Loading...
HomeMy WebLinkAboutLFMP 04; LOCAL FACILITIES MANAGEMENT PLAN ZONE 04; LOCAL FACILITIES MANAGEMENT PLAN ZONE 4; 1987-05-20Number Date ·cITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES MANAGEMENT PLAN ZONE 4 City Council Resolution No. 9122 Dated June 16, 1987 Planning Commission Resolution No. 2659 Dated May 20, 1987 AMENDMENTS Reso. No. Subject(s) CITY OF CARLSBAD GROWTH MANACENENT PROCRAN LOCAL FACILITIES MANAGEMENT PLAN ZONE 4 Plan Sponsor: City of Carlsbad 1200 Elm Avenue Carlsbad, CA 92008 (619) 438-5621 Preparer: Planning Department City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 92009 (619) 438-1161 May 20, 1987 I. II. III. IV. v. VI. TABLE OF CONTENTS Executive Summary •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Introduction •••••••••••••••••••••• • • • • • • • • • • • • • • Buildout Projections •••••••••••••••••••••••••••• Phasing •.•...•. • .....•.•..••••••••••.•.••••.•••• Zone Requirements for Public Facilities and Services •.••.••...•......•....••...... . . . . . Analysis of Public facilities and Improvements 1 • 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. City Administrative Facilities ••••••••••••• Adequacy findings ••••••••••••••••••••• Library .••..•••..•..••.••.••••••.......•.•. Adequacy Findings ••••••••••••••••••••• Wastewater Treatment Capacity ••• , ••• Adequacy Findings •••••••••••••• ....... ....... Parks •••••••••••••••••••••••••••••••••••••• Adequacy Findings ••••••••••••••••••••• Drainage •••••••••.•.•••.•.•..••••...•...••• Adequacy findings ••••••••••••••••••••• Circulation ••••••••••••••• . . . ~ . . . . . . . . . . . . . Adequacy findings •••• • • • • • • • • • • • • • • • • • F 1 re ..•.••...•............................. Adequacy Findings ••••••••• . . . . . . . . . . . . Open Space ••••••••••••••••••••••••••••••••• Adequacy Findings ••••••••••••••••••••• Schools ................................... • Adequacy Findings •••• . . . . . . . . . . . . . . . . . Sewer Collection System •••••••••••••••••••• Adequacy Findings ••••••••••••••••••••• Water Distribution System •••• Adequacy Findings ••••••• i . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page No. 1 9 15 23 27 29 36 38 44 47 52 53 60 62 66 67 71 74 77 78 81 82 86 88 93 96 100 TABLE OF CONTENTS Paoe No. VII. Appendices Appendix 1. -Glossary........................ 104 Appendix 2. -Growth Management Ordinance..... 110 Appendix 3. -Sources......................... 133 Appendix 4. -Planning Commission Resolution No. 2659............ 135 -City Council Resolution No. 9122............ 139 11 CHARTS, MAPS, TABLES AND EXHIBITS Local Facilities Management Plan Map •••••••••••••••••••• Public Facilities Summary Sheet ••••••••••••••••••••••••• Local Facilities Management Plan Map/Zone 4 ••.•••••••••• General Plan -Land Use Map ••••••••••••••••••••••••••••• Zoning Map •••••••••••••••••••••••••••••••••••••••••••••• Existing Land Use Categories, Exhibit A ••••••••••••••••• Approved Development Projects by Land Use Categories, Exhibit B •••• . . . . . . . . . . . . . . . . . . . Approved Development Projects, Exhibit C •••••••••••••••• Vacant Land Use Categories, Exhibit D ••••••••••••••••••• Buildout Population Projections ••••••••••••••••••••••••• Residential Phasing ••••••••••••••••••••••••••••••••••••• City Administrative Facilities Library Map ............................................ . Summary Sheet ••••.•.....•.••••.••••....•••••••• Facility Planning and Adequacy Analysis •••••••• Five-Year CIP ••.•........•....••••.••.......... Dwelling Unit and Population Projections, Exhibit E .•..••............................• City Administrative Facilities, Exhibit F •••••• Zone 4 Demand Comparison, Exhibit G •••••••••••• Map •••••••••••••••••••••••••••••••••••••••••••• Summary Sheet •••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis •••••••• Planning Projections, Exhibit H •••••••••••••••• Zone 4 Demand Comparison, Exhibit I •••••••••••• 111 Page No. 2 5 12 13 14 18 19 20 21 22 25 30 31 32 33 34 35 37 39 40 41 43 46 CHARTS, MAPS, TABLES AND EXHIBITS {Continued) Wastewater Treatment Parks Drainage Map ••••••••••••••••••••••••••••••••••••••••••• Summary Sheet •••••••••••••••••••••••••••••••.• Facility Planning and Adequacy Analysis ••••••• Phasing •••..••.•.•••..•.•••.••••...•••.•••••.. Park District Boundary Map •••••••••••••••••••• Map ••••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Summary Sheet ••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis ••••••• Park Demand, Park District 3, Exhibit J ••••••• Park Demand, Zone 4, Park District 3, Exhibit K ••••••••.••••.••.••.•••••••••...•• Map ••••••••••••••••••••••••••••••••••••••••••• Summary Sheet ••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis ••••••• Circulation Fire Map ••••••••••••••••••••••••••••••••••••••••••• Summary Sheet ••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis ••••••• Buildout Improvements, Table 1 •••••••••••••••• Map ••••••••••••••••••••••••••••••••••••••••••• Summary Sheet ••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis ••••••• Open Space Map •••••••••••••••••••••••••••••••••••••••••••• Summary Sheet •••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis •••• ~ ••• iv Page No. 48 49 50 51 54 55 56 57 58 59 63 64 65 68 69 70 73 75 76 77 79 80 81 Schools CHARTS, MAPS, TABLES AND EXHIBITS (Continued) School District Boundary Map ••••••••••••••••••• Map •••••••••••••••••••••••••••••••••••••••••••• Summary Sheet •••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis •••••••• Sewer Collection System Sewer District Boundary Map •••••••••••••••••••• Map •••••••••••••••••••••••••••••••••••••••••••• Summary Sheet •••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis •••••••• Sewer Demand, Exhibit L •••••••••••••••••••••••• Water Distribution System Water Service Boundary Map ••••••••••••••••••••• Map •••••••••••••••••••••••••••••••••••••••••••• Summary Sheet •••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis •••••••• Appendices Bridge and Thoroughfare District ••••••••••••••• Traff le Impact Fee ••••••••••••••••••••••••••••• V Page No. 83 84 85 86 89 90 91 92 95 97 98 99 100 108 109 1 EXECUTIVE SUMMARY ZONE.4: LOCAL FACILITIES MANAGEMENT PLAN 2 t Cllpel~ -----..... - -JANUARY 1887 EXECUTIVE SUNNA■Y The local Facilities Management Pl~n for Zone 4 was prepared pursuant to the City's Growth Management Program, Title 21, Chapter 21.90 of the Carlsbad Municipal Code. The contents of the plan follow the outline established by Section 21.90.110 of the Growth Management Ordinance. The Zone 4 plan is consistent with the Citywide Facilities and Imp~ovements Plan, and it implements the Citywide plan adopted September 23, 1986. The Zone 4 plan begins with the assumptions used to generate the buildout projections for residential and non- residential development within the Zone. The plan then phases or estimates the Zone's development on a yearly basis until buildout. The phasing is done to predict future facility demands. Each facility that is required to be addressed is then analyzed. The analysis includes an inventory of existing and proposed facilities,· a phasing schedule that establishes the timing for the provision of facilities in relationship to demand, and a financing plan that establishes various methods of funding facilities and improvements that are identified by the plan as needed. Since this Zone plan ls a regulatory document, each facility section also contains conditions to ensure that public facilities will conform ·to the adopted performance standards. The conditions will be adopted as part of the Zone 4 approval, and mandatory compliance will regulate -future development within the zone. The purpose of the summary chart shown below ls to provide a brief synopsis of the local Facilities Management Plan for Zone 4. City Ad ■lnlstratlve Library Waste Water Treat ■ent Capacity SUNNARY CHART Existing facilities meet the adopted performance standard until the year 2005. Library space is currently below standard. Until this is brought into conformance, no residential development may occur in Zone 4 or the City. Existing facilities meet the adopted performance standard to buildout of Zone 4. 3 Parks Drainage Circulation fire Open Space Schools Sewer Collection Syste ■ Water Distribution Park District 3 does not conform with the adopted peformance standard. Until this facility ls brought into conformance, no residential develop- ment may occur in this quadrant. Existing facilities meet the adopted performance standard to buildout of Zone 4. The existing road segments and intersections in Zone 4 currently meet the adopted performance stan- dard. Existing facilities meet the adopted performance standard to buildout of Zone 4. Existing open space meets the adop- ted performance standard to buildout of Zone 4. Existing school facilities currently have the capacity to meet the the demand generated by Zone 4. The School District has indicated that it will be able to provide capacity to buildout of Zone 4. Existing sewer comply with the standard to the Zone 4. collection networks adopted performance ultimate buildout of Water service to Zone 4 meets the adopted performance standard to the buildout of the Zone. 4 PUBLIC FACILITIES SUMMARY SHEET Conformance with Adopted Standard Cit):'.:wide Quadrant Zone 4 1) City Administrative Facilities Until 2005 NIA N/A 2) Library No* Presently below standard 3) Waste Water Treatment Capacity Yes With Phase IV expansion 4) Parks NIA No No** To Bulldout 5) Drainage N/A NIA Yes To Bulldout 6) Circulation N/A NIA Yes To Bulldout 7) Fire NIA NIA Yes To Bulldout 8) Open Space NIA NIA Yes To Buildout 9) Schools NIA NIA Yes To Bulldout 10) Sewer Collection System NIA NIA YES To Bulldout 11) Water Distribution System NIA NIA YES N/A = Not Applicable * No residential development may occur in the City until the Library shortage is rectified. Staff is recommending that construction of a Southern Library be added to the Capital Improvement Program Budget. ** No residential development may occur in the Southwest Quadrant until the park short-age is rectified. See Pages 60 and 61 for alternative solutions. 5 1 • GENERAL CONDITIONS All development within Zone provisions of Section 21.90 of and to the provisions and Facilities Management Plan. 4 shall conform to the the Carlsbad Municipal Code conditions of this Local 2. All development within Zone 4 shall be required to pay a public facility fee pursuant to the standards adopted by the City Council on April 22, 1986, and all other applicable fees. Development in Zone 4 shall also be responsible for any additional fees to be incorporated into this plan that are found to be necessary to enable facilities to meet the adopted performance standard. 3. The City of Carlsbad shall monitor all facilities in Zone 4 pursuant to Subsections 21.90.130(c), (d) and (e) of the Carlsbad Municipal Code. 4. All development in Zone 4 shall be in conformance with the adopted Citywide Facilities and Improvements Plan as adopted by City Council Resolution 8797. 5. Periodic amendment to the Zone 4 Local Facilities Management Plan is anticipa~ed to incorporate newly acquir~d data, to add conditions and upgrade standards as determined through the required monitoring program. Amendment to this Plan may be initiated by action of the Planning Commission or City Council at anytime. 6. If a public facility or service is found not to be in conformance with an adopted performance standard during the yearly monitoring, or at any other time, the matter will be immediately brought before the City Council. If the City Council determines that a non-conformance does exist then no future building or development permits, which would impact the facility, shall be issued until those facilities are brought into conformance with the adopted performance standard. SPECIAL CONDITIONS FOR ZONE 4 The following Special Conditions apply specifically to development in Zone 4 and must be complied with in addition to the General Conditions for Zone 4. These conditions are also listed separately under the analysis discussion of each facility. City Ad ■inistrative Facilities No special conditions are necessary at this time. 6 Library No residential building or development permits shall be issued in Zone 4 including those projects previously exempt under Section 21.90.030(c) of the Carlsbad Municipal Code until the City Council takes action approving measures which provide for library services to meet the adopted performance standards. Wastewater Treat ■ent Capacity The conformance of waste water treatment capacity assumes the Phase IV expansion of Encina WPCF. Without any expansion of Enclna's treatment capacity the facility would not meet the performance standard of treatment capacity for at least five years. Therefore, pursuant to Section 21.90 of the Carlsbad Municipal Code, should the Phase IV expansion be delayed for any reason, the analysis of the facility must be reassessed. Should the facility fall to comply with the adopted performance standard then an alternative measure would need to take place or all development would be stopped in Zone 4 and within the Carlsbad sewer service area. Parks No residential building or development permits shall be issued in Zone 4 or the Southwest Quadrant including those projects previously exempt under Section 21.90.030(c) of the Carlsbad Municipal Code until the City Council takes action approving measures which provide park facilities to meet the adopted performance standard. Drainage Drainage facilities shall be provided at the time of development to the satisfaction of the City Engineer. Circulation All future development within Zone 4 shall continue to pay Traffic Impact Fees, Public Facilities Fees and participate in the Bridge and Thoroughfare Benefit District. Fire No special conditions are necessary at this time. Open Space No special conditions are necessary at this time. 7 Schools No special conditions are necessary at this time. Sewer Collection Syste ■ No special conditions are necessary at this time. Water Dlstrlbatlo• Syste■ All development within Zone 4 shall pay the required Costa Real Municipal Water District fees. 8 9 INTRODUCTION I. INTRODUCTION The purpose of this Local Facility Management Plan ls to complete the second phase of the overall Growth Management Plan for Zone 4 within the City of Carlsbad. Phase One of the Growth Management Program established the Citywide Facilities and Improvements Plan based upon a phased bulldout of the City's existing General Plan. For purposes of public facilities analysis, the City has been separated into 25 Local Facilities Management Zones as shown on "Local Facility Management Plan Boundaries", on Page 2. PLAN OVERVIEW This plan for Zone 4 provides a detailed description and analysis of how this area of the City will develop from its current status to buildout. The plan also demonstrates how and when each facility and improvement will be constructed in order to accommodate development within the Zone (phasing). It also provides a complete description of how each facility and impr~vement will be financed-when mitigation is necessary. The body of ~he plan is divided into separate sections for each public facility. In each section there will be a summary sheet which highlights the important information described in the analysis. This summary is broken down into three categories: Existing, Existing plus approved, and Future. The demand column in each of these categories will show two numbers: Demand The top number (1) represents the Citywide, Quadrant or Zone demand, depending upon the public facility being evaluated. The lower number (2) represents the specific zone demand for the public facility evaluated on a Citywide or quadrant basis. Following the summary sheet will be the detailed analysis and additional information for each public facility. The sub- section, "Adequacy Findings", will summarize whether or not the public facility conforms with the adopted performance standard. If a facility ls not conforming with the adopted performance standard, there will be a discussion describing this situation, a mitigation or alternatives section, and a financing discussion. 10 ZONE --OVERVIEW The plan for Citywide· Facilities adopted performance development occurs. Zone 4 is consistent with all aspects of the and Improvement Plan and ensures that the standards shall be complied with as Local Facilities Management Zone 4 is located in the City's southwest quadrant and is generally bounded by Interstate 5 on the west and undeveloped land -to the east. The subject area is divided north and south by Paseo del Norte and east and west by Poinsettia Lane. Zone 4 consists of 500.7 acres of land which slopes moderately upward to the east from I-5. An open space corridor runs through the length of the Zone or, at times, runs immediately adjacent to the Zone. Zone 4 ls almost completely built out with residential development which ranges from single- family, R-1-7500 square foot lots, to sixplexes. The area includes a new City fire station and also an undeveloped 5.12 acre commercial site. The Map, "General Plan Land Use", shown on Page 13, denotes the General Plan Land Use for Zone 4. The accompanying Land Use Zoning is shown on the, "Zoning" map, on Page 14. 11 18 ZONE.-4; JANUARY 1887 LOCAL FACILITIES MANAGEMENT PLAN 12 Generali Plan-Land Use ZONE 4 ZONES l ,-·-·-·-·-·-·-·-·-·;·~ ! ·,._. . di! I I ! ~M ! I ........, I i i .. - .. I I I ; j ,.,_.. • I I ; RMH j I ! I I . ,.. I I .: RM RM . I i I . I . I LOCAL FACILITIES MANAGEMENT PLAN 13 ·--·~ I i i I ZONE 20 I ; ,-,-.. LEGEND MIIDINTIAL Ill. LOW Ol!NSITY (0-I. 5J 111M 109-MIDruM OINSITYI0--1) 11M MIDIUM OINSln' ( 4•8) -MIOIIJM HIGH Ol!NSITY (8-1') Ill HIGH l>IN.fflY (It-J9) COMMIICIAL 11111 ~VI UGIONAL llUAIL US DffNIIVI UGIONAL UTAU. U UGIONAI.SIIYICB C COMMUNITYCOMMIM:IAL N NIIGffllOIIIIOOO COMMUCIAL OS OPIN5PACI ND NON IIIIIDIHTIAI. USIIIVI t Cit, IIC••-a, .. ..,.._.,.,,..,_ -JANUARY 1187' ZONE !I ZONE 4 ZONE 5 Zoning l. ,(·-·-·-·-·-·-·-·-·-·-·i I '•-• • • I I PC • i ~ ! i ~~ : .. i .J .. I I I I I ! • i .. I .. I I ! ! I .. I I ~ c-2 PC I I PC .. , .. ROM ..... ..., I ; ~ ! ZONUJ I ; ,.. I ... .. , .. r-r .' I .. ! I ,-. I . LEGEND IIIIDINTIAL P.C PI.ANNIDCOMMUNmZl-■•4 Rl!SIDINTIAL AGIIK.1JL'rulW. ZONI ■·I ■IJIW. USIDe<TIAl ISTATI! ZON1 ■-I ONl·MMILY USIDINTW. ZON1 ■· l 1'fl>MMU.Y -01!N114L ZON1 ■· l NI ,.11,u MMILY llESIO!NlW. 7.cJNI! I ■-51. IJMIT!D MULTI·FAMllY IU!SIDINTW. ZON1 ID-M ■alD.DrTW.DINSlll'-Nl.11.Tlft! ZON1 IID-H IUID!lmAI.DIMITY-HIGH ZONI! -USIIJlloln.\L-LIHOMIMUZCINII . I·~ USIIIIN'llAL PIIUfUSIONAL ZONI llf IIIIIDIHTIM. 101J11sr Z0N1 .., IU!SIDmmALWA,._IOHI C:OJUIIIICIAL O OMCaZONI C. I NIJGHIOtUIOOD COMMIICIAL ZON1! C.J -COMN-ZONI JANUARY 1887 LOCAL FACILITIES MANAGEMENT PLAN 14 15 BUILDOUT PROJECTIONS II. BUILDOUT ASSUMPTIONS AND PROJECTIONS To properly assess and plan for public facilities and services in Zone 4, it is necessary to project the level of development that can be anticipated at the ultimate buildout of this Zone. Buildout projections are used to determine existing residential and non-residential land uses and to assess the ultimate potential that may be reached at the time Zone 4 is built out. The ultimate buildout of Zone 4 has been determined by examining: 1. The amount of existing land use, 2. The amount of approved, yet undeveloped land uses, and 3. The vacant land which can still be developed. The methodology used to compile the buildout projections is consistent with that used in the Citywide Facilities and Improvements Plan and assumptions are described below: A. B. Existing Land Uses Surveys and analysis were conducted to determine the acreage of each land use category within Zone 4. Field checks and subsequent research ascertained how each parcel was actually being utilized as well as the square footage of existing commercial/industrial structures. The following Exhibits detail this information: Exhibit A, "Existing Land Use Categories", Page 18. Approved But Undeveloped Land Exhibit B, "Approved Development Projects By Land Use Category", on Page 19 includes land uses which have approved projects but which have not been developed as of January 1, 1987. Buildout is constrained by approved projects because the land has been committed to a particular use or density, even though it ls presently vacant. Approved projects are those ~hich have received discretionary approval by the Planning Commission and/or City Council. C. Vacant Land All vacant land was inventoried by land use type to determine ultimate bulldout of the zone. The Citywide plan directed all environmentally constrained land to be subtracted from the gross acreage figure for vacant land. Zone 4 is in an infill area, however, and the remaining vacant land has very minimal environmental constraints. 