Loading...
HomeMy WebLinkAboutPD 2021-0040; 789 PALM AVENUE; DRAINAGE REPORT; 2022-10-28 786 Palm Avenue Drainage Report bha, Inc. 2 Table Of Contents Chapter 1 – Discussion ..................................................................................................................3 1.1 Vicinity Map ...............................................................................................................4 1.2 Purpose And Scope ...................................................................................................5 1.3 Project Description ....................................................................................................5 1.4 Existing Conditions ....................................................................................................5 1.5 Developed Conditions ...............................................................................................6 1.6 Summary of Results ...................................................................................................7 1.7 Study Method .............................................................................................................7 1.8 Conclusion ..................................................................................................................8 1.9 Declaration Of Responsible Charge ......................................................................10 Chapter 2 – Existing & Developed Hydrology Maps ................................................................11 Chapter 3 – 100-Year Peak Flow Calculations..........................................................................12 3.1 Existing Hydrology Calculations ............................................................................13 3.2 Developed Hydrology Calculations . .....................................................................15 3.3 Vegetated Swale Calculations . ..............................................................................20 3.4 Volumetric and Flow Calculations for Attenuation of Developed Runoff . .....28 Chapter 4 – References ................................................................................................................30 4.1 Methodology- Rational Method Peak Flow Determination ...............................31 786 Palm Avenue Drainage Report bha, Inc. 3 CHAPTER 1 DISCUSSION 786 Palm Avenue Drainage Report bha, Inc. 4 1.1 Vicinity Map 786 Palm Avenue Drainage Report bha, Inc. 5 1.2 Purpose And Scope The purpose of this report is to publish the results of hydrology and hydraulic computer analysis for the development of 786 Palm Avenue, located in the City of Carlsbad. The proposed project is a 0.16-acre site. The scope is to study the existing and proposed hydrology and hydraulics as it influences the surrounding properties during a 100-year frequency storm event (Q100), and make recommendations to intercept, contain and convey Q100 to the historic point of discharge. 1.3 Project Description The 786 Palm Avenue Project proposes the construction of two (2) separate single-family two-story residential buildings with associated improvements on two (2) assessor’s parcel numbers (APN) APN 204-171-10 and APN 204-171-11. Additionally, an accessory dwelling unit is proposed on the second story of each residential building. The project site, comprised of APN 204-171-10 and APN 204-171-11, is 0.16‐acres and an existing residential dwelling (to be demolished) occupying portions of both APNs. The existing project site is adjacent to Palm Avenue to the south, and alley to the west, and Jefferson Street to the east. Topographically, the generally rectangular-shaped APNs are characterized by flat grades sloping in a southwest direction from the northwest corner to the southwest corner of the project. Elevations range from a high of approximately 59 feet near the northeast corner of APN 204-171-10 and to a low of approximately 55 feet near the southwest corner of APN 204-171-11. The site drains towards the intersection of Palm Avenue and the Alley. Vegetation consists of shrubs, grasses, and trees. The onsite soil classification is Type B as determined from USDA Web Soil Survey (see References). 1.4 Existing Conditions Storm flows affecting the site are limited to the rainfall that lands directly on the properties. In the existing condition, surface runoff sheet flows in a southwesterly direction from Node 10 to one (1) Point of Compliance (POC 1) at Node 30. POC 1 is located near the southwest corner of the project, near the intersection of Palm Avenue and the alley. Excessive scouring or erosion is not present. The Existing Hydrology Exhibit shows runoff basins that will drain towards POC 1 (Node 30). 