Loading...
HomeMy WebLinkAbout2210 FARADAY AVE; ; AS140021; PermitCity of Carlsbad Sprinkler Permit Permit No: AS 140021 Job Address: 2210 FARADAYAV Permit Type: SPRINK Parcel No: 2121205500 Lot #: 0 Reference No.: PC #: Status: APPROVED Applied 1/29/2014 Approved: 2/4/2014 Issued: 2/4/2014 Inspector: Project Title: NEMKO TEST CHAMBER SCOPE IS TO PROVIDE FIRE SPRINKLER PROTECTION IN THE ONE NEW TESTING CHAMBER. CHAMBER #5 IS DESIGNED PER THE OWNERS INSURANCE REQUIREMENT OF .60/ENTIRE CHANBER. ALL THREE CHAMBERS ARE CONTROLLED WITH A SINGLE ISOLATION VALVE AS SHOWN ON PLANS. Applicant: EPIC FIRE PROTECTION, INC. 765 TURTLE POINT WY SAN MARCOS, CA 760-310-6122 Owner: P R E F RESEARCH CENTER L L C 4370 LA JOLLA VILLAGE DR #640 SAN DIEGO CA Fees ($) Add'I Fees ($) Total ($) Balance ($) ;, cAi411.c. MI4co2-( SUBMITTAL SERIAL NO:2932HY7 01-28-2014 PAGE 1 NEMKO CHAMBER 2 AND 3 .60/ENTIRE CHAMBER FLOW TEST RESULTS Water Supply STATIC 107.10 PSI RESIDUAL 106.20 PSI @ 1400.00 GPM CITY PRESSURE AVAILABLE AT 883.5 GPM 106.72 PSI SUMMARY OF SPRINKLER OUTFLOWS ACTUAL MINIMUM SPR FLOW FLOW K-FACTOR PRESSURE 410 68.51 60.00 16.80 16.63 411 62.85 60.00 16.80 14.00 412 66.11 60.00 16.80 15.49 413 60.63 60.00 16.80 13.02 414 65.44 60.00 16.80 15.17 415 60.00 60.00 16.80 12.76 TOTAL WATER REQUIRED FOR SYSTEM 383.55 GPM OUTSIDE HOSE STREAMS AT 0 500.00 GPM TOTAL WATER REQUIREMENT 883.55 GPM PRESSURE REQUIRED AT 0 96.34 PSI MAXIMUM PRESSURE UNBALANCE IN LOOPS 0.00 PSI SUBMITTAL SERIAL NO:2932HY7 01-28-2014 PAGE 2 NEMKO CHAMBER 2 AND 3 .60/ENTIRE CHAMBER Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 413 415 2.203 L 10.00 C=120 PT 12.76 (415) Q 60.00 F=0 F 0.00 PE 0.00 BN T 10.00 0.0268 PF 0.27 PT 13.03 (413) 412 414 2.203 L 10.00 C=120 PT 15.17 (414) Q 65.44 F=0 F 0.00 PE 0.00 BN T 10.00 0.0314 PF 0.31 PT 15.48 (412) 411 ------------------ 413 2.203 L 10.00 C=120 PT 13.02 (413) Q 120.63 F=0 F 0.00 PE 0.00 BN T 10.00 0.0975 PF 0.97 PT 13.99 410 ------------------ 412 2.203 L 10.00 C=120 PT 15.49 Q 131.56 F=0 F 0.00 PE 0.00 EN T 10.00 0.1144 PF 1.14 PT 16.63 401 ------------------ 411 2.203 L 2.00 C=120 PT 14.00 Q 183.48 F=T F 11.60 PE 0.00 BN T 13.60 0.2117 PF 2.88 PT 16.88 (401) 400 ------------------ 410 2.203 L 2.00 C=120 PT 16.63 (410) Q 200.07 F=T F 11.60 PE 0.00 BN T 13.60 0.2485 PF 3.38 PT 20.01 (400) 42 ------------------ 75 6.357 L 3.00 C=120 PT 70.04 ( 75) Q 321.88 F=0 F 0.00 PE 0.00 CM2 T 3.00 0.0034 PF 0.01 43 42D0 -28.77 6.357 L 11.00 C=120 PT 70.05 ( 42) Q 293.11 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0029 PY 0.03 44 43DQ -26.31 6.357 L 11.00 C=120 PT 70.08 ( 43) Q 266.80 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0024 PF 0.03 0.03 45 44DQ -24.09 L 11.00 C=120 PT 70.11 ( 44) Q 242.71 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0020 PF 0.02 46 45DQ -22.05 6.357 L 11.00 C=120 PT 70.13 ( 45) Q 