16 There are currently 2,448 existing residential units in Zone 4. An additional 581 units have been approved for development and may pull building permits prior to the Local Plan being adopted. After the adoption of this Plan by the City Council, no building permits or development permits will be allowed unless the adopted performance standards are complied with. This includes all projects which were exempt under Section 21.90.030(c) of the Carlsbad Municipal Code. Zone 4 exceeds the growth control yield by 696 units. This has occurred because existing development was approved at a time when higher density levels were permitted. Residential density in Zone 4 will be balanced out by reduced development in Zones 9, 19, 20, 21, 22 and 23, in the southwest quadrant. Growth in the southwest quadrant will be consistent with the Carlsbad Municipal Code as amended pursuant to the approval of Proposition Eon November 4, 1986. Therefore, growth will be in conformance with the residential quadrant cap. The additional finding can be made that there are facilities to service the demand created by Zone 4, as well as capacity in the quadrant to allow the residential unit total to exceed the growth control yield. 17 EXHIBIT A ZONE 11, EXISTING LAND USE CATEGORIES Listed below are the type and acreage of each land use category within Zone 4. GENERAL PLAN LAND USE DESIGNATION RESIDENTIAL: Rl low Density (0-1.5) RLM low-Med Density (0-4) RM Medium Density (4-8) RMH Med-Hi Density (8-15) RH High Density (15-23) COMMERCIAL: CBD Central Business District C Community N Neighborhood RC Recreation TS Travel Services 0 .Professional & Related RRE Extensive Regional Retail RRI Intensive Regional Retail RS Regional Service INDUSTRIAL: PI Planned Industrial OTHER: E J H HC p G u NRR OS RR FW MAJ MIN COL Elementary School Junior High School High School Continuation School Private School Government Facility Public Utilities Non-Residential Reserve Open Space Railroad Freeway Major Arterial Minor Arterial Collector Street 18 DWELLING UNITS 302 2727 SQUARE FOOTAGE ACRES 86 342 ACRES 5.1 67.6 EXHIBIT B ZONE 4 APPROVED DEVELOPMENT PROJECT BY LAND USE CATEGORIES Listed below are the number of units or acreage of each land use category with approved, but unbuilt, projects within Zone 4. GENERAL PLAN LAND USE DESIGNATION RESIDENTIAL: RL Low Density (0-1.5) RLM Low-Med Density (0-4) RM Medium Density (4-8) RMH Med-Hi Density (8-15) RH High Density (15-23) COMt-ERCIAL: CBD Central Business District C Community N Neighborhood RC Recreation TS Travel Services 0 Professional & Related RRE Extensive Regional Retail RRI Intensive Regional Retail RS Regional Service INDUSTRIAL: PI Planned Industrial OTHER: E J H HC p G u NRR OS Elementary School Junior High School High School Continuation School Private School Government Facility Public Utilities Non-Residential Reserve Open Space DWELLING UNITS 581 ACRES * See Exhibit C for a further breakdown of specific projects. 19 EXHIBIT C ZONE_, APPROVED DEVELOPMENT PR03ECTS Listed below are development projects located in Zone 4. City File Project Dwelling Number Name Units Acres CT 82-24. Seagate Village 288 35.4 CT 73-24/SP-175 Alta Mira 198 29.6 CT 73-24/SP-175 Alta Mira 280 22.6 CT 73-24/SP-175 Alta Mira 128 21.5 CT 73-24/SP-175 Alta Mira 140 16.1 CT 82-29 /PUD-61 Harbor Pointe (Warmington) 381 56.7 CT 81-30 Pacesetter, Seacrest 260 27 .9 PCD-66 Seascape 208 21.6 CT 83-2 Standard Paci f le (las Playas) 392 51.7 CT 83-2 Standard Pacific (Vista Pacifica) 192 34.6 CT 73-39 Spinnaker Hills 302 83.0 CT 74-24 Occidental (Plaza Builders) 260 27.6 20 EXHIBIT D ZONE 4 VACANT LAND USE CATEGORIES As of January 1, 1987, the following types and anounts of land use are vacant and not in the development process. GENERAL PLAN LANO USE DESIGNATION RESIDENTIAL: RL Low Density (0-1.5) RLM Low-Med Density (0-4) Single Family Duplex RM Medium Density (4-8} RMH Med-Hi Density (8-15) RH High Density (15-23} COMtERCIAL: CBD Central Business District C Community N Neighborhood RC Recreation TS Travel Services 0 Professional & Related RRE Extensive Regional Retail RRI Intensive Regional Retail RS Regional Service Itl>USTRIAL: PI Planned Industrial OTHER: E J H HC p G u NRR OS RR FW MAJ MIN COL Elementary School Junior High School High School Continuation School Private School Government Facility Public Utilities Non-Residential Reserve Open Space Railroad Freeway Major Arterial Minor Arterial Collector Street GROSS VACANT ··ACRES 5.1 21 NET VACANT ACRES 2.1 BUILDOUT PROJECTION Residential The Management generation existing, breakdown, residential buildout population projection for Zone 4 was determined by applying a population rate of 2.471 persons per dwelling unit to the approved and potential future units. The population therefore, is as follows: Units Rate Existing 2,448 X 2.471 = Approved 581 X II = Future 0 X n = Total 3,029 X II = The buildout population projections throughout this plan for the purpose of public facilities and improvements. Non-Residential Population 6,049 1,436 0 7,484 are used consistently predicting demand for The non-re.sidential buildout projection for Management Zone 4 was determined by totalling the existing, approved and potential future square footage by use category. Building permit files were researched to determine the existing and approved square footage. Vacant land square footage was calculated by multiplying the gross vacant acres (found on Exhibit D Vacant Land Use Categories) by 401 and then converting the results to square footage. The non-residential buildout breakdown, therefore is as follows: Existing Approved Future Non-Residential Buildout Projection 22 Square Footage 89,211 89,211 23 PHASING III. PHASING -AN OVERVIEW It is necessary to provide a phasing schedule of development for the entire City, each quadrant, and each of the 25 local Facility Management Zones for the purpose of: 1. Projecting future demands for public facilities on a yearly basis; and 2. Establishing the thresholds which identify when a public facility is needed; and 3. Assisting with the development of the City's Capital Improvement Program budget. In the Citywide Plan, phasing of residential development was 1,250 dwelling units per year. These projections were based on a review of the San Diego Association of Governments (SANDAG) projections along with those utilized in the City's Capital Improvement Program and the Public Facilities Management Systems, Monitoring Report of April, 1986. In each local Plan a key element will be the projected phasing schedule of development within that specific zone. These schedules are presented for the purpose of establishing thresholds for demand and future demands for public facilities. By projecting these future public facility and improvement demands the appropriate funds may be allocated into the Capital Improvement Budget to assure they are in place as development occurs. The phasing schedule is not presented to establish a rate of growth within the City. It will be used to assure that growth occurs only as public facilities are available to ensure compliance with the adopted performance standards. The specific phasing schedule presented in this plan is provided to accomplish the three purposes of phasing which were discussed above. These projections have been established by reviewing development in the pipeline which has tentative and final maps as well as applications pending. The same type of phasing has been prepared for SANDAG's Series VII for the entire City and will be utilized to review phasing projections presented in this and other local plans to determine the overall impact on public facilities and services. Zone 4 -Phasing Schedule Phasing for Zone 4 in·corporates the Citywide projections as well as localized factors unique to the Zone. These localized circumstances include: 1. The amount and type of developing projects: -Final Maps -Tentative Maps -Applications Pending 24 2. The ultimate type and amount of land use potential. 3. The amount of development that can be reasonably absorbed into the market. The specific residential phasing schedule for Zone 4 is shown below. The schedule assumes the zone will be completely built out by the end of 1990. The schedule phases those projects identified in the developing process beginning in 1987 through 1990. During this time period it is estimated that a total of 581 additional residential units will be built in Zone 4. Year 1986 1987 1988 1989 1990 RESIDENTIAL PHASINC Zone 4 Yearly Dwelling Increase 230 115 115 121 Total Dwelling Units 2,448 2,678 2,793 2,908 3,029 In Zone 4 the non-residential land uses will be phased based upon previous growth trends, location of parcels, and current applications being considered by the Planning Department. In all, a total of 3,029 residential dwelling units will exist at the buildout of Zone 4. This residential total, although above the growth control point, ls in compliance with the Carlsbad Municipal Code as modified by the passage of Proposition E on November 4, 1986 because adequate public facilities can be provided. Although this zone exceeds the growth control point, future development in Zone 4 will be balanced by reduced development in the other zones within the southwest quadrant (Zones 9 and 19 through 23). The actual amount of reduced development per zone cannot be determined until all the local plans for the quadrant are submitted •. The total vacant non-residential land use is shown on Exhibit C, "Vacant Land Use Categories" on Page 20. There ls one remaining non-residential lot in Zone 4. This ls a 5.12 acre commercial lot which currently has no specific plan for development. Because there is only one non-residential lot remaining in the zone, no non-residential phasing schedule ls provided in this plan. 25 Phasing Summary It is estimated that the remaining residential units in Zone 4 will develop by 1990. Yearly residential growth is expected to range from a high of 230 units in 1987 to a low of 115 units in 1989 and 1990. Non-residential development of Zone 4 is limited to one 5.12 acre commercial lot. The specific phasing of Zone 4, is presented for the purpose of determining future annual demand and thresholds for public facilities. It is impossible to predict the exact way development will occur in this z9ne of the City, but through these phasing projections the City will be able to establish a direct link between development and the need for public facilities. This link will allow the City to ensure compliance with the adopted performance standards at all times as growth occurs. And if compliance is not maintained, development will be stopped until it conforms with the adopted performance standards. 26 27 ZONE REQUIREMENTS IV. ZONE REQUIREMENTS FOR PUBLIC FACILITIES AND SERVICES The Management Plan for Zone 4 addresses eleven separate facilities: 1. City Administrative Facilities 2. Library 3. Wastewater Treatment Capacity 4. Parks 5. Drainage 6. Circulation 7. Fire 8. Open Space 9. Schools 10. Sewer Collection System 11. Water Distribution System Each of these facilities will be evaluated to determine conformance with the adopted performance standard. The evaluation will be made in three stages based on existing demand, approved or committed demand, and future demand at buildout. For each of these facilities and services the following is provided: 1. An illustrative map showing what is existing and what will be needed as the zone develops to its ultimate bulldout; 2. District boundary maps where facilities are provided by special districts (le., school, water, sewer). 3. Adopted service level performance standards which must be complied with at all times as growth occurs; and 4. A detailed facility planning and adequacy analysis for each of the public facilities and services. 5. A list of special conditions for each facility to ensure conformance with the adopted performance standard. 6. A discussion of mitigation measures and financing mechanisms relevant to each facility. The Citywide facilities, which include City Administrative Facilities, Library, and Waste Water Treatment, have been analyzed in the Citywide Facilities and Improvements Plan. These will also be included in the Local Facility Management Plan to show compliance or to suggest alternatives to assure conformance with the adopted standard. 28 29 CITY ADMINISTRATIVE FACILITIES ZONE 4 LOCAL CITY ADMINISTRATIVE FACILITIES t • CITY ADMINl8TRATION•l>Cl8TINCI Q CITY AIIMINl8TRA TION-1'1..AHNID -_.--,--- ---.. ,t I 0 LIVE NH. IN I I , I to FACILITIES MANAGEMENT PLAN 30 CHyOfC- Gtowttl MaN,oeme,w Proa,MI -JANUARY 1987 LOCAL FACILITIES MANAGEMENT PLAN-Zone 4 BUILDOUT PROJECTION EXISTING APPROVED CJ z -"' c( l: ~ FUTURE CITY ADMINISTRATIVE FACILITIES SUMMARY SHEET DEMAND SUPPLY ADEQUACY (Caluiuwm . w181andard) 86,539 106,084 YES 9,074 118,867* 168,084 YES 2,153 202,371 168,084 YES*** 11,227 MITIGATION N/A N/A --- FUNDING N/A N/A --- * As of January 1, 1987, development generating 32,328 square feet of new demand has been approved but not yet constructed. ** In the year 2005 this facility will no longer conform to the adopted performance standard. *** Zone 4 ls scheduled to phase out all of its residential land by 1989. 31 I CITY ADNINISTRATIYE FACILITIES I. PERFORMANCE STANDARD 1,500 square feet per 1,000 population must be scheduled for construction within a five year period. II. FACILITY PLANNING AND ADEQUACY ANALYSIS The purpose of this not the performance standard Zone 4 complies with the Administrative Facilities. analysis is to determine whether or is being met, and if the demand for overall Citywide analysis of City A. Inventory 1 • Buildout Assumptions: Current (Citywide/Zone) Buildout (Citywide/Zone) Population 57,495/6,049 134,914/7,484 2. Existing City Administrative Facilities: City Hall Facilities City Hall Finance Dept. Modular Purchasing/Personnel Dept. Modular Leased Space Redevelopment Community Development Dept. Las Palmas Facility SQUARE FEET Square Footage Temporary Permanent Space Space 12,899 2,700 1,800 Public Safety and Service Center Phase I Police and Fire Depts. Vehicle Maintenance Totals Total Existing Facilities * Year-to-Year Option 53,700 10,358 76,957 32 4,500 Required Square Footage 86,539/9,074 202,371/11,227 Lease Leased Expi~ation Space Date 2,000 22,627 24,627 106,084 3/31/83* 7/31/90 As indicated on the table on the previous page, approximately 231 of existing administrative facilities are leased and 4.21 are temporary (portable modular units). If the rental leases are terminated or the modulars are no longer used, the existing square footage of City Administrative Facilities will be reduced. At that time, the Management Plan for Zone 4, as well as the Citywide Plan, will need to be amended to modify the phasing assumptions in order to plan for more City Administrative Facilities at an earlier time. 3. facilities in City's Five Year Capital Improvements Program: Item Sq. Ft. Year Amount Source a. Public Safety Center Phase II* Design Construction 86-87 62,000 89-90 $ 255,000 Pff** $3,455,000 PFF/S/W** b. Total Facilities in City's 5 Year Capital Improvements Program. 62,000 square feet * ** Public Safety Center Phase II. Yard offices, Maintenance shops, and Purchasing warehouse for the use of Utility Maintenance, Parks & Recreation Maintenance, Street Maintenance and Purchasing. Approximate size is 62,000 square feet. This includes a two-story yard office and Purchasing warehouse with a 6,400 square foot mezzanine. PFF -Public Facilities Fee S -Sewer W -Water Enterprise 33 From these population projections a demand for City Administrative Facilities has been assessed. The specific phasing for Zone 4 is being projected based on the number of projects which have received final approvals. The exact timing of these specific projects may vary, however, the timing of necessary public facility improvements would also vary accordingly. This will assure that the adopted performance standards will be met as development occurs. It should be noted that there is no more available residential land to be developed in Zone 4. Exhibit E is provided as a projection of growth throughout the City of Carlsbad on a yearly basis. YEAR EXHIBIT E P L A 1' 1' I 1' G P R O J B C 'l' I O If S O If L Y -----------------------------------------------DWELLING UNIT AND POPULATION PROJECTIONS ASSUMING A BUILDING RATE OF 1250 UNITS PER YEAR AND 2.471 PERSONS PER DWELLING UNIT EXISTING REMAINING PROJECTED BEGINNING, ENDING D. U. 'S D. U. 'S GROWTH YEAR YEAR POP. POP. ~---------------------------------------------------------------- 1987 23,348 31,251 1,250 57,693 60,782 1988 24,598 30,001 1,250 60,782 63,870 1989 25,848 28,751 1,250 63,870 66,959 1990 27,098 27,501 1,250 66,959 70,048 1991 28,348 26,251 1,250 70,048 73,137 1992 29,598 25,001 1,250 73,137 76,225 1993 30,848 23,751 1,250 76,225 79,314 1994 32,098 22,501 1,250 79,314 82,403 1995 33,348 21,251 1,250 82,403 85,492 1996 34,598 20,001 1,250 85,492 88,580 1997 35,848 18,751 1,250 88,580 91,669 1998 37,098 17,501 1,250 91,669 94,758 1999 38,348 16,251 1,250 94,758 97,847 2000 39,598 15,001 1,250 97,847 100,935 2001 40,848 13,751 1,250 100,935 104,024 2002 42,098 12,501 1,250 104,024 107,113 2003 43,348 11,251 1,250 107,113 110,202 • 2004 44,598 10,001 1,250 110,202 113', 290 2005 45,848 8,751 1,250 113,290 116,379 2006 47,098 7,501 1,250 116,379 119,468 2007 48,348 6,251 1,250 119,468 122,557 2008 49,598 5,001 1,250 122,557 125,645 2009 50,848 3,751 1,250 125,645 128,734 2010 52,098 2,501 1,250 128,734 131,823 2011 53,348 1,251 1,250 131,823 134,912 2012 54,598 l 1 134,912 134,914 2013 54,599 0 34 B. Phasing Population projections for the entire City were made within the Citywide Facilities and Improvements Plan which have been updated and are shown on Exhibit E. The following exhibit shows the yearly demand for City Administrative Facilities as well as the yearly demand created by Zone 4 based on the projected Citywide phasing. EXHIBIT f P LANN I NG_ PRO J E CT I ON S ON LY --------------------------------------------------CITY ADMINISTRATIVE FACILITIES PROJECTIONS ASSUMING A BUILDING RATE OF 1250 UNITS PER YEAR AND 2.471 PERSONS PER DWELLING UNIT (1,500 SQUARE FEET PER 1 1 000 POPULATION) YEAR ZONE 4 ZONE 4 CITYWIDE DEMAND BEGINNING 01/01/YR EXISTING CONFORMS/ POP. DEMAND BEGINNING 01/01/YR FACILITIES (NON - CONFORMING) . --~------------------------------------------------------~----- 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 6,049 6,617 6,902 7,186 7,186 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 7,485 9,074 9,926 10,352 10,779 10,779 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 11,227 86,243 90,876 95,509 100,142 104,775 109,408 114,042 118,675 123,308 127,941 132,574 137,207 141,840 146,473 151,107 155,740 160,373 165,006 169,639 174,272 178,905 183,538 188,172 192,805 197,438 202,071 202,371 106,084 106,084 106,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 19,841 15,208 10,575 67,942 63,309 58,676 54,042 49,409 44,776 40,143 35,510 30,877 26,244 21,611 16,977 12,344 7,711 3,078 (1,555) (6,188) (10,821) (15,454) (20,088) (24,721) (29,354) (33,987) (34,287) These projections were based on a review of the San Diego Association of Governments (SANDAG) p~ojections along with those utilized in the City's Capital Improvement Program and the Public Facilities Management Systems, Monitoring Report of April, 1986. 