Loading...
HomeMy WebLinkAboutSUP 2022-0001; OMNI LA COSTA GOLF COURSE; HYDRAULIC ANALYSIS; 2022-03-21 HYDRAULIC ANALYSES FOR OMNI LA COSTA RESORT & SPA CHAMPIONS COURSE RENOVATION March 21, 2022 Wayne W. Chang, MS, PE 46548, Exp. 6/30/2023 Civil Engineering ◦ Hydrology ◦ Hydraulics ◦ Sedimentation P.O. Box 9496 Rancho Santa Fe, CA 92067 (858) 692-0760 ChlllffiCDDJ~rnOOSJITrn TABLE OF CONTENTS Introduction ........................................................................................................................................1 Hydraulic Analysis.............................................................................................................................2 Conclusion .........................................................................................................................................3 APPENDIX A. Hydraulic Results MAP POCKET City of Carlsbad Drawing No. 233-6 HEC-RAS Work Map 1 INTRODUCTION The Omni La Costa Resort & Spa is located at 2100 Costa Del Mar Road in the city of Carlsbad (see the Vicinity Map). The resort currently includes a driving range and two 18-hole golf courses: the Champions Course and the Legends Course. The driving range is located southwest of the two golf courses, south of the resort buildings, and north of San Marcos Creek. The Champions Course is aligned in a north-south direction between Poinsettia Lane on the north and San Marcos Creek on the south. A tributary to San Marcos Creek (identified as Unnamed Tributary 1 by FEMA) flows in a southerly direction through the Champions Course. San Marcos Creek flows in an east to west direction through the Legends Course, along the south edge of the driving range, then under El Camino Real, and ultimately into Batiquitos Lagoon. Vicinity Map CITY OF OCEANSIDE PACIFIC OCEAN CITY OF ENCINITAS CITY OF VISTA CITY OF SAN MARCOS 2 The project grading is being designed by O’Day Consultants and proposes remodeling of the driving range and Champions Course. The proposed project will include both cut and fill activities. Graded materials are expected to be balanced on-site. The current submittal is in support of a Special Use Permit. Under both existing and proposed conditions, storm runoff from the driving range flows to San Marcos Creek, while storm runoff from the Champions Course flows to Unnamed Tributary 1 and then San Marcos Creek. FEMA has mapped a Zone A floodplain along Unnamed Tributary 1 and San Marcos Creek on Flood Insurance Map Numbers 06073C1032H and 06073C1034H dated December 20, 2019. A Zone A floodplain is approximate and not based on detailed engineering analyses. As a result, this report contains detailed existing and proposed condition 100-year hydraulic analyses of Unnamed Tributary 1 and San Marcos Creek through the project site. HYDRAULIC ANALYSIS Existing and proposed condition hydraulic analyses were performed using the US Army Corps of Engineers’ HEC-RAS model (latest version 5.0.7). One set of analyses were performed for San Marcos Creek and a second set of analyses were performed for Unnamed Tributary 1. The following describes the HEC-RAS input parameters and results. The HEC-RAS cross-sections are delineated on the HEC-RAS Work Map in the map pocket. The cross-sections along San Marcos Creek start at 100 and along Unnamed Tributary 1 start at 200. The existing cross-sections were primarily created from November 3, 2021 1-foot contour interval topographic mapping prepared for the project. This was supplemented with SANGIS’ 2-foot contour interval topographic mapping for portions of cross-sections 247 and 248. In addition, cross-section 120 is based on the SANGIS mapping. The project mapping is on NGVD 29, while the SANGIS mapping is on NAVD 88. According to O’Day Consultants, NAVD 88 = NGVD 29 + 2.16 feet. The HEC-RAS analyses are on NGVD 29, so the SANGIS elevations were reduced by 2.16 feet. The proposed condition cross-sections are at the same locations as the existing condition cross-sections, but were revised where needed to reflect O’Day Consultants’ grading. FEMA’s effective 100-year flow rate of 15,700 cubic feet per second (cfs) was used for San Marcos Creek. This flow rate was discussed with Mr. Scott Lyle from City staff and is being used for the City’s El Camino Real pedestrian bridges project. An effective flow rate is not available for Unnamed Tributary 1. The City provided an August 7, 2002 letter report by Rick Engineering Company (excerpts attached in Appendix A), which used a 100-year flow rate of 1,900 cfs. Therefore, 1,900 cfs was modeled for Unnamed Tributary 1. Average roughness coefficients were assigned to the main channel and overbank areas. The golf course areas were assigned a roughness of 0.030. The remaining natural areas were assigned a roughness varying from 0.030 to 0.060 depending on vegetation density. Paved areas were assigned a roughness of 0.020 to 0.030. The higher range was used when landscaping or other obstructions existing within the paved areas. 3 The downstream starting water surface elevation in San Marcos Creek was set equal to the 100-year elevation from the El Camino Real pedestrian bridges project at cross-section 9741. City staff provided hydraulic data for their project, which showed an elevation of 10.49 feet NAVD 88 or 8.33 feet NGVD 29. Although this elevation was entered, HEC-RAS increased the elevation to 13.17 feet NGVD 29. The existing and proposed condition downstream starting water surface elevations in Unnamed Tributary 1 were assigned values based on the receiving 100-year water surface elevations in San Marcos Creek, i.e., 17.88 and 17.90 feet, respectively, at cross-section 111. Expansions were assigned at some cross-sections using a 1.3:1 expansion ratio based on Table 6-1 from the HEC-RAS User’s Manual (included in Appendix A). There are multiple culverts under Alga Road along Unnamed Tributary 1. Drawing No. 233-6 shows that there are three 84-inch RCPs and one 14-foot, 3-inch by 9-foot, 7-inch structural plate arch used as a golf cart crossing. The culverts were modeled at cross-section 266.5 based on the drawing. The existing and proposed condition 100-year results are included in Appendix A and summarized in Table 1. O’Day Consultants plotted the existing and proposed condition floodplains, which are included on the HEC-RAS Work Map. CONCLUSION Existing and proposed condition 100-year HEC-RAS hydraulic analyses has been performed for San Marcos Creek and Unnamed Tributary 1 to San Marcos Creek along the Omni La Costa Resort & Spa Champions Course Renovation Project. The results show relatively minor differences in the water surface elevations at most cross-sections. The larger increases occur along the golf course and do not impact existing structures. 