220.67 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0017 PF 0.02 SUBMITTAL SERIAL NO:2932HY7 01-28-2014 PAGE 3 NEMKO CHAMBER 2 AND 3 .60/ENTIRE CHAMBER Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 47 46DQ -20.24 6.357 L 11.00 C=120 PT 70.15 ( 46) Q 200.43 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0014 PF 0.02 48 47DQ -18.56 6.357 L 11.00 C=120 PT 70.17 ( 47) Q 181.87 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0012 PF 0.01 49 48DQ -17.08 6.357 L 11.00 C=120 PT 70.18 ( 48) Q 164.79 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0010 PF 0.01 50 49DQ -15.75 6.357 L 11.00 C=120 PT 70.19 ( 49) Q 149.05 F=O F 0.00 PE 0.00 CM2 T 11.00 0.0008 PF 0.01 51 50DQ -14.56 6.357 L 11.00 C=120 PT 70.20 ( 50) Q 134.49 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0007 PF 0.01 52 51DQ -13.52 6.357 L 11.00 C=120 PT 70.21 ( 51) Q 120.96 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0006 PF 0.01 53 52DQ -12.60 6.357 L 11.00 C=120 PT 70.22 ( 52) Q 108.36 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0005 PF 0.01 54 53DQ -11.82 6.357 L 11.00 C=120 PT 70.23 ( 53) Q 96.54 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0004 PF 0.00 55 54DQ -11.14 6.357 L 11.00 C=120 PT 70.23 ( 54) Q 85.40 F=O F 0.00 PE 0.00 CM2 T 11.00 0.0003 PF 0.00 56 55DQ -10.56 6.357 L 11.00 C=120 PT 70.23 ( 55) Q 74.83 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0002 PF 0.00 57 56DQ -10.11 6.357 L 11.00 C=120 PT 70.23 ( 56) Q 64.73 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0002 PF 0.00 58 57DQ -9.73 6.357 L 11.00 C=120 PT 70.23 ( 57) Q 55.00 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0001 PF 0.00 SUBMITTAL SERIAL NO:2932HY7 01-28-2014 PAGE 4 NEMKO CHAMBER 2 AND 3 .60/ENTIRE CHAMBER Location Flow Pipe Fittings Equiv Friction. Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 59 58DQ -9.44 6.357 L 11.00 C=120 PT 7023 ( 58) Q 45.56 F=0 F 0.00 PE 0.00 M2 T 11.00 0.0001 PF 0.00 60 59DQ -9.25 6.357 L 11.00 C=120 PT 70.23 ( 59) Q 36.3 Q 36.30 F=0 F PE 0.00 CM2 T 11.00 0.0001 PF 0.09 61 60DQ -9.16 6.357 L 11.00 C=120 PT 70.23 ( 60) Q 27.14 F=0 F 0.00 PE 0.00 M2 T 11.00 0.0000 PF 0.00 62 61DQ -9.08 6.357 L 11.00 C=120 PT 70.23 ( 61) Q 18.06 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0000 PF 0.00 63 62DQ -9.03 6.357 L 11.00 C=120 PT 70.23 ( Q 9.03 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0000 PF 0.00 33 63 2.703 L 97.00 C=120 PT 70.23 ( Q 9.03 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0003 PF 0.05 32 33 6.357 L 11.00 C=120 PT 71.15 ( 33) Q 9.03 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0000 PF 0.00 31 32DQ 9.03 6.357 L 11.00 C=120 PT 71.15 ( 32) Q 18.06 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0000 PF 0.00 30 31DQ 9.08 6.357 L 11.00 C=120 PT 71.15 ( 31) Q 27.14 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0000 PF 0.00 