35 Currently, Zone 4 has 2,448 dwelling units which generates a 9,074 square footage demand for City Administrative Facilities. As of January 1, 1987, the existing Citywide demand for City Administrative Facilities was 86,539 square feet of which the demand for Zone 4 ls included. Zone 4 has the potential to create an additional 2,153 square feet of demand. c. Adequacy Findings City Administrative Facilities based upon the projected phasing. of Citywide development and that of Zone 4, will conform with the adopted standard until the year 2005. The following Exhibit G, "City Administrative Facilities", on Page 37 shows the existing and committed facilities, projected Citywide demand, and Zone 4's phased demand. Residential development in Zone 4 will be "phased out" by 1989. III. MITIGATION A. Special Conditions for Zone 4 No special conditions are necessary at this time. B. Financing Public Facilities Fees are continuing to be collected Citywide and in Zone 4. Future residential development will create a relatively small demand for City Administrative Facilities (2,153 sq. ft. of additional demand at buildout) therefore, it is assumed that the minimal proportionate share required of this zone will be financed by Public Facilities Fees paid by future Zone 4 development. In other words no other financing mechanism will be required as a condition of development relative to adequate City Administrative Facilities. 36 CITY ADMINSTRATIVE FACILITIES ZONE 4 COMPARISON 210 200 190 180 170 106,084 106,084 106,084 160 0 150 z <( 140 ~ w 130 0,........ (/) 120 u.. "O 0 C: 110 0 w I-(/) ...., w :> 100 W 0 u.. ..c: 90 I-w- Cl'.: 80 <( :::> 70 0 (/) 60 50 40 30 20 10,779 11,227 11,227 11,227 11,227 10 0 1990 1995 2000 2005 2013 DEMAND BY YEAR m )( ::c ' -m --I G) 38 LIBRARY ZONE 4 LOCAL ... __ ,,,ii" ZONE 4 ,, ..!-~ --1:9."'--,,,,, LIBRARY ,-r--- ----... ~, J I I I I ,o \ ' ' ', ...... ... , ' \ I I Cltyal~ Otowrft ......... Pt~-" -JANUARY 1187 FACILITIES MANAGEMENT PLAN 39 LOCAL FACILITIES MANAGEMENT PLAN-Zone 4 BUILDOUT PROJECTION DEMAND 46,154 EXISTING 4,839 63,396 APPROVED C, , 149** z -ct) < J: 107,931 Q. FUTURE 5,987 LIBRARY SUNNARY SHEET SUPPLY ADEQUACY (Ccduin ... wAltandard) 31,500 NO* 31,500 NO* ------ MITIGATION --- --- FUNDING --- --- * Until this facility conforms with the adopted performance standard, no residential development may occur in the City. With existing plus committed demand, this facility is short 31,896 square feet. ** There is no more available residential land within the Zone to be developed other than that which has already received final approvals. 40 LIBRARY I. PERFORMANCE STANDARD 800 square feet per 1,000 population of Library must be scheduled for construction within a five year period. II. FACILITY PLANNING AND ADEQUACY ANALYSIS The purpose of this analysis is to determine whether or not the performance standard is being met and, if the demand for Zone 4 is consistent with the overall Citywide analysis of the Library. The Library Director has determined that the impacts of commercial and industrial development on library facilities is mitigated through the collection of PFF and development of residential projects only should be stopped if the standard is not being complied with. A. Inventory 1. Buildout Assumptions: Current (Citywide/Zone) Buildout (Citywide/Zone) 2. Existing Facilities: Population 57,495/6,049 134,914/7,484 Owned Sq. Ft. Leased Sq. Ft. Civic Center Library Adult Learning Center* La Costa Area Library Warehouse Total 24,600 24,600 400 4,500 2,000 6,900 Required Square Footage 46,154/4,839 107,931/5,987 Lease Expiration Date 9/30/87 1/31/89 1/10/88 Total owned and leased space * Year-To-Year Option 31,500 Sq.Ft. 3. Facilities in the Five Year Capital Improvement Program: The adopted Five Year CIP includes $650,000 for the design of a main library in the southern area of the City. Also, 41 B. in Appendix A of the CIP. "To be Considered Capital Projects", the construction of this library is estimated at $6,900,000 to be funded by the Public Facilities Fee. 4. Other Information: The City Council on August 26, 1986 approved the final report entitled, "A Strategic Plan & Space Needs Study of the City of Carlsbad City Hall & Libraries" which was prepared by Michael Feerer & Associates. The Council adopted option #5 of the library portion of the study which directed staff to initiate a site selection study to be returned for Council consideration by Jan~ary 1, 1987. Several sites have been determined to be suitable for a southern library location. Staff is attempting to negotiate an agreement for a site at this time. Phasin9 Population projections for the entire City were prepared on a yearly basis and are shown in Exhibit E, "Dwelling Unit and Population Projections" on Page 34. These projections are based on a review of the· San Diego Association of Governments (SANDAG) projections along with those utilized for the City's Capital Improvements Program and the Public Facilities Management System, Monitoring Report of April, 1986. The specific phasing for Zone 4 is being projected based on the number of projects which have received·approval. There are no future residential areas to be developed in this Zone. All residential land is either developed or has ·already received approval to be developed. 42 EXHIBIT H PLANNING PROJECTIONS ONLY LIBRARY FACILITIES ASSUMING A BUILDING RATE OF 1250 UNITS PER YEAR AND 2.471 PERSONS PER DWELLING UNIT (800 SQUARE FEET PER 1,000 POPULATION) YEAR ZONE 4 ZONE 4 CITYWIDE EXISTING POP. DEMAND DEMAND FACILITIES CONFORMS/ (NON - BEGINNING BEGINNING CONFORMING) 01/01/YR 01/01/YR --------------------------------------------------------------- 1987 6,049 4,839 46,154 31,500 (14,654) 1988 6,617 5,294 48,625 1989 6,902 5,521 51,096 CURRENTLY NON - 1990 7,186 5,749 53,567 CONFORMING 1991 7,186 5,749 56,038 1992 7,485 5,988 58,509 1993 7,485 5,988 60,980 1994 7,485 5,988 63,451 1995 7,485 5,988 65,922 1996 7,485 5,988 68,393 1997 7,485 5,988 70,864 1998 7,485 5,988 73,335 1999 7,485 5,988 75,806 2000 7,485 5,988 78,277 2001 7,485 5,988 80,748 2002 7,485 5,988 83,219 2003 7,485 5,988 85,690 2004 7,485 5,988 88,161 2005 7,485 5,988 90,632 2006 7,485 5,988 93, 10'3 2007 7,485 5,988 95,574 2008 7,485 5,988 98,045 2009 7,485 5,988 100,516 2010 7,485 5,988 102,987 2011 7,485 5,988 105,458 2012 7,485 5,988 107,929 2013 7,485 5,988 107,931 Exhibit H shows that as of January 1, 1987 the demand for Library Facilities in Zone 4 ls 4,839 square feet. The City currently has 31,500 square feet of library space with an existing deficiency of 14,654 square feet. With additional demand generated by approved projects the library shortage will increase to 31,896 square feet. 43 c. Adequacy Findings Library space ls currently below standard and there are no adopted or guaranteed plans to bring this into conformance with the adopted performance standard. Until it does comply no residential development may occur in Zone 4 or the City. Exhibit I, "Zone 4 Demand Comparison", on Page 46 shows graphically the existing and committed facilities, projected Citywide demand and Zone 4's phased demand. Staff is recommending that the City Council follow alternative No. 1 under the "Mitigation" section and that the five year CIP be amended to include funding for new library facilities in excess of the current shortage. Until this alternative, or another, ls chosen no residential development may be allowed in Zone 4 or the City. III. MITIGATION There are a number of alternatives which could be considered to bring the City's library space into conformance with the adopted standard. 1 • Amend the current five year CIP new library facilities, which deleting other projects. residential development cannot City. to include funding for would could require Until this is done, occur in Zone 4 or the 2. Put a measure on the ballot that would raise the necessary money to fund the building of a new library facility through the use of General Obligation Bonds. This would require a 2/3 approval for the bonds and would mean that no development could occur in the interim; or 3. Walt until a Local Facilities Management Plan for a zone other than 1 through 6 resolves the problem and brings the City's library space into conformance with the adopted performance standard. It is recommended that the City approve Alternative No. 1 and amend the CIP to include funding for new library facilities.· It should be noted that the Citywide Facilities and Improvements Plan utilized leased library space in assessing compliance with the adopted performance standard. This space should be considered temporary and may not always be available for use by the Library. 44 A. Special Conditions for Zone 4 No residential building or development permits shall be issued in Zone 4 or the City, until the City Council takes action approving a measure or measures which provide for library services to meet the adopted performance standards. a. Financing The City currently collects a Public Facility F~e (PFF) which is set at 2.5% of permit valuation. This fee is paid at the time of building permit issuance. The adopted Capital Improvement Budget includes $650,000 of PFF funds to design a new library facility. Other possible funding sources could be: Issuance of General Obligation Bonds, Certificates of Participation, General Capital Construction funds, Revenue Sharing, State or Federal grants. At the present time there are no funds appropriated for the construction of additional library space. 45 LIBRARY FACIL·ITIES ZONE 4 COMPARISON 120 110 107,931 100 90 0 z 80 <( ~ w 70 Q,....._ (/) LL 1J 0 C: 60 0 r-(/) a w:::, 50 O'I W 0 LL ..c: we 40 0::: <( :) a 30 (/} 31,500 31,500 31,500 31,500 31,500 20 10 5,749 5,988 5,988 5,988 5,988 0 -10 1990 1995 2000 2005 2013 m DEMAND BY YEAR X :!: I! -I 47 WASTEWATER ENCINA WASTEWATER T·AEATMENT PLANT ZONE 4 LOCAL FACILITIES MANAGEMENT PLAN 118 , Wastewater ID BUILDOUT LOCAL FA CI LIT IE S MAN AGE MEN T ·PLAN -Zone 4 WASTEWATER TREATMENT CAPACITY Carlsbad Service Area SUMMARY SHEET ADEQUACY PROJECTION DEMAND SUPPLY ( C cnonTWlCtt w/Stl!ndard) · MIT/GA T/ON FUNDING 4.7 EXISTING 5.7 NO SEE PAGE 52A SEE MGO PAGE a 6.6d 8.6b,d YES N/A N/A APPROVED MGD C, ---z -(/) < 7.7c J: a.. FUTURE 8.6c,d YES N/A N/A MGD --- a. Buildout assumptions are for the entire sewer service area which includes Zone 4. The following analysis of a Citywide facility, therefore, focuses on the entire sewer service area, and not just on Zone 4. b. Assumes Phase IV expansion of Encina. c. Demand and Supply, as of 1995. d. Demand and Supply, as of 1991. 49 52A WASTEWATER TREATNENT CAPACITY I. PERFORMANCE STANDARD Sewer plant capacity is adequat~ for at least a five year period. II. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventory Sewer service in the City of Carlsbad is provided by three separate and independent agencies, Leucadia County Water District, San Marcos County Water District, and the City of Carlsbad. Sewer service for Zone 4 is provided entirely by the City of Carlsbad. 1. Buildout Assumptions (Carlsbad Sewer Service Area): Wastewater Treatment Demands Carlsbad Population Current Buildout 40,356 95,669 * EDU -Equivalent Dwelling Units EDuit Curren't'Buildout 21,354 47,800 MG~* Current Buildout 4.7 11.8 ** K;D -Million Gallons per Day -Average Dry Weather Flow (ADWF) 2. Existing Facilities The City of Carlsbad has capacity available at two treatment plant facilities. Secondary treatment capacity is provided through the Encina Water Pollution Control Facility (WPCF) which is a regional facility owned by six member agencies. The current rated capacity of the plant is 22.5 MCD of which Carlsbad retains ownership of 25.4 percent (5.7 MGD). The City of Carlsbad also holds. title to the Calavera Hills Treatment Plant which has a capacity of 1.2 MGD. The Calavera Facility is not operational at this time and will require the expenditure of $1.1 to $1.5 million to make it functional. Operation of the Calavera Hills Plant ls estimated to cost $360,000 per year. Comparable treatment at the Encina WPCF is estimated at $135,000 per year. The Calavera Hills Plant ls not economical to operate for treatment capacity except in the absence of needed capacity at Encina. 50 3. Facilities in the City's Five Year Capital Improvements Program: The adopted CIP includes two items which will be financed from the sewer fund which affect wastewater treatment capacity: B. a. Encina WPCF -Phase IV expansion, scheduled to begin in 1989, and completed in 1991 -$6,500,000 Carlsbad's share of this facility is 2.9 MGD. b. Calavera Hills $2,000,000 for 1986-87 and the 1990-91 Fiscal Years. Construction to be phased to correspond to capacity needs. Phasing and Service Demand Based on data maintained by the City Development Processing Services Department, on March 31, 1987, 22,965 EDU's had been permitted by the City. Utilizing 246 CPD per EDU and the adopted 3% vacancy factor, 985 EDU's of capacity remain to be issued prior to reaching Carlsbad's share of capacity at the Encina WPCF. The Citywide Facilities Management Plan is based on phased growth of 1,250 dwelling units per year plus non- residential development. Using a similar phasing for the portion of the City within the Carlsbad Sewer Service Area an annual growth rate of 1,143 EDU's per year (905 residential EDU's and 238 non-residential EDU's) is projected. This phasing would indicate that Carlsbad's wastewater treatment allocation could be exceeded within a year. Staff has just completed an analysis of Carlsbad's wastewater flows to Encina WPCF to determine the actual flow value of an EDU. As of March 30, 1987, 21,354 equivalent dwelling units (EDU's) were connected and being billed by the City for sewer service. Flow corresponding to these EDU 1 s has been measured at 4.69 MGD. That flow divided by the currently billed EDU's yields an actual flow rate of 220 gallons per day (GPO) per EDU. However, for planning purposes the City of Carlsbad has adopted a flow rate of 246 CPD per EDU. Evaluation of available capacity varies significantly depending on the value of flow per EDU utilized. As can be seen from Table 1 on Page 52, utilizing 220 GPO per EDU, treatment capacity at Encina WPCF would be available until 1990 with plant expansion expected to be completed in 1991. C. Adequacy Findings Based on analysis of existing flow data and a range of projections it is likely that current treatment capacity will be reached between 1988 and 1990, and that additional interim capacity will be required to meet the performance standard. Options exist to provide interim treatment capacity which would allow the Zone as well as the City's Sewer Service Area to meet 51 !Y.! 1987 1988 1989 1990 1991 1992 V1 1993 N 1994 1995 FLOW PROJECTIONS1 EQUIVALENT DWELLING FLOW a 220 T A B L E 1 CARLSBAD SERVICE AREA DEMAND AND AVAILABLE WASTEWATER TREATMENT CAPACITY FLOW al 246 UNITS (EDU 1 S) GAL/EDU (MGD)2 GAL/EDU (MGD) ENCINA CMGD) 21,354 4.69 5.25 5. 71 23,3843 5 .14 5. 75 5. 71 24,492 5.40 6.03 5. 71 25,600 5.63 6.29 5. 71 26,708 5.87 6.57 8.57 27,816 6.12 6.84 8.57 28,924 6.36 7 .12 8.57 30,032 6.60 7.38 8.57 31,140 6.85 7.66 8.57 TREATMENT CAPACITY LAKE CALAVERA HILLS CMGO) TOTAL CMGD) 0.0 5. 71 0.6 6.31 0.7 6.41 0.7 6.41 0.0 8.57 0.0 8.57 o.o 8.57 o.o 8.57 o.o 8.57 1 NOTE: 1989 to 1995 EDU 1s are expanded 1,143 per year. This represents 905 dwelling units.and 238 EDU 1s of commercial and industrial. (428,400 sq. ft. at 1,800 sq. ft. per EDU.) Each year fa projected to July 1 to correspond to ftacal year budgeting and adjusted for a 3X vacancy. 2 MGD = Millions of Gallons Per Day 3 1988 EDU 1S • 22,965 EDU 1S issued 3·31·87 + 1,143 per Note 1 adjusted for 3X vacancy (22,965 + 1,143) X 0.97 • 23,384 performance standard. the proposed special Mitigation section. These alternatives are incorporated into conditions outlined in the following III. A. 8. MITIGATION Special Conditions for Zone 4 1. The following actions shall be pursued by the City to ensure adequate wastewater treatment capacity throughout a five (5) year period: a. Monitor Encina Treatment Plant flows on a monthly basis to determine actual flow rates and to have an early warning of capacity problems. b. Actively pursue acceleration and phasing of treatment plant Phase IV expansion to provide adequate capacity. c. When Carlsbad's share of Encina flows reach 5.25 MCD, actively seek leased capacity from other Encina agencies. d. When Carlsbad Encina flows reach 5.45 HGD, proceed to activation of the Calavera Hills Reclamation/Treatment Facility. Plant to be activated when more cost effective treatment measures are no longer feasible and Carlsbad capacity ·at Encina has been reached. Financing Sewer connection fees provide the primary source of funding for both sewer line upgrades and expansion of treatment plant capacity. The timing of sewer facilities up~rades and the mechanism of financing are critical to analysis of the adequacy of funding for plant expansion. A complete financial and cash flow analysis should be conducted in conjunction with the Citywide Sewer Master Plan update. This analysis will provide a basis to evaluate development phasing within sewer basins and each Growth Management Zone. Priority for funding should be given to wastewater treatment capacity. 52A 53 PARKS ZONE 4 LOCAL FACILITIES MAN·AGEMENT PLAN · 54 PARK DISTRICTS 10 4 t 01, .. _ _ ..._.,.,,..., ... 5 JANUARY 1187 ZONE 4 ZONE 4 t COMMUNITY PARKS 0 IXISTING • ,uTURI * SPICIAL USE ARIA .. ~ 0 • V _.---~N------ ,,,,, I , ,,,. \ ' ', ... ___ Aca,. ... ,, \ ------,--------,._'4l I I I I I ID ''-t'o•---~ LOCAL FACILITIES MANAGEMENT PLAN 55 PARKS GECOACH JANUARY 1887 LOCAL FACILITIES MANAGEMENT PLAN-Zone 4 BUILDOUT DEMAND PROJECTION 26.07 EXISTING 18 .15 33.68** APPROVED C, 4.31 z -(/'J < :c 95.33 a. FUTURE 22.45 PARKS SUMMARY SHEET SUPPLY ADEQUACY (Calllau•• . w18t■llllrd) 16.0 NO* 16.0 --- ------ MITIGATION SEE PACE 60 ---' --- FUNDING ! EE PAGE 60 --- --- I * Until this shortage is corrected no residential development may occur in the southwest quadrant. ** The approved demand is contingent upon local.plans being approved in Zones 6, 9 and 20. 