NV 5
CUP 2020-0003 / CDP 2020-0021
Hydrology and
Hydraulic Study
For
Recycled Water
Phase Ill -D4
Storage Reservoir
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
Table of Contents
SECTION 1 PROJECT DESCRIPTION AND SCOPE ........................................................................ 2
1.1. PROJECT DATA .............................................................................................................................. 2
1.2. SCOPE OF REPORT .......................................................................................................................... 2
1.3. PROJECT SITE INFORMATION ......................................................................................................... 3
SECTION 2 STUDY OBJECTIVES ...................................................................................................... 7
SECTION 3 METHODOLOGY ............................................................................................................ 8
3.1. HYDROLOGY .................................................................................................................................. 8
3.2. HYDRAULICS ................................................................................................................................. 8
SECTION 4 RESULTS ........................................................................................................................ 10
4.1. HYDROLOGIC RESULTS ................................................................................................................ 10
4.2. HYDRAULIC RESULTS .................................................................................................................. 11
SECTION 5 CONCLUSIONS .............................................................................................................. 13
SECTION 6 CERTIFICATION ........................................................................................................... 14
SECTION 7 REFERENCES ................................................................................................................ 15
List of Figures
FIGURE 1: VICINITY MAP ................................................................................................................................ 3
FIGURE 2: FEMA FIRMETTE ........................................................................................................................... 5
List of Tables
TABLE 1 – EXISTING CONDITION ................................................................................................................... 10
TABLE 2 – PROPOSED CONDITION (UNMITIGATED) ................................................................................... 10
TABLE 3– COMPARISON OF EXISTING TO PROPOSED FLOWS (UNMITIGATED) ........................................ 11
TABLE 4 – COMPARISON OF EXISTING TO PROPOSED FLOWS (MITIGATED) ............................................ 11
TABLE 5 – HYDRAULIC SUMMARY ................................................................................................................ 12
TABLE 6 – EXISTING ROCK LINED CHANNEL ................................................................................................ 12
List of Appendixes
Appendix A – Rainfall Isopluvials
Appendix B – FEMA Flood Plain Maps
Appendix C – Existing Condition Hydrologic Work Map & Calculations
Appendix D – Proposed Condition Hydrologic Work Map & Calculations
Appendix E – Hydraulic Calculations
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
2
Section 1 Project Description and Scope
1.1. Project Data
Project Owner: Carlsbad Municipal Water District
5950 El Camino Real
Carlsbad, CA 92008
Project Site Address: D Tank Site, Black Rail Road
Planning Area/
Community Area/
Development Name: Carlsbad
APN Number(s): 251-081-16, 251-081-15
Project Location: Latitude: 33.111992°
Longitude: -117.286452°
Project Site Area: 2.74 Acres
Adjacent Streets:
North: Poinsettia Lane
South: New Crest Court
East: Fisherman Drive
West: Black Rail Road
Adjacent Land Uses:
North: Residential/Religious
South: Residential
East: Residential
West: Residential
1.2. Scope of Report
This report addresses the Hydrologic and Hydraulic aspects of the project. This
report does not discuss required water quality measures to be implemented on a
permanent basis, nor does it address construction storm water issues. Post
construction storm water issue discussions can be found under separate cover in
the project “Storm Water Quality Management Plan.”
In addition, because this project proposes to disturb less than one acre, a Storm
Water Pollution Prevention Plan for construction is not required.
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
3
The purpose of this study is to analyze existing and proposed peak flows during
the 100-year storm event, and verify that the 100-year peak flow in the proposed
condition does not exceed the 100-year peak flow in the existing condition.
Flows from 0.1 of the two year, to the 25-year storm are addressed in the
Hydromodification section of the Storm Water Quality Management Plan
(SWQMP).
1.3. Project Site Information
1.3.1 Project Location
The project area is located about 1.5 miles east of Interstate 5, and 2
miles east of the beautiful Pacific Ocean. Please refer to Figure 1 below
for a Vicinity Map. The project is located on the City of Carlsbad ‘D’ Tank
Site, which is located on Black Rail Road, north of New Crest Road, and
south of Poinsettia Lane, at the extension of Triton Street.
Figure 1: Vicinity Map
CITY OF OCEANSIDE
PACIFIC
OCEAN
78
VICINITY MAP
NOT TO SCALE
PROJECT
LOCATION
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
4
1.3.2 Project Description
This project proposes the installation of a 1.5 MG recycled water
welded steel reservoir tank. In addition, the project proposes an
access roadway along the circumference of the tank, and a
driveway to access to the tank from the current site.
1.3.3 Site Topography
The project site sits adjacent to the existing ‘D’ Site, and is a
relatively flat site with slopes wrapping around the site from the
northeast to the southwest, about 180 degrees of the site, with the
other half being relatively flat.
The project proposes to raise the tank from the existing grade
about 10 feet, with a slope around most of the tank, outside of the
ring road.
1.3.4 Land Use and Vegetation
The existing land use at the project site consists of sparse non-native
vegetation of the pad, and moderate non-native vegetation around the
perimeter of the site.
1.3.5 FEMA Information
The Federal Emergency Management Agency (FEMA) has mapped this
area of Carlsbad. The project does not lie within any mapped floodplain
(FIRM Panel FM06073C1035G). The project lies within Zone X
(Unshaded) which is of minimal flood hazard, which are the areas outside
the SFHA and higher than the elevation of the 0.2-percent-annual-chance
flood.
a) Flood Zone Definitions
Zone A -- Areas subject to inundation by the 1-percent-annual-chance
flood event generally determined using approximate methodologies.
Because detailed hydraulic analyses have not been performed, no Base
Flood Elevations (BFEs) or flood depths are shown. Mandatory flood
insurance purchase requirements and floodplain management standards
apply.
Zone AE -- Areas subject to inundation by the 1-percent-annual-chance
flood event determined by detailed methods. Base Flood Elevations
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
5
(BFEs) are shown. Mandatory flood insurance purchase requirements
and floodplain management standards apply.
Zone X (Shaded) – Areas between the limits of the base flood and the 0.2-
percent-annual-chance (or 500-year) flood.
Zone X (Unshaded) Areas of minimal flood hazard, which are the areas
outside the SFHA and higher than the elevation of the 0.2-percent-
annual-chance flood
Figure 2: FEMA Firmette
1.3.6 Existing Drainage Improvements
The existing tank pad is graded to sheet flow to the perimeter.
