HomeMy WebLinkAboutGVP Consultants; 1997-11-04;Project Task Description & Budget
This is the fifth Project Task Description And Budget describing tasks, establishing payment
amounts to complete said tasks and establishing the time of completion for the tasks described
herein pursuant to paragraphs 1, 3 and 4 of the contract entered into by GVP Consultants,
hereinafter referred to as "Contractor" and the City of Carlsbad, hereinafter referred to as "City"
on the 4th day of November, 1997.
1. CONTRACTOR'S OBLIGATIONS
The Contractor shall provide contract management and design services in accordance with the
"Project Development Manual", 1990 edition, hereinafter PDM, as published by the City's
Engineering Department, City "Standards for Design & Construction of Public Works
Improvements in the City of Carlsbad" and the schedule and task list, hereinafter S& T, attached
as Appendix 'A' for the Full Downtown Sidewalk Repairs project, account number 3605,
hereinafter "Project". Said services shall include the planning tasks, administrative tasks, plan
preparation, estimate preparation, specification preparation, document preparation, project
management, plan checking, scheduling, coordination and reporting tasks of the PDM, the S&T
and such other tasks that the City may assign to the Contractor that are required to complete
the documents required to issue a construction contract for said project.
3. PROGRESS AND COMPLETION
The Contractor's receipt of this Project Task Description and Budget, signed by the City
Engineer, constitutes notification to proceed to the Contractor. The Contractor shall begin work
within ten (10) working days after receipt of this fully executed document and shall complete the
work within 250 working days thereafter. Working days shall be as section 6-7.2 "Working Day"
of the Standard Specifications for Public Works Construction and shall additionally exclude days
used by public agencies, including City, in excess of the estimated processing time for said
agencies shown in the S& T.
4. FEES TO BE PAID TO THE CONTRACTOR
The budget for the Project shall be as shown in Table 1, "Project Management & Design
Services", herein. Fees shall be paid as lump sums for each task group sliown in said table.
Progress payments shall be based on the percentage of completion of each task group as
approved by the City. Appendix 'A', attached, has been prepared by the Contractor and
reviewed by City and shows the intent of parties as to the elements, scope and extent of the
task groups. The Contractor acknowledges that performance of any and all tasks by the
Contractor constitutes acknowledgment by the Contractor that such tasks are those defined in
Appendix 'A'. If the need to perform task groups or individual tasks that are not shown in said
table or in Appendix 'A' is identified by the Contractor or City the additional task groups will be
performed by the Contractor only upon authorization of the City through the mechanism of a
separate Project Task Description And Budget. The elements, scope and extent of the
additional task groups and tasks and fees to be paid for performing such additional task groups
and tasks shall be established, upon the mutual agreement of City and Contractor, in said
separate Project Task Description and Budget. In the event that City directs Contractor to
curtail or eliminate all , or portions of the task groups and tasks identified in said table the lump
sum fee for each task so eliminated shall be reduced proportionately by the ratio of the number
of hours shown for each element of said task groups and task(s) so curtailed or eliminated
divided by the number of hours shown for each element of said task groups and task(s) shown
in the S& T. The maximum total cost of Contractor's services for this project task description
and budget is $28,200.00 and the maximum total of this and all Project Task Description and
Budgets that are a part of the contract entered into by the Contractor and the City is
$150,000.00. The total of the maximum cost, up to and including this project, of all projects
total cost authorized for Contractor's services for specific projects is $83,900.00.
Table '1'
PROJECT MANAGEMENT SERVICES
TASK GROUP LUMP SUM FEE
Establish Project Scope $12,000.00
Project Management (Scheduling & Tracking)
Obtain Environmental Approvals
Manage Right-of-Way Acquisition
Perform and Manage PS&E Preparation
Manage Construction Contract Award
Total
Executed by Contractor this_-'-14-'-~---day of ~
CONTRACTOR:
G VP Cow f) u L-, /ttJT.S
(name~of Contractor) !I
By: ,-2/. ~ ~
( ign here)
Gl~ ii.. . Ja11 Pet>}?; ~le
(print name/title) '
orporation of the State of California
By:-+-----;,'"---~'-'-----,~+-,,-'.....,s-<-_..,__-14-___.,,c__ ______ _
Page 2 of 2 Pages Project Task Description & Budget for Project# 3605
Date of Preparation 7/1/98
neer
$1,900.00
Not Included
Not Included
$9,200.00
$5,100.00
$28,200.00
, 1998.
City of Carlsbad #3605 Full Downtown Sidewalk Repairs APPENDIX 'A'
Qtr3 Qtr4 Qtr1
ID Task Name Duration ~~vmm~~~~~~~~~~~~~~«~~Q~~w~m 1 2 3 4 5 6 7
1 PROJECT INITIATED 1311.3 h
2 START PROJECT 371 h I I
3 START ASSIGNMENT & ASSESSMENT 3.75 h
4 Assess Proj for Assignment 3.75 h
5 Initiate File 3.75 h I I
6 Obtain Proj Account Number(s) 0.5 h sultan! i
7 Check Funding 2h ! ·sultan! I
8 Establish Proj File 1.25 h
I 9 Obtain Drawing No. 0.25 h sultan!
10 Prep Proj Folders 0.5 h I rk
11 Set Up Telephone & Meeting Logs 0.5 h I rk
12 PROJECT ASSIGNED & FILES SET UP 0d
13 ESTABLISH SCOPE OF PROJECT 364 h
14 Scope Proj 289 h
15 Rev Capital Proj Description & Budget 1 h
16 Check for Adjacent Projects 2h I
17 Site reconnaissance 2h I
18 Meet with City Horticulturist 4h I
19 Photo Proj Site Sh
20 Prep Photo Key Map on Orthotopo Sheets 2h
I 21 Rev Proj Scope w/ Utilities 6h
22 Consult Client Dept 2h ' I 23 Conceptual Plan of Proj Extent 151 h
24 Obtain Suitable Base Map 2h I
25 Prep Detailed Proj Description 4h I
26 Prep Conceptual Plan of Proj Extent 12 h
27 Prep Proj Budget 4h
$ons;nt
28 Gather Public Input 75 h
29 Identify Participants 4h
30 Prepare 600' Radius Map 2h
Task !lliil,-~111i.11u.1.,~• ~11)" i-~•'"i Summary • • Rolled Up Progress Split 1t•l•i1illll!lt1l•ll lt•+
Progress Rolled Up Task ij~ External Tasks Rolled Up Split ll il iJ IJ jl !Ill JO ll "" II
Milestone ♦ Rolled Up Milestone 0 Project Summary • ' GVP Consultants Page 1 of 12 Pages downtown sidewalk r(rev2) 7/1/98 1:24 PM
City of Carlsbad
ID I Task Name
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
GVP Consultants
#3605 Full Downtown Sidewalk Repairs APPENDIX 'A'.
