 (TREE).SDF JOB TITLE: LEGOLAND PS AREA-1 (TREE) . PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: MAIN17 168.3 2.703 PL 46.08 PF 4.3 15 19.0 0.0 59.3 0.0 9.4 120 FIG T PE 0.0 16 19.0 0.0 55.0 0.0 0.067 TL 64.73 PV Pipe: MAIN18 179.6 2.703 FL 18.00 PF 1.4 16 19.0 0.0 55.0 0.0 10.0 120 FTG ---- FE 0.0 17 19.0 0.0 53.7 0.0 0.075 TL 18.00 PV Pipe: MAIN19 186.4 2.703 PL 18.00 PP 1.4 17 19.0 0.0 53.7 0.0 10.4 120 FTG ---- FE 0.0 18 19.0 0.0 52.2 0.0 0.081 TL 18.00 PV Pipe: MAIN20 190.0 2.703 FL 18.00 PF 1.5 18 19.0 0.0 52.2 0.0 10.6 120 FTG ---- PE 0.0 19 19.0 0.0 50.7 0.0 0.083 TL 18.00 PV Pipe: MAIN21 191.4 2.703 PL 18.00 PF 1.5 19 19.0 0.0 50.7 0.0 10.7 120 FIG ---- FE 0.0 20 19.0 0.0 49.2 0.0 0.085 TL 18.00 PV Pipe: MAIN22 191.8 2.703 PL 18.00 PF 1.5 20 19.0 0.0 49.2 0.0 10.7 120 FTG ---- PE 0.0 21 19.0 0.0 47.7 0.0 0.085 TL 18.00 PV Pipe: MAIN23 191.8 2.703 FL 18.00 PF 1.5 21 19.0 0.0 47.7 0.0 10.7 120 FTG ---- PE 0.0 22 19.0 0.0 46.2 0.0 0.085 TL 18.00 PV Pipe: MAIN24 191.3 2.703 PL 18.00 PF 1.5 22 19.0 0.0 46.2 0.0 10.7 120 FTG ---- PE 0.0 23 19.0 0.0 44.6 0.0 0.084 TL 18.00 PV Pipe: MAIN25 189.5 2.703 PL 18.00 PF 1.5 23 19.0 0.0 44.6 0.0 10.6 120 FTG ---- PE 0.0 24 19.0 0.0 43.1 0.0 0.083 TL 18.00 PV Pipe: MAIN26 185.4 2.703 PL 51.00 PF 4.1 24 19.0 0.0 43.1 0.0 10.4 120 FTG ---- PE 0.0 25 19.0 0.0 39.1 0.0 0.080 IL 51.00 PV Pipe: MAIN27 185.4 2.703 PL 62.50 PF 8.0 25 19.0 0.0 39.1 0.0 10.4 120 FIG 21 PE 0.0 12 19.0 0.0 31.1 0.0 0.080 TL 99.80 PV Pipe: GRID2 11.3 1.728 PL 125.00 PF 0.6 2 19.0 0.0 55.6 0.0 1.5 120 FTG 21 FE 0.0 16 19.0 0.0 55.0 0.0 0.004 IL 147.58 PV Pipe: GRID3 6.8 1.728 FL 125.00 PF 0.2 3 19.0 0.0 53.9 0.0 0.9 120 FIG 2T FE 0.0 17 19.0 0.0 53.7 0.0 0.002 TL 147.58 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-1 (TREE).SDF JOB TITLE: LEGOLAND PS AREA-1 (TREE) . PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: GRID4 3.6 1.728 PL 125.00 PF 0.1 4 19.0 0.0 52.3 0.0 0.5 120 FTG 2T FE 0.0 18 19.0 0.0 52.2 0.0 0.000 TL 147.58 PV Pipe: GRID5 1.5 1.728 PL 125.00 PF 0.0 5 19.0 0.0 50.7 0.0 0.2 120 FTG 2T FE 0.0 19 19.0 0.0 50.7 0.0 0.000 TL 147.58 PV Pipe: GRID6 0.4 1.728 PL 125.00 PF 0.0 6 19.0 0.0 49.2 0.0 0.1 120 FTG 2T PE 0.0 20 19.0 0.0 49.2 0.0 0.000 TL 147.58 PV Pipe: GRID7 0.0 1.728 PL 125.00 PF 0.0 7 19.0 0.0 47.7 0.0 0.0 120 FTG 2T PE 0.0 21 19.0 0.0 47.7 0.0 0.000 TL 147.58 PV Pipe: GRID8 -0.5 1.728 PL 125.00 PF 0.0 8 19.0 0.0 46.1 0.0 0.1 120 FTG 2T PE 0.0 22 19.0 0.0 46.2 0.0 0.000 TL 147.58 PV Pipe: GRID9 -1.8 1.728 PL 55.00 PF 0.0 9 19.0 0.0 44.6 0.0 0.2 120 FTG T FE 0.0 301 19.0 0.0 44.6 0.0 0.000 TL 66.29 PV Pipe: GRID10 -1.8 1.728 FL 15.00 PF 0.0 301 19.0 0.0 44.6 0.0 0.2 120 FTG ---- PE 0.0 302 19.0 0.0 44.6 0.0 0.000 TL 15.00 PV Pipe: GRID11 -1.8 1.728 PL 55.00 PF 0.0 302 19.0 0.0 44.6 0.0 0.2 120 FTG T PE 0.0 23 19.0 0.0 44.6 0.0 0.000 TL 66.29 PV Pipe: GRID12 -4.1 1.728 FL 39.00 PF 0.0 10 19.0 0.0 43.0 0.0 0.6 120 FTG T PH 0.0 303 19.0 0.0 43.1 0.0 0.001 TL 50.29 PV Pipe: GRID13 -4.1 1.728 FL 16.00 PF 0.0 303 19.0 0.0 43.1 0.0 0.6 120 FTG ---- PE 0.0 304 19.0 0.0 43.1 0.0 0.001 TL 16.00 PV Pipe: GR1D14 -4.1 1.728 FL 15.00 PF 0.0 304 19.0 0.0 43.1 0.0 0.6 120 FTG ---- FE 0.0 305 19.0 0.0 43.1 0.0 0.001 TL 15.00 PV Pipe: GR1D15 -4.1 1.728 FL 16.00 PF 0.0 305 19.0 0.0 43.1 0.0 0.6 120 FTG ---- FE 0.0 306 19.0 0.0 43.1 0.0 0.001 TL 16.00 PV Pipe: GRID16 -4.1 1.728 FL 39.00 PF 0.0 306 19.0 0.0 43.1 0.0 0.6 120 FTG T PE 0.0 24 19.0 0.0 43.1 0.0 0.001 TL 50.29 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 7 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-1 (TREE).SDF JOB TITLE: LEGOLAND PS AREA-1 (TREE) S PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: TREE1 69.6 1.728 PL 8.00 PF 2.2 13 19.0 0.0 26.9 0.0 9.5 120 FTG T PE 0.0 101 19.0 14.0 24.7 69.6 0.115 TL 19.29 PV Pipe: TREE2 69.6 1.728 PL 8.00 PF 2.2 13 19.0 0.0 26.9 0.0 9.5 120 FTG T PE 0.0 102 19.0 14.0 24.7 69.6 0.115 TL 19.29 PV Pipe: TREE3 122.2 1.728 PL 8.00 PF 6.3 14 19.0 0.0 26.1 0.0 16.7 120 FTG T PE 0.0 103 19.0 14.0 19.8 62.2 0.326 TL 19.29 PV Pipe: TREE4 60.0 1.728 PL 16.00 PF 1.4 103 19.0 14.0 19.8 62.2 8.2 120 FTG ---- PE 0.0 104 19.0 14.0 18.4 60.0 0.087 TL 16.00 PV Pipe: TREES 122.2 1.728 PL 8.00 PF 6.3 14 19.0 0.0 26.1 0.0 16.7 120 FTG T PE 0.0 105 19.0 14.0 19.8 62.2 0.326 TL 19.29 PV Pipe: TREE6 60.0 1.728 PL 16.00 PP 1.4 105 19.0 14.0 19.8 62.2 8.2 120 FTG ---- PE 0.0 106 19.0 14.0 18.4 60.0 0.087 TL 16.00 PV NOTES (HASS): Calculations were performed by the HASS 7.9 computer program under license no. 16080621 granted by HRS Systems, Inc. 4792 LaVista Road Tucker, GA 30084 The system has been calculated to provide an average imbalance at each node of 0.002 gpm and a maximum imbalance at any node of 0.084 gpm. Total pressure at each node is used in balancing the system. Maximum water velocity is 16.7 ft/sec at pipe TREE3. PIPE FITTINGS TABLE Pipe Table Name: STANDARD.PIP 0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 8 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-1 (TREE).SDF JOB TITLE: LEGOLAND PS AREA-1 (TREE) * MATERIAL: S40 HWC: 120 S PAGE: Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Eli Tee LngE1l ChkViv BfyVlv GatViv AimChk DPVlv NPTee 1.728 5.64 11.29 2.82 12.70 8.47 1.41 14.11 14.11 11.29 2.703 9.33 18.65 6.22 21.76 10.88 1.55 15.54 15.54 18.65 3.314 10.19 21.84 7.28 23.29 14.56 1.46 18.93 18.93 21.84 4.310 13.94 27.87 8.36 30.66 16.72 2.79 27.87 27.87 27.87 5.914 12.38 26.53 7.96 28.30 8.84 2.65 24.76 24.76 26.53 6.357 17.60 37.72 11.32 40.23 12.57 3.77 35.21 35.21 37.72 6.400 18.19 38.98 11.69 41.58 12.99 3.90 36.38 36.38 38.98 0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 9 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-1 (TREE) .SDF JOB TITLE: LEGOLAND PS AREA-1 (TREE) 0 0 0 0 cj (N 0 0 (N 0 0 In 0 0 (N 0 0 0 0 0 0 — 04 0 44 0 w 0 0 0 0 0 0 o 0 C) C) C) C) 0 0 I (N 0 CX) (N NWJ(I 0 (A -H---- iC4FPS n Fire Systems LEGOLAND PARKING STRUCTURE CARLSBAD, CA AREA-2 FILE NUMBER: LEGOLAND AREA-2.sdf DATE: 01/26/17 -DESIGN DATA- OCCUPANCY CLASSIFICATION: Ordinary Hazard Group 1 DENSITY: .15 /1500 COVERAGE PER SPRINKLER: 400 sq. ft. (most demanding head) NUMBER OF SPRINKLERS CALCULATED: 6 sprinklers TOTAL SPRINKLER WATER FLOW REQUIRED: 630.9 gpm (incl. 250 gpm hose allowance) FLOW AND PRESSURE (@ NODE SP1.2): 380.9 gpm @ 49.1 psi SPRINKLER K-FACTOR (ORIFICE SIZE): 14.0 DESIGN/LAYOUT BY: FPS AUTHORITY HAVING JURISDICTION: Carlsbad Fire Dept WATER FLOW AVAILABILITY DATA: STATIC: 97 psi RESIDUAL: 86 psi FLOW: 2350 gpm SOURCE: Fire Flow Test on 1/22/16 City of Carlsbad CALCULATIONS BY HASS COMPUTER PROGRAM HRS SYSTEMS, INC. ATLANTA, GA SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 DATE: 1/26/2017 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-2.SDF JOB TITLE: LEGOLAND PS AREA-2 9 WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) SRC 97.0 86.0 2350.0 96.0 630.9 61.0 Required pressure is 35.0 psi (36%) less than available pressure. AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 630.9 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 150.0 GPM OTHER HOSE STREAM ALLOWANCES 100.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 380.9 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (PT) (PSI) (GPM) SRC 0.0 SOURCE 61.0 480.9 DIP -4.0 - - - - 62.2 - - - RPI 3.0 - - - - 59.1 - - - 3.0 - - - - 52.1 S RPO FDC 3.0 - - - - 52.0 - - - PVC -4.0 - - - - 54.8 - - - SWP -4.0 - - - - 54.0 - - - A -4.0 - - - - 53.9 - - - B 2.0 - - - - 51.2 - - - SF1 4.0 HOSE STREAM 49.9 100.0 C 4.0 - - - - 49.7 - - - SP1.1 5.0 - - - - 49.1 - - - D 8.8 - - - - 47.2 - - - E 8.8 - - - - 47.0 - - - F 8.8 - - - - 46.8 - - - G 8.8 - - - - 45.8 - - - H 8.8 - - - - 47.0 - - - I 8.8 - - - - 47.0 - - - J 8.8 - - - - 47.0 - - - SP2 7.4 - - - - 46.2 - - - SP2.1 4.0 - - - - 47.7 - - - SP2.2 13.2 - - - - 43.5 - - - TOR 19.0 - - - - 38.2 - - - 1 19.0 - - - - 37.4 - - - 2 30.4 - - - - 25.6 - - - 3 30.4 - - - - 25.3 - - - 4 30.4 - - - - 25.3 - - - 201 30.4 K=14.00 23.4 67.8 202 30.4 K=14.00 23.4 67.8 203 30.4 K=14.00 20.1 62.7 204 30.4 K=14.00 18.4 60.0 ., 205 30.4 K=14.00 20.1 62.7 206 30.4 K=14.00 18.4 60.0 207 30.4 - - - - 25.3 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 1/26/2017 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-2.SDF JOB TITLE: LEGOLAND PS AREA-2 S NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE (PT) 208 30.4 - - - - 209 30.4 - - - - PRESSURE DISCHARGE (PSI) (GPM) 25.3 - - - 25.3 - - - S 0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 1/26/2017 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-2 . SDF JOB TITLE: LEGOLAND PS AREA-2 PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 1 480.9 5.914 PL 40.00 PF 0.6 SRC 0.0 SRCE 61.0 (N/A) 5.6 150 FTG TG PE 1.7 DIP -4.0 0.0 62.2 0.0 0.007 TL 84.10 PV Pipe: 2 480.9 6.400 FL 7.00 PF 0.1 DIP -4.0 0.0 62.2 0.0 4.8 140 FTG L PE -3.0 RPI 3.0 0.0 59.1 