There are no existing underground storm drains on site. All
drainage is through on site gutters and swales. The ultimate
discharge location is to the north of the tank site, through a
concrete channel, heading to the east.
National Flood Hazard Layer FIRMette
250 500 1,000 1,500
Legend
SPECIAL FLOOD
HAZARD AREAS
~~o~.'l!';: Flood Elevation (BFE)
With BFEor DepthZol>fAE,AO,,f.H, V£,AR
RegulatoryFloodway
0.2% Annual Chance Flood Hazard. Areas oll'l.annualchancetloodwlthaverage
depthlessthanonefootorwlthdralnage areasollessthanon.esquaremllez.,,,.x
FutureCOndltlons1%Annual
ChanceFloodHazardzo,,.x
AfeawlthReducedFloodRlskdueto
OTHER AREAS OF Levee. See Notes. zo,.. II
FLOOD HAZARD r',. ~ AreawlthF1oodRlskduetoleveezo,,.,D
~AreaofMlnlmalFloodHazard zonex
c:::::::J EffecUveLOMRs
OTHER AREAS Area of Undetemilned Flood Hazard z.,,.. o
GENERAL - - - • Channel, Culvert. or Storm Sewer
STRUCTURES 11 I I I I I Levee. Dike, Of Floodwall
c,~, Se<<loo, wl<h 1%Aa,~I Chaoc,
Water Surface Elevation
coastal Transect
-BasefloodElevatlonllne(BFE)
=umitofStudy
--JurlsdletlonBoundary
-CoastalTranse<:tBaseHne
OTHER -ProflleBasellne
FEATURES __ Hydrographle Feature
N
MAP PANELS I
DlgltalDataAvallable
NoDlgltalDataAva!lable
Unmapped +
Theplndisplayedonthemaplsanapproxlmate
polntseleetedbytheuseranddoesnotrepresent anauthoritativepropertyloeatlon.
This map eomplles with FEM A's standards lo, the use of
dlgitalltoodmapsifitisnotvoldasdeseribedbelow.
The basemap shown eomptles with FEMA's basemap aeeu,aeystandards
Thefloodhazardlnformat!onisderlveddlrec:tlyfromthe authoritative NFHL web servlees provided by FEMA. This map
was exported on 7/3/2019 at 12:45:21 PM and does not
refleetehangesoramendmentssubsequenttothlsdateand tlme.TheNFHLandeffeetlwt!nformatlonmayehangeor
beoomesupersecledbynewdataovertlme.
This map Image Is void If the one or more of the following map
elementsdonotappear.basemaplmagery.ltoodzonelabels,
legend,scalebar,mapereallondate,eommunityldentiflers,
FIRM panel number. and FIRM effeetlve date. Map images for
unmappedandunmodemizedareascannotbeusedfor
regulatory purposes.
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
6
1.3.7 Proposed Improvements
This project proposes the installation of a 1.5 MG tank, access road, and
access driveway. Drainage improvements include the addition of a
biofiltration basin at the north end of the tank site, and vegetated swales
along the perimeter to drain the biofiltration basin. In addition, a 6”
storm drain pipe flows to the north, connected to the sub drain pipe and
overflow riser within the biofiltration basin. All drainage from the site
drains to the biofiltration basin.
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
7
Section 2 Study Objectives
The specific objectives of this study are as follows:
· To provide hydrologic analysis of the project site for the 100-year, 6-hour
storm event under existing and proposed conditions,
· To provide a hydraulic analysis of the project to ensure that the correct
sizes of pipes and inlets have been chosen,
· And to ensure that no additional runoff or downstream impacts occur
due to this project.
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
8
Section 3 Methodology
3.1. Hydrology
Hydrologic analysis has been completed using the Rational Method (Q = CIA).
Whereas,
Q = rate of flow in cubic feet per second
C = Coefficient of runoff,
I = intensity of rainfall based on the time of concentration and the 6-hour,
100-year precipitation
A=Area of the basin.
For this project, a composite coefficient of runoff was used. Data was entered
into an Excel Spreadsheet which calculates the runoff based on the County of San
Diego methodology electronically, therefore reducing errors.
The following software packages were used in the analysis of the project:
· Microsoft Excel (Rational Method Hydrology)
· AutoCAD Civil 3D Hydraflow Hydragraph Extension 2018 (Storm Routing)
· RatHydro (Rational Method Hydragraphs)
· Flowmaster (Hydraulic Analysis for Open Channels and Pipes for Storm
Routing)
3.2. Hydraulics
Proposed improvements include new grated storm drain inlets in paved areas,
and a new underground storm drain system. Private underground storm drain
will consist of PVC or HDPE pipe with watertight joints. Public storm drain, if
applicable, will consist of reinforced concrete pipe, with a minimum strength of
2000-D.
Capacity calculations for the inlets have been performed using the standard weir
and orifice equations. Grate perimeter and open area values have been reduced
to account for the bars, and an additional 50-percent to account for potential
clogging.
Runoff will ultimately be discharged from the project site at the same location as
the existing condition, to the existing cleanout at the southwest corner of the
project site.
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
9
Proposed improvements will not increase the total peak flow runoff, as compared
to existing conditions, through the removal of pavement and installation of
vegetation.
Manning’s equation was used to calculate the depth of flow being conveyed
through proposed pipes and for existing pipes which experience additional flows
as a result of the proposed improvements. Proposed pipes with diameters of
less than 12 inches were not individually calculated for depth and velocity,
however, the capacity was verified against tables showing the maximum flow in
the smaller pipes.
The following software packages were used in the analysis of the project:
· Hydraflow Hydragraph Extension for AutoCAD Civil 3D 2018 (Storm
Routing)
· RatHydro (Rational Method Hydrographs)
· Bentley Flowmaster (Hydraulic Analysis for Open Channels and Pipes for
Storm Routing)
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
10
Section 4 Results
4.1. Hydrologic Results
The following tables summarize the hydrologic analysis of the project.
· Table 1 – Existing Condition, summarizes the existing hydrologic
properties of the site.
· Table 2 – Proposed Condition (Unmitigated), summarizes the proposed
condition hydrology of the site in the unmitigated condition.
· Table 3 – Comparison of Existing to Proposed Flows (Unmitigated),
compares existing flows to the proposed flows (Unmitigated).
· Table 4 – Comparison of Existing to Proposed Flows (Mitigated),
compares existing flows to the proposed flows (mitigated).
Table 1 – Existing Condition
Sub
Basin
ID
Storm
Event
Runoff
Coefficient
Basin
Intensity
Basin
Area
(acres)
Runoff
(cfs)
A 100 0.25 2.86 0.758 0.543
A 50 0.25 2.55 0.758 0.482
A 25 0.25 2.21 0.758 0.418
Table 2 – Proposed Condition (Unmitigated)
Sub
Basin
ID
Storm
Event
Runoff
Coefficient
Basin
Intensity
Basin
Area
(acres)
Runoff
(cfs)
A 100 0.50 3.43 0.758 1.299
A 50 0.50 3.05 0.758 1.155
A 25 0.50 2.64 0.758 1.001
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
11
Table 3– Comparison of Existing to Proposed Flows (Unmitigated)
Sub
Basin
ID
Storm Event
Existing
Condition
Runoff (cfs)
Unmitigated
Proposed
Condition
Runoff (cfs)
Difference
(cfs)
A 100 0.543 1.299 0.756
A 50 0.482 1.155 0.673
A 25 0.418 1.001 0.583
Table 4 – Comparison of Existing to Proposed Flows (Mitigated)
Sub
Basin
ID
Storm Event
Existing
Condition
Runoff (cfs)
Mitigated
Proposed
Condition
Runoff (cfs)
Difference
(cfs)
A 100 0.543 0.379 -0.170
A 50 0.482 0.304 -0.178
A 25 0.418 0.231 -0.187
4.2. Hydraulic Results
Results of the hydraulic analysis show that all proposed pipes are able to convey
the 100-year flow in open-channel conditions. The ultimate stormwater
discharge location remains the same as in the existing condition. In addition,
improvements to the existing storm water infrastructure are not needed based
on the proposed improvements, as there shall be no increase in the proposed
storm water flow rate downstream of the projects tie in location.
The proposed pipe for the new storm drain draining the 100-year storm from the
water quality basin has been appropriately sized using Manning’s equation. A
summary of the storm drain is shown below in Table 5 – Hydraulic Summary. The
calculations for this pipe were performed using the Flowmaster software and are
included in the appendix of this report.
Total inflow to the water tanks on site is 10,000 GPM, or 26.8 CFS. Each tank
features an overflow pipe which discharges to an existing rock lined channel on
the southeast corner of the property. This existing channel was modeled within
Hydraflow Express to determine if it has the capacity to pass the entirety of the
overflow. A summary of this calculation is shown in Table 6 – Existing Rock Lined
Channel. A section of this channel can be found on Sheet C-01.
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
12
Table 5 – Hydraulic Summary
Input Output
Storm
Drain
Line
Pipe Size
(inches)
Pipe
Material
Manning’s
Value
Pipe
Slope (%)
Pipe
Flow (cfs)
Depth of
Flow
Depth
Ratio
d/D
1 6” PVC .013 20 0.379 1.5” 0.25
1 6” PVC .013 2 0.379 2.9” 0.48
Table 6 – Existing Rock Lined Channel South
Input Output
Channel
Bottom
Elev
Channel
Slope (%)
N-Value Q (cfs) Channel
Depth
(ft)
Depth of
Flow (ft)
Velocity
(ft/s)
352.0 13.8 0.4 26.8 2.25 1.95 1.56
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
13
Section 5 Conclusions
As indicated in the Table of Hydrologic Results, the proposed improvements will
not increase the total 25, 50, and 100-year, 6-hour peak flow rate.
Based on the analysis above, a 6” pipe at 15% is adequate to convey the peak
flow rate for a 100-year design storm off-site.
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
14
Section 6 Certification
This Hydrology and Hydraulics report has been prepared under the direction of
the following Registered Civil Engineer. The Registered Civil Engineer attests to
the technical information contained herein and the engineering data upon which
recommendations, conclusions, and decisions are based. The plans and
specifications in this Hydrology and Hydraulics report are not for construction
purposes; the contractor shall refer to final approved construction documents for
plans and specifications.
Richard S. Tomlinson, Jr. RCE 59276 December 20, 2022
Richard S. Tomlinson, Jr. RCE 59276 March 15, 2022
Hydrology and Hydraulic Basis of Design
Recycled Water
Phase III - D4
Storage Reservoir
N:\226816-0000111\HH\Dwainage\2022-12-20 Drainage Study.docx
15
Section 7 References
City of Carlsbad, Grading Ordinance (April 1996)
County of San Diego, 2003. Hydrology Manual (June 2003)
County of San Diego, 2014, Hydraulic Design Manual (September 2014)
FEMA, 1997. FEMA. (June 17, 1997). Flood Insurance Study, San Diego County.
N:\226816-0000111\HH\Dwainage\2022-03-15 Drainage Study.docx
1
Appendix A
Rainfall Isopluvials
2.1"
: "t ... ,I-• ' .. I I ~ • • ' ' ' '
..
DPW
~GIS
Oep!:U"'iJ7iem Di P11bttc Works
G00.~•pJ-ik /11furrr,.i00/1 &rv,i:;rJ:r
S~GIS
'1/(/c Have San Diq,:o Covered!
3.5"
-----
. . .
•·---t----i-,-11
DPW
~GIS
[lep:IJ""iJ7ient Di P1.10c Wo.~ Gca,r,.Jpjik /11furtr,.100!1 &-rv,'Cr.:5'
S~GIS
V/;/c Have San Diq;o Covered!
2.4"
l ~1 ; l-1-H---l---l--t--t-t-t---t----t---t---t-iti-r-n•;-f--l;.-;;~"
I\ r------...... ;,~ ~ ~ ', !\,11 , ..-r-~r:-~,
.. .. ~+--t--" ~ r-
r----1--~ ,--,--,--
S~GIS
'.:Xie Have San Diq;o Covered!
4.0"
I I I I
,----I---J--+--1-t-11n
I I J
I I I I I I I I I I I I I I I
I I I I I I I I I I I I J J 1 I I J I I I J
I I I I I I I I I I I I I
I I J 1 I J I 1 J I J I J
I I
-~
I
--------
I
' . -
-
-
~GIS Sans l)1''"C'()Covcrcd! V/;/c Have . an ~"'
I
I I J J J I I J I
2.7"IL__·-----_--_I
4.2"
I I I I I
. . . . . . . . • .