4 San Marcos Creek Unnamed Tributary to San Marcos Creek Cross-Section Existing Condition Proposed Condition Prop.–Exist. Condition Cross-Section Existing Condition Proposed Condition Prop.–Exist. Condition 120 21.32 21.32 0.00 248 100.84 100.84 0.00 119 20.62 20.62 0.00 247 99.03 99.03 0.00 118 19.52 19.52 0.00 246 96.43 96.43 0.00 117 18.42 18.44 0.02 245 94.66 94.63 -0.03 116 18.40 18.42 0.02 244 92.15 92.15 0.00 115 18.32 18.34 0.02 243 90.47 90.47 0.00 114 18.26 18.27 0.01 242 89.39 89.18 -0.21 113 18.15 18.17 0.02 241 87.54 88.07 0.53 112 18.12 18.14 0.02 240 86.48 87.28 0.80 111 18.05 18.08 0.03 239 86.08 86.61 0.53 110 18.04 18.07 0.03 238 85.90 86.25 0.35 109 17.98 18.00 0.02 237 84.48 84.68 0.20 108 17.93 17.95 0.02 236 77.74 77.74 0.00 107 17.75 17.76 0.01 235 74.85 73.87 -0.98 106 17.70 17.75 0.05 234 72.93 72.50 -0.43 105 17.59 17.60 0.01 233 70.74 70.75 0.01 104 17.53 17.53 0.00 232 69.11 68.93 -0.18 103 17.40 17.34 -0.06 231 66.97 67.34 0.37 102 17.20 17.20 0.00 230 65.12 65.14 0.02 101 16.79 16.79 0.00 229 63.27 63.29 0.02 100 13.17 13.17 0.00 228 62.62 62.62 0.00 227 62.26 62.26 0.00 226.5 Alga Road 0.00 226 58.85 58.85 0.00 225 56.84 56.84 0.00 224 53.08 53.19 0.11 223 48.50 48.54 0.04 222 46.62 46.61 -0.01 221 44.54 44.53 -0.01 220 43.36 43.34 -0.02 219 39.69 39.69 0.00 218 38.66 39.42 0.76 217 38.22 38.84 0.62 216 37.33 36.92 -0.41 215 35.67 36.28 0.61 214 33.42 33.40 -0.02 213 31.25 31.16 -0.09 212 29.49 29.49 0.00 211 27.15 27.22 0.07 210 25.83 25.55 -0.28 209 25.18 25.29 0.11 208 23.92 23.92 0.00 207 22.14 22.22 0.08 206 20.07 20.24 0.17 205 19.46 19.43 -0.03 204 18.48 18.45 -0.03 203 18.17 18.20 0.03 202 18.19 18.22 0.03 201 18.10 18.15 0.05 200 18.05 18.08 0.03 Table 1. Summary of 100-Year HEC-RAS Results APPENDIX A HYDRAULIC DATA AND RESULTS VOLUME 2 OF 12 REVISED: DECEMBER 20, 2019 FLOOD INSURANCE STUDY NUMBER 06073CV002E Version Number 2.3.3.3 SAN DIEGO COUNTY, CALIFORNIA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER CARLSBAD, CITY OF 060285 NATIONAL CITY, CITY OF 060293 CHULA VISTA, CITY OF 065021 OCEANSIDE, CITY OF 060294 CORONADO, CITY OF 060287 POWAY, CITY OF 060702 DEL MAR, CITY OF 060288 SAN DIEGO, CITY OF 060295 EL CAJON, CITY OF 060289 SAN DIEGO COUNTY, UNINCORPORATED AREAS 060284 ENCINITAS, CITY OF 060726 SAN MARCOS, CITY OF 060296 ESCONDIDO, CITY OF 060290 SANTEE, CITY OF 060703 IMPERIAL BEACH, CITY OF 060291 SOLANA BEACH, CITY OF 060725 LA MESA, CITY OF 060292 VISTA, CITY OF 060297 LEMON GROVE, CITY OF 060723 FLOOD INSURANCE STUDY FEDERAL EMERGENCY MANAGEME T AGENCY I I 98 Table 10: Summary of Discharges, continued Peak Discharge (cfs) Flooding Source Location Drainage Area (Square Miles) 10% Annual Chance 4% Annual Chance 2% Annual Chance 1% Annual Chance 0.2% Annual Chance San Luis Rey River Downstream of Palma 167.3 4,0005 * 18,000 30,000 78,000 San Luis Rey River Downstream of Confluence with Puma Creek 126.7 4,0005 * 16,800 28,000 72,800 San Luis Rey River Upstream of Confluence with Puma Creek 71.5 5,000 * 15,000 24,500 64,000 San Marcos Creek Upstream of the San Marcos Dam (Lake San Marcos) 28.1 * * * 15,700 * San Marcos Creek Upstream of Discovery Street * 7,400 * 13,300 14,700 19,350 San Marcos Creek Upstream of Confluence with Las Posas Creek * 6,450 * 11,650 13,150 16,950 San Marcos Creek Upstream of Highway 78 * 6,200 * 11,000 12,450 16,000 San Marcos Creek Upstream of Confluence with Twin Oaks Valley Creek * 2,600 * 4,550 5,150 6,600 San Marcos Creek Approximately 1,000 Feet Upstream of Confluence with Twin Oaks Valley Creek * 2,200 * 3,900 4,400 5,600 San Vicente Creek At Mouth 83.0 1,400 * 10,500 16,000 34,000 San Marcos Upstream of tlie San Marcos Dam (Lake San 28.1 * '* * 15,700 * Creek Mar~ I I I I I I I I I I I I I I I I I I I - RICK ENGINEERING v COMPANY San Diego • Riverside • Orange • Phoenix • Tucson August 7, 2002 Mr. Howard H. Chang, Ph.D, P.E. P.O. Box 9492 Rancho Santa Fe, California 92067 Water Resources Division SUBJECT: PRELIMINARY HEC-2 HYDRAULIC ANALYSES OF SAN MARCOS CREEK AND THE NORTH TRIBUTARY STREAM FOR PROPOSED GRADING WITHIN THE LA COSTA GOLF COURSE IN THE CITY OF CARLSBAD, CALIFORNIA (RICK ENGINEERING COMP ANY JOB NUMBER 13952) Mr. Howard H. Chang: The La Costa Golf Course and Resort is an existing development that is located east of El Camino Real Road and south of Costa Del Mar Road in the City of Carlsbad, California. See the Vicinity Map attached. San Marcos Creek flows through the eastern portion of the golf course toward the El Camino Real Bridge and ultimately to Batiquitos Lagoon. There is also a tributary stream that flows through the northern portion of the golf course and confluences with San Marcos Creek just upstream of the El Camino Real Bridge. Herein referred to as the "north tributary". There is grading proposed by the La Costa Resort in the northern and eastern portions of the golf course as well as the employee parking lot near El Camino Real. We have prepared existing condition and post-project condition hydraulic analyses of San Marcos Creek and the north tributary to determine impacts to the 100-year floodplain resulting from the proposed grading. This is a request for your review of the hydraulic analyses. The U.S. Army corps of Engineers HEC-2 Water Surface Profiles program was used to determine the water surface elev~tions (WSELs) in San Marcos Creek and the north tributary. The existing condition HEC-2 cross-sectional geometry data was obtained from a digital terrain model compiled by photogrammetric methods using aerial photography dated August 3, 2001. The post-project condition cross-sectional geometry data was based on the proposed grading shown on the "La Costa Resort HEC-2 Workmap for San Marcos Creek and North Tributary," Sheets 1-5 of 5, dated August 7, 2002 located in Map Pockets 1 and 2. The horizontal variation of Manning's n-values along San Marcos