0.0 0.005 TL 22.55 PV Pipe: 3 FIXED PRESSURE LOSS DEVICE RPI 3.0 0.0 59.1 0.0 7.0 psi, 480.9 gpm RPO 3.0 0.0 52.1 0.0 Pipe: 4 480.9 6.400 PL 2.00 PF 0.0 RPO 3.0 0.0 52.1 0.0 4.8 140 FTG ---- PE 0.0 FDC 3.0 0.0 52.0 0.0 0.005 TL 2.00 PV Pipe: 5 480.9 6.400 PL 7.00 PF 0.3 FDC 3.0 0.0 52.0 0.0 4.8 140 FTG T PE 3.0 PVC -4.0 0.0 54.8 0.0 0.005 TL 58.84 PV Pipe: 6 480.9 5.914 PL 72.00 PF 0.8 -4.0 0.0 54.8 0.0 5.6 150 FTG 4L PE 0.0 .PVC SWP -4.0 0.0 54.0 0.0 0.007 TL 120.11 PV Pipe: 7 480.9 6.357 FL 6:00 PF 0.0 SWP -4.0 0.0 54.0 0.0 4.9 150 FTG ---- PE 0.0 A -4.0 0.0 53.9 0.0 0.005 TL 6.00 PV Pipe: 8 480.9 6.357 FL 6.00 PF 0.1 A -4.0 0.0 53.9 0.0 4.9 150 FTG L PE -2.6 B 2.0 0.0 51.2 0.0 0.005 TL 23.10 PV Pipe: 9 480.9 6.357 PL 6.58 PF 0.4 B 2.0 0.0 51.2 0.0 4.9 120 FTG TL PE -0.9 SF1 4.0 H.S. 49.9 100.0 0.007 TL 55.62 PV Pipe: 9A 380.9 6.357 PL 9.42 PF 0.3 SF1 4.0 H.S. 49.9 100.0 3.9 120 FTG TB PE 0.0 C 4.0 0.0 49.7 0.0 0.005 TL 59.71 PV Pipe: 9B 380.9 6.357 FL 1.00 PF 0.2 C 4.0 0.0 49.7 0.0 3.9 120 FTG T PE -0.4 SF1.1 5.0 0.0 49.1 0.0 0.005 TL 38.72 PV Pipe: 10 380.9 6.357 FL 4.33 PF 0.2 SP1.1 5.0 0.0 49.1 0.0 3.9 120 FTG T PE -1.6 D 8.8 0.0 47.2 0.0 0.005 TL 42.05 PV Pipe: 11 380.9 6.357 FL 17.67 PF 0.2 S D 8.8 0.0 47.2 0.0 3.9 120 FTG 2L FE 0.0 E 8.8 0.0 47.0 0.0 0.005 TL 40.30 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 1/26/2017 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-2.SDF JOB TITLE: LEGOLAND PS AREA-2 S PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 12 380.9 6.357 PL 9.25 PF 0.2 E 8.8 0.0 47.0 0.0 3.9 120 FTG T PE 0.0 F 8.8 0.0 46.8 0.0 0.005 TL 46.97 PV Pipe: 13 380.9 6.357 FL 198.83 PF 1.0 F 8.8 0.0 46.8 0.0 3.9 120 FTG L PE 0.0 G 8.8 0.0 45.8 0.0 0.005 TL 210.15 PV Pipe: 14 0.0 6.357 PL 196.75 PF 0.0 E 8.8 0.0 47.0 0.0 0.0 120 FTG T PE 0.0 H 8.8 0.0 47.0 0.0 0.000 TL 234.47 PV Pipe: 15 0.0 6.357 PL 24.00 FE 0.0 H 8.8 0.0 47.0 0.0 0.0 120 FTG L PE 0.0 I 8.8 0.0 47.0 0.0 0.000 TL 35.32 PV Pipe: 16 0.0 6.357 PL 128.00 PF 0.0 I 8.8 0.0 47.0 0.0 0.0 120 FTG ---- FE 0.0 J 8.8 0.0 47.0 0.0 0.000 TL 128.00 PV Pipe: 17 380.9 6.357 PL 3.50 PE 0.2 G 8.8 0.0 45.8 0.0 3.9 120 FTG 2LB PE 0.6 SP2 7.4 0.0 46.2 0.0 0.005 TL 38.71 PV 5 Pipe: 18 0.0 6.357 PL 3.50 PF 0.0 SP2 7.4 0.0 46.2 0.0 0.0 120 FTG T PE 1.5 SP2.1 4.0 0.0 47.7 0.0 0.000 TL 41.22 PV Pipe: 19 380.9 6.357 PL 5.75 PF 0.2 SP2 7.4 0.0 46.2 0.0 3.9 120 FTG T PE -2.5 SP2.2 13.2 0.0 43.5 0.0 0.005 TL 43.47 PV Pipe: 20 380.9 4.310 FL 5.83 PF 2.8 SF2.2 13.2 0.0 43.5 0.0 8.4 120 FTG TLCB PE -2.5 TOR 19.0 0.0 38.2 0.0 0.031 TL 89.45 PV Pipe: 34 380.9 4.310 FL 16.83 PF 0.8 TOR 19.0 0.0 38.2 0.0 8.4 120 FTG L PE 0.0 1 19.0 0.0 37.4 0.0 0.031 TL 25.19 PV Pipe: 35 380.9 4.310 FL 214.58 PF 6.9 1 19.0 0.0 37.4 0.0 8.4 120 FTG L PE -4.9 2 30.4 0.0 25.6 0.0 0.031 TL 222.94 PV Pipe: 36 245.4 4.310 PL 18.00 PF 0.2 2 30.4 0.0 25.6 0.0 5.4 120 FTG ---- FE 0.0 3 30.4 0.0 25.3 0.0 0.014 TL 18.00 FV Pipe: 37 0.0 4.310 FL 15.00 Fl 0.0 3 30.4 0.0 25.3 0.0 0.0 120 FTG ---- FE 0.0 4 30.4 0.0 25.3 0.0 0.000 TL 15.00 PV S SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: 1/26/2017 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-2.SDF JOB TITLE: LEGOLAND PS AREA-2 . PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 38 67.8 1.728 PL 8.00 PF 2.1 2 30.4 0.0 25.6 0.0 9.3 120 FTG T PE 0.0 201 30.4 14.0 23.4 67.8 0.109 TL 19.29 PV Pipe: 46 67.8 1.728 PL 8.00 PF 2.1 2 30.4 0.0 25.6 0.0 9.3 120 FTG T PE 0.0 202 30.4 14.0 23.4 67.8 0.109 TL 19.29 PV Pipe: 47 122.7 1.728 PL 16.00 PF 5.3 3 30.4 0.0 25.3 0.0 16.8 120 FTG ---- PE 0.0 203 30.4 14.0 20.1 62.7 0.328 TL 16.00 PV Pipe: 48 60.0 1.728 PL 8.00 PF 1.7 203 30.4 14.0 20.1 62.7 8.2 120 FTG T PE 0.0 204 30.4 14.0 18.4 60.0 0.087 TL 19.29 PV Pipe: 49 122.7 1.728 PL 16.00 PF 5.3 3 30.4 0.0 25.3 0.0 16.8 120 FTG ---- PE 0.0 205 30.4 14.0 20.1 62.7 0.328 TL 16.00 PV Pipe: 50 60.0 1.728 PL 8.00 PF 1.7 205 30.4 14.0 20.1 62.7 8.2 120 FTG T PE 0.0 206 30.4 14.0 18.4 60.0 0.087 TL 19.29 PV Pipe: 51 0.0 1.728 PL 16.00 PF 0.0 4 30.4 0.0 25.3 0.0 0.0 120 FTG ---- PE 0.0 207 30.4 0.0 25.3 0.0 0.000 TL 16.00 PV Pipe: 52 0.0 1.728 PL 8.00 PF 0.0 4 30.4 0.0 25.3 0.0 0.0 120 FTG T PE 0.0 208 30.4 0.0 25.3 0.0 0.000 TL 19.29 PV Pipe: 53 0.0 1.728 PL 16.00 PF 0.0 208 30.4 0.0 25.3 0.0 0.0 120 FTG ---- PE 0.0 209 30.4 0.0 25.3 0.0 0.000 TL 16.00 PV NOTES (HASS) Calculations were performed by the HASS 7.9 computer program under license no. 16080621 granted by HRS