Loading...
HomeMy WebLinkAbout5540 FERMI CT; ; FPC2018-0091; Permit(ity of PERMIT REPORT Carlsbad Print Date: 03/22/2022 Permit No: FPC2018-0091 Job Address: 5540 FERMI CT, CARLSBAD, CA 92008-7325 Status: Closed - Finaled Permit Type: FIRE-Construction Commercial Work Class: Fire Sprinklers Parcel #: 2121305100 Track #: Applied: 03/15/2018 Valuation: $179,063.50 Lot #: Issued: 03/23/2018 Occupancy Group: Project #: Finaled Close Out: 02/23/2021 #of Dwelling Units: Plan #: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check #: Inspector: Plan Check #: Final Inspection: Project Title: Description: ADIDAS PHASE 2- SPRINKLER TI (36 HEADS) -REVISION #2 (47 HEADS) Applicant: CoApplicant: A & D FIRE SPRINKLER INC A & D FIRE SPRINKLERS INC DEVIN KRENZ 7130 CONVOY CT 7130 CONVOY CT SAN DIEGO, CA 92111-1019 SAN DIEGO, CA 92111-1019 (858) 277-3473 (858) 277-3473 FEE AMOUNT FIRE Expedited Plan Review Per Hour - Office Hours $132.00 FIRE Expedited Plan Review Per Hour - Office Hours $132.00 FIRE NFPA 13 or 13R System 7 - 100 heads $536.00 FIRE Reinspection (per inspection) $187.00 Total Fees: $987.00 Total Payments To Date: $987.00 Balance Due: $0.00 Fire Department Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov FIRE SPRINKLERS INC. Adidas Phase Two 5540Fermi Court Carlsbad, CA 92008 FIRE SPRINKLER SUBMITTAL HYDRAULIC CALCULATIONS ** Materials of equal design, utility, and performance may be substituted for submitted materials so as to avoid delays in the construction schedule and shall be deemed accepted by the Purchaser. FIRE SPRINKLERS INC. A&D FIRE SPRINKLERS INC. 7130 CONVOY COURT SAN DIEGO, CA 92111 858-277-3473 Job Name : ADIDAS PHASE 2 Building Location System Contract Data File : PROOF CALC FOR NEW PRESENTATION & SHOWROOM.WXF Computer Programs by Hydratec Inc. Revision: 50.52.1 Water Supply Curve C A&D FIRE SPRINKLERS INC. Page ADIDAS PHASE 2 Date City Water Supply: Demand: Cl - Static Pressure : 126 Dl - Elevation : 5.739 C2 - Residual Pressure: 114 D2 - System Flow :471.695 C2 - Residual Flow : 2950 D2 - System Pressure :122.486 Hose ( Demand) :250 D3 - System Demand : 721.695 Safety Margin : 2.627 150 140 130 _____ p120 ID3 R 11 E10° s90 80 u70 R6° E5° 40 30 20 ssi_.I I 10 I I 300 600 900 1200 1500 1800 2100 2400 2700 FLOW (N " 1.85) Computer Programs by Hydratec Inc. Revision: 50.52.1 Fittings Used Summary A&D FIRE SPRINKLERS INC. ADIDAS PHASE 2 ----------------------------------------------------------------------- Fitting