Loading...
HomeMy WebLinkAbout2071 LEE CT; ; CBR2021-1113; PermitBuilding Permit Finaled Residential Permit Print Date: 09/19/2022 Job Address: 2071 LEE CT, CARLSBAD, CA 92008-2765 Permit Type: BLDG-Residential Work Class: Pool Parcel#: 2053303500 Track#: Valuation: $22,265.75 Lot#: Occupancy Group: Project#: #of Dwelling Units: Plan#: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check#: Occupant Load: Plan Check#: Code Edition: Sprinkled: Project Title: Description: KING: 425 SF POOL & SPA// GAS FOR FIRE PIT Applicant: Property Owner: CARRIE JONES 5431 AVENI DA ENCINAS, # B CARLSBAD, CA 92008-4411 (619) 343-5908 CO-OWNERS KING CHARLES AND LEINAIA 2071 LEE CT FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) CARLSBAD, CA 92008 ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL SB1473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1-Medium BLDG SWPPP PLAN REVIEW FEE TIER 1-MEDIUM Total Fees: $786.35 Total Payments To Date: $786.35 (city of Carlsbad Permit No: CBR2021-1113 Status: Closed -Finaled Applied: 04/19/2021 Issued: 05/25/2021 Finaled Close Out: 07/22/2022 Final Inspection: 07/22/2022 INSPECTOR: Alvarado, Tony Contractor: LOS CABOS POOLS INC PO BOX 189 VISTA, CA 92085-0189 (760) 908-3443 Balance Due: AMOUNT $230.27 $161.19 $41.00 $49.00 $1.00 $2.89 $246.00 $55.00 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov ,,. (cicyof Carlsbad RESIDENTIAL BUILDING PERMIT APPLICATION B-1 Job Address (jl)') \ le B:: 6)-.,/ :t: Plan Check Est. Value PC Deposit Date CT/Project #: _________________ ,Lot #: ____ Year Built: ________ _ Fire Sprinklers: QvEsQ NO Air Conditioning:Q YES Q NO Electrical Panel Upgrade:QYESQ NO BRIEF DESCRIPTION OF WORK: ~qi~ 5('A 0 Addition/New: _____ Living SF, ____ Deck SF, ____ Patio SF, ____ G.arage SF __ _ Is this to create an Accessory Dwelling Unit? Ov ON New Fireplace? OY ON, if yes how many? __ 0Remodel: ______ .SF of affected area Is the area a conversion or change of use? Ov ON ~ Pool/Spa: 4 0 l SF Additional Gas or Electrical Features? _1-_,_r<, _ _.._p_l_~ _______ _ osolar: ___ .KW, ___ .Modules, Mounted:ORoof OGround, Tilt: 0 vO N, RMA: Ov ON, Battery:OY ON, Panel Upgrade: Ov ON D Reroof: --------------------------------□ Plumbing/Mechanical/Electrical D Only: Other: This permit Is to be Issued in the name of the Property owner as Owner-Builder, licensed contractor or Authorized Agent of the owner or contractor. The person listed as the Applicant below will be the main point of contact throughout the permit process. PROPERTY OWNER APPLICANT O PROPERTY OWNERS AUTHORIZED AGENT Name: C\.c,,,e, ~'l\t Name: Co.rne.,:J4'.'&:\ Address: (zO) \ Lee cw t-Address: 5 I B 3 M ' I.;. I""' ce..-.ter f. A City: C,-,r\.slo-cl,, State: C/l Zip: 9oa,€;, City: -SD State: cA Zip: 'i"olv~ Phone: l.?L0 -3't 3·"54 08 Phone: ,, I~ -3 '-'"3 -s---,oe Email: _______________ ,Email: Cc r ( I C)0 <""':)Ii!~ fM;. L( · COlv'\ APPLICANT~ DESIGN PROFESSIONAL APPLICANT O CONTRACTpR OF RECORD D _ APPLICANT 0 Name: ______________ Name: (.,t,J ~/()ru TC>J,ll .J")r - Address: Address· fD e;/)1(. (fY! City: _______ ,State: __ ,Zip: ____ City: V,ifc. State:cA Zip: lj~f Phone: Phone: ) bu -qoE -'3\l'{] Email: Email: J_ Architect State License: State License/class: fzfi"3E:',bS]&t;'3 Bus. License: ___ _ 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: 8ullding@car1sbadca.gov REV. 08/20 r:NTIFY WHO WILL PERFORM THE WORK BY COMPLETING (OPTION A) OR (OPTION B) BELOW: (OPTION A): LICENSED CONTRACTOR DECLARATION: I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the following declarations: DI have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. Policy No. ________________________________________ ~ D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage Is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000.00, In addition the to the cost of compensation, damages as provided for In Section 3706 of the Labor Code, interest and attorney's fees. CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: ______________________ ,Lender's Address:---------------~-----~ CONTRACTOR PRINT:__,,C'-'0_1_r....::,t:....C'..;;;~_..;·::.1 __ s1GN: 0/"\... --DATE: Y/·2)0"1 (OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractor's License Law for the following reason: O I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). DI, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License law). 