HomeMy WebLinkAboutLFMP 05; LOCAL FACILITIES MANAGEMENT PLAN ZONE 05; LOCAL FACILITIES MANAGEMENT PLAN ZONE 5; 1987-06-17CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES MANAGEMENT PLAN ZONE 5 Plan Sponsor: City of Carlsbad 1200 Elm Avenue Carlsbad, CA 92008 (61-9) 438-5621 Preparer: Planning Department City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 92009 (619) 438-1161 June 17, 1987 I. II. III. IV. v. VI. TABLE OF CONTENTS Executive Summary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction •••••• . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Builc:lout Projections. . . . . . . . . . . . . . . . . . . . . . . . . . . . Phasing •••••••••••••• . . . . . . . . . . . . . . . . . . . Zone and Requirements for Public Facilities Services .......................... . ........ Analysis of Public Facilities and Improvements 1. 2. 3. 4. 5. 6. 7. 8. 9. 1 o. 11 • City Administrative Facilities ••••••••••••• Library ••••••••••••••••••.••••••••••••••••• Wastewater Treatment Capacity. Parks •••• . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drainage .......•.•......•........ . . . . . . . . . . Adequacy Findings Circulation •••••••••••• . . . . . . . . . . . . . . . . . . . . Adequacy findings F 1 re .................. . . . . . . . . . . . . . . . . . . . . . Adequacy Findings •• . . . . . . . . . . . . . . . . . . . Ope_n Space ••••••••••••••••••••••••••••••••• Adequacy Findings ••••••••••••••••••••• Schools ............... . . . . . . . . . . . . . . . . . . . . . Adequacy Findings •• Collection System. Sewer Adequacy Findin~s •• Distribution System. Water Adequacy Findings ••••• . . .............. Page No. 1 13 20 28 34 37 41 45 52 59 64 67 74 101 106 108 110 112 116 117 122 126 131 VII. --- TABLE OF CONTENTS Page No. Append ices •••••••••••••••••••••••••••••••••••••• 132 Appendix 1. -Glossary........................ 133 Appendix 2. -Growth Management Ordinance..... 140 Appendix 3. -Sources......................... 163 Appendix 4. -Existing Structures Square footage.................. 165 Appendix 5. -Buildout Arterial Improvements.................... 171 Appendix 6. -Existing Plus Committed Traffic Projections for Impacted Road Segments within Zone 5 ••••••••••• 180 Appendix 7. -Amended Cost Estimates for Impacted Intersections.................... 187 Appendix 8. -Memo from Fire Department Dated April 27, 1987 ••.•••••••••• 194 Appendix 9. -Memo from Parks and Recreation Di rector.............. 201 Appendix 10. -Zone 5 Workforce Population Survey........................... 204 Appendix 11. -Plannin9 Commission Resolution No. 2668......................... 209 -City Council Resolution No. 9188 •••••••••••••• 213 ii Charts, Maps, Tables and EXHIBITS Page No. local Facilities Management Plan................................. 2 Public Facilities Summary Sheet.................................. 6 Local Facilities Management Plan Map/Zone 5...................... 16 General Plan -Land Use Map...................................... 17 Zoning Map••··••••••••••••••••••••••·•··••••••·•·•••••••••·••·•• 18 Major Projects/Properties, Exhibit A............................. 19 Existing land Use Categories, Exhibit B.......................... 23 Existing Structural Square Footage, Exhibit C.................... 24 Approved Structural Square Footage, Exhibit D.................... 25 Future Potential Structural Square Footage, Exhibit E............ 26 Non-Residential Buildout Projections............................. 27 Non-Residential Phasing Exhibit F............................... 32 Non-Residential Phasing (Graph) Exhibit G........................ 33 City Administrative Facilities Map. • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 38 Summary Sheet. . . . . . • . . • • • . • • • . . • . • . • . • • . • • . . . • • • . . . • • . • • • • 39 Facility Planning and Adequacy Analysis................... 40 Library ~1ap. . . . • • . . • . • . • . . . • . • . • . . . • . . . • . . . • • • . • • • • . . • • • . • . • . . • • . • 42 Summary Sheet •••••..•.•••.•••••••.•••..••. • • . • • • . . . • . . • . • • . 43 Facility Planning and Adequacy Analysis................... 44 Wastewater Treatment Map. • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 46 Summary Sheet............................................. 47 Facility Planning and Adequacy Analysis................... 48 Service Area Demand and Treatment Capacity, Table 1....... 51 iii -- Parks Charts, Maps, Tables and EXHIBITS (Continued) PaQe No Park District Boundary Map............................ 53 Map. • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 54 Summary Sheet. • • . . . • . . . • . . . • . . . . • . . • . • . . . • . . • • • . • • • • . • 55 Special Considerations................................ 56 Drainage Master Storm Drain Basins, Exhibit H.................. 60 Drainage, Exhibit 1................................... 61 Summary Sheet......................................... 62 Facility Planning and Adequacy Analysis............... 63 Circulation Map ••••••••••••••••••••••••••••••••••••••••••••••••••• Summary Sheet ••••••••••••••••••••••••.•••••••••••••••• Facility Planning and Adequa~y Analysis ••••••••••••••• Trip Distribution Map, Exhibit J •••••••••••••••••••••• Circulation Improvements •••••••••••••••••••••••••••••• Levels of Service, Chart A •••••••••••••••••••••••••••• Road Segments, Chart 6 •••••••••••••••••••••••••••••••• Failure Projections, Chart C •••••••••••••••••••••••••• Proposed Improvements •••••••••••••••••••••••••••••••.• -Palomar Airport Road/1-5, Exhibit K ••••••••••••••••• -El Camino Real/Kelly Dr, Exhibit L •••••••••••••••••• -El Camino Real/Faraday, Exhibit M ••••••••••••••••••• -El Camino Real/Palomar Airport Road, Exhibit N •••••• -El Camino Real/Tamarack Ave., Exhibit 0 ••••••••••••• -Palomar Airport Rd/Paseo del Norte, Exhibit P ••••••• -Cannon Rd/El Camino Real, Exhibit Q ••••••••••••••••• -El Camino Real/College, Exhibit R ••••••••••••••••••• -Palomar Airport Rd/College, Exhibit 5 ••••••••••••••• -Palomar Airport Rd/El Fuerte, Exhibit T ••••••••••••• -Palomar Airport Rd/Melrose, Exhibit U ••••••••••••••• -El Camino Real/Palomar Airport Rd., Exhibit V ••••••• -Palomar Airport Rd/Yarrow, Exhibit W ••••••••..•••••• -El Camino Real/Faraday, Exhibit X ••••••••••••••••••• -Palomar Airport Rd/Paseo del Norte, Exhibit Y ••••••• Circulation Improvement Costs, Exhibit Z •••••••••••••• iv 68 69 70 73 73a 76 77 78 82 84 85 86 87 88 89 90 91 92 93 94 95 96 97 100 Fire Charts, Maps, Tables and EXHIBITS (Continued) Map ..................... _ ••••• ~ ••••••••••••••••••••••••••••.•• Summary Sheet •••••••.••••••••..••••••••••••••••.••••••• Facility Planning and Adequacy Analysis •••••••••••••••• Open Space Schools Summary Sheet .•••.•••••••.•••••••••••••.•••••••••.••••• Facility Planning and Adequacy Analysis •••••••••••••••• Map •••••••••••••••••••••••••••••••••••••••••••••••••••• Sun1111ar)' St\eet •••••••••••.••••••••••••••••••••••.••••••• Facility Planning and Adequacy Analysis •••••••••••••••• Sewer Collection System Sewer District Boundary Map ••••••••••••••••••••••••••••• Map ••••••••••••••••••••••••••••••••••••••••••••••••••••• Summary Sheet ••••••••••••••••••••••••••••••••••••••••••• Facility Planning and Adequacy Analysis ••••••••••••••••• Sewer Demand, Exhibit M ••••••••••••..•••••••••.••••••.• Carlsbad Demand in the Buena Interceptor and San Marco Interceptor, Exhibit BB ••••••••••••••••••••• Water Distribution System Page No 102 103 104 109 110 113 114 115 118 119 120 121 124 125 Water Service Boundary Map.............................. 127 Map..................................................... 128 Summary Sheet........................................... 129 Facility Planning and Adequacy Analysis................. 130 Appendices Traffic Impact Fee •••.•••..••.•..•.••...•••.••.•••••••.• Bridge & Thoroughfare District •••••••••••••••••••••••••• Circulation Improvements •••••••••••••••••••••••••••••••• Circulation Improvements/Buildout ••••••••••••••••••••••• Failure Projections/Palomar Airport Rd (Paseo del Norte to Camino Vida Roble) ••••••••••••••••• Failure Projections/Palomar Airport Rd. (El Camino Real to East City Limit) ••••• ~ •••••••••••••• Typical lane Improvements ••••••••••••••••••••••••••••••• V 138 139 174a 174b 182 183 193 1 EXECUTIVE SUMMARY ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN -2 - City or ca,ttbaa CirowlPI MeNlgement ProO"am JANUARY 1987 -EXECUTIVE SUMMARY The Local Facilities Management Plan for Zone 5 was prepared pursuant to the City's Growth Management program, Title 21, Chapter 21.90 of the Carlsbad Municipal Code. The contents of the plan follow the outline established by Section 21.90.110 of the Growth Management Ordinance. The Zone 5 plan is consistent with the Citywide Facilities and Improvements Plan, and it implements the Citywide plan adopted September 23, 1986. Zone 5 is different than most of the other 25 zones in Carlsbad. There is no existing residential development within it, nor will there be any future residential development within it. The Zone 5 plan begins with the assumptions used to generate the buildout projections for non-residential development within the Zone. The plan then phases or estimates the Zone's development on a yearly basis until buildout. The phasing is done to predict future facility demands. Each facility that is required to be addressed is then analyzed. The analysis includes an inventory of existing and proposed facilities, a phasing schedule that establishes the timing for the provision of facilities in relationship to demand, and a financing plan that establishes various methods of funding facilities and improvements that are identified by the plan as needed. Since this Zone plan ls a. regulatory document, each facility section also contains conditions to ensure that public facilities will conform to the adopted performance standards. The conditions will be adopted as part of the Zone 5 approval, and mandatory compliance will regulate future development within the zone. It should be noted that some of the performance standards for public facilities in the Citywide Growth Management Program are based on residential population and are Aot applicable to Zone 5. When this occurs they are listed as not applicable in the following summary chart. Based on recommendations from the Parks and Recreation Department and Fire Department, special non-residential performance standards are being recommended for these two facilities. The purpose of the summary chart shown below is to provide a brief synopsis of the Local Facilities Management Plan for Zone 5. City Ad ■lnlstratlve library Wastewater Treat ■ent Capacity SUMMARY .CHART Not applicable Not applicable Existing facilities meet the adopted performance standards -3- -Parks Drainage Circulation Fire Zone 5 does not impact the adopted performance standard because it is based upon re~idential development. However, staff is recommending a new standard for Zone 5. This proposed standard is discussed beginning on Page 56. Zone 5 complies with the adopted performance standard. The drainage _section does highlight items in sub- basins 11 and 13 which will be required when individual projects are proposed in those areas of the Zone. Currently all intersections and road segments within Zone 5, or impacted by Zone 5 traffic meet the adopted performance standard. With the existing plus committed traffic im- pacts, seven intersections dnd two road segments are projected to fall below the adopted performance stan- dard. At buildout, nine inter- sections are projected to fall below the City's adopted performance standard unless mitigating improve- ments beyond those required under the current circulation element are installed. Zone 5 does not impact the adopted performance standard because it 1s based upon residential development However, staff is recommending a new standard for Zone 5. This proposed standard is discussed beginning on Page 104. Because of the proposed standard, most of the development within Zone 5 cannot comply with the second and third considerations of proposed non-residential Fire Service Performance Standard. It is projected that by 1989 all three components will not be complied with and, therefore Fire Station 5 must be constructed by early 1989 or all development in Zone 5 will be stopped. -4- Open Space Schools Sewer Collection Syste11 Water Distribution The Citywide Facilities and Im- provements Plan as adopted by the City Council in September 1981 indicated this Zone did not have to address Open space in the local plan. Existing school facilities curtently have the capacity to meet the the anticipated demand generated by Zone 5, that results from recent legislation that allows parents to enroll their children in schools in the communities where the parent works. The school district had in- dicated that it will be able to provide capacity to ·buildout of Zone 5. Sewer service for Zone 5 currently meets the performance standard. However, with committed and future development, there will be sewage capacity deficits within certain reaches of the Buena-San Marcos Interceptor System. Prior to any further development of land tribu- tary to these reaches, additional short and long term capacity shall be developed. Adequate financial mechanisms shall be developed to secure construction of the South Agua Hedionda Interceptor by 1995 prior to the approval of any addi- tional development within basin 5B. Water service to Zone 5 meets the adopted performance standards to the buildout of the Zone. -5- --- - PUBLIC FACILITIES SUMMARY SHEET Conformance with Adopted Standards Citrwide Quadrant Zone 5 1) City Administrative Facilities N/A N/A N/A 2) Library N/A N/A N/A ·3) Wastewater Treatment Yes*** N/A* 4) Parks N/A N/A No** 5) Drainage· N/A N/A Yes 6) Circulation N/A N/A No** 7) Fire N/A N/A N/A* 8) Open Space N/A N/A Yes 9) Schools N/A N/A Yes 10) Sewer Collection System N/A N/A No** 11) Water Distribution System N/A N/A Yes N/A = Not Applicable * A new standard is being proposed for these facilities in Zone 5. ** These facilities do not conform with the adopted performance standards. Mitigation to bring these facilities into conformance are found in the next section "Special Conditions for Zone 5", Pages 8 12 and are discussed in further detail in each applicable Chapter. *** Based on Council adoption of interim wastewater treatment capacity policy. -6- GENERAL CONDITIONS 1. All development within Zone 5 shall conform to the provisions of Section 21.90 of the Carlsbad Municipal Code and to the provisions and conditions of this Local Facilities Management Plan. 2. All development within Zone 5 shall be reQuired to pay a public facility fee pursuant to the standards adopted by the City Council on April 22, 1986, and all other applicable fees. Development in Zone 5 shall also be responsible for any additional fees to be incorporated into this plan that are found to be necessary to enable facilities to meet the adopted performance standard. 3. The City of Carlsbad shall monitor all facilities in Zone 5 pursuant to Subsections 21.90.130(c), (d) and (e) of the Carlsbad Municipal Code. 4. All development in Zone 5 shall be in conformance with the Citywide Facilities and Improvements Plan as adopted by City Council Resolution 8797. 5. Periodic amendment to the Zone 5 Local Facilities Management Plan is anticipated to incorporate newly acquired data, to add conditions and upgrade standards as determined through the required monitoring program. Amendment to this Plan may be initiated by action of the Planning Commission or City Council at anytime. 6. If a public facility or service is found to not be in c~nformance with an adopted performance standard during the yearly monitoring, or at any other time, the matter will be immediately brought before the City Council. If the City Council determines that a non-conformance does exist then no future building or development permits which would impact the facility shall be issued until those facilities are brought into conformance with the adopted performance standard. 7. After adoption of this Plan by the City Council, no building permits -or development permits will be allowed unless the performance standards are complied with. This includes all projects which were exempt under Section 21.90.030(c) of the Carlsbad Municipal Code. SPECIAL CONDITIONS FOR ZONE 5 ' The following Special Conditions apply specifically to development in Zone 5 and must be complied with in addition to the General Conditions for Zone 5. These conditions are also listed separately under the analysis discussion of each facility. City Administrative Facilities Not applicable to this Zone. Library Not applicable to this Zone Wastewater Treatment Capacity The following actions shall be pursued by the City to ensure adequate wastewater treatment capacity throughout a five (5) year period. Parks a. Monitor Encina Treatment Plant flows on a monthly basis to determine actual flow rates and to have an early warning of capacity problems. b. Actively pursue acceleration and phasing of treatment plant Phase IV expansion to provide ad~quate capacity. c. When Carlsbad's share of Encina flows reach 5.25 MGD, actively seek leased capacity from other Encina agencies. d. When Carlsbad Encina flows reach 5.45 MGD, proceed to activation of the Calavera Hills Reclamation/Treatment Facility. Plant to be activated when more cost effective treatment m~asures are no longer feasible and Carlsbad capacity at Encina has been reached. All non-residential development will be required to pay a park-in-lieu fee of $.50 per square foot to be collected at the time of building permit issuance. Drainage Prior to the issuance of further development permits within drainage area 13 of Zone 5 the developers shall: -8- 1) Pay or enter into an agreement with the City to pay for a_ proportional share of the mitigation of the downstream drainage problems associated with the Rancho Carlsbad Mobile Home Park in accordance with the requirements of the future update to the Master Drainage Plan. 2) Install the desiltation basin identified as a 2700 cubic yard basin at the north end of Master Drainage Plan Facility "BL" (as shown in the Master Drainage Plan). Impacts along the Encinas Canyon drainage below Palomar Oaks Way, along Palomar Airport Road shall be required to be mitigated by the respective developers as development occurs. Circulation The following implemented within four years and total bulldout. 1-3 Years circulation phases of improvements shall he 1-3 years, 4-6 years, 7-10 1. Palomar Airport Road, between Paseo del Norte and Palomar Oaks Way shall be widened to 6 lanes by 1991. 2. Palomar eastern 1991. Airport Road City limits between El Camino Real to the shall be widened to 4 lanes by 3. The following improvements will he required to be implemented by 1991 in order to bring the Palomar Airport Road/1-5 Interchange into conformance with the adopted circulation performance standard. I-5 Southbound at Palomai Airport Road a) Restripe to provide two through lanes for eastbound and westbound each and widen southbound off-ramp to provide three lanes (one left only, one right only, and one optional). 1-5 Northbound at Palomar Airport Road b) Widen east and west approaches of Palomar Airport Road to provide an additional through lane for each direction. c) Both intersections of Palomar Airport Road at the I-5 off- ramps shall be signaled and coordinated with the signals at Paseo del Norte. -9- --4-6 Years 1. Widen El Camino Real at Kelly Drive to prime arterial standards with signalization and separate southbound right-turn lane. 7-10 Years 1. El Camino Real at Faraday Avenue -Modify the lane usage pattern and improvements such that three lanes can be provided in each north-south direction. For the east-west approach, the lanes shall be designated so that there is a right-turn only and through plus left turn for each approach. 2. El Camino Real at Palomar Airport Road -Add one westbound lane along west side of Palomar Airport Road (west of El Camino Real), add two westbound lanes (east of El Camino Real), add one eastbound lane, (east of El Camino Real), add one northbound lane (north of Palomar Airport Road), add two southbound lanes (north of Palomar Airport Road), add one northbound lane (south of Palomar Airport Road). 3. El Camino Real at Tamarack Boulevard -Add one northbound lane along El Camino Real (north of Tamarack intersection), add three northbound lanes along El Camino Real (South of Tamarack Avenue). 4. Palomar Airport Road at Paseo del Norte -Add one westbound free right turn lane, one northbound through lane and restripe and sign Palomar Airport Road. Total Buildout 1. Cannon Road at El Camino Real Install a northbound to eastbound right-turn only lane. 2. El Camino Real at College Boulevard Add an eastbound to northbound left turn lane, a westbound to southbound left turn lane and provide a right turn only and an optional right and through lane to the westbound approach. 3. "El Camino Real at Faraday Avenue Add one westbound right turn lane, add two eastbound right turn lanes, add one northbound left turn lane, one westbound turn lane and a southbound to westbound right turn ramp. -10- ,--. Fire 4. 5. 6. 7. 8. -Add a Palomar Airport Road at College Boulevard southbound to westbound right only lane, a lane, an 1 ane and an westbound to southbound left-turn eastbound to southbound right only eastbound to northbound left turn lane. Palomar Airport Road at El Fuerte Add a southbound to eastbound left turn lane, an additional westbound to southbound left-turn lane and an eastbound to southbound right-turn only lane. Palomar Airport Road at Melrose Drive -Add a left- turn lane on each approach and an eastbound to southbound right-turn only lane. Palomar Airport Road at Paseo del Norte -Widen the westbound approach to provide a separate right-turn only lane and widen the northbound approach to provide two left turn only lanes. Signals shall also be installed for the westbound approach to channel drivers into the proper lanes. El Camino Real at Palomar Airport Road -Add one eastbound left turn lane. 9. Palomar Airport Road at Yarrow/McClellan Drive - Add a westbound left-turn lane and restripping the northbound through lane for an optional through plus a right-turn lane. The construction schedule for the Fire Station No. 5 shall be required to be accelerated so that construction will begin in 1988 with an opening date projected for early 1989. Open Space No special conditions are necessary at this time. Schools No special conditions are necessary at this ime. Sewer Collection System 1 ) to any development tributary to Reach 2 Interceptor additional short and long term capacity shall be through a lease of additional capacity from the Prior System, developed -11- Buena Sanitation District and securing construction of a collection line paralleling the reach. If leasing is only temporary, the parallel line will be required by the year 2000. If the Buena Sanitation District will not lease additional capacity, the new reach of line will be required by 1989 and no development should be allowed that would exceed capacity. 2. Reach 4, 5, 6, 7 and 8 of the Buena-San Marcos Interceptor System will not meet the adopted performance standard at buildout of Zone 5. At the time that these lines reach capacity, additional interceptor lines will be required or additional capacity in the major interceptors acquired. The timing of these improvements will be determined through the update of the City's Sewer Master Plan. 3. Adequate financial mechanisms should be developed to secure construction of the South Agua Hedionda Interceptor from El Camino Real to the Enuna Water Central Facility by 1995 prior to approval of additional development. Water Distribution System All development within Zone 5 shall pay the required Costa Real Municipal Water District Fees. -12- 13 INTRODUCTION - ,- I. INTRODUCTION The purpose of this Local Facility Management Plan is to complete the second phase of the overall Growth Management Plan for Zone 5 within the City of Carlsbad. Phase One of the Growth Management Program established the Citywide Facilities and Improvements Plan based upon a phased buildout of the City's existing General Plan. For purposes of public facilities analysis, the City has been separated into 25 Local Facilities Management Zones as shown on "Local Facility Management Plan Boundaries", on Page 2. PLAN OVERVIEW This plan for Zone 5 provides a detailed description and analysis of how this area of the City will develop from its current status to buildout. The plan also demonstrates how and when each facility and improvement will be constructed in order to accommodate developm~nt within the Zone (phasing). The plan also provides a complete description of how each facility ·and improvement will be financed when mitigation is necessary. The body of the plan is divided into separate ,sections for each public facility. In each section there will be a summary sheet which highlights the important information described in the analysis. This summary is broken down into three categories: Existing, Existing plus Approved, and Future. The demand column in each of these categories will show two numbers: Demand The top number (1) represents -the Citywide, Quadrant or Zone demand, depending upon the public facility being evaluated. The lower number (2) represents the specific zone demand for the public facility, i.e., in this case, Zone 5. Following the summary sheet will be the detailed analysis and additional information for each public facility. If a facility is not conforming with the adopted performance standard, there will be a discussion describing this situation, a mitigation or alternatives section, and a financing discussion. Each facility subsection will conclude with a sub-section, "Adequacy Findings". This section will summarize whether or not the public facility conforms with the adopted performance standard. -14- --ZONE 5 -OVERVIEW The plan· for Citywide Facilities adopted performance development occurs. Zone 5 is consistent with all aspects of the and Improvement Plan and ensures that the standards shall be complied with as Local Facilities Management Zone 5 is located within the center of Carlsbad at ·the _intersection of the City's four quadrants. The Zone is generally bounded by Interstate 5 on the west, and the City's eastern boundary on the east. The Zone is bisected east to west by Palomar Airport Road and north to south by El Camino Real. Zone 5 consists of 2,360.6 acres of land which slopes upward -to the north from Palomar Airport Road. Palomar Airport (235 acres) is located within the center of the Zone. The predominant remainder of Zone 5 is designated and zoned for industrial/office uses. There are no residentially designated and zoned properties in Zone 5. Approximately one- fifth of the Zone is already built-out with industrial uses. The Map, "General Pl~n Land Use", shown on Page 17, denotes the General Plan Land Use for Zone 5. The accompanying Land Use Zoning· is shown on the , "Z on 1 n g" map , on Page 1 8 • Exhibit A, "Major Projects/Property Owners" ls shown on Pag.e 19. -15- ZONE 5 I LOCAL FACILITIES MANAGEMENT PLAN ...... .... RRI RRE RS C N TS 0 CBD Pl G u IIC E J ff p OS NRR C:OMMIRCIAL INTENSl\"E REGIONAL RET.