Systems, Inc. 4792 LaVista Road Tucker, GA 30084 The system has been calculated to provide an average imbalance at each node of 0.002 gpm and a maximum imbalance at any node of 0.074 gpm. Total pressure at each node is used in balancing the system. Maximum water velocity is 16.8 ft/sec at pipe 47. SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 1/26/2017 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-2.SDF JOB TITLE: LEGOLAND PS AREA-2 (4) PIPE FITTINGS TABLE Pipe Table Name: STANDARD.PIP PAGE: * MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Eli Tee LngEil ChkVlv BfyVlv GatViv AimChk DPVlv NPTee 1.728 5.64 11.29 2.82 12.70 8.47 1.41 14.11 14.11 11.29 4.310 13.94 27.87 8.36 30.66 16.72 2.79 27.87 27.87 27.87 5.914 12.38 26.53 7.96 28.30 8.84 2.65 24.76 24.76 26.53 6.357 17.60 37.72 11.32 40.23 12.57 3.77 35.21 35.21 37.72 6.400 18.19 38.98 11.69 41.58 12.99 3.90 36.38 36.38 38.98 0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 7 DATE: 1/26/2017 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-2 SDF JOB TITLE: LEGOLAND PS AREA-2 0 0 0 (V) ml 0 C r- (N C 0 0 (N 0 0 (N 0 0 C U) 0 0 LI) ,-1 0 0 0) C 0 (N C 0 0 0 0 0 0 • • . • • • o 0 0 0 C) 0 0 I (N 0 00 (N SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 8 DATE: 1/26/2017 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-2 . SDF JOB TITLE: LEGOLAND PS AREA-2 10 WATER SUPPLY CURVE 108+ 99+ *\0\\ I \\\\\ 90+ \\\\\ \\\\ * <-86.0 psi @ 2350 gpm Flow Test Point 81+ P 72+ R I E I S I 5 63+ U IX R I E I 54+ .(I P I S I 45+ ) I 36+ 27+ 18+ LEGEND I! I X = Required Water Supply I 61.05 psi 8 630.9 gpm 9+ I 0 = Available Water Supply It I 96.03 psi 8 630.9 gpm I, 0++-+---+----+-----+ ------+ --------+ --------+---------+ -----------+ 8001200 1600 2000 2400 2800 3200 3600 4000 FLOW (GPM) 0 F P S Specialists in Fire Systems LEGOLAND PARKING STRUCTURE CARLSBAD, CA AREA-3 (GRID) FILE NUMBER: LEGOLAND AREA-3 (GRID).sdf DATE: 02/22/17 -DESIGN DATA- OCCUPANCY CLASSIFICATION: DENSITY: COVERAGE PER SPRINKLER: NUMBER OF SPRINKLERS CALCULATED: TOTAL SPRINKLER WATER FLOW REQUIRED: FLOW AND PRESSURE (@ NODE SF1.2): SPRINKLER K-FACTOR (ORIFICE SIZE): Ordinary Hazard Group 1 .15/1500 400 sq. ft. (most demanding head) 6 sprinklers 643.2 gpm (incl. 250 gpm hose allowance) 393.2 gpm @ 62.0 psi 14.0 DESIGN/LAYOUT BY: AUTHORITY HAVING JURISDICTION: WATER FLOW AVAILABILITY DATA: FPS Carlsbad Fire Dept STATIC: 97 psi RESIDUAL: 86 psi FLOW: 2350 gpm SOURCE: Fire Flow Test on 1/22/16 City of Carlsbad CALCULATIONS BY HASS COMPUTER PROGRAM HRS SYSTEMS, INC. 0 ATLANTA, GA SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-3 (GRID) .SDF JOB TITLE: LEGOLAND PS AREA-3 (GRID) WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. 8 PRESS. 8 DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) SRC 97.0 86.0 2350.0 96.0 643.2 77.4 Required pressure is 18.6 psi (19%) less than available pressure. AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 643.2 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 150.0 GPM OTHER HOSE STREAM ALLOWANCES 100.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 393.2 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) SRC 0.0 SOURCE 77.4 493.2 DIP -4.0 - - - - 78.6 - - - RPI 3.0 - - - - 75.4 - - - RPO FDC 3.0 3.0 - - - - 68.4 - - - - 68.4 - - - PVC -4.0 - - - - 71.1 - - - SWP -4.0 - - - - 70.3 - - - A -4.0 - - - - 70.2 - - - B 2.0 - - - - 67.5 - - - SF1 4.0 HOSE STREAM 66.2 100.0 SP1.2 13.2 - - - - 62.0 - - - TOR 19.0 - - - - 56.5 - - - 1 19.0 - - - - 55.5 - - - 2 19.0 - - - - 48.3 - - - 3 19.0 - - - - 46.5 - - - 4 19.0 - - - - 44.9 - - - 5 19.0 - - - - 43.2 - - - 6 19.0 - - - - 41.6 - - - 7 19.0 - - - - 40.0 - - - 8 19.0 - - - - 38.4 - - - 9 19.0 - - - - 36.8 - - - 10 19.0 - - - - 36.2 - - - 11 19.0 - - - - 36.2 - - - 12 19.0 - - - - 36.2 - - - 13 19.0 - - - - 36.2 - - - 14 19.0 - - - - 36.2 - - - 15 19.0 - - - - 52.2 - - - 16 19.0 - - - - 47.7 - - - 17 19.0 - - - - 46.3 - - - 18 19.0 - - - - 44.8 - - - 19 19.0 - - - - 43.2 - - - .20 19.0 - - - - 41.6 - - - 21 19.0 - - - - 40.0 - - - 22 19.0 - - - - 38.4 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-3 (GRID).SDF JOB TITLE: LEGOLAND PS AREA-3 (GRID) NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 23 19.0 - - - - 36.8 - - - 24 19.0 - - - - 36.2 - - - 25 19.0 - - - 36.2 - - - 101 19.0 - - - - 36.2 - - - 102 19.0 - - - - 36.2 - - - 103 19.0 - - - - 36.2 - - - 104 19.0 - - - - 36.2 - - - 105 19.0 - - - - 36.2 - - - 106 19.0 - - - 36.2 - - - 301 19.0 K=14.00 28.2 74.4 302 19.0 K=14.00 28.2 74.4 303 19.0 K=14.00 19.8 62.2 304 19.0 K=14.00 18.4 60.0 305 19.0 K=14.00 18.4 60.0 306 19.0 K=14.00 19.8 62.2 0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-3 (GRID).SDF JOB TITLE: LEGOLAND PS AREA-3 (GRID) PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: UG1 493.2 5.914 PL 40.00 PF 0.6 SRC 0.0 SRCE 77.4 (N/A) 5.8 150 FTG TG PE 1.7 DIP -4.0 0.0 78.6 0.0 0.007 TL 84.10 PV Pipe: UG2 493.2 6.400 PL 7.00 PF 0.1 DIP -4.0 0.0 78.6 0.0 4.9 140 FTG L PE -3.0 RPI 3.0 0.0 75.4 0.0 0.006 TL 22.55 PV Pipe: UG3 FIXED PRESSURE LOSS DEVICE RPI 3.0 0.0 75.4 0.0 7.0 psi, 493.2 gpm RPO 3.0 0.0 68.4 0.0 Pipe: UG4 493.2 6.400 PL 2.00 PF 0.0 RPO 3.0 0.0 68.4 0.0 4.9 140 FTG ---- PE 0.0 FDC 3.0 0.0 68.4 0.0 0.006 TL 2.00 PV Pipe: UGS 493.2 6.400 PL 7.00 PF 0.3 FDC 3.0 0.0 68.4 0.0 4.9 140 FTG T PE 3.0 PVC -4.0 0.0 71.1 0.0 0.006 TL 58.84 PV Pipe: UG6 493.2 5.914 PL 72.00 PF 0.9 -4.0 0.0 71.1 0.0 5.8 150 FTG 4L PE 0.0 .PVC SWP -4.0 0.0 70.3 0.0 0.007 TL 120.11 PV Pipe: UG7 493.2 6.357 PL 6.00 PF 0.0 SWP -4.0 0.0 70.3 0.0 5.0 150 FTG ---- PE 0.0 A -4.0 0.0 70.2 0.0 0.005 TL 6.00 PV Pipe: SP1 493.2 6.357 PL 6.00 PF 0.1 A -4.0 0.0 70.2 0.0 5.0 150 FTG L PE -2.6 B 2.0 0.0 67.5 0.0 0.005 TL 23.10 PV Pipe: 5P2 493.2 6.357 PL 6.58 PF 0.4 B 2.0 0.0 67.5 0.0 5.0 120 FTG TL PE -0.9 SP1 4.0 H.S. 66.2 100.0 0.008 TL 55.62 PV Pipe: SP3 393.2 6.357 PL 9.42 PF 0.3 SP1 4.0 H.S. 66.2 100.0 4.0 120 FTG TB PE -4.0 SP1.2 13.2 0.0 62.0 0.0 0.005 TL 59.71 PV Pipe: RISER 393.2 4.310 PL 5.83 PF 3.0 SP1.2 13.2 0.0 62.0 0.0 8.6 120 FTG TLCB PE -2.5 TOR 19.0 0.0 56.5 0.0 0.033 TL 89.45 PV Pipe: MAIN1 393.2 4.310 PL 14.50 PF 1.0 TOR 19.0 0.0 56.5 0.0 8.6 120 FTG 2L PE 0.0 1 19.0 0.0 55.5 0.0 0.033 TL 31.22 PV Pipe: MAIN2 220.7 2.703 PL 46.08 PF 7.1 S i 19.0 0.0 55.5 0.0 12.3 120 FTG T PE 0.0 2 19.0 0.0 48.3 0.0 0.110 TL 64.73 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-3 (GRID) .SDF JOE TITLE: LEGOLAND PS AREA-3 (GRID) . PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: MAIN3 209.1 2.703 PL 18.00 PF 1.8 2 19.0 0.0 48.3 0.0 11.7 120 FTG ---- FE 0.0 3 19.0 0.0 46.5 0.0 0.100 TL 18.00 PV Pipe: MAIN4 202.2 2.703 PL 18.00 PF 1.7 3 19.0 0.0 46.5 0.0 11.3 120 FTG ---- FE 0.0 4 19.0 0.0 44.9 0.0 0.094 TL 18.00 PV Pipe: MAIN5 198.5 2.703 PL 18.00 PF 1.6 4 19.0 0.0 44.9 0.0 11.1 120 FTG ---- PE 0.0 5 19.0 0.0 43.2 0.0 0.090 TL 18.00 PV Pipe: MAIN6 197.0 2.703 PL 18.00 PF 1.6 5 19.0 0.0 43.2 0.0 11.0 120 FTG ---- FE 0.0 6 19.0 0.0 41.6 0.0 0.089 TL 18.00 PV Pipe: MAIN7 196.6 2.703 PL 18.00 PF 1.6 6 19.0 0.0 41.6 0.0 11.0 120 FTG PE 0.0 7 19.0 0.0 40.0 0.0 0.089 TL 18.00 PV Pipe: MAIN8 196.6 2.703 PL 18.00 PF 1.6 7 19.0 0.0 40.0 0.0 11.0 120 FTG ---- PE 0.0 8 19.0 0.0 38.4 0.0 0.089 TL 18.00 PV Pipe: MAIN9 196.6 2.703 PL 18.00 PF 1.6 8 19.0 0.0 38.4 0.0 11.0 120 FTG PE 0.0 9 19.0 0.0 36.8 0.0 0.089 TL 18.00 PV Pipe: MAIN10 122.2 2.703 FL 18.00 PF 0.7 9 19.0 0.0 36.8 0.0 6.8 120 FTG ---- PE 0.0 10 19.0 0.0 36.2 0.0 0.037 TL 18.00 PV Pipe: MAIN11 0.0 2.703 FL 51.00 PF 0.0 10 19.0 0.0 36.2 0.0 0.0 120 FTG ---- FE 0.0 11 19.0 0.0 36.2 0.0 0.000 TL 51.00 PV Pipe: MAIN13 0.0 2.703 PL 62.50 PF 0.0 11 19.0 0.0 36.2 0.0 0.0 120 FTG T FE 0.0 12 19.0 0.0 36.2 0.0 0.000 TL 81.15 PV Pipe: MAIN14 0.0 3.314 FL 15.00 PF 0.0 12 19.0 0.0 36.2 0.0 0.0 120 FTG T FE 0.0 13 19.0 0.0 36.2 0.0 0.000 TL 36.84 PV Pipe: MAIN15 0.0 3.314 PL 18.00 PF 0.0 13 19.0 0.0 36.2 0.0 0.0 120 FTG ---- PE 0.0 14 19.0 0.0 36.2 0.0 0.000 TL 18.00 PV Pipe: MAIN16 172.5 3.314 FL 125.00 PF 3.2 1 19.0 0.0 55.5 0.0 6.4 120 FTG ---- PE 0.0 15 19.0 0.0 52.2 0.0 0.026 TL 125.00 PV S SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-3 (GRID).SDF JOB TITLE: LEGOLAND PS AREA-3 (GRID) . PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: MAIN17 172.5 2.703 PL 46.08 PF 4.5 15 19.0 0.0 52.2 0.0 9.6 120 FTG T PE 0.0 16 19.0 0.0 47.7 0.0 0.070 TL 64.73 PV Pipe: MAIN18 184.1 2.703 PL 18.00 PF 1.4 16 19.0 0.0 47.7 0.0 10.3 120 FTG ---- PS 0.0 17 19.0 0.0 46.3 0.0 0.079 TL 18.00 PV Pipe: MAIN19 191.0 2.703 PL 18.00 PF 1.5 17 19.0 0.0 46.3 0.0 10.7 120 FTG ---- PS 0.0 18 19.0 0.0 44.8 0.0 0.084 TL 18.00 PV Pipe: MAIN20 194.7 2.703 PL 18.00 PF 1.6 18 19.0 0.0 44.8 0.0 10.9 120 FTG ---- PE 0.0 19 19.0 0.0 43.2 0.0 0.087 TL 18.00 PV Pipe: MAIN21 196.2 2.703 PL 18.00 PF 1.6 19 19.0 0.0 43.2 0.0 11.0 120 FTG ---- PE 0.0 20 19.0 0.0 41.6 0.0 0.088 TL 18.00 