HomeMy WebLinkAbout6965 EL CAMINO REAL; ; AS100106; PermitCity of Carlsbad
Sprinkler Permit
Permit No: AS100106
6965 EL CAM INO
Job Address:
REAL
Permit Type: SPRINK
Parcel No: 2150507500
Lot #: 0
Reference No.:
PC #:
Status: ISSUED
Applied 9/2/2010
Approved: 9/2/2010
Issued: 9/2/2010
Inspector:
Project Title: MASSAGE HEIGHTS THREE FIRE SPRINKLER INSPECTIONS
@ $65/EA
Applicant:
THORPE DESIGN
STE. 118
31878 DEL OBISPO ST.
SAN JUAN CAPISTRANO, CA
877-977-3473
Owner:
THE VONS COMPANIES INC PLAZA
PASEO REAL ASS
C/O MADISON MARQUETTE
2001 PENNSYLVANIA NW 10TH FLOOR
WASHINGTON DC
Fees ($) Add'I Fees ($) I Total ($) [ Balance($)l
195 0 195 0
AG
13-190 INSTALLATION OF SPRINKLER SYSTEMS
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, Inspection and tests shall be made by the contractor's representative and witnessed by an owner's
representative. M defects shall be corrected and system left In service before contractor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and
contractor. It Is understood the owner's representative's signature In no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances.
Property name I I I'14 446 0-21-S
Date
Property address 4el (A (2M • Accepted by approving authorities (names) e
• Address
plans A
Installation conforms to accepted plans Yes E No
Equipment used Is approved 1ls El No
If no, explain deviations
Has person In charge of fire equipment been instructed as WYee No • to Iction of control valves and care and maintenance
of this new equipment?
If no, explain,
Instructions.
Have copies of the following been left on the premises? J'es El No
System components instructions' El Yes No
Care and maintenance Instructions El Yes No
___________
3. NFPA 25 El Yes [...No
Location of
system Supplies buildings
Year of Orifice Temperature
rating - Make Model manufacture size OtJty
711 CA it/ 34,51
1'j?a-•:l __________ i j-z.. Spriniders
Pipe and Type of pipe fittings Type of fittings '.
Alarm valve or
flow
Alarm device '
Maximum time to operate
through test connection
[ Make Model Minutes Seconds
Indicator
' Drylve,... _00.D.
.Make Model no. no. _Serial _'Serial _Make _Model
Dry pipe
operating
test
-
.
Time to trip
through test
conneótion Water pressure Jr pressure
. - ' point ,Time water reached
test outletU
Alarm operated
properly
Mim!tesl Seconds psi
_'
osl Minutes Yes
Vviinout ,
_Seconds
D.O.D.
_No
With
lf no, explain
1Measured from time Inspector's test connection is Opened
2NFPA 13 only requires -the 60-second limitation In specific sections
FIGURE 16.1 Contractor's Material and Test Certificate for Aboveground Piping.
2002Edition'
Fj
El Pneumatic El Electric* El Hydraulics
Piping supervis—... Yes El No Detecting media supervised 0 No Does valve operate from the manuMIRp remote, or both 0 Yes 0 No control stations?
preaction
Deluge and
If no, explain
valves
Is there an accessible facility In: each cirm: for testing?
ElYes 0 No
Doe .aadicircuit operate Does each circuit Maximum time to Make Model L __ti@Msion loss alarm? valve release? operate release. 1 Yes No Yes No Mlnut Seconds
-
Loca Setting Static pressure Residual pressure re Pressure and floor model
reducing
valve test I utlet Outlet (psi) Flow (gpm)
Hydrostatic- Hydrostatic tests shall be made at not less than 200 par (13.8 bar) for 2 hours or 50 psi (3.4 bar) above static pressure in excess of 150 psi (10.2 bar) for 2 hours. Differential dry-pipe valve clappers shall be left open during the test to prevent damage. All aboveground piping leakage shall be stopped. Test
description -Pnowmatio ctablisM0 pal (2.7 bar) air pressure and moaourorop, whiehehell-not-ieoodi½ peF(O.1befl at normal-wator -1n-24-hawa.-.Tesl.preseeice-tanko lovol und-oir-proosused-measwair-preesue-drepwhleh-&iaI net-exeee444ps-ba24-iteuFe.
0* VZ>'fI All piping hydrostatically tested at .Lpsi ( bar) for hours If no, state reason Dry piping pneumatically tested G Yes [J No Equipment operates property D Yes 0 No
Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives of sodium silicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks? ;'Yes D No
Drain Reading of gauge located near water Residual pressure with vah,4n test Tests test supply test connection: psi (_ bar) connection open wide: I3'), psi (. bar) Underground mains and lead-in connections to system risers flushed before connection made W . sprinkler piping
Verified by copy of the Contractor's Material and Test 0 Yes El No Other Explain Certificate for Underground Piping.