\ll ( ~ Plau Camino lttal) ::~.~~~:-s~~~:~;AL RETAIL (q. Car Counrrr Carlsbad) COMMl:NITY COMMERCIAL NEIGHBORHOOD COMMERCIAL TIL\VEL SfR\'ICES COMMERCIAL PROFESSIONAL REL\TED CENTRAL B\,'SINESS DISTIUCT PLANNED INOl 1STRIAL GOVERNAIENT FACILITIES l't!BLIC UTILITIES RECREATION COMMEIICIAL SC:HOOLS ELEMENTARY JUNIOR HIGH .HIGH SCHOOL PRIVATE OPEN SPACE NON RESIDENTIAL RESERVE ZONE 1J ~·-·-·-·-·-·--1 ZONE.I. ZONE 5 ) ZONE 8 ZONE 20 LOCAL FACILITIES MANAGEMENT PLAN GENERAL PLAN ZONE 16 I ZONE 17 ZONE 10 JANUARY 1887 I-' 00 I RESIDENTIAL P·C PLANNED COMMUNITY ZONE R·A Rf.Sll)ENTIAL ACiRJCIJLn'RAL ZONE R·E Rl1RAL R!SIDEri..TIAt f.STATE Zt )NE R· I ONE-FAMILY RESIDENTIAL ZOl'iF. R·2 T'IU·FAMILY RESIOEITTIAI. ZOSf R·3 MULTIPLE FA.MII.Y RESIDENTIAi. /.ONE R-3L UMITEU MULTI-FAMILYllf.SIDF:l\'lHJ. ZONE RO-M llESll>ENTIAL DENSJTI'•Ml!I.TIPIJ: 7,( IN[ RD-H RESIDENTIAL OENSJn',fllGII zo,-;r RMHP RF.IIDENTIAL MOBILE HOME PARS 1, !NE R·P RESIDENTIAL PROFESSIONAL ZONE KT RESIDENTIAL TOURIST ZONE RW RESIDENTIAL WATERWAY ZONE COMMERCIAL 0 OFFlCE ZONE C· l NEIGHBORHOOD COMMERCIAL ZONE C-2 GENERAL COMMERc:IALlONE C•T COMMERCIAL-IDURIST ZONE C·M IIEA\'Y COMMERCIAL-LIMITED INDIJSllUAI. ZONE M INDUSTillAL ZONE P,M PLANNED INDUSllUAL ZONE OTHH f.p nooDPWNOVERUYZONE L-C LIMITED CONTROL OS OPEN SPACE ZONE 1.l ZONE 4 ZONE 5 ·-·-·-·- ZONE 8 LOCAL FACILITIES ) MANAGEMENT PLAN M-0 I I \ ·-·-·• OS ZONE 10 ZONE 16 ZONE 17 ZONING Cl!Jol'C•ltob■d G,111.-,111,1.,,.~,.,.,.,Pl-0111■"' JANUARY 11187 ,_. \0 ZONE 1.l MACARIO PARK ZONE8 I ...... -,.., PALOMAR LAND GROUP I ,._,_,. -.... I I I I COLLEGE BUSINESS PARK :··-·-·-·-·-·•-" I ECK E ZONE 5 LAUREL TREE ZONE 20 UKEGAWA LOCAL FACILITIES MANAGEMENT PLAN ) MAJOR PROJECTS/PROPERTIES GATEWAY PALOMAR TECH CENTER \ CARLSBAD SAFETY •••••••yCENTER ~ ZONE 16 I I KAISER ZONE 10 m X :I: ~ jjj ~ ~ -JANUARY 1187 20 BUILDOUT PROJECTIONS - II. BUILDOUT ASSUMPTIONS AND PROJECTIONS To adequately assess and plan for public facilities and services in Zone 5, it is necessary to project the level of development th~t can be anticipated at the ultimate buildout of this Zone. Buildout projections for Zone 5 are used to determine existing industrial and commercial land uses and to assess the ultimate potential that may be reached at the time Zone 5 is built out. The ultimate buildout of-Zone 5 has been approxifflated by examining: · 1. The amount of existing land use, 2. The amount of approved, yet_ undeveloped land uses, and 3. The vacant land which can still be developed. All major Zone 5 projects or properties referenced in this section of the plan are shown on Exhibit A on Page 19. The methodology used to compile the buildout projections is consistent with that used in the Citywide Facilities and Improvements Plan. Assumptions are described below: A. Existing Land Uses B. Surveys and analysis were conducted to determine the acreage of each land use category within Zone 5. Field checks and subsequent research ascertained how each parcel within Zone 5 was actually being utilized as well as the square footage of existing commercial or industrial structures. The following Exhibits detail this information: Exhibit B, "Existing Land Use Categories", Page 23. Exhibit C, "Existing Structural Square Footage", on Page 24. Appendix 4, "Existing Structural Square Footage." Approved But Undeveloped Land Exhibit D, "Approved Structural Square Footage" on Page 25 includes a summary of projects that are currently unbuilt but already have approved final maps, site development plans, planned industrial permits or planned unit developments as of January 1, 1987. These listed projects have received discretionary approval by the Planning Commission and/or City Council and only require building permits. The building· square footage per project included on Exhibit D was calculated by taking the net developable acreage of each project, and assuming that every net developable acre would result in a maximum square footage yield of 40%. -21- C. Vacant Land for purposes of determining the ultimate (future potential buildout of Zone 5, all vacant properties and projects with only approved tentative maps were inventoried. Tentative Maps were included within this "Future" classification because these projects still require Final Map approval by the City Council. Exhibit E, "Future Potential Structural Square footage", on Page 26 includes a summary of all properties within Zone 5 that are either (1) currently vacant or (2) only have approved tentative maps over them. The building square footage per vacant property or projects with only approved tentative maps was calculated by taking the gross acreage of each property, deducting the ·constraints and assuming that every developable acre would result in a maximum square footage yield of 30%. The following chart summarizes the square footage information shown on Exhibits "B" -"E". INDUSTRIAL COMMERCIAL TOTAL Existing 4,223,177 33,432 4,256,609 Approved 8,658,422 886,881 9,545,303 Future Potential 7,989,279 405,108 8,394,387 Total 20,870,878 1,325,421 22,196,299 -22- EXHIBIT B ZONE 5 EXISTING LAND USE CATEGORIES Listed below are the type and acreage of each land use category within Zone 5. General Plan Land Use Designation Commercial: C RC TS RS Community Recreation Travel Services Regional Service Industrial: PI Other: G u 05 MAJ MIN COL Planned Industrial Governmental Facility Public Utilities Open Space Major Arterial Minor Arterial Collector Street Cross Acres 61.42 14.6 10.48 10.00 1,719.9 254.7 4.9 68.2 118.0 48.7 49.7 TOTAL ACREAGE 2,360.6 -23- ZONE 5 EXISTINC STRUCTURAL SQUARE FOOTACE SQUARE FEET Project Name Industrial/Office Palomar Business Park Carlsbad Research Center Palomar Tech Center Birtcher Business Center Beckman Instruments Faraday Business Park City Safety Center Cable Vision Palomar Airport Palomar Solid Waste Transfer Station Costa Real Municipal Water District Olympic Resort 2,525,725 984,568 156,440 187,818 127,200 36,645 63,376 17,720 76,775 37,410 9,500 4,223,177 -24- Commercial 33,432. 33,432 EXHIBIT C EXHIBIT D ZONE 5 APPROVED STRUCTURAL SQUARE FOOTAGE Listed below are projects with approximated square footage yield, which are currently unbuilt. SQUARE FEET Project City Name File No. Industrial/Office Commercial Airport Business Center CT 81-46 2,554,359 372,873 Carlsbad Research Center CT 81-10 1,282,388 130,680 Carlsbad Airport Business Center CT 74-21 Kaiser 1,203,475 191,664 T & G Investments 1,254,005 191,664 Birtcher Business Center CT 82-4 93,915 Palomar Business Park CT 79-1 568,893 Carlsbad Gateway Center SOP 84-5 230,300 Beckman Instruments SOP 80-1 148,800 lnteramerican Development SDP 83-2 60,160 Palomar Airport Plaza SDP 86-4 62,609 City Safety Center CUP-262 74,000 Eaton Leonard PIP 85-2 176,800 Birtcher Business Center PIP 84-8 . 116,622 Kaiser Center PIP 85-7 176,760 McNary/White PIP 86-4 17,046 Andrex Development CT 80-47 139,200 McRoskey PUD-68 98,320 Kelly MS-696 400,770 --- TOTAL 8,658,422 886,881 -25- EXHIBIT E - ZONE 5 FUTURE POTENTIAL STRUCTURAL SQUARE FOOTACE SQUARE FEET Project Name/ Net* Proeert~ Owner Acres Industrial/Office Commercial Ecke 26 339,768 McReynolds 24 313,632 Fox 43 564,537 County 105 1,365,606 Palomar Land Group 14 181,645 Hughes 30 392,040 Laurel Tree 5 60,113 Ivar 16 209,088 Ukegawa 12 155,378 Aladray .27 3,528 Beckman 26 337,807 Frazee 12 159,429 -College Business Park CT 85-17 85.3 1,114,700 111,078 Carlsbad Research Center 2,692,008 294,030 (Phases III -IV) CT 85-24 206 Safety Center (City Hall) 100,000 7,989,279 405,108 *Constraints already deducted -26- -BUILDOUT POPULATION PROJECTION Zone 5 does not include within its' boundaries any residential uses. In accordance, no additional residential population will be generated within it. However, for purposes of public facilities analysis, a Zone 5 workforce population survey for existing conditions was conducted by staff. The survey (See Appendix 10) indicates that there currently exists a workforce population of approximately 7,820 people within Zone 5. This averages out to 1 person (employee) per 544 square feet of existing building area within Zone 5. Assuming that this employee generation factor remains constant through buildout of the Zone, the Zone will include approximately 40,800 people at full buildout. This figure is based on the existing ratio of employees to building square footage. This could change significantly in the future but staff believes this is a good starting point for analyzing the impact the Zone's workforce will have upon public facilities. A change could occur because many industrial parks replace manufacturing and warehousing uses with research/development and office uses as they mature. Both of these uses require significantly more people per square feet then do manufacturing and warehousing uses as updates occur to this plan staff will cQntinue to monitor workforce population within Zone 5. Non Residential The non-residential buildout projection for Zone 5 was determined by totaling the existing, approved and potential future square footage by use category. Building permit files were researched to determine the existing square footage. Approved structural square footage was calculated by multiplying the net developable acreage of approved final maps by 40%. Future structural square footage was calculated by multiplying the gross acres of vacant property or property with only an approved tentative map by 301. The non-residential buildout breakdown, therefore is as follows: Existing Approved Future Total SQUARE FOOTAGE lndustrial/O~fice 4,223,177 8,658,422 7,989,279 20,870,878 -27- Commercial 33,432 886,881 405,108 1,325,421 Total Square Feet 4,256,609 9,545,303 8,394,387 22,196,299 28 PHASING . - III. PHASINC -AN OVERVIEW It is necessary to provide a phasing schedule. of development for the entire City, each quadrant, and each of the· 25 Local Facility Management Zones for the purpose of: 1. Projecting future demands for public facilities on a yearly basis; and 2. Establishing the thresholds which identify when a public facility is needed; and 3. Assisting with the development of the City's Capital Improvement Program budget. Because Zone 5 includes no residential uses within its boundaries, phasing of dwelling units over time will not be discussed. Zone 5 is predominated by industrial and commercial uses. In accordance, the phasing discussion for this Zone will deal exclusively with non-residential uses. In the Citywide Plan, phasing of industrial development was not discussed. For purposes of discussing the phasing of industrial development within this non-residential zone, City industrial building permit records and project specific marketing studies were reviewed to come up with a "best guess" phasing scenario of industrial development. In each Local Plan a key element will be the projected phasing schedule of development within that specific zone. These schedules are presented for the purpose of establishing thresholds for demand and future demands for public facilities. By projecting these future public facility and improvement demands the appropriate funds may be allocated into the Capital Improvement Budget to assure they are in place as development occurs. The phasing schedule is not presented to establish a rate of growth within the City. It will be used to assure that growth occurs only as public facilities are available to ensure compliance with the adopted performance standards. The specific phasing schedule presented in this plan is provided to accomplish the three purposes of phasing which were discussed above. These projections have been established by reviewing development in the pipeline which have tentative and final maps as well as applications pending. The same type of phasing has been prepared for SANDAG's Series VII for the entire City and will be utilized to review phasing projections presented in this and other local plans to determine the overall impact on public facilities and services • -29- Zone 5 -Phasing Schedule Phasing for Zone 5 incorporates the Citywide projections as well as localized factors unique to the Zone. These localized circumstances include: 1. The amount and type of developing projects: -Final Maps -Tentative Maps -Applications Pending 2. The ultimate type and amount of land use potential. 3. The amount of development that can be reasonably absorbed into the market. The specific phasing schedule for Zone 5 is shown on Pages 32 and 33. As shown on_ Exhibit C, "Existing Structural Square Footage", on Page 24, there currently exists 4,223,177 square feet of industrial building space and 33,432 square feet of commercial within Zone 5. The schedule assumes the Zone will be completely built out by 2013. The schedule phases those projects identified in the developing process (which includes all projects with approved final maps) beginning in 1987 through 1996. This assumption is based on the fact that Zone 5 already has in excess --of 9,000,000 square foot approved for development. Based upon historical records it is not anticipated that the City could absorb more than 1,000,000 square foot per year. During this time period, a total of 8,658,422 square feet of industrial and 886,881 square feet of commercial building space will be built in Zone 5 (See Exhibit D). The phasing schedule assumes that the Zone's vacant land or projects with only a tentative map approved will be developed beginning in 1997 and phased through the buildout of the Zone (See Exhibit E). In all, a total of 20,870,878 square feet of industrial building space and 1,325,421 square feet of commercial building space will exist at the buildout of Zone 5. Phasing Summary It is estimated that the rema1n1ng non-residential development in Zone 5 will build out by 2013. This phaslnq scenario assumes that the already approved industrial/ office/commercial projects (See Exhibit D, Page 25) will build out first, with an anticipated completion date of 1996. Future industrial/office/commercial development (See Exhibit E, on Page 26) will build out between the years 1997 and 2013 (average of around 493,788 square feet/year). The peak non-residential growth period within Zone 5 ls approximated between the years 1987 and 1996. During these years, development could reach close __ to 954,530 square feet per year. -30- The specific phasing of Zone 5 is presented for the purpose of determining future annual demand and thresholds for public facilities. It is impossible to predict the exact way development will occur in this Zone or in the City, but through these phasing proje~tions the City will be able to establish a direct link between development and the need for public facilities. This link will allow the City to ensure compliance with the adopted performance standards at all times as growth occurs. And if compliance is not maintained, development will be· stopped until it conforms with the adopted performance standards. -31- EXHIBIT F - LOCAL FACILITIES MANAGEMENT ZONE 5 NON-RESIDENTIAL PHASING ----------------------------------------------------------------------YEAR YEARLY TOTAL YEARLY TOTAL CUMMULATIVE INDUSTRIAL INDUSTRIAL COMMERCIAL COMMERCIAL SQ.FT. SQ.FT. SQ.FT. SQ.FT. SQ.FT. TOTAL ---------------------------------------------------------------------1976 244,500 244,500 0 0 244,500 E 1977 397,868 642,368 0 0 642,368 X 1978 397,868 1,040,235 0 0 1,040,235 I 1979 397,868 1,438,103 0 0 1,438,103 s 1980 397,868 1,835,971 0 0 1,835,971 T 1981 397,868 2,233,839 0 0 2,233,839 I 1982 397,868 2,631,706 0 0 2,631,706 N 1983 397,868 3,029,574 0 0 3,029,574 G 1984 397,868 3,427,442 0 0 3,427,442 1985 397,868 3,825,309 33,432 33,432 3,858,741 ----1986 397,868 4,223,177 0 33,432 4,256,609 1987 865,842 5,089,019 88,688 122,120 5,211,139 A .1988 865,842 5,954,861 88,688 210,808 6,165,670 p 1989 865,842 6,820,704 88,688 299,496 7,120,200 p 1990 865,842 7,686,546 88,688 388,184 8,074,730 R 1991 865,842 8,552,388 88,688 476,873 9,029,261 0 1992 865,842 9,418,230 88,688 565,561 9,983,791 V 1993 865,842 10,284,072 88,688 654,249 10,938,321 E 1994 865,842 11,149,915 88,688 742,937 11,892,851 D 1995 865,842 12,015,757 88,688 831,625 12,847,382 ----1996 865,842 12,881,599 88,688 920,313 13,801,912 1997 469,958 13,351,557 23,830 944,143 14,295,699 1998 469,958 13,821,514 23,830 967,973 14,789,487 1999 469,958 14,291,472 23,830 991,803 15,283,274 2000 469,958 14,761,429 23,830 1,015,633 15,777,062 F 2001 469,958 15,231,387 23,830 1,039,462 16,270,849 u 2002 469,958 15,701,345 23,830 1,063,292 16,764,637 T 2003 469,958 16,171,302 23,830 1,087,122 17,258,424 u 2004 469,958 16,641,260 23,830 1,110,952 17,752,212 R 2005 469,958 17,111,217 23,830 1,134,782 18,245,999 E 2006 469,958 17,581,175 23,830 1,158,612 18,739,787 2007 469,958 18,051,132 23,830 1,182,442 19,233,574 2008 469,958 18,521,090 23,830 1,206,272 19,727,362 2009 469,958 18,991,048 23,830 1,230,101 20,221,149 2010 469,958 19,461,005 23,830 1,253,931 20,714,937 2011 469,958 19,930,963 23,830 1,277,761 21,208,724 2012 469,958 20,400,920 23,830 1,301,591 21,702,512 2013 469,958 20,870,878 23,830 1,325,421 22,196,299 ---------------------------------------------------------------------- 32 ) 24 22 20 18 16 I-w 14 w,,....., u.. (/J C: W 0 12 Cl'.'.= w <( ·- w :::J 2 a...__, 10 If) 8 6 4 2 0 1976 ) LOCAL FACILITIES MANAGEMENT ZONE 5 1980 D NON-RESIDENTIAL PHASING ,825,309 388,184 1985 1990 INDUSTRIAL 12,015,757 831,625 1,015,633 1,134,782 1995 YEARS + 2000 2005 COMMERCIAL 20,87 ,878 1,325,421 2013 m )( :c -m --f G) 34 ZONE REQUIREMENTS --- IV. ZONE REQUIREMENTS FOR PUBLIC FACILITIES AND SERVICES The Management Plan for Zone 5 addresses eleven separate facilities: 1. City Administrative Facilities 2. library 3. Wastewater Treatment Capacity 4. Parks 5. Drainage 6. Circulation 7. Fire 8. Open Space 9. Schools 10. Sewer Collection System 11. Water Distribution System Each of these facilities will be evaluated to determine conformance with the adopted performance standard. The evaluation will be made in three stages based on existin~ demand, approved or committed demand, and fvture demand at buildout. For each of these facilities and services the following is provided: 1. An illustrative map showing what is existing and what will be needed as the zone develops to its ultimate buildout; 2. Dictrict boundary maps where facilities are provided by special districts (i.e., school, water, sewer). 3. Adopted service level performance standards which must be complied with at all times as growth occurs; and 4. A detailed facility planning and adequacy analysis for each of the public facilities and services. 5. A list of special ensure conformance standard. conditions with the for each facility to adopted performance ·6. A discussion of mitigation measures and financing mechanisms relevant to each facility. The Citywide facilities, which include City Administrative Facilities, library, and Wastewater ·Treatment, have been analyzed in th~ Citywide Facilities and Improvements Plan. These will also be included in the Local Facilities Management Plan to show compliance or to suggest alternatives to assure conformance with the adopted standard. -35- -In any case, ~his analysis will show how each of the adopted performance standards will be complied with as development occurs within the City, quadrant, and zone. This plan includes financing of all public facilities and services where non-conformance with the standard requires mitigation. It also includes a complete phasing schedule for all development within the zone. -36-. 37 CITY ADMINISTRATIVE FACILITIES ZONE 5 LOCAL CITY ADMINISTRATIVE FACILITIES • CITY ADMINISTIIATION-:EXl8TING Q CITY ADMINISTIIATION•PLANNED I ' I ' I I FACILITIES MANAGEMENT PLAN -38 - POLICE CENTER JANUARY 1887 BUILDOUT LOCAL FACILITIES MAN·AGEMENT PLAN-Zone 5 CITY ADMINISTRATIVE FACILITIES SUMMARY SHEET ADEQUACY PROJECTION · DEMAND SUPPLY (Ca.lui11..wce w/9tal:iard) MIT/GA TION FUNDING EXISTING * * YES N/A N/A * * YES APPROVED N/A N/A * C, z -rn < J: a. FUTURE * * YES N/A N/A Zone 5, as determined in the Citywide Facilities and Improvements Plan will conform to the adopted performance standard at all times as the Zone builds out. ,..39_ ,_.. CITY ADMINISTRATIVE FACILITIES I. PERFORMANCE STANDARD 1,500 square feet per 1,000 population must be schedul~d for construction within a five year period. II. FACILITY PLANNING AND ADEQUACY ANALYSIS Zone 5 is comprised exclusively of industrial and commercial uses. Because the adopted performance standard deals specifically with residential land uses and not with non- residential, it is concluded that this zone currently and at buildout meets the performance standard for this facility. The City has considered creating a City Administrative Facilities performance standard for non-residential uses. However, it is staff's conclusion that the Public Facilities Fees required to be paid by all non-residential uses, are adequate to meet the associated City Administrative Facility demands created by these uses. In accordance, no new performance standard or fee requirement is suggested. -40- 41 LIBRARY - ZONE 5 LOCAL , ' I I J , I I LIBR·ARY \ CAIAVE•A '[o< ZONE 5 ■ L•IINIE8-EXIIITIHO D LIBIIAAIH~NNED I \ ' ( ' ~ ',~,,. ,,_ .. ' ,,. ........ ;"' ' ✓ '✓ /' ,/ \ '~o ,,-" \~ ' , ... ---" I G_.',, \ I I 1< ,e , .... -(o -.---. COS I A Ollvf ""'"'-" 'N FACILITIES MANAGEMENT PLAN -!J2 - I \ ' ..... ' --......... ' \ \ I I Cffy ol C.,l9be0 G,owth ~ Pu9affl 5 JANUARY 1887 BUILDOUT LOCAL.FACILITIES MANAGEMENT PLAN-zone ·5 .LIBRARY SUMMARY SHEET ADEQUACY PROJECTION DEMAND SUPPLY (Cantotn•ic» w/9taidard) MITIGATION FUNDING EXISTING * * YES N/A N/A * * APPROVED YES N/A N/A * C, z -Cl) < ::c a. FUTU.RE * * YES N/A N/A Zone 5, as determined in the Citywide Facilities and Improvements Plan will conform to the adopted performance standard at all times as the Zone builds out. -43- --LIBRARY I. PERFORMANCE STANDARD 800 square feet per 1,000 population of Library must be scheduled for construction within a five year period. II. FACILITY PLANNING AND ADEQUACY AHALYSIS Zone 5 is comprised exclusively of industrial and commercial uses. Because the adopted performance standard deals specifically with residential land uses and not with non- residential, it is concluded that this zone currently and at buildout meets the performance standard for this facility. The City ~as considered creating a Library performance standard for non-residential uses. However, it is the conclusion of the Library Director and staff that the Public Facilities Fees required to be paid by all non-residential uses are adequate to meet the associated Library demands created by these uses. In accordance, no new performance standard or fee requirement is suggested. -44- 45 WASTEWATER ENCINA ,.-WASTEWATER T·REATMENT PLANT -ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN -46 - WASTEWATER t CilyolC_,_ Growffl ............ lll'Gp'am -JANUARY 1987 - BUILDOUT LOCAL-FACILITIES MANAGEMENT PLAN-Zone 5 WASTEWATER TREATMENT CAPACITY Carlsbad Service Area SUMMARY SHEET ADEQUACY PROJECTION DEMAND SUPPLY (CcdOln•ice wlStlniard) MITIGATION FUNDING 4.7 EXISTING 5.7 NO SEE PAGE 50 SEE MGD PAGE a 6.6d APPROVED 8.6b,d YES. N/A N/A MGD C, ---z -U) c( ::c 7-.7c l:L FUTURE 8.6c,d YES N/A N/A MGD --- a. Buildout assumptions are for the entire sewer service area which includes Zone 5. The following analysis of a citywide facility, therefore, focuses on the entire sewer service area, and not just on Zone 5. · b. Assumes Phase IV expansion of Enclna. c. Demand and Supply, as of 1995. d. Demand and Supply, as of 1991. -47- 50 WASTEWATER TREATMENT CAPACITY I. PERFORMANCE STANDARD Sewer plant capacity is adequate for at least a five year period. II. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventory Sewer service in the City of Carlsbad is provided by three separate and independent agencies, Leucadia County Water District, San Marcos County Water District, and the City of Carlsbad. Sewer service for Zone 5 is provided entirely by the City of Carlsbad. 