786 Palm Avenue Drainage Report bha, Inc. 6 Table 1 summarizes the existing runoff information from the site. Refer to the Existing Hydrology Exhibit for drainage patterns, areas, and POC. Table 1 - Summary of Existing Peak Flows Discharge Location Drainage Area (ac) 100-Year Peak Flow (cfs) NODE 30 0.24 0.48 Existing Condition 100-Year Peak Flow 1.5 Developed Conditions The 786 Palm Avenue Project proposes the construction of two (2) separate single-family two-story residential buildings with associated improvements on two (2) separate APNs. The majority of stormwater runoff from the project will be intercepted by vegetated yard swale around each single-family residential building that will direct runoff to a curb outlet to Palm Avenue for APN 204-171-10 and an infiltration basin to the Alley for APN 204-171-11. The remaining runoff will be directed onto vegetation and permeable pavers before discharging onto Jefferson Street, Palm Avenue or the Alley. Permeable pavers will provide dispersion and infiltration underneath the gravel section of the permeable pavers. For the purposes of this report, runoff was modeled as draining in a similar direction as the existing runoff condition, from the northeast corner of the project, Node 10, to the southwest corner of the project, near the intersection of Palm Avenue and the alley. Node 60 to Node 70, the northerly portion of APN 204-141, drains to the alley. Developed site flow will mimic existing drainage conditions. Impervious surfaces have been minimized where feasible. Table 2 & 3 summarizes the expected cumulative 100-year peak flow rates. Refer to the Developed Hydrology Map for drainage patterns, areas, and Points of Compliance. Table 2 - Summary of Developed Peak Flow Discharge Location Drainage Area (ac) 100-Year Peak Flow (cfs) Node 0.24 0.55 Developed Condition 100-Year Peak Flow 786 Palm Avenue Drainage Report bha, Inc. 7 1.6 Summary of Results Table 3 compares the cumulative existing and developed peak flow conditions. Table 3 - Summary of Existing vs Developed Peak Flows Drainage Area (ac) 100-Year Peak Flow (cfs) Difference 0.00 -0.01 Attenuated Developed Condition 0.24 0.47 Existing Condition 0.24 0.48 Developed Condition 0.00 0.55 1.7 Study Method The method of analysis was based on the Rational Method according to the San Diego County Hydrology Manual (SDCHM). The Hydrology and Hydraulic Analysis were done on Hydro Soft by Advanced Engineering Software 2014. The study considers the runoff for a 100-year storm frequency. Methodology used for the computation of design rainfall events, runoff coefficients, and rainfall intensity values are consistent with criteria set forth in the “2003 County of San Diego Drainage Design Manual.” A more detailed explanation of methodology used for this analysis is listed in Chapter 5 – References of this report. Drainage basin areas were determined from the topography and proposed grades shown on the Grading Plan. The Rational Method for this project provided the following variable coefficients: Rainfall Intensity – Initial time of concentration (Tc) values based on Table 3-2 of the SDCHM. Rainfall Isopluvial Maps from the SDCHM were used to determine P6 for 100- year storm, see References. Precipitation values were verified with the values obtained from NOAA website at the coordinates of the project (Chapter 5 - References). I = 7.44x(P6)x(Tc)- 0.645 P6 for 100-year storm =2.66 inches 786 Palm Avenue Drainage Report bha, Inc. 8 Runoff Coefficient - In accordance with the County of San Diego standards, runoff coefficients were based on land use and soil type. The soil conditions used in this study are consistent with Type-B soil qualities. An appropriate runoff coefficient (C) for each type of land use in the subarea was selected from Table 3-1 of SDCHM and multiplied by the percentage of total area (A) included in that class. The sum of the products for all land uses is the weighted runoff coefficient (∑[CA]). The Developed Hydrology Exhibit shows the offsite area, proposed on-site drainage system, on-site subareas, and nodal points. Table 5 summarizes the composite C-values calculated in the existing and proposed conditions. Table 5 - Composite Runoff Coefficient Value Calculations Up Node Down Node Total Area (ac)C1 A1 (AC)C2 A2 (AC)CCOMP 10 20 0.061 0.25 0.042 0.90 0.019 0.46 20 30 0.184 0.25 0.126 0.90 0.057 0.45 Notes: C-values taken from Table 3-1 of San Diego County Hydrology Manual, consistent with on-site existing soil types from the USDA Web Soil Survey. See References. Up Node Down Node Total Area (ac)C1 A1 (AC)C2 A2 (AC)CCOMP 10 20 0.058 0.25 0.041 0.90 0.017 0.44 20 40 0.049 0.25 0.016 0.90 0.034 0.69 30 40 0.032 0.25 0.018 0.90 0.013 0.52 40 50 0.069 0.25 0.042 0.90 0.028 0.51 60 70 0.037 0.25 0.024 0.90 0.013 0.48 Notes: C-values taken from Table 3-1 of San Diego County Hydrology Manual, consistent with on-site existing soil types from the USDA Web Soil Survey. See References. 1.8 Conclusion As shown in Table 4, the development of the proposed 786 Palm Avenue project site will decrease the runoff by 0.01 cfs during a 100-year storm event. The permeable pavers and bioretention basin (trash capture BMP) will slow runoff discharges by storing runoff in the gravel sections underneath them to allow infiltration into the onsite soils beneath, further decreasing runoff to maintain the existing hydrology. The 786 Palm Avenue project satisfies the drainage requirements of the City of Carlsbad. All storm drain facilities have been sized to convey the 100-year storm event without any adverse effects. Based on this conclusion, runoff released from the proposed project site will unlikely cause any adverse impact to downstream water bodies or existing habitat integrity. Sediment will likely be reduced upon site development. Side yard vegetated swales adjacent to each building will drain not less than 2% away from the building and not less than 1% longitudinal slope. See vegetated swale calculations in 786 Palm Avenue Drainage Report bha, Inc. 9 Chapter 3 showing that the vegetated swales can adequately convey the calculated runoff for each lot at longitudinal slopes between 1% to 2% and sides slopes between 2% and 5%. Peak flow rates listed above were generated based on criteria set forth in SDCHM presented in Chapter 4 of this report. 