Conduct Metro Scan Owner Search
Prepare Mailing List
Advise Participants
Set Time & Location for lnfomational Meeting
Compose Informational Meeting Notices
Mail Informational Meeting Notices
Post Informational Meeting Notices
Publish Informational Meeting Notice in Newspaper
Prepare Informational Meeting Exhibits
Attend Village Mechants Meeting w/ Exhibits
Identify and Enlist Residents Showing High Interest
Post Informational Exhibits in Storefronts of Enlisted Residents
Prepare Participant Survey Forms
Arrange for Amenities at Informational Meeting
Conduct Informational Meeting
Analyze Public Input
Catagorize Responses
Establish Median of Responses
Prep Summary of Public Responses w/ Recommendations
Respond to Public input
Modify Project Concept
Prepare Cost Estimate for Modified Project Concept
Prepare Exhibits for Modified Project Concept
Publish Modified Project Concept in Newspaper
Post Modified Project Concept Exhibits in Storefronts of Enlisted Resid
Public Input Gathered & Analysed
Finalize Project Scope
Prepare Finalized Concept Plan
Prep Prelim Cost Estimate
Proj Scope Approval
Summary
Rolled Up Task
Qtr3 -Qtr4 I Qtr1
Duratioo ImlHIVIDl~l~l~l~l~l~l~l•l~l~l~l~l~l~l~l44I~I~IUlal6I~I~I~I1I2I3I4I5I6I7
1 h
1 h
58 h
1 h
2h
2h
4h
2h
12 h
3h
Sh
2h
4h
2h
4h
10 h
2h
2h
4h
49 h
11 h
4h
Sh
4h
4h
Oh
12 h
4h
4h
Sh
• • -~--
it1anagement Assistant
I Management Assistant
IJ;onsultant
'tonsultant
ftlerk
'tonsultant
'tonsultant
8tonsultant,Technician
ltonsultant
9!onsultant
'tonsultant
'tonsultant
'tonsultant
~onsultant
IJ;onsultant
'tonsultant
I Consultant ....
Consultant ..
'tonsultant
9!onsultant
~onsultant
~onsultant
♦ 8/24 ..
ltechnician
• Consultant
Split
Rolled Up Split
Task
Progress
Milestone ♦ Rolled Up Milestone 0
Rolled Up Progress
External Tasks
Project Summary • • Page 2 of 12 Pages downtown sidewalk r(rev2) 7 /1 /98 1 :24 PM
City of Cartsbad #3605 Full Downtown Sidewalk Repairs APPENDIX 'A'
Qtr3 Qtr4 I Qtr1
ID Task Name Duration 25 I 26 I 21 I 28I29130 I 31 I 32 I 33 I 34 I 35 I 36 I 31 I 38 I 39 I 40 I 41 I 42 I 43 I 44 I 45 I 46 I 47 I 48 I 49 I 50 I 51 I 52 I 1 I 2 I 3 I 4 I 5 I 6 l 1
61 Sub Draft Scope, Concept Plan & Budget to Super & Client Dept 2h
62 Rev Scope 2h
63 Approve Final Proj Scope & Budget 3h
64 PROJECT SCOPE ESTABLISHED Od
65 PROJECT STARTED Oh
66 MANAGE PROJECT 1303.3 h • 67 PROJECT MANAGEMENT 1080 h •
68 SETUP PROGRAM 116 h • f--6-9---+--------,T,-a-s.,.k-/--:R:--e-s_o_u_r_c_e--:Uc-tc:il-,-iz-a-ti,-o_n_/--:D:--u-r-a-ti,-o-n--:L--:i:--s-t--------------t-----:1--:1--:6--:h--1
70 Prep TUD List 116 h
iJi:onsultant ,
hF . I ,trincipal Civil,Consultari
lt'rincipal Civil,Consultant
~8/17
~18,11
.... .... .... 2hn 71 Prep TUD Input List 'tonsultant
72 Input TUD List 1 h ltlJ,k
73 Approve TUD List 2 h hPrilcipal Civil,
l onsultant
74 PERT Analysis 109 h ..... .,1
75 Rev Precedences 2 h hcdnsultant
. ~ ! 76 Modify Precedence 4 h ·
77 Input Data 1 h
78 Input Data 11 h
79 PROJECT TRACKING SYSTEM IN PLACE Od
80 PROJECT TRACKING 961 h
81 Track Progress 961 h
82 Maintain Schedule Program 1 h
83 Data Collation 0.5 h
84 Data Input 0.25 h
'!onfultant
~le
lfic1e k
• 7"14
...
.....
•
Ito sultan!
85 Data Output Analysis 0.25 h
86 Maintain Schedule Program 1 h
ito!sultant
I Pri cipal Cl~Const,ltant
87 Data Collation 0.5 h
88 Data Input 0.25 h Con ltant
89 Data Output Analysis 0.25 h ionl[ltant
I Prin pal Civil,Consultant
90 Maintain Schedule Program 1 h '7
Task gm Fl Summary • • Rolled Up Progress
Progress Rolled Up Task ... External Tasks
Milestone ♦ Rolled Up Milestone 0 Project Summary • •
GVP Consultants Page 3 of 12 Pages
...
...,
...,
...,
Split 1,1,1,,,,,11111111 11111,
Rolled Up Split ,,,,,..,.,,1,11111111111
downtown sidewalk r(rev2) 7/1/98 1 :24 PM
City of Carlsbad
ID I Task Name
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
GVP Consultants
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Task
Progress
Milestone
f@911■el
♦
#3605 Full Downtown Sidewalk Repairs APPENDIX 'A'
Duration
0.5 h
0.25 h
0.25 h
Oh
Oh
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
Summary • Rolled Up Task
Rolled Up Milestone 0
Otr3 I Otr4
25l26l27l28 l29l30l31 l32l33l34l35l36l37l38l39l40l41l42l43l44l45l46l47l48l49l50l51I52I1
• Rolled Up Progress
External Tasks
Project Summary
Q;on
Q;on
I Prin
ultant
ultant
+t'7
Q;on
I Prin
..
ultant
I
Q;oni; ultant ~on l ultant
I Prin . ipal Civil,Consultant
!