Legend Abbrev. Name E NFPA 13 90' Standard Elbow F NFPA 13 45' Elbow L NFPA 13 Long Turn Elbow T NFPA 13 90' Flow thru Tee Page 2 Date 1/2 % 1 11/4 1% 2 21/2 3 31/2 4 5 6 8 10 12 14 16 18 20 24 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 1 1 1 1 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28 0.5 1 2 2 2 3 4 5 5 6 8 9 13 16 18 24 27 30 34 40 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Unit Summary Diameter Units Length Units Flow Units Pressure Units Inches Feet US Gallons per Minute Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with . The fittings marked with a * show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a * will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Computer Programs by Hydratec Inc. Revision: 50.52.1 Pressure / Flow Summary - STANDARD A&D FIRE SPRINKLERS INC. Page 3 ADIDAS PHASE 2 Date Node Elevation K-Fact Pt Pn Flow Density Area Press No. Actual Actual Rea. 1 14.25 5.6 7.01 na 14.83 0.15 48 7.0 2 13.75 7.41 na 3 13.75 8.08 na 4 13.75 8.56 na 5 13.75 8.76 na 6 13.75 10.71 na 7 13.75 12.98 na 8 13.75 14.21 na 9 13.75 15.94 na 10 13.75 34.02 na 11 12.0 43.94 na 12 12.0 48.37 na 13 12.0 55.13 na 14 12.0 59.65 na 15 12.0 62.6 na 16 12.0 64.65 na 17 12.0 65.83 na 18 12.0 66.37 na 19 12.0 66.53 na 20 13.75 66.63 na 21 13.75 95.85 na 22 12.0 97.47 na 23 12.0 97.62 na 24 12.0 98.17 na 25 12.0 99.35 na 26 12.0 101.4 na 27 12.0 105.97 na TOR 12.0 106.7 na BOR 1.0 112.01 na UGI -3.0 113.77 na UG2 -3.0 113.95 na BF1 3.0 111.39 na BF2 3.0 120.4 na UG3 -3.0 123.04 na UG4 -3.0 123.91 na SOR 1.0 122.49 na 250.0 28 9.0 5.6 8.46 na 16.29 0.15 99 7.0 29 13.75 8.11 na 30 13.75 8.13 na 31 13.75 8.91 na 32 13.75 9.44 na 33 13.75 83.95 na 34 12.0 87.55 na 35 12.0 89.2 na 36 12.0 92.51 na 37 12.0 96.8 na 38 9.0 5.6 8.96 na 16.77 0.15 35 7.0 39 13.75 8.08 na 40 14.25 5.6 7.0 na 14.82 0.15 72 7.0 41 13.75 7.4 na 42 9.0 5.6 9.54 na 17.3 0.15 56 7.0 43 14.25 5.6 7.39 na 15.22 0.15 80 7.0 44 13.75 7.8 na 45 9.0 5.6 9.7 na 17.44 0.15 38 7.0 46 14.25 5.6 8.17 na 16.01 0.15 79 7.0 47 13.75 8.6 na 48 14.25 5.6 9.31 na 17.08 0.15 80 7.0 49 13.75 9.77 na 50 9.0 5.6 13.34 na 20.45 0.15 38 7.0 51 9.0 5.6 13.61 na 20.66 0.15 96 7.0 52 14.25 5.6 14.0 na 20.95 0.15 80 7.0 53 13.75 14.57 na Computer Programs by Hydratec Inc. Revision: 50.52.1 Flow Summary - Standard A&D FIRE SPRINKLERS INC. Page 4 ADIDAS PHASE 2 Date Node Elevation K-Fact Pt Pn Flow Density Area Press No. Actual Actual Req. 54 14.25 5.6 21.67 na 