56 PARKS I. PERFORMANCE STANDARD Three acres of Community Park or Special Use Area per 1,000 population within a park district, must be scheduled for construction within a five-year period. Special Considerations The Citywide Plan divides the City into four park districts whlc~ are the same as the City's four quadrants. Zone 4 ls located entirely within Park District 3 (SW Quadrant). PARK DISTRICT 3 II. FACILITY PLANNING AND ADEQUACY ANALYSIS The purpose of not the park demand performance standard. this analysis ls to determine whether o~ for Zone 4 complies with the adopted A. Inventory Existing Facilities: Community Parks Alta Mira Special Use Area Spinnaker B. Phasing 1 • Buildout Park District 3 · Zone 4 Ownershie City .!.U!. Passive/Natural City Passive/Natural Total Acreage Ass·umptions ( 1/1/87) Acreage 12.0 4.0 16.0 Population Reguired Acres Current 8,690 26.07 Buildout 31,775 95.33 Current 6,049 18.15 Bulldout 7,484 22.45 57 2. Park Demand (Park District 3) Listed below is the demand for parks generated by residential development in Park District 3. Demand was determined by using the following formula: Yearly Dwelling Units x 2.471 = Population Population x Park Standard= Park Demand (by year) Supply ls determined by analyzing existing parks and any parks scheduled for construction. This is compared with the demand to determine if the performance standard is being met. EXHIBIT l PLANNING PROJECTIONS ONLY FOR THE SOUTHWEST QUARDRANT PARK ACREAGE COMPARISON OF DEMAND -V-SUPPLY 3 ACRES OF COMMUNITY PARK OR SPECIAL USE ARE PER 1,000 POPULATION WITHIN THE PARK DISTRICT ----------------------------~-------------------------~-----~-----------YEAR DWELLING TOTAL POP. TOTAL PARKS TOTAL TOTAL CONFORMS/ UNITS DWELLING POP. DEMAND DEMAND SUPPLY (NON - UNITS CONFORMING) ------------------------------------------~-----------------------------EXISTING 3,517 3,517 8,691 8,691 26.07 26.07 16.00 (10.07) 1987 419 3,936 1,035 9,726 3.11 29.18 16.00 (13.18) 1988 22·3 4,159 551 10,277 1.65 30.83 16.00 (14.83) 1989 321 4,480 793 11,070 2.38 33.21 16.00 (17.21) 1990 500 4,980 1,236 12,306 3.71 36.92 16.00 (20.92) 1991 560 5,480 1,236 13,541 3.71 40.62 16.00 (24.62) 1992 559 6,040 1,384 14,925 4.15 44.77 16.00 (28.77) 1993 491 6,599 1,381 16,306 4.14 48.92 16.00 (32.92) 1994 435 7,090 1,213 17,519 3.64 52.56 16.00 (36.56) 1995 589 7,525 1,075 18,594 3.22 55.78 16.00 (39.78) 58 3. Park Demand (Zone 4 Only) listed below is the demand for parks generated specifically by residential development in Zone 4 and not the entire quadrant. Information must be generated from each zone before the whole quadrant can be analyzed. Demand for Zone 4 was reached by using the following formula: Yearly Dwelling Units x 2.471 = Population Population x Park Standard= Park Demand (by year) EXHIBIT K PLANNING PROJECTIONS ONLY FOR ZONE 4 PARK ACREAGE COMPARISON OF DEMAND -V-SUPPLY 3 ACRES OF COMMUNITY PARK OR SPECIAL USE ARE PER 1,000 POPULATION WITHIN THE PARK DISTRICT ------------------------------------------------------------------------PHASING DWELLING TOTAL POP. TOTAL PARKS TOTAL TOTAL CONFORMS/ UNITS DWELLING POP. DEMAND DEMAND SUPPLY (NON -· UNITS CONFORMING) -------~---------------~------------------------------------------------EXISTING 2,448 2,448 6,049 6,049 18.15 18.15 16.00 (2 .15) 1987 230 2,678 568 6,617 1.70 19.85 16.00 (3.85) 1988 115 2,793 284 6,902 0.85 20.70 16.00 ( 4. 70) 1989 115 2,908 284 7,186 0.85 21.56 16.00 (5.56) 1990 121 3,029 299 7,485 0.90 22.45 16.00 (6.45) 1991 0 3,029 0 7,485 o.oo 22.45 16.00 (6.45) 1992 0 3,029 0 7,485 o.oo 22.45 16.00 (6.45) 1993 0 3,029 0 7,485 o.oo 22.45 16.00 (6.45) 1994 0 3,029 0 7,485 o.oo 22.45 16.00 (6.45) 1995 0 3,029 0 7,485 o.oo 22.45 16.00 (6.45) 59 4. Evaluation of Zone 4 Within Park District 3 Listed below are the demand and supply of existing park acreage. Existing Community Parks Special Use Required Acres Total Acres 12.0 4.0 16.00 26.07 Shortage (10.07) Currently, in Park District 3, a shortage of 10.07 acres exists. As Zone 4 develops to buildout an additional 4.31 acres will be necessary to meet its park demand. C. Adequacy Findings Park District 3 does not conform with the adopted performance standard. Therels a~rrent shortage of 10.34 acres and based upon those projects which have already pulled building permits in the quadrant, the shortage will grow to 16.05 acres. III. MITIGATION The current Capital Improvements Program (CIP} contains an appropriation for $190,000 to design a community park in the southwest quadrant (Park District 3). The development of this park was contingent upon City negotiations with the Sammis Corporation and Hunt Properties, Inc. for the possible construction of a "turn-key" park. To date, these negotiations have not resulted in the City obtaining even the land for the proposed park. Since Zone 4 ls an infill zone with all remaining residential development already approved, it ls impossible for the Zone to provide future developed park land. Given that, there are several alternatives which could be considered to resolve the park shortage in Park District 3. 1. The CIP could be funds to purchase acreage. amended to include the necessary a sui tabl_e park sl te of adequate 2. The City could wait until the other zones in Park District 3 submit Facilities Plans which would resolve the shortage. The other zones are largely undeveloped and have the potential to provide 60 developed park land. Under this alternative no residential development would be allowed in Park District 3 until another zone resolved the park shortage. Special Considerations As mentioned in the local Facilities Management Plan for Zone 3, the future usability of Alta Mira Park should be addressed in thls Zone plan. At issue is a determination of what types of park should be considered developed under the Growth Management Program. Alta Mira Park was dedicated to the City before the current standards existed for City parks. Therefore, this park site is designed as a passive/natural type in the parks inventory and ls considered as developed. It should be noted that dedication of Alta Mira Park was consistent with the Park and Recreation Element and General Plan in effect at that time. At present, the City plan is to obtain more acreage in Zone 20, next to the existing Alta Mira park site for the purpose of constructing an active Community Park. Currently, the Parks and Recreation Commission is reviewing the entire City parks inventory, so this issue may be resolved by the time Zone 4 comes to a public hearing. Although, staff would like the Planning Commission to consider this issue and make a recommendation to the City £ouncil as to how to count developed park acreage. A. Special Conditions for Zone 4 The facility analysis has indicated that the parks standard within the Southwest Quadrant is not being met. Therefore, pursuant to Section 21.90 of the Carlsbad Municipal Code, no residential development may be allowed in this quadrant until the performance standard is complied with. 61 62 DRAINAGE ao• ZONf 9 ZONE 4 tOal •ox TIIIPL■ ~ DRAINAGE +---It . • , : I ,lk -~--·~-·~~--·-·-·-\ • •• : I CA'NYON D■ I '•-• '-: • ! ~ i LAI INCINAI .. I .. I . I -! ! I .. I I .. I . I • -......~~ 1 ; ~ : -! ")~~ i i I : I . · .. ._ i : •.; .. i f • ,········· ,.1 ... .__,· ,,, Iii:.-,,., ........... ,. .. Deellt• ....••••• ·-.... i i ; j ZONE 211 i I i .i IXIITIMG ITOIIM IIIIAIN8 I JIZI: OPINCHANNIL c:::=> CONCIIETI! UNl!O CHANNEL • CONCIIV't! IOX CULVIIIT 0 IX18Tll!G 0111111$ IAIIN -■A■IN ■OUNDAIIY ■U■•.■A■IN ■OUNDAIIY t JANUARY 1987 LOCAL FACILITIES MANAGEMENT PLAN 63 LOCAL FACILITIES MANAGEMENT PLAN:-Zone 4 DRAINAGE SUMMARY SHEET BUILDOUT ADEQUACY PROJECTION DEMAND SUPPLY (Ccdau,... wllttndard)_ MITIGATION FUNDING EXISTING * * . YES N/A APPROVED ------YES N/A C, z -en < :c . 0. FUTURE ------YES . N/A * Specific drainage facilities will be required as individual projects are approved in Zone 4. 64 N/A N/A N/A DRAINAGE I. PERFORMANCE STANDARD Drainage facilities must be provided as required by the City concurrent with development. II. FACILITY PLANNING AND ADEQUACY ANALYSIS As was indicated in the Citywide Facilities and Improvements Plan, drainage is distinguished from all other public facilities and improvements because by its very nature it is more accurately assessed as specific development plans are finalized. However, certain facilities may be necessary which are larger than those required from a single development project and, therefore, need to be identified so that t~e proper funding can be collected for the construction of these facilities. A. Inventory The City's Master Drainage Plan, completed in March, 1980, does not identify the need for major drainage facilities within Zone 4. However, to accommodate development in this area, a desiltation basin was previously constructed at the south end of Zone 4. At the time of the Zone 4 development, the City was unable to construct, in Zone 19, the drainage facility identified in the Master Drainage Plan. This other desiltation basin will need to be constructed as development occurs in Zone 19 and will be included in the local plan for Zone 19. The Master Drainage Plan is currently being revised; however, preliminary research indicates there will be no significant impacts in Zone 4. 1. Existing Facilities Existing development has constructed the majority of the drainage facilities required to service Zone 4. Zone 4 drainage flows in two predominant directions. The northern half of Zone 4 flows north into the Canyon de Las Encinas floodplain while the southern half of Zone 4 ·flows south into the Batiquitos Lagoon. A smaller basin along the southwest portion of Zone 4 flows southwest beneath I-5 and drains into the Batiquitos Lagoon. 2. Buildout Assumptions Future development within Zone 4 will consist of the following: Commercial Industrial Residential 65 5.1 Acres Acres Acres 3. Facilities in the Five Year Capital Facilities Program: There are no improvements scheduled in the current CIP Budget. B. Phasing Since the demand for future drainage facilities within Zone 4 will be localized and generated by specific development, it will be addressed as that development occurs. At present there is no significant drainage impact from development outside of Zone 4. In the future, as development occurs in Zones 5, 19, 20 and 21, there may be drainage impacts upon Zone 4. These out-of-zone impacts will be assessed and mitigation measures proposed when ~he local plans for these zones are prepared. c. Adequacy Findings Existing facilities conform with the adopted performance standard. III. A. MITIGATION Special Conditions for Zone 4 Drainage facilities shall be provided at the time of development to the satisfaction of the City Engineer. a. Financing Drainage improvements shall be financed by the developer. 66 67 CIRCULATION ZOh£9 I • I I ZONE 4 CIRCULATION ELEMENT- z~, ROADS AND INTERS~CTIONS l ,l·-·-·-·-·-·-·-·-·-·-·~ ! ·~·-· ! I I i i i -~ . i. ! ·~ ! .. I I I I I I ~,. ,;;- ,. I I . •.; . Q PFF TRAFFIC SIGNAL CllyotC•IMM Gfowlll ~ ,., ... .,., -JANUARY 1987 LOCAL FACILITIES MANAGEMENT PLAN 68 LOCAL FACILITIES MANAGEMENT PLAN-Zone 4 BUILDOUT DEMAND PROJECTION. EXISTING * ---APPROVED C, z -"' C :c ~ FUTURE ** CIRCULATI~N SUMMARY SHEET SUPPLY ADEQUACY (Cailal''S..rc., * YES ------ ** --- MITIGATION N/A --- --- FUNDING N/A --- --- * The existing demand includes the 581 approved but not constructed residential dwelling units in Zone 4. The existing level of service at each impacted road segment or intersection complies with the adopted performance standard. ** There is only one remaining 5.12 commercial site left to develop within Zone 4. It ls projected, this site could develop in the next two or three years and not reduce the level of service at any impacted road segments or intersections. 69 I .,,. CIRCULATION I. PERFORMANCE STANDARD No road segment or intersection in the zone nor any road segment or intersection out of the zone which ls impacted by development in the zone shall be projected to exceed a service level C during off-peak hours, nor service level D during peak hours. Impacted means where twenty percent or more of the traffic generated by the local Facility Management Zone will use the road segment or intersection. II. FACILITY PLANNING AND ADEQUACY ANALYSIS The purpose of this analysis ls to determine whether or not the circulation system within Zone 4 conforms to the adopted performance standards for Zone 4. It will also address all Circulation Element Roads and Intersections outside of Zone 4 impacted by twenty percent or more of the traffic generated by Zone 4 to ensure conformance with the adopted performance standard. A. Inventory The following Circulation Element Roads and Intersections meet the impacted criteria for Zone 4. See Page 68 for "Circulation Element Roads and Intersections" that are located within Zone 4. Roads 1 • Paseo del Norte 2. Palomar Airport Road west to I-5 3. Poinsettia lane east of I-5 to Zone's eastern boundary 4. Poinsettia Lane west of I-5 to Carlsbad Boulevard Intersections 1. Paseo del Norte/Palomar Airport Road 2. Palomar Airport Road/Northbound I-5 3. Palomar Airport Road/Southbound I-5 4. Poinsettia Lane/Northbound I-5 5. Poinsettia Lane/Southbound I-5 6. Poinsettia lane/Avenida Encinas 7. Poinsettia lane/Carlsbad Boulevard 8. Poinsettia Lane/Alga-College 70 B. Phasing Zone 4 is completely built out with_ the exception of a 5.12 acreage commercial site which is vacant. The 581 residential units which have been approved for development and may pull building permits will not cause the existing level of service to change at any of the impacted road segments or intersections. The remaining commercial site could be developed in the next two to three years. Its development would not cause any of these impacted road segments or intersections to fall below the adopted performance standard. c. Adequacy Findings The existing conditions of these road segments and intersections all comply with the adopted performance standard. The following service for each intersections. Paseo del-Norte/ Palomar Airport Road Palomar Airport Road/ I-5 Northbound Palomar Airport Road/ I-5 Southbound Poinsettia lane/ I-5 Northbound Poinsettia lane/ I-5 Southbound Poinsettia Lane/ Avenida Encinas Poinsettia Lane/ Carlsbad Boulevard Poinsettia Lane/ Alga-College chart indicates the of these impacted existing level of road segments or Existing A.M. Peak A B A A A A* A (Future P.H. Peak B D A A A A* A Intersection) * The level of service analysis for this intersection was determined by staff. 71 These levels of service were obtained from the preliminary draft report of Barton-Aschman Associates traffic study. Existing levels of service are based on actual traffic counts at these intersections. As discussed in the phasing section, staff believes that Zone 4 will be able to completely buildout without causing the level of service at any impacted road segment or intersection to fall below the adopted performance standard. However, should any one of these impacted road segments or intersections fall below the adopted performance standard prior to the remaining 581 residential building permits being pulled, these permits would not be allowed to be obtained until the road segment or intersection complied with the standard. This is also true for the remaining commercial site, although any development plans for this site would require an adequacy analysis for circulation as well as all other public facilities. III. MITIGATION The facility analysis for circulation indicates that Zone 4 is in compliance with the adopted performance standard. Therefore, pursuant to Section 21.90.110 (a)(4) of the Carlsbad Municipal Code, no special conditions are required at this time. Although no mitigation ls necessary, as a result of impacts from Zone 4, each of the road segments and intersections will be monitored on an annual basis to assure compliance with the adopted standards. The City's monitoring system will assure that those road segments and intersections which appear to be moving towards a level of service less than the adopted standard will be assessed before they fall below standard. This monitoring system will augment the local plans and be used as an early warning system. A third level of analysis will occur as individual projects are considered within a Zone with an approved local plan, the specific analysis of the project will address compliance and impacts upon all of the public facilities including circulation. Should circulation or another public facility fall below standard, this individual project could not be approved until the standard was met. A. Special Conditions for Zone 4 In order to partially mitigate the incremental circulation impacts of future development, all future development within Zone 4 shall continue to pay Traffic Impact Fees, Public Facilities Fees and participate in the Bridge and Thoroughfare Benefit District. 72 B. Financing The source of funds for the needed future circulation improvements both in Zone 4 and impacted by Zone 4 ls listed on Table 1 below. The City collects fees from all projects located in the Bridge and Thoroughfare Benefit District. This money will go for interchange improvements at the intersections of: Palomar Airport Road; Poinsettia Lane; and La Costa Avenue with Interstate 5. The cost of improving the intersection of Palomar Airport Road and Interstate 5 which is not included in Table 1 and which is located in Zone 3 is estimated at $5,100,000. The cost of improving the la Costa Avenue/1-5 interchange which is not impacted by. Zone 4 traffic has not been included here. · The City currently collects a Public Facility Fee (PFF) which ls set at 2.51 of permit valuation. This fee is paid at time of building permit issuance. Certain street improvements as well as all needed traffic signals in Zone 4 will be paid for by Public Facilities Fees. See Table 1 below. ZONE~ BUILDOUT INPROVENENTS TABLE 1 (A) Freeway.Bridge Widening and Ramp lmprovments -$4,990,670 as part of the Bridge and Thoroughfare Benefit District (B) Traffic Signal -Poinsettia and Freeway -$120,000 -PFF (C) Traffic Signal -Paseo del Norte and Poinsettia -$65,000 - PFF (D) Traffic Signal -Poinsettia and Lagoon -$65,000 -PFF 73 74 FIRE t * PIR■ ITATION8-aXIITINCI 0 ,tit■ ITATIONl-1'1.ANlaD ( .. , ... , ., l'IRE RESPONSE TIME --STATION f --STATION 2 •--STATION a --STATION <J ZONE 4 PAlOMAI LOCAL FACILITIES MANAGEMENT PLAN 75 FIRE Cllr•-Qrowlll..._.. ,..,.._ e JANUARY 1187 LOCAL FACILITIES MANAGEMENT PLAN-Zone 4 BUILDOUT DEMAND PROJECTION EXISTING ~,448 Units $81 Units APPROVED C, z -rn < % a. FUTURE 3,029 Units FIRE SUMMARY SHEET ADEQUACY SUPPLY (Ccifun•• .,.lllilrd) * YES * YES * YES MITIGATION N/A N/A . N/A FUNDING N/A N/A N/A * The existing Fire Station locations will guarantee compliance with the adopted performance standard at all times as the Zone builds out. 76 FIRE I. PERFORMANCE STANDARD No more than 1,500 dwelling units outside of a five minute response time. II. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventory Zone 4 ls presently served by Fire Station No. 4 located at 6885 Batiquitos Road. B. Phasing Because all existing plus future development in Zone 4 is within the five minute response time of Fire Station No. 4, Zone 4 will conform to the fire performance standard to buildout. Therefore, it was not necessary to do a phasing analysis for fire services in Zone 4. c. Adequacy Findings During preparation of the Citywide Facilities and Improvements Plan, it was determined that Zone 4 presently meets the fire performance standard and will continue to· conform to this standard to buildout of the City. III. MITIGATION A. Special Conditions for Zone 4 No conditions are necessary for fire services in Zone 4 because Fire Station 4 ls located within the required five minute response time of the entire zone. B. Financing All fire facilities are in place for Zone 4 and the required performance standard has been met and, therefore, no special funding mechanisms are required. 77 78 OPEN SPACE ZONE 4 ZONES .. I . I I .,~::!!::::::..