~on
Q;on
I Prin
ultant
ultant
~oTltant
~on ultant
I Prin
~
~onrltant
~on ultant
I Prin
~
~on~ultant
~on~ultant
I Prin
~
~onrltant
Con ultant
Split
Rolled Up Split •
Qtr1
2 3 4 5 6 I 7
Page 4 of 12 Pages downtown sidewalk r(rev2) 7 /1 /98 1 :24 PM
City of Carlsbad
ID
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
Task Name
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
PROJECT TRACKED TO COMPLETION
START PROJECT ACCOUNT REVIEW
Rev Monthly Staff Charges for Appropriateness
Rev Monthly Staff Charges for Appropriateness
Rev Monthly Staff Charges for Appropriateness
Rev Monthly Staff Charges for Appropriateness
Rev Monthly Staff Charges for Appropriateness
Rev Monthly Staff Charges for Appropriateness
Rev Monthly Staff Charges for Appropriateness
Rev Monthly Staff Charges for Appropriateness
PROJECT MANAGED
OBTAIN ENVIRONMENTAL APPROVALS
START PRELIMINARY ENVIRONMENTAL
Project IS Categorically Exempt
OBTAIN GENERAL PLAN CONSISTENCY DETERMINATION
Research
GPCD Was Made @ CIP Approval
Task
Progress
Milestone
6f~l'ii'7":~
♦
GVP Consultants
#3605 Full Downtown Sidewalk Repairs
Otr3 I Otr4
Duration l25 l26 l27 l2B l29 l30 l31 l32 l33 l34 l35 l36 l37 l3B l39l40I41 l42 l43 l44 l45 l46
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
Od
1135.3h
0.1 h
0.1 h
0.1 h
0.1 h
0.1 h
0.1 h
0.1 h
0.1 h
Oh
309 h
Oh
Oh
1 h
1 h
1 h
Summary •
6f;23
•
• • [ Principal Civil
Rolled Up Task r~. ,.1. 1
:,:';_· r '_ ,1L:1{
Rolled Up Progress
External Tasks
Project Summary Rolled Up Milestone 0 " Page 5 of 12 Pages
Split
Rolled Up Split
llf
APPENDIX 'A'
Qtr1
21314151617
ipal Civil,C~nsultant
I ~ on,ult,.nt
~on,ultr
I Prin ·
~on
~on
/ Prin
ultant
ultant
ipal Civil,Consultant
~onsultant
~onsultant
[ Principal Civil,Cons
downtown sidewalk r(rev2) 7/1/98 1 :24 PM
City of Carlsbad
ID
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
Task Name
GENERAL PLAN CONSISTENCY DETERMINED
ENVIRONMENTAL APPROVALS OBTAINED
START DESIGN PROCESS
RETAIN DESIGN CONSULTANT
Design Consultant Selection
ID Consultant Need Field
Check for Open P.O. Consultants
Determine Probable Fee Range
Req for Prop
Prep Task List
Prep Request for Prop
Identify Target Firm
Call Target Firm for Proposal
START CONSULTANT'S RESPONSE PERIOD
Respond to Inquiries
Conduct Pre-proposal Mtg
DESIGN CONSULTANT RETAINED
START PLANS, SPECS & ESTIMATE
Launch Consultant
Prep Design Criteria Package
Copy Proj Scope Info
Research City Files for Support Data
Assemble Pertinent City Standards
Conduct Pre-Design Mtg
Prep & Dist Conference Report
DESIGN CONSULTANT RETAINED & STARTED
START PLANS, SPECS & ESTIMATE
PREPARATION OF 30% PLANS
Prepare 30% Plans, Specifications & Estimate
PREP OF SUB OF 30% PLANS COMPLETED
Task
Progress
Milestone ♦
GVP Consultants
#3605 Full Downtown Sidewalk Repairs APPENDIX 'A'
~3 ~4 Qtr1
Duration 28 I 29 I 30 I 31 I 32 I 33 I 34 I 35 I 36 I 37 I 38 I 39 I 40 I 41 I 42 I 43 I 44 I 45 I 46 I 47 I 48 I 49 I 50 I 51 I 52 I 1 21314151617
Summary
Rolled Up Task
0d
0d
370.5 h
26 h
26 h
2h
2h
1 h
18 h
4h
4h
2h
2h
7h
2h
2h
0d
Sh
Sh
7h
1 h
4h
2h
4h
1 h
0d
258.5 h
Oh
Oh
0d
• • ~~~l.,'J"i"' ,,,i-.••~!~:'I'
,1 "" , ~ ,~e,
Rolled Up Milestone 0
'tonsultant
'tonsultant
.onsultant
'tonsultant
~onsultant
'tonsultant
't'"'""'"'
ffonsultant
i Consultant
-• ~echnician
hTechnician
~ Technician
tJtonsultant
Rolled Up Progress
External Tasks
Project Summary
I Consultant
• Page 6 of 12 Pages
Split
Rolled Up Split • downtown sidewalk r(rev2) 7/1/98 1 :24 PM
City of Carlsbad
ID I Task Name
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
GVP Consultants
#3605 Full Downtown Sidewalk Repairs APPENDIX 'A'
Qtr3 Qtr4 Qtr1
Duration
187 h
25l26l27l2Bl29l3Dl31 l32l33l34l35l36l37l38 %l~IQl~l~l~l~lml1 21314151617
Distribute 30% Plans
Assemble Packages 1 h
Prepare Letter of Transmittal 1 h
Distribute Submittal 1 h
Distribute Sub to City Depts 1 h
Distribute Sub to Utilities 1 h
30% PLANS DISTRIBUTED Od
Review 30% Plans 234 h
Receive Sub 81.25 h
Verify Contents of Submission 0.25 h
Sched Return of Sub by Utilities, ClienVAffected/Planning Depts 1 h
Sched Rev Mtg w/ Utilities, ClienVAffected/Planning Depts 1 h
Rev Sub 234 h
Field Check 4h
Conformity to City Stds, Planning Req's & EIR 2h
Compare Sub to Proj Scoping Docs 1 h
Rev & Conform City Dept Comments 1 h
Meet w/ City Depts to Rev Comments 1 h
Transcribe City Dept Comments 1 h
Prep Rev Report 2h
Rev Comments w/ Supervisor 4h
Rev Timeliness of Sub 0.5 h
COMPLETE REVIEW OF 30% PLANS Od
START PREP OF SUB OF 90% PS&E Oh
Prepare 90% Plans, Specifications & Estimate Oh
PREP OF SUB OF 90% PS&E COMPLETED Od
225.25 h
Start 90% Review, PS&E 91.75 h
Receive Sub Oh
Verify Contents of Sub 0.25 h
Summary • • Rolled Up Task ~1~l''.;'.:~ :Ji•~~~~~~ "':,~~~t •"~it!
Task
Progress
Milestone ♦ Rolled Up Milestone 0
Rolled Up Progress
External Tasks
Project Summary
Page 7 of 12 Pag·es
..
I Clerk
I Clerk,
l
1Technician
!j;echnician
I I Te~Mnician
Consultan
~ons ltant
~ons ltant
I
Consultant
~ nsul1nt,Principal Civil 't ncip~I Civil
~/14
t..+ /14
♦ 10/26
• 9/7
Split
Rolled Up Split • downtown sidewalk r(rev2) 7/1/98 1 :24 PM
City of Carlsbad
ID I Task Name
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
GVP Consultants
#3605 Full Downtown Sidewalk Repairs
Qtr3
Duration 25l26l27l2Bl29l3Dl31I32I33
Sched Return of Sub by Utilities, ClienUAffected/Planning Depts 1 h
Set up Mtg w/ City Depts
Rev Sub
Compare Sub to Proj Scoping Docs
Conformity to City Stds. Planning Req's & EIR
Compare Sub to Previous Sub Check Comments
Check for Utility Confiicts
Rev & Conform City Dept Comments
Meet w/ City Depts to Rev Comments
Transcribe City Dept Comments
Prep Rev Report
Rev Comments w/ Supervisor
Rev Timeliness of Sub
Transmit Rev
Prep LetteiofTransmittal
COMPLETE REVIEW OF 90% PS&E
PREPARATION OF 100% PS&E
Prepare 100% Version of Plans
COMPLETE PREP OF SUB OF 100% Plans
Prepare 100% Version of Specs
Review Specs for Conflicting Provisions
Update Standard Special Provisions
Prepare 100% Version of Estimate
Confirm Unit Prices
Confirm Quantities
Revise Spreadsheet if Necessary
SPECS & ESTIMATE PREPARED
DISTRIBUTE 100% PS&E
Assemble Packages
Prepare Letter of Transmittal
Task
Progress
Milestone
r;~~~~~--:.. r ..-::~~ altii:!11!.!!_ ~ ~' -•.rl,~ ,•ri JI..I
♦
2h
91.5 h
1 h
1 h
2h
2h
1 h
4h
2h
2h
2h
0.5 h
0.25 h
0.25 h
Oh
20.25 h
Oh
0d
8.25 h
4h
2h
12 h
2h
4h
2h
0d
3 h
2h
2h
Summary • Rolled Up Task
Rolled Up Milestone 0
• Rolled Up Progress
External Tasks
Project Summary
Page 8 of 12 Pages •
~onsittant
~ons~ttant
'tons
I Cons
I Cons
•
APPENDIX 'A'
Qtr4 Qtr1
40141l42l43l44l45l46l47l4Bl49l5Dl5115211 2 3 4 5 6 I 7
!