0 I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason: O"Owner Builder acknowledgement and verification form" has been filled out, signed and attached to this application. 0 Owners "Authorized Agent Form" has been filled out, signed and attached to this application giving the agent authority to obtain the permit on the owner's behalf. By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed contractors. / understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is submitted or at the following Web site: http://www.leginfo.ca.gov/colow.html. OWNER PRINT: SIGN: _________ DATE: _____ _ APPLICANT CERTIFICATION: SIGNATURE REQUIRED AT THE TIME OF SUBMITTAL By my signature below, I certify that: I am the property owner or State of California Licensed Contractor or authorized to act on the property owner or contractor's behalf I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARl5BAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height. APPLICANT PRINT: __.C_.c-=:;..a.-._r""ie'--;-};;_~_.;;.';:;_ __ s1GN: 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov 2 REV. 08120 . PERMIT INSPECTION-HIS. ORY for (CBR2021-1113) 8 - Permit Type: BLDG-Residential Work Class: Pool Status: Scheduled Date Closed -Finaled Actual Inspection Type Start Date Checklist Item Application Date: 04/19/2021 Issue Date: 05/25/2021 Expiration Date: 08/22/2022 IVR Number: 32859 Owner: CO-OWNERS KING CHARLES AND LEINAIA Subdivision: CARLSBAD TCT#85-36 Address: 2071 LEE CT CARLSBAD. CA 92008-2765 Inspection No. Inspection Primary Inspector Reinspection Inspection Status COMMENTS Passed BLDG-Building Deficiency September 24, 2021: (pass). Yes 02/22/2022 02/22/2022 BLDG-55 Fence/Preplaster 07/22/2022 07/22/2022 BLDG-Final Inspection Checklist Item BLDG-Plumbing Final BLOG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final Monday, September 19, 2022 1. No equipotential bond copper wire Deficiencies. 2. New copper equipotential swimming pool and spa bond wire connected at four points perimeter of swimming pool and spa areas-approved. 177015-2022 Passed Tony Alvarado 187 494-2022 Passed Tony Alvarado COMMENTS Passed Yes Yes Yes Yes Complete Complete Page 4 of 4 C PERMIT INSPECTION HISTORY for (CBR2021-1113) Permit Type: BLDG-Residential Work Class: Pool Status: Scheduled Date Closed -Finaled Actual Inspection Type Start Date Checklist Item Application Date: 04/19/2021 Issue Date: 05/25/2021 Expiration Date: 08/22/2022 IVR Number: Inspection No. COMMENTS 32859 Inspection Status Owner: CO-OWNERS KING CHARLES AND LEINAIA Subdivision: CARLSBAD TCT#85-36 Address: 2071 LEE CT CARLSBAD, CA 92008-2765 Primary Inspector Reinspection Inspection Passed BLDG-Building Deficiency June 28, 2021: Yes BLDG-53 Elec/Conduit/Wiring(Po ols) Checklist Item 1. No Building/lnground swimming pool with spa-Deficiencies. 2. In ground swimming pool/spa plumbing piping, under water leak pressure test-approved. 3. Swimming pool and spa steel reinforcement rebar, scope of work, per Stapleton pool engineering, approved engineered swimming pool/spa -approved. 4. Equipotential pool bond ground wire located at 4-points located at pool perimeter -partial pass. 5. New gas plumbing line, with tracer wire, under gas leak air pressure test with test gauge, scope of gas line work-approved. 6. New electrical conduit type.size, depth, for inground pool/spa, scope of work-approved. 160623-2021 Passed Tony Alvarado COMMENTS BLDG-Building Deficiency June 28, 2021: 09/24/2021 09/24/2021 BLDG-54-Equipotential Bond(Pools) Monday, September 19, 2022 1. No Building/Jnground swimming pool with spa-Deficiencies. 2. In ground swimming pool/spa plumbing piping, underwater leak pressure test-approved. 