786 Palm Avenue Drainage Report bha, Inc. 11 Chapter 2 Existing & Developed Hydrology Maps SMH 51.19 FLSMH 48.10 FL 30 0.49 0.106 LEGEND CC=0.34 EL=54.80 RONALD L. HOLLOWAY NO. 29271 K:\Civil 3D\1501\DWG\HYDRO\1501 - EXIST HYDROLOGY.dwg, 8/24/2022 9:12:34 AM SMH 51.19 FLSMH 48.10 FL UP UP A B 30 0.57 0.188 LEGEND CC=0.57 RONALD L. HOLLOWAY NO. 29271 A K:\Civil 3D\1501\DWG\HYDRO\1501 - PROP HYDROLOGY.dwg, 8/24/2022 9:33:32 AM 786 Palm Avenue Drainage Report bha, Inc. 12 Chapter 3 100-Year Peak Flow Calculations 786 Palm Avenue Drainage Report bha, Inc. 13 3.1 Existing Hydrology Calculations 100-Year Storm ____________________________________________________________________________ **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT 2003,1985,1981 HYDROLOGY MANUAL (c) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1459 Analysis prepared by: BHA INC. 5115 AVENIDA ENCINAS, SUITE L CARLSBAD, CA 92008 ************************** DESCRIPTION OF STUDY ************************** * EXISTING 100 YEAR STORM HYDROLOGY * * 786 PALM AVE * * JN 1130-1501-600 * ************************************************************************** FILE NAME: K:\HYDRO\1501\1501E103.DAT TIME/DATE OF STUDY: 17:36 04/09/2022 ---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: ---------------------------------------------------------------------------- 2003 SAN DIEGO MANUAL CRITERIA USER SPECIFIED STORM EVENT(YEAR) = 100.00 6-HOUR DURATION PRECIPITATION (INCHES) = 2.660 SPECIFIED MINIMUM PIPE SIZE(INCH) = 3.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: USE MODIFIED RATIONAL METHOD PROCEDURES FOR CONFLUENCE ANALYSIS *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) === ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS: 1. Relative Flow-Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top-of-Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* **************************************************************************** FLOW PROCESS FROM NODE 10.00 TO NODE 20.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ *USER SPECIFIED(SUBAREA): USER-SPECIFIED RUNOFF COEFFICIENT = .4600 S.C.S. CURVE NUMBER (AMC II) = 0 786 Palm Avenue Drainage Report bha, Inc. 14 INITIAL SUBAREA FLOW-LENGTH(FEET) = 100.00 UPSTREAM ELEVATION(FEET) = 58.24 DOWNSTREAM ELEVATION(FEET) = 57.50 ELEVATION DIFFERENCE(FEET) = 0.74 SUBAREA OVERLAND TIME OF FLOW(MIN.) = 9.832 WARNING: INITIAL SUBAREA FLOW PATH LENGTH IS GREATER THAN THE MAXIMUM OVERLAND FLOW LENGTH = 59.60 (Reference: Table 3-1B of Hydrology Manual) THE MAXIMUM OVERLAND FLOW LENGTH IS USED IN Tc CALCULATION! 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.531 SUBAREA RUNOFF(CFS) = 0.13 TOTAL AREA(ACRES) = 0.06 TOTAL RUNOFF(CFS) = 0.13 **************************************************************************** FLOW PROCESS FROM NODE 20.00 TO NODE 30.00 IS CODE = 61 ---------------------------------------------------------------------------- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>(STANDARD CURB SECTION USED)<<<<< ============================================================================ UPSTREAM ELEVATION(FEET) = 57.50 DOWNSTREAM ELEVATION(FEET) = 54.80 STREET LENGTH(FEET) = 121.00 CURB HEIGHT(INCHES) = 6.0 STREET HALFWIDTH(FEET) = 24.00 DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 1.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.020 OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020 SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1 STREET PARKWAY CROSSFALL(DECIMAL) = 0.020 Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0130 Manning's FRICTION FACTOR for Back-of-Walk Flow Section = 0.0200 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 0.31 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW: STREET FLOW DEPTH(FEET) = 0.16 HALFSTREET FLOOD WIDTH(FEET) = 1.50 AVERAGE FLOW VELOCITY(FEET/SEC.) = 3.25 PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 0.51 STREET FLOW TRAVEL TIME(MIN.) = 0.62 Tc(MIN.) = 10.45 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.356 *USER SPECIFIED(SUBAREA): USER-SPECIFIED RUNOFF COEFFICIENT = .4500 S.C.S. CURVE NUMBER (AMC II) = 0 AREA-AVERAGE RUNOFF COEFFICIENT = 0.452 SUBAREA AREA(ACRES) = 0.18 SUBAREA RUNOFF(CFS) = 0.36 TOTAL AREA(ACRES) = 0.2 PEAK FLOW RATE(CFS) = 0.48 END OF SUBAREA STREET FLOW HYDRAULICS: DEPTH(FEET) = 0.17 HALFSTREET FLOOD WIDTH(FEET) = 2.21 FLOW VELOCITY(FEET/SEC.) = 2.89 DEPTH*VELOCITY(FT*FT/SEC.) = 0.49 LONGEST FLOWPATH FROM NODE 10.00 TO NODE 30.00 = 221.00 