29 30DQ 9.16 6.357 L 11.00 C=120 PT 71.15 ( 30) Q 36.30 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0001 PF 0.00 28 29DQ 9.25 6.357 L 11.00 C=120 PT 71.15 ( 29) Q 45.56 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0001 PF 0.00 27 280Q 9.44 6.357 L 11.00 C=120 PT 71.15 ( 28) Q 55.00 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0001 PF 0.00 SUBMITTAL SERIAL NO:2932HY7 01-28-2014 PAGE 5 NEMKO CHAMBER 2 AND 3 .60/ENTIRE CHAMBER Location Flow Pipe Fittings Equi.v Friction Pressure in Size & Length Loss Summary From To GPM IN Devices. Ft PSI/Ft PSI 26 27DQ 9.73 6.357 L 11.00 C=120 PT 71.15 ( 27) Q 64.73 F=0 F 0.00 PE 0.00 CM]. T 11.00 0.0002 PF 0.00 25 26DQ 10.11 6.357 L 11.00 C=120 PT 71.15 ( 26) Q 74.83 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0002 PF 0.00 24 25DQ 10.56 6.357 L 11.00 C=120 PT 71.15 ( 25) Q 85.40 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0003 PF 0.00 23 24DQ 11.14 6.357 L 11.00 C=120 PT 71.15 ( 24) Q 96.54 F=0 F 0.00 PE 0.00 CM]. T 11.00 0.0004 PF 0.00 22 23DQ 11.82 6.357 L 11.00 C=120 PT 71.15 ( 23) Q 108.36 F=0 F 0.00 PE 0.00 CM]. T 11.00 0.0005 PF 0.01 21 22DQ 12.60 6.357 L 11.00 C=120 PT 71.16 ( 22) Q 120.96 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0006 PF 0.01 20 21DQ 13.52 6.357 L 11.00 C=120 PT 71.17 ( 21) Q 134.49 F=0 F 0.00 PE 0.00 CM]. T 11.00 0.0007 PF 0.01 19 20DQ 14.56 6.357 L 11.00 C=120 PT 71.18 ( 20) Q 149.05. F=O F 0.00 PE 0.00 CM]. T 11.00 0.0008 PF 0.01 18 19DQ 15.75 6.357 L 11.00 C=120 PT 71.19 ( 19) Q 164.79 F=0 F 0.00 PE 0.00 CM]. T 11.00 0.0010 PF 0.01 17 18DQ 17.08 6.357 L 11.00 C=120 PT 71.20 ( 18) Q 181.87. F=0 F 0.00 PE 0.00 CM]. T 11.00 0.0012 PF 0.01 16 17DQ 18.56 6.357 L 11.00 C=120 PT 71.21 ( 17) Q 200.43 F=O F 0.00 PE 0.60 CM]. T 11.00 0.0014 PF 0.02 15 16DQ 20.24 6.357 L 11.00 C=120 PT 71.23 ( 16) Q 220.67 F=0 F 0.00 PE 0.00 CM]. T 11.00 0.0017 PF 0.02 SUBMITTAL SERIAL NO:2932HY7 01-28-2014 PAGE 6 NEMKO CHAMBER 2 AND .3 .60/ENTIRE CHAMBER Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 14 15DQ 22.05 6.357 L 11.00 C=120 PT 71.25 ( 15) Q 242.71 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0020 PF 0.02 13 14DQ 24.09 6.357 L 11.00 C=120 PT 71.27 ( 14) Q 266.80 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0024 PF 003 12 13DQ 26.31 6.357 L 11.00 C=120 PT 71.30 ( 13) Q 293.11 F=0 F 0.00 PE 0.00 CM1 T 11.00 0.0029 PF 0.03 11 12DQ 28.77 6.357 L .11.00 C=120 PT 71.33 ( 12) Q 321.88 F=0 F 0.00 P9 0.00 CM1 T 11.00 0.0034 PF 0.04 5 11DQ 30.49 6.357 L 5.00 C=120 PT 71.37 ( 11) Q 352.37 F=0 F 0.00 PE 0.00 CM1 T 5.00 0.0041 PF 0.02 PT 71.39 ( 5) 32 ------------------ 62 2.703 L 97.00 C=120 PT 70.23 ( 62) Q 9.03 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0003 PF 0.05 PT 71.15 ( 32) 31 ------------------ 61 2.703 L 97.00 C=120 PT 70.23 ( 61) Q 9.08 F=2T/2T F 66.80 PE 0.87 EL T 163.80 0.0003 PF 0.05 PT 