----~lh"L- 1 . I jj I I ! .. ZCH, ! ! ! I I I I I I . I I I . . , ,.._ .,· . .._., OPEN ·SPACE .... .., ; i • ; ZONUt i i ,· i .. t cn,e1c.,_ a,-------- -JANUARY 1887 LOCAL FACILITIES MANAGEMENT PLAN 79 LOCAL FACILITIES MANAGEMENT ·PLAN-Zone 4 BUILDOUT PROJECTION DEMAND EXISTING * APPROVED * C, z -u, < ::c Q. FUTURE * OPEN SPACE SUMMARY SHEET SUPPLY ADEQUACY (Calul.,.w::e W/St ... rd) * YES * YES * YES MITIGATION NIA N/A NIA FUNDING N/A N/A NIA * Zone 4 as determined in the Citywide Facilities and Improvements Plan will conform to the adopted performance standard at all times as the Zone builds out. 80 OPEN SPACE I. PERFORMANCE STANDARD Fifteen percent of the total land area in the zone exclusive of environmentally constrained non-developable land must be set aside for permanent open space and must be available concurrent with development. II. FACILITY PLANNING ANO ADEQUACY ANALYSIS A. Inventory During preparation of the Citywide Facilities and Improvements Plan it was determined that certain areas of the City are already developed or meet or exceed the requirements for Open Space and, therefore, an analysis is not needed in the local plan. This includes Zones 1 through 10, as well as, 16. Zone 4, an infill zone, is almost completely built out with only a small amount of remaining land available for development. This eliminates the opportunity to create future permanent open space unless existing structures are removed. For these reasons, the ·open Space facility for Zone 4 needs no further analysis. B. Phasing Because Zone 4 is an infill zone with no future opportunity to increase open space, the phasing requirements for Open Space were not addressed as required by Chapter 21.90.110(d)(2) of the Carlsbad Municipal Code. c. Adequacy Findings During preparation of the Citywide Facilities and Improvements Plan, it was determined that the adopted performance standards for Open Space in Zone 4 have already been met. III. A. B. MITIGATION Special Conditions for Zone 4 There are no special conditions which apply at this time. Financing Because Zone 4 creates a minimal amount of future development, it has been assumed this development will continue to meet the adopted performance standard. Therefore, financing was not addressed as required by Chapter 21.90.110(d)(3) of the Carlsbad Municipal Code. 81 82 SCHOOLS School District Boundaries CARLSBAD , to I ZONE 4 LOCAL FACILITIES MANAGEMENT PLAN 83 01,., _ ____ ,,.._ -JANUARY 198i EXISTING • 11.DaNTARY • JUNIOR HIGH A HIGH SCHOOL fY!!!!! 0 ELEloENTARY □ JUNIOR HIGH t:,. HIGH SCHOOL ZONE 4 LOCAL FACILITIES MANAGEMENT PLAN 84 Do ·SCHOOLS I \,. '"" Y" I I I I I I CltyofC•tweo G,owtfl ~ Pr'9am II JANUARY 1987 LOCAL FACILITIES MANAGEMENT ·PLAN-Zone 4 BUILDOUT PROJECTION DEMAND EXISTING * APPROVED --- C, z -"' < :r; a. FUTURE ** SCHOOLS SUMMARY SHEET ADEQUACY SUPPLY (Ccntamw ice w/StSldard) * YES ---YES ** YES MITIGATION N/A N/A N/A FUNDING N/A N/A NIA * The Carlsbad Unified School District has capacity to meet the existing demands generated from Zone I&. ** Because the future school demand from Zone II is minimal, the School District has indicated that it is able to provide capacity at all times as the Zone builds out. 85 SCHOOLS. I. PERFORMANCE STANDARDS School capacity to meet the projected enrollment within the zone as determined by the appropriate school district must be provided prior to projected occupancy. II. FACILITY PLANNING ANO ADEQUACY ANALYSIS A. Inventory Zone 4 falls completely within the boundaries of the Carlsbad Unified School District. Currently, there are no schools in the Southwest Quadrant. Elementary school students in Zone 4 attend Jefferson Street or Pine Street Elementary Schools. Secondary school students attend Carlsbad Junior and Senior High Schools. The Citywide Facilities and Improvements Plan identifies general locations for future school sites in each school category. The locations are a result of the School Master Location Study, completed in 1982. The Carlsbad Unified School District ls in the process of beginning to update the School Master Location Plan. 8. Phasing In Zone 4 there are presently 2,448 existing residential dwelling units. As the zone builds out, there will be an additional 581 residential dwelling units. These units will add approximately 200 to 250 students to the school demand generated by Zone 4. The Carlsbad Unified School District has indicated the ability to handle the additional demand. Based upon the School District's indication, the adopted performance standard will continue to be met, and therefore, phasing of school facilities was not addressed as required by Chapter 21.90.110(d)(2) of the Carlsbad Municipal Code. c. Adequacy Findings The Carlsbad Unified School District is currently providing capacity for the existing demand generated by Zone 4. The School District has indicated its ability to provide capacity to the ultimate buildout of Zone 4. 86 III. MITIGATION A. Special Conditions for Zone 4 No conditions are necessary. The Carlsbad Unified School District has indicated they will be able to accommodate the additional number of students generated through the buildout of Zone 4. B. Financing No financing options are necessary. The Carlsbad School District has indicated that they can accommodate the additional students generated in Zone 4 with existing facilities. Since existing facilities can handle the additional students, no financing alternatives for new facilities are required. All future development will be required to pay the appropriate school fees as determined by the District. 87 88 SEWER SYSTEM CARLSBAD ZONE 4 Sewer Dictricts ti) r--'! L., .... i SAN MARCOS s ...... ., t ""·, LEUCADIA COUNTY c:os r.• JANUARY 1987 LOCAL FACILITIES MANAGEMENT PLAN 89 ENCtNA WASTE WATER TREATMENT FACILITY ZONE 4 .. .. . 54• SAN MAACOS INTl!RCl!P'TOI! (WATEAJ 30" BUl!NA VISTA INTERCEP'TOA(SANITATIONI l . ! ·, .... I I I I ,. i I I I -.. SEWER BASIN E·2 Existing Sewer Facilities I ........ I I ; i I I i ....... BASIN ■·OUNDARV LOCAL FACILITIES MANAGEMENT PLAN 90 BUILDOUT LOCAL FACILITIES MANAGEMENT PLAN-Zone 4 SEWER COLLECTION SYSTEM SUMMARY SHEET ADEQUACY PROJECTION-DEMAND SUPPLY (CcnlalllWIN wlllt■mrct) MITIGATION FUNDING * EXISTING 4. 2*-* YES N/A MGD 0.745 * APPROVED 4.2** YES . N/ A MGD C, 0.745 z -en ,c l: a. * FUTURE *** YES*** *** MGD 0.754 * Interceptors are not monitored for existing capacity. ** 2~9 MGD Buena Sanitation interceptor and 1.3 MGD for the North Batiquitos/Ponto interceptor. The Buena Sanitation interceptor capacity is based on existing agreements with Buena Sanitation District and the City. N/A N/A *** *** Zone 4 will be able to completely build out in conformance with the adopted performance standard. Although, both interceptors will be upgraded as a result of future upstream demands generated outside of Zone 4. Specific improvements will be identified in the Sewer Master Plan update and the exact timing of these improvements will be provided in the Local Plans for Zones 6, 19, 20 and 21. 91 SEWER COLLECTION SYSTEM I. PERFORMANCE STANDARD Trunk line appropriate sewer development. capacity to meet demand as determined by the district must be provided concurrent with II. FACILITY PLANNING AND ADEQUACY ANALYSIS Service Are, Zone 4 lies entirely within and is served by the City of Carlsbad Sewer Service District. A. Inventory and Description Zone 4 is serviced by two trunk line sewer interceptors, the Buena Sanitation interceptor and the North Batiquitos/Ponto interceptor. Approximately 1/3 of Zone 4 drains southerly through 8 and 10 inch sewer collectors to a sewer lift station, located within Zone 19, adjacent to the north shore of the Batiquitos Lagoon. This sewer lift station, which is a part of the North Batiquitos interceptor, also serves portions of Zones 6, 19, 20 and 21. There are 392 dwelling units outside of Zone 4 which currently utilize this sewer lift station. inch I-5. along Lane flows Leaving the lift station, sewage is pumped through a 14 force main to an 18 inch gravity line along the east side of From there the sewage flows north, crosses under I-5, runs the Avenlda Encinas right-of-way, turns west on Poinsettia and flows into the 27 inch Ponto interceptor which gravity north to the Encina Water Pollution Control Facility. units to the 4 has adopted of Zone There also is a potential for 520 residential dwelling to be approved in Zone 20 which will sewer through Zone 4 lift station. Analysis of the gravity system serving Zone shown that the existing sewer system currently meets the performance standard and will do so through the buildout 4. The remainder of Zone 4 drains north through a gravity sewer collection system to the 30 inch Buena Sanitation interceptor located just outside Zone 4. The Buena Sanitation sewer interceptor flows west under 1-5 to the Encina Water Pollution Control Facility. With the exception of the Buena Sanitation interceptor all the sewer collection facilities ~hich service Zone 4 are owned and maintained by the City of Carlsbad. 92 The Buena Sanitation interceptor is owned and maintained by the Buena Sanitation District (County of San Diego). By agreement, the City of Carlsbad shares capacity rights in this line with the Vista Sanitation District and the Buena Sanitation District. City capacity rights along this portion of the Buena line are 32.7351 of the pipe capacity which equates to approximately 2.90 million gallons per day. B. Phasing and Service Demand Existing committed and future sewer collection demands are shown on Exhibit L, "Sewer Demand" on Page 98. The service demands have been divided by interceptor to facilitate future analysis of each of these major sewer trunk line interceptors. The City ls currently in the process of revising and updating the sewer master plan. Until these revisions have been completed, analysis of the upstream service demands cannot be fully assessed, although the analysis for Zone 4 has been com~leted. Facility Analysis The existing sewer collection networks for Zone 4 will conform with the adopted performance standard for existing and committed service demand. The ultimate buildout of Zone 4, which is limited to an additional 5.12 acres of commercial use located at the southwest corner of Poinsettia and Paseo del Norte, will not necessitate upgrading these facilities and will, therefore, conform with the adopted performance standard. The detailed analysis of the buildout needs of the North Batiquitos/Ponto interceptor will not be available until the sewer master plan has been updated or as upstream zones prepare their local plans. The ultimate buildout of Zone 4 will not increase flows to the Buena Sanitation interceptor trunk line which will conform with the adopted performance standard to buildout of this zone. Preliminary analysis indicates the North Batiquitos/Ponto interceptor will not conform with the adopted performance at buildout, as a result of upstream demands outside of Zone 4. The detailed analysis of the buildout needs of the North Batiquitos/ Ponto interceptor will not be available until the sewer master plan has been updat~d or as upstream zones (6, 19, 20 and 21) prepa~e their local plans. C. Adequacy Findings The performance change this handle Zone sewer collection system currently meets the adopted standard. Zone 4 will be able to buildout and not conclusion, because the necessary facilities to 4's demand are already in place. However, as 93 upstream or out-of-zone development is proposed, certain facilities will need to be upgraded. The specific improvements will be addressed in the revised Sewer Master Plan as well as when the local plans which will impact this line are prepared. III. MITIGATION A. Special Conditions for Zone 4 The facility analysis above indicated that the sewer collection system for Zone 4 will conform to the adopted performance standard to the buildout of the zone. Therefore, pursuant to Section 21.90.110(d)(4) of the Carlsbad Municipal Code, no special conditions on future development are required at this time other than payment of normal sewer connection fees. B. Financing Future development will continue to pay sewer related fees which will assist in funding the improvement operations and maintenance of the system. 94 Master Plan Demand Trunkllne Reach Status Interceetor Designation Existing Buena Sanitation 209-610 Ponto 707-709 Committed N/A Future Ponto 707-709 Buena Sanitation \0 U1 SEWER DEMAND ZONE 4 Land Use Residential Residential Commercial None Acres/Number Demand (EDU's)* Demand of Units Subtotal 2,179 2,179 2,179 850 850 850 5.12 AC 36 36 * Equivalent dwelling mlts \\hlch equal average dally flow divided by 246 Gallons Per Day m X :z: a, -I r 96 WATER SYSTEM ZONE 4 WATER SERVICE DISTRICTS OllVENHAIN r- /SAN MARCOS i J1u111111111un1u111111111mud.-l = = : ◄"', If Cl1YolC•- Grawtt1 ~-Jlr~am e JANUARY 1187 LOCAL FACILITIES MANAGEMENT PLAN 97 ZONE 4 l. ! 4-,_. ! ! I I .. ! I • . ZONI 5 ·-·-·-·-·-·-·-·-·-·-·---- WATER DISTRIBUTION SYSTEM . I . I . I . I . ; i i ZONE :ZU f! -EXISTING WATER LINES I . I -PROPOSED WA TEA LINIS i A EXISTING PREIIUM REGULATING STATIOII I 6 PROPOSED PRl88URI REGULATING STATION ZONE BOUNDARY i '4-'4-•4-•4- ... ., •4-•4-.,.....___ I . I . ZONE 19 JANUARY 1187 LOCAL FACILITIES MANAGEMENT PLAN 98 BUILDOUT LOCAL FACILITIES MANAGEMENT PLAN-Zone 4 WATER DISTRIBUTION SYSTEM SUMMARY SHEET ADEQUACY PROJECTION DEMAND SUPPLY (CCl1ifcw11•a w/Stln:lard) MITIGATION FUNDING EXISTING * * YES N/A APPROVED ------· YES N/A C, z -Cl) < ::c . a. FUTURE ** ** YES N/A I * The Costa Real Water-Distr-ict has capacity to meet the existing demands of Zone 4. N/A N/A NIA ** Because the futur-e demands fr-om Zone 4 will be minimal, the Water-Distr-ict has indicated that it will be able to pr-ovide capacity at all times as the Zone .builds out. 99 WATER DISTRIBUTION SYSTEN I. PERFORMANCE STANDARD Line appropriate development. capacity to meet demand as determined by the water district must be provided concurrent with A minimum 10 day average storage capacity must be provided prior to any development. II. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventory and Description Water service in the City of Carlsbad ls provided by three independent agencies, Costa Real Municipal Water District, San Marcos County Water District, and the Olivenhain Municipal Water District. Water service for Zone 4 is provided entirely by the Costa Real Municipal Water District. Costa Real Municipal Water District has identified those facilities which need to be added, upgraded, and improved in order to meet the needs of future growth within their service area. The facilities shown on map, "Water Distribution System" on Page 101 are currently in place and servicing the existing development. When the remaining commercial site develops, certain facilities will need to be added to service this new demand. As identified by the Costa Real Municipal Water District, these facilities will be financed jointly by direct developer contribution and the District's Capital Fund. B. Phasing The performance standard indicates that line capacity must meet demand as determined by the appropriate water district. Costa Real Municipal Water District has indicated that improvements remaining in Zone 4, can be handled at the time the remaining commercial site develops. c. Adequacy Findings The Costa Real Municipal Water District service to Zone 4 conforms with the adopted performance standard. Because this zone ls almost completely built out, the additional water demands as determined by the Costa Real Municipal Water District, will be minimal and conformance with the standard will be maintained to the ultimate buildout of Zone 4. 100 III. A. MITIGATION Special Conditions for Zone 4 All development within Zone 4 shall pay the required Costa Real Municipal Water District fees. B. Financing Remaining facilities and improvements in Zone 4 will be financed by the Costa Real Municipal Water District's Capital Fund. Revenues for that budget are funded from direct .developer contributions to the District. 101 102 APPENDICES APPENDIX 1 103 ADT Average daily ciaTly vehicle trips associated region. GLOSSARY trips. A guide of average, or estimated generated from a specific project or £!:!. Assessor's Parcel Number. A portion of the legal description which specifically identifies each parcel of land. Buildout The year when the City of Carlsbad is completely developed with all associated public facilities in place. Bridge and Thoroughfare Benefit District -A district established to fund major thoroughfares and bridge improvements. These bridge improvements are at I-5, Palomar Airport Road, Poinsettia Lane, and La Costa Avenue. See Exhibit S, Page 125. CIP -Abbreviation for Capital Improvement Program. Community Park 20 -50 acres in size; designed to serve the broad recreational needs of several neighborhoods; located adjacent to secondary arterial or greater; publicly owned. Demand -The amount of needed facility generated within the zone, quadrant, or City based upon the adopted performance standard. DU -Abbreviation for dwelling unit. EDU Equivalent dwelling unit. The average amount of sewage generated by a single family household per day. Commercial and industrial developments are also converted into EDU's to assess their direct impact upon facilities. Environmentally Constrained lands -Beaches, wetlands, floodways, other water bodies, riparian and woodland habitats, slopes greater than 251, major roadways, railroad tracks, and major powerline easements. 104 General Plan Density Ranges Residential Land Use Allowed Units Per Acre RL -Residential Low RLM -Residential Low-Medium RM -Residential Medium RHH -Residential Medium-High RH -Residential High Growth Management Control Point 0 -1.5 0 -4.0 4.0 -8.0 8.0 -15.0 15 .o -23 .o Residential Land Use ·Allowed Units Per Acre RL RLM RM RMH RH 1.0 3.2 6.0 11.S 19.0 Established based upon the overall average land use yield in each designation or the midpoint of the density range. ICU -Abbreviation for Intersection Capacity Unit. The ratio of traffic demands to be placed on an intersection in relation to the capacity of an intersection. Level of Service The relative level of operation of an intersection or traffic signal. Level of Service (LOS) A B Description Free flow (relatively). If signalized, conditions are such that no approach phase ls fully utilized by traffic and no vehicle waits through more than one red indication. Very slight or no delay. Stable flow. If signalized, an occa- sional approach phase is fully utilized; vehicle platoons are formed. This level is suitable operation for rural design purposes. Slight delay • . 105 ICU Value 0.00-0.60 0.61-0.70 Level of · Service (LOS) C D E f Description Stable flow of operation. If signalized, drivers occasionally may have to wait through more than one red indication. Acceptable delay. Approaching unstable flow or operation; queues develop, but are periodically cleared. Tolerable delay. Unstable flow or operation; the inter- section has reached ultimate capacity; this condition ls not uncommon in peak hours. Congestion and intolerable delay. Forced flow or operation. Intersection operates below capacity. ICU Value 0.81-0.90 0.91-1.00 1.00+ Derived from: Highway Capacity Manual, HRB Special Report 87. HGD Million gallons a day. A term used to describe flow of water or sewage. Net Vacant Acres Obtained by subtracting all of the 100% --------,,----.-----constrained acres and one-half of the areas shown as 25-40% slopes. Industrial and commercial development were then multiplied by .4 to determine net acreage (this allows for all regulations which affect overall lot coverage). Open S~ace Pocket parks, homeowner ball fields, planned resident al development (PRO), common areas, tennis courts, or other areas containing passive or active recreational facilities, such as major power line easements. PIL Park-in-Lieu Fee. A fee paid prior to the issuance of building permits in lieu of land dedication for park purposes. PFF -Public Facility Fee. A 2.51 fee paid prior to the issuance of building permits. All proceeds from this fund are used for the purpose of acquiring, building, improving, expanding and equipping public property, improvements, and facilities. 106 Special Use Area -1-5 acres in size; a local facility of only one or two activity type uses, i.e., tennis court, swimming pool, etc. TIF Traffic Impact Fee. A fee paid at issuance of building permits for various traffic circulation improvements. The City is divided into two fee categories: 1) The La Costa area and 2) the remainder of the City. See Exhibit T, on Page-126. Turn Key Facility -a facility constructed by developer(s) and turned over or dedicated to the City after its completion. 107 BRIDGE & THOROUGHFARE DISTRICT POIN8ETTIA LN ,+ ~ DISTRICT BOUNDARY ZONE 4 LOCAL FACILITIES MANAGEMENT PLAN 108 ~,,_MELROSE -~~7 AYE cn,a1_ Orowlll ...._,_ ,."G'_ -JANUARY 1187 TRAFFIC IMPACT FEE POINSETTIA LN _. 1111111 AREA BOUNDARY t ZONE 4 JANUARY 1887 LOCAL FACILITIES MANAGEMENT PLAN 109 APPENDIX 2 110 ·-----~----------------- l 2 3 4 5 6 7 8 9 lO 11 12 I q 13! 14 15 16 17 I 1al! ,. p 19 !f 11 201! !I 21 1/ II 2211 I 23: 241! 25 I 26 27 !: ,, 28 'I n~DINANCE NO. 9808 ----- AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFOPNIA AMENDING TITLE 21 OF THE CARLSBAD MUNICIPAL CODE ~Y. THE ADnITION OF CHAPTER 21. 