26.07 0.15 54 7.0 55 13.75 23.05 na 56 13.75 23.25 na 57 13.75 24.52 na 58 13.75 27.8 na 59 13.75 37.4 na 60 12.0 43.03 na 61 14.25 5.6 21.74 na 26.11 0.15 81 7.0 62 13.75 23.12 na 63 13.75 24.11 na 64 13.75 84.08 na 65 12.0 87.12 na 66 14.25 5.6 21.85 na 26.18 0.15 90 7.0 67 14.25 5.6 22.68 na 26.67 0.15 89 7.0 68 14.25 5.6 23.07 na 26.9 0.15 90 7.0 69 14.25 5.6 26.19 na 28.66 0.15 91 7.0 70 9.0 5.6 37.54 na 34.31 0.15 103 7.0 71 13.75 41.35 na 72 13.75 42.03 na 73 13.75 86.75 na 74 9.0 5.6 37.75 na 34.41 0.15 96 7.0 75 13.75 41.58 na 76 13.75 46.24 na 77 9.0 5.6 38.14 na 34.58 0.15 85 7.0 78 13.75 55.41 na 79 13.75 90.71 na 80 13.75 59.92 na 81 13.75 95.01 na 82 13.75 62.92 na 83 13.75 99.56 na 84 13.75 64.86 na 85 13.75 97.62 na 86 13.75 65.97 na 87 13.75 96.51 na 88 13.75 66.49 na 89 13.75 95.99 na The maximum velocity is 29.11 and it occurs in the pipe between nodes 9 and 10 Computer Programs by Hydratec Inc. Revision: 50.52.1 Final Calculations - Hazen-Williams - 2007 A&D FIRE SPRINKLERS INC. Page 5 ADIDAS PHASE 2 Date Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. 11G.or Ftngs Pe Pv ******* Notes Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 1 14.83 1.083 E 2.336 0.500 7.010 K Factor =5.60 to 120.0 0.0 2.336 0.217 2 14.83 0.0642 0.0 2.836 0.182 Vel = 5.17 2 0.0 1.083 T 5.84 4.670 7.409 to 120.0 0.0 5.840 0.0 3 14.83 0.0640 0.0 10.510 0.673 Vel = 5.17 3 9.19 1.38 0.0 10.000 8.082 to 120.0 0.0 0.0 0.0 4 24.02 0.0480 0.0 10.000 0.480 Vel = 5.15 4 15.23 1.38 0.0 1.630 8.562 to 120.0 0.0 0.0 0.0 5 39.25 0.1190 0.0 1.630 0.194 Vel = 8.42 5 17.29 1.38 0.0 8.330 8.756 to 120.0 0.0 0.0 0.0 6 56.54 0.2341 0.0 8.330 1.950 Vel = 12.13 6 17.09 1.38 0.0 5.950 10.706 to 120.0 0.0 0.0 0.0 7 73.63 0.3815 0.0 5.950 2.270 Vel = 15.79 7 20.45 1.38 0.0 2.050 12.976 to 120.0 0.0 0.0 0.0 8 94.08 0.6005 0.0 2.050 1.231 Vel = 20.18 8 20.66 1.38 0.0 2.000 14.207 to 120.0 0.0 0.0 0.0 9 114.74 0.8670 0.0 2.000 1.734 Vel = 24.61 9 20.96 1.38 1 6.0 9.290 15.941 to 120.0 0.0 6.000 0.0 10 135.7 1.1821 0.0 15.290 18.075 Vel = 29.11 10 0.0 1.38 T 6.0 1.750 34.016 to 120.0 0.0 6.000 0.758 11 135.7 1.1822 0.0 7.750 9.162 Vel= 29.11 11 96.44 2.157 0.0 12.240 43.936 to 120.0 0.0 0.0 0.0 12 232.14 0.3626 0.0 12.240 4.438 Vel = 20.38 12 48.76 2.157 0.0 13.100 48.374 to 120.0 0.0 0.0 0.0 13 280.9 0.5160 0.0 13.100 6.760 Vel = 24.66 13 -41.84 2.157 0.0 11.790 55.134 to 120.0 0.0 0.0 0.0 14 239.06 0.3828 0.0 11.790 4.513 Vel = 20.99 14 -41.71 2.157 0.0 11.000 