PV Pipe: MAIN22 196.6 2.703 PL 18.00 PF 1.6 20 19.0 0.0 41.6 0.0 11.0 120 FTG ---- PE 0.0 21 19.0 0.0 40.0 0.0 0.089 TL 18.00 PV Pipe: MAIN23 196.6 2.703 PL 18.00 PF 1.6 21 19.0 0.0 40.0 0.0 11.0 120 FTG ---- PE 0.0 22 19.0 0.0 38.4 0.0 0.089 TL 18.00 PV Pipe: MAIN24 196.6 2.703 PL 18.00 PF 1.6 22 19.0 0.0 38.4 0.0 11.0 120 FTG ---- PE 0.0 23 19.0 0.0 36.8 0.0 0.089 TL 18.00 PV Pipe: MAIN25 122.2 2.703 PL 18.00 PF 0.7 23 19.0 0.0 36.8 0.0 6.8 120 FTG ---- PE 0.0 24 19.0 0.0 36.2 0.0 0.037 TL 18.00 PV Pipe: MAIN26 0.0 2.703 PL 51.00 PP 0.0 24 19.0 0.0 36.2 0.0 0.0 120 FTG ---- PE 0.0 25 19.0 0.0 36.2 0.0 0.000 TL 51.00 PV Pipe: MAIN27 0.0 2.703 PL 62.50 PF 0.0 25 19.0 0.0 36.2 0.0 0.0 120 FTG 2T PS 0.0 12 19.0 0.0 36.2 0.0 0.000 TL 99.80 PV Pipe: GRID2 11.6 1.728 PL 125.00 PP 0.6 2 19.0 0.0 48.3 0.0 1.6 120 FTG 2T PS 0.0 16 19.0 0.0 47.7 0.0 0.004 TL 147.58 PV Pipe: GRID3 7.0 1.728 PL 125.00 PP 0.2 3 19.0 0.0 46.5 0.0 1.0 120 FTG 2T FE 0.0 17 19.0 0.0 46.3 0.0 0.002 TL 147.58 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-3 (GRID).SDF JOB TITLE: LEGOLAND PS AREA-3 (GRID) . PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: GRID4 3.6 1.728 PL 125.00 PF 0.1 4 19.0 0.0 44.9 0.0 0.5 120 FTG 2T PE 0.0 18 19.0 0.0 44.8 0.0 0.000 TL 147.58 PV Pipe: GRID5 1.5 1.728 PL 125.00 PF 0.0 5 19.0 0.0 43.2 0.0 0.2 120 FTG 2T PE 0.0 19 19.0 0.0 43.2 0.0 0.000 TL 147.58 PV Pipe: GRID6 0.4 1.728 PL 125.00 PF 0.0 6 19.0 0.0 41.6 0.0 0.1 120 FTG 2T PE 0.0 20 19.0 0.0 41.6 0.0 0.000 TL 147.58 PV Pipe: GRID7 0.0 1.728 PL 125.00 PF 0.0 7 19.0 0.0 40.0 0.0 0.0 120 FTG 2T PE 0.0 21 19.0 0.0 40.0 0.0 0.000 TL 147.58 PV Pipe: GRID8 0.0 1.728 PL 125.00 PP 0.0 8 19.0 0.0 38.4 0.0 0.0 120 FTG 2T PE 0.0 22 19.0 0.0 38.4 0.0 0.000 TL 147.58 PV Pipe: GRID9 74.4 1.728 PL 55.00 PP 8.6 9 19.0 0.0 36.8 0.0 10.2 120 FTG T PE 0.0 301 19.0 14.0 28.2 74.4 0.130 TL 66.29 PV Pipe: GRID10 0.0 1.728 PL 15.00 PF 0.0 301 19.0 14.0 28.2 74.4 0.0 120 FTG ---- PE 0.0 302 19.0 14.0 28.2 74.4 0.000 TL 15.00 PV Pipe: GRID11 -74.4 1.728 PL 55.00 PF 8.6 302 19.0 14.0 28.2 74.4 10.2 120 FTG T PE 0.0 23 19.0 0.0 36.8 0.0 0.130 TL 66.29 PV Pipe: GRID12 122.2 1.728 PL 39.00 PF 16.4 10 19.0 0.0 36.2 0.0 16.7 120 FTG T PE 0.0 303 19.0 14.0 19.8 62.2 0.326 TL 50.29 PV Pipe: GRID13 60.0 1.728 PL 16.00 PF 1.4 303 19.0 14.0 19.8 62.2 8.2 120 FTG ---- PE 0.0 304 19.0 14.0 18.4 60.0 0.087 TL 16.00 PV Pipe: GRID14 0.0 1.728 PL 15.00 PF 0.0 304 19.0 14.0 18.4 60.0 0.0 120 FTG ---- PE 0.0 305 19.0 14.0 18.4 60.0 0.000 TL 15.00 PV Pipe: GRID15 -60.0 1.728 PL 16.00 PP 1.4 305 19.0 14.0 18.4 60.0 8.2 120 FTG ---- PE 0.0 306 19.0 14.0 19.8 62.2 0.087 TL 16.00 PV Pipe: GRID16 -122.2 1.728 PL 39.00 PF 16.4 306 19.0 14.0 19.8 62.2 16.7 120 FTG T PE 0.0 24 19.0 0.0 36.2 0.0 0.326 TL 50.29 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 7 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-3 (GRID).SDF JOB TITLE: LEGOLAND PS AREA-3 (GRID) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. S END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: TREE1 0.0 1.728 PL 8.00 PF 0.0 13 19.0 0.0 36.2 0.0 0.0 120 FTG T PE 0.0 101 19.0 0.0 36.2 0.0 0.000 TL 19.29 PV Pipe: TREE2 0.0 1.728 PL 8.00 PF 0.0 13 19.0 0.0 36.2 0.0 0.0 120 FTG T PE 0.0 102 19.0 0.0 36.2 0.0 0.000 TL 19.29 PV Pipe: TREE3 0.0 1.728 PL 8.00 PF 0.0 14 19.0 0.0 36.2 0.0 0.0 120 FTG T PE 0.0 103 19.0 0.0 36.2 0.0 0.000 TL 19.29 PV Pipe: TREE4 0.0 1.728 PL 16.00 PF 0.0 103 19.0 0.0 36.2 0.0 0.0 120 FTG ---- PE 0.0 104 19.0 0.0 36.2 0.0 0.000 TL 16.00 PV Pipe: TREE5 0.0 1.728 PL 8.00 PF 0.0 14 19.0 0.0 36.2 0.0 0.0 120 FTG T PE 0.0 105 19.0 0.0 36.2 0.0 0.000 TL 19.29 PV Pipe: TREE6 0.0 1.728 PL 16.00 PF 0.0 105 19.0 0.0 36.2 0.0 0.0 120 FTG ---- PE 0.0 106 19.0 0.0 36.2 0.0 0.000 TL 16.00 PV NOTES (HASS) : Calculations were performed by the HASS 7.9 computer program under license no. 16080621 granted by HRS Systems, Inc. 4792 LaVista Road Tucker, GA 30084 The system has been calculated to provide an average imbalance at each node of 0.002 gpm and a maximum imbalance at any node of 0.074 gpm. Total pressure at each node is used in balancing the system. Maximum water velocity is 16.7 ft/sec at pipe GR1D16. PIPE FITTINGS TABLE Pipe Table Name: STANDARD.PIP 11 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 8 DATE: 2/22/2016 J:\LL\00-FIRE\CALCS\LEGOLAND AREA-3 (GRID).SDF JOB TITLE: LEGOLAND PS AREA-3 (GRID) . PAGE: * MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Eli Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee 1.728 5.64 11.29 2.82 12.70 8.47 1.41 14.11 14.11 11.29 2.703 9.33 18.65 6.22 21.76 10.88 1.55 15.54 15.54 18.65 3.314 10.19 21.84 7.28 23.29 14.56 1.46 18.93 18.93 21.84 4.310 13.94 27.87 8.36 30.66 16.72 2.79 27.87 27.87 27.87 5.914 12.38 26.53 7.96 28.30 8.84 2.65 24.76 24.76 26.53 6.357 17.60 37.72 11.32 40.23 12.57 3.77 35.21 35.21 37.72 6.400 18.19 38.98 11.69 41.58 12.99 3.90 36.38 36.38 38.98 S SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 9 DATE: 2/22/2016 J:\LL\00—FIRE\CALCS\LEGOLAND AREA-3 (GRID).SDF JOB TITLE: LEGOLAND PS AREA-3 (GRID) S 0 0 LU (N 0 r1 44 04 C,) 0 0 00 C,) co 04 (J)0 zo 4J U) 0 0 0 co 0 0 N 0 0 (N 0 0 0 14 0 co oH 0 0 LU 0 0 (N oH 0 0 0 0 S S o o 0 0 0 0 0 0 0 0 0 0 0 0 I (N 0 00 w (N .iC4 FPS Specialists in Fire Systems LEGOLAND PARKING STRUCTURE CARLSBAD, CA STANDPIPE CALCULATION FILE NUMBER: LEGOLAND-STANDPIPE.sdf DATE: 02/22/17 -DESIGN DATA- CLASS I STANDPIPES: DENSITY: TOTAL FLOW REQUIRED: FLOW AND PRESSURE (@ NODE HV1): FLOW AND PRESSURE (@ NODE HV2): FLOW AND PRESSURE (@ NODE HV3): FLOW AND PRESSURE (@ NODE HV4): DESIGN/LAYOUT BY: AUTHORITY HAVING JURISDICTION: WATER FLOW AVAILABILITY DATA: 2-1/2" STANDPIPE HOSE CONNECTIONS 1000 gpm @ 100 psi MINIMUM 1000 gpm 250 gpm @ 107.1 psi 250 gpm @ 107.1 psi 250 gpm @ 114.1 psi 250 gpm @ 117.2 psi FPS Carlsbad Fire Dept STATIC: 151 psi RESIDUAL: 150 psi FLOW: 1000 gpm SUPPLY FOR STANDPIPE TO BE SUPPLIED BY CARLSBAD FIRE DEPARTMENT PUMPER APPARATUS CALCULATIONS BY HASS COMPUTER PROGRAM HRS SYSTEMS, INC. ATLANTA, GA SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 DATE: 2/22/2017 J:\LL\00-FIRE\CALCS\LEGOLAND STANDPIPE.SDF JOB TITLE: LEGOLAND PS STANDPIPE RESID. FLOW AVAIL. TOTAL REQ'D PRESS. @ PRESS. 8 DEMAND PRESS. (PSI) (GPM) (PSI) (GPM) (PSI) 150.0 1000.0 150.0 1000.0 TOTAL FLOW AT SOURCE 1000.0 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 0.0 GPM OTHER HOSE STREAM ALLOWANCES 1000.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 0.0 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) FDC 3.0 SOURCE 150.0 1000.0 PVC -4.0 - - - - 151.8 - - - SWP -4.0 - - - - 148.6 - - - A -4.0 - - - - 148.5 - - - B 2.0 - - - - 145.5 - - - SP1 4.0 - - - - 143.1 - - - S C4.0 - - - - 141.4 - - - SP1.1 5.0 - - - - 139.9 - - - D 8.8 - - - - 137.1 - - - E 8.8 - - - - 136.0 - - - F 8.8 - - - - 135.9 - - - G 8.8 - - - - 135.4 - - - H 8.8 - - - - 132.1 - - - I 8.8 - - - - 132.1 - - - J 8.8 - - - - 130.2 - - - SP2 7.4 - - - - 135.8 - - - SP2.2 13.2 - - - - 133.3 - - - SP2R 24.5 - - - - 128.1 - - - SP3 7.4 - - - - 132.5 - - - SP3.2 13.2 - - - - 129.9 - - - SP3R 24.5 - - - - 124.9 - - - SP4 7.4 - - - - 130.3 - - - SP4.2 13.2 - - - - 127.5 - - - SP4.3 24.5 - - - - 122.5 - - - SP4R 34.7 - - - - 118.0 - - - HV1 34.7 HOSE STREAM 107.1 250.0 HV2 34.7 HOSE STREAM 107.1 250.0 HV3 24.5 HOSE STREAM 114.1 250.0 HV4 24.5 HOSE STREAM 117.2 250.0 WATER SUPPLY DATA AGGREGATE FLOW ANALYSIS: SOURCE STATIC NODE PRESS. TAG (PSI) FDC 151.0 0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 2/22/2017 J:\LL\00-FIRE\CALCS\LEGOLAND STANDPIPE.SDF JOB TITLE: LEGOLAND PS STANDPIPE S PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 1 1000.0 6.400 PL 9.00 PF 1.2 FDC 3.0 SRCE 150.0 (N/A) 10.0 140 FTG T PE 3.0 PVC -4.0 0.0 151.8 0.0 0.020 TL 60.84 PV Pipe: 2 1000.0 5.914 PL 72.00 PF 3.2 PVC -4.0 0.0 151.8 0.0 11.7 150 FTG 4L PE 0.0 SWP -4.0 0.0 148.6 0.0 0.026 TL 120.11 PV Pipe: 3 1000.0 6.357 PL 6.00 PF 0.1 SWP -4.0 0.0 148.6 0.0 10.1 150 FTG ---- PE 0.0 A -4.0 0.0 148.5 0.0 0.019 TL 6.00 PV Pipe: 4 1000.0 6.357 PL 6.00 PF 0.4 A -4.0 0.0 148.5 0.0 10.1 150 FTG L PE -2.6 B 2.0 0.0 145.5 0.0 0.019 TL 23.10 PV Pipe: 5 1000.0 6.357 PL 6.58 PF 1.6 B 2.0 0.0 145.5 0.0 10.1 120 FTG TL PE -0.9 SP1 4.0 0.0 143.1 0.0 0.028 TL 55.62 PV Pipe: 6 1000.0 6.357 PL 9.42 PF 1.7 SP1 4.0 0.0 143.1 0.0 10.1 120 FTG TB PE 0.0 5 C 4.0 0.0 141.4 0.0 0.028 TL 59.71 PV Pipe: 7 1000.0 6.357 PL 1.00 PF 1.1 C 4.0 0.0 141.4 0.0 10.1 120 FTG T PE -0.4 SP1.1 5.0 0.0 139.9 0.0 0.028 TL 38.72 PV Pipe: 8 1000.0 6.357 PL 4.33 PF 1.2 SP1.1 5.0 0.0 139.9 0.0 10.1 120 FTG T PE -1.6 D 8.8 0.0 137.1 0.0 0.028 TL 42.05 PV Pipe: 9 1000.0 6.357 PL 17.67 PF 1.1 D 8.8 0.0 137.1 0.0 10.1 120 FTG 2L PE 0.0 E 8.8 0.0 136.0 0.0 0.028 TL 40.30 PV Pipe: 10 250.0 6.357 PL 9.25 PF 0.1 E 8.8 0.0 136.0 0.0 2.5 120 FIG T PE 0.0 F 8.8 0.0 135.9 0.0 0.002 TL 46.97 PV Pipe: 11 250.0 