Creek and the north tributary were based on a field visit on July 19, 2002. The tennis courts and the driving range at the southwest portion of the project are surrounded by woven fences made of cloth material. Since 5620FriarsRoad • SanDiego • California • 92110-2596 • (619)291-0707 • FAX: (619)291-4165 • www.rickengineering.com I I I I I I I I I I I I Mr. Howard H. Chang Page2 August 7, 2002 these areas are within the floodplain, the Manning's n-value was adjusted to account for the obstructed flow through the fences. The calculations for the adjusted Manning's n-value are included with this letter as Attachment 1. The effective Federal Emergency Management Agency (FEMA) 100-year flow in San Marcos Creek is 14,700 cubic feet per second ( cfs ). The 100-year flow of 1,900 cfs in the north tributary stream was obtained from a study prepared by Rick Engineering Company entitled, "Hydrologic and Hydraulic Study for Rancho Carrillo Local Facilities Management Plan Zone 18" dated January 12, 1995 (Job Number 12119-C). The starting WSEL in San Marcos Creek at El Camino Real was determined from a study prepared by Rick Engineering Company entitled, "HEC-2 Hydraulic Analysis for La Costa Employee Parking Lot" dated September 25, 1991 (Job Number 11347). The existing condition HEC-2 results show that the house at the north end of cross-section 280 is inundated by approximately 0.4 ft during the 100-year storm event. The existing condition HEC-2 output and cross-sectional plots are included with this letter as Attachment 2 (FN: LCGCEX.HC2). The post-project condition HEC-2 results show that WSELs for San Marcos Creek and the north tributary increase by a maximum of 0.02 feet within the golf course and 0.05 feet at the El Camino Real Bridge over the existing WSELs. Therefore, the impacts of the proposed grading are not a significant impact to the floodplain for the creeks. The post-project condition HEC-2 output and cross-sectional plots are included as Attachment 3 (FN: LCGCP.HC2). Please review the attached HEC-2 hydraulic analyses and HEC-2 workmaps and respond with your comments. If you have any questions, please call Roberta Cronquist at (619) 688-1454. Sincerely, I RICKENGINEEK1r~tt:1Mt' I I I I I I <:: Dennis C. Bowling,,~~ .. ---_-_:-_:-~- R.C.E. #32838, Exp. 06/06 Prinicpal DCB:KW:nd.001 Attachments Chapter 6 Entering and Editing Geometric Data 4 3 2 1 A B C D Lc L e Expansion Reach Contraction Reach ER CR 1 1 Typical flow transition pattern Idealized flow transitionpattern for 1-dimensionalmodeling Figure 6-11 Cross Section Locations at a Bridge or Culvert The average obstruction length is half of the total reduction in floodplain width caused by the two bridge approach embankments. In Table 6-1, b/B is the ratio of the bridge opening width to the total floodplain width, nob is the average Manning n value for the overbanks, nc is the n value for the main channel, and S is the average longitudinal bed slope through the bridge reach. The values in the interior of the table are the ranges of the expansion ratio. For each range, the higher value is typically associated with a higher discharge. 6-27 --o - - - - - - - - - -""'-:~-- - - - - --~e - - - - - - - - - - - -,✓ I ~ .. _, I , ..... I .... ---------,,--I \ ........ ~ I \ ', I \ ', I \ ' I \ \ , I \ ' , //\ ',~\\ : I \ ' I \ ' I \ \ I I \ : I \ ' I I ' I \ I , / \ I ,'/ --0 ~ ---0 Chapter 6 Entering and Editing Geometric Data Table 6-1 Ranges of Expansion Ratios nob / nc = 1 nob / nc = 2 nob / nc = 4 b/B = 0.10 S = 1 ft/mile 5 ft/mile 10 ft/mile 1.4 – 3.6 1.0 – 2.5 1.0 – 2.2 1.3 – 3.0 0.8 – 2.0 0.8 – 2.0 1.2 – 2.1 0.8 – 2.0 0.8 – 2.0 b/B = 0.25 S = 1 ft/mile 5 ft/mile 10 ft/mile 1.6 – 3.0 1.5 – 2.5 1.5 – 2.0 1.4 – 2.5 1.3 – 2.0 1.3 – 2.0 1.2 – 2.0 1.3 – 2.0 1.3 – 2.0 b/B = 0.50 S = 1 ft/mile 5 ft/mile 10 ft/mile 1.4 – 2.6 1.3 – 2.1 1.3 – 2.0 1.3 – 1.9 1.2 – 1.6 1.2 – 1.5 1.2 – 1.4 1.0 – 1.4 1.0 – 1.4 A detailed study of flow contraction and expansions at bridges was undertaken by the Hydrologic Engineering Center. The results of this study have been published as a research document entitled "Flow Transitions in Bridge Backwater Analysis" (RD-42 HEC, 1995). The purpose of this study was to provide better guidance to hydraulic engineers performing water surface profile computations through bridges. Specifically the study focused on determining the expansion reach length, Le; the contraction reach length, Lc; the expansion energy loss coefficient, Ce; and the contraction energy loss coefficient, Cc. A summary of this research, and the final recommendations, can be found in Appendix B of the HEC-RAS Hydraulic Reference manual. The user should not allow the distance between cross section 1 and 2 to become so great that friction losses will not be adequately modeled. If the modeler feels that the expansion reach will require a long distance, then intermediate cross sections should be placed within the expansion reach in order to adequately model friction losses. The user will need to estimate ineffective flow areas for these intermediate cross sections. Cross section 2 is located a short distance downstream from the bridge or culvert. This cross section should represent the natural ground (main channel and floodplain) just downstream of the bridge or culvert. This section is normally located near the toe of the downstream road embankment. This cross section should Not be placed immediately downstream of the face of the bridge deck or the culvert opening (for example some people wrongly place this cross section 1.0 foot downstream of the bridge deck or culvert opening). Even if the bridge has no embankment, this cross section should be placed far enough from the downstream face of the bridge to allow enough distance for some flow expansion due to piers, or pressurized 6-28 Use low end of range (1.3:1) since slope is steeper than 10 ft/mile. nob/ nc = 1 b/B = 0.50 10 ft/mile 1.3 - 2.0 HEC-RAS Plan: SMC Exist Cond River: RIVER-1 Reach: Reach-1 Profile: 100-Year Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft)(ft)(ft)(ft)(ft/ft) (ft/s) (sq ft) (ft) Reach-1 120 100-Year 15700.00 9.84 21.32 21.61 0.001074 5.37 3686.71 852.98 0.31 Reach-1 119 100-Year 15700.00 8.50 20.62 21.27 0.002466 8.39 2653.44 748.09 0.47 Reach-1 118 100-Year 15700.00 8.30 19.52 19.52 20.71 0.004904 