Loading...
HomeMy WebLinkAboutPS 2019-0007; MADISON STREET APARTMENTS; FINAL COMPACTION 2; 2022-08-23 August 23, 2022 CTE Job No. 10-16609T Prophet Solutions Attention: Mark Nolting 814 S El Camino Real San Clemente, California 92672 Telephone: (760) 330-3242 Via Email: mnolting44@gmail.com CC: George Stoutenburg, george@prophetsolutionsinc.com Subject: Final Certification of Compaction Proposed Madison Apartments 3130 Madison Street, Carlsbad, California Mr. Nolting: As requested, Construction Testing & Engineering, Inc. (CTE) has performed observation and testing of compacted fill materials during recent construction. This letter is provided as certification that the recent fill or backfill placement has been conducted in substantial conformance with current industry standards and the applicable plans (City of Carlsbad Project No. PD 2019-0007, Drawing No. 516-5A). Field-testing of the compacted trench fill material was conducted as scheduled by the contractor between December 29, 2021 and May 11, 2022. Testing was performed in general accordance with ASTM D-6938 (nuclear method). Results of the field-testing indicate that fill materials in the subject areas were compacted to a minimum of 90 and 95 percent (depending on location and requirements) of the laboratory maximum dry density as determined by test method ASTM D-1557. Tabulated results of the field compaction testing performed are provided in the attached Table I, “Compaction Test Summary”. The laboratory maximum density results are provided in Table II, “Laboratory Test Results.” The attached Figure 1 provides approximate compaction test locations. This letter is subject to the same limitations as the other project geotechnical documents. The opportunity to be of service is appreciated. If you have any questions, please do not hesitate to contact this office. Respectfully submitted, CONSTRUCTION TESTING & ENGINEERING, INC. Rodney J. Jones, GE #3205 Senior Engineer MB/RJJ:ach A Universal Engineering Construction Testing & Engineering, Inc. Sciences Company Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying 1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net TABLE I COMPACTION TEST SUMMARY Job Name: Madison Apartments Job No. 10-16609T Job Address: 3130 Madison Street, Carlsbad, California Date: 6/28/2022 Date Test Location Elevation Density Moisture Relative Soil No. or Depth pcf Content Compaction Type Feet % Dry % Weight 12/29/2021 1 Middle of Garage Subgrade 50.0 118.3 4.5 90% 1 3/24/2022 2 E Side of Street, N of Apt Garage Entrance 47.0 121.2 10.1 96% 2 3/24/2022 3 W Side of Street, Slightly S of Garage Entrance 47.0 122.4 10.5 97% 2 5/11/2022 4 E Side of Road, N of Garage Entrance From Street Base 48.0 109.2 15.3 96% 3 5/11/2022 5 E Side of Road, NW of Garage Entrance From Street Base 48.0 110.3 14.2 97% 3 5/11/2022 6 W Side of Road, SW of Garage Entrance From Street Base 48.0 109.8 14.6 96% 3 5/11/2022 7 E Side of Road, N of Garage Entrance From Street Base, AC 48.5 145.2 - 96% 4 5/11/2022 8 E Side of Road, NW of Garage Entrance From Street Base, AC 48.5 144.8 - 96% 4 5/11/2022 9 W Side of Road, SW of Garage Entrance From Street Base, AC 48.5 144.5 - 96% 4 ** TEST FAILED, SEE RETEST 1 TABLE II LABORATORY TEST DATA Job Name: Madison Apartments Job No. 10-16609T Job Address: 3130 Madison Street, Carlsbad, California Date 6/28/2022 Maximum Optimum Sample No.Dry Density Moisture Soil pcf Content Description %wt 1 131.3 8.9 2 125.8 9.2 3 113.8 15.4 4 151.0 - Moderate Brown (Class II Base) Asphalt Concrete Dark Brown (SM) Moderate Brown SM 2