6.357 PL 198.83 PF 0.5 F 8.8 0.0 135.9 0.0 2.5 120 FTG L PE 0.0 G 8.8 0.0 135.4 0.0 0.002 TL 210.15 PV Pipe: 12 750.0 6.357 PL 196.75 PP 3.9 E 8.8 0.0 136.0 0.0 7.6 120 FTG T PE 0.0 H 8.8 0.0 132.1 0.0 0.016 TL 234.47 PV Pipe: 13 250.0 6.357 PL 3.00 PF 0.0 8.8 0.0 132.1 0.0 2.5 120 FTG L PE 0.0 S H 1 8.8 0.0 132.1 0.0 0.002 TL 14.32 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 2/22/2017 J:\LL\00-FIRE\CALCS\LEGOLAND STANDPIPE.SDF JOB TITLE: LEGOLAND PS STANDPIPE PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. S END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 14 500.0 6.357 PL 179.50 FE 1.9 H 8.8 0.0 132.1 0.0 5.1 120 FTG T2L FE 0.0 J 8.8 0.0 130.2 0.0 0.008 TL 239.85 PV Pipe: 15 250.0 6.357 PL 28.00 FE' 0.1 G 8.8 0.0 135.4 0.0 2.5 120 FTG 2LB PE 0.6 SF2 7.4 0.0 135.8 0.0 0.002 TL 63.21 PV Pipe: 16 250.0 6.357 PL 5.75 PE 0.1 SF2 7.4 0.0 135.8 0.0 2.5 120 FTG T PE -2.5 SP2.2 13.2 0.0 133.3 0.0 0.002 TL 43.47 PV Pipe: 17 250.0 6.357 PL 11.33 PF 0.2 SP2.2 13.2 0.0 133.3 0.0 2.5 120 FTG TLCB FE -4.9 SP2R 24.5 0.0 128.1 0.0 0.002 TL 113.17 PV Pipe: 18 250.0 2.469 PL 1.50 FE 10.9 SP2R 24.5 0.0 128.1 0.0 16.8 120 FTG 49.0 PE 0.0 HV4 24.5 H.S. 117.2 250.0 0.215 TL 50.50 PV Pipe: 19 250.0 6.357 FL 30.00 FE' 0.2 I 8.8 0.0 132.1 0.0 2.5 120 FTG TLB FE 0.6 SF3 7.4 0.0 132.5 0.0 0.002 TL 91.61 PV Pipe: 20 250.0 6.357 FL 5.75 FF 0.1 W SF3 7.4 0.0 132.5 0.0 2.5 120 FTG T FE -2.5 SF3.2 13.2 0.0 129.9 0.0 0.002 TL 43.47 PV Pipe: 21 250.0 6.357 FL 11.33 PE 0.0 SP3.2 13.2 0.0 129.9 0.0 2.5 120 FTG ---- FE -4.9 SF3R 24.5 0.0 124.9 0.0 0.002 TL 11.33 PV Pipe: 22 250.0 2.469 FL 1.50 FE 10.9 SP3R 24.5 0.0 124.9 0.0 16.8 120 FTG 49.0 FE 0.0 HV3 24.5 H.S. 114.1 250.0 0.215 TL 50.50 PV Pipe: 23 500.0 6.357 FL 6.00 FE 0.5 J 8.8 0.0 130.2 0.0 5.1 120 FTG TLB FE 0.6 SF4 7.4 0.0 130.3 0.0 0.008 TL 67.61 PV Pipe: 24 500.0 6.357 FL 5.75 FE 0.3 SF4 7.4 0.0 130.3 0.0 5.1 120 FTG T FE -2.5 SF4.2 13.2 0.0 127.5 0.0 0.008 TL 43.47 PV Pipe: 25 500.0 6.357 FL 11.33 FE 0.1 SF4.2 13.2 0.0 127.5 0.0 5.1 120 FTG ---- FE -4.9 SF4.3 24.5 0.0 122.5 0.0 0.008 TL 11.33 PV Pipe: 26 500.0 6.357 FL 10.17 FE 0.1 SF4.3 24.5 0.0 122.5 0.0 5.1 120 FTG ---- FE -4.4 SF4R 34.7 0.0 118.0 0.0 0.008 TL 10.17 PV 0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 2/22/2017 J:\LL\00-FIRE\CALCS\LEGOLAND STANDPIPE.SDF JOB TITLE: LEGOLAND PS STANDPIPE . PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (PT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 27 250.0 2.469 PL 1.50 PF 10.9 SP4R 34.7 0.0 118.0 0.0 16.8 120 FTG 49.0 PE 0.0 HV1 34.7 H.S. 107.1 250.0 0.215 TL 50.50 PV Pipe: 28 250.0 2.469 PL 1.50 PF 10.9 SP4R 34.7 0.0 118.0 0.0 16.8 120 FTG 49.0 PE 0.0 HV2 34.7 H.S. 107.1 250.0 0.215 TL 50.50 PV NOTES (HASS) Calculations were performed by the HASS 7.9 computer program under license no. 16080621 granted by HRS Systems, Inc. 4792 LaVista Road Tucker, GA 30084 The system has been calculated to provide an average imbalance at each node of 0.015 gpm and a maximum imbalance at any node of 0.121 gpm. Total pressure at each node is used in balancing the system. Maximum water velocity is 16.8 ft/sec at pipe 18. PIPE FITTINGS TABLE Pipe Table Name: STANDARD.PIP PAGE: * MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Ell Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee 5.914 12.38 26.53 7.96 28.30 8.84 2.65 24.76 24.76 26.53 6.357 17.60 37.72 11.32 40.23 12.57 3.77 35.21 35.21 37.72 6.400 18.19 38.98 11.69 41.58 12.99 3.90 36.38 36.38 38.98 PAGE: A MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Ell Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee 2.469 6.00 12.00 4.00 14.00 7.00 1.00 10.00 10.00 12.00 qPpTMTvP qYcT1M t-TVnPArTT.Tr AMAT.YqTq Pri.r C DATE: 2 JOB TIT E 0 0 0 0 04 44 (D 0 0 u) -1 U) a) U) çJ)0 0 Ln r1 z r1 4J 4J CJ) C') H 0 0 0 0 04 OX 0 0 44 0 U-, 0 0 IN 0 0 CN N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 zzp (N 0 co klo N SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 2/22/2017 J:\LL\00-FIRE\CALCS\LEGOLAND STANDPIPE.SDF JOB TITLE: LEGOLAND PS STANDPIPE . WATER SUPPLY CURVE 156+ * \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \X I Flow Test Point 143+ 130+ 117+ P104+ R I E I S I S 91+ U I R I E I 78+ ( I P S I I 65+ ) I 52+ 39+ 26+ LEGEND I I X = Required Water Supply U I 150.00 psi @ 1000.0 gpm " 13+ I 'I 'I 0----------------------------------------------- I' 200 300 400 500 600 700 800 FLOW (GPM) 0 ----------------- 900 1000