i 1suttant I nsultant I nsultant
I nsuttant
onsultant
~10/12
'tterk
' Cterk,Consultant
Split
Rolled Up Split
downtown sidewalk r(rev2) 7 /1 /98 1 :24 PM
City of Carlsbad #3605 Full Downtown Sidewalk Repairs APPENDIX 'A'
Qtr 3 Qtr 4 Qtr1
ID Task Name Duration 25 126 I 27 128 129 I 30 I 31 I 32 I 33 I 34 I 35 36 I 37 38 I 39 I 40 I 41 42 I 43 I 44 I 45 I 46 I 47 I 48 I 49 I 50 I 51 I 52 I 1 I 2 I 3 I 4 I 5 I 6 I 7
241 Distribute Submittal 2h ~
242 Distribute Sub to City Depts 1 h lt"echnician
243 Distribute Sub to Utilities 1 h I Technician
244 100% PS&E DISTRIBUTED 0d 10/13
245 COMPLETE PREP OF SUB OF 100% PS&E 0d 10/13
246 START REVIEW OF 100% PS&E 14.25 h ~ ' 247 Receive Sub 14.25 h ~ ' 248 Verify Contents of Sub 0.25 h ' technician
249 Rev Sub 4h ~onsultant
250 Compare Sub to Previous Sub Check Comments 2h r"""' 251 Obtain Applicable Signatures 0.29 d Consultant
252 PLANS & ESTIMATE COMPLETED 0d +-i10,19
253 SPECIFICATION ASSEMBLY 45.25 h 4 ...
254 Start Specification Assembly 45.25 h i ~ 255 Insert Bid Docs & Special Provisions into Boiler Plate 9h Clerk
256 Proof Read Specs 9h I Consultant
I
257 Correct Specs 9h I Consultant
258 Obtain & Insert Std Dwgs 2h t echnician
259 Print Master Specs 4h
1,t1erk
260 SPECIFICATIONS COMPLETED 0d ~ 261 DESIGN PROCESS COMPLETED Oh
262 START CONSTRUCTION CONTRACT AWARD PHASE 673.25 h I .... I ..,.,
263 START BID PROCESS 186.75 h .... ! 264 Council Authorization to Request Bids 186.75 h ..,., i 265 Agenda Bill 186.75 h .... I 266 Write Project Description 1 h Consultant
267 Prep Fiscal Impact Sec 1 h I
1J;onsultan1
268 Prep Reso 4h tonsultan[t
269 Prep Location Map 2h ~echniciai
270 Type Agenda Bill 0.5 h ~Clerk !
l;:tt'f.Jil¥l=i~l • • Task Summary Rolled Up Progress Split 1,11 1,1111,1 .. 11<1 111111
Progress Rolled Up Task 1Mjjilt:lrjllj1 External Tasks I Rolled Up Split i'"""""""''"""
Milestone ♦ Rolled Up Milestone 0 Project Summary • •
GVP Consultants Page 9 of 12 Pages downtown sidewalk r(rev2) 7/1/98 1 :24 PM
City of Carlsbad
ID Task Name
271 Proof Read Agenda Bill
272 Correct, Copy & Distribute A B
273 Confirm Circulation of Agenda Bill for Award
274 Review Agenda Bill
275 Review Agenda Bill
276 Review Agenda Bill
277 Review Agenda Bill
278 Review Agenda Bill
279 Revise Agenda Bill
280 Type Revised Agenda Bill
281 Proof Read Agenda Bill
282 Correct, Copy & Distribute A B
283 Review Agenda Bill
284 Prepare & Forward Agenda Bill Approval Package
285 Approve Agenda Bill
286 Approve Agenda Bill
287 Approve Agenda Bill
288 Attend Council Meeting
289 Agenda Bill Approved
290 SOLICIT BIDS
291
292
293
294
295
296
297
298
299
300
GVP Consultants
Bidding Period
Plan & Spec Publication
Prep Purchase Requisition
Obtain City Clerk Sig on Auth to Bid
Deliver Plans & specs to Purchasing
Prep Bid Abstract Base Shi
Bidder Inquiries
Answer Inquiries
Receive Bids
Prep Bid Abstract
Task
Progress
Milestone ♦
#3605 Full Downtown Sidewalk Repairs APPENDIX 'A'
~3 ~4 Qtr1
Duration ~1m1v1~1m1w1~1~1~1Ml~l~l~l~l§l~l~IGl~IMl~l~IUl~l~IWl~l~l1 2 3 4 5 6 I 7
0.5 h
0.5 h
0.5 h
1 h
1 h
1 h
1 h
1 h
2h
0.5 h
0.5 h
0.5 h
1 h
1 h
1 h
1 h
1 h
3h
Od
263 h
263 h
7.5 h
1 h
0.5 h
1 h
2h
7h
4h
263 h
2h
Summary • • Rolled Up Task rr~
Rolled Up Progress
External Tasks
Project Summary Rolled Up Milestone 0
Page 1 O of 12 Pages •
• I
ii=onsulta~t
ii=lerk I
. I NNING DIREl:;TOR I ·ncipal Civil
I ffic Enginee
i ty Engineer
I ity Attorne
I nanace Clelrk I I Consultant .. I
ii=lelk
it=orltan
it=lerk
ftrTcipal
i,,;nsulta
Split
ivil
Rolled Up Split • downtown sidewalk r(rev2) 7 /1 /98 1 :24 PM
City of Carlsbad #3605 Full Downtown Sidewalk Repairs APPENDIX 'A'
Qtr3 Qtr4 Qtr1
ID Task Name Duration mmvnm~~u~~~•~••~~~a«~~Q 52 1 2 3 4 5 6 7
301 Attend Bid Opening 2h
302 Analyze Bids 6h
303 Prep Bid Abstract 6h
304 Enter Unit Prices in Bid Abstract 2h
305 Distribute Bid Abstract to Reports & Project Managers 1 h
306 Examine Bid Docs Sh
307 Check Bidding Sheets for Completeness 2h
r"'··· 308 Compare Bidding Sheets to Bid Abstract 2h Consultant
309 Check Bid package for Completion of All Entries 1 h Consultant
310 Confirm Data in Bidde~s Statements 2h 'tonsultant
311 BID PROCESS COMPLETED Oct 12/2
312 CONTRACT AWARD 178 h
313 Assure Financial Status 7h
314 Analyze Funding & Resolve Shortfall 7h • 315 Determine Proj Acct Balance vs. Bid + Admin 2h
316 Consult w/ Finance Dir for Addnl. Funds 2h
317 Facilitate Award 171 h
318 Guide Contractor in Correct Bond & Contract Execution 4h
319 Guide Contractor in Correct Insurance 2h
320 Confirm Carlsbad Business License 1 h
321 Recommend Award to Lowest Responsible Bidder 1 h
322 Approve Award to Lowest Responsible Bidder 1 h
323 All Documents executed and Approved Oh
324 Prep Council Award Pkg 128 h
325 Prep Fiscal Impact Sec 1 h 'tonsultant
326 Prep Reso 2h ~onsultant
327 Type Agenda Bill 0.5 h
~lerk
328 Proof Read Agenda Bill 0.5 h ~onsultant
329 Correct, Copy & Distribute AB 0.5 h ~lerk
330 Confirm Circulation of Agenda Bill for Award 0.5 h NNING Dl~ECTOR
!iffl:lfflf¥iffl/!M • • Task Summary Rolled Up Progress Split !l!l!l !llllllll!IJll!ili
Progress Rolled Up Task ~~lb•,.111 External Tasks Rolled Up Split """""""" .. ''""
Milestone ♦ Rolled Up Milestone 0 Project Summary • • GVP Consultants Page 11 of 12 Pages downtown sidewalk r(rev2) 7/1/98 1 :24 PM
....