71.15 ( 31) 30 ------------------ 60 2.703 L 97.00 C=120 PT 70.23 ( 60) Q 9.16 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0003 PF 0.05 PT 71.15 ( 30) 29 ------------------ 59 2.703 L 97.00 C=120 PT 70.23 ( 59) Q 9.25 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0003 PF 0.05 PT 71.15 ( 29) ------------------ 28 58 2.703 L 97.00 C=120 PT 70.23 ( 58) Q 9.44 F=2T/2T 66.80 PE 0.87 EL T 163.80 0.0003 PF 0.05 PT 71.15 ( 28) 27 ------------------ 57 2.703 L 97.00 C=120 PT 70.23 ( 57) Q 9.73 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0003 PF 0.05 PT 71.15 ( 27) SUBMITTAL SERIAL NO:2932HY7 01-28-2014 PAGE 7 NEMKO CHAMBER 2 AND 3 .60/ENTIRE CHAMBER Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 26 56 ------------------ 2.703 L 97.00 C=120 PT 70.23 ( 56) Q 10.11 F=2T/2T F 66.80 Pg 0.87 EL T 163.80 0.0004 PF 0.07 PT 71.17 ( 26) 25 55 ------------------ 2.703 L 97.00 C=120 PT 70.23 ( 55) Q 10.56 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0004 PF 0.07 PT 71.17 ( 25) 24 54 ------------------ 2.703 L 97.00 C=120 PT 70.22 ( 54) Q 11.14 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0004 PF 0.07 PT 71.16 ( 24) 23 53 ------------------ 2.703 L 97.00 C=120 PT 70.22 ( 53) Q 11.82 F=2T/2T F 66.80 PE 0.87 EL T 163.80 0.0005 PF 0.08 PT 71.17 ( 23) 22 52 ------------------ 2.703 L 97.00 C=120 PT 70.21 ( 52) Q 1.60 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0006 PF 0.10 PT 71.18 ( 22) 21 51 ------------------ 2.703 L 97.00 C=120 PT 70.21 ( 51) Q 13.52 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0006 PF 0.10 PT 71.18 ( 21) 20 50 ------------------ 2.703 L 97.00 C=120 PT 70.20 ( 50) Q 14.56 F=2T/2T F 66.80 PE 0.87 EL T 163.80 0.0007 PF 0.11 PT 71.18 ( 20) 19 49 ------------------ 2.703 L 97.00 C=120 PT 70.19 ( 49) Q 15.75 F=2T/2T F 66.80 PE 0.87 EL T 163.80 0.0008 PF 0.13 PT 71.19 (19) 18 48 ------------------ 2.703 L 97.00 C=120 PT 70.18 ( 48) Q 17.08 F=2T/2T F 66.80 PE 087 BL T 163.80 0.0010 PF 0.16 PT 71.21 ( 18) 17 47 ------------------ 2.703 L 97.00 C=120 PT 70.17 ( 47) Q 18.56 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0011 PF 0.18 PT 71.22 ( 17) SUBMITTAL SERIAL NO:2932HY7 01-28-2014 PAGE 8 NEMKO CHAMBER 2 AND 3 .60/ENTIRE CHAMBER Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 16 46 ------------------ 2.703 L 97.00 C=120 PT 70.15 ( 46) Q 20.24 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0013 PF 0.21 PT 71.23 ( 16) 15 45 ------------------ 2.703 L 97.00 C=120 PT 70.13 ( 45) Q 22.05 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0016 PF 0.26 PT 71.26 ( 15) 14 44 ------------------ 2.703 L 97.00 C=120 PT 70.11 ( 44) Q 24.09 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0018 PF 0.29 PT 71.27 ( 14) 13 43 ------------------ 2.703 L 97.00 C=120 PT 70.08 ( 43) Q 26.31 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0022 PF 0.36 PT 71.31 ( 13) 12 42 ------------------ 2.703 L 97.00 C=120 PT 70.05 ( 42) Q 28.77 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0025 PF 0.41 PT 71.33 ( 12) 41 75 ------------------ 6.357 L 8.00 C=120 PT 70.04 ( 75) Q 61.67 F=0 F 0.00 PE 0.00 CM2 T 8.00 0.0002 PF 0.00 11 41DQ -31.18 2.703 L 97.00 C=120 PT 70.04 ( 41) Q 30.49 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0028 PF 0.46 PT 71.37 ( 11) 40 41 ------------------ 6.357 L 11.00 C=120 PT 70.04 ( 41) Q 31.18 F=0 F 0.00 PE 0.00 CM2 T 11.00 0.0000 PF 0.00 10 40 2.703 L 97.00 C=120 PT 70.04 ( 40) Q 31.18 F=2T/2T F 66.80 PE 0.87 BL T 163.80 0.0029 PF 0.48 5 10 6.357 L 6.00 C=120 PT 71.39 ( 10) Q 31.18 F=0 F 000 PE 0.00 CM1 T 6.00 0.0000 PF 0.00 PT 71.39 ( 5) SUBMITTAL SERIAL NO:2932HY7 NEMKO CHAMBER 2 AND 3 .60/ENTIRE CHAMBER Location Flow Pipe Fittings Equiv in Size & Length From To GPM IN Devices Ft 01-28-2014 PAGE 9 Friction Pressure Loss Summary PSI/Ft PSI ------------------ 400 401 Q 183.48 90 400DQ 200.07 Q 383.55 76 90 Q 383.55 75 76 Q 383.55 ------------------ 2 5 Q 383.55 1 2 Q 383.55 0 1 0 383.55 2.203 L 10.00 C=120 PT 16.88 (401) F=E F 4.80 PE 0.00 FM T 14.80 0.2117 PP 3.13 2.203 L 30.00 C=120 PT 20.01 (400) F=E F 4.80 PE -5.20 FM T 34.80 0.8284 PF 28.83 2.703 L 77.00 C=120 PT 43.64 ( 90) F=3E,2T F 53.20 PE -5.20 FM T 130.20 0.3059 PF 39.83 6.357 L 35.00 C=120 PT 78.27 ( 76) F=T,2E F 56.57 PE -8.67 FM T 91.57 0.0048 PF 0.44 PT 70.04 ( 75) 8.249 L 252.00 C=120 PT 71.39 ( 5) F=E/T F 62.25 PE 0.00 FM T 314.25 0.0013 PF 0.41 8.249 L 26.00 C=120 PT 71.80 ( 2) F=GV,E F 25.84 PE 11.27 FR T 51.84 0.0013 PF 0.07 9.420 L 96.00 C=150 PT 83,14 ( 1) F=T,GV/DDC,3E F 163.21 PE 0.00 UN T 259.21 0.0005 PF 0.13 10" WILKINS 375 ADA RPDA 13.07 PT 96.34 ( 0) 04c-)D2, i Flow Test Record Test Hydrant Location '2Z\c Hydrant ID No. Size Main______________ Static ............. Residual........... Pressure Drop ) (P01 1).....K factor for P01 i I Flow Hydrant(s) Hydrant 1 location Hydrant 2 location Hydrant 3 location Hydrant I Pitot Hydrant 2 Pitot Hydrant 3 Pitot 1c PSI PSI PSI GPM: 4o Size of Orifice_______ GPM: Size of Orifice__________ GPM: Size of Orifice.__________ Total: (Q1) Calculated test and flow data - 0 x PD2 k =Q2 PDI*k Static:....................l Desired Residual.......20 Pressure Drop (PD 2)° K factor PD 2:1 \ . 'i. 4CC> x divided by equals \ (cT 4A— GPM at 20 psi residual QI P02k POlk Q2 Comments: Test conducted for: Conducted by: EF't- \' c-TIo 1 h::c-. Date:\t \c Time:__ , Flow Test Record Formulas GPM-Flow 2 /z 4" PSI GPM PSI GPM PSI GPM PSI GPM 1 170 16 670 1 430 16 1720 2 240 17 690 2 610 17 1770 3 290 18 710 3 740 18 1820 4 340 19 730 4 860 19 1870 5 380 20 750 5 960 20 1920 6 410 22 790 6 1050 22 2020 7 440 24 820 7 1140 24 2110 8 480 26 860 8 1220 26 2190 9 500 28 890 9 1290 28 2280 10 530 30 920 10 1360 30 2330 11 560 33 950 11 1430 32 2430 12 580 34 980 12 1490 34 2510 13 610 36 1010 13 1550 36 2580 14 630 38 1040 14 1610 38 2650 15 650 40 1060 15 1660 40 2720 K Factor Formula PD K PD K PD K PD K PD K 1= 1.0 21= 5.18 41= 7.43 61= 9.21 81= 10.73 2= 1.45 22= 5.31 42= 7.53 62= 9.29 82= 10.80 3= 1.81 23= 5.44 43= 7.62 63= 9.37 83= 10.87 4= 2.11 24= 5.56 44= 7.72 64= 9.45 84= 10.94 5= 2.39 25= 5.69 45= 7.81 65= 9.53 . 