3. Swimming pool and spa steel reinforcement rebar, scope of work, per Stapleton pool engineering, approved engineered swimming pool/spa -approved. 4. Equipotential pool bond ground wire located at 4-points located at pool perimeter -partial pass. 5. New gas plumbing line, with tracer wire, under gas leak air pressure test with test gauge, scope of gas line work-approved. 6. New electrical conduit type,size, depth, for inground pool/spa, scope of work-approved. 167156-2021 Passed Tony Alvarado Complete Passed Yes Complete Page 3 of 4 { t ,,," PEIMIT 1NSPECT::IPN HISTORY for (CBR2021-1113) Permit Type: BLDG-Residential Application Date: 04/19/2021 Owner: CO-OWNERS KING CHARLES AND LEINAIA Work Class: Pool Status: Closed -Finaled Issue Date: 05/25/2021 Expiration Date: 08/22/2022 IVR Number: 32859 Subdivision: CARLSBAD TCT#85-36 Address: 2071 LEE CT CARLSBAD, CA 92008-2765 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection Checklist Item BLDG-Building Deficiency COMMENTS June 28, 2021: 1. No Building/lnground swimming pool with spa-Deficiencies. 2. In ground swimming pool/spa plumbing piping, under water leak pressure test-approved. 3. Swimming pool and spa steel reinforcement rebar, scope of work, per Stapleton pool engineering, approved engineered swimming pool/spa -approved. 4. Equipotential pool bond ground wire located at 4-points located at pool perimeter-partial pass. 5. New gas plumbing line, with tracer wire, under gas leak air pressure test with test gauge, scope of gas line work-approved. 6. New electrical conduit type.size, depth, for inground pool/spa, scope of work-approved. BLDG-51 Excav/Steel(Pools) 160622-2021 Passed Tony Alvarado Checklist Item BLDG-Building Deficiency COMMENTS June 28, 2021: 1. No Building/lnground swimming pool with spa-Deficiencies. 2. In ground swimming pool/spa plumbing piping, under water leak pressure test-approved. 3. Swimming pool and spa steel reinforcement rebar, scope of work, per Stapleton pool engineering, approved engineered swimming pool/spa -approved. 4. Equipotential pool bond ground wire located at 4-points located at pool perimeter -partial pass. 5. New gas plumbing line, with tracer wire, under gas leak air pressure test with test gauge, scope of gas line work-approved. 6. New electrical conduit type,size, depth, for inground pool/spa, scope of work-approved. BLDG-52 Pool Plumbing 160624-2021 Passed Tony Alvarado Monday, September 19, 2022 Passed Yes Complete Passed Yes Complete Page 2 of4 Building Permit Inspection History Finaled ( City of Carlsbad PERMIT INSPECTION HISTORY for (CBR2021-1113) Permit Type: BLDG-Residential Work Class: Pool Status: Scheduled Date 06/02/2021 Closed -Finaled Actual Inspection Type Start Date 06/02/2021 BLDG-SW-Pre-Con Checklist Item Application Date: 04/19/2021 Issue Date: 05/25/2021 Expiration Date: 08/22/2022 IVR Number: Inspection No. 158706-2021 COMMENTS 32859 Inspection Status Cancelled Owner: CO-OWNERS KING CHARLES AND LEINAIA Subdivision: CARLSBAD TCT#85-36 Address: 2071 LEE CT CARLSBAD, CA 92008-2765 Primary Inspector Tony Alvarado Reinspection Inspection Reinspection Incomplete Passed BLDG-Building Deficiency No Checklist Item BLDG-Building Deficiency COMMENTS June 2, 2021: (virtual Inspection). DryroVtermite wood damage to existing stairwell-structural beams-(typical). No building deficiencies. 1. Inform contractor Rep., (Charles), regarding the following: 2. Temporary toilet facilities require pan under toilet Temporary toilet factlities require pan under toilet I need to be located outside public right-of-way and on owners property. 3. Dirt spoils/stockpiling, requires be covered and protected, dust and runoff containment, with straw waddle or gravel/sandbags. 4. Contain all soil erosion and sediment erosion on property, keep any soil or debris away from storm water inlet, adjacent property owners, and public-right-of-way sidewalk areas (typical). 5. Final as-built plan revisions need to be approved prior to final inspection, for historical purposes and city records management maintaining latest and greatest current plans on file. 6. Security perimeter fencing and gates installed at all times during the construction process till final clearances and sign offs from all agencies/depts. 