Loading...
HomeMy WebLinkAbout6155 EL CAMINO REAL; ; FPC2017-0024; PermitC of PERMIT REPORT Carlsbad Print Date: 03/02/2022 Permit No: FPC2017-0024 Job Address: 6155 EL CAMINO REAL, CARLSBAD, CA 92009-1602 Status: Closed - Finaled Permit Type: FIRE-Construction Commercial Work Class: Fire Sprinklers Parcel #: 2131000100 Track #: Applied: 01/30/2017 Valuation: $46,882.08 Lot #: Issued: 02/08/2017 Occupancy Group: Project #: Finaled Close Out: 02/22/2021 #of Dwelling Units: Plan #: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check #: Inspector: Plan Check #: Final Inspection: Project Title: Description: VIASAT LAB I/SPRINKLER TI <100 HEADS (14 HEADS) CoApplicant: WESTERN FIRE PROTECTION INC 13630 DANIELSON ST POWAY, CA 92064-6830 (858) 513-4949 FEE AMOUNT FIRE NFPA 13 or 13R System 7 - 100 heads $536.00 Total Fees: $536.00 Total Payments To Date: $536.00 Balance Due: $0.00 Fire Department Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov ~v 4=PLaot*T - 0o24 Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the Contractor's representative and witnessed by an owner's representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. -- PROPERTY ADDRESS 6155 Camino Real BLDG 5 ACCEPTED BY APPROVING AUTHORITIES (NAMES) PLANS INSTALLATION CONFORMS TO ACCEPTED PLANS 0 YES 0 NO EQUIPMENT USED IS APPROVED D YES 0 NO IF NO, EXPLAIN DEVIATIONS INSTRUCTIONS HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION 0 YES OF CONTROL VALVES AND CARE AND MAINTENANCE OF THEIS NEW EQUIPMENT? IF NO, EXPLAIN 0 NO HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES 0 YES SYSTEM COMPONENTS INSTRUCTIONS 0 YES CARE AND MAINTENANCE INSTRUCTIONS 0 YES NFPA25 DYES 0 NO 0 NO 0 NO 0 NO LOCATION SUPPLIES BUILDINGS SPRINKLERS MAKE MODEL YEAR OF MANUFACTURE ORIFICE SIZE - QUANTITY TEMPERATURE RATING TYCO 323 2017 1/2" 17 155 PIPE AND FITTINGS TYPE OF PIPE ASTM Sch 40 TYPE OF FITTINGS ASTM Sch 40 ALARM VALVE ALARM DEVICE MAXIMUM TIME TO OPERATE THROUH TEST CONNECTION OR TYPE MAKE I MODEL MIN SEC FLOW INDICATOR MODEL SERIAL NO. MAKE -MODEL SERIAL NO. DRY PIPE OPERATING TIME TO TRIP THROUGH TEST CONNECTION WATER PRESSURE AIR TRIP PRESSURE AIR POINT PRESSURE TIME WATER REACHED TEST OUTLET ALARM OPERATED PROPERLY TEST MIN SEC PSI PSI PSI MIN 'SEC YES NO - WITH Q.O.D. W/O Q.O.D. IF NO, EXPLAIN OPERATION LI PNEUMATIC fl ELECTRIC 0 HYDRAULIC PIPING SUPERVISED LI YES LI NO DETECTING MEDIA SUPERVISED LI YES LI NO DELUGE & DOES THE VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS [1 YES ElNO PREACTION VALVES IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT IF NO, UPLAIN FOR TESTING? LI YES [I NO MAKE I MODELI DOES EACH CIRCUIT OPERATE SUPERVISION LOSS ALARM DOES EACH CIRCUIT OPERATE VALVE RELEASE MAXIMUM TIME TO OPERATE RELEASE YES NO YES NO MIN SEC tbUPb LOUA I ION MAKE & SETTING STATIC PRESSURE RESIDUAL PRESSURE FLOW RATE REDUCING & FLOOR MODEL (FLOWING) VALVE TEST INLET (PSI) OUTLET (PSI) INLET (PSI) OUTLET (PSI) FLOW (GPM) HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 bars) above static TEST pressure in excess of 150 psi (10.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent DESCRIPTION damage. All aboveground piping leakage shall be stopped. PNEUMATIC: Establish 40 psi (2.7 bars) air pressure and measure drop, which shall not exceed 1/2 psi (0.1 bars) in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1 .4 psi in 24 hours. ALL PIPING HYDROSTATICALLY TESTED AT _FOR 2 HOURS IF NO, STATE REASON DRY PIPING PNEUMATICALLY TESTED 0 YES ONO EQUIPMENT OPERATES PROPERLY El YES F1 NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICATE OR DERIVATIVES OF SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? M YES El NO DRAIN READING OF GAGE LOCATED NEAR WATER RESIDUAL PRESSURE WITH VALVE IN TEST TESTS TEST SUPPLY TEST CONNECTION 98 PSI CONNECTION OPEN WIDE 87 PSI UNDERGROUND MAINS AND LEAD-IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. VERIFIED BY COPY OF THE U FORM NO. 858 0 YES 0 NO OTHER EXPLAIN FLUSHED BY INSTALLER OF UNDERGROUND SPRINKER PIPING M YES DNO IF POWDER DRIVEN FASTENERS ARE USED IN CONCRETE IF NO, EXPLAIN HAS REPRESENTATIVE SAMPLE TESTING BEEN COMPLETED? 0 YES El NO BLANK TEST NUMBER USED LOCATIONS NUMBER REMOVED GASKETS WELDED PIPING M YES 0 NO IF YES... DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS D10.9. LEVEL AR 3? YES 0 NO DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN COMPLIANCE WELDING NTH THE REQUIREMENTS OF AT LEAST AWS D10.9. LEVEL AR 3? YES 0 NO DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED? YES El NO CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL CUTOUTS (DISCS) (DISCS) ARE RETRIEVED? YES 0 NO HYDRAULIC NAMEPLATE PROVIDED IF NO, EXPLAIN DATA EYES ONO NAMEPLATE DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN. REMARKS 3/9/17 NAME OF SPRINKER CONTRACTOR: Western Fire Protection SIGNATURES TESTS WITNESSED BY FOR PROPERTY OWNER (SIGNED) TITLE DATE FQR TI 'IlS,j4. TLE DATE ADDITIONAL EXPLANATIONS AND NOTES: