Loading...
HomeMy WebLinkAboutAMEND 2021-0004; AMAZON DISTRIBUTION LOTS 13-15 SHELL BUILDING; BMP CERTIFICATION - SOILS & ASPHALT COMPACTION; 2022-07-14Page 1 of 8 GEOTECHNICAL ENGINEERING CONSTRUCTION INSPECTION MATERIALS TESTING ENVIRONMENTAL OFFICE LOCATIONS ORANGE COUNTY CORPORATE BRANCH 2992 E. La Palma Avenue Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 SAN DIEGO IMPERIAL COUNTY 6295 Ferris Square Suite C San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 INLAND EMPIRE 14467 Meridian Parkway Building 2A Riverside, CA 92518 Tel: 951.653.4999 Fax: 951.653.4666 OC/LA/INLAND EMPIRE DISPATCH 800.491.2990 SAN DIEGO DISPATCH 888.844.5060 www.mtglinc.com July 14, 2022 MTGL Project No.: 8139A14 Mr. Keith Pitts MTGL Log No.: 22-0401R1 Ryan Companies US, Inc. MTGL Branch: San Diego 533 South Third Street, Suite 100 Permit No.: GR2021-0021 Minneapolis, MN 55415 Subject: SOILS & ASPHALT COMPACTION REPORT DGB6 Amazon 3266 Lionshead Ave Carlsbad, CA 92010 References: 1. Nova Services Inc., (2017) Proposed Tilt-Up Commercial Structure Carlsbad Raceway Lot 15, Lionshead Avenue- Carlsbad, California, Nova Project No. 2016433, dated March 14th. 2.AECOM, (2021) Grading Plans for Carlsbad Raceway Lots 13-15 ADJ 06-07 (Lionshead Avenue), Drawing No. 501-3A, approved, November 19th, 2021. 3.Standard Specifications for Public Works Construction, “Greenbook” (2018). Dear Keith Pitts, This final report presents the results of compaction testing performed for the subject project. We understand mass grading and initial site grading at the project site were previously performed under observation by others. Observation and testing for this project was performed for tenant improvements including pavements, utility trench backfills, curb & gutters, a generator pad, and loading dock levelers. Compaction tests were taken on the subject improvements on a periodic basis, as directed by your field representative during the period of July 1st, 2021, through April 15th, 2022. A field daily report was prepared by our soil’s technicians for each day of testing and a copy was provided to the jobsite superintendent. Field density testing was performed by first probing with T-handle steel probe, and then using direct transmission nuclear methods, ASTM D6938/D2950. The maximum density – optimum moisture relationship for the soil was established by our laboratory in accordance with ASTM D1557 test methods. In-place density tests indicated relative compaction was achieved in general conformance with the project specifications and referenced geotechnical report. Ryan Companies US, Inc. MTGL Project No. 8139A14 DGB6 Amazon MTGL Log No. 22-0401R1 Carlsbad, California July 14, 2022 Page 2 Where density testing indicated failing results, the areas were reworked until passing tests were achieved. Approximate locations of in-place density test are presented in Figure 1. Appendix A presents the results of laboratory testing performed. Appendix B presents the results of field density tests performed. This report does not constitute certification of compaction of the subject improvements. We have performed the tests, as previously described, in accordance to generally accepted soil testing practices. No other warranty, express or implied, is made. MTGL, Inc. appreciates this opportunity to be of continued service to you on this project. Should you have any questions regarding this report, please do not hesitate to contact us at your convenience. Respectfully Submitted, MTGL, Inc. Daniel Richardson, P.E. Senior Engineer Attachments: Figure 1 – In-Place Density Test Map Appendix A – Laboratory Test Results Appendix B – Field Density Test Results APPENDIX A LABORATORY TEST RESULTS Reference: AECOM (2021), Grading Plan for Carlsbad Raceway Lots 13-15 ADJ 06-07 (Lionshead Avenue) Drawing No. 501-3A, approvedNovember 11, 2021. LEGEND 47 • [lp ll ll r.r (IJ} /l' IY! fj (Qi fl l!4J -Density Test Location (Soil/ Aggregate Base)• AC-6 -Density Test Location (Asphalt) MTGL Project No.: 8139A14 SATURATED SOILS REMOVED, AREAS REWORKED r--"""""l�,. r,J.lD�'# l/��"C\t#·m,11-,,,,.,"'"•""'-' ... ""• ,-----------/,� ----=--=··--· IN-PLACE DENSITY TEST MAP DGB6 Amazon Carlsbad, CA SCALE O' Date: Author: April, 2022 TC Note: All locations are approximate. �t� I Figure No. 60' 120' 1 Ryan Companies US, Inc MTGL Project No. 8139A14 DGB6 Amazon MTGL Log No. 22-0401R1 Carlsbad, CA July 2022 Page A1 APPENDIX A - LABORATORY TEST RESULTS Maximum Density – Optimum Moisture Content Lab No. Sample Date Sample Location Material Description Max Density (pcf) Opt Moist (%) 171 3/8/22 Fireline -North Parking Lot Clayey Sand (SC), Tan 120.4 11.9 162 2/28/22 On-Site Existing Base, Gray 122.7 10.7 163 2/28/22 Import Class 2 Recycled Base, Gray 120.2 10.4 451 9/28/21 Import - Superior Class 2 Recycled Base, Gray 118.5 14.5 264 7/1/21 Loading Dock Levelers Sandy Clay (CL), Light Brown 120.3 12.7 Test Method: ASTM D1557 – Maximum Density – Optimum Moisture Content Relationship Bulk Specific Gravity and Density Of Bituminous Mixtures Lab No. Sample Date Sample Location Material Description Bulk Sp Gr. Unit Weight (pcf) 231 4/15/22 Parking Lot Behind Warehouse 1/2" HMA Superior Ready Mix 2.4 150.2 Test Method: CTM 308 - Bulk Specific Gravity and Density of Compacted Hot Mix Asphalt APPENDIX B FIELD DENSITY TEST RESULTS Ryan Companies US, Inc MTGL Project No. 8139A14 DGB6 Amazon MTGL Log No. 22-0401R1 Carlsbad, CA July 2022 APPENDIX B - FIELD DENSITY TEST RESULTS Test No. Date Location Test Elev or Depth (ft) Moist Content (%) Dry Density or Unit Weight (pcf) Max No. Rel Comp (%) Req'd Comp (%) Test Type Remarks Page B1 1 7/1/21 Loading Dock Levelers SG 15.3 110.4 264 92 90 NU 2 7/1/21 Loading Dock Levelers SG 15.1 109.0 264 91 90 NU 3 7/1/21 Loading Dock Levelers SG 16.0 108.3 264 90 90 NU 4 7/1/21 Loading Dock Levelers SG 16.4 108.7 264 90 90 NU 5 7/1/21 Loading Dock Levelers SG 16.1 108.1 264 90 90 NU 6 9/23/21 Electrical Trench for Generator at North Side of Building -1.0 15.7 108.8 264 90 90 NU 7 9/27/21 Generator Pad Northeast Side of Building SG 14.8 110.3 264 92 95 NU FAIL 8 9/27/21 Generator Pad Northeast Side of Building SG 13.3 104.1 264 87 95 NU FAIL 9 9/28/21 Generator Pad Northeast Side of Building SG 12.0 114.5 264 95 95 NU RT 2 10 9/28/21 Generator Pad Northeast Side of Building SG 14.5 115.1 264 96 95 NU RT 3 11 9/28/21 Generator Pad Northeast Side of Building AB 14.3 113.2 451 96 95 NU 12 9/28/21 Generator Pad Northeast Side of Building AB 16.0 114.1 451 96 95 NU 13 1/27/22 3/4" Electrical Conduit Trench at North Parking Lot. (Light poles) -0.5 14.0 114.3 264 95 95 NU 14 1/27/22 3/4" Electrical Conduit Trench at North Parking Lot. (Light poles) -0.5 13.0 115.4 264 96 95 NU 15 1/27/22 3/4" Electrical Conduit Trench at North Parking Lot. (Light poles) -0.5 14.1 114.5 264 95 95 NU 16 1/27/22 3/4" Electrical Conduit Trench at North Parking Lot. (Light poles) -0.5 12.8 114.3 264 95 95 NU 17 2/28/22 Parking Lot- PCC Area SG 14.8 111.5 264 93 95 NU FAIL 18 2/28/22 Parking Lot- PCC Area SG 16.1 110.2 264 92 95 NU FAIL 19 2/28/22 