Loading...
HomeMy WebLinkAbout2519 PALOMAR AIRPORT RD; ; AS130199; Permit12/16/21, 4:13 PM AS130199 Permit Data City of Carlsbad Sprinkler Permit 2519 PALOMAR Job Address: AIRPORT RD Permit Type: SPRINK Parcel No: 2130201800 Lot #: 0 Reference No.: PC #: Permit No: AS130199 Status: ISSUED Applied 11/5/2013 Approved: 11/18/2013 Issued: 11/18/2013 Inspector: Project Title: CREATE YOUR OWN PIZZA TI OF EXISTING FIRE SPRINKLER SYSTEM: BLDG 5 STE 101 Applicant: SYMONS FIRE PROTECTION SUITE R 1050 PIONEER WAY EL CAJON, CA 619-588-6364 Owner: COUNTY OF SAN DIEGO PUBLIC AGENCY Fees ($) Add'l Fees ($) Total ($) Balance ($) 268 0 268 0 1/1 THERE ARE NO PLANS ASSOCIATED WITH THIS PERMIT (_~ \--2) ~~% Automatic Sprinkler Systems FORM 2-J Contractor's Material, and Test Certificate for Aboveground Piping Date: 12/05/13 12/05/13 Property Name: CYO Pizza L Property Address: 2519 Palomar Airport Rd. Ste.5-101, Carlsbad, CA 92011 Procedure Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be corrected and the system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authori- ties, owners, and contractors. It is understood that the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. Plans Accepted by [approving authority's name(s)] Carlsbad Fire Department Address 1635 Faraday Ave. Carlsbad, CA Installation conforms to accepted plans? . Yes No. Equipment used is approved? E Yes 0 No If no, explain deviations. Instructions Has person in charge of fire equipment been instructed as to location of control valves and care and maintenance of this new equipment? 21 Yes El No If no, explain. Have copies of appropriate instructions and care and maintenance charts and NFPA 13 been left on premises? El Yes . No If no, explain. to be provided by System installing contractor Location of System Supplies building(s) South by court yard Sprinklers Year of Orifice Temperature Make Model Manufacture Size Quantity Rating TYCO SSP Chrome TY-323 2013 1/2. 18 155 QR TYCO SSU Upriqht TY-323 2013 1/2 4 ,200 QR TYCO Dry Pendant DS-1 TY-3255 2013 1/2 . 1 155 Pipe and Fittings Pipe conforms to NFPA 13 standard. . 21 Yes El No Fittings conform to NFPA 13 standard. . '. 21 Yes .0 No If no, explain. . . . . PAGE lof 3 Copyright © 2000 National Fire Protection Association FORM 2-1 Automatic Sprinkler Systems Contractor's Material and Test Certificate for Aboveground Piping (cont.) Alarm Valve or Flow Indicator Alarm Device Maximum Time to Operate Through Test Pipe Type Make Model Mm. Sec. water flow switch Potter VF-R 0 45 Dry Pipe Operating Test Dry Valve Q.O.D. Make Model Serial No. Make Model Serial No. N/A Time to Trip Trip Point Time Water Alarm Through Water Air Air Reached Operated. Test Pipe* Pressure Pressure Pressure Test Outlet* Properly Mm. Sec. Psi (Bar) Psi (Bar) Psi (Bar) Mm. Sec. Yes No Without Q.O.D. X With Q.O.D. X If no, explain. Does Not Apply Deluge and Preaction Valves Operation El Pneumatic El Electric El Hydraulic Piping supervised? El Yes E No Detecting media supervised? El Yes El No Is there an accessible facility in each circuit for testing? LI Yes LI No If no explain. N/A Does each circuit operate Does each circuit Maximum Time to supervision loss alarm? operate valve release? Operate Release Yes No Yes No Make Model Mm. Sec. Test Description HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13.6 bar) for two hours or 50 psi (3.4 bar) above static pressure in excess of 150 psi (10.2 bar) for two hours. Differential dry pipe valve clappers shall be left open during test to prevent damage. All aboveground piping leakage shall be stopped. : FLUSHING: Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as hydrants and blow-offs. Flush at flows not less than 400 gpm (1514:L/min) for. 4.-in. (102-mm)- pipe, 600 gpm (2271 L/min) for 5-in. (127-mm) pipe, 750 gpm (2839 L/min). for 6-in: (152-mm) pipe, 1000 gpm (3785 L/min) for 8-in. (203-mm) pipe, 1500 gpm (5678 L/min) for 10-in. (254-mm) pipe nd'2000gpm (7570 1/mm) for 12-in. (305-mm) pipe. When supply cannot produce stipulated flow rates, obtain maximum available. *Measured from time inspector's test pipe is opened. . . .. . .:',.. L:.: -. PAGE 2of3 II Copyright © 2000 National Fire Protection Association . ti Automatic Sprinkler Systems FORM 2-j Contractor's Material and Test - Certificate for Aboveground Piping (cont.) Test Description (cont.) PNEUMATIC: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 11/2 psi (0.1 bar) in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1112 psi (0.1 bar) in 24 hours. Tests All piping hydrostatically tested at 200 psi (bar) for 2 hrs. Dry piping pneumatically tested? LI Yes E No Equipment operates properly? 2 Yes LI No If no, state reason. N/A . . Drain test—Reading of gauge located near water supply test pipe: Static pressure: psi (bar) Drain test—Residual pressure with valve in test pipe open wide: psi (bar) Underground mains and lead-in connections to system risers flushed before connections made to sprinkler piping Verified by copy of the U Form No. 85B LI Yes LI No. Z .. Other Flushed by installer of underground sprinkler piping LI Yes LI. No Z - Other If other, explain, by others . . ,. . . . . Blank Testing Gaskets . . Number used N/A Locations - Number. removed Welding ,., ... Welded piping? - LI Yes • No If yes, . . Do you certify as the sprinkler contractor that welding procedures comply with the requirements of at least AWS D10.9, Level AR-3? . . LI Yes 21 No Do you certify that the welding was performed by welders qualified in com- . . . . pliance with the requirements of at least AWS Dl 0.9, Level AR-3? . LI Yes . - No Do you certify that welding was carried out in compliance with a documented . . . . . quality control procedure to insure that all discs are retrieved, that openings in . piping are smooth, that slag and other welding residue are removed, and that . the internal diameters of piping are not penetrated? LI Yes Z No Hydraulic Data Nameplate . .. - Nameplate provided? ZI Yes LI - No . . . .. If no, explain. Remarks Date left in service with all control valves open: 12/02/2013 - CYO Pizza Suite 5-101 work only performed in this suite. . ,. •. Sprinkler Contractor: Symons Fire Protection, Inc. Signatures of Test Witnesse For property owner L - Date 12/06/2013 For sprinkler contractor (signed o2 72-, . -- Title Superi tendat..... Date 12/06/2013 /7 . PAGE 3of3 Copyright © 2000 National Fire Protection Association