City of Carlsbad #3605 Full Downtown Sidewalk Repairs APPENDIX 'A'
Qtr3 Qtr4 Qtr1
ID Task Name Duration 2sI2sI21I2sI29l30l31 l32l33l34l35l3Bl37l3Bl39l40l41 l42l43l44l45l4Bl47I4B 49 50151 I 52 I 1 I 2 I 3 I 4 I 5 I s I 1
331 Review Agenda Bill 1 h if I ·ncipal Civil
332 Review Agenda Bill 1 h ' .. I ~ ~ffic Engineer
333 Review Agenda Bill 1 h ·~ I
ty Engine~r
334 Review Agenda Bill 1 h ' I ity Attorney
335 Review Agenda Bill 1 h I ~inanace Clerk
336 Revise Agenda Bill 2h I Consultant I 337 Type Revised Agenda Bill 0.5 h
~lerk I
338 Proof Read Agenda Bill 0.5 h ~onsuli nt
339 Correct, Copy & Distribute A B 0.5 h
~Jerk I
340 Review Agenda Bill 1 h
~rincipi' Civil
341 Prepare & Forward Agenda Bill Approval Package 1 h b;onsul[ant
342 Approve Agenda Bill 1 h rincipal Civil
343 Approve Agenda Bill 1 h I · Engineer
344 Approve Agenda Bill 1 h i
~ership Team
345 Attend Council Meeting 3h Principal Civil
346 CONTRACT AWARD APPROVED 46.5 h
11111 ~ 347 Advise lnsp Div -Contract Awarded 1 h I ~pnsultant
348 Set Contract handoff Mtg w/ Inspection 0.5 h ~ l, ... 349 Attend Contract HandoffMeeting 2h
350 CONSTRUCTION CONTRACT HANDED OFF 0d 1/13
351 CONSTRUCTION CONTRACT AWARDED 0d 1/13
352 COMPLETE CONSTRUCTION AWARD PHASE Oh 1/13
353 DESIGN & AWARD PHASE CLOSEOUT 11 h
354 Cull Files 4h l_tonsultant
355 Prep Files for Archiving 4h
ftlerk
356 PROJECT DESIGN FILES CLOSED 0d
~1/14
357 PROJECT DESIGNED & TRANSFERRED TO INSPECTION 0d 1/14
Task ~~ Summary • • Rolled Up Progress Split 11111111•1 11111111111111
Progress Rolled Up Task ~ External Tasks I Rolled Up Split ,11, .... 1,1,,,.,.,,.,,.,
Milestone ♦ Rolled Up Milestone 0 Project Summary • • GVP Consultants Page 12 of 12 Pages downtown sidewalk r(rev2) 7/1/98 1 :24 PM
Project Task Description & Budget
This is the third Project Task Description And Budget describing tasks, establishing payment
amounts to complete said tasks and establishing the time of completion for the tasks described
herein pursuant to paragraphs 1, 3 and 4 of the contract entered into by GVP Consultants,
hereinafter referred to as "Contractor" and the City of Carlsbad, hereinafter referred to as "City"
on the 4th day of November, 1997.
1. CONTRACTOR'S OBLIGATIONS
The Contractor shall provide contract management and design services in accordance with the
"Project Development Manual", 1990 edition, hereinafter PDM, as published by the City's
Engineering Department, City "Standards for Design & Construction of Public Works
Improvements in the City of Carlsbad" and the schedule and task list, hereinafter S&T, attached
as Appendix 'A' for the Interim State and Grand Sidewalk Repairs project, account number
3605, hereinafter "Project". Said services shall include the planning tasks, administrative tasks,
plan preparation, estimate preparation, specification preparation, document preparation, project
management, plan checking, scheduling, coordination and reporting tasks of the PDM, the S&T
and such other tasks that the City may assign to the Contractor that are required to complete
the documents required to issue a construction contract for said project.
3. PROGRESS AND COMPLETION
The Contractor's receipt of this Project Task Description and Budget, signed by the City
Engineer, constitutes notification to proceed to the Contractor. The Contractor shall begin work
within ten (10) working days after receipt of this fully executed document and shall complete the
work within 180 working days thereafter. Working days shall be as section 6-7.2 "Working Day"
of the Standard Specifications for Public Works Construction and shall additionally exclude
days used by public agencies, including City, in excess of the estimated processing time for
said agencies shown in the S& T.
4. FEES TO BE PAID TO THE CONTRACTOR
The budget for the Project shall be as shown in Table 1, "Project Management & Design
Services", herein. Fees shall be paid as lump sums for each task group shown in said table.
Progress payments shall be based on the percentage of completion of each task group as
approved by the City. Appendix 'A', attached, has been prepared by the Contractor and
reviewed by City and shows the intent of parties as to the elements, scope and extent of the
task groups. The Contractor acknowledges that performance of any and all tasks by the
Contractor constitutes acknowledgment by the Contractor that such tasks are those defined in
Appendix 'A'. If the need to perform task groups or individual tasks that are not shown in said
table or in Appendix 'A' is identified by the Contractor or City the additional task groups will be
performed by the Contractor only upon authorization of the City through the mechanism of a
separate Project Task Description And Budget. The elements, scope and extent of the
additional task groups and tasks and fees to be paid for performing such additional task groups
and tasks shall be established, upon the mutual agreement of City and Contractor, in said
separate Project Task Description and Budget. In the event that City directs Contractor to
curtail or eliminate all, or portions of the task groups and tasks identified in said table the lump
sum fee for each task so eliminated shall be reduced proportionately by the ratio of the number
of hours shown for each element of said task groups and task(s) so curtailed or eliminated
divided by the number of hours shown for each element of said task groups and task(s) shown
in the S& T. The maximum total cost of Contractor's services for this project task description
and budget is $14,600.00 and the maximum total of this and all Project Task Description and
Budgets that are a part of the contract entered into by the Contractor and the City is
$150,000.00. The total of the maximum cost, up to and including this project, of all projects
total cost authorized for Contractor's services for specific projects is $55,700.00.