-)
. ,-. ' ' .
: . . . ,, .,,. . . -... ·,
"~ ~ ~ .
I
· . ---
. . -~ . . . . . . . .
,='
·---. . . . . .
.
.
'
~
e,a\H'1'Y 0 ~i.NDIEc;o •
I -······_--___JI
DPW
~GIS
[lep:I.J""iJ7ient Di P11Mc Works
Grn,r,..•pfll/,; /11furrr,.itiw1 &rv,tr.i-:;
N:\226816-0000111\HH\Dwainage\2022-03-15 Drainage Study.docx
2
Appendix B
FEMA Flood Plain Maps
USGS The National Map: Orthoimagery. Data refreshed April, 2019.
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250Feet
Ü
11
7
°
1
7
'
3
1
.
6
0
"
W
33°6'58.53"N
11
7
°
1
6
'
5
4
.
1
4
"
W
33°6'28.40"N
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOODHAZARD AREAS
Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or Depth Zone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mile Zone X
Future Conditions 1% AnnualChance Flood Hazard Zone XArea with Reduced Flood Risk due toLevee. See Notes.Zone XArea with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm SewerLevee, Dike, or Floodwall
Cross Sections with 1% Annual Chance17.5 Water Surface ElevationCoastal Transect
Coastal Transect BaselineProfile BaselineHydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of StudyJurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards
The flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 7/3/2019 at 12:45:21 PM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time.
This map image is void if the one or more of the following mapelements do not appear: basemap imagery, flood zone labels,legend, scale bar, map creation date, community identifiers,FIRM panel number, and FIRM effective date. Map images forunmapped and unmodernized areas cannot be used forregulatory purposes.
Legend
OTHER AREAS OFFLOOD HAZARD
OTHER AREAS
GENERALSTRUCTURES
OTHERFEATURES
MAP PANELS
8
1:6,000
B 20.2
The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location.
1111111
0-- -
-513-
L]
□ .
121
N:\226816-0000111\HH\Dwainage\2022-03-15 Drainage Study.docx
3
Appendix C
Existing Condition Hydrologic
Work Map & Calculations
0 :,,
= = = = I ~
ro ~ N N
1" RESERVOIR
:LED WATER
. 25 MG
__ EX. 20" RW ------....____ \
383.29''\
-2" RESERVOIR
'CLEO WATER
1.25 MG
ACCESS ROAD
I
0
0
\
\ ..____,__-!-___.... 0
-
-,
a 1/2' I'
--
376.22'
X
380
DI
J'
4
EX. SURGE
TANK
376.22' X
□
EX. OUTLET M
VAULT N
0
>
24" W
EX. "D-3" RESERVOIR
POTABLE WATER
8.5 MG
0 0
--
0 ~~
~~
D
Cl
\
37 .
/;
,,;;;, /
~
\
I o
" "'
GRAPHIC SCALE
o' 20' 40' 60'
SCALE 1"= 20'
"' "' "'
I I
I I
I
I I
I
I I
I
I
I I
I
I
I I
I I
I I
"' "' ,,,
I
I
I
I I
I
I
I I
LEGEND
DRAINAGE BASIN LIMIT --
FLOW DIRECTION "' ...
"'
BASIN ID NUMBER BASIN-#
PERVIOUS AREA ~
DISCHARGE POINT FROM SITE 0
(
~ ,,,
' "' ... ,,,
0 ·:ll
EXISTING HYDROLOGY WORK MAP
RECYCLED WATER STORAGE RESERVOIR
PREPARED: 7/9/2019
AMENDED: 3/15/2022
~ L1r_:rH1:s B:_AR :□□E:s N:_□r :MEA:suR~E 1__::TH:_EN:□RA=WIN:G 1s~No~r r::._:□ s=cAL~E. -----------------------------------------------------------------NV 5 15092 AVENUE OF SCIENCE, SUITE 200
SAN DIEGO, CA 92128
P: 858.385.0500 WWW.NV5.COM
E
0 z
V
cL
San Diego County Hydrology Manual Section: 3 Date: June 2003 Page: 6 of 26 Table 3-1 RUNOFF COEFFICIENTS FOR URBAN AREAS
Land Use Runoff Coefficient “C”
Soil Type
NRCS Elements County Elements % IMPER. A B C D
Undisturbed Natural Terrain (Natural) Permanent Open Space 0* 0.20 0.25 0.30 0.35
Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41
Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46
Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49
Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52
Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57
Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 0.57 0.60
Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63
High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71
High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79
Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 0.78 0.79
Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80 0.81 0.82
Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 0.84 0.85
Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85
Commercial/Industrial (General I.) General Industrial 95 0.87 0.87 0.87 0.87
*The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff
coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area
is located in Cleveland National Forest).
DU/A = dwelling units per acre
NRCS = National Resources Conservation Service
3-6
NV5, Inc
Time of Concentration Calculations
Natural Areas
Land Use = Vacant
C = 0.25
Dist. = 285.00 ft.
slope = 2.000 %
Tc = 20.50 min.
* Minimum Tc = 5 Minutes
Basin Intensity Calculations
100 year
P6 =2.7 in.P6 must be within
P24 =4.2 in.45% to 65% of P24.
P6 / P24 =64%Adjust P6 as needed.
Adjusted P6= 2.70 in.
Tc (D) =20.50 min.
I = 2.86 in/hr
Basin Flow Calculations
Q =0.543 cfs
C = 0.25
I = 2.86 in/hr
A = 0.758 ac.
NV5 Job No. 226817-0000111
Carlsbad Reclaimed Water
Existing Basin
Selected Frequency,
2.86
0.1
1.0
10.0
1 10 100 1000
()
3
1.18.1
s
DCTC
-=
645.0
644.7 -=DPI
AICQ**=
Basin Calcs.xlsx Intensity-Duration Design Chart Existing Basin
' ' I ' ' + + + +-+ + + +-' ' + + + +-+ + + +-
t
+ + +-+ + + +-
t ✓1 ✓
L
NV5, Inc
Time of Concentration Calculations
Natural Areas
Land Use = Vacant
C = 0.25
Dist. = 285.00 ft.
slope = 2.000 %
Tc = 20.50 min.