85= 11.01 6= 2.63 26= 5.81 46= 7.91 66= 9.61 86= 1.08 7= 2.86 27= 5.93 47= 8.00 67= 9.69 87= 1.15 8= 3.07 28= 6.05 48= 8.09 68= 9.76 88= 11.22 9= 3.28 29= 6.16 49= 8.18 69= 9.84 89= 11.29 10= 3.47 30= 6.28 50= 8.27 70= 9.92 90= 11.36 11= 3.65 31= 6.39 51= 8.36 71= 9.99 91= 11.43 12= 3.83 32= 6.50 52= 8.44 72= 10.07 92= 1.1.49 13= 4.00 33= 6.61 53= 8.53 73= 10.14 93= 11.56 14= 4.16 34= 6.71 54= 8.64 74= 10.22 94= 11.63 15= 4.32 35= 6.82 55= 8.71 75= 10.29 95= 11.69 16= 4.48 36= 6.93 56= 8.79 76= 10.37 96= 11.76 17= 4.72 37= 7.03 57= 8.88 77= 10.44 97= 11.83 18= 4.76 38= 7.13 58= 8.96 78= .10.51 98= 11.89 19= 4.90 39= 7.23 59= 9.04 79= 10.59 99= 11.96 20= 5.04 40= 7.33 60= 9.12 . 80= 10.66 100= 12.02 *PD = Pressure drop K = K factor Carlsbad Municipal Water District Potable Water Discharge Event Report Date: 01 1'0 Location: Reason for Discharge Event: Type of Event: Dewate ring Water Mains Note: Includes flow testing and flushing Dewatering Reservoirs Unscheduled Water Discharge Clear flow path of debris, surface contaminants and/or hazardous materials. Do not remove native Ve9tLdLIuJI. ErosiOn control, i.e. sandbags, silt fencing, hay bales, gravel bags, decreasing the velocity of discharge water. Upon completion of dewatering, ensure that the flow path is free of all temporary erosion prevention materials. Initial t IA- Estimated Discharge Flow: r-1'oo &?M Start Time J k End Time q Pre-Dechlorination Residual: Post-Dechlorination Residual: (less than 0.1 mglL) pH within limits of 6.0 and 9.0 QOt M, Upon completion of dewatering, ensure that any sediment or silted areas are cleared. Water Sampling Performed by: Comments: Submitted by: Reviewd by: (Name & Date (Name & Date) ( City of Carlsbad 10-28-2010 Fire Department Permit. Permit No: FADI0072 Job Address: 2210 FARADAY AV CBAD Permit Type: FADD Subtype: HYD Status: ISSUED Parcel No: 2121205500 Lot #: 0 Applied: 10/28/2010 Issued: 10/28/2010 Fire Dept Ref#: FAD I 0072 Building Permit#: N/A Entered By: BSW Location: Project Title: HYDRANTFLOW TEST Description: TEST ON 11/1 @ 10:00A.M. Contractor: EPIC FIRE PROTECTION, INC. Phone: 760-310-6122 765 TURTLE POINT WY Fax: SAN MARCOS,CA 92069 Total Fees: $72.00 Total Payments To Date $0.00 Permit Fee $0.00 Additional Permit Fee $0.00 Re-Inspection Fee 0 $0.00 Other $0.00 Pre-Inspection Fee 0 $0.00 Additional Fees $0.00 TOTAL PERMIT FEES $72.00 NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as 'fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition.