Loading...
HomeMy WebLinkAboutPD 2019-0007; MADISON STREET APARTMENTS; FINAL COMPACTION 1; 2019-09-06Project No. FC-19-08-145 September 6, 2019 Prophet solutions, Inc. Mr. George Stoutenburg 814 South El Camino Real San Clemente, California 92672 SJIS GEOTECHNICAL SOLUTIONS. INC. Consulting Geotechnical Engineers 5931 Sea Lion Place, Suite 109 Carlsbad, California 92010 760-602-7815 smsgeosol.inc@gmail.com Final Geotechnical Certification Letter, Madison Street Apartments, 3130 Madison Street, Carlsbad, California (Project No. PD 2019-0007, Drawing No. 516-SA) ~'11~• Geotechnical Solutions, Inc. has provided construction-phase geotechnical services during grading, earthworks and construction of the subject project. ~'11~• Geotechnical Solutions, Inc. services have included geotechnical observations, field compaction testing, and appropriate laboratory testing during the construction phase. Based on s.11~• Geotechnical Solutions, Inc. observations and compaction testing, it is our professional opinion that the geotechnical engineering aspects of the construction have been completed in compliance with the approved geotechnical report(s), and grading plans. It is also our professional opinion that the site is suitable for its intended use. ~'ll~'Geotechnical Solutions, Inc., has performed engineering observations and compaction testing for the project with the degree of skill and care ordinarily exercised by geotechnical engineers practicing for similar projects and in this localities. No other warranty, expressed or implied is given regarding the conclusions or professional opinions given in this report. ~'11~• Geotechnical Solutions, Inc. assumes no responsibility for any work or fill materials placed without our knowledge and/or inspection and testing. Distribution: Address ( e-mail) §Jl§GEOTECHNICAL SOLUTIONS, INC. Project No. FC-19-08-145 September 5, 2019 Prophet Solutions, Inc. Mr. Rod Boone 5845 Avenida Encinas, Suite 138 Carlsbad, California 92008 §M§ GEOTECHNICAL SOLUTIONS, INC. Consulting Geotechnical Engineers & Geologists 5931 Sea Lion Place, Suite 109 Carlsbad, California 92010 760-602-7815 smsgeosol.inc@gmail.com Report of Geotechnical Engineering Observations And Compaction Testing, Remedial Pad Grading, Proposed Madison Street Apartments, 3130 Madison Street, Carlsbad, California (Project No. PD 2019-0007, Drawing No. 516-SA) Submitted herewith please find the following summary report of our geotechnical engineering observations and compaction testing completed by our firm in connection with the remedial building pad grading at the above-referenced property. Approximate limits of the remedial grading works and compacted fill areas at the property are delineated on the enclosed Approximate Compaction Tests Location Map (Figure 1), reproduced from the project Grading Plans (Sheet 2 of 4). Overall, associated operations at the project site chiefly consisted of demolition works of pre- existing structures and site improvements, and remedial building pad grading for reestablishing final design grades. Earthworks and remedial building pad grading operations within the designated limits were performed under engineering observations and compaction testing services provided by this office from August 21 , 2019 through August 29, 2019. I. REFERENCES The following pertinent reports and documents were used as a basis of our engineering observations and compaction testing services. 1. "Grading Plans For Madison Street Apartments (4-Unit Apartment Complex)," Sheet 2 of 4, Prepared by bHA, Inc., dated July 22, 2019. 2. "Geotechnical Grading Plan Review And Response to Third-Party Review Comments, Proposed Madison Street Apartments, 3130 Madison Street, Carlsbad, California 92008 (GR2019-0004, PD2019-0007, DWG516-5A)," prepared by SMSGeotechnical Solutions, Inc., Project No. GI-18-03-119, dated April 26, 2019. Report of Geotechnical Engineering Observations And Compaction Testing Page 2 Proposed Madison Street Apartments, Carlsbad September 5, 2019 3. "Geotechnical Foundation Plan Review, Proposed Madison Street Apartments, 3130 Madison Street, Carlsbad, California," prepared by SMS Geotechnical Solutions, Inc., Project No. GI-18-03-119, dated March 11, 2019. 4. "Geotechnical Investigation, Proposed Madison Street Apartments, 3130 Madison Street, Carlsbad, California," prepared by SMSGeotechnical Solutions, Inc., Project No. GI-18-03- 119, dated May 1, 2018. II. GEOTECHNICAL CONDITIONS Geotechnical conditions at the project site were found to be substantially the same as described in the referenced Geotechnical Investigation report (Referenced 4). All demolition works and site grubbing and clearing were completed prior to our first site on August 21, 2019. In general, the project property consists of a relatively level pad underlain by a thin section ofloose and compressible undifferentiated fill/topsoil deposits mantle, on the order of 12 inches, atop Quaternary age Old Paralic Deposits and Santiago Formation (buried). The upper near surface exposures of the underlying Old Paralic Deposits were found in a weathered loose to medium dense conditions becoming dense and tight with depth. III. LABORATORY TESTING Pertaining maximum dry densities and optimum moisture contents (ASTM D1557) for the onsite representative soil types were obtained from the project Geotechnical Investigation report, dated May 1, 2018 (Reference 4). Pertinent test results are summarized on the attached Compaction Test Results, Figure 2. IV. GROUND PREPARATION AND REMEDIAL GRADING OPERATIONS Prior to the remedial grading operations, any surface vegetation, roots and tree stumps, old foundation, surface improvements and buried structures were removed and cleared for the project areas, as appropriate. Surficial loose and compressible soil mantle and upper weathered section of the underlying Old Paralic Deposits within the Approximate Limits of Remedial Grading areas (see attached Approximate Compaction Tests Location Map, Figure 1) encompassing the building envelop plus a minimum of3 feet outside the perimeter were then stripped and removed. Removals were extended to a minimum depth of 4 feet below rough finish pad grade, or 2 feet below the bottom of deepest footing, whichever is more, exposing the underlying dense natural Old Paralic Deposits throughout. All exposed bottom of removals and over-excavations were visually examined, and probed to assure competent Old Paralic Deposits exposures suitable for receiving new fills. Report of Geotechnical Engineering Observations And Compaction Testing Page 3 Proposed Madison Street Apartments, Carlsbad September 5, 2019 Earth deposits generated from the onsite removals and over-excavations were reused as new fills and backfills and predominantly consisted of sandy to silty sand (SM/SP) deposits, ranging to very low expansion potential ( expansion index less than 20, based on ASTM D4829 classification). Site new fills and backfills were properly processed, moisture conditioned to near optimum moisture levels, manufactured into a uniform mixture, placed in thin ( approximately 8 inches thick) horizontal lifts and mechanically compacted with a Tracked Loader (CAT 963B), a Bobcat (259D) and a water truck to at least 95 percent of the corresponding laboratory maximum density per ASTM D1557, as required and where specified in the project soils report. Bottom of stripping, removals and over- excavations were additionally ripped, processed and recompacted to a minimum depth of 6 inches as a part of initial fill lift placement. Water was provided with a water truck. Engineering observation and compaction testing of the remedial pad grading operations carried out within the designated areas of the property were provided by this office from August 21 through August 29, 2019. Approximate limits of the remedial pad grading works, and field compaction test locations, as roughly established in the field by a hand level and pacing/tap measure form staking provided by others, or relative to identifiable features located at the site and noted on the project plans are shown on the enclosed Approximate Compaction Tests Location Map, Figure 1. Field density tests establishing both the in-place dry densities and moisture contents were performed in accordance with the ASTM D6938 (Nuclear Gauge) test methods, as the fill placement progressed. Test locations were placed to provide the best possible coverage. Areas of low compaction, as indicated by the field density tests, were brought to the attention of the project contractor. These areas were reworked by the contractor and retested. Field compaction test results including pertinent bottom of over-excavation and test elevations are tabulated on the enclosed Compaction Test Results, Figure 2. Engineering observations and compaction test results indicated that the new fills and backfills within the approved areas (see Approximate Limits of Remedial Grading on the enclosed Approximate Compaction Tests Location Map, Figure 1) were properly placed and compacted to at least 95 percent of the corresponding maximum dry density at the tested locations. Site preparations and remedial pad grading were conducted in substantial conformance with Chapter 18 (Soils and Foundations) and Appendix "J" (Grading) of the 2016 California Building Code (CBC), applicable codes, the Grading Ordinances for the city of Carlsbad and current engineering standards, as appropriate. All observations and testing were conducted by a representative from this office under direct supervision of the project geotechnical engineering. V. CONCLUSIONS AND RECOMMENDATIONS In our opinion, all site excavations and remedial building pad grading operations, fill/backfill placement and compaction procedures were completed in substantial conformance with the project soils reports (see References), approved plans, city of Carlsbad grading ordinances, applicable codes and current engineering standards, and are acceptable for their intended use. Report of Geotechnical Engineering Observations And Compaction Testing Page 4 Proposed Madison Street Apartments, Carlsbad September 5, 2019 All conclusions and recommendations including soil design parameters, geotechnical foundation/slab designs and improvement sections provided in the referenced reports (see References) stay unchanged, as specified therein and should be considered in the final designs and implemented during the construction phase, where applicable and as appropriate. VI. ADDITIONAL GEOTECHNICAL OBSERVATIONS AND TESTING This office should be notified before any of the following operations begin in order to