* Minimum Tc = 5 Minutes
Basin Intensity Calculations
25 year
P6 =2.1 in.P6 must be within
P24 =3.2 in.45% to 65% of P24.
P6 / P24 =66%Adjust P6 as needed.
Adjusted P6= 2.08 in.
Tc (D) =20.50 min.
I = 2.21 in/hr
Basin Flow Calculations
Q =0.418 cfs
C = 0.25
I = 2.21 in/hr
A = 0.758 ac.
NV5 Job No. 226817-0000111
Carlsbad Reclaimed Water
Existing Basin
Selected Frequency,
2.21
0.1
1.0
10.0
1 10 100 1000
()
3
1.18.1
s
DCTC
-=
645.0
644.7 -=DPI
AICQ**=
Basin Calc 25.xlsx Intensity-Duration Design Chart Existing Basin
' ' I ' ' + + + +-+ + + +-' ' + + + +-+ + + +-
t
+ + +-+ + + +-
t ✓1 ✓
t
NV5, Inc
Time of Concentration Calculations
Natural Areas
Land Use = Vacant
C = 0.25
Dist. = 285.00 ft.
slope = 2.000 %
Tc = 20.50 min.
* Minimum Tc = 5 Minutes
Basin Intensity Calculations
50 year
P6 =2.4 in.P6 must be within
P24 =4 in.45% to 65% of P24.
P6 / P24 =60%Adjust P6 as needed.
Adjusted P6= 2.40 in.
Tc (D) =20.50 min.
I = 2.55 in/hr
Basin Flow Calculations
Q =0.482 cfs
C = 0.25
I = 2.55 in/hr
A = 0.758 ac.
NV5 Job No. 226817-0000111
Carlsbad Reclaimed Water
Existing Basin
Selected Frequency,
2.55
0.1
1.0
10.0
1 10 100 1000
()
3
1.18.1
s
DCTC
-=
645.0
644.7 -=DPI
AICQ**=
Basin Calc 50.xlsx Intensity-Duration Design Chart Existing Basin
+ I + + +-+ + + +-
+ + + +-+ + + +-
t
+ + +-+ + + +-
t
N:\226816-0000111\HH\Dwainage\2022-03-15 Drainage Study.docx
4
Appendix D
Proposed Condition Hydrologic
Work Map & Calculations
= = = = I ~
ro ~ N N ---z
V E
0 z
V
cL
1" RESERVOIR
:LED WATER
.25 MG
__ EX. 20" RW------....____ \
383.29''\
-2" RESERVOIR
'CLEO WATER
1.25 MG
_ ....3~82-!-"'0B~' -X ---
ACCESS ROAD
-w-
-
-,
a 1/2' I'
I
--
376.22'
X
~EX. 30" W
380
DI
J'
IF THIS BAR ODES NOT MEASURE I THEN DRAWING IS NOT TD SCALE.
EX. SURGE
TANK
376.22' X
□
EX. OUTLET M
2
0
>
24" W
EX. "D-3" RESERVOIR
POTABLE WATER
8.5 MG
0 0
--
0 ~ ~
D
Cl
c-;,
• <
,,;;;,
/"
\ •
•
• I •
< .\
<
37.
\
BASIN-A
0. 758 acre Tatal
0.286 acre Impervious
0.472 acre Perviaus
376.45'
X
"' "' "'
0 " "'
GRAPHIC SCALE
o' 20' 40' 60'
SCALE 1"= 20'
I I
I I
I
I I
I
I I
I
I
I I
I
I
I I
I I
I I
"' "' "'
I
I I
I
I
I I
LEGEND
DRAINAGE BASIN LIMIT --
FLOW DIRECTION "' ...
"'
BASIN ID NUMBER BASIN-#
PERVIOUS AREA ~
DISCHARGE POINT FROM SITE 0
(
~ "'
' "' ... "'
0 ·:ll
PROPOSED HYDROLOGY WORK MAP
RECYCLED WATER STORAGE RESERVOIR
PREPARED: 7/9/2019
AMENDED: 12/20/2022
NV 5 15092 AVENUE OF SCIENCE, SUITE 200
SAN DIEGO, CA 92128
P: 858.385.0500 WWW.NV5.COM
Proposed Condition Composite C Value
Pervious Area (C=0.25) 0.472
Impervious Area (C=0.9) 0.286
Total Area 0.758
C Value 0.50
San Diego County Hydrology Manual Section: 3 Date: June 2003 Page: 6 of 26 Table 3-1 RUNOFF COEFFICIENTS FOR URBAN AREAS
Land Use Runoff Coefficient “C”
Soil Type
NRCS Elements County Elements % IMPER. A B C D
Undisturbed Natural Terrain (Natural) Permanent Open Space 0* 0.20 0.25 0.30 0.35
Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41
Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46
Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49
Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52
Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57
Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 0.57 0.60
Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63
High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71
High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79
Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 0.78 0.79
Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80 0.81 0.82
Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 0.84 0.85
Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85
Commercial/Industrial (General I.) General Industrial 95 0.87 0.87 0.87 0.87
*The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff
coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area
is located in Cleveland National Forest).
DU/A = dwelling units per acre
NRCS = National Resources Conservation Service
3-6
Impervious Area C Value = 0.9 for
Composite C calculation
NV5, Inc.
Time of Concentration Calculations
Natural Areas
Land Use = Vacant
C = 0.50
Dist. = 270.00 ft.
slope = 1.500 %
Tc = 15.50 min.
* Minimum Tc = 5 Minutes
Basin Intensity Calculations
25 year
P6 =2.1 in.P6 must be within
P24 =3.2 in.45% to 65% of P24.
P6 / P24 =66%Adjust P6 as needed.
Adjusted P6= 2.08 in.
Tc (D) =15.50 min.
I = 2.64 in/hr
Basin Flow Calculations
Q =1.001 cfs
C = 0.50
I = 2.64 in/hr
A = 0.758 ac.
NV5 Job No. 226817-0000111
Carlsbad Reclaimed Water
Proposed Condition
Selected Frequency,
2.64
0.1
1.0
10.0
1 10 100 1000
()
3
1.18.1
s
DCTC
-=
645.0
644.7 -=DPI
AICQ**=
Basin Calc 25.xlsx Intensity-Duration Design Chart Proposed Condition
' ' I ' ' + + + +-+ + + +-' ' + + + +-+ + + +-
t
+ + +-+ + + +-
t ✓1 ✓
t
NV5, Inc.