1. Buildout Assumptions (Carlsbad Sewer Service Area): Wastewater Treatment Demands Carlsbad Population Current Buildout 40,356 95,669 * EDU -Equivalent Dwelling Units EDU* CurrentBuildout 21,354 47,800 MGD** Current Buildout 4.7 11.8 ** MGD -Million Gallons per Day -Average Dry Weather Flow (ADWF) 2. Existing Facilities The City of Carlsbad has capacity available at two treatment plant facilities. Secondary treatment capacity is provided through the Encina Water Pollution Control Facility (WPCF) which is a regional facility owned by six member agencies. The current rated capacity of the plant is 22.5 MGD of which - Carlsbad retains ownership of 25.4 percent (5.7 MGD). The City of Carlsbad also holds title to the Calavera Hills Treatment Plant which has a .capacity of 1.2 MGD. The Calavera Facility ls not operational at this time and will require the expenditure of $1.1 to $1.5 million to make it functional. Operation of the Calavera Hills Plant is estimated to cost $360,000 per year. Comparable treatment at the Encina WPCF is estimated at $135,000 per year. The Calavera Hills Plant is not economical to operate for treatment capacity except in the absence of needed capacity at Enclna. -48- 3. Facilities in the City's Five Year Capital Improvements Program: The ddopted CIP includes two items which will be financed from the sewer fund which affect wastewater treatment capacity: B. a. Encina WPCF -Phase IV expansion, scheduled to begin in 1989, and completed in 1991 -$6,500,000 Carlsbad's share of this facility is 2.9 MGD. b. Calavera Hills $2,000,000 for 1986-87 and the 1990-91 Fiscal Years. Construction to be phased to correspond to capacity needs. Phasing and Service Demand Based on data maintained by the City Development Processing Services Department, on March 31, 1987, 22,965 EDU's had been permitted by the City. Utilizing 246 GPO per EDU and the adopted 3% vacancy factor, 985 EDU's of capacity remain to be issued prior to reaching Carlsbad's share of capacity at the Encina WPCF. The Citywide Facilities Management Plan is based on phased growth of 1,250 dwelling units per year plus non- residential development. Using a similar phasing for the portion of the City within the Carlsbad Sewer Service Area an annual growth rate of 1,143 EDU's per year (905 residential EDU's and 238 non-residential EDU's) is projected. This phasing would indicate that Carlsbad's wastewater treatment allocation could be exceeded within a year. Staff has just completed an analysis of Carlsbad's wastewater flows to Encina WPCF to determine the actual flow value of an EDU. As of March 30, 1987, 21,354 equivalent dwelling units (EDU's) were connected and being billed by the City for sewer service. Flow corresponding to these EDU's has been measured at 4.69 MGD. That flow divided by the currently billed EDU's yields an actual flow rate of 220 gallons per day (GPU) per EDU. However, for planning purposes the City of Carlsbad has adopted a flow rate of 246 GPO per EDU. Evaluation of available capacity varies significantly depending on the value of flow per EDU utilized. As can be seen from Table 1 on Page 51, utilizing 220 GPO per EDU, treatment capacity at Encina WPCF would be available until 1990 with plant expansion expected to be completed in 1991. c. Adequacy Findings Based. on analysis of existing flow data and a range of projections it is likely that current treatment capacity will be reached between 1988 and 1990, and that additional interim capacity will be required to meet the performance standard. Options exist to provide interim treatment capacity which would allow the Zone as well as the City's Sewer Service Area to meet -49- the performance standard. These alternatives are incorporated into the proposed special conditions outlined in the following Mitigation section. III. A. B. MITIGATION Special Conditions for Zone 5 1. The following actions shall be pursued by the City to ensure adequate wastewater treatment capacity throughout a five (5) year period: a. Monitor Encina Treatment Plant flows on a monthly basis to determine actual flow rates and to have an early warning of capacity problems. b. Actively pursue acceleration and phasing of treatment plant Phase IV expansion to provide adequate capacity. c. When Carlsbad's share of Encina flows reach 5.25 MGD, actively seek leased capacity from other Encina agencies. d. When Carlsbad Encina flows reach 5.45 MGD, proceed to activation of the Calavera Hills Reclamation/Treatment Facility. Plant to be activated when more cost effective treatment measures are no longer feasible and Carlsbad capacity at Encina has been reached. Financing Sewer connection fees provide the primary source of funding for both sewer line upgrades and expansion of treatment plant capacity. The timing of sewer facilities upgrades and the mechanism of financing are critical to analysis of the adequacy of funding for plant expansion. A complete financial and cash flow analysis should be conducted in conjunction with the Citywide Sewer Master Plan update. This analysis will provide a basis to evaluate development phasing within sewer basins and each Growth Management Zone. Priority for funding should be given to wastewater treatment capacity. -50- ill! 1987 1988 1989 1990 1991 U1 .... 1992 1993 1994 1995 FLOW PROJECTIONS1 EQUIVALENT DWEL(ING FLOW i 220 TABLE 1 CARLSBAD SERVICE AREA DEMAND AND AVAILABLE VASTEWATER TREATMENT CAPACITY FLOW iii 246 UNITS CEDU'S) GAL/EDU (MGD )2 GAL/EDU (MGD) ENCINA (MGD) 21,354 4.69 5.25 5. 71 23,3843 5 .14 5.75 5. 71 24,492 5.40 6.03 5. 71 25,600 5.63 6.29 5. 71 26,708 5.87 6.57 8.57 27,816 6.12 6.84 8.57 28,924 6.36 7.12 8.57 30,032 6.60 7.38 8.57 31, 140 6.85 7.66 8.57 TREATMENT CAPACITY LAKE CALAVERA HILLS CMGD) TOTAL (MGQ) 0.0 5. 71 0.6 6.31 0.7 6.41 0.7 6.41 0.0 8.57 0.0 8.57 0.0 8.57 0.0 8.57 0.0 8.57 1 NOTE: 1989 to 1995 EDU's are expanded 1,143 per year. This represents 905 dwelling units and 238 EDU's of commercial and industrial. (428,400 sq. ft. at 1,800 sq. ft. per EDU.) Each year is projected to July 1 to correspond to fiscal year budgeting and adjusted for a 3X vacancy. 2 MGD = Millions of Gallons Per Day 3 1988 EDU'S • 22,965 EDU'S issued 3·31·87 + 1,143 per Note 1 adjusted for 3X vacancy (22,965 + 1,143) X 0.97 a 23,384 52 PARKS - -ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN -53 - PARK DISTRICTS ir Caty of C•labe(3 G,owth Mar\llOlmM Program -JANUARY 1987 ZONE 5 LAG RIVIERA . --( •;'~2."'-- A-~ -A Fil, ~ COMMUNITY PARKS 0 EXISTING • FUTURE * SPECIAL USE AREA • -------.... --lN I \ ,, __ ---.... ' G◄ ... ', \ ''-(o --.--- ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN -54 - PARKS CH Clly of C•tllltecl Growrh "'-oem..r Program JANUARY 1887 BUILDOUT LOCAL -FACILITIES MAN-AGEMENT PLAN-Zone 5 PARKS ZONE 5 SUMMARY SHEET ADEQUACY PROJECTION DEMAND SUPPLY (Calb,-m w18t■mrd) MITIGATION FUNDING * * * * EXtllfjNG ** ** ** ** APPROVED C, z -"' < ~ Q. ** ** ** ** FU TU-RE * Based on the existing performance standard. No ·park acreage is required for this non-residential zone. ** Staff is proposing a park-in-lieu fee be implemented for all non- residential development in Zone 5 at $.50 per square foot of development. -55- * ** ** PARKS I. PERFORMANCE STANDARD Three acres of Community Park or Special Use Area per 1,000 population within a Park District, must be scheduled for construction within a five year period. Special Considerations Zone 5 does not include any residential uses, but is instead composed exclusively of non-residential uses. The Growth Management Program does not identify a Parks performance standard for non-residential uses. Currently, non-residential uses are required to pay Public Facilities Fees. A percentage of all ·Public Facilities Fees collected are allocated for the construction and improvements to City parks. Non-residential uses are however, not required to pay Park-In-Lieu fees, which have historically been utilized for the purchase of park land. Zone 5 is located within Park Districts 1-3. At full buildout of Zone 5, there will be approximately 22,000,000 square feet of non-residential building area. This structural square footage corresponds to a potential average workday population within the Zone of at least 40,000 people. In view of this potential number of people being located within Zone 5 on a daily basis, the Director of Parks and Recreation believes there is a need for park facilities within Zone 5 (see Appendix 9). These park facilities should include active recreational facilities. In accordance, staff recommends that a Parks performance standard be adopted for non-residential uses within Zone 5. Listed and discussed below are four alternative Parks performance standards which_ may be applied to non-residential uses within Zone 5. A staff recommendation for a preferred parks performance standard will follow. 1. Park-In-Lieu fees shall be required to be paid for all non-residential development. This fee shall be established at a rate of $.50 per square foot of non- residential building areai and shall be utilized for the purchase .of park land within Zone 5. The fee shall apply to all projects or properties that d~ not as yet have building permits. Implementation of this fee will result in the potential allocation of approximately $8,969,845 for the purchase of park facilities. Construction of the park(s) will remain dependent upon the allocation of Public Facilities Fee funds. These new funds will be earmarked for Zone 5 and their specific use will be determined when the Parks and Recreation Element ls revised. T~e element ls currently being updated. -56- 2. Non-residential uses in Zone 5 shall be required to pay a special parks fee tQ be utilized to initiate development of Macario Canyon Park, which ls located immediately north of and adjacent to Zone 5. The rate of this fee shall be $.50 per square foot of non-residential building area and shall apply to all projects or properties that do not as yet have building permits. This fee.will result in a similar allocation of funds as the first alternative does. 3. Require that four separate areas (active recreational parks) each totaling 3 acres in area, be developed within Zone 5. The first active recreational park shall be required to be constructed within one year of approval of this Zone Plan (in 1998). The second, third and fourth active recreational parks shall be required to be constructed by 1993, 2002 and 2013, respectively. This phasing of park facilities would ensure that a 3 acre park is available for approximately every 5,500,000 structural square feet of non-residential development within Zone 5. With this alternative, the propertx owners/developers within the Zone would be responsible for allocating property for and fully developing the parks. The specific location of each park site would be closely associated with the major ongoing and anticipated concentrations of development within the Zone. 4. This alternative entails a hybrid of alternatives 1, 2 and 3, whereby, the property owners/developers within Zone 5 shall be required to; (1) pay a park fee at a rate of $.50 per sq. ft. of non-residential building area and (2) create four separate areas (active recreation parks) within Zone 5 which shall be operated as active parks until Macario Canyon Park is open for active recreational uses. The park fee shall apply to all projects or properties that do not as yet have building permits. Similar to alternative 3, each temporary active recreation park shall be required to be 3 acres in area and shall be located relative to concentrations of development within the Zone. At the time that Macario Canyon Park ls open for active recreational uses, the four Zone 5 temporary park sites may be phased out and developed with industrial uses. The separate park fees that are collected may be allocated for ei~her the purchase of parks within Zone 5 or the fee may be used to improve Macario Canyon Park. -57- - Staff is recommending as part of this Zone Plan, that alternative No. 1 be adopted as a Performance Standard for non-residential development in Zone 5. This alter·native provides the greatest amount of flexibility, yet still assures that park facilities will be provided in a timely manner. Special Conditions Staff is recommending that a park-in-lieu fee of $.50 per foot of non-residential be collected at the time of permit issuance, to be used for park facilities within square building Zone 5. -58- 59 DRAINAGE O'l 0 MASTER DRAINAGE PLAN FEE AREAS 10 ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN 7.0NL 1r. ZONt 10 ••-ZONE 15 BOUNDARY '"""' DRAINAGE AREA NUMBER 11 FEE AREA BOUNDARY ) (} en .... ZONE 1.1 ZONE 10 -ZONE.t - -D ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN ) DRAINAGE ZONE 16 MASTER PLANNED FACILITY EXISTING STORM DRAINS & SIZE OPEN CHANNEL CONCRETE LINED CHANNEL m X :c CONCRETE BOX CULVERT DEBRIS BASIN BASIN BOUNDARY DEBRIS BAS IN (FUTURE) t~ JANUARY 1987 . -LOCAL FACILITIES MAN·AGEMENT PLAN-Zone 5 BUILDOUT PROJECTION DEMAND EXISTING * ---APPROVED C, z -U) c( J: IL FUTURE --- DRAINAGE SUMMARY SHEET ADEQUACY SUPPLY (Ca.1cJ111•1» wlSttniard) * YES ---YES ---YES MITIGATION N/A N/A N/A FUNDING N/A N/A N/A * Specific drainage facilities will be required as individual projects are approved in Zone 5. -62- DRAINAGE I. PERFORMANCE STANDARD Drainage facilities must be provided as required by the City concurrent with development. II. FACILITY PLANNING AND ADEQUACY ANALYSIS As was indicated in the Citywide Facilities and Improvements Plan, drainage is distinguished from all other public facilities and improvements because by its very nature it is more accurately assessed as specific development plans are finalized. However, certain facilities may be necessary which are larger than those required from a single development project and, therefore, need to be identified so that the proper funding can be collected for the construction of these facilities. A. Inventory The City's Master Drainage Plan, completed in March, 1980, identifies major. drainage facilities within Zone 5. The Master Drainage Plan is currently being revised; however, preliminary research indicates there will be no significant impacts in Zone 5 • 12, Page area. Zone 5 contains three Master Drainage Plan fee areas (11, and 13) as shown on Exhibit H, "Master Storm Drain Basins", 60, and one sub-basin not included with a drainage fee 1. Existing Facilities Existing drainage facilities, within Zone 5 are shown on Exhibit I, on Page 61. Zone 5 is divided into three separate drainage basins, two of which drain to the Aqua Hedionda Lagoon. The third and most predominant basin drains down the Encinas Canyon and empties directly into the Pacific Ocean. Drainage Area 11 drains westerly through the Encinas Canyon to the Pacific Ocean. In addition to Zone 5 drainage the Encinas Canyon basin drains portions of Zones 3, 4, 13, 17, 19, 20 and 21. The east end or upper portion of the Encinas Canyon basin drains by way of localized storm drain pipes which empty into an unlined open drainage channel. This unlined channel extends westerly to the intersection of Palomar Oaks Way and Palomar Airport Road and is privately owned and maintained. Through the Birtcher Business Center, this channel includes three permanent ponds or basins which were designed for siltation control and storm water retention. West of Palomar Oaks Way the drainage flows along unimproved open drainage channels and flood -63- - plain until it rail pond the channel. From once again flows exception of the reaches Interstate 5. From I-5 to the AT & SF drainage is carried within a concrete lined open the railroad tracks to the ocean the drainage in unimproved open channels/flood plain with the drainage structures_ beneath Carlsbad Blvd. Drainage within area 12 generally drains northwesterly through a series of public and private storm drains to a proposed 20 foot high dam/retention pond which is currently under construction with Phase IV of the Carlsbad Researc~ Center. The dam and included facilities act as both a desiltation and detention basin. This facility will be privately owned and maintained; however, pursuant to a Council approved condition of approval for Carlsbad Tract 85-24 (Carlsbad Research Center) the City may purchase the facility for water reclamation purposes anytime prior to July 1, 1991. Below the dam structure the drainage flows in unimproved open channels across the police firing range and Macario Canyon Park which are located within Zone 8. Drainage within area 13 drains through a series of newly constructed storm drains and discharges out of Zone 5 into Zone 15 at El Camino Real. Below this point the drainage flows in unimproved channels to the Sunny Creek flood plain/riparian corridor. In the future this section of drainage course will be placed in an underground storm drain. In addition a desiltation basin will be constructed at the point of discharge into Sunny Creek, in accordance with the City's Master Drainage Plan. Sunny Creek meanders in an unimproved state until it reaches the Carlsbad Mobile Home Park. Through the mobile home park this creek is contained within a rock lined, open channel. After leaving the mobile home park this creek passes under El Camino Real to a 15,000 cubic yard desiltation basin adjacent to Agua Hedionda Lagoon. The portion of Zone 5 north of Palomar Airport Road and east of El Camino Real drains through a series of small strom drains into the south fork of Sunny Creek. From there it flows in unimproved riparian channel/flood plain to the main Sunnycreek stream described above. B. Phasing Since the demand for future drainage facilities within Zone 5 will be localized and generated by specific development, it will be addressed as that developme~t occurs. c. Adequacy findings 1. Zone 5 has been found to be in conformance with the adopted performance standard. Additional information is beinQ provided concerning drainage facilities which will be required as new development occurs. -64- Drainage Area 11 The Encinas Canyon drainage below Palomar Oaks Way currently flows in unimproved channels~ No master plan facilities have been identified for this flood plain area. Staff has conditioned several tentative maps within this area to place the drainage within unlined or rock lined open channels generally located along and parallel with Palomar Airport Road. Depending upon which properties develop first, this alignment may have impacts which extend both up and down. stream of the proposed development. These impacts will be mitigated by the respective developers as development occurs. Drainage Area 12 No drainage problems are anticipated to occur within Drainage Area 12. The proposed dam/retention facility at the boundary of Zone 5 and 8 will provide adequate desiltation and flood control to the Macario Canyon Park site below. Zone 5 properties within the bas·in will pay drainage area fees to mitigate any possible impacts in accordance with the existing drainage fee ordinance. Drainage Area 13 and Sunnycreek Drainage Basin The existing rock lined channel through Rancho Carlsbad Mobile Home Park, is not up to City standards and is reported to have overtopped its banks during recent storms. The drainage area of this creek is approximately 20 square miles. The 100 yr. storm flow through the mobile home park is approximately 10,000 cubic feet per second. (Ref. Williamson and Schmid/PD 277, 5/23/86). The portion of Zone 5 which drains this direction is approximately 700 acres or less than 1 square mile, roughly, 5% of the total drainage area is contributed by·Zone 5. The exact nature of the improvements needed to mitigate the Rancho Mobile Home Park drainage channel is not known at this time and is beyond the scope of this zone report. Potential mitigations will be addressed in the update to the Master Drainage Plan. Staff recommends that prior to develpment of any property located within the Sunnycreek Drainage Basin of Zone 5, the developers shall be required to pay · their fair share of the mitigation measures as required in the Master Drainage Plan Update. In .addition Staff recommends that the 2700 cubic yard desiltation basin at the north end of drainage line BL as shown on the Master Drainage Plan, be installed prior to issuance of further development permits in drainage area 13 within Zone 5~ -65- -III. MITIGATION A. Special Conditions for Zone 5 Prior to issuance of further development permits within the Sunnycreek Drainage Basin of Zone 5 the developer shall pay or enter into an agreement with the City to pay for a proportional share of the· mitigation of the 'downstream' drainage problems associated with the Rancho Carlsbad Mobile Home Park in accordance with the reQuirements of the update to the Master Drainage Plan. Prior to isssuance of further development permits within Drainage Area 13 of Zone 5 the developer shall install the desiltation basin identified as a 2700 cubic yard basin at the north end of Master Drainage Plan Facility 'BL'. Oetween I-5 and Hidden Valley Road the Encinas Canyon drainage flows across land which has not been farmed or otherwise improved. This area is potentially environmentally sensitive and may not be able to support channelization. This issue must be further addressed and resolved at the time specific development and environmental plans are prepared for the area. B. Financing The cost of the mitigation to relieve the drainage problem within the Rancho Carlsbad Mobile Home Park cannot be determined until a mitigation plan is adopted with the Master Drainage Plan Update. Per the Master Drainage Plan the estimated cost of desiltation basin 'BL' is as follows: Desiltation basin Contingencies (+15%) Subtotal Engr. and Admin (+20%) Total per 1980 OMP Inflation since 1980 (+50%) Total Cost $32,000 4,800 $36,800 7,360 $44,160 22,080 $66,240 The developer is eligible for reimbursement for installation of desiltation basin 'BL' in accordance with Chapter 20.09 of the Carlsbad Municipal Code. Currently no funds exist within the drainage fee account for area 13. All other drainage improvements impacted by Zone 5 will be financed by developers or by the use of drainage fees collected b)' the City. -66- 67 CIRCULATION ) XON[ 11 I . I I ZONE 5 CIRCULATION ELEMENT ROADS & INTERSECTIONS ZON[ lr. ZONE 17 ZON£ 10 0 FfF Traffic Slpl CU, of Ctfltf:l•d G,owrtt '4.,....~•""'•'"r "1-'J-.J,lffl J A N U A R Y 1 9 87 ========================================================================================-::=-::-:=======-=-:~------··• .•• LOCAL FACILITIES MANAGEMENT PROGRAM LOCAL. FACILITIES MANAGEMENT PLAN-Zone 5 BUILDOUT DEMAND PROJECTION EXISTING * ** APPROVED C, z -(J') < ** ::x: Q. FUTURE CIRCULATION SUMMARY SHEET ADEQUACY SUPPLY (Ca.lo.11•11» wllltandard) * YES ** NO - ** NO MITIGATION N/A See Page . 79 See Page 79 * The existing road segments and intersections impacted by Zone 5 currently comply with the adopted performance standard. FUNDING N/A See Page 98 See Page 98 ** The existing plus committed and future traffic demands will cause the identified road segments and intersections impacted by Zone 5 to fall below the adopted performance standard if the proposed mitigation is not implemented. -69- -CIRCULATION I. PERFORMANCE STANDARD No road segment or intersectio~ in the zone nor any road segme~t or intersection out of the zone which is impacted by development in the zone shall be projected to exceed a service level C during off-peak hours, nor service level D during peak hours. Impacted means where twenty percent· or more of the traffic generated by the Local Facilities Management Zone will use the road segment or intersection. II. FACILITY PLANNING AND ADEQUACY ANALYSIS The purpose of this analysis is to determine whether or not the circulation system within Zone 5 conforms to the adopted performance standards for Zone 5. It will also address all Circulation Element Roads and intersections outside of Zone 5 impacted by twenty percent or more of the traffic generated by Zone 5 to ensure conformance with the adopted performance standard. Improvements that will be needed to completely develop the Circulation Element road~ such as sidewalks, street lights, etc., are discussed separately for informational purposes, in Appendix 5, beginninq on Page 175. A• Inventory The followinq Circulation Element Roads and Intersections are located within Zone 5. Appendix 5 lists the needed improvements to complete all Circulation Element roadways within Zone 5 to their full buildout width. Number of Lanes Roads Existing Buildout Classification 1. Palomar Airport Road 2-4 6 Prime Arterial 2. El Camino Real 4 6 Prime Arterial 3. College Avenue O* 4 Major Arterial 4. Camino Vida Roble 2** 2 Secondary Arterial 5. Faraday Avenue 0/4 4 Secondary Arterial 6. El Fuerte Street 0 4 Secondary Arterial 7. Hidden Valley Road 0 4 Secondary Arterial * Under construction from PAR to ECR -4 lanes. ** Built to industrial street standards 52' V.S. 64' curb to curb width ultimate configuration to be two thru lanes and a left turn pocket. Intersections 1. Palomar Airport Road and Hidden Valley Road (Future) 2. Palomar Airport Road and College Boulevard (Under Construction) 3. Palomar Airport Road and Camino Vida Roble (Existing) 4. Palomar Airport Road and Yarrow Drive (Existing) 5. Palomar Airport Road and El Camino Real (Existing) -70- 6. Palomar Airport Road and El Fuerte Street (Existing -3 legs) 7. El Camino Real and College Boulevard (Under Construction) 8. El Camino Real and Faraday Avenue (Existing) 9. El Camino Real and Camino Vida Roble (Existing 3 leqs) 10. College Boulevard and Faraday Avenue (Under Construction) The following Circulation Element Roadways and Intersections are outside of Zone 5, but are impacted by 20% or more of the traffic generated by Zone 5. Number of Lanes Roads Existing Buildout Classification 1 • Palomar Airport Rd. from Zone 5 to Southbound I-5 Ramps 2/4 6 Prime Arterial 2. Palomar Airport Rd. from Zone 5 to existing City limits 2 6 Prime Arterial 3. El Camino real from Zone 5 to Tamarack Ave.