Parking Lot- PCC Area SG 16.0 112.2 264 93 95 NU FAIL 20 3/1/22 Parking Lot- PCC Area SG 13.0 115.0 264 96 95 NU RT 17 21 3/1/22 Parking Lot- PCC Area SG 11.9 116.0 264 96 95 NU RT 18 22 3/1/22 Parking Lot- PCC Area SG 10.8 118.0 264 98 95 NU RT 19 23 3/1/22 Parking Lot- PCC Area AB 14.0 117.7 163 98 95 NU 24 3/1/22 Parking Lot- PCC Area AB 12.6 116.9 163 97 95 NU 25 3/1/22 Parking Lot- PCC Area AB 14.2 117.2 163 98 95 NU NU - Nuclear Gauge Test (ASTM D6938 / D2950) AB – Aggregate Base SG - Subgrade AC – Asphalt Concrete Ryan Companies US, Inc MTGL Project No. 8139A14 DGB6 Amazon MTGL Log No. 22-0401R1 Carlsbad, CA July 2022 APPENDIX B - FIELD DENSITY TEST RESULTS Test No. Date Location Test Elev or Depth (ft) Moist Content (%) Dry Density or Unit Weight (pcf) Max No. Rel Comp (%) Req'd Comp (%) Test Type Remarks Page B2 26 3/7/22 Irrigation Trenches at North Parking Lot AB 12.6 118.3 162 96 95 NU 27 3/7/22 Irrigation Trenches at North Parking Lot AB 11.5 116.1 451 98 95 NU 28 3/8/22 Fireline Trenches at North Parking Lot FG 22.7 94.3 171 78 95 NU FAIL 29 3/8/22 Fireline Trenches at North Parking Lot FG 23.6 96.7 171 80 95 NU FAIL 30 3/10/22 6" Hydrant Line at East End of Parking SG 16.1 114.8 171 95 95 NU RT 28 31 3/10/22 6" Hydrant Line at East End of Parking -2.0 15.8 109.5 171 91 90 NU RT 29 32 3/10/22 6" Hydrant Line at East End of Parking SG 16.3 110.6 171 92 90 NU 33 3/10/22 6" Hydrant Line at East End of Parking -1.0 16.8 108.5 171 90 90 NU 34 3/10/22 6" Hydrant Line at East End of Parking SG 14.5 114.3 171 95 90 NU 35 3/14/22 Curb & Gutter -North Parking Lot SG 16.8 103.8 451 88 90 NU FAIL- Soils Removed 36 3/14/22 Curb & Gutter -North Parking Lot SG 15.9 105.7 451 89 90 NU 37 4/5/22 Curb & Gutter at North Parking Lot SG 10.9 113.8 163 95 95 NU 38 4/5/22 Curb & Gutter at North Parking Lot SG 12.2 114.1 163 95 95 NU 39 4/5/22 Curb & Gutter at North Parking Lot SG 10.0 115.4 163 96 95 NU 40 4/6/22 Curb & Gutter at Northwestern Corner of Parking Lot AB 14.0 113.3 451 96 95 NU 41 4/6/22 Curb & Gutter at Northwestern Corner of Parking Lot AB 14.3 114.6 451 97 95 NU 42 4/6/22 Curb & Gutter at Northwestern Corner of Parking Lot AB 13.8 112.6 451 95 95 NU 43 4/15/22 Parking Lot Asphalt Behind Warehouse AB 14.0 115.0 451 97 95 NU 44 4/15/22 Parking Lot Asphalt Behind Warehouse AB 13.1 113.2 451 96 95 NU 45 4/15/22 Parking Lot Asphalt Behind Warehouse AB 13.8 112.7 451 95 95 NU 46 4/15/22 Parking Lot Asphalt Behind Warehouse AB 13.6 114.2 451 96 95 NU 47 4/15/22 Parking Lot Asphalt Behind Warehouse AB 14.2 113.3 451 96 95 NU AC-1 4/15/22 Parking Lot Asphalt Behind Warehouse AC --- 145.0 231 97 95 NU AC-2 4/15/22 Parking Lot Asphalt Behind Warehouse AC --- 144.4 231 96 95 NU AC-3 4/15/22 Parking Lot Asphalt Behind Warehouse AC --- 147.5 231 98 95 NU NU - Nuclear Gauge Test (ASTM D6938 / D2950) AB – Aggregate Base SG - Subgrade AC – Asphalt Concrete FAIL- Soils Removed Ryan Companies US, Inc MTGL Project No. 8139A14 DGB6 Amazon MTGL Log No. 22-0401R1 Carlsbad, CA July 2022 APPENDIX B - FIELD DENSITY TEST RESULTS Test No. Date Location Test Elev or Depth (ft) Moist Content (%) Dry Density or Unit Weight (pcf) Max No. Rel Comp (%) Req'd Comp (%) Test Type Remarks Page B3 AC-4 4/15/22 Parking Lot Asphalt Behind Warehouse AC --- 146.8 231 98 95 NU AC-5 4/15/22 Parking Lot Asphalt Behind Warehouse AC --- 143.8 231 96 95 NU AC-6 4/15/22 Parking Lot Asphalt Behind Warehouse AC --- 143.6 231 96 95 NU NU - Nuclear Gauge Test (ASTM D6938 / D2950) AB – Aggregate Base SG - Subgrade AC – Asphalt Concrete