Table '1'
PROJECT MANAGEMENT SERVICES
TASK GROUP LUMP SUM FEE -
Establish Proiect Scope
Project Manaoement (Schedulinq & Trackino)
$1,100.00
$1,700.00
Obtain Environmental Approvals Not Included
Manage Rioht-of-Wav Acquisition
Perform and Manaoe PS&E Preparation
Manage Construction Contract Award
Total
Executed by Contractor this _ _...14__,__~ __ day of ;J:cJ1
CONTRACTOR:
G v P Co t-4~ U L.-:JA:t:JJ 5
(name of Contractor) M:
By:~ -/Yk (sign here) 1 • '
GI~ ~. v~~, ~e 4~/J/1
(print nan'le/fitle)
pal corporation of the State of California
ty Engineer
Page 2 of 2 Pages Project Task Description & Budget for Project# 3605
Date of Preparation 6/29/98
Not Included
$9,600.00
$2,200.00
$14,600.00
, 1998.
City of Carlsbad Interim State and Grand Sidewalk Rehabilitation APPENDIX 'A'
ID Task Name
PROJECT INITIATED
2 START PROJECT
3 START ASSIGNMENT & ASSESSMENT
4 Assess Proj for Assignment
5 Assign Proj to Proj Mgr
6 Initiate File
7 Check Funding
8 Establish Proj File
9 Obtain Drawing No.
10 Prep Proj Folders
11 Set Up Telephone & Meeting Logs
12 PROJECT ASSIGNED & FILES SET UP
13 ESTABLISH SCOPE OF PROJECT
14 Scope Proj
15 Rev Capital Proj Description & Budget
16 Site reconnaissance
17 Photo Proj Site
18 Prep Photo Key Map on Orthotopo Sheets
19 Conceptual Plan of Proj Extent
20 Obtain Suitable Base Map
21 Prep Conceptual Plan of Proj Extent
22 Prep Proj Budget
~..-7!11"\i,Htl1o! .tFlfl,,,--1 l~"ffl l!tt'lf.~1;_
' r' -I'
Duration I 6/7
731 h
--18 h
--3.25 h
--3.25 h
--
0.5 h
--3.25 h
--2h
--1.25 h
--
0.25 h I~ Consultant
0.5 h I ~lerk
0.5 h I ~lerk
~6/8
18 h
--18 h
-1 h
-
8h
-3rhn;c;aa
Technician
12 h
--2h
-2h
-2h
Rolled Up Task
Rolled Up Milestone 0
Rolled Up Progress
Task
Progress
Milestone
Summary
♦ • • External Tasks
GVP Consultants Page 1 of 11 Pages
July I August I September I October
7/5 l7/12l7/19l7/26l 8t2 I 8/9 l8/16l8/23l8/30l 9/6 l9/13l9/20l9/27l10/4I 011 I 011
Project Summary llf
Split
Rolled Up Split
•
Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
City of Carlsbad Interim State and Grand Sidewalk Rehabilitation APPENDIX 'A'
June July I August I September I October
ID Task Name Duration 715 17/1217/1917/261 8/2 I 8/9 l8/16l8/23l8/30I 9/6 l9/13l9/20l9/27l10/4I 011 I 011
23 PROJECT SCOPE ESTABLISHED Od
24 PROJECT STARTED Oh
25 MANAGE PROJECT 696 h
26 PROJECT MANAGEMENT 696 h i l
27 SETUP PROGRAM 27.75 h
28 Task/ Resource Utilization / Duration List 7.25 h
29 Prep TUD List 7.25 h
30 Prep TUD Input List 2h
31 Input TUD List 1 h
32 Approve TUD List 1 h rincipal Cjvil,Consultant
33 PERT Analysis 3.25 h
34 Rev Precedences 2 h onsultant
35 Modify Precedence 0.5 h onsultant
36 ID Available Resources 0.5 h Principal Cjvil
11 37 Confirm Hourly Rates 0.25 h If rincipal Cl~i
38 PROJECT TRACKING SYSTEM IN PLACE Od
39 PROJECT TRACKING 696 h
40 Track Progress 696 h i j
41 Maintain Schedule Program 1 h. I
42 Data Collation o.5 h 't~nsultant
43 Data Input 0-25 h If l~rk
44 Data Output Analysis 0-25 h I P~inciJtal Civif fonsultant
GVP Consultants
Task
Progress
Milestone
Summary
~~ -' ~ 'T.t /;~:~~~~~~]1_:._':_J
♦
Rolled Up Task _
Rolled Up Milestone 0
Rolled Up Progress • • External Tasks
Page 2 of 11 Pages
Project Summary • • Split
Rolled Up Split
Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
City of Carlsbad
ID I Task Name
45
-46
-47
48
-49
50
51
-52
-53
54
-55
-56
-57
-58
-59
-60
-61
-62
63
-64
65
-66
GVP Consultants
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule Program
Data Collation
Data Input
Data Output Analysis
Maintain Schedule.Program
Data Collation
Task
Progress
Milestone
Summary
...,
Interim State and Grand Sidewalk Rehabilitation APPENDIX 'A'
-, .. , .... , •• ,:::t,~~
June I July I August I September I October
Duration 6/7 16/1416/2116/2817/5 17/1217/1917/261 8/2 I 8/9 18/1618/2318/3019/6 19/1319/2019/27110/41 0/1 I 0/1
1 h
0.5 h
0.25 h
0.25 h
1.75 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
, i
1 1
'toiiultant
~lefiAssociate Engr
I Pril)ci
'tonsullant
~lerk
I Princi
~onsulltant
~Jerk
I Princi
~-.,-... , ,,._,r-r--"~"""" -~-7"\l Rolled Up Task _
Rolled Up Milestone 0
Rolled Up Progress
Project Summary
Split
nl, Cl >o<
Rolled Up Split
~onsul!
~lerk
I Princi
I
i nt
I I Civil,Consultant
l
nt
♦ • • External Tasks
Page 3 of 11 Pages Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
City of Carlsbad Interim State and Grand Sidewalk Re habilitation APPENDIX 'A'
ID \ Task Name I 67 Data Input
-68 Data Output Analysis
69 Maintain Schedule Program
70 Data Collation
I
71 Data Input I
72 Data Output Analysis I
73 Maintain Schedule Program I
74 Data Collation I
75 Data Input I
76 Data Output Analysis
77 Maintain Schedule Program
78 Data Collation
79 Data Input
80 Data Output Analysis I
81 PROJECT TRACKED TO COMPLETION
82 START PROJECT ACCOUNT REVIEW
83 Rev Monthly Staff Charges for Appropriateness
84 Rev Monthly Staff Charges for Appropriateness
85 Rev Monthly Staff Charges for Appropriateness
86 PROJECT MANAGED
87 I ST ART DESIGN PROCESS
88 I PREPARATION OF 30% PLANS
•. 1 l ; i\ • ,.,,
♦
June July August I September I October
Duration I 6n 6/14 5121 6/28 115 1112 1119111261812 8/9 I 8116 I 8/23 I 8!30 I 9/6 I 9113 I 9!20 I 9/27 I 10/4 I 011 I 011
0.25 h
0.25 h
1.75 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
1 h
0.5 h
0.25 h
0.25 h
0d
328.3 h
0.1 h
0.1 h
0.1 h
Oh
500.25 h
179.5 h I
Rolled Up Task
Rolled Up Milestone 0
Rolled Up Progress
11
! l
♦ 8/10
Project Summary
Split
Rolled Up Split
•
~lerk, ssociate Englr i l I
II Princi I Civil,Consultant
I
1tonsuian}
~::::; I L,.coasultam
l
•
I
~onsultant
~lerk
I Princip
I
1tonsul
'tlerk
I Princip
Task
Progress
Milestone
Summary • • External Tasks
GVP Consultants Page 4 of 11 Pages Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
City of Carlsbad
ID Task Name
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
Interim State and Grand Sidewalk Rehabilitation APPENDIX 'A'
Prepare 30% Plans
Layout of 30% Design
Draft Location Sheets
Preparation of Title and Detail Sheets
Review of Drafting, Revisions
PREP OF SUB OF 30% PLANS COMPLETED
Distribute 30% Plans
Copy Drawings
Prepare Letter of Transmittal
Distribute Submittal
Sched Return of Sub by Utilities, Client/Affected/Planning D
30% PLANS DISTRIBUTED
Review 30% Plans
Compare Sub to Proj Scoping Docs
Rev & Conform City Dept Comments
Meet w/ City Depts to Rev Comments
Transcribe City Dept Comments
Prep Rev Report
Rev Comments w/ Supervisor
Rev Timeliness of Sub
COMPLETE REVIEW OF 30% PLANS
Duration
55 h
Sh
16 h
Sh
4h
0d
15 h
0.5 h
1 h
2h
0.5 h
0d
110 h
1 h
2h
1 h
0.5 h
1 h
0.5 h
0.5 h
0d
June I July I August I September I October
6n 16/1416/2116/2817/5 l7/12l7/19l7/26l 8!2 I 8/9 l8/16l8/23l8/30I 9/6 l9/13l9/20l9/27l10/4I 011 I 011
ian
!
Technician
11
l~rk,
1
CI nsultant
Cle k
I rco , L1tant
11
Civil
ff onsultant
~onsultant
tnsultant,Prlincipal Civil
Principal Civil
i
110 PREPARATION OF 90% PS&E 175.5 h ~7/13--! •
GVP Consultants
Task
Progress
Milestone
Summary
=,..,..,.,..,.,.,.,..,,~ !;l:il~,;r.:rtf:~;,;•I~,. i-•o'1 I ,ui'j ~-..:~ ..... •.:X:~ .. Lt...~~~ ~ Rolled Up Task ~~ ~ ,: ,,_I~~
Rolled Up Milestone 0
Rolled Up Progress ♦ • • External Tasks
Page 5 of 11 Pages
Project Summary 'fl
Split
Rolled Up Split
•
Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
City of Carlsbad
ID I Task Name
111
112
-113
114
115
116
117
-118
-119
-120
-121
122
123
-124
-125
126
127
-128
-129
130
-131
132
GVP Consultants
Interim State and Grand Sidewalk Rehabilitation APPENDIX 'A'
Prepare 90% Version of Plans
Field Review
Refine/revise Design
Refine Design of Details
Drafting
Review of Drafting, Revisions
COMPLETE PREP OF SUB OF 90% Plans
Prepare 90% Version of Specs. & Estimate
Review Specs for Conflicting Provisions
Prepare Estimate
Confirm Unit Prices
Confirm Quantities
Revise Spreadsheet if Necessary
SPECS & ESTIMATE PREPARED
DISTRIBUTE 90% PS&E
Copy Drawings, Specs
Assemble Packages
Prepare Letter of Transmittal
Distribute Submittal
Distribute Sub to City Depts
Distribute Sub to Utilities
90% PS&E DISTRIBUTED
r1rr.r;:"''";"""1:-nr!1"~~:r~
r:.nil.luu'A~Ab "ii,i.; ,1~U1i,~ii1,[J~i
June Ju~ August September October
Duration 6/7 16/1416/2116/2817/517/1217/1917/26 8/2 I 8/9 I 8/16 I 8/2318/30 I 9/6 I 9/13I9/20 I 9/27 I 10/4 I 011 I 011
50 h
6h
4h
2h
2h
2 h
0d
54.5 h
6h
50.5 h
0.5 h
4h
0.5 h
0d
8h
2h
2h
1 h
3h
1 h
2 h
0d
• • ~ Consultant
Technician ... !
'tons~ltant,Technician
.. 7/21
~~ltant
~onsr tant
~ons11tant
. 7/21 j
. I
't"ecridian
lt"ecrnitian
. I
Clerk,Qonsultant
I
tecr nitian
I Technician
I 7/24 i
Rolled Up Task -,, ' •.. I'." --' _ u-L• Project Summary 'fll
Split Rolled Up Milestone 0
Rolled Up Progress Rolled Up Split
• Task
Progress
Milestone
Summary
♦ • • External Tasks
Page 6 of 11 Pages Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
"
City of Carlsbad Interim State and Grand Sidewalk Rehabilitation APPENDIX 'A'
ID I Task Name
133 COMPLETE PREP OF SUB OF 90% PS&E
-134 REVIEW OF 90% PS&E
-135 Start 90% Review, PS&E
136 Receive Sub
-137 Verify Contents of Sub
-138 Sched Return of Sub by Utilities, Client/Affected/
-139 Set up Mtg w/ City Depts
-140 Rev Sub
-141 Compare Sub to Proj Scoping Docs
-142 Conformity to City Stds, Planning Req's & EIR
-143 Compare Sub to Previous Sub Check Comments
-144 Check for Utility Conflicts
-145 Rev & Conform City Dept Comments
-146 Meet w/ City Depts to Rev Comments
-147 Transcribe City Dept Comments
-148 Prep Rev Report
-149 Rev Comments w/ Supervisor
-150 Rev Timeliness of Sub
151 Transmit Rev
152 Prep Letter of Transmittal
153 COMPLETE REVIEW OF 90% PS&E
154 PREPARATION OF 100% PS&E
-',,1.-} T ,,~-_ -,--,.,-r-,~~• •\:11
t:~.j': : ;I ,' '/1 ':~ti.~;
June
Duration I 6/7 16/14\6/2116/281 7/5
Od
17 h
17 h
3.25 h
0.25 h
1 h
2h
Sh
0.5 h
2h
2h
0.5 h
2h
2h
2h
1 h
1 h
0.5 h
0.25 h
0.25 h
Od
24 h
Rolled Up Task
Rolled Up Milestone ◊
Rolled Up Progress
Task
Progress
Milestone
Summary
♦ • • External Tasks
GVP Consultants Page 7 of 11 Pages
August I September I October
8/9 18/16\8123\8/30\ 9/6 \9/13\9/20\9/27\10/41 0/1 I 0/1