FEET. ============================================================================ END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 0.2 TC(MIN.) = 10.45 PEAK FLOW RATE(CFS) = 0.48 ============================================================================ ============================================================================ END OF RATIONAL METHOD ANALYSIS 786 Palm Avenue Drainage Report bha, Inc. 15 3.2 Developed Hydrology Calculations 100-Year Storm ____________________________________________________________________________ **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT 2003,1985,1981 HYDROLOGY MANUAL (c) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1459 Analysis prepared by: BHA INC. 5115 AVENIDA ENCINAS, SUITE L CARLSBAD, CA 92008 ************************** DESCRIPTION OF STUDY ************************** * DEVELOPED 100 YEAR STORM HYDROLOGY * * 786 PALM AVE * * JN 1130-1501-600 * ************************************************************************** FILE NAME: K:\HYDRO\1501\1501P103.DAT TIME/DATE OF STUDY: 16:07 08/03/2022 ---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: ---------------------------------------------------------------------------- 2003 SAN DIEGO MANUAL CRITERIA USER SPECIFIED STORM EVENT(YEAR) = 100.00 6-HOUR DURATION PRECIPITATION (INCHES) = 2.660 SPECIFIED MINIMUM PIPE SIZE(INCH) = 3.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: USE MODIFIED RATIONAL METHOD PROCEDURES FOR CONFLUENCE ANALYSIS *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) === ===== ========= ================= ====== ===== ====== ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS: 1. Relative Flow-Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top-of-Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* **************************************************************************** FLOW PROCESS FROM NODE 10.00 TO NODE 20.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ 786 Palm Avenue Drainage Report bha, Inc. 16 *USER SPECIFIED(SUBAREA): USER-SPECIFIED RUNOFF COEFFICIENT = .4400 S.C.S. CURVE NUMBER (AMC II) = 0 INITIAL SUBAREA FLOW-LENGTH(FEET) = 100.00 UPSTREAM ELEVATION(FEET) = 58.24 DOWNSTREAM ELEVATION(FEET) = 57.50 ELEVATION DIFFERENCE(FEET) = 0.74 SUBAREA OVERLAND TIME OF FLOW(MIN.) = 10.140 WARNING: INITIAL SUBAREA FLOW PATH LENGTH IS GREATER THAN THE MAXIMUM OVERLAND FLOW LENGTH = 59.60 (Reference: Table 3-1B of Hydrology Manual) THE MAXIMUM OVERLAND FLOW LENGTH IS USED IN Tc CALCULATION! 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.442 SUBAREA RUNOFF(CFS) = 0.11 TOTAL AREA(ACRES) = 0.06 TOTAL RUNOFF(CFS) = 0.11 **************************************************************************** FLOW PROCESS FROM NODE 20.00 TO NODE 40.00 IS CODE = 61 ---------------------------------------------------------------------------- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>(STANDARD CURB SECTION USED)<<<<< ============================================================================ UPSTREAM ELEVATION(FEET) = 57.50 DOWNSTREAM ELEVATION(FEET) = 56.77 STREET LENGTH(FEET) = 47.00 CURB HEIGHT(INCHES) = 6.0 STREET HALFWIDTH(FEET) = 24.00 DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 1.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.020 OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020 SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1 STREET PARKWAY CROSSFALL(DECIMAL) = 0.020 Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0130 Manning's FRICTION FACTOR for Back-of-Walk Flow Section = 0.0200 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 0.19 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW: STREET FLOW DEPTH(FEET) = 0.16 HALFSTREET FLOOD WIDTH(FEET) = 1.50 AVERAGE FLOW VELOCITY(FEET/SEC.) = 2.71 PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 0.42 STREET FLOW TRAVEL TIME(MIN.) = 0.29 Tc(MIN.) = 10.43 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.362 *USER SPECIFIED(SUBAREA): USER-SPECIFIED RUNOFF COEFFICIENT = .6900 S.C.S. CURVE NUMBER (AMC II) = 0 AREA-AVERAGE RUNOFF COEFFICIENT = 0.554 SUBAREA AREA(ACRES) = 0.05 SUBAREA RUNOFF(CFS) = 0.15 TOTAL AREA(ACRES) = 0.1 PEAK FLOW RATE(CFS) = 0.26 END OF SUBAREA STREET FLOW HYDRAULICS: DEPTH(FEET) = 0.16 HALFSTREET FLOOD WIDTH(FEET) = 1.50 FLOW VELOCITY(FEET/SEC.) = 2.71 DEPTH*VELOCITY(FT*FT/SEC.) = 0.42 LONGEST FLOWPATH FROM NODE 10.00 TO NODE 40.00 = 147.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 40.00 TO NODE 40.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: 786 Palm Avenue Drainage Report bha, Inc. 17 TIME OF CONCENTRATION(MIN.) = 10.43 RAINFALL INTENSITY(INCH/HR) = 4.36 TOTAL STREAM AREA(ACRES) = 0.11 PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.26 **************************************************************************** FLOW PROCESS FROM NODE 30.00 TO NODE 40.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ *USER SPECIFIED(SUBAREA): USER-SPECIFIED RUNOFF COEFFICIENT = .5200 S.C.S. CURVE NUMBER (AMC II) = 0 INITIAL SUBAREA FLOW-LENGTH(FEET) = 107.00 UPSTREAM ELEVATION(FEET) = 59.08 DOWNSTREAM ELEVATION(FEET) = 57.62 ELEVATION DIFFERENCE(FEET) = 1.46 SUBAREA OVERLAND TIME OF FLOW(MIN.) = 8.177 WARNING: INITIAL SUBAREA FLOW PATH LENGTH IS GREATER THAN THE MAXIMUM OVERLAND FLOW LENGTH = 75.47 (Reference: Table 3-1B of Hydrology Manual) THE MAXIMUM OVERLAND FLOW LENGTH IS USED IN Tc CALCULATION! 