Time of Concentration Calculations
Natural Areas
Land Use = Vacant
C = 0.50
Dist. = 270.00 ft.
slope = 1.500 %
Tc = 15.50 min.
* Minimum Tc = 5 Minutes
Basin Intensity Calculations
50 year
P6 =2.4 in.P6 must be within
P24 =4 in.45% to 65% of P24.
P6 / P24 =60%Adjust P6 as needed.
Adjusted P6= 2.40 in.
Tc (D) =15.50 min.
I = 3.05 in/hr
Basin Flow Calculations
Q =1.155 cfs
C = 0.50
I = 3.05 in/hr
A = 0.758 ac.
NV5 Job No. 226817-0000111
Carlsbad Reclaimed Water
Proposed Condition
Selected Frequency,
3.05
0.1
1.0
10.0
1 10 100 1000
()
3
1.18.1
s
DCTC
-=
645.0
644.7 -=DPI
AICQ**=
Basin Calc 50.xlsx Intensity-Duration Design Chart Proposed Condition
' ' I ' ' + + + +-+ + + +-' ' + + + +-+ + + +-
t
+ + +-+ + + +-
t ✓1 ✓
NV5, Inc.
Time of Concentration Calculations
Natural Areas
Land Use = Vacant
C = 0.50
Dist. = 270.00 ft.
slope = 1.500 %
Tc = 15.50 min.
* Minimum Tc = 5 Minutes
Basin Intensity Calculations
100 year
P6 =2.7 in.P6 must be within
P24 =4.2 in.45% to 65% of P24.
P6 / P24 =64%Adjust P6 as needed.
Adjusted P6= 2.70 in.
Tc (D) =15.50 min.
I = 3.43 in/hr
Basin Flow Calculations
Q =1.299 cfs
C = 0.50
I = 3.43 in/hr
A = 0.758 ac.
NV5 Job No. 226817-0000111
Carlsbad Reclaimed Water
Proposed Condition
Selected Frequency,
3.43
0.1
1.0
10.0
1 10 100 1000
()
3
1.18.1
s
DCTC
-=
645.0
644.7 -=DPI
AICQ**=
Basin Calcs.xlsx Intensity-Duration Design Chart Proposed Condition
' ' I ' ' + + + +-+ + + +-' ' + + + +-+ + + +-
t
+ + +-+ + + +-
t ✓1 ✓
N:\226816-0000111\HH\Dwainage\2022-03-15 Drainage Study.docx
5
Appendix E
Hydraulic Calculations
RATIONAL METHOD HYDROGRAPH PROGRAM
COPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
RUN DATE 9/21/2021
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 15 MIN.
6 HOUR RAINFALL 2.1 INCHES
BASIN AREA 0.758 ACRES
RUNOFF COEFFICIENT 0.5
PEAK DISCHARGE 1.001 CFS
TIME (MIN) = 0
TIME (MIN)= 15
TIME (MIN) = 30
TIME (MIN) = 45
TIME (MIN) = 60
TIME (MIN) = 75
TIME (MIN) = 90
TIME (MIN)= 105
TIME (MIN)= 120
TIME (MIN)= 135
TIME (MIN)= 150
TIME (MIN)= 165
TIME (MIN)= 180
TIME (MIN)= 195
TIME (MIN)= 210
TIME (MIN) = 225
TIME (MIN) = 240
TIME (MIN) = 255
TIME (MIN) = 270
TIME (MIN) = 285
TIME (MIN) = 300
TIME (MIN)= 315
TIME (MIN) = 330
TIME (MIN) = 345
TIME (MIN) = 360
TIME (MIN) = 375
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.2
DISCHARGE (CFS) = 0.3
DISCHARGE (CFS) = 1.001
DISCHARGE (CFS) = 0.2
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0
25-Year Storm
RATIONAL METHOD HYDROGRAPH PROGRAM
COPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
RUN DATE 9/21/2021
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 15 MIN.
6 HOUR RAINFALL 2.4 INCHES
BASIN AREA 0.758 ACRES
RUNOFF COEFFICIENT 0.5
PEAK DISCHARGE 1.155 CFS
TIME (MIN) = 0
TIME (MIN)= 15
TIME (MIN) = 30
TIME (MIN) = 45
TIME (MIN) = 60
TIME (MIN) = 75
TIME (MIN) = 90
TIME (MIN)= 105
TIME (MIN)= 120
TIME (MIN)= 135
TIME (MIN)= 150
TIME (MIN)= 165
TIME (MIN)= 180
TIME (MIN)= 195
TIME (MIN)= 210
TIME (MIN) = 225
TIME (MIN) = 240
TIME (MIN) = 255
TIME (MIN) = 270
TIME (MIN) = 285
TIME (MIN) = 300
TIME (MIN)= 315
TIME (MIN) = 330
TIME (MIN) = 345
TIME (MIN) = 360
TIME (MIN) = 375
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.2
DISCHARGE (CFS) = 0.2
DISCHARGE (CFS) = 0.4
DISCHARGE (CFS) = 1.155
DISCHARGE (CFS) = 0.2
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0
50-Year Storm
RATIONAL METHOD HYDROGRAPH PROGRAM
COPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
RUN DATE 6/29/2021
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 15 MIN.