11.26 2127.46 801.23 0.65 Reach-1 117 100-Year 15700.00 7.70 18.42 18.97 0.002670 7.46 2853.28 936.15 0.47 Reach-1 116 100-Year 15700.00 6.30 18.40 18.60 0.000768 4.14 4618.78 1243.32 0.25 Reach-1 115 100-Year 15700.00 5.70 18.32 18.47 0.000470 2.78 5114.11 1131.84 0.19 Reach-1 114 100-Year 15700.00 5.20 18.26 18.37 0.000402 3.61 5981.02 1393.48 0.19 Reach-1 113 100-Year 15700.00 3.60 18.15 18.28 0.000428 4.04 5711.65 1360.76 0.20 Reach-1 112 100-Year 15700.00 2.19 18.12 18.21 0.000223 3.16 6966.61 1321.10 0.15 Reach-1 111 100-Year 15700.00 2.19 18.05 18.16 0.000293 3.33 6185.65 1247.50 0.16 Reach-1 110 100-Year 15700.00 2.19 18.04 18.11 0.000180 2.45 7654.88 1355.08 0.13 Reach-1 109 100-Year 15700.00 2.19 17.98 18.07 0.000230 2.59 6675.80 1163.31 0.13 Reach-1 108 100-Year 15700.00 2.19 17.93 18.02 0.000235 2.68 6458.13 1048.71 0.13 Reach-1 107 100-Year 15700.00 2.12 17.75 17.94 0.000510 3.75 4506.06 734.65 0.19 Reach-1 106 100-Year 15700.00 2.12 17.70 17.85 0.000349 3.48 5244.57 826.32 0.16 Reach-1 105 100-Year 15700.00 2.10 17.59 17.77 0.000414 3.64 4672.34 685.44 0.17 Reach-1 104 100-Year 15700.00 2.12 17.53 17.68 0.000373 3.46 5222.78 853.26 0.17 Reach-1 103 100-Year 15700.00 2.12 17.40 17.59 0.000511 3.85 4512.57 755.08 0.19 Reach-1 102 100-Year 15700.00 2.12 17.20 17.45 0.000858 4.00 3973.67 716.10 0.22 Reach-1 101 100-Year 15700.00 2.12 16.79 14.90 17.21 0.001571 5.77 3086.41 704.27 0.30 Reach-1 100 100-Year 15700.00 2.10 13.17 13.17 16.17 0.014652 14.73 1232.88 224.61 0.88 HEC-RAS Plan: SMC Exist Cond 0 200 400 600 800 1000 1200 1400 16000 10 20 30 40 50 60 La Costa Golf Course RS = 120 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 14000 10 20 30 40 50 La Costa Golf Course RS = 119 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 14000 10 20 30 40 50 La Costa Golf Course RS = 118 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16000 10 20 30 40 50 La Costa Golf Course RS = 117 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16005 10 15 20 25 30 35 40 La Costa Golf Course RS = 116 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16005 10 15 20 25 30 35 La Costa Golf Course RS = 115 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16005 10 15 20 25 30 35 La Costa Golf Course RS = 114 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16000 5 10 15 20 25 30 La Costa Golf Course RS = 113 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16000 5 10 15 20 25 La Costa Golf Course RS = 112 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03~ ,1-. ------------~ 0 200 400 600 800 1000 1200 1400 16000 5 10 15 20 25 La Costa Golf Course RS = 111 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .04 .03 0 200 400 600 800 1000 1200 14000 5 10 15 20 La Costa Golf Course RS = 110 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .04 .03 0 200 400 600 800 1000 1200 14000 5 10 15 20 25 30 La Costa Golf Course RS = 109 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .045 .03 -+ -+ t_j 0 200 400 600 800 1000 12000 5 10 15 20 25 30 La Costa Golf Course RS = 108 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .045 .03 0 200 400 600 800 10000 5 10 15 20 25 La Costa Golf Course RS = 107 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .045 .03 0 200 400 600 800 10000 5 10 15 20 25 La Costa Golf Course RS = 106 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .045 .03 + +-tj tj 0 200 400 600 800 10000 5 10 15 20 25 La Costa Golf Course RS = 105 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .02 .045 .03 0 200 400 600 800 10002 4 6 8 10 12 14 16 18 La Costa Golf Course RS = 104 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .045 .03 0 200 400 600 8002 4 6 8 10 12 14 16 18 La Costa Golf Course RS = 103 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .045 .03 +-tj t:::_±+ ~============-==~:::== tj 0 100 200 300 400 500 600 700 8000 5 10 15 20 La Costa Golf Course RS = 102 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .045 .05 .03 0 100 200 300 400 500 600 700 8002 4 6 8 10 12 14 16 18 La Costa Golf Course RS = 101 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .02 .05 .03 0 100 200 300 400 5000 5 10 15 20 La Costa Golf Course RS = 100 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .02 .05 .05 t_j t_j t_j HEC-RAS Plan: SMC Trib 1 Exist Cond River: RIVER-1 Reach: Reach-1 Profile: 100-Year Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft)(ft)(ft)(ft)(ft/ft) (ft/s) (sq ft) (ft) Reach-1 248 100-Year 1900.00 98.00 100.84 100.84 101.90 0.014978 8.54 256.03 136.10 0.94 Reach-1 247 100-Year 1900.00 95.67 99.03 98.07 99.33 0.004001 4.40 445.14 192.87 0.48 Reach-1 246 100-Year 1900.00 93.00 96.43 96.43 97.69 0.016769 9.00 212.09 284.76 0.99 Reach-1 245 100-Year 1900.00 91.37 94.66 94.10 95.08 0.007072 5.22 370.92 359.58 0.63 Reach-1 244 100-Year 1900.00 89.00 92.15 92.15 92.73 0.022037 6.07 313.56 287.10 1.00 Reach-1 243 100-Year 1900.00 87.33 90.47 89.68 90.64 0.003663 3.32 572.16 321.97 0.44 Reach-1 242 100-Year 1900.00 85.56 89.39 88.84 89.65 0.006812 4.16 458.81 298.45 0.58 Reach-1 241 100-Year 1900.00 84.33 87.54 87.94 0.010880 5.13 377.69 274.81 0.73 Reach-1 240 100-Year 1900.00 82.75 86.48 86.75 0.003540 2.90 500.55 289.41 0.42 Reach-1 239 100-Year 1900.00 82.03 86.08 86.26 0.001646 2.49 583.11 244.21 0.30 Reach-1 238 100-Year 1900.00 81.30 85.90 84.28 85.99 0.000926 2.00 796.67 364.22 0.23 Reach-1 237 100-Year 1900.00 77.89 84.48 84.48 85.37 0.009777 8.49 276.21 500.38 0.78 Reach-1 236 100-Year 1900.00 74.33 77.74 77.74 78.34 0.013524 6.64 307.51 424.35 0.84 Reach-1 235 100-Year 1900.00 72.00 74.85 74.66 75.52 0.011082 6.74 295.80 326.21 0.79 Reach-1 234 100-Year 1900.00 69.28 72.93 72.55 73.55 0.008633 6.52 307.63 303.44 0.71 Reach-1 233 100-Year 1900.00 68.84 70.74 70.64 71.34 0.014566 6.52 319.63 264.67 0.87 Reach-1 232 100-Year 1900.00 64.74 69.11 68.18 69.58 0.005692 5.46 350.41 394.67 0.58 Reach-1 231 100-Year 1900.00 63.55 66.97 66.91 67.91 0.012317 8.12 252.81 125.69 0.86 Reach-1 230 100-Year 1900.00 61.23 65.12 65.12 65.70 0.009997 6.98 332.72 258.09 0.76 Reach-1 229 100-Year 1900.00 59.70 63.27 63.69 0.005851 5.62 396.23 259.83 0.59 Reach-1 228 100-Year 1900.00 58.47 62.62 62.85 0.002816 3.84 503.37 209.32 0.41 Reach-1 227 100-Year 1900.00 54.26 62.26 57.82 62.55 0.000897 4.32 439.42 339.48 0.28 Reach-1 226.5 Culvert Reach-1 