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 5.103 SUBAREA RUNOFF(CFS) = 0.08 TOTAL AREA(ACRES) = 0.03 TOTAL RUNOFF(CFS) = 0.08 **************************************************************************** FLOW PROCESS FROM NODE 40.00 TO NODE 40.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 8.18 RAINFALL INTENSITY(INCH/HR) = 5.10 TOTAL STREAM AREA(ACRES) = 0.03 PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.08 ** CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE) 1 0.26 10.43 4.362 0.11 2 0.08 8.18 5.103 0.03 RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN.) (INCH/HOUR) 1 0.29 8.18 5.103 2 0.33 10.43 4.362 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 0.33 Tc(MIN.) = 10.43 TOTAL AREA(ACRES) = 0.1 LONGEST FLOWPATH FROM NODE 10.00 TO NODE 40.00 = 147.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 40.00 TO NODE 50.00 IS CODE = 61 ---------------------------------------------------------------------------- 786 Palm Avenue Drainage Report bha, Inc. 18 >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>(STANDARD CURB SECTION USED)<<<<< ============================================================================ UPSTREAM ELEVATION(FEET) = 56.77 DOWNSTREAM ELEVATION(FEET) = 54.80 STREET LENGTH(FEET) = 74.00 CURB HEIGHT(INCHES) = 6.0 STREET HALFWIDTH(FEET) = 24.00 DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 1.50 INSIDE STREET CROSSFALL(DECIMAL) = 0.020 OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020 SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1 STREET PARKWAY CROSSFALL(DECIMAL) = 0.020 Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0130 Manning's FRICTION FACTOR for Back-of-Walk Flow Section = 0.0200 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 0.41 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW: STREET FLOW DEPTH(FEET) = 0.16 HALFSTREET FLOOD WIDTH(FEET) = 1.50 AVERAGE FLOW VELOCITY(FEET/SEC.) = 3.55 PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 0.55 STREET FLOW TRAVEL TIME(MIN.) = 0.35 Tc(MIN.) = 10.78 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.271 *USER SPECIFIED(SUBAREA): USER-SPECIFIED RUNOFF COEFFICIENT = .5100 S.C.S. CURVE NUMBER (AMC II) = 0 AREA-AVERAGE RUNOFF COEFFICIENT = 0.534 SUBAREA AREA(ACRES) = 0.07 SUBAREA RUNOFF(CFS) = 0.15 TOTAL AREA(ACRES) = 0.2 PEAK FLOW RATE(CFS) = 0.47 END OF SUBAREA STREET FLOW HYDRAULICS: DEPTH(FEET) = 0.16 HALFSTREET FLOOD WIDTH(FEET) = 1.50 FLOW VELOCITY(FEET/SEC.) = 3.55 DEPTH*VELOCITY(FT*FT/SEC.) = 0.55 LONGEST FLOWPATH FROM NODE 10.00 TO NODE 50.00 = 221.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 50.00 TO NODE 50.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) = 10.78 RAINFALL INTENSITY(INCH/HR) = 4.27 TOTAL STREAM AREA(ACRES) = 0.21 PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.47 **************************************************************************** FLOW PROCESS FROM NODE 60.00 TO NODE 70.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ *USER SPECIFIED(SUBAREA): USER-SPECIFIED RUNOFF COEFFICIENT = .4800 S.C.S. CURVE NUMBER (AMC II) = 0 INITIAL SUBAREA FLOW-LENGTH(FEET) = 92.00 UPSTREAM ELEVATION(FEET) = 57.78 DOWNSTREAM ELEVATION(FEET) = 55.63 ELEVATION DIFFERENCE(FEET) = 2.15 SUBAREA OVERLAND TIME OF FLOW(MIN.) = 7.981 WARNING: INITIAL SUBAREA FLOW PATH LENGTH IS GREATER THAN 786 Palm Avenue Drainage Report bha, Inc. 19 THE MAXIMUM OVERLAND FLOW LENGTH = 90.05 (Reference: Table 3-1B of Hydrology Manual) THE MAXIMUM OVERLAND FLOW LENGTH IS USED IN Tc CALCULATION! 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 5.184 SUBAREA RUNOFF(CFS) = 0.09 TOTAL AREA(ACRES) = 0.04 TOTAL RUNOFF(CFS) = 0.09 **************************************************************************** FLOW PROCESS FROM NODE 70.00 TO NODE 70.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 7.98 RAINFALL INTENSITY(INCH/HR) = 5.18 TOTAL STREAM AREA(ACRES) = 0.04 PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.09 ** CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE) 1 0.47 10.78 4.271 0.21 2 0.09 7.98 5.184 0.04 RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN.) (INCH/HOUR) 1 0.48 7.98 5.184 2 0.55 10.78 4.271 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 0.55 Tc(MIN.) = 10.78 TOTAL AREA(ACRES) = 0.2 LONGEST FLOWPATH FROM NODE 10.00 TO NODE 70.00 = 221.00 FEET. ============================================================================ END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 0.2 TC(MIN.) = 10.78 PEAK FLOW RATE(CFS) = 0.55 ============================================================================ ============================================================================ END OF RATIONAL METHOD ANALYSIS 786 Palm Avenue Drainage Report bha, Inc. 20 3.3 Vegetated Swale Calculations 100-Year Storm 786 Palm Avenue Drainage Report bha, Inc. 21 APN Flow Path (node to node) Flow (cfs) Swale Slope (%) Side Slopes (%) Depth (ft) Width (ft) 10 30 to 40 0.08 1 2 0.06 5.53 10 30 to 40 0.08 1 5 0.07 2.98 10 30 