HomeMy WebLinkAboutCUP 2020-0003; RECYCLED WATER PHASE III D-4; ADDENDUM 1 - REVISED REMOVE AND RECOMPACTION RECOMMENDATIONS; 2021-05-25NV 5 Carlsbad Municipal Water District 5950 El Camino Real Carlsbad, California 92009-8802 Attention : Project: Mr. Dave Padilla, PE, QSD Recycled Water Phase Ill: D-4 Reservoir Carlsbad Municipal Water District Carlsbad, California May 25, 2021 Project Number 226816-000011.00 EVE OCT 18 2022 LA O DEVELOPMENT ENGINEERING Subject: Addendum No. 1 -Revised Remove and Recompaction Recommendations References: "Geotechnical Investigation Report, Carlsbad Municipal Water District, Phase Ill Recycled Water Project, Carlsbad, California", prepared by NV5 West, Inc. (NV5), dated April 24, 2019 Dear Mr. Padilla, Introduction Civil Plan Sheet C-01, "Improvement Plans for: Recylced Water Phase Ill: 0-4 Reservoir, Tank Site Grading", 100% Submittal (Not for construction), prepared by NV5 As requested, this letter addendum provides NV5 West, Inc. (NV5) revised recommendations for removal and recompaction of "topsoil" material within the footprint of the subject project's proposed water tank. Reference is made to the geotechnical report and civil plan Sheet C-01 prepared for the project. Per our correspondence with the City the following revisions are provided to our geotechnical recommendations for consideration. • Recomm.endations presented in Sections 9.1 (General) and 9.2 (Earthwork) of the referenced report should be revised to indicate "topsoil" within the footprint of the proposed water tank pad should be removed to a project elevation (as indicated on referenced Civil Plan Sheet C-01) of 372.0 feet. The removal should extend at least 5 feet outside of the perimeter of the water tank pad footprint. • The base of the excavation noted above should be scarified in place to a depth of at least 8 inches, moisture conditioned within 2 percent above optimum moisture content (unless otherwise directed by the geotechnical engineer) and compacted to at least 95 percent relative compaction based on laboratory standard ASTM D1557. • Excavated "topsoil" noted above can be placed back in the excavation in approximately 8 inches lifts (loose thickness). The loose lifts should be moisture conditioned within 2 percent above optimum moisture content (unless otherwise directed by the geotechnical engineer) and compacted to at least 95 percent relative compaction based on laboratory standard ASTM D1557. OFFICES IJATIONl'llDf 15092 AVENUE OF SCIENCE, STE 200 SAN DIEGO, CA 92128 I www.NV5.COM OFFICE 858.715.5800 I FAX 858.715.5810 CONSTRUCTION QUALITY ASSURANCE -INFRASTRUCTURE -ENERGY -PROGRAM MANAGEMENT -ENVIRONMENTAL Addendum No. 1 -Revised Remove and Recompaction Recommendations Recycled Water Phase 111:D-4 Reservoir Carlsbad Municipal Water District Carlsbad, California Closing and Limitation May 25, 2021 226816-0000111.00 Page 2 NV5 appreciates the opportunity to be of service. We have prepared this letter in substanfial accordance with the generally accepted geotechnical engineering practice as it exists in the site area at the time of our study. No warranty is expressed or implied. The limitations discussed in the referenced report apply to the recommendations contained in this letter. If you have any questions regarding this letter or need further assistance, please contact us at your convenience. Respectfully Submitted, NV5 Inc. Gene Custenborder, CEG No. 1319 Senior Engineering Geologist Distribution (1) Addressee, via e-mail NIVl5 OFFlCES NATIONWIDE CONSTRUCTION QUALITY ASSURANCE · INFRASTRUCTURE ENGINEERING -MUNICIPAL OUTSOURCING -ASSET MAtiAGEMENT • ENVIAOl-4ME.ITTA.L SERVICES