* 4 6 Prime Arterial *For existing conditions. At buildout this road segment will carry less than 20% of the Zone 5 traffic. Intersections 1. Palomar Airport Road and I-5 southbound (Existing) 2. Palomar Airport Road and I-5 northbound (ExistinQ) 3. Palomar Airport Road and Paseo del Norte (Existing) 4. Palomer Airport Road and Melrose Drive (Future) 5. El Camino Real and Tamarack Avenue (Existing) 6. El Camino Heal and Kelly Drive (Existinq -3 legs) 7. El Camino Heal and Cannon Road (Future) B. Phasing Although Zone 5 is considered an infill zone there is still a tremendous amount of building potential remaininq in this zone. It is estimated that only 1~% of the total development that will occur in Zone 5 has been completed. Presently 4,256,609 square foot of non-residential development exists within Zone 5. There is a potential for a total of 22,196,299 square foot of non-residential development within Zone 5 at buildout. The non-residential development in this zone has been phased out to the buildout of Zone 5 in the year 2013. There are 15 approved projects in Zone 5 with a development potential of 9,545,303 square feet. It is estimated that these projects will buildout by 1996 at an average yearly rate of 954,530 square feet. The remaining acreage in Zone 5 that currently does not have any approvals is projected to probably buildout after 1996. As explained previously, this yearly estimate was obtained from researching past records, marketinq studies and talking with commercial brokers. -71- The Barton-Aschman traffic study which is the source for this traffic a~alysis was set up to analyze traffic at three threshold points; existing development, existing plus committed and buildout. Previous zone plans for infill areas with little development potential did not attempt to phase needed improvements, but based the timing of the needed improvements at one of these three thresholds. Due to the large development potential of Zone 5, this plan has been prepared with a modified phasing program. The Zone 5 plan still recognizes the three thresholds of existing, existing plus committed and buildout. However, the existing plus committed category has been separated into three phases: 1. Improvements needed in 1 3 years 2. Improvements needed in 4 -6 years 3. Improvements needed in 7 10 years The buildout phase of Zone 5 is projected to be from 1998-2013. c. Assumptions The following assumptions were utilized by staff for purposes of evaluating traffic impact of Zone 5. 1. Distribution of Zone 5 traffic for both existing and buildout conditions is shown on Exhibit Jon Page 73. 2. 3. 4. All Circulation Element road segments are in place at buildout. Industrial Traffic Generation = building area. 8 ADT/1000 SF of Road segments were analyzed using the capacity manual worksheet for general segments for two lane hiahways. highway terrain 5. Greater than 20,000 ADT = LOS F for Collector Steets 6. AM/PM peak= 10% of ADT -72- -..J (.;J ) EXISTING ROAD ---FUTURE ROAD 10/ 15 % OF ZONE TRAFFIC EXISTING/BUILDOUT ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN ) TRIP DISTRIBUTION MAP RO , v o,e "' I I 20/20 m X :::c m I -..J w QI I INTERSECTION IMPROVEMENTS e 1-3 years • 4-6 years O 7-10 years -k BEFORE BUILDOUT ~ R O A D S E G M E N T IMPROVEMENTS AT BUILDOUT ZONE 5 LOCAL FACILITIES ) CIR1CULATION IMPROVEMENTS REQUIRED FOR EXISTING PLUS COMMITTEED DEVELOPMENT *NOTE: Some of these intersection improvements may be completed with existing plus committed development or may require special improvements beyond those required by the circulation element of the General Plan. MANAGEMENT PLAN ---.,,,,,,,,,,,.--r ---...,t ' ,._ I \ \ ' ' ' .......... ..... ' '\ & BUILDOUT I *' \ \ \ CllfolC•twN Gro•lfl Management i,tro,gram JANUARY 1987 D. Adequacy Findings Currently all intersections and road segments within Zone 5 or impacted by Zone 5 traffic meet the adopted performance standard. With the existing plus committed traffic impacts, seven intersections and two road segments are projected to fall below the adopted performance standard. At buildout nine intersections are projected to fall below the City's adopted performance standard unless mitigating improvements beyond those required under the current circulation element are installed. These intersections and segments are identified in tabular form on Chart C on Page 78. This chart also presents an estimated time to failure in three separate phases as discussed previously under phasing. Chart "A'' on Page 76 indicates the existing, existing plus committed, and buildout levels of service for each of the intersections impacted by Zone 5. These levels of service were obtained from the traffic study prepared by Barton-Aschman Associates. The existing levels of service are based on actual traffic counts at these intersections. The existing plus committed, and the bulldout levels of service are projected based upon sophisticated modeling techniques that determine traffic assignments from committed, and future projects respectively. The trip assignments for committed projects are added to actual traffic volumes to determine existing plus committed levels of service. For the buildout level of service analysis, future trip assignments were added to existing plus committed traffic volumes. The buildout level of service noted for each intersection assumes that all of the mitigation measures proposed to provide acceptable levels of service for existinq plus committed are already in place. Zone 5 is the first zone to include road segments which are projected to fall below the adopted performance standard. Since the Barton-Aschman study did not analyze road segments, City Engineering staff performed the analysis. Only the two lane road segments along Palomar Airport Road were analyzed. The four lane segments of Palomar Airport Road and El Camino Real were assumed to operate at acceptable levels of service for existing and existing plus committed traffic volumes. It should be understood these other road segments will at some time in the future (before buildout) need upgrading to their full circulation element configuration. The timing of these upgrades will be subject to on-going review and monitoring of the Fac~lities Management Plan as specific development is approved which affects these road segments. To utilized general existing determine the capacity of the road segments, staff the Highway Capacity Manual Technical Worksheet for terrain segments for two lane highways. Existing and plus committed peak hour traffic volumes for the -74- corresponding road segments were obtained from the Barton-Aschman Traffic Study. As can be seen on Chart "B'' on Page 77 these two road segments on Palomar Airport Road currently operate a level of Service D. At existing plus committed these two segments of Palomar Airport ~oad drop below the established standard. Since the Highway Capacity Manual method of determininq service levels does not quantify the difference between level of service E and F, the exact service level cannot be determined by this method. However, for the purpose of this study it ls sufficient to know the level of service will not meet the adopted performance standard with existing plus committed traffic. -75- ) ) ) ~HART A Existing Existing/Committed Buildout AM PM AM PM AM PM Intersection Peak Peak Peak Peak Peak Peak College Blvd/Faraday Ave. C C El Camino Real/Camino Vida Roble A. A B D C A El Camino Real/Cannon Road C E* El Camino Real/College C F* El Camino Real/Faraday A A C E* F* F El Camino Real/Kelly A A D F* A A El Camino Real/Palomar Airport Rd A A E* F* D E* ..... ll Camino Real/Tamarack Ave A A F* F* A A en Palomar Airport Rd/Camino Vida Roble A A C D D D Palomar Airport Rd/.College u F* Palomar Apt Rd/El Fuerte St. E* F* Palomar Apt Rd/Hidden Valley Rd. A C Palomar Apt Rd/1-5 Northbound B D D F* C D Palomar Apt Rd/1-5 Southbound A A C F* A A Palomar Apt Rd/Melrose Dr E F* Palomar Apt Rd/Paseo del Norte A B D F* D F* Palomar Apt Rd/Yarrow Dr. A A A B D F* *Fails to meet the required performance Standard -..J -..J Segment Palomar Airport Rd -Paseo del Norte to Palomar Oaks Way Palomar Airport Rd -El Camino Real to east City limit CHART B Peak Hour Level of Service Existing Existing Plus AM PM AM D D E D D E Committed PM E or F* E or F* * All level of service values calculated using the highway capacity manual special report 209, 1985. The manual does not make analytical distinctions between level of service E and Fas level of service E represents capacity failure of the road segment. -...J 00 Intersections El Camino Heal/Cannon El Camino Real/College El Camino Real/Faraday El Camino Real/Kelly CHART C ZONE 5 FAILURE PROJECTIONS Time to Failure 1-3 Years 4-6 Years 7-10 Years ) Before Buildout ----------------------------------------------X ----------------------------------------------X ----------------------------X-----------------X ----------------X El Camino Real/Palomar Airport Rd. ----------------------------X-----------------X El Camino Heal/Tamarack ----------------------------X Palomar Airport Rd/College ------------------------------.---------------X Palomar Airport Rd/El Fuerte ----------------------------------------------X Palomar Airport Rd/1-5 S/B ----X Palomar Airport Rd /1-5 N/B ----X Palomar Airport Rd/Melrose ----------------------------------------------X Palomar Airport Rd/Paseo del Norte ----------------------------X-----------------X Palomar Airport Rd/Yarrow ----------------------------------------------X Segments Palomar Airport Road PON to Camino Vida Roble ----X Palomar Airport Road ECR to east City limits ----X The timing for the upgrade to these road segments was determined by using a straight line projection of the increase in traffic from existing to existing plus committed and pickinq the point at which the traffic volume crosses the threshold of "E" level of service. Intersection failure times were analyzed in a similar manner, however, the added variables of turning movements, cycle-times and side frictions makes it somewhat less reliable as a means of determining exactly when the intersection will fail. As noted above for road segments the timing for installation of the buildout mitigations for intersections cannot be estimated at this time. These intersections will be monitored and recommendations made on the timing of the installations as part of the ongoing review process for the Growth Management Program. It will be necessary to closely review projects which front on impacted intersections to obtain additional right-of-way which may be required to install the proposed mitigating improvements. III. MITIGATION The proposed mitigation is divided into two sections. One section will deal with the mitigation needed to acommodate existin9 plus committed traffic and the other section will deal with mitigation for buildout traffic demands. All the intersection mitigation improvments are taken directly from the mitigation recommendations presented in the Barton-Aschman traffic study. The cost estimates have been altered to better reflect existing field conditions. It should be understood that all cost estimates presented in this plan are preliminary in nature and will need further refinement as the actual scope of work, utility needs and right-of-way dedications are determined. Mitigation for the various intersections and road segments have been grouped in accordance with the phasing parameters discussed previously. For easy reference the report includes a matrix on Page 100 which summarizes the project mitigation phasing groups, cost and alternative financing mechanisms. Improvements needed within 1 -3 Years A. Impacted Intersections Palomar Airport Road at I-5 Northbound and Southbound These two because they are intersections will be mitigated as a unit both dependent on construction of the bridge -79- overpass at the Interstate-5 freeway. The Barton-Aschman study has recommended the following improvements to be made to Palomar Airport Road and the freeway ramps to bring these intersections into conformance with adopted performance standards. These recommended improvments are subject to revision and modification as the bridge plans become formalized. The Caltrans process for construction of interstate bridges require more detailed traffic analysis and study be done on the specific area prior to their approval than -was done with the Citywide Barton-Aschman traffic study. For existing plus committed conditions, it is anticipated that the intersection of I-5 southbound and Palomar Airport R6ad will operate at levels of service C and F during the morning and afternoon peak periods, respectively. The improvments shown in Exhibit K on Page 82 would improve conditions such that the level of service will be A and C, respectively. The required improvments consist of restriping to provide two through lanes for eastbound and westbound, each and widening of the southbound off-ramp to provide three lanes (one left only, one right only and one optional). It is anticipated that the intersection of Palomar Airport ·Road at the I-5 northbound ramps will operate at levels of service D and F during the morning and afternoon, respectively. Widening of the east and west approaches to provide an additional through lane for each direction would result in level of service A and B, respectively. These improvements are also shown on Exhibit Kon Page 82. In addition to the roadway improvements discussed above, both intersections of Palomar Airport Road at I-5 off-ramps should be signalized and coordinated with the signals at Paseo del Norte. Estimated construction cost is $7,989,000 to construct the additional right-turn lane for the southbound ramp and installation of signals. Widening of Palomar Airport Road is part of the City's circulation plan and is, therefore, not included in this cost estimate. Staff is projecting failure of the northbound ramps within the next 3 years and the southbound ramps within 4-6 years. Since the Barton-Aschman report required construction of the bridge widening as mitigation for intersections, the bridge installation and improvements needed to bring both intersections into conformance would be required by 1990. The best estimates at this point are that the bridge could not be installed through the normal Caltrans process until 1992 or 1993 at the earliest .• -80- There are three alternatives which if implemented together or separately may be able to provide an interim solu~ion to allow continued development in the zone until the bridqe widening is in place. More detailed traffic analysis will be needed to determine the actual impacts each of these proposed alternatives would have on the performance level of the freeway intersections. The alternatives are as follows: 1. Installation of Cannon Road from El Camino Real to I-5 and Faraday Avenue from College Boulevard to Cannon Road. These roadway links would siphon existing and proposed traffic off at Palomar Airport Road. 2. Installation of Poinsettia Lane from El Camino Real to I-5 and College Boulevard from Palomar Airport Road to Poinsettia Lane. This would have a similar effect as the Cannon Road link. Staff believes this link would have less impact to reduce traffic on Palomar Airport Road than the Cannon Road link. 3. Modification of the· northbound on and off ramp to provide a separate left turn and right turn lane. Also widen the south side of Palomar Airport Road from the northbound off ramp to the Denney's Restaurant driveway. The following cost estimates for the mitigation and each of the alternatives are ~reliminary in nature and subject to change as detailed engineering studies and plans are prepared. B. 1. Cost of bridge and intersection improvements: $8 million Alternatives: Cannon Road/Faraday Ave. Connection: $6 million Poinsettia Lane/College Blvd. Connection: $10 million Widening N/S off ramp and Palomar Apt. Rd: $50,000 Impacted Road Segments Palomar Airport Road Segment from Paseo del Norte to Palomar Oaks Way Without widening it is anticipated this road segment will fall by the year 1990. Widening the road to a 4 lane facility will bring the road into conformance with the adopted performance standard for existing plus committed traffic. The City is currently in the process of forming an assessment district to widen this section of Palomar Airport Road to its ultimate configuration of six lanes plus median. Improvement drawings should be completed by August of 1987. The current estimate for -81- I 00 N I ) PALOMAR AIIPOAT ... m (/) ,n ..!.. l ... ) t ... ... J ... SCHEMATIC OF PRO.POSED IMPROVEMENTS AT 6 ::P::A::L_O.;;;. _.;.;.;M~A::R::A::IR;:P:;O::R=T::::R::0::A::D::A::T::::1-::5=::s_o=-_=-u_T.;..;H=B=O::U::N::D::::A::N=D::N::O::_R:..:.T::H::8::0::U=N~D~============:;~ N ~ :::c m =i " -the cost of this work is $7,300,000. This estimate is based on detailed improvement drawings and is a fairly accurate representation of the actual cost to construct. 2. Cost of mitigation: $7,300,000 Timing: Construction must be complete by 1990 City projects construction by 1989. Palomar Airport Road Segment from El Camino Real to East City Limits Without widening it is anticipated this road segment will fail by the year 1991. Widening of the road to a 4 lane facility will brinq the road into conformance with the adopted performance standard for existinq plus committed traffic. The City is currently working on two projects within the limits of this road segment. The first project which .is under design is installation of half street improvements along the north side of Palomar Airport Road from El Camino Real to the newly ·constructed improvements at the Carlsbad Oaks Business ~ark (Kaiser/Bedford). Together with a new striping arrangement adjacent to the Carlsbad Oaks project this will provide four lanes of traffic from El Camino Real to the east end of Zone 5. The latest cost estimate for this work is $650,000 (including design which ls 90% complete). The City has budgeted $900,000 for this project. Construction could be complete on this project by mid 1988. The second project is a proposed assessment district which would complete the remaining Palomar Airport Road improvements east of El Camino Real to full prime arterial standards (6 lanes and median). This proposed assessment district is in the prelimindry stage only at this time. No improvement plans have been prepared and Council has not yet directed staff to proceed with the project. Preliminary estimates of the cost of this work is $8 million. Since it is fairly assured Palomar Airport Road will be widened to 4 lanes from El Camino Real to east end of Zone 5, the only rema1n1ng section which is needed to keep Palomar Airport ·Road in conformance with the adopted standard for existing plus committed traffic is the widening of Palomar Airport Road to a four lane facility from the Zone 5 boundary to the east City limits. The remaining widening is needed to meet buildout traffic needs. Cost of mitigation: Project 1 -North half Palomar Airport Road from El Camino Real to Zone 5 boundary ••••••••••••••• $650,000 Project 2 -4 land facility from Zone 5 to east City 1 i m 1 ts ••••...•••••...•••••.....••••••.••... $1 , 1 00, 000 Timing: Improvements needed by 1991 -83- EXHIBIT L El Camino Real at Kelly Drive It is anticipated that this intersection will operate at Levels of Service D and F during the respective peak periods. Widening of El Camino Real to prime arterial standard, signalization, and separate southbound right-turn lane would result in Levels of Service 8 and C, respectively. The proposed intersection configuration is shown in the Figure below. · Estimated cost is $200,000. SINGLE FAMILY RESIDENTIAL KELLY OR ~ ~ j VACANT < u _, 1 1----.---.---1 W T I T SINGLE FAMILY RESIDENTIAL I I S ::C::H::E:::M:::A:::T::IC::::::::::0::F::P:::R::::O::::P:::O::S::ED:::::::IM::P::R:::0:::::V=E=M=E=NT=S==A=T===========fl "if :L CAMINO REAL AT KELL y DRIVE Ll -BIJ- /- EXHIBIT M El Camino Real at Faraday Avenue With the existing geometric conditions, it is anticipated that this intersection will operate at Level of Service C in the morning and Level of Service E in the afternoon. The intersection configuration shown in the Figure below would provide level of Service C in the morning and Bin the afternoon~ The improvements consist of modifying the lane usage pattern and improvements such that three lanes can be provided in each north- south direction. For the east-west approach, the lanes should be designated so that there is a right-turn only, and throuqh plus left turn lane for each approach. These improvements require restriping only. Therefore the cost is neglible. Estimated Cost: $50,000 lJ INDUSTRIAL INDUSTRIAL -1 ! ...... FARADAY AVE ~I E , .. 9\ r t f. < INDUSTRIAL OFFICE "' ~ I c.> .. "' St:=C1~H§E~M~A~T~IC~O~F~P~R:::O::::P:::O::S::E:::O:::N::::::PR::O::::V::::E:::M::E=NTS===AT===========n <ii s_L CAMINO REAL AT F ARA0A Y AVENUE lJ -85- - EXHIBIT N El Camino Real at Palomar Airport Road Upon completion of the existing plus committ~d projects, the intersection of El Camino Real at Palomar Airport Road ls expected to operate at Levels of Service E and· F during the morning and afternoon peak period, respectively. In order for the intersection to operate at acceptable standards, the improvements shown in the Figure below should be implemented. These improvements consist of widening El Camino Real to the full prime arterial width of three lanes each direction as indicated in the City's circulation plan, and provision of an additional southbound right-turn lane and designation of two left-turn-only lanes. In addition, the westbound approach should be widened so that two through and two right-turn-only lanes can be provided. The level of service following implementation of the improvements would result in Levels of Service C and D, respectively. The Barton-Aschman study recommended a dual right-turn lane configuration from westbound Palomar Airport Road to northbound El Camino Real. Staff recommends that prior to implementation of this configuration the use of a free right-turn together with an additional merge lane on El Camino Real be investiqated. Dual right-turn lanes are not common and present problems for the drivers making the turn. Installation of a free right lane would increase the cost of the mitigation by about $70,000. The City Engineer recommends that the City include the Barton- Aschman buildout mitigation improvements within the existing plus committed improvement mitigation. For this intersection little additional costs and no additional right of way would be needed to install the buildout improvement. Barton-Aschman estimates these additional buildout costs to be approximately $37,200. Existing plus committed mitigation costs: Free right turn/merge lane option: Buildout option: AIRPORT - MOTEL VACANT fi'ALOM•• A,_ftO-T •OAO '---t: VACANT $100,000 $ 70,000 $ 37,200 SCHEMATIC OF PROPOSED IMPROVEMENTS AT 0 :::PA::L~O'.::M:::A:::R::::A::l::R:::PO::R:::T:::::::R::0::A:::D:::A:::T:::E~L::C~A::M:::IN::O~R~E::A~L=====::::!~ -86- EXHIBIT 0 El Camino Real at Tamarack Avenue Without mitigation measures, it ls anticipated that this intersection will operate at Level of Service F during both peak periods. In order to mitlqate the unacceptable levels of service, the improvements shown below should be provided. These improvments consist of restriping to provide optional through and turn lanes for the east and west approaches, wideninq of the southbound approach to provide one additional lane and widening the northbound approach to provide two left-turn-only, two right- turn-only and three through lanes. The result of these improvements would be Level of Service D during the peak periods. The Barton-Aschman study recommended a dual right turn lane configuration from northbound El Camino Real to eastbound Tamarack Avenue. Staff recommends that prior to implementation of this configuration the use of a free right turn ramp together with an additional merge lane on Tamarack Avenue be investigated. Dual right turn lanes are not common and will present problems to drivers making the turn. Installation of a free right lane would increase the cost of mitigation by about $70,000. Cost of mltiqation: $200,000 Free right turn/merge lanes option: $70,000 SINGLE FAMILY RESIDENTIAL SINGLE FAMILY RESIDENTIAL SINGLE FAMILY RESIDENTIAL TAMARACK AVE '- ~ ,r VACANT SCHEMATIC OF PROPOSED IMPROVEMENTS AT EL CAMINO REAL AT TAMARACK AVENUE XISTING PLUS COMMITTED CONDITION) -87- cn,DIC•-..,_..,-~..,.., -JANUARY 1987 EXHIBIT P Palomar Airport Road at Paseo del Norte The level of service analysis indicated that the intersection of Palomar Airport Road and Paseo del Norte would operate at level of Service D and F during the morning and afternoon peak periods, respectively. The improvements necessary to mitigate the unacceptable afternoon level of service consist of widening the westbound approach to provide a separate right-turn-only lane and widening the northbound approach to provide two left-turn-only lanes. Signals should also be installed for the ·westbound approach to channelize drivers into the proper lanes as shown in the Figure below. The improvements shown would result in a level of Service O in the afternoon and Bin the morning peak hours. Estimated Cost: $50,000 VACANT RESTAURANT PALOMA!CI Al!CIPORT ROAC ... -1'0 1-1 .. ,._ -T0 1-1 --_,,_, r -- SERVICE ST A TION SERVICE STATION SCHEMATIC OF PROPOSED IMPROVEMENTS D :::PA::L:::O::::M::::A:::R::::::::A::IR::::P:::O::R:::::T:::::R:::0:::A::D:::::A::T:::P:::A::::S:::E:::0:::::0::E::L:::N::O::R::T:::::E:::==========!f'U! -BB- EXHIBIT Q Cannon Road at El Camino Real If this intersection is constructed with cross sections shown in the City's Circulation Plan, the morning and afternoon levels of service would be C and E, respectively for buildout conditions. Installation of a northbound to eastbound right-turn only lane as shown below would improve the afternoon condition to Level of Service D. Cost Estimate: $35,500 ~ < w a:: i ~ < t.) ~ ! ! ~ ~ w ~ -- .J r --.. ~ ~ CANNON AD -i T T T i. SCHEMATIC OF PROPOSED IMPROVEMENT AT .Q. :::E::L::C::A:::M::::IN::O::::=R:::E:::A:::L=A=T=:::C::::A::NN::O:::::N:::R:::::O::A::D::==================~fl..N -89- EXHIBIT R El Camino Real at College Boulevard Without improvements in addition to those in the City's Circulation Plan, this intersection is expected to operate at Level of Service C and F during the morning and afternoon respectively. In order to provide an acceptable level of service during the afternoon, an eastbound to northbound left-turn lane and a westbound to southbound left-turn lane should be added. The westbound approach should also be restriped to provide a right only and an optional right and through lane. See Figure below. These improvements would improve the afternoon level of service to D. Cost Estimate: $74,500 ~ ~ i < ~ ! ! I. 0 _, w ... '- A - _, I- I ,r J r -- T "'"COLLEGE BLVD ~ 1 1 l- SCHEMATIC OF PROPOSED IMPROVEMENT AT 0, =E=L=C=A=M=IN=O:::::R::EA:::L:::::A::::T:::C::::O::::L::L::EG::E:::::B::LV::D::==================::.flli -90- EXHIBIT S Palomar Airport Road at College Boulevard Without improvements, this intersection will operate at Level of Service D and F during the morning and afternoon respectively. Mitigation measures include an additional southbound to westbound right~only lane, a westbound to southbound left-turn lane, an eastbound to southbound right-only lane, and an eastbound to northbound left turn lane. With the improvements shown in Figure below, the morning and afternoon Levels of Service would be C and D, respectively. Cost estimate $145,400. _, .J --- ~ -i f f ~ 0 cc -- r r ~ 'COLLEGE BL VD SCHEMATIC OF PROPOSED IMPROVEMENT AT Q =P::A=LO==M=A::R=A:::IR:::P=O::R:::T::::::::R:::O::A::D::A::::T:::C::O::L::L::E::::G::E:::B::::L::V:::D=============~M -91- EXHIBIT T Palomar Airport Road at El Fuerte. During the morning and afternoon peak periods, this intersection is expected to operate at Levels of Service E and F, respectively. Mitigation measures include an additional southbound to eastbound left-turn lane, an additional westbound to southbound left-turn lane and an eastbound to southbound -riqht-turn only lane. See Figure below. The Levels of Service would be C and D, respectively. Cost Estimate: $109,900 I-Cl) w I-a: ~ -i l ~ '-l. ~ w .. .s. --.,.. .J r --- 1 1----,-----.. PALOMAR AIRPORT ROAD t =SC=H:::E:::::M:::A:::::T:::IC:::::::::O::::F::::PR:::::O::::PO::S:::E::::D::::::IM::P::R::::O::::V:::EM::E::NT:::=A=T=============~n~ FUERTE ST AT PALOMAR AIRPORT ROAD J L..U -92- EXHIBIT U Palomar Airport Road at Melrose Drive Without additional improvements, this intersection will operate at Level of Service E and F during the morninq and afternoon peak periods. Improvements required consist of an. additional left- turn lane on each approach and an eastbound t~ southbound right- turn only lane as shown below. These improvements would provide Level of Service D during both morning and afternoon peak periods. Cost Estimate: $184,200 -- J r J r --- ""'It 1--........ --...-.---,---, MELROSE DR "'19\Tf~ SCHEMATIC OF PROPOSED IMPROVEMENT AT /\ PALOMAR AIRPORT ROAD AT MELROSE DR nJ! =====================================================---, -93- -- - EXHIBIT V El Cami8o Real at Palomar Airport Roap It is anticipated that this intersection will operate at Level of Service D and E during the morning and afternoon peak periods, respectively, it huildout conditions. The necessary improvements to allo~ this intersection to operate at an acceptable level of service include adding one eastbound left-turn lane and are shown below. As a result, Level of Service D would result at this intersection during the morning and afternoo~ peak periods. Cost Estimate: $37,200 ..J < I.I.I cc i :IE < 0 ..J I.I.I ... '- '---r --... 1---.---,..---r--.....,.~ PALOMAR AIRPORT ROAD "I t t t- SCHEMATIC OF PROPOSED IMPROVEMENT AT {j EL CAMINO REAL AT PALOMAR AIRPORT ROAD n N ===========================================~· L..!.: -94- EXHIBIT W Palomar Airport Road at Yarrow/McClellan Drive The level of service analysis projicts this intersection will operate at Level of Service D and F during the morning and afternoon peak periods, respectively. The Figure below shows the improvements necessary to allow the intersection to operate at an aceptabl~ level of service. These include an additional westbound left-turA lane and restriping and the northbound through lane for an optional through plus a right-turn lane, plus right-turn only lane and restriping the southbound approach. As a result of these improvements, the intersection is •projected to operate at Level of Service B and C during the morning and afternoon peak periods, respectlvley. Cost Estimate: $37,300 w ~ fs z w .., .., w .., i ~ 0 a: ,) i. a: < ► .. .. '--- r .J r -- ~ -,. PALOMAR AIRPORT ROAD 9\ 1-(' SCHEMATIC OF PROPOSED IMPROVEMENT AT /). ;:Y=A=R::R:::::O:::W::::/::M:::C:::L::EL::L::E::N::::D:::R:::::A:::T::::P::::A::L::::0::::M:::A::R:::::A::IR:::P::::O:::R:::T:::R::D::========::::::~ -95- ·- - EXHIBIT X El Camino Real at Faraday Avenue It is projected that this intersection will operate at Level of Service F during the morning and afternoon peak periods for buildout conditions. The improvements shown below would result in Level of Se~vice D during the morning and afternoon peak periods. The improvements consist of adding one westbound right- turn lane, adding one eastbound left-turn lane, adding two eastbound right-turn lanes, adding one northbound left lane, one westbound left-turn lane and a southbound to westbound right-turn ramp. Cost Estimate: $352,100 ~ w a: i < 1 ' (.) ' '-_, w ~ -- J r -- -it -it ~ ~ t t i-FARADAY AVENUE SCHEMATIC OF PROPOSED IMPROVEMENT AT 0 =E=L=C=A=M=l.:.:N_ =o_ ..:._R-:..E=:.A-:..L=:..:..:A_T-:_..:.F.;.A=R.:A_-:.=.o.:A:Y:_A~V-=-E ____ -:..-:..-:..-:..-:..-_-:..-:..-:..-:..-_-:..-:..-_-_-_-_-_-__,-fll:l -96- EXHIBIT Y Palomar Airport Road at Paseo del Norte It is projected that this intersection will operate at Level of Service D and F during the morning and afternoon peak periods, respectively, for buildout conditions. The necessary improvements to allow this intersection to operate at an acceptable level of service will include restrlpinq the southbound through lane for an optional through plus left-turn lane. These improvements will result in a Level of Service D for both the morning and afternoon peak periods. See Fiqure Below. Cost Estimate: -0-(Restriping costs only) VACANT RESTAURANT - r -- SERVICE ST A TION SERVICE ST A TION SCHEMATIC OF PROPOSED IMPROVEMENTS ,6. .... P...;.A=-LO=-M_A_R_A_I_R_P_O_R_T_R_O_A_D_A_T_P_A_S __ E_O ____ D_E __ L __ N __ Oa..;.R ..... T __ E _______ ___.n.lL ------------------------------- -97- - Timing and Financing of Mitigation Each of the needed improvements have been separated into four categories which indicate a specific· time range for the improvements to be made. ·These categories are more specific than the three levels of analysis which were done for the Barton- Aschman Traffic Study. Those were existing, existing plus committed, and buildout. Exhibit Z, "Circulation Improvement Costs," on Page 100 summarizes these categories~ The matrix classifies all improvements in projected to be 1991, 1994, 1998, terms of the year in which the improvement is needed, i.e., specific improvements needed by and 2013. The exhibit further identifies the estimated cost and financing options available to provide each of the improvements. A summary shows the cost estimate to complete the improvements identified in each category as follows: 1. 2. 3. 4. Constructed Construct.ed Constructed Constructed Total by by by by 1991 $17,139,000 1994 200,000 1998 540,000 2013 7,524,000 $25,655,100 These cost estimates will be reviewed and updated as improvement plans are prepared. Exact timing of these improvements has been related directly to staff's phasing of the Zone. There is the potential for this schedule to be modified as individual development projects are proposed which vary from staff's projected phasing. Under whatever phasing scenario actually occurs, the adopted performance standard will be maintained or no development shall be allowed to proceed. The financing of these needed circulation improvements can be acomplished through a number of available financing alternatives. Each alternative will have different advantaqes and disadvantages which must be evaluated prior to selecting the best method for a given improvement. The specific advantages and disadvantages change over time so that selecting a precise financing method today for a future improvement may create unforseen consequences. For that reason, staff has developed a flexible financing matrix which priortizes the best financing opt ions available . t-oday for each needed improvement as identified. Other financing options may be available and more appropriate as these improvements are needed in the future. -98- Wherp the City is currently collecting a fee for a specific improvement, this financing source has been identified as the City's first priority. However, because there ls a laq time between fees collected and the need for improvements, funds from these sources may not be available to finance an improvement concurrent with need. Therefore, another source must be found such as a developer contribution or some other innovative financing alternative. If no other options exist, then development must wait until the City can finance the improvement. This plan will establish a sound basis for the City to ensure needed circulation improvements are made in accordance with the adopted performance standard. It also sets in place adaptable financing options that can be used to select the best alternative funding mechanism available when the improvement ls needed. -99- I .... 0 0 I CIRCULATION 1~¥ROVEMENT COSTS PROJECT TO BE CONSTRUCTED BY 1991 1 I-5/PALOMAR AIRPORT ROAD BRIDGES 2 PALOMAR AIRPORT ROAD/ROAD SEGMENT (PASEO DEL NORTE TO CAMINO VIDA ROBLE) 3 PALOMAR AIRPORT ROAD/ROAD SEGMENT (EL CAMINO REAL TO EAST CITY LIMITS) TOTAL COSTS BY 1991 TO BE CONSTRUCTED BY 1994 1 EL CAMINO REAL/KELLY DR. TOTAL COSTS BY 1994 ========================================= TO BE CONSTRUCTED BY 1998 -----------------------------------------1 EL CAMINO REAL/FARADAY 2 EL CAMINO REAL/PALOMAR AIRPORT ROAD 3 EL CAMINO REAL/TAMARACK* 4 PALOMAR AIRPORT ROAD/PASEO DEL NORTE TOTAL COSTS BY 1998 ========================================= TO BE CONSTRUCTED BY 2013 -----------------------------------------1 EL CAMINO REAL/CANNON RD. 2 EL CAMINO REAL/COLLEGE 3 PALOMAR AIRPORT ROAD/COLLEGE 4 PALOMAR AIRPORT ROAD/EL FUERTE 5 PALOMAR AIRPORT ROAD/MELROSE 6 PALOMAR AIRPORT ROAD/EL CAMINO REAL 7 PALOMAR AIRPORT ROAD/YARROW 8 EL CAMINO REAL/FARADAY 9 PALOMAR AIRPORT ROAD/ROAD SEGMENT (EL CAMINO REAL TO EAST CITY LIMITS) TOTAL COSTS BY 2013 COST 7,989,000 7,300,000 1,750,000 17,039,000 ---------------------- 200,000 200,000 ---------------------- 50,000 170,000 270,000 50,000 -----------540,000 ---------------------- 35,500 74,500 145,400 109,900 184,200 37,200 37,300 352,100 6,900,000 7,876,100 FINANCING PRIORITIES OPTION 1 BRIDGE DIST. DEVELOPER DEVELOPER -------------------------- T.I.F. -------------------------- T.I.F. T.I.F. T.I.F. T.I.F. -------------------------- DEVELOPER DEVELOPER T.I.F. T.I.F. T.I.F. T.I.F. T.I.F. T.I.F. DEVELOPER OPTION 2 DEVELOPER ASSESS.DIST. ASSESS.DIS';{'. DEVELOPER -------------------------- DEVELOPER DEVELOPER DEVELOPER DEVELOPER -------------------------- DEVELOPER DEVELOPER DEVELOPER DEVELOPER DEVELOPER DEVELOPER ASSESS.DIST. ==========================================-=============================================== m >< :c m =i N TOTAL IMPROVEMENT COSTS $ 25,655,100 * CONDITIONED UPON DEVELOPMENT IN ZONE 2 101 FIRE * FIRE STATIONS-EXISTING Q FIRE STATIONS-PLANNED (5 minute) FIRE RESPONSE TIME --STATION 1 ,._ -STATION 2 •--STATION 3 ■■• -STATION 4 ,_. ZONE 5 LOCAL FACILITIES -' -I --·-~ o ,,.---I I ZONE 6 MANAGEMENT PLAN -102 - FIRE 0 CH,-otCa,l1hd Growll'I ~ ......... P,◊Qll'a,n JANUARY 1887 L O CAL . FA C I L IT I ES MAN ·A G E M E N T PL A N -Zone 5 BUILDOUT PROJECTION DEMAND EXISTING * ** APPROVED C, z -"' < :c 0. FUTURE ** FIRE SUMMARY SHEET ADEQUACY SUPP.LY (CGNmmr» wlStln:lard) * * ** ** ** ** MITIGATION * ** ** * Based on the existing performance standard no fire station is . required for this non-residential zone •. FUNDING * ** ** ** Based on the proposed non-residential fire service performance standard, the construction schedule for Fire Station No. 5 shall be required to be accelerated so that construction wfll begin to assure an opening date projected for early 1989. -103- - FIRE I. PERFORMANCE ·s TANDARD No more than 1,500 dwelling units outside of a five minute response time. Special Considerations Zone 5 is comprised exclusively of non-residential uses. Since it does not include any residential uses, the performance standard does not apply. The Growth Management Program does not identify a Fire service performance standard for non-residential uses. However, as discussed in the attached memorandum (See Appendix 8) the City's Fire Chief recommends that a Fire service performance standard be adopted for the non-residential uses in Zone 5. The suggested Fire service performance standard would require the construction of a fire station based on the following three thresholds: (1) The daily workforce in a non-residential area exceeds 12,000 people. (2) The area is beyond the five minute response time for fire protection. ( 3 ) The Fire Department gallons per minute less. is of unable to provide 1,000 fire flow in 10 minutes or Staff is recommending as part of this zone plan that a Fire Service Performance Standard as outlined in this section be adopted. III. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventory Zone 5 is currently served by Fire Station No. 2 located at 1906 Arenal Road and Fire Station No. 4 located at 6885 Batiquitos Road. A large portion of the zone is not within five minutes of either of these two stations as shown on the exhibit on Page 99. B. Phasing Zone 5 currently has 4,256,609 square feet of industrial, commercial and office uses. This ls approximately 191 of the total buildout of this Zone. A recent Planning Department Survey of all businesses within Zone 5 revealed that 7,820 people work on a daily basis within Zone 5. This equates to approximately one person for every 544 square feet of building. -104- - Based on the phasing program that has been developed for this Zone plan, committed projects will result in an addition81 954,530 square feet of development every year. This will result in an additional work force population of 1,775 on an annual basis. Wit~in two years the workforce population will exceed 12,000. tlased on this ratio of one worker per 544 square feet of structural footage and a buildout· of Zone 5 of 22,196,299 square feet of development, a workforce can be estimated to exceed 40,000 people. This workforce figure is only an estim~te based on the existing ratio of development to the existing workforce. Although, often as industrial parks mature, they tend to shift from manufacturing and warehousing toward more employee intensive office and research and development type uses. c. Adequacy Findings The adequacy findings section will follow a format consistent with the proposed performance standard and be based upon meeting this recommended standard. Work-force Population At the present time there are presently 7,826 people who work in Zone 5 on a daily basis. This work-force population was obtained by a field study conducted by staff. This work-force population is less than that defined on threshold number one of the proposed non-residential fire service performance standard. Fire Response Time Zone 5 is presently served by Fire Station No. 2 which is located at 1906 Arenal Road and Fire Station No. 4 which is located at 6885 Batiquiotos Road. The portion of Zone 5, located south of Palomar Airport Road and east of Palomar Oaks Way lies within the 5 minute response time of Fire Station No. 2. The western portion of Zone 5 is located within the 5 minute response time of Fire Station No. 4. The remainder of Zone 5 is outside of the 5 minute response time of any existing Fire station in Carlsbad. The exhibit on Page 99 shows the portions of Zone 5 that are outside of the 5 minute response time. Fire Flow (1,000 GPM) As mentioned above, the Fire Chief indicates that the Fire Department currenty is not able to provide fire service to much of the already developed portions of Zone 5 within 5 minutes. Nor is the Fire Department currently able to meet the recommended fire flow requirements of 1,000 gallons per minute of fire flow in 10 minutes. The Fire Department would need three engine -105- -companies on gallons per companies in Zone 5 within the scene in less than 10 minutes to provide 1,000 minute of fire flow. Only two of the four enoine Carlsbad could currently reach the development in 10 minuies. Adequacy Findings Summary Based upon the proposed Fire Service Performance Standard two of the three thresholds to measure compliance cannot be made within Zone 5. These are the five minute response time and necessary fire flow requirements. The only threshold measure which does not exceed the proposed standard is that of work-force population. However, based upon the projected phasing, it is anticipated that all three thresholds will be exceeded by early 19&9. At that time it will be necessary to increase the fire service provided to Zone 5. III. MITIGATION A. Special Conditions Staff is recommending that the construction schedule of the proposed Safety Center, Fire Station No. 5 be accelerated. The construction of this station would be required to begin in early 1988 with an opening date projected for January 1989. The financing of this proposed mitigation could be accomplished in two ways. 1. The City Council could include Fire Station No. 5 in the 1987-1988 CIP Budget. This would enable construction of Station No. 5 to begin in early, 1988 with an opening date projected for January, 1989. 2. Developers within Zone 5 could be required to enter into an agreement with the City of Carlsbad for the construction of Fire Station No. 5. This aqreement would require the developers within Zone 5 to fund the construction of Station 5. The construction of this station would be required to start in early 1988 with an opening date projected for January, 1989. Developers may be required to pay for the cost of operating expenses incurred as a result of accelerating the construction schedule of Fire Station No. 5. The proposed performance standard for Fire protection of non-residential property was not included in the Citywide Facilities and Improvement Plan. However, based on the Fire Departments memo contained within Appendix 8, there is ample -106- -- justification to create a performance standard for non- residential development. Most of the development within Zone 5 cannot comply with the proposed standard. It is recommended that if Fire Station No. 5 is not constructed by Januaq', 1989, no further building permits be issued within Zone 5. -107- 108 OPEN SPACE -LOCAL. FACILITIES MANAGEMENT PLAN-Zone 5 BUILDOUT PROJECTION DEMAND EXISTING * * APPROVED C, z -en c( J: a.. FUTU.RE * OPEN SPACE SUMMARY SHEET ADEQUACY SUPPLY (Cu.luin•a w/Standard) * YES * YES * YES MITIGATION N/A N/A N/A FUNDING N/A N/A N/A * Zone 5, as determined in the Citywide Facilities and Improvements Plan will conform to the adopted performance standard at all times as the Zone builds out. -109- OPEN SPACE I. PERFORMANCE STANDARD Fifteen percent of the e~clusive of environmentally must be set aside for permanent concurrent with development. total land area in the zone constrained non-developable land open space and must be available II. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventory During preparation of the Citywide Facilities and Improvements Plan it was determined that certain areas of the City are already developed or meet or exceed the requirements for Open Space and, therefore, an analysis is not needed in the local plan. This includes Zones 1 through 10, as well as, 16. Zone 5 is an infill zone. Approximately 38 per~ent of Zone 5 is vacant. Of thls vacant area only 13 percent is without any existing development approvals. Since Zone 5 is almost completely built out, or has approved but undeveloped projects, the opportunity to create future permanent open space is reduced. Because Zone 5 currently complies with the open space performance standard and the opportunity to create future permanent open space is reduced, -the open space facility for Zone 5 needs no further analysis. The open space in Zone 5 falls into three categories: (1) 68.2 acres designated as open space on the Land Use Element of the General Plan; (2) mini parks and par courses; and (3) expanded landscaped setbacks (50 foot minimum) along major streets and local streets (35 foot minimum) B. Phasing Because Zone 5 with the open space limited opportunity requirements for Open Chapter 21.90.110(d)(2) c. Adequacy Findings is an infill zone which is in compliance performance standard and because there is to increase open space, the phasing Space were not addressed as required by of the Carlsbad Municipal Code. During preparation of the Citywide Facilities and Improvements Plan, it was determined that the adopted performance standards for Open Space in Zone 5 have already been met. III. MITIGATION A. Special Conditions for Zone 5 There are no special conditions which apply at this time. -110- B. Financing Future development within Zone 5 will create additional mini parks and par courses as well as expanded setbacks along major and local streets. It . has been assumed that this development will continue to provide required open space. Therefore, financing was not addressed as required by Chapter 21.90.110(d)(3) of the Carlsbad Municipal Code. -111- 112 SCHOOLS EXISTING • ELEMENTARY • JUNIOR HIGH • HIGH SCHOOL ~ 0 ELEMENTARY □ JUNIOR HIGH 6 HIGH SCHOOL ZONE 5 SCHOOLS ZONE 5 COS!• Do I \ ' ' ' 0 ........ , ' ' \ CltyolC.IHad GrowtPI ~ ~oar•m JANUARY 1887 LOCAL FACILITIES MANAGEMENT PLAN -113 - BUILDOUT LOCAL .FACILITIES MANAGEMENT PLAN-Zone 5 SCHOOLS SUMMARY SHEET ADEQUACY PROJECTION DEMAND SUPPLY (Ccnu.11w.,. wlStandard) MITIGATION EXISTING * * YES N/A * * YES N/A APPROVED C, z -en < J: a. FUTURE * * YES N/A FUNDING ** ** ** * The Carlsbad Unified School District has indicated that there is and will continue to be capacity to meet the school demands generated from Zone 5. ** School fees will be collected at a ratio of $.25/Sq. Ft. of non- residential building area. These fees are anticipated to be adequate and will be used for the construction or reconstruction of new school facilities as required. -114- SCHOOLS I. PERFORMANCE STAND~RD School capacity to meet the projected enrollment within the Zone as determined by the appropriate school district must be provided prior to projected occupancy. I I. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventory Zone 5 falls completely within the boundaries of the Carlsbad Unified School District. The Zone is comprised exclusively of industrial and commerial uses. Although there are no residential uses within Zone 5, industrial and commercial uses have historically generated some demand for school facilities. This demand is a function of convenience or necessity for households with two working parents, whereby employees within the Zone opt for schooling for their children within close proximity to their workplace. The school generation factor for non- residential uses, is not quantifiable. However, the State Government Code Section 53080(b) requires that all new commercial and industrial development pay a school fee in the amount of $.25 per square foot of building area. This fee is to be used for the construction or reconstruction of school facilities necessary to meet the needs of future development. The Carlsbad Unified School District has reviewed the proposed·Local Facilities Management Plan and has indicated their ability to serve the needs of future develop~ent within Zone 5. B. Phasing The following table provides an approximation of the anticipated school fees to be generated through buildout of the Zone. The table is broken down into (A) existing development, (b) approved development and (c) future development. As noted earlier, all non-residential development shall be required to pay a school fee of $.25 per square foot of building area. School Fees Total Sg. Ft. FEE Generated Existing Development 4,256,609 * * Approved Development 9,545,303 $.25 $2,386,325.75 Future Devlopment 8,394,387 $.25 $2,098,596.75 Total 22,196,299 $4,484,922.50 *Ho school fees collected from non-residential uses prior to January 1, 1987. -115- - -- c. Adequacy Findings The Carlsbad Unified School· District is currently providing capacity for the existing demand generated by Zone 5. The School District has indicated its ability to provide capacity to the ultimate buildout of Zone 5. III. A. MITIGATION Financing Future development will continue to pay school fees and no financing options are necessary. The Carlsbad School District has indicated that they can accommodate the additional students generated in Zone 5. The school fees collected will be utilized for the construction or reconstruction of new school facilities as required. -116- 117 SEWER SYSTEM .- CARLSBAD ZONE 5 ZONES SEWER DISTRICTS !'"'"""! : : : : • 5 lnnn111111•u1 ~ . . • ! ! _ ..................... , : I SAN MARCOS : ....... \ 1h11. .s LEUCADIA COUNTY cos,. 0 llYf NHAIN JANUARY 1987 LOCAL FACILITIES MANAGEMENT PLAN -118- .... .... \D ) ZONE 5 ) SEWER SYSTEM --· ,,. ,,. I .