to 40 0.08 2 2 0.05 4.77 10 30 to 40 0.08 2 5 0.07 2.67 11 60 TO 70 0.09 2 2 0.05 4.77 11 60 TO 70 0.09 2 5 0.07 2.82 See vegetated swale calculations in Chapter 3 of this report 786 Palm Avenue Drainage Report bha, Inc. 22 ____________________________________________________________________________ **************************************************************************** HYDRAULIC ELEMENTS - I PROGRAM PACKAGE (C) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1459 Analysis prepared by: BHA INC. 5115 AVENIDA ENCINAS, SUITE L CARLSBAD, CA 92008 ---------------------------------------------------------------------------- TIME/DATE OF STUDY: 16:23 08/03/2022 ============================================================================ Problem Descriptions: NODE 30 TO 40 VEGETATED SWALE AT 1% LONGITUDE AND 2% SIDE SLOPES **************************************************************************** >>>>CHANNEL INPUT INFORMATION<<<< ---------------------------------------------------------------------------- CHANNEL Z1(HORIZONTAL/VERTICAL) = 50.00 Z2(HORIZONTAL/VERTICAL) = 50.00 BASEWIDTH(FEET) = 0.00 CONSTANT CHANNEL SLOPE(FEET/FEET) = 0.010000 UNIFORM FLOW(CFS) = 0.08 MANNINGS FRICTION FACTOR = 0.0240 ============================================================================ NORMAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- >>>>> NORMAL DEPTH(FEET) = 0.06 FLOW TOP-WIDTH(FEET) = 5.53 FLOW AREA(SQUARE FEET) = 0.15 HYDRAULIC DEPTH(FEET) = 0.03 FLOW AVERAGE VELOCITY(FEET/SEC.) = 0.52 UNIFORM FROUDE NUMBER = 0.554 PRESSURE + MOMENTUM(POUNDS) = 0.26 AVERAGED VELOCITY HEAD(FEET) = 0.004 SPECIFIC ENERGY(FEET) = 0.060 ============================================================================ CRITICAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- CRITICAL FLOW TOP-WIDTH(FEET) = 4.41 CRITICAL FLOW AREA(SQUARE FEET) = 0.10 CRITICAL FLOW HYDRAULIC DEPTH(FEET) = 0.02 CRITICAL FLOW AVERAGE VELOCITY(FEET/SEC.) = 0.82 CRITICAL DEPTH(FEET) = 0.04 CRITICAL FLOW PRESSURE + MOMENTUM(POUNDS) = 0.22 AVERAGED CRITICAL FLOW VELOCITY HEAD(FEET) = 0.011 CRITICAL FLOW SPECIFIC ENERGY(FEET) = 0.055 ============================================================================ 786 Palm Avenue Drainage Report bha, Inc. 23 ____________________________________________________________________________ **************************************************************************** HYDRAULIC ELEMENTS - I PROGRAM PACKAGE (C) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1459 Analysis prepared by: BHA INC. 5115 AVENIDA ENCINAS, SUITE L CARLSBAD, CA 92008 ---------------------------------------------------------------------------- TIME/DATE OF STUDY: 16:25 08/03/2022 ============================================================================ Problem Descriptions: NODE 30 TO 40 VEGETATED SWALE AT 1% LONGITUDE AND 5% SIDE SLOPES **************************************************************************** >>>>CHANNEL INPUT INFORMATION<<<< ---------------------------------------------------------------------------- CHANNEL Z1(HORIZONTAL/VERTICAL) = 20.00 Z2(HORIZONTAL/VERTICAL) = 20.00 BASEWIDTH(FEET) = 0.00 CONSTANT CHANNEL SLOPE(FEET/FEET) = 0.010000 UNIFORM FLOW(CFS) = 0.08 MANNINGS FRICTION FACTOR = 0.0240 ============================================================================ NORMAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- >>>>> NORMAL DEPTH(FEET) = 0.07 FLOW TOP-WIDTH(FEET) = 2.98 FLOW AREA(SQUARE FEET) = 0.11 HYDRAULIC DEPTH(FEET) = 0.04 FLOW AVERAGE VELOCITY(FEET/SEC.) = 0.72 UNIFORM FROUDE NUMBER = 0.661 PRESSURE + MOMENTUM(POUNDS) = 0.28 AVERAGED VELOCITY HEAD(FEET) = 0.008 SPECIFIC ENERGY(FEET) = 0.082 ============================================================================ CRITICAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- CRITICAL FLOW TOP-WIDTH(FEET) = 2.53 CRITICAL FLOW AREA(SQUARE FEET) = 0.08 CRITICAL FLOW HYDRAULIC DEPTH(FEET) = 0.03 CRITICAL FLOW AVERAGE VELOCITY(FEET/SEC.) = 1.00 CRITICAL DEPTH(FEET) = 0.06 CRITICAL FLOW PRESSURE + MOMENTUM(POUNDS) = 0.26 AVERAGED CRITICAL FLOW VELOCITY HEAD(FEET) = 0.016 CRITICAL FLOW SPECIFIC ENERGY(FEET) = 0.079 ============================================================================ 786 Palm Avenue Drainage Report bha, Inc. 24 ____________________________________________________________________________ **************************************************************************** HYDRAULIC ELEMENTS - I PROGRAM PACKAGE (C) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1459 Analysis prepared by: BHA INC. 5115 AVENIDA ENCINAS, SUITE L CARLSBAD, CA 92008 ---------------------------------------------------------------------------- TIME/DATE OF STUDY: 16:26 08/03/2022 ============================================================================ Problem Descriptions: NODE 30 TO 40 VEGETATED SWALE AT 2% LONGITUDE AND 2% SIDE SLOPES **************************************************************************** >>>>CHANNEL INPUT INFORMATION<<<< ---------------------------------------------------------------------------- CHANNEL Z1(HORIZONTAL/VERTICAL) = 50.00 Z2(HORIZONTAL/VERTICAL) = 50.00 BASEWIDTH(FEET) = 0.00 CONSTANT CHANNEL