Flushed by installer of underground sprinkler piping El Yes C] No
If powder-driven fasteners are used in concrete, El Yes D No If no, explain has representative sample testing been satisfactorily completed?
Blank testing 1
gaskets
removed 'Weldi_ng piping El Yes C] No
If yes...
Do you certify as the contractor that welding procedures comply D with the requirements of at WS 82.1?
ld Welding Do you certify that the welding was performed by rs qualified in D Yes 0 No compliance with the requirements of at least AWS 82.1
was
rat
Do you certify that the welding was ca In compliance with 01 yes C3 No trol
al
documented quality control p to ensurethat all discs are retfineved, that.
:
cs
that
openings in pi ng a that slag arml othe7rwelding residue are pi are
re removed, a e internal damters of piping are riot penetrated?
Cutouts Do you ce5ty1hat-yortheygcontro1feature to ensure that (discs)
FIGURE 16.1 Continued
2002 Edition
11)-) . #?C.
Tests witnessed by .........,. .,... . ..
INSTAL1ATIONOF SPRINKLER SYSTEMS
Hydraulic Nameplate provided
.. . If no, explain
. data
,... ' nameplate . E Yes.' HO. .. ..'. .:..................
Date left in service with all control valves open ' " ..........' . . '.''. . '.. . Remarks
FIGURE 16.1 Con1imied
16.2.1.2 Portions of systems normally subjected to system
working pressures in excess of 150 psi (10.4 bar) shall be,
tested as described in 16.2.2.1 atapressure of .5.0.psi'..(3.5:bar)
in excess of system working pressure. ............ ..' ..
16.2.1.3 Where cold weather willnOt permittestiñgwith-ter, an interim air test shall be permitted to be conducted as
described in 16.2.3.
16.2.1.4 Modifications affecting 20 or fewer sprinklers shall
not require testing in excess of system working pressure.
16.2.1.5 Where addition or modification is made to an exist-
ing system affect1J3giPQre than 20 sp inkl.ers,.t. e new portion
shall be isolated and testedatnotless than 200 psi (13.8 bar) for hours.
16.2.1.6 Modilicitions that cannot be isolated, such as relo-
cated drops, shall not require testing in excess of system work-
ing pressure.
16.2.1.7 Loss. shall be determined by a drop in gauge pres-
sure or visual leakage.
16.2.1.8 The test pressure shall be read from a gauge located
at the low elevation point of the system or portion being
tested
16.2.1.9 Additives; corrosive chemicals such as sodium sili'
cate, or derivatives of sodium silicate, brine, or other hemi-
cals shall not be used while hydrostatically testing systems or for stopping leaks.
16.2.1.10 Piping between the exterior fire department con-
nection and the check valve in the fire department inlet pipe
thall be hydruitatically'testedi'n-the sainemanner, as"the'bai-ance of the system.
16.2.1.11 When deluge systems are being hydrostatically
tested, plugs shall be installed in fittings and replaced with
open sprinklers after the test is completed, or the operating
elements of automatic sprinklers shall be removed after
, the test is completed.
16.2.1.12* The trench shall be backfilled between joints be-
fore testing to prevent movement of pipe.
16.2.1.13 Where required for safety measures presented by
the hazards of open trenchis, the pipe and joints shall be per-
mitted to be backfilled provided the installing contractor
takes the responsibility for locating and correcting leakage in
excess of that permitted in 16.2.1.8.
16.2.1.14 Provision shall be made for the proper disposal of
water used for flushing or testing.
16.2.1.15* Test Blanks.
-
16.2.1.15.1 Test blanks shall have painted lugs protruding in
such a way as to clearly indicate their presence.
16.2.1.15.2 The test blanks shaH be numbered, and the in-
stalling contractor shall have a recórdkeeping method ensur-
ing their removal after work is completed.
16.2.1.16. When subject to hydrostatic test pressures, the clap-
per of a differential-type valve shall be held off its seat to pre-
vent damaging the valye.
16.2.2 D Pipe and Double interlock System(s) Air Test. ry
16.2.2.1 Ifif addui.ion to 'he a,idar hvdrratic test, an pressure leakage test at 40 psi (2.8 bar) shall be conducted for 24 hours.Any leakage that results in a loss of pressure in excess
of 1½ psi (0.1 bar) for the 2416urs shall be corrected.
16.2.2.2 Where systems. are installed in spaces that are ca-
pable of being operated at temperatures below 327F pressure leakage tests required in 16.2.2 shall be cducted at
the lowest nominal temperature of the space.
2002 Edition