-' I ZONE 5B I .... , / \ \ I I \ ZONE 5B / PUMP STATION ~ _,,,) I ANO FORCE MAIN \ ~ ' ~ ' t " ' I' / ,_,,/, ' / ../ , __ _ I '--✓ I ZONE 5A BSM5 -, ~ I I ---------~ SAN MARCOS INTERCEPTOR BUENA INTERCEPTOR ---f//11!!,f////!!, -----, ' -;;;,-BSM6 -,,,,. ' t,;-' PALOMAR BSM7 ,_ -- BSM3 BSM4 I - --:: (..) m. X :c a, =i > ► LOCAL FACILITIES MANAGEMENT PLAN LOCAL-FACILITIES MAN-AGEMENT PLAN-Zone 5 . BUILDOUT PROJECTION DEMAND * EXISTING ** * APPROVED C, ** z -"' < J: '* Ii. FUTURE ** SEWER COLLECTION SYSTEM SUMMARY SHEET ADEQUACY SUPPLY (Co•n--=e w/8tanda,d) ** YES ** NO ** NO MITIGA-TION N/A See Page 123 See Page 123 * Interceptors are not monitored for existing capacity. ** Demand and capacity analysis for critical reaches of the Buena Sanitation and San Marcos Interceptors are shown on Page 125. -120- FUNDING N/A See Page 123 See Page 123 SEWER COLLECTION I. PERFORMANCE STANDARD Trunk line appropriate sewer development. capacity district to meet demand as determined by the must be provided concurrent with II. FACILITY PLANNING AND ADEQUACY ANALYSIS Zone 5 lies entirely within and is served by the City of Carlsbad Sewer Service District. A. Facility Inventory and Description Zone 5, is comprised of primarily industrial land centered along Palomar Airport Road. The Zone, for analysis purposes, has been divided into two primary drainage ·basins. Basin SA, comprising the majority of the Zone, flows into the Encinas Canyon area paralleling -Palomar Airport Road. This basin is served by Buena and San Marcos Interceptors shown on Exhibit AA, Paye 119. These major reqional interceptors are joint facilities constructed by the Buena Sanitation District and the San Marcos County Water District. The second basin, SB, flows to the north into the future South Agua Hedionda Interceptor. Until completion of this interceptor, flows from Basin 58 will be pumped into Basin 5A to be served by the Buena and San Marcos Interceptors. Analysis of Zone 5 is complicated by the fact that the Buena and San Marcos Interceptors serve several agencies as well as Growth Manayement Zones 3, 4, 6, 10, 13, 17, 18 and 20. To simplify the analysis only Carlsbad ownership rights in these major interceptors will be evaluated. B. Service Demand Existing, committed and future service collection demands are shown on Page 124, Sewer Demand Zone 5. Service demands have been divided by drainage basins to facilitate the analysis of sewer line capacity. Facility Analysis Analysis of the City of Carlsbad capacity in the Buena and San Marcos (BSM) interceptors indicates that future demands exceed capacity in Reaches BSM2, 4, 5, 6, 7 and 8. Carlsbad Capacity of the Buena and San Marcos Interceptors, Page 125, shows the future demands and capacities of the City of Carlsbad in these trunks including flows from Zones 4, 6, 10, 17, 18 and 20. -121- Buena Interceptor The Buena Interceptor serving Basin SA was constructed by the Buena Sanitation District in 1963. The line varies in size from an 18-inch pipeline at Palomar Airport Road and El Camino Real to a 30-inch pipeline at the Encina Water Polution Control Facility. The Buena Interceptor is owned by the Buena Sanitation District, which has leased capacity to the City of Carlsbad and the City of Vista. The City of Vista's lease is temporary and will expire in the 1990's. Buena Sanitation District has a minimum capacity of 5.6 million gallons per day (mgd) in this interceptor and they are currently using less than 2 mgd. Flows from the Buena Sanitation District reach this pipeline in a force main from the Buena Pumping Station. The City of CBrlsbad has varying capacity rights in the interceptor beginning at Palomar Airport Road and El Camino Real with a peak capacity of 1.2 mgd increasing to 3.0 mgd in the lower reaches of the pipeline. San Marcos Interceptor The San Marcos County Water District Interceptor serving Basin SA was constructed in 1986. The City of Carlsbad owns peak capacity rights of 5.0 mgd through the gravity section of this pipeline. Carlsbad's ownership begins at El Camino Real near the intersection of Camino Vida Roble and travels parallel to Palomar Airport Road to the Encina Water Pollution Control Facility. At the present time; there are no Carlsbad flows in this interceptor. South Agua Hedionda Interceptor The South Agua Hedionda Interceptor will serve Basin 5B. This interceptor is not yet constructed, therefore a number of facilities are in place to pump flows from this basin into Basin SA. In the future, when the South Agua Hedionda Interceptor is completed, flows will be diverted into this intercepter and the pumping stations will be abandoned. C. Adequacy Findings As shown on Page 125 several reaches in the Buena-San Marcos Interceptor System have capacity exceeded at bulldout of the Zone. To meet the standard to buildout Reaches 2, 4, S, 6, 7 and 8 require additional facilities as discussed below. Reach 2 of the Buena-San Marcos Interceptor is currently at capacity for Carlsbad's ownership and will require. immediate mitigation. Basin SB will be required to insure construction of the South Agua Hedionda Trunk by the year 1995. -122- . III. MITIGATION A. Reach BSM 2 Reach BSM 2 of the Buena -San Marcos I~terceptor System is currently flowing at Carlsbad's capacity ownership Any further development tributary to the Reach will the standards for sewer collection and should be (BSM2) rights. violate mitigated as follows: 1. Additional short and long term capacity should be leased from the Buena Sanitation District and/or 2. Developers enter into an agreement to construct a parallel collection system providing for ultimate capacity. Staff is currently negotiating with the District for leased capacity which is estimated to cost $7,500 per year. Should tt1e City and District fair to reach agreement, any further development will be requ~red to constr~ct a parallel system to be in operation prior to occupancy of the proposed development. Estimated cost of the parallel interceptor is $200,000. B. Reaches BSM 4, 5, 6, 7 and 8 These reaches. are projected to exceed capacty in various amounts as indicated on Page 125, Carlsbad Capacity in the Buena- San Marcos Interceptor. No development should be allowed until adequate capacity is available for the various reaches. It is currently envisioned that it will be many years if ever before additional capacity will be required. That additional capacity can be obtained through leasing or participation in a new regional interceptor. Should Carlsbad be required to construct an independent parallel system the estimated cost is $750,000. This would be funded through sewer connection fees. South Agua Hedionda Interceptor Adequate financial mechanisms should be developed to secure construction of the South Agua Hedionda Interceptor from El Camino Real to the Encina·Water Pollution Control Facility before further development of Basin 5B is approved. IV. Financing Construction of adequate facilities must be secured by developers prior to approval of further development. Payment for facilities should include direct construction with reimbursements, fee collections or assessments. A financial program involving fees and assessments should be completed for Basin 5B to ensure completion of the South Agua Hedionda Interceptor by 1995 prior to approval of further development. -123- ) SEWER DEHAND ZONE 5 Drainage Basin Demand Status Land Use Square Feet Subbasin SA Buena Interceptor Existing Sen Marcos Commercial 33,432 Interceptor Industrial 2,984,168 Committed Commercial 756,201 Industrial 7,030,447 Future Commercial 111,078 Industrial 4,268,791 Subbasin SB South Agua Existing Hedionda Commercial ---- Interceptor Industrial 1,239,009 Committed Commercial 130,680 Industrial 1,627,957 Future Commercial ---- Industrial 3,903,440 I, EDUs Equivalent Dwelling Units Demand (EDUs) 19 1,658 420 3,906 62 2,372 --- 688 73 904 --- 2,169 Demand Totals (EDU's) 8,437 3,834 ) m X :c m =i > > .... N U1 Carlsbad Capacity in the Buena Interceptor and San Marcos Interceptor (Based on 246 gallons per EDU and a peaking factor of 2,0) Capacity Existing and Projected Flows EDUs EDUs Section Buena San Marcos Total Exist Approved 6 Future 7 Exist Interceptor Interceptor BSH 1 2,439 ---2,439 7961 2, 105 I 2,420 --- BSH 2 2,642 ---2,642 2,261 4,126 4,659 --- BSH 3 ---10,163 10,163 ------5,814 --- BSH 4 2,642 10,163 12,805 2,365 7,438 l 13,525 2 --- BSH 5 3,049 10,163 13,212 2,365 7,550 13,924 2 --- BSH 6 4,472 10,163 14,635 2,365 8,558 16,615 3 --- BSM 7 5,285 10,163 15,448 2,365 8,558 16,615 4 --- BSM 8 6,098 10,163 16,261 5,430 11,653 20,237 5 --- 1 • Includes some flow from Basin SB. 2. Includes flows from Zones 6, 10, 17 and 18, 3. Includes flows from Zones 6, 10, 1 7, 18 and 20, 4. Includes flows from Zones 6. 10, 13, 17, 18 and 20. 5. Includes flows from Zones 4. 6, 10, 13, 17, 18 and 20, 6. Includes existing. 7. InclQdes existing and approved, Deficit Approved --- 1,484 --- --- --- --- --- --- Future --- 2,017 --- 720 712 1,980 1,127 3,976 ) m )( :::c -m -I m m 126 WATER SYSTEM -- .• - ZONE 5· ZONE 5 WATER SERVICE DISTRICTS / OLIVENHAIN :•n111111111111111 J :SAN MARCOS i ~........................... 1111 ·: = I = ... ", 1~ ~ ~ JANUARY 11187 LOCAL FACILITIES MANAGEMENT PLAN -127- .... N 00 I ) EXISTING RESERVOIR -EXISTING WATER FACILITIES & EXISTING PRESURE REGULATING STATIONS PROPOSED WATER FACILITIES fci. PROPOSED PRESSURE REGULATING STATION ZONE 1.1 ZONE .t ZONE 5 LOCAL . ., I I . i ! ·-· .. ·-·-·-i . ZONE 11 FACILITIES ) WATER DISTRIBUTION SYSTEM ········· I 42• •••••••••••••••• -·-·-·• ·····•· . -·-· -;········ I -\-I -• I ~--·--~ -\~ I ZONI 11, ,e· ZONi I0 ZONE 20 t (.11yolC.,t1blll G,o .. , ..... _,,,....,1Pt09tl"' JANUARY 1987 MANAGEMENT PLAN BUILDOUT LOCAL "FACILITIES MAN-AGE ME NT PLAN-Zone 5 WATER DISTRIBUTION -SYSTEM SUMMARY SHEET ADEQUACY PROJECTION DEMAND SUPPLY (CaltGu•.,. wl8hnlard) MITIGATION FUNDING EXISTING * * YES N/A APPROVED C, * * YES N/A z -"' < J: Q. FUTURE ** ** YES N/A * The Costa Real Water District has capacity to meet the existing demands of Zone 5. ** All development will be conditioned to install adequate domestic water and fire flow needs to ensure conformance with the adopted performance standard. The Costa Real Municipal Water District will also collect fees for capital improvements. -129- N/A N/A N/A WATER DISTRIBUTION SYSTEM I. Performance Standard Line appropriate development. capacity to meet water district must demand as determined by the be provided concurrent with A m1n1mum 10 day average storage capacity must be provided prior to any development. II. Facility Planning and Adequacy Analysis A. Inventory and Description ~ater service in the City of Carlsbad is provided by three independent agencies: Costa Real Municipal Water District, San Marcos County Water District, and the 0livenhain Municipal Water District. Water service for Zone 5 is provided entirely by the Costa Real Municipal Water District. Costa Real Municipal Water District has identified those facilities which exist or are required to be added, upgraded and improved in order to meet the needs of future growth within their service area. The existing and future facilities shown on map "Water Distribution System" on Page 128 indicate the required improvements necessary to provide domestic water and fire flows needs for development in Zone 5. As development occurs, certain facilities are required to be improved, upgraded, or added to serve the buildout needs of Zone 5. As identified by the Costa Real Municipal Water District, these improvements will be financed by the districts capital improvement budget. Revenue for that budqet is collected directly from diveloper fees. b. Phasing The performance standard indicates that line capacity must meet demand as determined by the appropriate water district. The Master Plan for public water systems adopted by Costa Real Municipal Water District indicates certain facilities required to serve this Zone. A number of these improvements will be required as a condition to the approval of development projects. The owner of the affected property will be req~ired to install adequate water facilities to serve that particular project. The remainder of the requried improvements will be installed either by the water district or attached to approved assessment district improvements initiated by the City of Carlsbad. -130- The Costa Real Municipal Water District will determine which facilities are necessary when development occurs in Zone 5, therefore no phasing is required. C. Adequacy Findings The Costa Real Municipal Water District service to Zone 5 conforms with the adopted performance standard. Since the water district will condition development to install adequate domestic water and fire flow needs as a condition to future development, conformance with the adopted performance standards will be maintained to the ultimate buildout of Zone 5. I I I. MITIGATION A. Special Conditions for Zone 5 All development within Zone 5 shall pay the. required Costa Real Municipal Water District fees. B. Financinq Remaining facilities and improvements in Zone 5 will be financed by the Costa Real Municipal Water District's capital improvement budget. Revenues for that budget are funded from water enterprise funds charged by the district. -131- 132 APPENDICES APPENDIX 1 (_ -133- ( ADT Average daily daily vehicle trips associated region. GLOSSARY trips. generated A guide of average, or estimated from a specific project or APN Assessor's Parcel Number. A portion of the legal description which specifically identifies each parcel of land. Buildout The year when the City of Carlsbad is completely developed with all associated public facilities in place. Bridge and Thoroughfare Benefit District -A district established to fund major thoroughfares and bridge improvements. These bridge improvements are at I-5, Palomar Airport Road, Poinsettia Lane, and La Costa Avenue. See Exhibit S, Page 125. CIP -Abbreviation for Capital Improvement Program. Community Park 20 -50 acres in size; designed to serve the broad recreational needs of several neighborhoods; located adjacent to secondary arterial or greater; publicly owned. Demand -The amount of needed facility generated within the zone, quadrant, or City based upon the adopted performance standard. DU -Abbreviation for dwelling unit. EDU Equivalent dwelling unit. The average amount of sewage generated by a single family household per day. Commercial and industrial developments are also converted into EDU's to assess their direct impact upon facilities. Environmentally Constrained Lands -Beaches, wetlands, floodways, other water bodies, riparian and woodland habitats, slopes greater than 25%, major roadways, railroad tracks, and major powerline easements. 134 C General Plan Density Ranges Residential Land Use Allowed Units Per Acre RL RLM RM RMH RH -Residential Low -Residential Low-Medium -Residential Medium -Residential Medium-High -Residential High Growth Management Control Point 0 -1.5 0 -4.0 4.0 -8.0 8.0 -15.0 15.0 -23.0 Residential Land Use Allowed Units Per Acre RL RLM RM RMH RH 1. 0 3.2 6.0 11 • 5 19.0 Established based upon the overall average land use yield in each designation or the midpoint of the density range. ICU -Abbreviation for Intersection Capacity Unit. The ratio of traffic demands to be placed on an intersection in relation to the capacity of an intersection. Level of Service The relative level of operation of an intersection or traffic signal. Level of Service (LOS) A B Description Free flow (relatively). If signalized, conditions are such that no approach phase is fully utilized by traffic and no vehicle waits through more than one red indication. Very slight or no delay. Stable flow. If signalized, an occa- sional approach phase is fully utilized; vehicle platoons are formed. This level is suitable operation for rural design purposes. Slight delay. 135 ICU Value 0.00-0.60 0.61-0.70 C C Level of Service (LOS) C D E F Description Stable flow of operation. If signalized, drivers occasionally may have to wait through more than one red indication. Acceptable delay. Approaching unstable flow or operation; queues develop, but are periodically cleared. Tolerable delay. Unstable flow or operation; the inter- section has reached ultimate capacity; this condition is not uncommon in peak hours. Congestion and intolerable delay. Forced flow or operation. Intersection operates below capacity. ICU Value 0.71-0.80 0.81-0.90 0.91-1.00 1.00+ Derived from: Highway Capacity Manual, HRB Special Report 87. MGD Million gallons a day. A term used to describe flow of water or sewage. Net Vacant Acres Obtained by subtracting all of the 100% _c_o_n_s_t,_r_a_i_n_e_d-,-_a_c_r_e_s_ and one-half of the areas shown as 25-40% slopes. Industrial and commercial development were then multiplied by .4 to determine net acreage (this allows for all regulations which affect overall lot coverage). Open Space Pocket parks, homeowner ball fields, planned residential development (PRO), common areas, tennis courts, or other areas containing passive or active recreational facilities, such as major power line easements. PIL Park-in-Lieu Fee. A fee paid prior to the issuance of building permits in lieu of land dedication for park purposes. PFF -Public Facility Fee. A 2.5% fee paid prior to the issuance ~ building permits. All proceeds from this fund are used for the purpose of acquiring, building, improving, expanding and equipping public property, improvements, and facilities. 136 C (_ C. Special Use Area -1-5 acres in size; a local facility of only one or two activity type uses, i.e., tennis court, swimming pool, etc. TIF Traffic Impact Fee. A fee paid at issuance of building permits for various traffic circulation improvements. The City is divided into two fee categories: 1) The La Costa area and 2) the remainder of the City. See Exhibit T, on Page 126. Turn Key Facility -a facility constructed by developer(s) and turned over or dedicated to the City after its completion. 137 (_ C TRAFFIC IMPACT FEE 5 POINSETTIA LN ,. 1111111 AREA BOUNDARY ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN -138- --•~-MELROSE AVE CllyolC••- Qrowtf'I Maneoam• Proa,am II JANUARY 1887 C BRIDGE & THOROUGHFARE DISTRICT ~ DISTRICT BOUNDARY ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN -139- ~~MELROSE "~~7 AVE Clly ol C•IINII O,owH1 Manaoeffieftl llroo,am n JANUARY 1987 APPENDIX 2 -140- l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ii I' 181 1 11 19 !I 20/i 21 22 23 24 25 26 27 28 '1PDINANCE NO. 9808 ----- AN ORDINANCE OF THE CITY COUNCIL OF THE CITY CF CAFL~BAD, CALIFOP~IA AMENDING TITLE 21 OF THE CARLSBAD ~UNICIPAL C0DE RY. THE ADnITION OF CHAPTER 21. 90 ESTABLISHING A GROWTH MANAGE~1f.~JT PROGRAM FOR THE CITY The City Council of the City of Carlsbad, California does ordain as follows: SECTION 1: That Title 21 is amended by the addition of Chapter 21.90 to read as follows: Sections: 21.90.010 21.90.020 21.90.030 21.90.031 21.90.032 21.90.033 21.90.040 21.90.050 21.90.060 21.90.070 21.90.080 21.90.090 21.90.100 21.90.110 21.90.120 21.90.125 21.90.130 21.90.140 21.90.150 21.90.160 21.90.170 21.90.180 21.90.190 "Chapter 21.90 Growth Management Purnose and intent. Definitions. General prohibition, exceptions. Tolling of time for consideration of applications submitted before the effective date of this chapter. Tolling of expirition of previou~ly issued development permits. Extensions of prior approvals prohibited. Comoliance with this· chapter required. Establishment of local facilities management fee. Special provisions for buildinq pe~its issued during temporary moratoriuro. Finding of health, safety and welfare necessary for the fees imposed by sections 21.90.050 and 21.90.060. Performance standard. Citywide facilities and improvements plan. Local facilities management zones. Contents of local facility management plans. Facilities management olan preoartion. Facilities management plan processing. Implementation of facilities and improvements requirements. Obiigation to pay fees or install improvements required by any other law. Implementing guidelines. Exclusions. Council actions, fees, notice. Expiration of chapter. Severability. 1. 141 I 'I 6 7 8 9 10 11 12 13 14 15 16 17 i, 181) 1911 20 Ii 21 22 2:3 24 25 26 21.90.010 Puroose and intent. (a) It is the policy of the City of Carlsbad to: (1) Provide cruality housincr opportunities for all economic sectors of the community; (2) Provide a balanced community with adeauate commercial, industrial, recreational and open space areas to support the residential areas of the City; (3) Ensure that public facilities and i~provements meeting City standards are available concurrent with the need created by new development; (4) Balance the housinq needs of the reqion against the public service needs of C~rlsbad residents and available fiscal and environmental resources; · (5) Encourage infill development in urbanized areas before allowina extensions of public facilities and improvements to areas which have yet to be urbanized; (6) Ensure that all development is consistent with the Carlsbad qeneral plan; (7) Prevent growth unless adeauate public facilities and· imorovements are provided in a phased and logical fashion as reauired by the general plan: .- (8) Control of the timing and location of development by tyinq the pace of development to the provision of public facilities and improvements at the times established by the citywide facilities and improvements plan. (b) The City Council of the City of Carlsbad has determined despit• previous City Council actions including but not limited to, arnendroents to the land use, housing, and parks and recreation elements of the general plan, amendments to City Council Policy No. 17, adoption of traffic imoact fees, and modification of park dedication and improvement requirements, that the demand for facilities and improvements has outpaced the supply resulting in shortages ~n public facilities and improvements, includinq but not limited to streets, parks, open space, schools, libraries, drainage faGilities and general governmental facilities. The City Council has further determine that these shortages are detrimental to the public health, safet and welfare of the citizens of Carlsbad. (c) This chapter is adopted to ensure the implementation of the policies stated in subsection (a), to eliminate the shortages identified in subsection (b), to ensure that no development occurs without providing for adeauate facilities and improvements, to regulate the pace of development thereby ensuring a continued supply of housing over a period of years and to continue the auality of life for all economic sectors of the Carlsbad community. (d) This chapter will further the policies, goals and objectives established herein by reauirinq identification of all public facilities and improvements required for development, by prohibiting development until adequate provisions for the public facilities and improvements are made by developers of projects within the City, and by giving development priority to areas of the City where public facilities and improvements are already in place (infill areas). 2. 142 l 2 3 4 5 6 7 81 11 12. 13 14! 15 161 II 17 ii ,, ,, 18 ii ii 19 ij 11· 2011 'I 21 ti 22 !1 23 24 i 2s Ii 2e ii II 27 ii Ii 28 ii I I (e) This chapter replaces the temporary moratorium on processing and approval of develop~ent projects imposed bv City Council Or~inance No. 9791. 21.90.020 Definitions. (a) Whenever the following terms are used in this chapter they shall have the meaning established by this section unless from the context it is apparent that another meanino is intended: · (1) "Citywide facilities and improvements plan" means a plan prepared and approved according to Section 21.90.090 identifying those facilities and improvements required on a citywide basis to serve the projected population of the City as established by the general plan and providing an outline and budget for financing certain facilities and improvements which will be provided by the City. (2) "Development permit" means any permit, entitlement or approval whether discretionary or ministerial issued under Title 20 or 21 of this code and any legislative actions such as zone chanqes, general plan amendments, or master plan approval or amendment. (3) "Development" means any use to which land is put, building or other alteration of land and construction incident thereto. ( 4) "Fae i 1 it ies" means any schools, parks, open space, or recreational areas or structures providing for fire, library, or govern~ental services; identified in a facilities management plan. (5) "Improvement" includes traffic controls, streets and highways, including curbs, gutters, and sidewalks, bridges, overcrossings, street interchanqes, flood control or storm drain facilities, sewer facilities, water facilities and lighting facilities. (6) "Local facilities management plan" means a facilities management plan defined by Section 21.90.120 for a local facilities management zone which is established according to.Section 21.90.100. 21.90.030 General rohibition, exce tions. a Unless exempted by the provisions of this chapter no application for any building permit or development permit shall be accepted, processed or approved until a citywide facilities and improvements plan has been adopted and a local facilities management plan for the applicable local facilities management zone has been submitted and approved according to thi chapter. (b) No zone change, general plan amendment, master pla amendment or specific plan amendment which would incease the residential density or development intensity established by the general plan in effect on the effective date of this chapter shall be approved unless an amendment to the citywide facilities management plan and the applicable local facilities management plan has first been approved. 3. 