90 ESTABLISHING A GROWTH MANAGniF.NT PROGRAM FOP THE CITY The City Council of the City of Carlsbad, California does ordain as follows: SECTION 1: That Title 21 is amended by the addition of Chapter 21.90 to read as follows: Sections: 21.90.010 21.90.020 21.90.030 21.90.031 21.90.032 21.90.033 21.90.040 21.90.050 21.90.060 21.90.070 21.90.080 21.90.090 21.90.100 21.90.110 ,, 21.90.120 21.90.125 21.90.130 21.90.140 21.90.150 21.90.160 21.90.170 21.90.180 21.90.190 "Chapter 21.90 Growth Management Purnose and intent. Definitions. General prohibition, exceptions. Tolling of time for consideration of applications submitted before the effective date of this chapter. Tollino of expiration of previously issued development permits. Extensions of prior approvals prohibited. Comoliance with this chapter reouired. Establishment of local facilities management fee. Spec~.al provisions for buildinq permits issued during temporary moratorium. Finding of health, safety and welfare necessary for the fees imposed by sections 21.90.050 and 21.90.060. Perfornance standard. - Citywide facilities and improvements plan. Local facilities management zones. Contents ~f local facility management plans. Facilities management plan preoartion. Facilities management plan orocessinq. Implementation of facilities and improvements reouirements. Obligation to oay fees or install improvements reauired by any other law. Implementing guidelines. Exclusions. Council actions, fees, notice. Expiration of chapter. Severability. 1. 111 :1 I 31 4 5 6 7 8 9 10 11 12 13 141 151 161 I 171, 18 ii ,1 19 11 20l1 2111 221 I 23 24 25 26 27 28 21.90.010 Puroose and intent. (a) It is the policy of the City of Carlsbad to: (1) Provide auality housina opportunities for all economic sectors of the cc~~unity: (2) Provide a balanced co~~unitv ~ith adeauate commercial, industrial, recreational and open space areas to support the residential areas of the City: (3) Ensure that public facilities and i~provements meeting City standards are available concurrent with the need created by new development: (4) Balance the housino needs of the reqion against the public service needs of Carlsbad residents· and available fiscal and environmental resources: (5) Encouraoe infill development in urbanized areas before allowing extensions of public facilities and improvements to areas which have yet to be urbanized: (6) Ensure that all development is consistent with the Carlsbad general plan: (7) Prevent growth unless adeauate public facilities and improvements are provided in a phased and logical fashion as -reauired by the general plan: (8) Control of the timing and location of development by tying the pace of development to the provision of public facilities and improvements at the times established by the citywide facilities and improvements plan. (b) The City Council of the City of Carlsbad has determined despite previous City Council actions including but not liIT'ii ted to, ainendments to the land use, housing, and parks and recreation elements of the general plan, amendments to City Council Policy No. 17, adoption of traffic imoact fees, and modification of park dedication and improvement requirements, that the demand for facilities and improvements has outpaced the supply resulting in shortages in public facilities and improvements, includin9 but not limited to streets, parks, open space, schools, libraries, drainage facilities and general governmental facilities. The City Council has further determine that these shortages are detrimental to the public health, safet and welfare of the citizens of Carlsbad. (c) This chapter is adopted to ensure the implementation of the policies stated in subsection (a), to eliminate the shortages identified in subsection (b), to ensure that no,development occurs without providing for adeauate I facilities and improvements, to regulate the pace of development thereby ensuring a continued supply of housing over a period of years and to continue the auality of life for all economic sectors of the Carlsbad community. (d) This chapter will further the policies, goals and objectives established herein by requiring identification of all public facilities and improvements required for development, by prohibiting development until adequate provisions for the public facilities and improvements are made by developers of projects within the City, and by giving develop~ent priority to areas of the City where public facilities and i~provements are already in place (infill areas). 2. 112 -I l 2 -3 4 5 6 7 8 9 10 ll 12 13 14 15 16' 17 1a·j 19,! 2oli Ii 21Jj 22: I 23 1 24 251 I 26 21 .I 2a Ii 11 Ii Ii II 1, (e) This chapter replaces the terriporary ~oratorium on processing and approval of developrrient projects imposed bv City Council Ordinance No. 9791. 21.90.020 Definitions. {a) Whenever the following terms are used in this chapter they shall have the meaning established by this section unless from the context it is apparent that another ~eanina is intended: - (1) "Citywide facilities and improvel'l'!ents plan" means a plan prepared and approved according to Section 21.90.090 identifying those facilities and improvements required on a citywide basis to serve the projected population of the City as . established by the general plan and providing an outline and budget for financ1ng certain facilities and irrtprovelllents which will be provided by the City. (2) •Development pennit• means any pemit, entitlement or approval whether discretionary or ministerial issued under Title 20 or 21 of this code and any leqislative actions such as zone chanqes, general plan amendments, or master plan approval or amendment. · (3) "Development• means any use to which land is put, building or other alteration of land and construction inciden~ thereto. (4) •racilities• means ·any schools, r;>arks, open space, or recreational areas or structures providing for fire, library, or govern~ental services; identified in a facilities management plan. (5) "I•provement• includes traffic controls, streets and highways, including curbs, gutters, and sidewalks, bridges, overcross ings, street interchanges, flood control ·or storm drain facilities, sewer faci"lities, water facilities and lighting facilities. · · · · (6) "Local facilities management plan" means a facilities manaqe~ent plan defined by Section 21.90.120 for a local facilities manage~ent zone which is established according to Section 21.90.100. 21.90.030 General rohibition exce tions. a Un ess exempted y t e prov s1ons o this chapter no application for any building permit or develop~ent permit shall be accepted, processed or ap~roved until a citywide facilities and i~provements plan has been adopted and a local facilities management plan for the applicable local facilities management zone has been submitted and approved according to thi chapter. (b) No zone change, general plan amendment, master pla a•endment or specific plan amendment which would incease the residential density or development intensity established by the general plan in effect on the effective date of this chaoter shall be approved unless an amend~ent to the citywide facilities manage~ent plan and the applicable local f~cilities manaae~ent plan has first heen approved. 3. 113 I i ,- 1 ~ l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 ,I 20 21 I 221 23 24 25 26 27 (c) The classes of projects or permits listed in this subsection shall be exempt from the provisions of subsection (a). Development permits and building permits for these projects shall be subject to any fees established pursuant to the citywide facilities and improvement plan and any applicable local facilities management plan • . (1) Redevelopment projects. (2) Projects consisting of the construction or alteration of a single dwelling structure for a family on a lot owned by the family intending to occupy the structure, or not to exceed one nonowner-occupied house per individual for one or more lots owned prior to July 20, 1986. (3) Building permits and final maps for projects identified in Section 2(F) of Ordinance No. 9791 (projects for which construction had commenced and were designated on the map ·marked Exhibit A to Ordinance No. 9791 •as developing"). (4) Building permits for projects for which all required development permits. were issued or approved on or befor January 21, 1986. If all required development permits were issued for a portion of the project only, the exemption shall apply to that portion. · · (5) Building permits for projects for which all required development permits were is•u•d or approved before July . 20, 1986 and for which building permits could have been issued under OrdinJnce No. 9791. If all required development permits were issued for a portion of the project only, the exemption shall apply to that portion. (6) Commercial and industrial projects with approved development permits or with a complete application on file with the City prior to June 11, 1986 for such permits. New perm.its for commercial and indu~trial projects located within an area that has been previously approved for such uses may also be processed and approved. . . (7) Projects by nonprofit entities for structures and us~s for youth recreational and guidance programs such as boys and girls clubs. C 8) Zone changes or general plan amendments necessary to accomplish consistency between the general plan and zoning, to implement the provisions of the Local Coastal Plan or which the City Council finds will not increase the public facilities or services and which are initiated by the City Council or Planning Commission. (9) Public utility facilities and improve~ent projects without accommodations for permanent employees are exempt fro~ the provisions of·this chapter unless the City Council determines they are of sufficient size and scale to impact public facilities. (10) Adjustment plats. (11) Development permits for minor subdivisions located in the northwest quadrant of the City as defined in Ordinance No. 9791. Building permits for commercial or industrial construction on lots in such subdivisions may be approved. Residential building permits will not be ap9roved for · lots in such subdivisions unless oth~rwise e~empt under this 4. 114 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1s I I 19,I 2011 21 11 II I. 22 1 I 23 24 25 ! " 26 ii 27 \, ,j 281 i ; I .1 I, chapter except one permit for a nonowner-occupied lot may be approved for each such subdivision. (d) The provisions of this subsection apply to final maps and other development permits for projects with a tentative map approved before July 20, 1986 which are not included in the exemptions listed in subsection (c) • . (1) If a tentative map or tentative parcel map wa approved on or before January 21, 1986 then, after approval of the citywide facilities plan, a final map or parcel map ~ay be processed and approved before the adoption of a local facility management plan.-The expiration period for those tentative maps shall be tolled until the citywide plan is adopted. The expiration of any development permits issued _in conjunction with those maps shall be tolled until the applicable local facilities management plan is approved or, two years after the date the citywide plan is approved, whichever occurs first. · (2) If a tentative map or tentative parcel map wa approved after January 21, 1986 and before July 20, 1986, but th approval of final map or parcel map was prohibited by· Ordinance No. 9791 then approval of final maps and parcel maps is prohibited until after preparation of the applicable local facilities management plan. The expiration period of those tentative maps and tentative parc~l ma-ps, and any other development permits issued in conjunction with-the maps shall be tolled unti-1 the local facilities management plan is approved, or two years after date the citywide facilities and improvements plan is approved, whichever occurs first. (e) The exemption for projects listed in subsection (c ( 3), ( 4), ( 5), and ( 6) shall expire on ·July 20, 1988. After tha date all development permits for those projects shall be fully subject to the provisions of this chapter. The exemptions for projects listed in subsection (c) (3), (4), (5), and (6) shall apply only so long as the facilities and improvements reauired a a condition to the issuance of -final development permits have been installed or are being installed pursuant to a secured agreement. Any breach of such secured improvement agreement shall subject any remaining building permits for the project to the provisions of subsection (a). (f) Final or parcel maps for projects listed in subsection (c) (3), (4), (5), (6) and (7) which comply with all the requirements of the Subdivision Map Act and Title 20 of this Code which were filed with the City before July 20, 1986 may be approved by the City Council, or City Engineer as appropriate, af~er July 20, 1986. Upon approval, those projects shall be subject to the exemption of .subsection ( c). (g) The City Council may authorize the processing of and decision making on building permits and development perniits for a project with a master plan approved before July 20, 1986 subject to the following restrictions: (1) The City Council finds that the facilities an improvements reauired by the master plan are sufficient to meet the needs created by the project and that the master plan developer has agreed to install those facilities and i~provement · to the satisfaction of the City Council. s. 115 ,_ ! : l 2 3 4 5 6 7 8 9 10 ll 12 13 14 15 16 17 18 l I l9!i i 20 I ! 21 ! r ;I 22: I 23 1 24 ~5, 261 27' ·'' 2a 1 ii I. (2) The master plan developer shall agree in writing that all facilities and improvement requirements, including but not limited to the payment of fees established by the citywide facilities and management plan and the applicable local facilities management plan shall be applicable to development within the master plan area and that the master plan developer shall comply with those plans. (3) The master plan establishes an educational park and all uses within the park comprise an integral part of the educational facility. (4.) Building perniits for the 129 unit residential portion of Phase I of the project may be approved provided the applicant has provided written evidence that an educational entity will occupy Phase I of the project which the City Council finds is satisfactory and consistent with the goals and intent o the approved master plan. ( 5) Prior to the approval of the f ina-l map for Phase I the master plan developer shall have agreed to participate in the restoration of a significant lagoon and wetland resource area and made any dedications of property. necessary to accomplish the restoration. · Ch) After making the findings in paragraph l the City Council may authorize the processing of and decision making on master plans subject to the requirements of paragraph 2. After the grant of the easement required by· subpara_gra-ph ( h) ( iv) ·the tentative map for Phase I of the project, the site plan for the commercial development and the lo·cal coastal plan amendment may also be processed and approved. If such approvals are granted and, subject to all other provisions of this code, grading and building permits for construction of the golf course and first phase of the commercial portions of the project may be processed and approved. · . The processing and approval of.all other developments and building permits within the master plan shall not .occur unti after the citywide facilities plan and the local facilities management plan have been adopted by the City Council. (l){i) That the master plan will provide all necessary public facilities for the project and will cure any facilities deficits in the area affected by the project. (ii) That the approval will not prejudice the preparation of the citywide facilities plan and will improve the level of public facilities and services in the area. (iii) That by the dedication of land and the construction of public improvements the project will make a . significant contribution to the public facilities needs of the city and provide for the preservation or enhancement of sianificant environmental resources. · ( 2) ( i > The master plan shall include all of the information required by and implementing the provisions of Sections 21.90.090 and 21.90.110 for the area covered by the master plan. (ii) The applicant shall agree in writing that al facilities and improvement reQuirements, including but not I. limited to the payment of fees established by the citywide I 6. 116 l 2 I 3! 4 5 6 7 8 9 10 ll 12 Q < CD I 13 en ·i! ~ < ... ·u < 14 1 :> , -::i z ~ ..I! :> ► > 15 ii!::<!!: (.J 2 ..J i.: . ..I< ►WI(,,) ~LM~Q 16 u z < J :s -CD ; t: '.1 111 > a: < < > (.J I I-I• <3 1811 11 19 Ii [, 201: I 21 JI 221 23 241 25 26 27 I ,1 11 28 I facilities and improvement plan and the applicable local facilities management plan shall be applicable to ·development within the master plan area and that the master plan developer shall comply with those requirements. (iii) The master plan applicant shall agree to participate in the restoration of a significant lagoon and· wetland resource area. , (iv) Prior to any processing on the master plan the applicant shall grant an easement over the property necessary for the lagoon restoration and the right-of-way necessary for the widening of La Costa Avenue and its intersection with El Camino Real. 21.90.031 Tolling of time for consideration of applications submitted before the effective date of this chapter. After approval of the citywide facilities and improvement plan and the applicable local facilities management plan applications for development permits which were accepted as complete before the effective date of this chapter shall have processing priority in relationship to the acceptance date. Until the approval of the plans all a~plicable time limits for processing the development permits shall be tolled. 21.90.032 Tolling of expiration of previously issued development permits. If a discretionary development permit, other than a development permit issued in conjunction with a subdivision map, issued prior to July 20, 1986 has an expiration period within which building permits must be issued and ½he issuance of building permits for the project is prohibited by this chapter then the expiration period shall be tolled .until the applicable local facilities management plan is approved, or two years after the date the citywide p~an is approved, whichever occurs first. 21.90.033 Extensions of rohibited. Ater approva o an app 1cab e oca · ac1 1t1es management plan an extension of the expiration date of any development permit shall not be granted unless the extension is found to be consistent with the plan. The decision making body considering an extension may condition the extension upon compliaoce with the citywide plan and applicable local facilities management ~lan. 21.90.040 Com liance with this cha ter. a No deve opment permits all be approved unless the approving authority finds that the permit is consistent with the citywide facilities and improvements plan and the applicable local facilities management plan. To ensure consistency the approving authority may impose any condition to the approval necessary to implement the plans. (b) No building permit shall be issued unless the fees required by this chapter, and any applicable local facilities management plan fees are first paid, and the permit is consisten 7. 117 4 5 6 7 8 9 10 ll 12 13 141 isl isl I 171 I! 1ai1 ,I j, 19!! 