schedule appropriate testing and/or field observations for confirmation and approval of the completed work: 1. Foundations and Utility Trenches: Engineering observations or testing will also be required for the following work prior to foundation and slab concrete pours: a) Observe the plumbing and utility trenches after the pipes are laid and prior to backfilling. Backfill soils within trenches 12 inches or more in depth shall be compacted by mechanical means to a minimum of 95 percent of the corresponding maximum dry density, unless otherwise specified. Jetting or flooding of the backfill is not allowed. Care should be taken not to crush the utilities or pipes during the compaction of the trench backfill. b) Test the plumbing trenches beneath the floor slabs for mm1mum compaction requirements prior to sand and moisture barrier placement. c) Confirm minimum foundation embedment requirements and observe bottom of the footing trenches for proper compaction levels, including design foundation widths and embedment depths. Building foundations adjacent to the PICP pavements should be extended a minimum of24 inches below the bottom of the paver section (see referenced plans and reports). d) Confirm footing reinforcement size and placement, slab thickness and reinforcing, sand thickness and moisture barrier placement. 2. Fine Grading and Improvements: a) Observe placement and perform compaction testing for fills placed under any conditions 12 inches or more in depth, to include: • Pad perimeter contour grading for establishing positive (minimum 5 percent) drainage away from the building. • Utility and storm trench backfills. • Spreading or placement of soil obtained from any excavation (spoils from footings, underground utilities, etc.). Report of Geotechnical Engineering Observations And Compaction Testing Page 5 Proposed Madison Street Apartments, Carlsbad September 5, 2019 b) Any operation not included herein which requires our testing, observation, or conformation for submittal to the appropriate agencies. VII. DRAINAGE The owner/developer is responsible for insuring adequate measures are taken to properly finish grade the building pad after the structures and other improvements are in-place so that the drainage waters from the graded pad and improved sites as well as adjacent properties are directed away from the new building foundations. Stormwater and surface run off water should not be allowed to impact or saturate natural and graded ground surfaces, fills and backfills, foundation bearing and subgrade soils. Only the amount of water to sustain vegetation should be provided. A minimum of 5 percent gradient should be maintained away from all foundations, unless otherwise noted. Roof gutters and downspouts should be installed and all discharge from downspouts should be led away from the foundations and slab to a suitable location. Install area drains in the yards for collection and disposal of surface water. Planter areas adjacent to foundations should not to allowed. Site retaining walls should be provided a well-constructed back drainage. Planting large trees behind site retaining walls and near the building foundations should be avoided. It should be noted that shallow groundwater conditions may develop in areas where no such conditions existed prior to site development. This can be contributed to by substantial increases of surface water infiltration resulting from landscape irrigation which was not present prior to the site redevelopment. It is almost impossible to absolutely prevent the possibility of shallow water conditions developed from excessive landscape irrigation over the entire site, onsite drainage facilities and site flooding due to a major storm event. Street runoff flow shall be diverted from entering the property. We also recommend that shallow water conditions, if developed, be immediately remedied by implementing appropriate measure, which may include the installation of sub-drain( s) consisting of a 4-inch diameter perforated pipe (SD R 3 5) surrounded in ¾-inch rocks all wrapped in filter fabric. The property owner( s) should be made aware that altering drainage patterns, landscaping, the addition of patios, planters, and other improvements, as well as over-irrigation and variations in seasonal rainfall, all affect subsurface moisture conditions, which in tum affect structural and overall building pad performance. Report of Geotechnical Engineering Observations And Compaction Testing Page 6 Proposed Madison Street Apartments, Carlsbad September 5, 2019 Project development includes the installation ofPervious (Permeable) Interlocking Concrete Pavers (PICP) with an adequate storage capacity for retaining the majority of the onsite storm waters, as part of the storm water BMP designs (see project plans). The PICP pavers requires periodic monitoring and some maintenance that is the responsibility of the current and future property owner(s), in order prevent any potential for failures or impacts on the nearby structures and improvements. Prolonged excessive accumulation of water collected in the storage zone ofPICP, if it is allowed to occur, can have a major adverse impact on the stability of on and off site adjacent structures and improvements, and shall not be permitted. To reduce potential problems associated with project PICP driveway, the following recommendations are presented: 1. Establish and carry out a periodic maintenance/monitoring of the PICP pavements and associated drainage facilities by a qualified personnel. For this purpose, a regular maintenance, upkeep, and repair program should be considered and implemented, as necessary and appropriate. As a minimum, monitoring, and maintenance if needed, on a semi-annual basis (before and after the rainy season) and immediately after a major storm event should be considered. 