7. Hours of construction observed., 8. Federal holidays observed and no construction work allowed. 9. Additional preconstruction requirements may follow. 06/28/2021 06/28/2021 BLDG-23 160811-2021 Passed Tony Alvarado Gas/TesURepairs Monday, September 19, 2022 Passed Yes Complete Page 1 of 4 " fORM WATER POLLUTION PREVENTION NOTES ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN IS EMINENT. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY INSPECTOR AFTER EACH RUN-OFF PRODUCING RAINFALL. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT ( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGATE. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEDED TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY REGULATIONS. OWNER'S CERTIFICATE: I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTILrThlE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY nrE 1!1~ OF CA~AD. . "----Qvf I ,-e_ )D;l-e -· -------OWNER(S)/OWNER'S BGENT-NAME (PRINT to'1"10 SIGNATIJRt DATE E-29 s~roRM WATER. C.OMPLIANCE FORM TIER 1 CONST.RUCTION SWPPP ----··-'"" .. ·------· t :i:Jfz ?~-~ ' ,\ ' ,.......,, i ;\ ) BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE Erosion Control Sediment Control BMPs Tracking Non-storm Water Waste Management and Materials BMPs i Control BMPs Management BMPs Pollution Control BMPs ' ' C: .,_, C: C: :8 .,_, :8 :8 C: C: "O cn 0 " "O Q) "O "' C: u u C: ,5 "' E C: E c:: .,_, 0 2 ::, .2 ·c 0 0 E .,_, L "O .Q. Q) 0 Q) Q) .,_, L :,; "O "' "' L .., -C: s;::_ ::, c en -C: Q) L .5 " C: "' "' "' !a 'C CT 0 C: "' en c,_ Q) -~ ~ Co ·c -C: "' C: L C!l L w C: :8 0 Best Management Practice* .5 e co a. " u, ;,, "' L 0 Q) 0 " -" C .!B~ ;.: .,_, .,:: .5 I-E "' 0 .5 UL u "' ~ "O "iii "' ::. ! C: (BMP) Description ➔ "' u ., (/) u, en "' "' co C C: en § u, "O ., C: Cl u, "' " e "' 0 C ;,, C ~~ C C :::, "' Q) :5 ~<I,) 0 .., '5 LO "O >, C en Q) cE ::, E :;5 C: Cl 0) en·-en Cl +i '=·~ Co X :::. Cl c,, Cl C " a< ..,E 0 ~~ l!lo O):;:; Q) ~.5 0 Q) 0 "5. L-"'Q) 0 II) .!!l 0 ~ ~ .,,_ ] .0 E ~ =;,, :0 ·cg ":i"i :::: _g "' -e "' "O .C C " 0 L " ::, "O :.0 ~ ·-"O ~ t, cC oc i3 "O 0 cc a. "' :, L+' .0 0 •-L C •-C Q) L 0 0 t·o 0 .,_, Q) Q) e LO § 00 0 "' .s 0 o" e; ~ 15 .c Q) .,_, 0 ..., ti = C: ~§ N C: " ~ QL = Q) .c .0 ..,c +' L UJ C :;:: ct ~u o.,_, 0 c,_O cc C!l WCl in. (/) en u ti: C!l en> en (/) 0.. en a< 0.0 0. :,; en ::. (/) u VJ~ :c ::. d CASQA Designation ➔ ,... co a, .... 00 0 N t') ,... 00 N ,.,., .... "' <D ~ ..., It) <D ,... 'T ~ 'T 'T I <', I ,, I I I I I I J, I I I I I I I I I I u u 0 w w w w w w w ~ ~ en en en en :,; :,; ;:,, ~ :::. ~ .,,--Construction Activity w w w w: en U) en U) en en en en z :z z z .. .. .. ;.: / Grndina /Soil Disturbance i '/.-I V ' -Trench inn /Excavation I 1--l, ,, --5'tackPilina . T . .. Drillina /Borina ' " , Concrete/Asphalt SawcuttinQ ! · 'Concrete Flatwork , Pavinq ' ' Conduit/Pipe Installation ' ,Stucco/Mortar Work ' "" Waste Disposal ' v ' Staainn /Lav Down Areo I Eauloment Maintenance and Fuelinn I Hazardous Substance Use/Storaae ' Dewaterina ' Site Access Across Dirt ! Other (list l: Instructions: . 1. Check the box to the left of all applicable construction activity (first column) expected to occur during construction. I 2. Located along the top of the BMP Table is a list of BMP's with it's corresponding California Stormwater Quality Association (CASQA) designation number. Choose one or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column. 3. Refer to the CASQA construction handbook for intorjnation and details of the chosen BMPs and how to apply them to the project. PROJECT INFORMATION Site Address: d071 l,e(, Co..Jrt Assessor's Parcel Number: 00$", 33 v ·· 3\ •CN Emergency Contact: Name: Nc,r I~ e \ 24 Hour Phone, 76u, °JO[ ,, J'. .. c,{3 Construction Threat to Storm Water Quality (Check Box) ~EDIUM O LOW. Q) -"' c-3' C: "' "'E .., Q) f: o> uo CC: oo u:,; - ro I :::. :;:: )( . ,, Page 1 pf 1 REV 11/