1; 2011 21 ,· I 221 231 24 with the applicable local facilities management plan. As a condition to the issuance of any building permit pursuant to Section 21.90.030(c) the applicant shall agree to pay the appropriate fees within 30 days of the date each fee is established. Cc) The requirements of this chapter are imposed as a condition of zoning on the property to ensure iniplementation of and consistency with the general plan and to protect the public health, safety and welfare by ensuring that public facilities an improvements will be installed to serve new development prior to or concurrently with need. 21.90.050 Establishment of local facilities management fee. -(a) A local facilities management fee is hereby established to pay for improvements or facilities identified in local facilities management plan which are related to new development within the zone and are not otherwis~ financed by an other fee, charge or tax on development, or are not installed by a developer as a condition of a building permit or development permit. The fee may also be used to pay for that portion of the facilities or improvements identified in the citywide facilities and improvements plan attributed to development within the local zone which are not financed by other means~ The facilities management fee shall be paid before the issuance of a building permit. The amount of the fee shall be determined based upon th estimated cost of the facility or improvement designated as necessary to accommodate additional development within the applicable loca·l facilities management zone plus the estimated cost of facilities and improvements identified in the citywide facilities and improvement plan attributable to the local zone. The fee shall be fairly apportioned among the new development. (b) The fee required by this section is in addition to any other means of fin~ .. cing facilities or improvements identified by a local facilities management plan or any other tax, fee, charge or improvement requirement which may be imposed on the development of property under the provisions of state law this code or City Council policy. (c) The amount of the fee for a local facilities management zone shall be set by City Council resolution after a public hearing, published notice of which shall be given according to Carlsbad Municipal Code Section 21.S4.060(2) and Government Code Section 54992. (d) As. a condition of any building or development permit application submitted after the effective date of this ·chapter the applicant shall agree to pay the fee established by this section at the time a building permit is issued. (e} The fee established by this section shall be levie at the time of issuance of a building permit. 21.90.060 Special provisions for building permits issued durin tern orar moratorium. a) Ap~licants for proJects for which building permits were issued after January 21, 1986 and before July 20, 1986 shal 8. 118 l 2 3 4 5 6 7 8 9 10 ll 12 0 C m I 13 in ~ ~ 'IC 14 i ~ er: ►>0 15 '::<~ (J 2 :.! ' ... (J ► YI . 16 YI~ 0 i_~ o in t: ..I 17 er: C ~ ► I- 18 I G 19 I 20 21 22 23 24 25 26 27 28 pay the fee established by Section 21.90.050 within 30 days afte the amount of the fee is determined by the City Council. Payment shall be made according to the agreement executed by the applicant pursuant to Section 3 of Ordinance No. 9791. 21.90.070 Finding of health, safety and welfare necessarb for the fees imposed by Sections 21.90.050 and 21.90.06 • (a) The City Council hereby declares that payment of the fee established and imposed by Sections 21.90.050 and 21.90.060 and installation of the facilities and improvements identified in a facilities management plan are necessary to achieve the policies established in Section 21.90.010 and to implement the City's general plan. If the fees are not paid or the facilities or improvements are not installed the public health, safety and welfare will suffer because there will be insufficient facilities and improvements to accommodate any new development. This finding is based _upon City Council Policy No. 17, City Council Ordinance No. 9791, and the evidence presented at the public hearings on the ordinance adopting this chapter. (b) If any condition imposed as a conditon of a development permit or building permit pursuant to this chapter i protested then the permit shall be suspended during the period o the protest. (c) This section is adopted pursuant to Government Cod Section 65913.5. 21.90.080 Performance standard. The City Council shall adopt general performance standards for each facility or improvement listed in Section 21.90.090(b) or 21.90.ll0(c). Specific performance standards fo citywide facilities shall be adopted as part of the citywide facilities and improvement plan. Specific performance standards for each zone shall be J10opted as part of the local facilities management plan. If at any time after preparation of a local facilities management plan the performance standards established by a plan are not met then no development permits or building permits shall b9 issued within the local zone until the performance standard is met or arrangements satisfactory to the City Council guaranteeing the facilities and improvements have been made. ~ 21.90.090 Cit wide facilities and im rovements lan. a To imp ement the C ty s genera pan by secur ng provision of facilities and improvements, and to ensure that development does not occur unless facilities and improvements ar available the City Council shall adopt by resolution a citywide facilities and improvements plan. The plan shall: Identify all facilities and improvements necessary to accommodate the land uses specified in the general plan and by the zoning: specify size, capacity and service level performance standards for the identified facilities and improvements: establish specific time tables for acquisition, installation and operation of the facilities and improvements correlated to projected population 9. 119 l 2 3 4 5 6 7 8 9 10 ll 12 0 < m I 13 en ~ 9; ~ ... 'I.I< 14 8 , --Z z ,.ja: o ►>o 15 cij!::C!!: . u 2 ~ u. ' ~ u ,-► w • l6i zW~Q wZ < u a: _ m z O en s:r:: a! 17 < < ► u ,-1s1i u i' 19 lj 2oli 1- 2lii II 22 23 24 I I 25 I' 1! 261 27 I ,I 1! 28 growth, facility and improvement performance standards, and projected nonresidential development: identify the financing method or methods for each facility and improvement: and establish a facility and improvement budget for those facilities or improvements which will be constructed or financed by the City. The plan shall encourage infill development and reduce the growth inducing impact of premature extension of facilities or improvements to undeveloped areas by establishing priorities for facility and improvement installation or financing. (b) The citywide facilities and improvement plan shall show how and when the following facilities and improvements will be installed or financed as specified in subsection (c). (1) Major sewage transmission systems and sewage treatment plants: (2) Major water transmission lines: (3) Major area wide drainage facilities: (4) Prime and Major arterials: freeway interchanges, bridges or overcrossings: (5) Fire facilities: (6) Governmental administration facilities: (7) Parks and other recreational facilities: ( 8) Libraries. (c) The plan shall include the following information with regard to each facility and improvement listed in subsectio ( b): (1) An inventory of present and future requirements for each facility and improvement based upon the performance standard established for each facility and improvement. Cost estimates shall be included. The inventory shall be consistent with the general plan and zoning for the area. (2) A phasing schedule establishing the timing fo installation or provisions of facilities or iroprovements in relationship to the an1011ltt of development activity (e.g. number of dwelling units, number of square feet of commercial space within the service area of the facility or improvement) and the facility and improvement performance standards. (3) A financing plan establishing various methods of funding the facilities and improvements identified in the plan. The plan shall identify those facilities and improvements which would otherwise be provided as a requirement of processing a devel9pment project (i.e. requirements imposed as a condition of a development permit) or provided by the developer in order t establish consistency with the general plan or Titles 18, 20 or 21 of this Code, and those facilities and improvements for which new funding methods which shall be sufficient to ensure sufficient funds are available to construct or provide facilitie or improvements when required by the phasing schedule. (d) The City Manager shall prepare and present the pla to the City Council not later than one year from the effective date of this ordinance. 10. 120 l 2 :3 4 5 6 7 8 9 10 11 12 Q ~ I 13 ti) -' a: < .,, 0 1M < 14 -:,-. z . a: ;o 15 !:: C !!: CJ 2 ~ ;. ~ <.: 16! 1M i Q Z C ~ -iJ ~ -' 17 a: < < ,. CJ 181/ I-i::; 191! 2oli !I 21:i 22 ! 23 24 25 26 27 I 28I (e) Amendments to this citywide facilities and improvements plan shall be initiated by action of the Plannin9 Commission or City Council.- 21.90.100 Local facilities manaoement zones. (a) The City Council shall divide the City into facilities management zones. · (b) The boundaries of the zones shall be established based upon logical facilities and improvements planninq, construction and service relationships to ensure the economicall efficient and timely installation of required facilities and improvements. In establishing zone boundaries the City Council shall also be guided by the following considerations: (1) Service areas or drainage basins; (2) Extent to which facilities or improvements a~e in place or available; plan areas1 (3) Ownership of property; (4) Boundaries of existing zoning master plans; (S) Boundaries of pending zoning master plans; (6) Boundaries of potential future zoning master (7) Boundaries of approved tentative maps; (8) Public facilities relationships, especially the relationship to the City's planned major circulation network; (9) Special district service territories; (10) Approved fire, drainage, sewer, or other facilities or improvement master plans • (c) The zones shall be established by resolution after a public hearing notice of which is given pursuant to Section 21.54.060(2) of this code. 21.90.110 Contents of local facilit mana ement lans. a A local fa~1l1ties management plan shall be prepared for each facility zone and shall cover the entire zone. (b) The plan shall consist of maps, graphs, tables, narrative text and shall be based upon the general plan and zoning applicable within the local zone at the time of plan approval. The local facilities management plan shall be consistent with the citywide facilities and improvements plan shall implement the citywide facilities and improvements plan within the zone. · ✓ (c) The facilities management plan shall show how and when the following facilities and improvements necessary to accommodate development within the zone will be installed or financed as specified in subsection (d). (1) Sewer systems (2) Water (3) Drainage (4) Circulation (5) Fire facilities (6) Schools (7) Parks and other recreational facilities (8) Open space 11. 121 l. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 1a I 19!! 2011 .I 2111 22 23 24 25 26 27 l1 ,I I! 281 (d) The plan shall be consistent with and implement the citywide facilities management plan and general plan and shall include the following information with regard to each facility and improvement listed in subsection (c): (1) An inventory of ·present and future requirements for each facility and improvement based upon the performance standard established for each facility. Because improvement reauirements for certain facilities and improvements may overlap zone boundaries a discussion of the need for coordination and a proposed coordination plan for facilities extending from one zone to another shall be included. Cost estimates shall be included. It must be shown that development in the zone will not reduce the facilities or improvements capabilities or create facilities or improvements shortages in other zones or reduce service capability in any zone below the performance standard which is established pursuant to Section 21.90.080. The growth inducing impact of the out of zone improvements shall be assessed. (2) A phasing schedule establishing the timing for installation or provisions of facilities or improvements in relationship to the amount of development activity (e.g. number of dwelling units, number of square feet of commercial space, etc.) for the facilities management zone. The phasing schedule shall ensure that development of one area of the zone will not utilize more than the area's prorata share of facility or improvement capacity within that zone unless sufficient capacity is ensured for other areas of the zone at the time of the first development. The phasing schedule shall in·clude a schedule of development within the zone and a market data and cash flow analysis for financing of facilities and improvements for the zone. The phasing schedule shall identify periods where the demand for facilities and improvements may exceed the capacity and provide a plan for eliminating the shortfall. In those situations when demand ~xceeds capacity and it is not feasible t increase the capacity prior to development, no development shall occur unless a time schedule for and a means of increasing the capacity is established in the plan. (3) A financing plan establishing various methods of funding the facilities and improvements identified in the pla fairly allocating the cost to the various properties within the zone. The plan shall identify those facilities and improvements which ws,uld otherwise be provided as a requirement of processing a development project {i.e. requirements imposed as a condition of a development permit) or provided by the developer in order t establish consistency with the general plan or Titles 18, 20 or 21 of this Code, and those facilities and improvements for which new funding methods which shall be sufficient to ensure sufficient funds are available to construct or provide facilities or improvements when required by the phasing schedule Where facilities or improvements are required for more than one zone, the phasing plan shall identify those other zones and the plan for each zone shall be coordinated. Coordination, however, shall not require identical funding methods. 12. 122 l 2 3 4 5 6 7 8 9 10 11 12 0 < m I 13 <n ~ ~~ • (J "'< 14 g l!; i i z "'cc o ►>O 15 -i--c"-m c3 2 i i.. '~ (.J .... ~"' . 16 ffi z ~ ~ O~-m ~ ~ ~ 17 > cc < < ► (.J .... c3 18 i . 191i ,I 20 11 I, 2111 22.1 231 24 25: I 26 Ii !I 27 :; :: 2811 1. Ii 11 11 ii (4) A list or schedule of facilities requirements correlated to individual developroent projects within the zone. (e) The local facilities management plan shall establish the proportionate share of the cost ·of facilities and improvements identified in the citywide facilities and improvement plan attributable to developn,ent of property on the local facilities management zone. 21.90.120 Local facilities management olan preparation. {a) A local facilities management plan may be prepared by the City or by the property owners within the zone accordina to the procedures established by this section. (b) The City Council, upon its own initiative, may by resolution direct the City Manager to prepare a facilities management plan for any zone. The City Council may assess the cost of preparing the plan to the owners within the zone after a hearing ten days written notice of which is given to the propert owners within the zone. The cost shall be spread prorata according to acreage and development potential. Cc) All owners within the zone may jointly submit a facilities management plan. (d) For zones in which joint submission of a facilitie management plan is shown to be not feasible any owner o~ group o cooperating owners within the zone may petition the City Council to allow the owner or group of owners to prepare the plan. Afte a meeting for which ten days prior written not.ice has been given to the property owners within the zone, the City Council may permit the owner or group of owners to prepare and submit the plan. A limit based on the estimated cost of the plan shall be detern,ined at the time of the hearing. The actual cost shall be determined when the plan is adopted and shall be assessed prorat based on acreage and development potential to property within th facilities·management zone. The assessment shall be collected b the City at the time any application for a developroent project within the zone is submitted. The owner or owners who prepared the plan shall be reimbursed for the cost of the plan less the owner's or owners' prorata share. No reimbursement shall be mad unless the plan is approved. Cost of preparation shall not include interest. · (e) As an option to preparation by the owner or group of owners as provided in subsection (d) the City Council may decide to direct the City Manager to prepare the facilities management plan. The cost of preparation shall be advanced to the City by the requesting owner or owners, assessed to all the owners and reimbursed as provided in subsection (d). a Fac1 ties management pans according to the following procedure: rocessina. reviewed (1) A completed facilities management plan complying with this chapter, and accompanied by a processing in an amount established by City Council resolution, ~ay be submitted to the Planning Director for processing. If the 13. 123 fee I · 1 -' - l 2 3 4 5 6 7 8 9 10 ll 12 13 14 15 161 17 1a I I 19,1 2011 2111 221 1 23 24 i 25 I, 2611 11 27 ii I 28 Planning Director determines tha~ the plan complies with the provisions of Section 21.90.110 the director shall set a facilities management plan for public hearing before the Planning Commission within sixty days of receipt of a complete application. ( 2) The hearing shall be noticed according to the provisions of Section 21.54.060(2). A staff report containing recommendation on the plan shall be prepared and furnished to the public, the applicant, and the Planning Commission prior to the hearing. (3) The Planning Commission shall hear and consider the application for a facilities management plan and shall by resolution prepare recommendations and findings for the City Council. The action of ·the Commission shall be filed with the City Clerk, and.a copy shall be mailed to the owners within the facility zone. (4) When the Planning Commission action is filed with the City Clerk, the Clerk shall set the matter for public hearing before the City Council. The hearing shall be noticed according to the provisions of Section 21.54.060(2). (5) The City Council shall hear the matter, .and after considering the findings and recommendations of the Planning Commission, may approve, conditionally approve or deny facilities management plan. The C.ity Council may include in the resolution adopting the facilities management plan any fees or facilities improvement requirements which it deems necessary to impose on development projects within the zone in order to implement the citywide facilities and improvement plan and the local facilities management plan. (b) A facilities management plan may be amended following the same procedures for the original adoption. (c) A local faci.lities management plan shall be considered a project for the purposes ~f Title 19 of this Code. Environmental documents should be processed concurrently ·with th plan. 21.90.130 Im lementaeion of facilities and im rovement reauirements. (a) To ensure that the provisions of this cha0ter and the general plan are met the following shall apply: (1) Except as otherwise provided in this chapter n development permit shall be approved unless the map or permit is consistent with the local facilities management plan and unless provision for all facilities and improvements related to the development project are provided or funded. (2) No building.permit shall be issued unless all applicable fees, including but not limited to, public facilities fees, bridge and thoroughfare fees, traffic impact fees, facilities management fees, school fees, park-in-lieu fees, sewe fees, water fees, or other development fees identified in the citywide facilities and improvements plan and local facilities management plan and adopted by the City Council have first been paid or provision for their payment has been made to the satisfaction of the City Council. 14. 1211 l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ~:!1 20 21 221 23 1 24 I 251, " I 2sl I 27 !i ,! 