6 HOUR RAINFALL 2.7 INCHES
BASIN AREA 0.758 ACRES
RUNOFF COEFFICIENT 0.5
PEAK DISCHARGE 1.299 CFS
TIME (MIN) = 0
TIME (MIN)= 15
TIME (MIN) = 30
TIME (MIN) = 45
TIME (MIN) = 60
TIME (MIN) = 75
TIME (MIN) = 90
TIME (MIN)= 105
TIME (MIN)= 120
TIME (MIN)= 135
TIME (MIN)= 150
TIME (MIN)= 165
TIME (MIN)= 180
TIME (MIN)= 195
TIME (MIN)= 210
TIME (MIN) = 225
TIME (MIN) = 240
TIME (MIN) = 255
TIME (MIN) = 270
TIME (MIN) = 285
TIME (MIN) = 300
TIME (MIN)= 315
TIME (MIN) = 330
TIME (MIN) = 345
TIME (MIN) = 360
TIME (MIN) = 375
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.2
DISCHARGE (CFS) = 0.2
DISCHARGE (CFS) = 0.3
DISCHARGE (CFS) = 0.4
DISCHARGE (CFS) = 1.299
DISCHARGE (CFS) = 0.2
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0
1 00-Year Storm
Hydraflow Table of Contents N:\226816-0000111\HH\Dwainage\Hydraflow 4.gpw
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 12 / 20 / 2022
Watershed Model Schematic...................................................................................... 1
Hydrograph Return Period Recap............................................................................. 2
25 - Year
Summary Report......................................................................................................................... 3
Hydrograph Reports................................................................................................................... 4
Hydrograph No. 1, Manual, 1................................................................................................... 4
Hydrograph No. 2, Reservoir, 1................................................................................................ 5
Pond Report - Biobasin........................................................................................................ 6
50 - Year
Summary Report......................................................................................................................... 7
Hydrograph Reports................................................................................................................... 8
Hydrograph No. 1, Manual, 1................................................................................................... 8
Hydrograph No. 2, Reservoir, 1................................................................................................ 9
100 - Year
Summary Report....................................................................................................................... 10
Hydrograph Reports................................................................................................................. 11
Hydrograph No. 1, Manual, 1................................................................................................. 11
Hydrograph No. 2, Reservoir, 1.............................................................................................. 12
IDF Report.................................................................................................................. 13
1
1
Watershed Model SchematicHydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3
Project: N:\226816-0000111\HH\Dwainage\Hydraflow 4.gpw Tuesday, 12 / 20 / 2022
Hyd.Origin Description
Legend
1 Manual 1
2 Reservoir 1
1
2..
Hydrograph Return Period Recap
2
Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph
No. type hyd(s)Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 Manual ------ ------- ------- ------- ------- ------- 1.000 1.150 1.300 1
2 Reservoir 1 ------- ------- ------- ------- ------- 0.231 0.304 0.379 1
Proj. file: N:\226816-0000111\HH\Dwainage\Hydraflow 4.gpw Tuesday, 12 / 20 / 2022
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3
Hydrograph Summary Report
3
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Manual 1.000 15 255 3,150 ------ ------ ------ 1
2 Reservoir 0.231 15 270 3,042 1 372.49 2,202 1
N:\226816-0000111\HH\Dwainage\Hydraflow 4.gpwReturn Period: 25 Year Tuesday, 12 / 20 / 2022
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 12 / 20 / 2022
Hyd. No. 1
1
Hydrograph type = Manual Peak discharge = 1.000 cfs
Storm frequency = 25 yrs Time to peak = 255 min
Time interval = 15 min Hyd. volume = 3,150 cuft
4
0 60 120 180 240 300 360 420
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
1
Hyd. No. 1 -- 25 Year
Hyd No. 1
--
--
-
;/
/ I'"
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 12 / 20 / 2022
Hyd. No. 2
1
Hydrograph type = Reservoir Peak discharge = 0.231 cfs
Storm frequency = 25 yrs Time to peak = 270 min
Time interval = 15 min Hyd. volume = 3,042 cuft
Inflow hyd. No. = 1 - 1 Max. Elevation = 372.49 ft
Reservoir name = Biobasin Max. Storage = 2,202 cuft
Storage Indication method used.
5
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 1920 2040 2160
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
1
Hyd. No. 2 -- 25 Year
Hyd No. 2 Hyd No. 1 Total storage used = 2,202 cuft
j
1 1111111111
111111111
Pond Report 6
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 12 / 20 / 2022
Pond No. 1 - Biobasin
Pond Data
Trapezoid -Bottom L x W = 25.0 x 39.0 ft, Side slope = 0.00:1, Bottom elev. = 367.75 ft, Depth = 4.25 ft, Voids = 40.00%Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 372.01 ft
Stage / Storage Table
Stage (ft)Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 367.75 975 0 0
0.43 368.17 975 166 166
0.85 368.60 975 166 332
1.27 369.02 975 166 497
1.70 369.45 975 166 663
2.13 369.88 975 166 829
2.55 370.30 975 166 995
2.97 370.73 975 166 1,160
3.40 371.15 975 166 1,326
3.83 371.58 975 166 1,492
4.25 372.00 975 166 1,658
4.26 372.01 975 10 1,667
4.75 372.50 1,318 562 2,229
5.25 373.00 1,675 748 2,977
5.55 373.30 1,938 542 3,519
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr][A] [B] [C] [D]
Rise (in)= 8.00 0.75 4.00 Inactive
Span (in)= 8.00 0.75 4.00 0.00
No. Barrels = 1 1 1 0
Invert El. (ft)= 367.75 368.00 372.08 0.00
Length (ft)= 50.00 0.00 0.00 0.00
Slope (%)= 15.00 0.00 0.00 n/a
N-Value = .012 .012 .012 n/a
Orifice Coeff.= 0.60 0.60 0.60 0.60
Multi-Stage = n/a Yes Yes No
Crest Len (ft)= 6.00 Inactive 0.00 0.00
Crest El. (ft)= 372.80 0.00 0.00 0.00
Weir Coeff.= 3.33 3.33 3.33 3.33
Weir Type = 1 Rect --- ---
Multi-Stage = Yes No No No
Exfil.(in/hr)= 0.000 (by Wet area)
TW Elev. (ft)= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Stage (ft)
0.00 367.75
1.00 368.75
2.00 369.75
3.00 370.75
4.00 371.75
5.00 372.75
6.00 373.75
Elev (ft)
Discharge (cfs)
Stage / Discharge
Total Q
----::,r
Hydrograph Summary Report
7
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Manual 1.150 15 255 3,645 ------ ------ ------ 1
2 Reservoir 0.304 15 270 3,537 1 372.70 2,482 1
N:\226816-0000111\HH\Dwainage\Hydraflow 4.gpwReturn Period: 50 Year Tuesday, 12 / 20 / 2022
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 12 / 20 / 2022
Hyd. No. 1
1
Hydrograph type = Manual Peak discharge = 1.150 cfs
Storm frequency = 50 yrs Time to peak = 255 min
Time interval = 15 min Hyd. volume = 3,645 cuft
8
0 60 120 180 240 300 360 420
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
1
Hyd. No. 1 -- 50 Year
Hyd No. 1
--
-
I
/ I'"
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 12 / 20 / 2022
Hyd. No. 2
1
Hydrograph type = Reservoir Peak discharge = 0.304 cfs
Storm frequency = 50 yrs Time to peak = 270 min
Time interval = 15 min Hyd. volume = 3,537 cuft
Inflow hyd. No. = 1 - 1 Max. Elevation = 372.70 ft
Reservoir name = Biobasin Max. Storage = 2,482 cuft
Storage Indication method used.