226 100-Year 1900.00 50.26 58.85 59.42 0.002047 6.03 315.01 52.16 0.40 Reach-1 225 100-Year 1900.00 47.60 56.84 56.84 58.53 0.010112 11.62 189.60 54.96 0.76 Reach-1 224 100-Year 1900.00 46.80 53.08 53.08 53.62 0.005797 7.91 395.40 458.81 0.62 Reach-1 223 100-Year 1900.00 44.77 48.50 48.81 0.003316 4.53 462.70 276.97 0.45 Reach-1 222 100-Year 1900.00 44.00 46.62 46.62 47.32 0.013937 7.00 284.29 204.20 0.87 Reach-1 221 100-Year 1900.00 41.71 44.54 44.91 0.004822 5.15 412.50 247.44 0.54 Reach-1 220 100-Year 1900.00 36.75 43.36 43.36 43.87 0.005407 7.61 418.86 397.07 0.58 Reach-1 219 100-Year 1900.00 31.90 39.69 39.69 41.50 0.010315 11.03 186.63 60.54 0.82 Reach-1 218 100-Year 1900.00 30.80 38.66 38.66 39.92 0.008211 9.45 234.40 105.92 0.73 Reach-1 217 100-Year 1900.00 30.30 38.22 38.22 39.00 0.006064 8.93 308.73 162.89 0.61 Reach-1 216 100-Year 1900.00 29.80 37.33 37.33 38.12 0.005726 9.03 312.63 180.83 0.61 Reach-1 215 100-Year 1900.00 29.30 35.67 35.67 36.19 0.005883 7.55 396.29 355.32 0.62 Reach-1 214 100-Year 1900.00 25.40 33.42 33.42 34.02 0.006446 8.42 366.58 278.50 0.60 Reach-1 213 100-Year 1900.00 23.00 31.25 31.25 32.19 0.007229 8.95 269.67 124.52 0.65 Reach-1 212 100-Year 1900.00 23.00 29.49 29.49 30.22 0.008555 8.84 302.34 200.09 0.68 HEC-RAS Plan: SMC Trib 1 Exist Cond HEC-RAS Plan: SMC Trib 1 Exist Cond River: RIVER-1 Reach: Reach-1 Profile: 100-Year (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach-1 211 100-Year 1900.00 17.80 27.15 27.65 0.002344 6.20 390.37 178.58 0.40 Reach-1 210 100-Year 1900.00 16.80 25.83 25.83 27.19 0.006808 9.84 230.74 107.68 0.66 Reach-1 209 100-Year 1900.00 16.50 25.18 25.18 25.79 0.004108 7.69 388.09 278.13 0.49 Reach-1 208 100-Year 1900.00 16.10 23.92 23.92 24.38 0.005095 7.05 435.17 442.21 0.55 Reach-1 207 100-Year 1900.00 15.60 22.14 22.14 22.77 0.005865 7.92 357.22 253.77 0.61 Reach-1 206 100-Year 1900.00 15.59 20.07 19.93 20.51 0.006844 6.87 390.15 435.89 0.64 Reach-1 205 100-Year 1900.00 15.60 19.46 19.34 19.84 0.006320 5.71 422.90 409.83 0.60 Reach-1 204 100-Year 1900.00 15.59 18.48 18.48 19.15 0.006769 5.26 315.58 235.79 0.60 Reach-1 203 100-Year 1900.00 15.59 18.17 18.41 0.002078 4.23 509.94 264.57 0.47 Reach-1 202 100-Year 1900.00 15.60 18.19 18.26 0.000545 2.18 889.60 365.02 0.24 Reach-1 201 100-Year 1900.00 15.60 18.10 18.20 0.000753 2.50 768.57 318.67 0.28 Reach-1 200 100-Year 1900.00 9.80 18.05 16.16 18.13 0.000503 2.73 840.74 281.77 0.18 0 50 100 150 200 250 300 35095 100 105 110 115 120 125 La Costa Golf Course RS = 248 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 600 700 80095 100 105 110 115 120 125 La Costa Golf Course RS = 247 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 800 100090 95 100 105 110 115 120 La Costa Golf Course RS = 246 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03+- • 0 200 400 600 800 100090 95 100 105 110 La Costa Golf Course RS = 245 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 800 100085 90 95 100 105 110 La Costa Golf Course RS = 244 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 800 100085 90 95 100 105 110 La Costa Golf Course RS = 243 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 • • • 0 100 200 300 400 500 60085 90 95 100 105 La Costa Golf Course RS = 242 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 60084 86 88 90 92 94 96 98 100 La Costa Golf Course RS = 241 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 200 400 600 800 100080 85 90 95 100 105 La Costa Golf Course RS = 240 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 600 70080 85 90 95 100 La Costa Golf Course RS = 239 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 60080 85 90 95 100 105 La Costa Golf Course RS = 238 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 100 200 300 400 500 600 70076 78 80 82 84 86 88 90 92 94 96 La Costa Golf Course RS = 237 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03--+ • 0 100 200 300 400 500 600 70070 75 80 85 90 95 La Costa Golf Course RS = 236 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 80070 75 80 85 90 La Costa Golf Course RS = 235 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 100 200 300 400 500 600 70065 70 75 80 85 90 95 La Costa Golf Course RS = 234 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 • • • 0 100 200 300 400 500 600 700 80065 70 75 80 85 90 95 La Costa Golf Course RS = 233 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 800 100060 65 70 75 80 85 90 95 100 La Costa Golf Course RS = 232 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 100 200 300 400 500 600 700 80060 65 70 75 80 85 90 95 La Costa Golf Course RS = 231 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 • • +- 0 100 200 300 400 500 600 70060 65 70 75 80 85 90 La Costa Golf Course RS = 230 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 100 200 300 400 500 60055 60 65 70 75 80 La Costa Golf Course RS = 229 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 600 70055 60 65 70 75 80 85 La Costa Golf Course RS = 228 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03t t rn rn l]] 0 100 200 300 400 500 60050 55 60 65 70 75 80 La Costa Golf Course RS = 227 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 100 200 300 400 500 60050 55 60 65 70 75 80 La Costa Golf Course RS = 226.5 Culv Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 20 40 60 80 100 12050 55 60 65 70 La Costa Golf Course RS = 226 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 • • • 0 100 200 300 40045 50 55 60 65 70 75 La Costa Golf Course RS = 225 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 600 700 80045 50 55 60 65 70 La Costa Golf Course RS = 224 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 200 400 600 80040 45 50 55 60 65 70 75 La Costa Golf Course RS = 223 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 • t_j 0 100 200 300 400 500 600 70044 46 48 50 52 54 56 La Costa Golf Course RS = 222 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 100 200 300 400 500 60040 42 44 46 48 50 52 54 56 58 La Costa Golf Course RS = 221 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60035 40 45 50 55 La Costa Golf Course RS = 220 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 • 0 100 200 300 400 500 60030 35 40 45 50 55 La Costa Golf Course RS = 219 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60030 