~rincipal Civill
~rincipal Civil
1f onsultant
' 'onsultant
~onsultant
1tonsultant
'tonsultant
'tonsultant
'tonsultant,Plincipal Civil
~,;nc;pa1 Civil
'tonsultant
~1
Project Summary • • Split
Rolled Up Split
Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
City of Carlsbad
ID I Task Name
155
-156
-157
-158
-159
160
161
-162
-163
-164
165
166
-167
-168
-169
-170
171
-172
-173
-174
-175
-176
GVP Consultants
Interim State and Grand Sidewalk Rehabilitation APPENDIX 'A'
Prepare 100% Version of Plans
Design
Drafting
Review of Drafting, Revisions
COMPLETE PREP OF SUB OF 100% Plans
Prepare 100% Version of Specs. & Estimate
Review Specs for Conflicting Provisions
Determine Closure Date for Quotations
Update Standard Special Provisions
Prepare 100% Version of Estimate
Confirm Unit Prices
Confirm Quantities
Revise Spreadsheet if Necessary
SPECS & ESTIMATE PREPARED
DISTRIBUTE 100% PS&E
Copy Drawings, Specs
Assemble Packages
Prepare Letter of Transmittal
Distribute Submittal
Distribute Sub to City Depts
Distribute Sub to Utilities
100% PS&E DISTRIBUTED
~.i..;;111~~ tt~~:llti ::~~-:~"t:~::'.::,:,, -,.. ,.,,r ... ~
June July [ August September I October
Duration 6/7 l6/14l6/21I6/28I 715 l7/12l7/19l7/26l 8/2 I 819 l8/16l8/23l8/30l 9/6 l9/13l9/20l9/27l10/4I 011 I 011
Sh
2h
2h
4h
0d
14 h
6h
1 h
2 h
12 h
2h
4h
2h
0d
Sh
2h
2h
1 h
3h
1 h
2 h
0d
Rolled Up Task r:~. --y ~ .t:, _ _,,,:
Rolled Up Milestone 0
Rolled Up Progress
•
Project Summary
Split
Rolled Up Split
Consultant,Technician
nsultant
nsultant
onsultant
nsultant
Consultant
~13
\echnicir
~echnicitn
. ! Clerk,Consultant
I
~echnicifn
! Technici~n
8/17
Task
Progress
Milestone
Summary
♦ • • External Tasks
Page 8 of 11 Pages Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
City of Carlsbad Interim State and Grand Sidewalk Re habilitation
ID I Task Name
177 I COMPLETE PREP OF SUB OF 100% PS&E
178 START REVIEW OF 100% PS&E
179 Receive Sub
180 Verify Contents of Sub
181 Rev Sub
182 Compare Sub to Previous Sub Check Comments
183 Obtain Applicable Signatures
184 PLANS & ESTIMATE COMPLETED
185 SPECIFICATION ASSEMBLY
186 Start Specification Assembly
187 Insert Bid Docs & Special Provisions into Boiler Plate
188 Proof Read Specs
189 Correct Specs
190 Obtain & Insert Std Dwgs
191 Print Master Specs
192 SPECIFICATIONS COMPLETED
193 DESIGN PROCESS COMPLETED
194 START CONSTRUCTION CONTRACT AWARD PHASE< $25,000 Cont
195 START QUOTATION SOLICITATION PROCESS
196 Solicit Quotations
197 Identify Proposed Suppliers/Contractors
198 Contact Proposed Suppliers/Contractors
:;1 •• -'~~,r~" .. r,-;i;.
..... _ -' ' .. ~
June July
Duration I 6/7 16/1416/2116/2817/517/1217/1917/261 8/2
Od
41.25 h
7.25 h
0.25 h
4h
2h
1 h
Od
34 h
34 h
4h
18 h
9h
2h
1 h
Od
Oh
79 h
61 h
15 h
2 h
2h
Rolled Up Task
Rolled Up Milestone 0
Rolled Up Progress
Project Summary •
Split
Rolled Up Split
Task
Progress
Milestone
Summary
♦ • • External Tasks
-:.
APPENDIX 'A'
September October
9/6 I 9/13I9/20 I 9/27 I 10/4 I 011 I 011
Technician
i
~
, -Principal Civil
'tonsultant
'tonsultant
;i:
In Clerk
'technician
'Clerk
•
•
GVP Consultants Page 9 of 11 Pages Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
City of Carlsbad Interim State and Grand Sidewalk Rehabilitation APPENDIX 'A'
June July August I September October
ID Task Name Duration 16/7 16/1416/2116/2817/5 17/1217/1917/261 8/2 8/9 l8/16l8/23l8/3Dl 9/6 l9/13l9/2Dl9/27l10/4I 011 I 011
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
GVP Consultants
Confirm Interest & Availability, Arrange for Pickup of P
Facilitate Quotations
Accept Inquiries
Prepare Responses to Inquiries
Distribute Responses to Inquiries
Encourage Response to Reqest for Quotation
COMPLETE SOLICITATION OF QUOTATIONS
Analyze Quotations
Prep Spread Sheet
Confirm Contractor's License
Prep Memo Recommending Lowest Cost Contractor
Facilitate Award
Guide Contractor in Correct Bond & Contract Execution
Guide Contractor in Correct Insurance
Confirm Carlsbad Business License
Recommend Award to Lowest Responsible Bidder
Approve Award to Lowest Responsible Bidder
All Documents executed and Approved
CONTRACT SOLICITATION COMPLETED
CONTRACT HANDOFF
Advise lnsp Div -Contract Executed
Set Contract handoff Mtg w/ Inspection
~.; r.rrr.,!!!17 ,,....,..!,,.., "i?i:Wµ:rm
'....:·· ---~------'_._ '
2 h
8h
2h
2h
2h
2h
7h
5.5 h
4h
0.5 h
1 h
8.5 h
4h
2 h
0.5 h
1 h
1 h
Oh
Oh
18 h
0.5 h
0.5 h
Rolled Up Task i"' \ •• . , i r -1i:
----
Rolled Up Milestone ◊
Rolled Up Progress
Task
Progress
Milestone
Summary
♦ • • External Tasks
Page 10 of 11 Pages
Project Summary •
Split
Rolled Up Split
11 Consultant • itonsultant
l_tonsultant
~onsultant
~onsultant
~
•
i
\
Principal Civil
l Principal Civil .,. I
I City Engin~er
onsultant
I onsultant i
Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM
:.
Interim State and Grand Sidewalk Rehabi litation APPENDIX 'A'
ID Task Name
221 Conduct Contract Handoff Mtg w/ Inspection
222 CONSTRUCTION CONTRACT HANDED OFF
223 CONSTRUCTION CONTRACT AWARD PHASE COMPLETED
224 DESIGN & AWARD PHASE CLOSEOUT
225 Cull Files
226 Prep Files for Archiving
227 DESIGN FILES CLOSED, PROJECT TRANSFERRED TO INSPECTION
228 Start Construction Support Phase
229 Attend Pre-Construction Conference
230 Assist with Requests for Information
231 I CONSTRUCTION COMPLETED
•• -.. ~· -~--' ..,.. ~-, ... ~ Tt''" -~
.. . ' ' ~" ~-'
June I July I August September October
Duration 61716/1416/2116/281715 17/1217/1917/261 8/2 I 819 l8!16l8/23l8/30I 9/6 l9/13l9/20l9/27l10/4I 011 I 011
1.5 h
Od
Oh
3h
2h
1 h
Od
171.75 h
1.5 h
4h
Oh
Rolled Up Task
Rolled Up Milestone 0
Rolled Up Progress
Project Summary •
Split
Rolled Up Split
•
I Consultant
Consultant
i Technician
9/17 l
\,
♦1
Task
Progress
Milestone
Summary
♦ • • External Tasks
GVP Consultants Page 11 of 11 Pages Downtown Sidewalk R&R, Interim Project (2) 6/29/98 3:27 PM