59.647 to 120.0 0.0 0.0 0.0 15 197.35 0.2685 0.0 11.000 2.954 Vel = 17.33 15 42.70 2.157 0.0 11.980 62.601 to 120.0 0.0 0.0 0.0 16 154.65 0.1710 0.0 11.980 2.049 Vel= 13.58 16 -40.19 2.157 0.0 12.000 64.650 to 120.0 0.0 0.0 0.0 17 114.46 0.0980 0.0 12.000 1.176 Vel = 10.05 Computer Programs by Hydratec Inc. Revision: 50.52.1 Final Calculations - Hazen-Williams A&D FIRE SPRINKLERS INC. Page 6 ADIDAS PHASE 2 Date Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 17 -38.70 2.157 0.0 12.000 65.826 to 120.0 0.0 0.0 0.0 18 75.76 0.0458 0.0 12.000 0.549 Vel = 6.65 18 -37.98 2.157 0.0 12.000 66.375 to 120.0 0.0 0.0 0.0 19 37.78 0.0126 0.0 12.000 0.151 Vel = 3.32 19 0.0 1.38 T 6.0 1.750 66.526 to 120.0 0.0 6.000 -0.758 20 37.78 0.1110 0.0 7.750 0.860 Vel = 8.10 20 0.0 1.38 2T 12.0 251.210 66.628 to 120.0 0.0 12.000 0.0 21 37.78 0.1110 0.0 263.210 29.224 Vel = 8.10 21 0.0 1.38 1 6.0 1.750 95.852 to 120.0 0.0 6.000 0.758 22 37.78 0.1110 0.0 7.750 0.860 Vel = 8.10 22 0.0 2.157 0.0 12.000 97.470 to 120.0 0.0 0.0 0.0 23 37.78 0.0126 0.0 12.000 0.151 Vel = 3.32 23 37.98 2.157 0.0 12.000 97.621 to 120.0 0.0 0.0 0.0 24 75.76 0.0458 0.0 12.000 0.549 Vel = 6.65 24 38.70 2.157 0.0 12.000 98.170 to 120.0 0.0 0.0 0.0 25 114.46 0.0980 0.0 12.000 1.176 Vel = 10.05 25 40.19 2.157 0.0 11.980 99.346 to 120.0 0.0 0.0 0.0 26 154.65 0.1710 0.0 11.980 2.049 VeI= 13.58 26 42.70 2.157 T 12.307 4.740 101.395 to 120.0 0.0 12.307 0.0 27 197.35 0.2685 0.0 17.047 4.577 Vel = 17.33 27 274.35 4.26 0.0 14.930 105.972 to 120.0 0.0 0.0 0.0 TOR 471.7 0.0490 0.0 14.930 0.731 VeI= 10.62 TOR 0.0 4.26 0.0 11.000 106.703 to 120.0 0.0 0.0 4.764 BOR 471.7 0.0490 0.0 11.000 0.539 Vel = 10.62 BOR 0.0 8.39 L 22.054 4.000 112.006 to 140.0 0.0 22.054 1.732 UGI 471.7 0.0013 0.0 26.054 0.035 Vel = 2.74 UG1 0.0 7.98 2L 39.264 78.250 113.773 to 150.0 0.0 39.264 0.0 UG2 471.7 0.0015 0.0 117.514 0.179 Vel = 3.03 UG2 0.0 8.39 L 22.054 6.000 113.952 to 140.0 0.0 22.054 -2.599 BF1 471.7 0.0014 0.0 28.054 0.039 Vel = 2.74 BFI 0.0 8.249 0.0 6.000 111.392 to 120.0 0.0 0.0 9.000 * Fixed Loss = 9 BF2 471.7 0.0020 0.0 6.000 0.012 Vel = 2.83 Computer Programs by Hydratec Inc. Revision: 50.52.1 Final Calculations - Hazen-Williams A&D FIRE SPRINKLERS INC. Page 7 ADIDAS PHASE 2 Date Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv Notes Point Qt Pf/Ft Eqv. Ln. Total Pf Pn BF2 0.0 8.39 L 22.054 6.000 120.404 to 140.0 0.0 22.054 2.599 UG3 471.7 0.0013 0.0 28.054 0.037 Vel = 2.74 UG3 0.0 7.98 T 52.855 450.667 