35 40 45 50 55 La Costa Golf Course RS = 218 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 600 70030 35 40 45 50 La Costa Golf Course RS = 217 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 ~ + -+ tj ----+ ~- • 0 100 200 300 400 500 600 70025 30 35 40 45 50 55 La Costa Golf Course RS = 216 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 600 70028 30 32 34 36 38 40 42 44 46 La Costa Golf Course RS = 215 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 100 200 300 400 500 60025 30 35 40 45 50 La Costa Golf Course RS = 214 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 • t_j 0 50 100 150 200 250 300 35020 25 30 35 40 45 La Costa Golf Course RS = 213 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 50 100 150 200 250 300 35022 24 26 28 30 32 34 La Costa Golf Course RS = 212 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 50 100 150 200 250 300 35016 18 20 22 24 26 28 30 32 La Costa Golf Course RS = 211 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 50 100 150 200 250 300 350 40015 20 25 30 35 40 La Costa Golf Course RS = 210 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60016 18 20 22 24 26 28 30 La Costa Golf Course RS = 209 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 100 200 300 400 500 60016 18 20 22 24 26 28 30 La Costa Golf Course RS = 208 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 ,._____ )IE -----------~ • • 0 100 200 300 400 500 60014 16 18 20 22 24 26 28 30 La Costa Golf Course RS = 207 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60014 16 18 20 22 24 26 La Costa Golf Course RS = 206 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 100 200 300 400 500 60014 16 18 20 22 24 26 28 La Costa Golf Course RS = 205 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 t_j 0 100 200 300 400 500 600 70014 16 18 20 22 24 26 28 30 La Costa Golf Course RS = 204 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60015 20 25 30 35 La Costa Golf Course RS = 203 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .03 .03 0 100 200 300 400 500 60014 16 18 20 22 24 26 28 30 32 La Costa Golf Course RS = 202 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .03 .03 t_j 0 100 200 300 400 500 60014 16 18 20 22 24 26 La Costa Golf Course RS = 201 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .03 .03 0 100 200 300 400 5008 10 12 14 16 18 20 22 24 26 La Costa Golf Course RS = 200 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 HEC-RAS Plan: SMC Prop Cond River: RIVER-1 Reach: Reach-1 Profile: 100-Year Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft)(ft)(ft)(ft)(ft/ft) (ft/s) (sq ft) (ft) Reach-1 120 100-Year 15700.00 9.84 21.32 21.61 0.001074 5.37 3686.69 852.98 0.31 Reach-1 119 100-Year 15700.00 8.50 20.62 21.27 0.002466 8.39 2653.42 748.09 0.47 Reach-1 118 100-Year 15700.00 8.30 19.52 19.52 20.71 0.004904 11.26 2127.46 801.23 0.65 Reach-1 117 100-Year 15700.00 7.70 18.44 18.98 0.002634 7.43 2909.53 983.66 0.47 Reach-1 116 100-Year 15700.00 6.30 18.42 18.62 0.000755 4.12 4646.68 1244.33 0.25 Reach-1 115 100-Year 15700.00 5.70 18.34 18.49 0.000473 2.80 5183.81 1148.62 0.19 Reach-1 114 100-Year 15700.00 5.20 18.27 18.39 0.000405 3.63 5941.22 1375.91 0.19 Reach-1 113 100-Year 15700.00 3.60 18.17 18.31 0.000420 4.01 5739.96 1358.31 0.20 Reach-1 112 100-Year 15700.00 2.19 18.14 18.23 0.000223 3.16 6956.75 1313.50 0.15 Reach-1 111 100-Year 15700.00 2.19 18.08 18.18 0.000284 3.29 6226.07 1278.98 0.15 Reach-1 110 100-Year 15700.00 2.19 18.07 18.13 0.000180 2.46 7634.29 1346.31 0.13 Reach-1 109 100-Year 15700.00 2.19 18.00 18.09 0.000229 2.58 6662.73 1152.75 0.13 Reach-1 108 100-Year 15700.00 2.19 17.95 18.05 0.000232 2.67 6485.01 1049.36 0.13 Reach-1 107 100-Year 15700.00 2.12 17.76 17.96 0.000538 3.86 4435.40 734.79 0.20 Reach-1 106 100-Year 15700.00 2.12 17.75 17.87 0.000264 3.03 5727.65 833.11 0.14 Reach-1 105 100-Year 15700.00 2.10 17.60 17.79 0.000483 3.94 4476.56 696.61 0.19 Reach-1 104 100-Year 15700.00 2.12 17.53 17.69 0.000421 3.68 5025.45 853.25 0.18 Reach-1 103 100-Year 15700.00 2.12 17.34 17.58 0.000694 4.48 4099.77 754.56 0.22 Reach-1 102 100-Year 15700.00 2.12 17.20 17.43 0.000732 3.69 4158.62 716.10 0.20 Reach-1 101 100-Year 15700.00 2.12 16.79 14.90 17.21 0.001571 5.77 3086.41 704.27 0.30 Reach-1 100 100-Year 15700.00 2.10 13.17 13.17 16.17 0.014652 14.73 1232.88 224.61 0.88 HEC-RAS Plan: SMC Prop Cond 0 200 400 600 800 1000 1200 1400 16000 10 20 30 40 50 60 La Costa Golf Course RS = 120 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 14000 10 20 30 40 50 La Costa Golf Course RS = 119 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 14000 10 20 30 40 50 La Costa Golf Course RS = 118 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16000 10 20 30 40 50 La Costa Golf Course RS = 117 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16005 10 15 20 25 30 35 40 La Costa Golf Course RS = 116 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16005 10 15 20 25 30 35 La Costa Golf Course RS = 115 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16005 10 15 20 25 30 35 La Costa Golf Course RS = 114 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16000 5 10 15 20 25 30 La Costa Golf Course RS = 113 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 200 400 600 800 1000 1200 1400 16000 5 10 15 20 25 La Costa Golf Course RS = 112 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03~ ,1-. ------------~ 0 200 400 600 800 1000 1200 1400 16002 4 6 8 10 12 14 16 18 20 La Costa Golf Course RS = 111 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .04 .03 0 200 400 600 800 1000 1200 14000 5 10 15 20 La Costa Golf Course RS = 110 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .04 .03 0 200 400 600 800 1000 1200 14000 5 10 15 20 25 30 La Costa Golf Course RS = 109 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .045 .03 -+ -+ t_j 0 200 400 600 800 1000 12000 5 10 15 20 25 30 La Costa Golf Course RS = 108 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .045 .03 0 200 400 600 800 10000 5 10 15 20 25 La Costa Golf Course RS = 107 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .045 .03 0 200 400 600 800 10000 5 10 15 20 25 La Costa Golf Course RS = 106 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .045 .03 + +-tj tj 0 200 400 600 800 10000 5 10 15 20 25 La Costa Golf