Loading...
HomeMy WebLinkAboutCUP 2020-0003; RECYCLED WATER PHASE III D-4; ADDENDUM 2 - CLARIFICATION ON DRAINAGE GRADIENT REQUIREMENTS FOR THE PAVED ROAD LOCATED NEAR THE PROPOSED WATER TANK; 2022-03-22NV S Carlsbad Municipal Water District 5950 El Camino Real March 22, 2022 Project Number 226816-000011.00 Carlsbad, California 92009-8802 Attention : Project: Mr. Dave Padilla Recycled Water Phase Ill: D-4 Reservoir Carlsbad Municipal Water District Carlsbad, California RE EIVE OCT 18 2022 LAND DEVELOPMENT E= IGI EERING Subject: Addendum No. 2 -Clarification on Drainage Gradient Requirements for the Paved Road Located near the Proposed Water Tank. · References: "Addendum No. 1 -Revised Remove and Recompaction Recommendations, Recycled Water Phase Ill: 0 -4 Reservoir, Carlsbad Municipal Water District,Carlsbad, California", prepared by NV5 West, Inc. (NV5), dated May 25, 2021 Dear Mr. Padilla, Introduction "Geotechnical Investigation Report, Carlsbad Municipal Water District, Phase Ill Recycled Water Project, Carlsbad, California", prepared by NV5 West, Inc. (NV5), dated April 24, 2019 Civil Plan Sheet C-01, "Improvement Plans for: Recycled Water Phase Ill: D-4 Reservoir, Tank Site Grading", 100% Submittal (Not for construction), prepared by NV5 As requested, this 2nd letter addendum provides NV5 West, Inc. (NV5) clarification on gradient requirements for the proposed paved road located near the proposed water ta.nk for the subject project. Reference is made to the original geotechnical report (dated April 24, 2019) and first letter addendum (dated May 25, 2021) prepared for the project. Reference is also made to the civil plan Sheet C-01 prepared for the project. Discussion In Appendix C, Typical Earthwork Guidelines, Section 8.3 of the referenced geotechnical report the following guidelines were presented regarding drainage gradient. • Surface drainage on the site shall be provided so that water is not permitted to pond. A gradient of 2 percent or steeper shall be maintained over the pad area and drainage patterns shall be established to remove water from the site to an appropriate outlet. OFFICES llATIOlll~DE 15092 AVENUE OF SCIENCE, STE 200 SAN DIEGO, CA 92128 I www.NV5.COM OFFICE 858.715.5800 I FAX 858.715.5810 CONSTRUCTION QUALITY ASSURANCE -INFRASTRUCTURE -ENERGY -PROGRAM MANAGEMENT • ENVIRONMENTAL Addendum No. 2 -Clarification on Drainage Gradient Requirements Recycled Water Phase 111:D-4 Reservoir Carlsbad Municipal Water District Carlsbad, California March 22, 2022 226816-0000111.00 Page 2 However, as noted in Sheet C-01, Detail B/C-1 the proposed paved road has a gradient ranging between 1% and 4%. ---------------·· ,-----,,~-J f ~----------------·•···----------------<1-7_ ~:r-,·--' ,--1! N01t, I ;"4'"1-••;o ,-~ J' l'lt \ • ,v"',t: •t• I'•·., .......... ,-..-;~1 l."{l -~,~,o, ' ·.-·· -r,_~_-r·_ .... ,7,:~':.~?/J __ :-;_;~-.. - " ": II. ~f•l•'l {l.,: \ u•• tt:, ·· 11.:t SECTION II i! I : , .. -., Based on a review of the site grading and draining plan, it is NV5's opinion that the minimum 1 % gradient as noted above is acceptable for this project application. Closing and Limitation NV5 appreciates the opportunity to be of service. We have prepared this letter in substantial accordance with the generally accepted geotechnical engineering practice as it exists in the site area at the time of our study. No warranty is expressed or implied. The limitations discussed in the referenced report apply to the recommendations contained in this letter. If you have any questions regarding this letter or need further assistance, please contact us at your convenience. Respectfully Submitted, NV5 Inc. -- L Paul Cunningham, PE, GE No. 3186 Project Engineer Distribution (1) Addressee, via e-mail Carl Henderson, PhD, GE No. 2886 CDO / VP -Geotechnical Services W NIVl5 OFFICES NATIONWIDE CONSTAUCTI.ON 0UALITY ASSURANCE • INFRASTRUCTURE ENGIUEERtHG • MUNICIPAL OUTSOURCING -ASSET MANAGEMENT • ENVIRONMENTAL SERVICES