SLOPE(FEET/FEET) = 0.020000 UNIFORM FLOW(CFS) = 0.08 MANNINGS FRICTION FACTOR = 0.0240 ============================================================================ NORMAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- >>>>> NORMAL DEPTH(FEET) = 0.05 FLOW TOP-WIDTH(FEET) = 4.77 FLOW AREA(SQUARE FEET) = 0.11 HYDRAULIC DEPTH(FEET) = 0.02 FLOW AVERAGE VELOCITY(FEET/SEC.) = 0.70 UNIFORM FROUDE NUMBER = 0.803 PRESSURE + MOMENTUM(POUNDS) = 0.22 AVERAGED VELOCITY HEAD(FEET) = 0.008 SPECIFIC ENERGY(FEET) = 0.055 ============================================================================ CRITICAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- CRITICAL FLOW TOP-WIDTH(FEET) = 4.41 CRITICAL FLOW AREA(SQUARE FEET) = 0.10 CRITICAL FLOW HYDRAULIC DEPTH(FEET) = 0.02 CRITICAL FLOW AVERAGE VELOCITY(FEET/SEC.) = 0.82 CRITICAL DEPTH(FEET) = 0.04 CRITICAL FLOW PRESSURE + MOMENTUM(POUNDS) = 0.22 AVERAGED CRITICAL FLOW VELOCITY HEAD(FEET) = 0.011 CRITICAL FLOW SPECIFIC ENERGY(FEET) = 0.055 ============================================================================ 786 Palm Avenue Drainage Report bha, Inc. 25 ___________________________________________________________________________ **************************************************************************** HYDRAULIC ELEMENTS - I PROGRAM PACKAGE (C) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1459 Analysis prepared by: ____________________________________________________________________________ **************************************************************************** HYDRAULIC ELEMENTS - I PROGRAM PACKAGE (C) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1459 Analysis prepared by: BHA INC. 5115 AVENIDA ENCINAS, SUITE L CARLSBAD, CA 92008 ---------------------------------------------------------------------------- TIME/DATE OF STUDY: 16:28 08/03/2022 ============================================================================ Problem Descriptions: NODE 30 TO 40 VEGETATED SWALE AT 2% LONGITUDE AND 5% SIDE SLOPES **************************************************************************** >>>>CHANNEL INPUT INFORMATION<<<< ---------------------------------------------------------------------------- CHANNEL Z1(HORIZONTAL/VERTICAL) = 20.00 Z2(HORIZONTAL/VERTICAL) = 20.00 BASEWIDTH(FEET) = 0.00 CONSTANT CHANNEL SLOPE(FEET/FEET) = 0.020000 UNIFORM FLOW(CFS) = 0.08 MANNINGS FRICTION FACTOR = 0.0240 ============================================================================ NORMAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- >>>>> NORMAL DEPTH(FEET) = 0.07 FLOW TOP-WIDTH(FEET) = 2.67 FLOW AREA(SQUARE FEET) = 0.09 HYDRAULIC DEPTH(FEET) = 0.03 FLOW AVERAGE VELOCITY(FEET/SEC.) = 0.90 UNIFORM FROUDE NUMBER = 0.866 PRESSURE + MOMENTUM(POUNDS) = 0.26 AVERAGED VELOCITY HEAD(FEET) = 0.013 SPECIFIC ENERGY(FEET) = 0.079 ============================================================================ CRITICAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- CRITICAL FLOW TOP-WIDTH(FEET) = 2.53 CRITICAL FLOW AREA(SQUARE FEET) = 0.08 CRITICAL FLOW HYDRAULIC DEPTH(FEET) = 0.03 CRITICAL FLOW AVERAGE VELOCITY(FEET/SEC.) = 1.00 CRITICAL DEPTH(FEET) = 0.06 CRITICAL FLOW PRESSURE + MOMENTUM(POUNDS) = 0.26 AVERAGED CRITICAL FLOW VELOCITY HEAD(FEET) = 0.016 CRITICAL FLOW SPECIFIC ENERGY(FEET) = 0.079 ============================================================================ 786 Palm Avenue Drainage Report bha, Inc. 26 ____________________________________________________________________________ **************************************************************************** HYDRAULIC ELEMENTS - I PROGRAM PACKAGE (C) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1459 Analysis prepared by: BHA INC. 5115 AVENIDA ENCINAS, SUITE L CARLSBAD, CA 92008 ---------------------------------------------------------------------------- TIME/DATE OF STUDY: 16:39 08/03/2022 ============================================================================ Problem Descriptions: NODE 60 TO 70 VEGETATED SWALE AT 2% LONGITUDE AND 2% SIDE SLOPES **************************************************************************** >>>>CHANNEL INPUT INFORMATION<<<< ---------------------------------------------------------------------------- CHANNEL Z1(HORIZONTAL/VERTICAL) = 50.00 Z2(HORIZONTAL/VERTICAL) = 50.00 BASEWIDTH(FEET) = 0.00 CONSTANT CHANNEL SLOPE(FEET/FEET) = 0.020000 UNIFORM FLOW(CFS) = 0.09 MANNINGS FRICTION FACTOR = 0.0240 ============================================================================ NORMAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- >>>>> NORMAL DEPTH(FEET) = 0.05 FLOW TOP-WIDTH(FEET) = 4.77 FLOW AREA(SQUARE FEET) = 0.11 HYDRAULIC DEPTH(FEET) = 0.02 FLOW AVERAGE VELOCITY(FEET/SEC.) = 0.79 UNIFORM FROUDE NUMBER = 0.903 PRESSURE + MOMENTUM(POUNDS) = 0.25 AVERAGED VELOCITY HEAD(FEET) = 0.010 SPECIFIC ENERGY(FEET) = 0.057 ============================================================================ CRITICAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- CRITICAL FLOW TOP-WIDTH(FEET) = 4.65 CRITICAL FLOW AREA(SQUARE FEET) = 0.11 CRITICAL FLOW HYDRAULIC DEPTH(FEET) = 0.02 CRITICAL FLOW AVERAGE VELOCITY(FEET/SEC.) = 0.83 CRITICAL DEPTH(FEET) = 0.05 CRITICAL FLOW PRESSURE + MOMENTUM(POUNDS) = 0.25 AVERAGED CRITICAL FLOW VELOCITY HEAD(FEET) = 0.011 CRITICAL FLOW SPECIFIC ENERGY(FEET) = 0.057 ============================================================================ 786 Palm Avenue Drainage Report bha, Inc. 27 ____________________________________________________________________________ **************************************************************************** HYDRAULIC ELEMENTS - I PROGRAM PACKAGE (C) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1459 Analysis prepared by: BHA INC. 5115 AVENIDA ENCINAS, SUITE L CARLSBAD, CA 92008 ---------------------------------------------------------------------------- TIME/DATE OF STUDY: 16:41 08/03/2022 ============================================================================ Problem Descriptions: NODE 60 TO 70 VEGETATED SWALE AT 2% LONGITUDE AND 5% SIDE SLOPES **************************************************************************** >>>>CHANNEL INPUT INFORMATION<<<< ---------------------------------------------------------------------------- CHANNEL Z1(HORIZONTAL/VERTICAL) = 20.00 Z2(HORIZONTAL/VERTICAL) = 20.00 BASEWIDTH(FEET) = 0.00 CONSTANT CHANNEL SLOPE(FEET/FEET) = 0.020000 UNIFORM FLOW(CFS) = 0.09 MANNINGS FRICTION FACTOR = 0.0240 ============================================================================ NORMAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- >>>>> NORMAL DEPTH(FEET) = 0.07 FLOW TOP-WIDTH(FEET) = 2.82 FLOW AREA(SQUARE FEET) = 0.10 HYDRAULIC DEPTH(FEET) = 0.04 FLOW AVERAGE VELOCITY(FEET/SEC.) = 0.90 UNIFORM FROUDE NUMBER = 0.848 PRESSURE + MOMENTUM(POUNDS) = 0.30 AVERAGED VELOCITY HEAD(FEET) = 0.013 SPECIFIC ENERGY(FEET) = 0.083 ============================================================================ CRITICAL-DEPTH FLOW INFORMATION: ---------------------------------------------------------------------------- CRITICAL FLOW TOP-WIDTH(FEET) = 2.62 CRITICAL FLOW AREA(SQUARE FEET) = 0.09 CRITICAL FLOW HYDRAULIC DEPTH(FEET) = 0.03 CRITICAL FLOW AVERAGE VELOCITY(FEET/SEC.) = 1.05 CRITICAL DEPTH(FEET) = 0.07 CRITICAL FLOW PRESSURE + MOMENTUM(POUNDS) = 0.30 AVERAGED CRITICAL FLOW VELOCITY HEAD(FEET) = 0.017 CRITICAL FLOW SPECIFIC ENERGY(FEET) = 0.083 ============================================================================ 786 Palm Avenue Drainage Report bha, Inc. 28 3.4 Volumetric and Flow Calculations for Attenuation of Developed Runoff 100-Year Storm 786 Palm Avenue Drainage Report bha, Inc. 29 Volumetric and flow Calculations for Attenuation of Developed Runoff Calculations for Total Infiltration from Permeable Pavers and Bioretention Basin Total Permeable Paver Area = 1,561 sf Total Bioretention Area = 25 sf Total = 1,586 sf Calculate Total Infiltration in cfs Based on 1,586 sf Site is Type "B" Soils, Assume Infiltration Rate I = 0.2 in/hr QINF = I x Area = 1,586 sf * 0.2 in/hr =0.01 cfs Calculations for Total Volume of Storage Availbale from Permeable Pavers and Bioretention Basin Total Permeable Paver Area = 1,561 sf Depth of Gravel Section Underneath Permeble Pavers = 6 in = 0.5 ft Total Bioretnetion Area = 25 sf Depth of Gravel Section Underneath Bioretnetion Basin = 18 in = 1.5 ft Total = 1,586 sf Total Storage Volume Available in Gravel Section Underneath Permeble Pavers1 = 312 cf Total Storage Volume Available in Gravel Section Underneath Bioretnetion Basin1 = 15 cf Total = 327 cf Notes 1 - Assume a 40% Pososity in Gravel Section Calculate Total Flow Generated from Permeable Pavers assuming Tc = 5 minutes, Intensiy = 7.01 in/hr Q = CIA, C=0.25, I=7.01 in/hr, Area = 1,561 sf Q = 0.06 cfs  Calculate Total Volume Stored in Gravel Section Underneath Permeable Pavers Vol = Q * Time, Assume 5 min Tc Vol = 18 cf < 312 cf  Calculate Total Volume Stored in Garvel Section Underneath Permeable Pavers (Node 70) Assume Q = 0.09 cfs Vol = Q * Time, Assume 5 min Tc Vol = 27 cf >15 cf Asume Q = 0.045 cfs Vol = 14 cf <15 cf  Approximate Flow Attenuation Infiltration from Permeable Pavers and Bioretention Basin = 0.01 cfs Flow Stored in Gravel Section Underneath Permeable Pavers = 0.06 cfs Flow Stored in Gravel Section Underneath Bioretention Basin (say) = 0.01 cfs Total Flow Reduction = 0.08 cfs 786 Palm Avenue Drainage Report bha, Inc. 30 Chapter 4 References 786 Palm Avenue Drainage Report bha, Inc. 31 4.1 Methodology – Rational Method Peak Flow Determination 786 Palm Avenue Drainage Report bha, Inc. 32 786 Palm Avenue Drainage Report bha, Inc. 33 786 Palm Avenue Drainage Report bha, Inc. 34 786 Palm Avenue Drainage Report bha, Inc. 35 786 Palm Avenue Drainage Report bha, Inc. 36 786 Palm Avenue Drainage Report bha, Inc. 37 786 Palm Avenue Drainage Report bha, Inc. 38 786 Palm Avenue Drainage Report bha, Inc. 39 786 Palm Avenue Drainage Report bha, Inc. 40 786 Palm Avenue Drainage Report bha, Inc. 41 786 Palm Avenue Drainage Report bha, Inc. 42 786 Palm Avenue Drainage Report bha, Inc. 43 786 Palm Avenue Drainage Report bha, Inc. 44 786 Palm Avenue Drainage Report bha, Inc. 45 786 Palm Avenue Drainage Report bha, Inc. 46 786 Palm Avenue Drainage Report bha, Inc. 47 786 Palm Avenue Drainage Report bha, Inc. 48 786 Palm Avenue Drainage Report bha, Inc. 49 786 Palm Avenue Drainage Report bha, Inc. 50