Course RS = 105 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .02 .045 .03 0 200 400 600 800 10002 4 6 8 10 12 14 16 18 La Costa Golf Course RS = 104 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .04 .045 .03 0 200 400 600 8002 4 6 8 10 12 14 16 18 La Costa Golf Course RS = 103 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .045 .03 +-t_j t_±+ ~========~==~ t_j 0 100 200 300 400 500 600 700 8000 5 10 15 20 La Costa Golf Course RS = 102 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .045 .05 .03 0 100 200 300 400 500 600 700 8002 4 6 8 10 12 14 16 18 La Costa Golf Course RS = 101 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .02 .05 .03 0 100 200 300 400 5000 5 10 15 20 La Costa Golf Course RS = 100 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .02 .05 .05 t_j t_j t_j HEC-RAS Plan: SMC Trib 1 Prop Cond River: RIVER-1 Reach: Reach-1 Profile: 100-Year Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft)(ft)(ft)(ft)(ft/ft) (ft/s) (sq ft) (ft) Reach-1 248 100-Year 1900.00 98.00 100.84 100.84 101.90 0.014978 8.54 256.03 136.10 0.94 Reach-1 247 100-Year 1900.00 95.67 99.03 98.07 99.32 0.004020 4.40 444.47 342.17 0.49 Reach-1 246 100-Year 1900.00 93.00 96.43 96.43 97.69 0.016769 9.00 212.09 236.29 0.99 Reach-1 245 100-Year 1900.00 91.37 94.63 94.06 95.01 0.006705 5.02 386.54 203.33 0.61 Reach-1 244 100-Year 1900.00 89.00 92.15 92.15 92.73 0.022037 6.07 313.56 287.10 1.00 Reach-1 243 100-Year 1900.00 87.33 90.47 89.68 90.64 0.003670 3.32 571.82 321.94 0.44 Reach-1 242 100-Year 1900.00 85.56 89.18 89.50 0.009834 4.57 426.86 349.90 0.68 Reach-1 241 100-Year 1900.00 84.33 88.07 88.27 0.003991 3.64 537.09 318.09 0.46 Reach-1 240 100-Year 1900.00 82.75 87.28 87.51 0.003644 3.91 503.15 257.12 0.45 Reach-1 239 100-Year 1900.00 82.03 86.61 86.85 0.003026 3.87 487.54 222.71 0.42 Reach-1 238 100-Year 1900.00 81.30 86.25 86.37 0.001691 2.95 678.64 385.06 0.32 Reach-1 237 100-Year 1900.00 77.89 84.68 84.68 85.48 0.008486 8.18 297.69 519.67 0.73 Reach-1 236 100-Year 1900.00 74.33 77.74 77.74 78.34 0.013501 6.64 307.68 427.30 0.84 Reach-1 235 100-Year 1900.00 72.00 73.87 73.87 74.63 0.011408 4.97 292.15 324.38 0.74 Reach-1 234 100-Year 1900.00 69.28 72.50 71.81 72.89 0.005925 5.06 382.07 181.67 0.58 Reach-1 233 100-Year 1900.00 69.00 70.75 70.51 71.25 0.011790 5.86 348.24 263.92 0.78 Reach-1 232 100-Year 1900.00 64.74 68.93 68.19 69.46 0.007046 5.86 325.86 370.64 0.64 Reach-1 231 100-Year 1900.00 63.55 67.34 66.90 68.01 0.007347 6.83 298.19 125.13 0.68 Reach-1 230 100-Year 1900.00 61.23 65.14 65.14 66.12 0.013771 8.23 241.70 170.62 0.90 Reach-1 229 100-Year 1900.00 59.70 63.29 63.72 0.005913 5.67 387.74 242.00 0.60 Reach-1 228 100-Year 1900.00 58.47 62.62 62.85 0.002947 3.92 489.72 198.76 0.42 Reach-1 227 100-Year 1900.00 54.26 62.26 57.82 62.55 0.000897 4.32 439.42 339.48 0.28 Reach-1 226.5 Culvert Reach-1 226 100-Year 1900.00 50.26 58.85 59.42 0.002047 6.03 315.01 52.16 0.40 Reach-1 225 100-Year 1900.00 47.60 56.84 56.84 58.53 0.010112 11.62 189.60 54.96 0.76 Reach-1 224 100-Year 1900.00 46.80 53.19 53.19 53.69 0.005162 7.58 409.81 359.97 0.59 Reach-1 223 100-Year 1900.00 44.77 48.54 47.26 48.89 0.003599 4.75 404.62 272.92 0.47 Reach-1 222 100-Year 1900.00 44.00 46.61 46.61 47.32 0.014071 7.03 283.46 204.69 0.87 Reach-1 221 100-Year 1900.00 41.71 44.53 44.90 0.004887 5.17 407.95 237.11 0.54 Reach-1 220 100-Year 1900.00 36.75 43.34 43.34 43.86 0.005478 7.63 415.68 395.06 0.58 Reach-1 219 100-Year 1900.00 31.90 39.69 39.69 41.50 0.010315 11.03 186.63 60.54 0.82 Reach-1 218 100-Year 1900.00 30.80 39.42 38.51 40.36 0.005164 8.20 282.63 150.50 0.59 Reach-1 217 100-Year 1900.00 30.30 38.84 38.84 39.79 0.006221 9.60 291.67 156.06 0.63 Reach-1 216 100-Year 1900.00 29.80 36.92 36.92 38.57 0.010848 11.93 199.83 76.09 0.83 Reach-1 215 100-Year 1900.00 29.30 36.28 36.28 36.74 0.004469 7.14 443.05 529.29 0.55 Reach-1 214 100-Year 1900.00 25.40 33.40 33.91 0.005575 7.81 395.98 298.94 0.56 Reach-1 213 100-Year 1900.00 23.00 31.16 31.16 32.34 0.008765 9.74 235.08 93.88 0.72 Reach-1 212 100-Year 1900.00 23.00 29.49 29.49 30.16 0.007965 8.53 320.39 231.41 0.66 HEC-RAS Plan: SMC Trib 1 Prop Cond HEC-RAS Plan: SMC Trib 1 Prop Cond River: RIVER-1 Reach: Reach-1 Profile: 100-Year (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Reach-1 211 100-Year 1900.00 17.80 27.22 27.70 0.002233 6.08 405.16 191.61 0.39 Reach-1 210 100-Year 1900.00 16.80 25.55 25.55 27.19 0.008405 10.64 202.73 83.95 0.72 Reach-1 209 100-Year 1900.00 16.50 25.29 25.29 25.91 0.004056 7.71 378.25 264.19 0.49 Reach-1 208 100-Year 1900.00 16.10 23.92 23.92 24.43 0.005338 7.22 410.39 405.94 0.56 Reach-1 207 100-Year 1900.00 15.60 22.22 22.22 22.85 0.005703 7.89 356.91 263.18 0.61 Reach-1 206 100-Year 1900.00 15.59 20.24 19.90 20.62 0.005656 6.44 410.67 404.17 0.59 Reach-1 205 100-Year 1900.00 15.60 19.43 19.43 19.94 0.008085 6.42 366.40 377.93 0.68 Reach-1 204 100-Year 1900.00 15.59 18.45 18.45 19.16 0.007039 5.33 309.26 224.35 0.61 Reach-1 203 100-Year 1900.00 15.59 18.20 18.43 0.001985 4.16 518.11 265.78 0.46 Reach-1 202 100-Year 1900.00 15.60 18.22 18.29 0.000523 2.15 900.89 365.50 0.23 Reach-1 201 100-Year 1900.00 15.60 18.15 18.23 0.000660 2.37 835.17 372.56 0.26 Reach-1 200 100-Year 1900.00 9.80 18.08 16.14 18.17 0.000549 2.86 794.97 306.44 0.19 0 50 100 150 200 250 300 35095 100 105 110 115 120 125 La Costa Golf Course RS = 248 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 600 700 80090 95 100 105 110 115 120 125 La Costa Golf Course RS = 247 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 800 100090 95 100 105 110 115 120 La Costa Golf Course RS = 246 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03+- • 0 200 400 600 800 100090 95 100 105 110 La Costa Golf Course RS = 245 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 800 100085 90 95 100 105 110 La Costa Golf Course RS = 244 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 800 100085 90 95 100 105 110 La Costa Golf Course RS = 243 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 • • • 0 100 200 300 400 500 60085 90 95 100 105 La Costa Golf Course RS = 242 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 60084 86 88 90 92 94 96 98 100 La Costa Golf Course RS = 241 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 200 400 600 800 100080 85 