123.040 to 150.0 2L 39.264 119.301 0.0 UG4 471.7 0.0015 2F 27.183 569.968 0.869 VeI= 3.03 UG4 0.0 6.09 T 46.249 8.250 123.909 to 150.0 0.0 46.249 -1.732 SOR 471.7 0.0057 0.0 54.499 0.309 Vel = 5.20 250.00 Qa = 250.00 721.70 122.486 K Factor 65.21 28 16.29 1.049 E 2.0 12.140 8.459 K Factor= 5.60 to 120.0 T 5.0 7.000 -2.057 29 16.29 0.0890 0.0 19.140 1.704 Vel = 6.05 29 7.57 1.38 0.0 0.420 8.106 to 120.0 0.0 0.0 0.0 30 23.86 0.0476 0.0 0.420 0.020 Vel = 5.12 30 14.81 1.38 0.0 6.730 8.126 to 120.0 0.0 0.0 0.0 31 38.67 0.1159 0.0 6.730 0.780 Vel = 8.29 31 17.44 1.38 0.0 2.300 8.906 to 120.0 0.0 0.0 0.0 32 56.11 0.2309 0.0 2.300 0.531 Vel = 12.04 32 16.01 1.38 T 6.0 196.930 9.437 to 120.0 0.0 6.000 0.0 33 72.12 0.3672 0.0 202.930 74.509 Vel = 15.47 33 0.0 1.38 T 6.0 1.750 83.946 to 120.0 0.0 6.000 0.758 34 72.12 0.3672 0.0 7.750 2.846 VeI= 15.47 34 64.14 2.157 0.0 12.230 87.550 to 120.0 0.0 0.0 0.0 35 136.26 0.1353 0.0 12.230 1.655 Vel = 11.96 35 54.54 2.157 0.0 13.100 89.205 to 120.0 0.0 0.0 0.0 36 190.8 0.2522 0.0 13.100 3.304 Vel = 16.75 36 41.84 2.157 0.0 11.790 92.509 to 120.0 0.0 0.0 0.0 37 232.64 0.3641 0.0 11.790 4.293 Vel = 20.43 37 41.71 2.157 T 12.307 6.260 96.802 to 120.0 0.0 12.307 0.0 27 274.35 0.4939 0.0 18.567 9.170 Vel = 24.09 0.0 274.35 105.972 K Factor = 26.65 38 16.77 1.049 E 2.0 5.480 8.963 K Factor = 5.60 to 120.0 T 5.0 7.000 -2.057 39 16.77 0.0938 0.0 12.480 1.171 Vel = 6.23 39 -9.20 1.38 0.0 5.030 8.077 to 120.0 0.0 0.0 0.0 29 7.57 0.0058 0.0 5.030 0.029 Vel = 1.62 Computer Programs by Hydratec Inc. Revision: 50.52.1 Final Calculations - Hazen-Williams A&D FIRE SPRINKLERS INC. Page 8 ADIDAS PHASE 2 Date Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 0.0 7.57 8.106 K Factor = 2.66 40 14.82 1.049 E 2.0 0.500 7.000 K Factor = 5.60 to 120.0 0.0 2.000 0.217 41 14.82 0.0744 0.0 2.500 0.186 Vel = 5.50 41 0.0 1.049 T 5.0 4.670 7.403 to 120.0 0.0 5.000 0.0 30 14.82 0.0748 0.0 9.670 0.723 Vel = 5.50 0.0 14.82 8.126 K Factor = 5.20 42 17.30 1.049 E 2.0 5.800 9.540 K Factor = 5.60 to 120.0 T 5.0 7.000 -2.057 5 17.3 0.0995 0.0 12.800 1.273 Vel = 6.42 0.0 17.30 8.756 K Factor = 5.85 43 15.22 1.049 E 2.0 0.500 7.390 K Factor = 5.60 to 120.0 0.0 2.000 0.217 44 15.22 0.0784 0.0 2.500 0.196 Vel = 5.65 44 0.0 1.049 T 5.0 4.670 7.803 to 120.0 0.0 5.000 0.0 4 15.22 0.0785 0.0 9.670 0.759 Vel = 5.65 0.0 15.22 8.562 K Factor = 5.20 45 17.44 1.049 E 2.0 5.480 9.702 K Factor= 5.60 to 120.0 1 5.0 7.000 -2.057 31 17.44 0.1010 0.0 12.480 1.261 Vel = 6.47 0.0 17.44 8.906 K Factor = 5.84 39 9.20 1.38 0.0 0.550 8.077 to 120.0 0.0 0.0 0.0 3 9.2 0.0091 0.0 0.550 0.005 Vel = 1.97 0.0 9.20 8.082 K Factor = 3.24 46 16.01 1.049 E 2.0 0.500 8.171 K Factor = 5.60 to 120.0 0.0 2.000 0.217 47 16.01 0.0860 0.0 2.500 0.215 Vel = 5.94 47 0.0 1.049 T 5.0 4.670 8.603 to 120.0 0.0 5.000 0.0 32 16.01 0.0862 0.0 9.670 0.834 Vel = 5.94 0.0 16.01 9.437 KFactor = 5.21 48 17.08 1.049 E 2.0 0.500 9.307 K Factor = 5.60 to 120.0 0.0 2.000 0.217 49 17.08 0.0968 0.0 2.500 0.242 Vel = 6.34 49 0.0 1.049 T 5.0 4.670 9.766 to 120.0 0.0 5.000 0.0 6 17.08 0.0972 0.0 9.670 0.940 Vel = 6.34 Computer Programs by Hydratec Inc. Revision: 50.52.1 Final Calculations - Hazen-Williams A&D FIRE SPRINKLERS INC. Page 9 ADIDAS PHASE 2 Date Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 0.0 17.08 10.706 K Factor = 5.22 50 20.45 1.049 E 2.0 5.480 13.340 K Factor = 5.60 to 120.0 1 5.0 7.000 -2.057 7 20.45 0.1357 0.0 12.480 1.693 Vel = 7.59 0.0 20.45 12.976 K Factor = 5.68 51 20.66 1.049 E 2.0 12.190 13.612 K Factor= 5.60 to 120.0 T 5.0 7.000 -2.057 8 20.66 0.1382 0.0 19.190 2.652 Vel = 7.67 0.0 20.66 14.207 K Factor = 5.48 52 20.95 1.049 E 2.0 0.500 13.998 K Factor = 5.60 to 120.0 0.0 2.000 0.217 53 20.95 0.1416 0.0 2.500 0.354 Vel = 7.78 53 0.0 1.049 T 5.0 4.670 14.569 to 120.0 0.0 5.000 0.0 9 20.95 0.1419 0.0 9.670 1.372 Vel = 7.78 0.0 20.95 15.941 K Factor = 5.25 54 26.07 1.049 T 5.0 0.500 21.667 K Factor = 5.60 to 120.0 0.0 5.000 0.217 55 26.07 0.2124 0.0 5.500 1.168 Vel = 9.68 55 -11.36 1.38 0.0 10.000 23.052 to 120.0 0.0 0.0 0.0 56 14.71 0.0193 0.0 10.000 0.193 Vel = 3.16 56 26.18 1.38 0.0 9.960 23.245 to 120.0 0.0 0.0 0.0 57 40.89 0.1285 0.0 9.960 1.280 Vel = 8.77 57 26.89 1.38 0.0 10.000 24.525 to 120.0 0.0 0.0 0.0 58 67.78 0.3273 0.0 10.000 3.273 Vel = 14.54 58 28.66 1.38 T 6.0 9.280 27.798 to 120.0 0.0 6.000 0.0 59 96.44 0.6286 0.0 15.280 9.605 Vel = 20.69 59 0.0 1.38 T 6.0 1.750 37.403 to 120.0 0.0 6.000 0.758 60 96.44 0.6285 0.0 7.750 4.871 Vel = 20.69 60 0.0 2.157 0.0 12.670 43.032 to 120.0 0.0 0.0 0.0 11 96.44 0.0713 0.0 12.670 0.904 Vel = 8.47 0.0 96.44 43.936 K Factor = 14.55 61 26.11 1.049 T 5.0 0.500 21.735 K Factor 5.60 to 120.0 0.0 5.000 0.217 62 26.11 0.2131 0.0 5.500 1.172 Vel = 9.69 62 11.36 1.38 0.0 9.040 23.124 to 120.0 0.0 0.0 0.0 63 37.47 0.1093 0.0 9.040 0.988 Vel = 8.04 Computer Programs by Hydratec Inc. Revision: 50.52.1 Final Calculations - Hazen-Williams A&D FIRE SPRINKLERS INC. Page 10 