143 C C ii I l 21 4 5 6 7 8 9 10 11 12 13 l4j isl I I 161 I 171 :I I, 18 i I 19 I 2011 21 22 23 24 25 26 27 I 281 ' (c) The classes of projects or pernits listed in this subsection shall be exempt from the provisions of subsection (a). Development permits and building permits for these projects ·shall be subject to any fees established pursuant to the citywide facilities and improvement plan and any applicable local facilities management plan. (1) Redevelopment projects. (2) Projects consisting of the construction or alteration of a single dwelling structure for a family on a lot owned by the family intending to occupy the structure, or not to exceed one nonowner-occupied house per individual for one or more lots owned prior to July 20, 1986. (3) Building permits and final maps for proiects identified in Section 2(F) of Ordinance No. 9791 (projects· for which construction had commenced and were desiqnated on the map marked Exhibit A to Ordinance No. 9791 "as developing"). (4) Building permits for projects for which all required development permits were issued or approved on or before January 21, 19-86. If all reauired development pernits were. issued for a portion of the project only, the exemption shall apply to that portion. (5) Building pernits for projects for which all required development permits were issued or approved before July 20, 1986 and for which building permits could .have been issued under Ordinance No. 9791. If all required development permits were issued for a portion of the project only, the exemption shall apply to that portion. (6) Commercial and industrial projects with approved develop~ent permits or with a complete application on file with the City prior to June 11, 1986 for such permits. N~w permits for commercial and industrial projects located within an area that has been previously approved for such uses may also be processed and approved. · ( 7) Projects by nonprofit entities for structures and uses for youth recreational, educational or guidance programs such as boys and girls clubs or private schools. (8) Zone changes or general plan amendments necessary to accomplish consistency between the general plan and zoning, to implement the provisions of the Local Coastal Plan or which the City Council finds will not increase the public facilities or services and which are initiated by the City Council or Planning Commission. (9) Public utility facilities and improvement projects without accommodations for permanent employees are exempt from the provisions of this chapter unless the City Council determines they are of sufficient size and scale to impact public facilities. · (10) Adjustment plats. (11) Development permits for minor subdivisions located in the northwest quadrant of the City as defined in Ordinance No. 9791. Building permits for commercial or industrial construction on lots in such subdivisions may be approved. Residential building permits will not be approved for lots in such subdivisions unless otherwise exempt under this 4. 144 C 3J 4 5 6 7 8 9 10 11 12 13 14( 15 I 16i I 171 1sij 1, 19 ~I 2oli 1! 21 22 23 24 25 26 27 28 chapter except one permit for a nonowner-occupied lot may be approved for each such subdivision. (d) The provisions of this subsection apply to final .maps and other developrr,ent permits for projects with a tentative map approved before July 20, 1986 which are not included in the exemptions listed in subsection (c). (1) If a tentative map or tentative parcel map was approved on or before January 21, 1986 then, after approval of the citywide facilities plan, a final map or parcel map ~ay be processed and approved before the adoption of a local facility management plan. The expiration period for those tentative maps shall be tolled until the citywide plan is adopted. The expiration of any development permits issued in conjunction with those maps shall be tolled until the applicable local facilities management plan is approved or, two years after the date the citywide plan is approved, whichever occurs first. (2) If a tentative map or tentative parcel map wa approved after January 21, 1986 and before July 20, 1986, but th approv 1.i. of fi.nal map or parcel map was prohibited by Ordinance No. 9791 then approval of final maps and parcel maps is prohibited until after preparation of the applicable local facilities management plan. The expiration period of those tentative maps and tentative parcel maps, and any other development permits issued in conjunction with the maps shall be tolled until the local facilities management plan is approved, or two years after date the citywide facilities and improvements plan is approved, whichever occurs first. (e) The exemption for projects listed in subsection (c (3), (4), (5), and (6) shall expire on July 20, 1988. Aftertha date all development permits for those projects shall be fully subject to the provisions of this chapter. The exemptions for projects listed in subsection (c) (3), (4), (5), and (6) shall apply only so long as the facilities and improvements required a a condition to the issuance of final development permits have been installed or are being installed pursuant to a secured agreement. Any breach of such secured improvement agreement shall subject any remaining building permits for the project to the provisions of subsection (a). (f) Final or parcel maps for projects listed in subsection (c) (3), (4), (5), (6) and (7) which comply with all the requirements of the Subdivision Map Act and Title 20 of this Code which were fil.ed with the City before July 20, 1986 may be approved by the City Council, or City Engineer as appropriate, after July 20, 1986. Upon approval, those projects shall be subject to the exemption of subsection (c). (g) The City Council may authorize the processing of and decision making on building permits and development permits for a project with a master plan approved before July 20, 1986 subject to the following restrictions: (1) The City Council finds that the facilities an improvements required by the master plan are sufficient to meet the needs created by the project and that the master plan developer has agreed to install those facilities and improvement to the satisfaction of the City Council. s. 145 l 4 5 6 7 8 9 10 11 12 13 14 1 15 16 17 18 19 20 Ii 21il 11 221 2:3 24 25 26 27 28 (2) The master plan developer shall agree in writing that all facilities and improvement requirements, including but not limited to the payment of fees established bv the citywide facilities and manaqement plan and the applicable· local facilities management plan shall be applicable to development within the master plan area and that the master plan developer shall comply with those plans. (3) The master plan establishes an educational park and all uses within the park comprise an integral part of the educational facility. (4) Building permits for the 129 unit residential portion of Phase I of the project may be approved provided the applicant has provided written evidence that an educational entity will occupy Phase I of the project which the City Council finds is satisfactory and consistent with the goals and intent 0 the approved master plan. (5) Prior to the approval of the final map for Phase I the master plan developer shall have agreed to participate in the restoration of a significant lagoon and wetland resour·ce area and made any dedications of. property. necessary to accomplish the restoration. (h) After making the findings in paragraph 1 the City Council may authorize the processing of and decision making on master plans subject to the reauirements of paragraph 2. After the grant of the easement required by subparagraph (h)(iv) the tentative map for Phase I of the project, the site plan for the commercial development and the local coastal plan amendment may also be processed and approved. If such approvals a_re granted and, subject to all other provisions of this code, grading and building permits for construction of the golf course and first phase of the commercial portions of the project may be processed and approved. · The processing and approval of all other developments and building permits within the master plan shall not occur unti after the citywide facilities plan and the local facilities management plan have been adopted by the City Counci 1. (l)(i) That the master plan will provide all necessary public facilities for the project and will cure any facilities deficits in the area affected by the project. (ii) That the approval will not prejudice the preparation of the citywide facilities plan and will improve the level of public facilities and services in the area. (iii) That by the dedication of land and the construction of public improvements the project will make a significant contribution to the public facilities needs of the city and provide for the preservation or enhancement of si9nificant environmental resources. (2)(i) The master plan shall include all of the information required by and implementing the provisions of Sections 21.90.090 and 21.90.110 for the area covered by the master plan. (ii) The applicant shall agree in writing that al facilities and improvement requirements, including but not limited to the payment of fees established by the citywide 6. 146 C. l 2 3 4 5 6 7 81 9 10 ll 12 13 14 15 I 161 171. 1811 19 Ii 20/1 21 22 23 24 25 26 ~n I 28 facilities and improvement plan and the applicable local facilities management plan shall be applicable to development within the master plan area and that the master plan developer shall comply with those requirements. . (iii) The master plan applicant shall agree to participate in the restoration of a significant laqoon and wetland resource area. -' (iv) Prior to any processing on the master plan the applicant shall grant an easement over the property necessary for the lagoon restoration and the right-of-way necessary for the widening of La Costa Avenue and its intersection with El Camino Real. 21.90.031 Tolling of time for consideration of applications sub~itted before the effective date of this chapter. After approval of the citywide facilities and improvement plan and the applicable local facilities manaqement plan applicati9ns for development permits which were accepted as complete before the effective date of this chapter shall have processing priority in relationship to the acceptance date. Until the approval of the plans all a?plicable time limits for processing the development permits shall be tolled. 21.90.032 Tolling of expiration of previously issued development permits. If a discretionary development permit, other than a development permit issued in conjunction with a subdivision map, issued prior to July 20, 1986 has an expiration period within which building permits must be issued and the issuance of building permits for the project is prohibited by this chapter then the expiration period shall be tolled until the aoplicable local facilities management pla·n is approved, or two years after the date the citywide plan is approved, whichever occurs first. 21.90.033 Extensions of erior alprovals erohibited. After approval of an applicable ocal facilities management plan an extension of the expiration date of any development permit shall not be granted unless the extension is found to be consistent with the plan. The decision making body considering an extension may condition the extension upon compliance with the citywide plan and applicable local facilities management plan. 21.90.040 Com liance with this cha ter. a No development permit sha 1 be approved unless the approving authority finds that the permit is consistent with the citywide facilities and improvements plan and the applicable local facilities management plan. To ensure consistency the approving authority may impose any condition to the approval necessary to implement the plans. (b) No building permit shall be issued unless the fees required by this chapter, and any applicable local facilities management plan fees are first paid, and the permit is consisten 7. 147 (_ 3 4 5 6 7 8 9 10 11 12. 13 14 15 16 1 I l7j " ,. 1811 I' 1! 19 Ii 20 II 21 22 23 24 25 I ! 2~ I 21 I ii 281 with the applicable local facilities management plan. As a condition to the issuance of any building permit pursuant to Section 2l..90.030(c) the applicant s·hall agree to pay the appropriate fees within 30 days of the date each fee is established. (c) The requirements of this chapter are imposed as a condition of zoning on the property to ensure implementation of and consistency with the general plan and to protect the public health, safety and welfare by ensuring that public facilities an improvements will be installed to serve new development prior to or concurrently with need. fee. 21.90.050 Establishment of local facilities management (a) A local facilities management fee is hereby established to pay for improvements or facilities identified in local facilities management plan which are related to new development within the zone and are not otherwise financed by an other fee, cha-rge or tax on development, or are not instal 1,ed by a developer as a condition of a building permit or development permit. •The fee may also be used to pay for that portion of the facilities or improvements identified in the citywide facilities and improvements plan attributed to develoP.ment within the local zone which are not financed by other· means. The facilities management fee shall be paid before the issuance of a building permit. The amount of the fee shall be determined based upon th estimated cost of the facility or improvement designated as necessary to accommodate additional development within the applicable local facilities management zone plus the estimated cost of facilities and improvements identified in the citywide facilities and improvement plan attributable to the local zone. The fee shall be fairly apportioned among the new development. (b) The fee required by this section is in addition to any other means of financing facilities or improvements identified by a local facilities management plan or any other tax$ fee, charge or improvement requirement which may be imposed on·the development of property under the provisions of state law this code or City Council policy. (c) The amount of the fee for a local facilities management zone shall be set by City Council reso_lution after a public hearing, published notice of which shall be given according to Carlsbad Municipal Code Section 21.54.060(2) and Government Code Section 54992. (d) As a condition of any building or development permit application submitted after the effective date of this chapter the applicant shal 1 agree to pay the fee established by this section at the time a building permit is issued. (e) The fee established by this section shall be levie at the time of issuance of a building permit. 21.90.060 Special provisions for building permits issued during tem1orary moratorium. (a) . App icants for projects for which building permits were issued after January 21, 1986 and before July 20, 1986 shal 8. 148 C l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18/i 19 Ii Ii 20 Ii 2111 22 23 24 25 26 l?? I, 28 i I I pay the fee established by Section 21.90.050 within 30 days afte~ the amount of the fee is determined by the City Council. Payment shall be made according to the agreement executed by the applicant -pursuant to Section 3 of Ordinance No. 9791. 21.90.070 Findin of health, safetv and welfare necessary or the fees imposed by Sections 21.9 .050 and 21.90.060. (a) The City Council hereby declares that payment of the fee established and imposed by Sections 21.90.050 and 21.90.060 and installation of the facilities and improvements identified in a facilities management plan are necessary to achieve the policies established in Section 21.90.010 and to implement the City's general plan. If the fees are not paid or the facilities or improvements are not installed the public health, safety and welfare will suffer because there will be insufficient facilities and improvements to accommodate any new development. This finding is based upon City Council Policy No. 17, City Council Ordinance No. 9791, and the evidence presented at the public hearings on the ordinance adopting this chapter. (b) If any condition imposed as a conditon of a development permit or building permit pursuant to this chapter i protested then the permit shall be suspended during the period o the protest. ( c) This sect ion is adopted pursuan·t to Government Cod Section 65913.5. 21.90.080 Performance standard. The City Council shall adopt general performance standards for each facility or improvement listed in Section 21,90.090(b) or 21.90.ll0(c). Specific performance standards fo citywide facilities shall be adopted as part of the citywide facilities and improvement plan. Specific performance standards for each zone shall be adopted as part of the local facilities management plan. If at any time after preparation of a local facilities management plan the performance standards established by a plan are not met then no development permits or buildin·g permits shall be issued within the local zone until the performance standard is met or arrangements satisfactory to the City Council guaranteeing the facilities and improvements have been made. 21.90.090 Cit wide facilities and im rovements lan. a To implement the City s general plan by securing provision of facilities and improvements, and to ensure that development does not occur unless facilities and improvements ar available the City Council shall adopt by resolution a citywide facilities and improvements plan. The plan shall: Identify all facilities and improvements necessary to accommodate the land uses specified in the general plan and by the zoning: specify size, capacity and service level performance standards for the identified facilities and improvements: establish specific time tables for acquisition, installation and operation of the facilities and improvements correlated to projected population 9. 149 C 6 7 8 9 I 10! 11 12 13 14 15 16i i 171, 1aj 1 11 19 !I 2011 21 I' I 22 23 24 25 26 271 28 growth, facility and improvement performance standards, and projected nonresidential development; identify the financing method or methods for each facility and improvement; and establish -a facility and improvement budget for those faci 1 it ies or improvements which will be constructed or financed by the City. The plan shall encourage infill development and reduce the growth inducing impact of premature extension of facilities or improvements to undeveloped areas by establishing priorities for facility and improvement installation or financing. (b) The citywide facilities and improvement plan shall show how and when the following facilities and improvements will be installed or financed as specified in subsection (c). (1) Major sewage transmission systems and sewage treatment plants; (2) Major water transmission lines; (3) Major area wide drainage facilities; (4) Prime and Major arterials; freeway interchanges, bridges or overcrossings; ·-(5) Fire facilities; (6) Governmental administration facilities;· (7) Parks and other recreational facilities; ( 8) Libraries. (c) The plan shall include the following information with regard to each facility and improvement listed in subsectio ( b) : (1) An inventory of present and future requirements for each facility and improvement based upon the performance standard established for each facility and improvement. Cost estimates shall be included. The inventory shall be consistent with the general plan and zoning for the area. (2) A phasing schedule establishing the timing fo installation or provisions of facilities or improvements in relationship to the amount of development activity (e.g. number of dwelling units, number of square feet of commercial space within the service area of the facility or improvement) and the facility and improvement performance standards. (3) A financing plan establishing various methods of funding the facilities and improvements identified in the plan. The plan shall identify those facilities and improvements which would otherwise be provided as a requirement of processing a development project (i.e. requirements imposed as a conditi.on of a development permit) or provided by the developer in order t establish consistency with the general plan or Titles 18, 20 or 21 of this Code, and those facilities and improvements for which new funding methods which shall be sufficient to ensure sufficient funds are available to construct or provide facilitie or improvements when required by the phasing schedule. (d) The City Manager shall prepare and present the pla to the City Council not later than one year from the effective date of this ordinance. 10. 150 C l 2 3 4 5 6 7 8 9 10 . 11 12 131 I 14 15 16 17 181/ 'i 1· 19 If 2oli ii i" 21 !I 221 23 1 24 25 I 26 2, 1 1 I, 28 (e) Amendments to this citywide facilities and improvements plan shall be initiated by action of the Planninq Commissio~ or City Council. 21.90.100 Local facilities management zones. (a) The City Council shall divide the City into facilities management zones. (b) The boundaries of the zones shall be established based upon logical facilities and improvements planninq, construction and service relationships to ensure the economicall~ efficient and timely installation of required facilities and improvements. In establishing zone boundaries the City Council shall also be guided by the following considerations: (1) Service areas or drainage basins; (2) Extent to which facilities or improvements are in place or available: plan areas: (3) Ownership of property: (4) Boundaries of existing zoning master plans; .. ( 5) Boundaries of pending zoning master plans: (6) Boundaries of potential future zoning master (7) Boundaries·of approved tentative maps: (8) Public facilities relationships, especially the relationship to the City's planned major circulation network: (9) Special district service territories: (10) Approved fire, drainage, sewer, or other facilities or improvement master plans. (c) The zones shall be established by resolution after a public hearing notice of which is given pursuant to Section 21.54.060(2) of this code. 21.90.110 Contents of local facility management plans. (a) A local facilities management plan shall be prepared for each facility zone and shall cover the entire zone. (b) The plan shall consist of maps, graphs, tables, an narrative text and shall be based upon the general plan and zoning applicable within the local zone at the time of plan approval. The local facilities management plan shall be consistent with the citywide facilities and improvements plan shall implement the citywide facilities and improvements plan within the zone. (c) The facilities management plan shall show how and when the following facilities and improvements necessary to accommodate development within the zone will be installed or financed as specified in subsection (d). (1) Sewer systems (2) Water (3) Drainage (4) Circulation (5) Fire facilities (6) Schools (7) Parks and other recreational facilities (8) Open space 11. 151 C C,. .. l 2 3 4 5' 6 7 8 9 10 11 12 13 ,, 14 15 161 171 I 1811 19 Ii 2011 21 I' 22 23 24, 25 I 26 I 2711 'i 2a I ,I (d) The plan shall be consistent with and implement the citywide facilities management plan and general plan and shall include the following information with regard to each facility and improvement listed in subsection (c): (1) An inventory of present and future reauirements for each facility and improvement based upon the performance standard established for each facility. Because improvement reauirements for certain facilities and improvements may overlap zone boundaries a discussion of the need for coordination and a proposed coordination plan for facilities extending from one zone to another shall be included. Cost estimates shall be included. It must be shown that development in the zone will not reduce the facilities or improvements capabilities or create facilities or improvements shortages in other zones or reduce service capability in any zone below the performance standard which is established pursuant to Section 21.90.080. The growth inducing impact of the out of zone improvements shall be assessed. (2) A phasing schedule establishing the timing for installation or provisions of facilities or improvements in relationship to the amount of development activity (e.g. number of dwelling units, number of square feet of commercial space, etc.) for the facilities management zone. The phasing schedule shall ensure that development of one area of the zone will not utilize more than 'the area's prorata share of facility or improvement capacity within that zone unless sufficient capacity is ensured for other areas of the zone at the time of the first development. The phasing schedule shall include a schedule of development within the zone and a market data and. cash flow analysis for financing of facilities and improvements for the zone. The phasing schedule shall identify periods where the demand for facilities and improvements may exceed the capacity and provide a plan for eliminating the shortfall. In those situations when demand exceeds capacity and it is not feasible t increase the capacity prior to development, no development shall occur unless a time schedule for and a means of increasing the capacity is established in the plan. (3) A financing plan establishing various methods of funding the facilities and improvements identified in the pla fairly allocating the cost to the various properties within the zone. The plan shall identify those facilities and ir.lprovements which would otherwise be provided as a requirement of processing a development project (i.e. requirements imposed as a condition of a development permit) or provided by the developer in order t establish consistency with the general plan or Titles 18, 20 or 21 of this Code, and those facilities and improvements for which new funding methods which shall be sufficient to ensure sufficient funds are available to construct or provide facilities or improvements when required by the phasing schedule Where facilities or improvements are reauired for more than one zone, the phasing plan shall identify those other zones and the plan for each zone shall be coordinated. Coordination, however, shall not require identical funding methods. 12. 152 l 2 3 4 5 6 7 8 91 10 11 12. 