90 95 100 105 La Costa Golf Course RS = 240 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 600 70080 85 90 95 100 105 La Costa Golf Course RS = 239 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 60080 85 90 95 100 105 La Costa Golf Course RS = 238 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 600 70076 78 80 82 84 86 88 90 92 94 96 La Costa Golf Course RS = 237 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 tj --+ • 0 100 200 300 400 500 600 70070 75 80 85 90 95 La Costa Golf Course RS = 236 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 80070 75 80 85 90 La Costa Golf Course RS = 235 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 100 200 300 400 500 600 70065 70 75 80 85 90 95 La Costa Golf Course RS = 234 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 • • 0 100 200 300 400 500 600 700 80065 70 75 80 85 90 95 La Costa Golf Course RS = 233 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 200 400 600 800 100060 65 70 75 80 85 90 95 100 La Costa Golf Course RS = 232 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 100 200 300 400 500 600 700 80060 65 70 75 80 85 90 95 La Costa Golf Course RS = 231 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 • +- • 0 100 200 300 400 500 600 70060 65 70 75 80 85 90 La Costa Golf Course RS = 230 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 100 200 300 400 500 60055 60 65 70 75 80 La Costa Golf Course RS = 229 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03 0 100 200 300 400 500 600 70055 60 65 70 75 80 85 La Costa Golf Course RS = 228 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .06 .04 .03t t rn rn l]] 0 100 200 300 400 500 60050 55 60 65 70 75 80 La Costa Golf Course RS = 227 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 100 200 300 400 500 60050 55 60 65 70 75 80 La Costa Golf Course RS = 226.5 Culv Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .06 .04 .03 0 20 40 60 80 100 12050 55 60 65 70 La Costa Golf Course RS = 226 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 • • • 0 100 200 300 40045 50 55 60 65 70 75 La Costa Golf Course RS = 225 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 600 700 80045 50 55 60 65 70 La Costa Golf Course RS = 224 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 200 400 600 80040 45 50 55 60 65 70 75 La Costa Golf Course RS = 223 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 • • 0 100 200 300 400 500 600 70044 46 48 50 52 54 56 La Costa Golf Course RS = 222 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 100 200 300 400 500 60040 42 44 46 48 50 52 54 56 58 La Costa Golf Course RS = 221 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60035 40 45 50 55 La Costa Golf Course RS = 220 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 • 0 100 200 300 400 500 60030 35 40 45 50 55 La Costa Golf Course RS = 219 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60030 35 40 45 50 55 La Costa Golf Course RS = 218 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 600 70030 35 40 45 50 La Costa Golf Course RS = 217 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 ~ + -+ tj ----+ ~- • 0 100 200 300 400 500 600 70025 30 35 40 45 50 55 La Costa Golf Course RS = 216 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 100 200 300 400 500 600 70028 30 32 34 36 38 40 42 44 46 La Costa Golf Course RS = 215 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 100 200 300 400 500 60025 30 35 40 45 50 La Costa Golf Course RS = 214 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 • • 0 50 100 150 200 250 300 35020 25 30 35 40 45 La Costa Golf Course RS = 213 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 50 100 150 200 250 300 35022 24 26 28 30 32 34 La Costa Golf Course RS = 212 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 50 100 150 200 250 300 35016 18 20 22 24 26 28 30 32 La Costa Golf Course RS = 211 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 50 100 150 200 250 300 350 40015 20 25 30 35 40 La Costa Golf Course RS = 210 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60016 18 20 22 24 26 28 30 La Costa Golf Course RS = 209 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 0 100 200 300 400 500 60016 18 20 22 24 26 28 30 La Costa Golf Course RS = 208 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 • • 0 100 200 300 400 500 60014 16 18 20 22 24 26 28 30 La Costa Golf Course RS = 207 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60014 16 18 20 22 24 26 La Costa Golf Course RS = 206 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60014 16 18 20 22 24 26 28 La Costa Golf Course RS = 205 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 t_j 0 100 200 300 400 500 600 70014 16 18 20 22 24 26 28 30 La Costa Golf Course RS = 204 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .04 .03 0 100 200 300 400 500 60014 16 18 20 22 24 26 28 30 32 34 La Costa Golf Course RS = 203 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .03 .03 0 100 200 300 400 50014 16 18 20 22 24 26 28 30 32 La Costa Golf Course RS = 202 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .03 .03 tj 0 100 200 300 400 500 60014 16 18 20 22 24 26 La Costa Golf Course RS = 201 Station (ft)Elevation (ft)Legend WS 100-Year Ground Bank Sta .03 .03 .03 0 100 200 300 400 5008 10 12 14 16 18 20 22 24 26 La Costa Golf Course RS = 200 Station (ft)Elevation (ft)Legend WS 100-Year Ground Ineff Bank Sta .03 .04 .03 • 14.3' 8.92' net height 84" are 165' Long - ~ . .,. ~ ~~~~~-~ ~-= .,; _, ,:cc [•cc: cc:, ::_ ~~; -.,.: ":"--... •· ~-, ·. c ~ :-.'". ~-,cs :Cc~ t = : '= .:::~--==l:::-c-:: ;:_:_::-:.:~. v~ :~--::::::: l::..:·_ ~---i:.;.~7::.-:: i:.:-: ii ?r' ::~> ·-:~: ~-~ ---~:~ ,i'l ·:.: :.f, • , ., c ~ ,'= ., --,--·:.~:~ :.:.:.~ = _:~-;'.~. t::~"-=:--=- · :;: ::-~ ~{i: :~t-t:,· ::;:: -~.::: ·.:::: .::-f--_; _::::E,:=_:··;:·1--=-··-· -:.--.. ··-. E~ ,WTE, CtlJIUAC11JI? Ttl /??tl/1/L)E 5/((l,P f).R.4W/#6.5 t?,.C STRUCTURAL [ ,0/ATE ARC/I~ $E C/1Y tfl/ ;::: C,4,f't5LJl'liJ rZW AIPRtJl/4t: F tl ----···· ... . ---··- I l i JOBN11~ Clflffl) 77-tii . , I GRAPHIC SCALE 300 0 150 300 600 1200 □~r£•:.•L•--1~1 l __ ~I LEGEND: 1 INCH -300 FEET SANGIS 2-FOOT CONTOUR TOPO (NAVO 88) EXISTING CONDITION 100-YEAR FLOODPLAIN PROPOSED CONDITION 100-YEAR FLOODPLAIN HEC-RAS CROSS-SECTION PROPOSED GRADING HEC-RAS WORK MAP