ADIDAS PHASE 2 Date Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C' or Ftng's Pe Pv ******* Notes Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 63 26.66 1.38 T 6.0 196.930 24.112 to 120.0 0.0 6.000 0.0 64 64.13 0.2955 0.0 202.930 59.964 Vel = 13.76 64 0.0 1.38 1 6.0 1.750 84.076 to 120.0 0.0 6.000 0.758 65 64.13 0.2955 0.0 7.750 2.290 Vel = 13.76 65 0.0 2.157 0.0 12.670 87.124 to 120.0 0.0 0.0 0.0 34 64.13 0.0336 0.0 12.670 0.426 Vel = 5.63 0.0 64.13 87.550 K Factor = 6.85 66 26.18 1.049 1 5.0 0.500 21.851 K Factor =5.60 to 120.0 0.0 5.000 0.217 56 26.18 0.2140 0.0 5.500 1.177 Vel = 9.72 0.0 26.18 23.245 K Factor = 5.43 67 26.67 1.049 T 5.0 0.500 22.677 K Factor = 5.60 to 120.0 0.0 5.000 0.217 63 26.67 0.2215 0.0 5.500 1.218 Vel = 9.90 0.0 26.67 24.112 K Factor = 5.43 55 11.36 1.38 0.0 6.000 23.052 to 120.0 0.0 0.0 0.0 62 11.36 0.0120 0.0 6.000 0.072 Vel = 2.44 0.0 11.36 23.124 K Factor = 2.36 68 26.90 1.049 1 5.0 0.500 23.070 K Factor = 5.60 to 120.0 0.0 5.000 0.217 57 26.9 0.2251 0.0 5.500 1.238 Vel = 9.99 0.0 26.90 24.525 K Factor = 5.43 69 28.66 1.049 T 5.0 0.500 26.190 K Factor = 5.60 to 120.0 0.0 5.000 0.217 58 28.66 0.2529 0.0 5.500 1.391 Vel = 10.64 0.0 28.66 27.798 K Factor = 5.44 70 34.31 1.049 E 2.0 9.590 37.543 K Factor = 5.60 to 120.0 T 5.0 7.000 -2.057 71 34.31 0.3532 0.0 16.590 5.860 Vel = 12.74 71 -14.35 1.38 0.0 20.000 41.346 to 120.0 0.0 0.0 0.0 72 19.96 0.0341 0.0 20.000 0.682 Vel = 4.28 72 34.58 1.38 1 6.0 198.230 42.028 to 120.0 0.0 6.000 0.0 73 54.54 0.2190 0.0 204.230 44.722 Vel = 11.70 73 0.0 1.38 T 6.0 1.750 86.750 to 120.0 0.0 6.000 0.758 35 54.54 0.2190 0.0 7.750 1.697 Vel = 11.70 Computer Programs by Hydratec Inc. Revision: 50.52.1 Final Calculations - Hazen-Williams A&D FIRE SPRINKLERS INC. Page 11 ADIDAS PHASE 2 Date Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftngs Pe Pv ******* Notes Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 0.0 54.54 89.205 K Factor = 5.77 74 34.41 1.049 E 2.0 9.590 37.750 K Factor = 5.60 to 120.0 1 5.0 7.000 -2.057 75 34.41 0.3550 0.0 16.590 5.890 Vel = 12.77 75 14.35 1.38 T 6.0 20.150 41.583 to 120.0 0.0 6.000 0.0 76 48.76 0.1780 0.0 26.150 4.654 Vel = 10.46 76 0.0 1.38 T 6.0 1.750 46.237 to 120.0 0.0 6.000 0.758 12 48.76 0.1779 0.0 7.750 1.379 Vel = 10.46 0.0 48.76 48.374 K Factor = 7.01 77 34.58 1.049 E 2.0 9.590 38.139 K Factor =5.60 to 120.0 T 5.0 7.000 -2.057 72 34.58 0.3584 0.0 16.590 5.946 Vel = 12.84 0.0 34.58 42.028 K Factor = 5.33 71 14.35 1.38 