9
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 1920 2040 2160
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
1
Hyd. No. 2 -- 50 Year
Hyd No. 2 Hyd No. 1 Total storage used = 2,482 cuft
~111111 1111
111111111
Hydrograph Summary Report
10
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Manual 1.300 15 255 3,960 ------ ------ ------ 1
2 Reservoir 0.379 15 270 3,852 1 372.86 2,689 1
N:\226816-0000111\HH\Dwainage\Hydraflow 4.gpwReturn Period: 100 Year Tuesday, 12 / 20 / 2022
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 12 / 20 / 2022
Hyd. No. 1
1
Hydrograph type = Manual Peak discharge = 1.300 cfs
Storm frequency = 100 yrs Time to peak = 255 min
Time interval = 15 min Hyd. volume = 3,960 cuft
11
0 60 120 180 240 300 360 420
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
1
Hyd. No. 1 -- 100 Year
Hyd No. 1
-
--
-
/ -
V
/ I'"
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Tuesday, 12 / 20 / 2022
Hyd. No. 2
1
Hydrograph type = Reservoir Peak discharge = 0.379 cfs
Storm frequency = 100 yrs Time to peak = 270 min
Time interval = 15 min Hyd. volume = 3,852 cuft
Inflow hyd. No. = 1 - 1 Max. Elevation = 372.86 ft
Reservoir name = Biobasin Max. Storage = 2,689 cuft
Storage Indication method used.
12
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 1920 2040
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
1
Hyd. No. 2 -- 100 Year
Hyd No. 2 Hyd No. 1 Total storage used = 2,689 cuft
~ 111111 111
111111111
Worksheet for 6" Pipe @ 2%
Project Description
Manning FormulaFriction Method
Normal DepthSolve For
Input Data
0.013Roughness Coefficient
ft/ft0.020Channel Slope
in6.0Diameter
cfs0.38Discharge
Results
in2.9Normal Depth
ft²0.1Flow Area
ft0.8Wetted Perimeter
in1.5Hydraulic Radius
ft0.50Top Width
in3.8Critical Depth
%48.7Percent Full
ft/ft0.009Critical Slope
ft/s4.00Velocity
ft0.25Velocity Head
ft0.49Specific Energy
1.618Froude Number
cfs0.85Maximum Discharge
cfs0.79Discharge Full
ft/ft0.005Slope Full
SupercriticalFlow Type
GVF Input Data
in0.0Downstream Depth
ft0.0Length
0Number Of Steps
GVF Output Data
in0.0Upstream Depth
Profile Description
ft0.00Profile Headloss
%0.0Average End Depth Over Rise
%48.7Normal Depth Over Rise
ft/sInfinityDownstream Velocity
ft/sInfinityUpstream Velocity
in2.9Normal Depth
in3.8Critical Depth
ft/ft0.020Channel Slope
ft/ft0.009Critical Slope
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
12/20/2022
FlowMaster
[10.02.00.01]
Bentley Systems, Inc. Haestad Methods Solution
CenterPipecalcs.fm8
Worksheet for 6" Pipe @ 20%
Project Description
Manning FormulaFriction Method
Normal DepthSolve For
Input Data
0.013Roughness Coefficient
ft/ft0.230Channel Slope
in6.0Diameter
cfs0.38Discharge
Results
in1.5Normal Depth
ft²0.0Flow Area
ft0.5Wetted Perimeter
in0.9Hydraulic Radius
ft0.44Top Width
in3.8Critical Depth
%25.4Percent Full
ft/ft0.009Critical Slope
ft/s9.67Velocity
ft1.45Velocity Head
ft1.58Specific Energy
5.683Froude Number
cfs2.89Maximum Discharge
cfs2.69Discharge Full
ft/ft0.005Slope Full
SupercriticalFlow Type
GVF Input Data
in0.0Downstream Depth
ft0.0Length
0Number Of Steps
GVF Output Data
in0.0Upstream Depth
Profile Description
ft0.00Profile Headloss
%0.0Average End Depth Over Rise
%25.4Normal Depth Over Rise
ft/sInfinityDownstream Velocity
ft/sInfinityUpstream Velocity
in1.5Normal Depth
in3.8Critical Depth
ft/ft0.230Channel Slope
ft/ft0.009Critical Slope
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
12/20/2022
FlowMaster
[10.02.00.01]
Bentley Systems, Inc. Haestad Methods Solution
CenterPipecalcs.fm8
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Sep 14 2021
Existing Rock Lined Channel
User-defined
Invert Elev (ft) = 352.00
Slope (%) = 13.80
N-Value = 0.400
Calculations
Compute by: Known Q
Known Q (cfs) = 26.80
(Sta, El, n)-(Sta, El, n)...
( 0.00, 355.00)-(6.29, 352.00, 0.400)-(10.54, 352.00, 0.400)-(16.42, 354.30, 0.400)
Highlighted
Depth (ft) = 1.95
Q (cfs) = 26.80
Area (sqft)= 17.13
Velocity (ft/s)= 1.56
Wetted Perim (ft) = 14.13
Crit Depth, Yc (ft) = 0.91
Top Width (ft)= 13.32
EGL (ft)= 1.99
-2 0 2 4 6 8 10 12 14 16 18 20
Elev (ft)Depth (ft)Section
351.00 -1.00
352.00 0.00
353.00 1.00
354.00 2.00
355.00 3.00
356.00 4.00
Sta (ft)
- - - - - - - - - - -
- - - - - - - - - -
~ - -
-
-
- - - - - - -
, __ -~ ~ -±_ - -- --- -- -~ ---/-
- --- - --/ - - -
" - - -- - -r_ - - -~ ~ -
- - ---- - -\
- - - - -- - - -
- - - - - - - - - - -