2. Provide landscaping consisting of drought resistant plants and monitor the amount of irrigation that is suggested. Irrigation should be limited to the amount of water necessary to sustain plant life. A landscape architect may be consulted in this regard. 3. Should any saturated surfaces or seepage conditions occur, the project design consultant should be immediately notified. Additional recommendations and mitigation measures may be necessary and should be provided at that time which may be expected to include the installation of a subsurface or pavement underdrain(s) consisting of a 4-inch diameter (Sch 40) perforated pipe with a filter sock to allow relief from excessive accumulation of collected water in the PICP pavement storage zone. VIII. LIMITATIONS Our description of the remedial grading operations, as well as observations and testing services described herein, are limited to the work performed by this office during the period from August 21 through August 29, 2019. The recommendations provided herein have been based on our field observations and testing, as noted. No representations are made as to the quality or extent of materials not observed and tested. All geotechnical information, test location and mapping on the enclosed Approximate Compaction Tests Location Map are based on rough field measurements for the purpose of geotechnical presentations only. Report of Geotechnical Engineering Observations And Compaction Testing Page 7 Proposed Madison Street Apartments, Carlsbad September 5, 2019 This report is issued with the understanding that the owner or his representative is responsible for ensuring that the information and recommendations are provided to the project architect/structural engineer and respective contractors so that they can be incorporated into the plans and implemented at the site. Necessary steps shall be taken to ensure that the project general contractor and subcontractors carry out such recommendations during construction. The project geotechnical engineer should also be provided the opportunity to field verify the foundation trenching, and foundations/slab steel reinforcement prior to placing concrete. If the project geotechnical engineer is not provided the opportunity of making these reviews and observations, he can assume no responsibility for misinterpretation of his recommendations. This report should be considered valid for permit purposes for a period of six months and is subject to review by our firm following that time. IF ANY CHANGES ARE MADE IN THE FINAL PAD SIZE,LINESANDGRADES,BUILDINGLOCATION,ELEVATIONS,ETC.,PRIOR TO THE CONSTRUCTION, THIS REPORT WILL BECOME INVALID AND FURTHER ENGINEERING AND RECOMMENDATIONS WILL BECOME NECESSARY. If you have any questions or need clarification, please contact this office at your convenience. Reference to our Project No. FC-19-08-145 will help to expedite our response to your inquiries. We appreciate this opportunity to be of service to you. SM§ Geotechnical Solutions, Inc. Attachments: Approximate Compaction Tests Location Map, Figure 1 Compaction Test Results, Figure 2 Distribution: Addressee (3, e-mail) SM§ GEOTECHNICAL SOLUTIONS, INC. ATTACHMENTS PROJECT NO: PROJECT NAME: PROJECT LOCATION: COMPACTION TEST RESULTS FC-19-08-145 Madison Street Apartments 3130 Madison Street, Carlsbad LABORATORY MAXIMUM DRY DENSITY/ OPTIMUM MOISTURE CONTENT TEST RESULTS (ASTM D1557): Soil Type (1): Maximum Dry Density: Dark to Tan-Orange Brown Silty Sand 130.0 pcf Optimum Moisture: 9% FIELD COMPACTION TEST RESULTS (ASTM D6938): Test Approximate Approximate Field Date No. Test Test Moisture Location Elevation (ft, MSL) (%) 08/23/2019 I Well Area, Westerly 46'± 10.1 08/23/2019 2 Pad Area, Westerly 48'± 7.8 08/23/2019 3 Pad Area, Westerly 48'± 9.5 08/26/2019 4 Pad Area, Central 49.8'± 7.9 08/26/2019 5 Pad Area, Central 49.8'± 8.5 08/26/2019 6 Pad Area, Central 49.8'± 9.6 08/27/2019 7 Pad Area, Easterly 50.9'± 9.8 08/27/2019 8 Pad Area, Easterly 50.9'± 9.4 08/27/2019 9 Pad Area, Easterly 50.9'± 8.7 08/29/2019 lO Pad Area Rough Finish Grade 8.8 08/29/2019 11 Pad Area Rough Finish Grade 8.9 08/29/2019 12 Pad Area Rough Finish Grade 7.8 08/29/2019 13 Pad Area Rough Finish Grade 8.2 08/29/2019 14 Pad Area Rough Finish Grade 9.1 08/29/2019 15 Pad Area Rou_gh Finish Grade IO.I Field Soil Dry Type Density(pcf) 123.5 I 124.9 I 123.8 I 124.0 I 124.5 I 123.5 I I 18.6 I 124.0 I 123.5 I 124.2 I 123.7 I 125.2 I 123.5 I 125.3 I 124.4 I SMSGeotechnical Solutions, Inc. Max. Relative Dry Compaction Comments Density(pcf) (%) 130.0 95 Bottom of Over-Ex. @46'± 130.0 96 130.0 92 130.0 95 Bottom of Over-Ex. @47.5'± 130.0 96 130.0 95 130.0 91 Bottom of Over-Ex. @ 48.5'± / Failure 130.0 95 Retest # 7 130.0 95 130.0 96 130.0 95 130.0 96 130.0 95 130.0 96 130.0 96 Figure 2