0.0 12.820 41.346 to 120.0 0.0 0.0 0.0 75 14.35 0.0185 0.0 12.820 0.237 Vel = 3.08 0.0 14.35 41.583 K Factor = 2.23 13 41.84 1.38 T 6.0 1.750 55.134 to 120.0 0.0 6.000 -0.758 78 41.84 0.1341 0.0 7.750 1.039 Vel = 8.97 78 0.0 1.38 2T 12.0 251.210 55.415 to 120.0 0.0 12.000 0.0 79 41.84 0.1341 0.0 263.210 35.297 Vel = 8.97 79 0.0 1.38 T 6.0 1.750 90.712 to 120.0 0.0 6.000 0.758 36 41.84 0.1341 0.0 7.750 1.039 Vel = 8.97 0.0 41.84 92.509 K Factor = 4.35 14 41.71 1.38 T 6.0 1.750 59.647 to 120.0 0.0 6.000 -0.758 80 41.71 0.1333 0.0 7.750 1.033 Vel = 8.95 80 0.0 1.38 2T 12.0 251.210 59.922 to 120.0 0.0 12.000 0.0 81 41.71 0.1333 0.0 263.210 35.088 Vel = 8.95 81 0.0 1.38 T 6.0 1.750 95.010 to 120.0 0.0 6.000 0.758 37 41.71 0.1334 0.0 7.750 1.034 Vel = 8.95 0.0 41.71 96.802 K Factor = 4.24 15 42.69 1.38 T 6.0 1.750 62.601 to 120.0 0.0 6.000 -0.758 82 42.69 0.1392 0.0 7.750 1.079 Vel = 9.16 Computer Programs by Hydratec Inc. Revision: 50.52.1 Final Calculations - Hazen-Williams A&D FIRE SPRINKLERS INC. Page 12 ADIDAS PHASE 2 Date Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. O.Cf,or Ftng's Pe Pv ******* Notes Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 82 0.0 1.38 21 12.0 251.210 62.922 to 120.0 0.0 12.000 0.0 83 42.69 0.1392 0.0 263.210 36.636 Vel = 9.16 83 0.0 1.38 1 6.0 1.750 99.558 to 120.0 0.0 6.000 0.758 26 42.69 0.1392 0.0 7.750 1.079 Vel = 9.16 0.0 42.69 101.395 K Factor = 4.24 16 40.19 1.38 1 6.0 1.750 64.650 to 120.0 0.0 6.000 -0.758 84 40.19 0.1245 0.0 7.750 0.965 Vel = 8.62 84 0.0 1.38 2T 12.0 251.210 64.857 to 120.0 0.0 12.000 0.0 85 40.19 0.1245 0.0 263.210 32.766 Vel = 8.62 85 0.0 1.38 1 6.0 1.750 97.623 to 120.0 0.0 6.000 0.758 25 40.19 0.1245 0.0 7.750 0.965 Vel = 8.62 0.0 40.19 99.346 K Factor = 4.03 17 38.70 1.38 1 6.0 1.750 65.826 to 120.0 0.0 6.000 -0.758 86 38.7 0.1161 0.0 7.750 0.900 Vel = 8.30 86 0.0 1.38 2T 12.0 251.210 65.968 to 120.0 0.0 12.000 0.0 87 38.7 0.1160 0.0 263.210 30.544 Vel = 8.30 87 0.0 1.38 T 6.0 1.750 96.512 to 120.0 0.0 6.000 0.758 24 38.7 0.1161 0.0 7.750 0.900 Vel = 8.30 0.0 38.70 98.170 K Factor = 3.91 18 37.98 1.38 T 6.0 1.750 66.375 to 120.0 0.0 6.000 -0.758 88 37.98 0.1121 0.0 7.750 0.869 Vel = 8.15 88 0.0 1.38 2T 12.0 251.210 66.486 to 120.0 0.0 12.000 0.0 89 37.98 0.1121 0.0 263.210 29.508 Vel = 8.15 89 0.0 1.38 1 6.0 1.750 95.994 to 120.0 0.0 6.000 0.758 23 37.98 0.1121 0.0 7.750 0.869 Vel = 8.15 0.0 37.98 97.621 K Factor= 3.84 Computer Programs by Hydratec Inc. Revision: 50.52.1