28 (b) The citywide facilities and improvement plan and the local facility management plan process is part of the City's ongoing planning effort. It is anttcipated that amendments to the plans may be necessary. Adoption of a facilities management plan does not establish any entitlement or right to any particular general plan or zoning designation or any particular development proposal. The citywide facilities and improvements plan and the ·1ocal facilities management plans are guides to ensure that no development occurs unless adequate facilities or improvements will be available to meet demands created by development. Th.e City Counci 1 may initiate an amendment to any of the plans at any time if in its discretion it determines that an amendment is necessary to ensure adequate facilities and improvements. · Cc) If at any time it appears to the satisfaction of the City Manager that facilities or i.nlprovements within a facilities management zone or zones are inadequate to accommodate any furth·er development within that zone or that the performance standards adopted pursuant to Section 21.90.100 are not being n,et he shall immediately report the deficiency to the Council. If the Council determines that a deficiency exists then no further building or development permits shall be issued within the affected zone or zones and development shall cease until an amendment to the citywide facilittes· and improvements plan or applicable local facilities management plan.which addresses the deficien·cy ·ts approved by the City Council and the perfornance standard is met. · (d) The Planning Director shall monitor the developmen activity for each local facilities management zone and shall prepare an annual report to the City Council consisting of maps, graphs, charts, tables and text and which includes a developniental activity analysis~. a facilities and improvements adequacy analysis, a facility revenue/expenditure analysis and recommendation for any amendments to the facilities management plan. The co~tent of the annual report shall be established by the City Council. (e) The City Council shall annually review the citywid facilities and improvements plan at the time it considers the City's capital improvement budget. 21.90.140 Obligation to pay fees or install improvements reauired by any other law. Nothing in this chapter shall be construed as relieving a builder, developer or subdivider from any public improvement requirement, dedication reauirement or fee requirement which is imposed pursuant to Titles 13, 18, 20 or 21 of this code or pursuant to any City Council policy. 21.90.150 Implementino guidelines. The City Council may adopt any guidelines it deems necessary to implement this chapter. 21.90.160 Exclusions. (a) Development proposals which consist of facilities, 15. 125 l 2 I 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 ! 201[ 211 22 23 24 25 26 27 28 or structures constructed by a city, county, special district, state, or federal government or any agency, department, or subsidiary thereof for governmental purposes are excluded from the provisions of this chapter. · This exclusion shall not apply to development proposals to which a possessory interest tax would be applicable. {b) Tentative maps the application for which was accepted before August 6, 1985 ~ay be approved without complyino with the plans adopted pursuant to this Chapter but any other - development permits or building permits for the project shall be subject to the reauirements of the plans. The tentative map shall be subject to Section 21.90.030. 21.90.170 Council actions, fees, notice. (a) Whenever this chapter requires or permits an action or decision of the City Council, that action or decision shall be accomplished by a resolution. (b) The City Council shall establish application and processing fees for·the submission and processing of facilities management plans and for any other request made under Section 21.90.100, 21.90.120 or 21.90.140. (c) Whenever written notice is required to be given to property owners under this section the notice shall be mailed by first class mail to the owners shown on the last equalized assessment roll. 21.90.180 Expiration of chapter. This chapter shall expire on June 30, 2001 unless it is extended or reenacted on or before that date. 21.90.190 Severability. If any section, subsection, sentence, clause or phrase of the ordinance codified in this chapter is for any reason held to be invalid or unconstitutional by the decision of any ~ourt of competent jurisdiction, such decision shall not affect the validity of the remaining portions of the ordinance codified in this chapter. The City Council declares that it would have passed the ordinance codified in thi chapter and each section, subsection, sentence, clause and phras thereof, irrespective of the fact that any part thereof be declared invalid or unconstitutional. ,,-SECTION 2: The City Council makes the following findings: 1. Since January 1985, the City of Carlsbad has been undertaking a comprehensive review of the Land Use Element of it General Plan. As part of that review a Council appointed Citizens Committee prepared a comprehensive report and recommendation to the City Council. That report was subject to public hearings by both the Planning Commission and City Council Included in the recom~endations of the Citizens Committee were recommendations that no new development should occur unless 16. 126 l 2 5 6 7 ai 9 10 11 12 13 14 15 16 17 j, lSP 19!! 2oli I! 2111 22: ' 23 24 25 26 27 i 281 adequate public facilities are available concurrently with need to serve the new development. 2. On August 6, 1985, the City Council adopted Interi~ Ordinance No. 9766, imposing certain temporary land use controls on property within the City, consistent with the recommendation of the Citizens Committee. On September 3, 1985, the City Council adopted Interim Ordinance No. 9771 which extended the restrictions of Ordinance No. 9766 until July 20, 1986. on December 10, 1985, the City Council approved in concept several land use proposals not contained in the Citizens Committee report. On January 21, 1986 the City Council adopted Urgency Ordinance No. 9791 imposing a temporary moratorium on development approvals based on the findings contained in that ordinance. On April 22, 1986 the City Council revised City Council Policy No. 17, based on the findings contained therein. On May 6, 1986 the City Council adopted Ordinance No. 8107 establishing a traffic impact fee for the La Costa Area of the City. The City Council finds that all of _these actions plus the adoption of Chapter 21.90 of the Carlsbad Municipal Code are necessary to ensure adequate public facilities are available to serve any new development in the City. Without Chapter 21.90 and the requirements imposed by it, adequate public facilities may not b available to serve new development or building. Development or building without public facilities is contrary to the City General Plan and would be dangerous to the public health and safety. 3. This action of the City Council is consistent with long standing policies and objectives of the City to ensure adequa.te public facilities within Carlsbad. This action will protect the public health, safety and welfare of the citizens of Carlsbad by ensuring safe streets, adequate water, sewer and drainage facilities, su-iicient fire protection and recreation facilities. 4. This action is consistent with the City's policy to provide housing opportunities for all economic sectors of the community, because sufficient opportunities for new housing continue to exist within the City and Chapter 21.90 does not affect the number of houses which may be built. In addition, develop~ent of housing for low and moderate income persons and families would most likely occur in areas of the City which are designated for highest development priority. By encouraging development of infill areas first, where the infrastructure is already existing, the cost of housing may be reduced. s. Because any new development affects public facility availability it is necessary to impose the fees and charges whic will be used to provide public facilities on any new building in the City. The Council finds that failure to impose the fees and charges on any new building in the City will adversely affect th public health and safety by reducing the-safety of its City's streets, increasing the burden on water, sewer, drainage and fir 17. 127 l· 2 I 31 4 5 6 7 8 9 10 ll 12 13 I 141 isl I 161 I 11!! ,: 181! 19.I I! 20:: !I 21!1 ii 22:1 23 24 facilities, and by overcrowding existing schools, parks and recreational facilities. 6. Adoption of Chapter 21.90 will not advers&ly affect the regional welfare. By ensuring that adequate and safe public facilities and improvements will exist to serve all of the . development in Carlsbad and because many of these facilities and improvements are used by persons residing in neighboring areas and cities the safety and welfare of the whole region is enhanced. SECTION 3: The City Council intends to implement the growth management program contained in Chapter 21.90 by following the work program in Exhibit A which is hereby made a part of this ordinance. The City Council may adjust the work program without amending this ordinance as they determine necessary to accomplis effective growth management for the City of Carlsbad. EFFECTIVE DATE: This ordinance shall be effective thirty days after its adoption, and the City Clerk shall certify to the adoption of this ordinance and cause it to be published a least once in the Carlsbad Journal within fifteen days ·after its adoption. The fees created by Section 21.90.050 of this ordinance shall be effec:.:ive as to building permits for single o multifamily residential projects 60 days after the adoption of this ordinance. INTRODUCED AND FIRST READ at a regular meeting of the Carlsbad City council held on the 24th .,,. day of June ------- 1986 and thereafter 18. 128 l 2 3 4 5 6 7 8 9 10 / 11 12 25 26 27 .2a I PASSED AND ADOPTED at a regular meeting of said City Council held on the 1st day of __ J_u~lv....._ ___ , 1986, by the following vote, to wit: ATTEST: AYES: Council Members Casler, Lewis, Kulchin, Chick and Pettine NOES: None ABSENT: None 19. 129 • CULSBAD Ciff COOWCIL GROll'l'B ll&W&G■NaT Pl.A■ •■-•9in9 a aeapoaaible aa4 Pr09r•••i•• Carlsbad Putare• I. Citywide Pacilities and Improvement Plan A. Growth Control Mapping and Planning Systems 1. The General Plan will be utilized ·as the overalr base map with a maximum residential utilization i.e. mean density. 2. A citywide map will show all current and future public facilities and improve■ents. Each public facility and improvement will also be shown separately on a citywide map. 3. A citywide environmental constraints and open space map will be prepared. 4. These maps will also be broken down into quadrants to show greater area detail. B. Manaqement Performance Standards 1. Establish overall performance or adequacy standards for each public facility and improvement. 2. !stablish thresholds for each public facility and improvement. c. Citywide Pinancinq Option■ 1. Pinancing options will be identified for each facility and improvement. 2. ✓Budgeting for citywide public facility and improvement will be in conjunction with the City's five year capital improvement budget. D. Citywide Plan 1. A Citywide Pacilitiea and Improvements Plan will be prepared using growth control maps, performance standards and financing options. -1- 130 E. Development of Local Paeility Management and Planning zones. 1. The City ·shall be divided into 25 specific zones. 2. The size of each zone shall depend upon major circulation roads, lagoons, property ownership boundaries, and other identifiable characteristics. 3. The purpose of zonesa a. Requires landowners to work together in order to present development plans in accordance with the City's Growth Management Program~ b. Requires landowners to provide development plans which adhere to the citywide facilities plan and to relate develop■ent to adjacent zones. c. Zones allow for greater citizen review prior to development approval • . 4. Bach zone will have a aaximua residential u~ilization i.e. ■ean densit~. Specific densities for. individual develop■ent plans within the zone, however, will be controiled through the normal planning process. 5. Bach zone must conform to the General Plan and the Growth Management Ordinance. II. Pacility Management Zone Processing A. Landowners submit local facilities management plans for prqeeseing concurrently with ·normal environmental analysis. B. Local facilities ■ana9eaent plane shall conform to all standard• of the Growth Control Mapping and Planning syste■s and other existing City standards. c. Th• local plan shall provide a detailed financing plan to assure adequate funding of all citywide facilities _ and improvements identified in th• citywide plan. The local plan ■ball also proYide a detailed financial plan for all public facilities and improvements located within the local facilities aanagement zone. All development within the local facilities management zone will be phased in accordance with the facility and improvement performance standards. D. A public hearing on the local facilities management plan ·and environmental analysis will be held concurrently. Notice to all landowners within.the zone as well as surrounding adjacent zone landowners. -2- 131 .... -.. .:; 1. A'fter the public hearinf is complet•d on the local facilities mana9ement zone and environmental analysis, then th• specific development plans will be process•d in the normal method. p. 1ach local facilities 11ana9e■ent plan will be reviewed annually by th• City to ensure that all performance standai-d• are bein9 met. If they are not, development will be atopped. S/13/8, ad 132 APPENDIX 3 133 REFERENCE SOURCES 1. Citywide Facilities and Improvements Plan, City of Carlsbad, Revised September 29, 1986 2. Master Drainage Plan for the City of Carlsbad, adopted June, 1980 3. Sewer Master Plan, City of Carlsbad November, 1976 June, 1984 April, 1985 4. Costa Real Municipal Water District Master Plan, February, 1%5 5. Parks and Recreation Element of the General Plan, City of Carlsbad, June, 1982 6. Memo to Planning ~ommission from Parks and Recreation Director, dated March 26, 1987 7. Circulation. Element of the General Plan, City of Carlsbad 8. Standard Design Criteria for the Design of Public Works Improvements in the City of Carlsbad, 1984 9. Draft Barton-Aschman Traffic Study, March, 1987 10. Capital Improvement Program Budget, 1986-1987 11. Capital Improvement Program, 1987-1991 134 APPENDIX 4 135 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 · PLANNING COMMISSION RESOLUTION NO. 2659 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA RECOMMENDING APPROVAL OF THE LOCAL · ~ACILITIES MANAGEMENT PLAN FOR ZONE 4 ON PROPERTY GENERALLY LOCATED SOUTH OF AGUA HEDIONDA LAGOON, NORTH OF AND INCLUDING THE ENCINA WASTEWATER TREATMENT PLANT, EAST OF THE PACIFIC OCEAN TO A POINT JUST EAST OF PASEO DEL NORTE. APPLICANT: CASE NO.: CITY OF CARLSBAD: LOCAL FACILIITES MANAGEMENT PLAN -ZONE 4 WHEREAS, a verified application has been filed with the City of Carlsbad and referred to the Planning Commission, and WHEREAS, the City Council passed Resolution No. 8797 adopting the Citywide Facilities and Improvements Plan establishing facility zones and performance standards for public facilities, and WHEREAS, the City Council passed Ordinance No. 9808 requiring the processing of a local Facilities Management Plan, and WHEREAS, Ordinance No. 9808 requires the Planning Commission to hold a public hearing to consider the application for a Local Facilities Plan and shall make recommendations and findings for the City Council; and WHEREAS, the Planning Commission did, on the 20th day of May, 1987, hold a duly noticed public hearing as prescribed by law to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the Local Facilities Management Plan for Zone 4. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the Citj of Carlsbad as follows: -136- l. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 A) B) That t~e above recitations are true and correct. That based on the evidence presented at.the public hearing, the Commission APPROVES Local Facilities Management Plan - Zo~e-4,-based on the following findings and subject to the following conditions: Findings: 1) 2) 3 ) 4) 5) That the Local Facilities Management Plan for Zone 4 is consistent with the Land Use Element, the Public Facilities Element, and the other Elements contained in Carlsbad's General Plan. That the Local Facilities Management Plan for Zone 4 is consistent with Section 21.90 of the Carlsbad Municipal Code (Growth Management), and with the adopted Citywide Facilities and Improvements Plan. That the Local Facilities Management Plan and the conditions contained therein will promote the public safety and welfare by ensuring that public facilities will be provided in conformance with the adopted performance standards. -The Local Facilities Management Plan will control the timing and locations of growth by tying the pace of development to the provision of public facilities and improvements. The Plan will prevent growth unless public facilities and services are available in conformance with the adopted performance standards. Conditions: 1 ) Ill/ /Ill Ill/ Ill/ /Ill /Ill /Ill Approval is granted for Local Facilities Management Plan - Zone 4 as contained in the Plan titled Local Facilities Management Plan Zone 4, dated May 20, 1987, attached hereto, and incorporated herein by reference. Pt 1RESO"NO. 2659 -2- -137- l. 2 3 4 5 6 7 8 9 10 ll 12 13 14 15 16 17 18 19 20 21. 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on the 20th day of May, 1987, by the following vote, to wit: AYES: Chairman Marcus, Commissioners Schlehuber, Schramm, Holmes, Hall. NOES: Commissioners McFadden and McBane. ABSENT: None. ABSTAIN: None. MARY CUS, Chairman CARLS D PLANNING COMMISSION ATTEST: ~Q~~ MICHAEL J .ZMl TR PLANNING DIRECTOR PC RESO NO. 2659 -3- -138- 1 2 3 4 RESOLUTION NO. 9122 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA APPROVING A LOCAL FACILITIES MANAGEMENT PLAN FOR LOCAL FACILITIES MANAGEMENT ZONE 4. WHEREAS, a Local Facilities Management Plan has been prepared for Local Facilities Management Zone 4 in accordance with 5 6 Chapter 21.90 of the Carlsbad Municipal Code; and 7 WHEREAS, the Planning Commission did on May 20, 1987, hold 8 duly noticed public hearings as required by law to consider said 9 plan and at the conclusion of the hearing adopted Resolution No. 10 2650 making findings and recommending that the City Council adopt a ll plan; and 12 WHEREAS, a Negative Declaration was issued by the ~lanning \ 13 Director on May 8, 1987 and approved by the Planning Commission 14 on May 20, 1987 indicating that the Local Facilities Management 15 Plan is not anticipated to have any significant adverse impact on 16 the environment; and 17 18 WHEREAS, the City Council at their meeting of June 16, 1987 , held a duly noticed public hearing and considered all the 19 testimony and arguments of anyone desiring to be heard, 20 NOW, THEREFORE, BE IT RESOLVED by the City Council.of the 21 City of Carlsbad, California as follows: 22 23 1. That the above recitations are true and correct. 2. That the findings of the Planning Commission in 24 Planning Commission Resolution No. 2659 constitute the findings of 25 the City Council. 26 27 28 3. That the Local Facilities Management Plan for Zone 4 -139- 1 dated Hay 20, 1987 on file with the City Clerk and incorporated 2 herein by reference is hereby approved. Any development 3 occurring within the boundaries of Zone 4 shall comply with all the 4 terms and conditions of said plan. 5 PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held on the 16th day of June 6 ----, 1987 7 by the following vote, to wit: 8 9 10 11 AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson 12 13 ATTEST: 14 NOES: None ABSENT: None. ~: ;(~Y~et®ctERK 17 (SEAL) 18 19 20 21 22 23 24 25 26 27 28 -2- -140-