13 14i · 151 l6i I 171 11 1s1t ii 19 Ii Ii 2011 ,, 21 ii I 22 23 24 25 I 26 27 I ,I 2s lj I (4) A list or schedule of facilities recuirements correlated to individual development projects within the zone. (~) The local facilities management plan shall establish the proportionate share of the cost of facilities and improvements identified in the citywide facilities and improvement plan attributable to development of property on the local facilities management zone. 21.90.120 Local facilities management plan preparation. (a) A local facilities management plan may be prepared by the City or by the property owners within the zone accordina to the procedures established by this section. (b) The City Council, upon its own initiative, may by resolution direct the City Manager to prepare a facilities management plan for any zone. The City Council may assess the cost of preparing the plan to the owners within the zone after a hearing ten days written notice of which is given to the property owners within the zone. The cost shal 1 be spread prorata according to acreage and development potential. ·(c) All owners within the zone may jointly submit a facilities management plan. (d) For zones in which joint submission of a facilitie management plan is shown to be not. feasible any owner or group o cooperating owners within the zone may petition the City Council to allow the owner or group of owners to prepare the plan. Afte a meeting for which ten days prior written notice has been given to the property owners within the zone, the City Council may permit the owner or group of owners to prepare and submit the plan. A limit based on the estimated cost of the plan shall be determined at the time of the hearing. The actual cost shall be determined when the plan is adopted and shall be assessed prorat~ based on acreage and development potential to property within th~ facilities management zone. The assessment shall be collected b the City at the time any application for a development project within the zone is submitted. The owner or owners who prepared the plan shall be reimbursed for the cost of the plan less the owner's or owners' prorata share. No reimbursement shall be mad unless the plan is approved. Cost of preparation shall not include interest. (e) As an option to preparation by the owner or group of owners as provided in subsection (d) the City Council may decide to direct the City Manager to prepare the facilities management plan. The cost of preparation shall be advanced to the City by the requesting owner or owners, assessed to all the owners and reimbursed as provided in subsection (d). a Fac1 1t1es management pans according to the following procedure: rocessin • be reviewed (1) A completed facilities management plan complying with this chapter, and accompanied by a processing in an amount established by City Council resolution, may be submitted to the Planning Director for processing. If the 13. 153 fee C (_ \ I l! I 2j 4 5 6 7 8 9 10 I 11 12 l:3 14 15 16 17 18 I, 19 !I 2011 ,i 'I 211 221 23 24 25 26 Planning Director determines that the plan complies with the provisions of Section 21.90.110 the director shall set a facilities.management plan for public hearing before the Planning Commission within sixty days of receipt of a complete application. (2) The hearing shall be noticed according to the provisions of Section 21.54.060(2). A staff report containina recommendation on the plan shall be prepared and furnished to· the public, the applicant, and the Planning Commission prior to the hearing. (3) The Planning Commission shall hear and consider the application for a facilities manage~ent plan and shall by resolution prepare recommendations and findings for the City Council. The action of the Commission shall be filed with the City Clerk, and a copy shall be mailed to the owners within the facility zone. (4) When the Planning Commission action is filed with the City Clerk, the Clerk shall set the matter for public hearing before .. ·the City Council. The hearing shall be noticed according to the provisions of Section 21.54.060(2). · (5) The City Council shall hear the matter, and after considering the findings and recommendations of the Planning Commission, may approve, conditionally approve or deny facilities management plan. The City Council may -include in the resolution adopting the facilities management plan any fees or facilities improvement requirements which it deems necessary to impose on development projects within the zone in order to implement the citywide facilities and improvement plan and the local facilities management plan. (b) A facilities management plan may be amended following the same procedures for the original adoption. ~ (c) A local facilities management plan shall be considered a project for the purposes of Title 19 of this Code. Environment~l documents should be processed concurrently with th plan. 21.90.130 Im lementation of facilities and improvement reouirements. (a) To ensure that the provisions of this chapter and the general plan are met the following shall apply: (1) Except as otherwise provided in this chapter n development permit shall be approved unless the map or permit is consistent with the local facilities management plan and unless provision for all facilities and improvements related to the development project are provided or funded. (2) No building permit shall be issued unless all applicable fees, including but not limited to, public facilities fees, bridge and thoroughfare fees, traffic impact fees, facilities management fees, school fees, park-in-lieu fees, sewe fees, water fees, or other development fees identified in the citywide facilities and improvements plan and local facilities management plan and adopted by the City Council have first been paid or provision for their payment has been made to the satisfaction of the City Council. 14. 154 1 2 I 3! 4 5 6 7 8 9 10 111 12/ 131 i, 14 15 I 16 1 17 1a I 1, 19 !I 20!! !I 21 Ii I, 22 23 24 25 I 26 27 !I 11 281 (bl The citywide facilities and improvement plan and the local facility management plan process is part of the City's ongoing pl_anning effort. It is anticipated that amendments to the plans may be necessary. Adoption of a facilities management plan does not establish any entitlement or right to any particular general plan or zoning designation or any particular development proposal. The citywide facilities and improvements plan and the local facilities management plans are guides to ensure that no development occurs unless adequate facilities or improvements will be available to meet demands created by development. The City Council may initiate an amendment to any of the plans at any time if in its discretion it determines that an amendment is necessary to ensure adequate facilities and improvements. (c) If at any time it appears to the satisfaction of the City Manager that facilities or improvements within a facilities management zone or zones are inadequate to accommodate any further development within that zone or that the performance standards adopted pursuant to Section 21.90.100 are not being met he shall immediately report the deficiency to the Council.· If the Council determines that a deficiency exists then no further building or development permits shall be issued within the affected zone or zones and development shall cease until an amendment to. the citywide facilities and improvements plan or applicable local facilities management plan which addresses the deficiency is approved by the City Council and the performance standard is met. (d) The Planning Director shall monitor the developmen activity for each local facilities management zone and shall prepare an annual report to the City Council consisting of maps, graphs, charts, tables and text and which includes a developmental activity analysis, a facilities and improvements adequacy analysis, a facility revenue/expenditure analysis and recommendation for any amendments to the facilities management plan. The content of the annual report shall be established by the City Council. (e) The City Council shall annually ,review the citywid facilities and improvements plan at the time it considers the City's capital improvement budget. 21.90.140 Obligation to pay fees or install improvements required by any other law. Nothing in this chapter shall be construed as relieving a builder, developer or subdivider from any public improvement requirement, dedication requirement or fee requirement which is imposed pursuant to Titles 13, 18, 20 or 21 of this code or pursuant to any City Council policy. 21.90.150 Implementing guidelines. The City Council may adopt any guidelines it deems necessary to implement this chapter. 21.90.160 Exclusions. (a) Development proposals which consist of facilities, 15. 155 C 1, 2 3 4 5 6 7 8 9 10 11 12 13 14 15 161 17 18 i 19 !I 20 Ii 211 221 23 24 25 26 27 I 2sl or structures constructed by a city, county, special district, state, or federal government or any agency, department, or subsidiary thereof for governmental purposes are excluded from the provi~ion~ of this chapter. This exclusion shall not applv to development proposals to which a possessory interest tax would be applicable. (b) Tentative maps the application for which was accepted before August 6, 1985 roay be approved without complying with the plans adopted pursuant to this Chapter but any other development permits or building permits for the project shall be subject to the reauirements of the plans. The tentative map shall be subject to Section 21.90.030. 21.90.170 Council actions, fees, notice. (a) Whenever this chapter requires or permits an action or decision of the City Council, that action or decision shall be accomplished by a resolution. (b) The City Council shall establish ap?lication and processing fee.s for the submission and processing of facilities management plans and for any other request made under Section 21.90.100, 21.90.120 or 21.90.140. (c) Whenever written notice is required to be given to property owners under this section the notice shall be mailed by first class mail to the owners shown on the last equalized assessment roll. 21.90.180 Expiration of chapter. This chapter shall expire on June 30, 2001 unless it is extended or reenacted on or before that date. 21.90.190 Severability. If any section, subsection, sentence, clause or phrase of the ordinance codified in this chapter is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of the ordinance codified in this chapter. The City Council declares that it would have passed the ordinance codified in thi chapter and each section, subsection, sentence, clause and phras thereof, irrespective of the fact that any part thereof be declared invalid or unconstitutional. SECTION 2: The City Council makes the following findings: l. Since January 1985, the City of Carlsbad has been undertaking a comprehensive review of the Land Use Element of it General Plan. As part of that review a Council appointed Citizens Committee prepared a comprehensive report and recommendation to the City Council. That report was subject to public hearings by both the Planning Commission and City Council Included in the recommendations of the Citizens Committee were recommendations that no new development should occur unless 16. 156 C ll 21 I 3: 41 I 5' 6 7 8 9 10 11 12 13 ' 141 1 i 1s 1 I 16i I 171 1a!I I: 19 Ii 1: 2011 !I 211! 22 2:3 24 25 26 27 28 adequate public facilities are available concurrently with need to serve the new development. 2. On August 6, 1985, the City Council adopted Interi~ Ordinance No. 9766, imposing certain temporary land use controls on property within the City, consistent with the recommendation of the Citizens Committee. On September 3, 1985, the City Council adopted Interim Ordinance No. 9771 which extended the restrictions of Ordinance No. 9766 until July 20, 1986. on December 10, 1985, the City Council approved in concept several land use proposals not contained in the Citizens-Committee . report. On January 21, 1986 the City Council adopted Urgency Ordinance No. 9791 imposing a temporary moratorium on development approvals based on the findings contained in that ordinance. on April 22, 1986 the City Council revised City Council Policy No. 17, based on the findings contained therein. On May 6, 1986 the City Council adopted Ordinance No. 8107 establishing a traffic impact fee fo~ the La Costa Area of the City. The City Council finds that all of these actions plus the adoption of Chapter 21.90 of the Carlsbad Municipal Code are necessary to ensure adequate public facilities are available to serve any new development in the City. Without Chapter 21.90 and the requirements imposed by it, adequate public facilities may not b available to serve new development or building. Development or building without public facilities is contrary to the City General Plan and would be dangerous to the public health and safety. 3. This action of the City Council is consistent with long standing policies and objectives of the City to ensure adequate public facilities within Carlsbad. This action will protect the public health, safety and welfare of the citizens of Carlsbad by ensuring safe streets, adequate water, sewer and drainage facilities, sufficient fire protection and recreation facilities. 4. This action is consistent with the City's policy to provide housing opportunities for all economic sectors of the community, because sufficient opportunities for new housing continue to exist within the City and Chapter 21.90 does not affect the number of houses which may be built. In addition, development of housing for low and moderate income persons and families would most likely occur in areas of the City which are designated for highest development priority. By encouraging development of infill areas first, where the infrastructure is already existing, the cost of housing may be reduced. 5. Because any new development affects public facility availability it is necessary to impose the fees and charges whic will be used to provide public facilities on any new building inl the City. The Council finds that failure to impose the fees and charges on any new building in the City will adversely affect th. public health and safety by reducing the safety of its City's ! streets, increasing the burden on water, sewer, drainage and firr 17. 157 C l 2 3 4 5 6 7 81 9 10 11 12 13 14j 151 l6i I 171 I I I' 1s11 11 19 11 11 2011 21 Ji 221 23 24 25 26 27 I I 28 facilities, and by overcrowding existing schools, parks and recreational facilities. 6. Adoption of Chapter 21.90 will not adversely affect the regional welfare. By ensuring that adequate and safe public facilities and improvements will exist to serv-e all of the development in Carlsbad and because many of these facilities and improvements are used by ~ersons residing in neighborinq areas and cities the safety and welfare of the whole region is enhanced. SECTION 3: The City Council intends to implement the growth management program contained in Chapter 21.90 by following the work program in Exhibit A which is hereby made a part of this ordinance. The City Council may adjust the work program without .. amending this ordinance as they determine necessary to accomplis effective growth management for the City of Carlsbad. EFFECTIVE DATE: This ordinance shall be effective _thirty days after its adoption, and the City Clerk shall certify to the adoption of this ordinance and cause it to be published a least once in the Carlsbad Journal within fifteen days after its adoption._ ordinance shall be effective as to building permits for single o~ I The fees created by Section 21.90.050 of this multifamily residential projects 60 days after the adoption of this ordinance. Carlsbad City Council held on the INTRODUCED AND FIRST READ at a regular meeting of the j 24th day of June 1986 and thereafter 18. 158 C c ... l 2 31 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1s1i 1! 19 11 2 oli 211 22 23 24 25 26 27 I 2sl PASSED AND ADOPTED at a regular meeting of said City Council held on the 1st day of __ J_u~l~y ____ , 1986, by the following vote, to wit: V ATTEST: AYES: Council Members Casler. Lewis, Kulchin, Chick and Pettine NOES: None ABSENT: None AS TO F~RM D LEGALITY City Attorney 19. 159 :ASLER, Mayor CULSBAD Ciff COO■CIL GROIITB NA■AGBNB■~ PLA■ •■ana9in9 a •••poaaibl• and Pro9reaai•• Carlabad Putare• .I. Citywide Facilities and Improvement Plan A. Growth Control Mapping and Planning Systems 1. The General Plan will be utilized as the overall base map with a maximum residential utilization i.e. mean density. 2. A citywide map will show all current a.nd future public facilities and improvements. Each public facility and improvement will also be shown separately on a citywide map. 3. A citywide environmental constraints and open space map will be prepared. 4. These maps will also be broken down into quadrants to show greater area detail. B. Management Performance Standards 1. Establish overall performance or. adequacy standards for each public facility and improvement. 2. Establish thresholds for each public facility and improvement. c. Citywide Pinancing Options 1. Pinancing options will be identified for each facility and improvement. 2. Budgeting for citywide public facility and improvement will be in conjunction with the City's five year capital improvement budget. o. Citywide Plan 1. A Citywide Facilities and Improvements Plan will be prepared using growth control maps, performance standard ■ and financing options. 160 E. Development of Local Facility Management and Planning zones. 1. The ·city shall be divided into 25 specific zones. 2. The size of each zone shall depend upon major circulation roads, lagoons, property ownership boundaries, and other identifiable characteristics. 3. The purpose of zones: a. Requires landowners to work together in order to present development plans in accordance with the City's Growth Management Program. b. Requires landowners to provide devel~pment plans which adhere to the citywide facilities plan and t~ relate development to adjacent zones. c. Zones allow for greater citizen review prior to development approval. 4. Each zone will have a maximum residential utilization i.e. mean density. Specific densities for individual development plan• within the zone, however, will be controlled through the normal planning process. s. Each zone must conform to the General Plan and the Growth Management Ordinance. II. Facility Management Zone Processing A. Landowners submit local facilities management plans for procesaing concurrently with normal environmental analysis. B. Local facilitiea management plans shall conform to all standard• of the Growth Control Mapping and Planning systeaa and other existing City standards. c. Th• local plan shall provide a detailed financing plan to assure adequate funding of all citywide facilities and improvements identified in the citywide plan. The local plan shall also provide a detailed financial plan for all public facilities and improvements located within the local facilities management zone. All development within the local facilities management zone will be phased in accordance with the facility and improvement performance standards. D. A public hearing on the local facilities management plan and environmental analysi• will be held concurrently. Notice to all landowners within the zone as well as surrounding adjacent zone landowners. -2- 161 E. After the public hearing is completed on the local facilities management zone and environmental analysis, then the specific development plans will be processed in the normal method. P. Each local facilities management plan will be reviewed annually by the City to ensure that all performance standards are being met. If they are not, development will be stopped. 6/13/86 ad -3- 162 APPENDIX 3 C -163- C" C. 1 • 2. REFERENCE SOURCES Citywide Facilities and Improvements Plan, City of Carlsbad, Revised September 29, 1986 Master Drainage Plan for the City of Carlsbad, adopted June, 1980 3. Sewer Master Plan, City of Carlsbad November, 1976 4. 5. 6. 7. 8. 9. 1 0. 11. 12. June, 1984 April, 1985 Costa Real Municipal Water District Master Plan, February, 1985 Parks and Recreation Element of the General Plan, City of Carlsbad, June, 1982 Memo to Planning Commission from Parks and Recreation Director, dated March 26, 1987 Circulation Element of the General Plan, City of Carlsbad Standard Design Criteria for the Design of Public Works Improvements in the City of Carlsbad, 1984 Draft Barton-Aschman Traffic Study, March, 1987 Capital Improvement Program Budget, 1986-1987 Capital Improvement Program, 1987-1991 Memo to City Manager from Fire Chief dated April 27, 1987 164 APPENDIX 4 C -165- ZONE 5 EXISTING STRUCTURAL SQUARE FOOTAGE APN PROJECT NAME NUMBER STREET LAND USE SQUARE FOOTAGE ---------------------------------------------------------------------------------------------213-020-18 PALOMAR AIRPORT INDUSTRIAL 76,775 213-050-13 PALOMAR BUSINESS PARK 2175 CAMINO VIDA ROBLE INDUSTRIAL 3,475 213-050-24 PALOMAR BUSINESS PARK 2225 CAMINO VIDA ROBLE INDUSTRIAL 17,545 213-050-24 PALOMAR BUSINESS PARK 2245 CAMINO VIDA ROBLE INDUSTRIAL 31,167 213-050-24 PALOMAR BUSINESS PARK 2265 CAMINO VIDA ROBLE INDUSTRIAL 24,153 213-050-47 PALOMAR BUSINESS PARK 2270 CAMINO VIDA ROBLE INDUSTRIAL 102,162 213-050-08 PALOMAR BUSINESS PARK 2310 CAMINO VIDA ROBLE INDUSTRIAL 42,446 213-050-08 PALOMAR BUSINESS PARK 2320 CAMINO VIDA ROBLE INDUSTRIAL 43,660 213-050-27 PALOMAR BUSINESS PARK 2325 CAMINO VIDA ROBLE INDUSTRIAL 19,481 213-050-27 PALOMAR BUSINESS PARK 2335 CAMINO VIDA ROBLE INDUSTRIAL 45,241 213-050-27 PALOMAR BUSINESS PARK 2345 CAMINO VIDA ROBLE INDUSTRIAL 18,000 213-050-09 PALOMAR BUSINESS PARK 2350 CAMINO VIDA ROBLE INDUSTRIAL 54,600 213-050-27 PALOMAR BUSINESS PARK 2355 CAMINO VIDA ROBLE INDUSTRIAL 8,115 I 213-050-27 PALOMAR BUSINESS PARK 2365 CAMINO VIDA ROBLE INDUSTRIAL 16,440 ~ 213-050-27 PALOMAR BUSINESS PARK 2375 CAMINO VIDA ROBLE INDUSTRIAL 15,920 er 213-050-23 PALOMAR BUSINESS PARK 2380 CAMINO VIDA ROBLE INDUSTRIAL 18,053 213-050-23 PALOMAR BUSINESS PARK 2382 CAMINO VIDA ROBLE INDUSTRIAL 18,053 213-050-23 PALOMAR BUSINESS PARK 2384 CAMINO VIDA ROBLE INDUSTRIAL 18,053 213-050-37 PALOMAR BUSINESS PARK 2385 CAMINO VIDA ROBLE INDUSTRIAL 30,100 213-061-01 PALOMAR BUSINESS PARK 6212 CORTE DBL ABETO INDUSTRIAL 71,248 213-061-12 PALOMAR BUSINESS PARK 6352 CORTE DEL ABETO INDUSTRIAL 41,032 213-061-12 PALOMAR BUSINESS PARK 6354 CORTE DEL ABETO INDUSTRIAL 22,965 213-080-17 PALOMAR BUSINESS PARK 6054 CORTE DEL CEDRO INDUSTRIAL 10,899 213-080-15 PALOMAR BUSINESS PARK 6056 CORTE DEL CEDRO INDUSTRIAL 10,607 213-080-16 PALOMAR BUSINESS PARK 6058 CORTE DEL CEDRO INDUSTRIAL 8,500 213-080-14 PALOMAR BUSINESS PARK 6060 CORTE DEL CEDRO INDUSTRIAL 6,334 213-080-13 PALOMAR BUSINESS PARK 6062 CORTE DEL CEDRO INDUSTRIAL 6,060 213-080-12 PALOMAR BUSINESS PARK 6064 CORTE DEL CEDRO INDUSTRIAL 5,384 213-080-11 PALOMAR BUSINESS PARK 6066 CORTE DBL CEDRO INDUSTRIAL 4,695 213-080-10 PALOMAR BUSINESS PARK 6068 CORTE DEL CEDRO INDUSTRIAL 4,803 213-080-09 PALOMAR BUSINESS PARK 6070 CORTE DEL CEDRO INDUSTRIAL 4,368 213-080-08 PALOMAR BUSINESS PARK 6072 CORTE DEL CEDRO INDUSTRIAL 3,825 213-080-07 PALOMAR BUSINESS PARK 6074 CORTE DEL CEDRO INDUSTRIAL 2,978 213-080-06 PALOMAR BUSINESS PARK 6076 CORTE DEL CEDRO INDUSTRIAL 6,819 213-080-05 PALOMAR BUSINESS PARK 6078 CORTE DEL CEDRO INDUSTRIAL 6,481 r-,.. I APN ZONE 5 EXISTING STRUCTURAL SQUARE FOOTAGE PROJECT NAME NUMBER STREET LAND USE SQUARE FOOTAGE ---------------------------------------------------------------------------------------------213-080-04 213-080-03 213-080-02 213-080-01 213-061-05 213-061-09 213-061-06 213-061-08 213-061-07 213-050-40 213-050-42 213-050-41 ~209-041-23 0\212-062-12, 13 ~209-050-19 209-050-25 213-020-11 213-020-14 213-050-11 213-050-22 213-050-38 213-050-28 209-041-26 212-070-20 212-070-21 212-070-21 212-070-21 212-070-21 212-070-21 212-070-21 212-061-25 212-061-25 212-061-25 212-061-25 212-061-04 PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK CABLEVISION CARLSBAD RESEARCH CENTER CARLSBAD MUNICIPAL WATER PALOMAR SOLID WASTE TRANS OLYMPIC RESORT PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK BECKMAN INSTRUMENTS CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER 6082 6084 6086 6088 2042 2045 2052 2055 2075 2261 2270 2271 5720 5815 5950 5960 6115 6155 6225 6305 6405 6451 2131 2185 2195 2205 2215 2225 2227 2231 2233 2235 2237 2240 CORTE DEL CBDRO CORTE DBL CEDRO CORTE DBL CEDRO CORTE DBL CEDRO CORTE DBL NOGAL CORTE DBL NOGAL CORTE DBL NOGAL CORTE DBL NOGAL CORTE DEL NOGAL COSMOS COURT COSMOS COURT COSMOS COURT EL CAMINO REAL EL CAMINO REAL BL CAMINO REAL BL CAMINO REAL BL CAMINO REAL EL CAMINO REAL EL CAMINO REAL BL CAMINO REAL BL CAMINO REAL BL CAMINO REAL FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL COMMERCIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL 4,384 3,994 6,279 6,666 47,872 35,408 44,136 32,640 48,874 27,272 29,618 85,165 17,720 80,800 9,500 37,410 33,432 237,520 73,660 67,200 12,438 38,824 50,400 43,448 9,975 18,682 21,582 16,118 11,990 5,700 9,402 28,570 12,230 9,289 65,340 n n ' APN ZONE 5 EXISTING STRUCTURAL SQUARE FOOTAGE PROJECT NAME NUMBER STREET LAND USE SQUARE FOOTAGE ---------------------------------------------------------------------------------------------212-061-32 212-061-33 212-061-31 212-061-30 212-061-29 212-061-28 212-062-13 213-062-11 212-062-10 209-041-26 209-041-06,07 I 209-041-08 ~209-041-09, 10 f 209-041-11 209-041-19 209-041-15,16 209-041-14 209-041-21 209-041-12,13 212-062-06 212-062-06 212-062-06 212-061-19 212-061-09 212-061-22 213-061-14 213-061-19 213-061-18 213-061-15 213-061-17 213-050-33 213-050-34 213-050-33 213-050-32 213-050-35 CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER BECKMAN INSTRUMENTS PALOMAR TECH CENTER PALOMAR TECH CENTER PALOMAR TECH CENTER PALOMAR TECH CENTER PALOMAR TECH CENTER PALOMAR TECH CENTER PALOMAR TECH CENTER PALOMAR TECH CENTER PALOMAR TECH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER CARLSBAD RESEARCH CENTER PALOMAR BUSINESS PARK BIRTCHER BUSINESS CENTER PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK 2280 2282 2292 2310 2320 2330 2351 2386 2390 2470 2431-2433 2443-2445 2453-2455 2463-2465 2440 2441 2451 2460 2461 5962 5964 5966 5927 5928 5957 2070 2075 2077 2080 2081 2101 2120 2131 2151 2160 FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE FARADAY AVENUE IMPALA DRIVE IMPALA DRIVE IMPALA DRIVE IMPALA DRIVE IMPALA DRIVE IMPALA DRIVE IMPALA DRIVE IMPALA DRIVE IMPALA DRIVE LA PLACE COURT LA PLACE COURT LA PLACE COURT LANDAU COURT LANDAU COURT LANDAU COURT LAS PALMAS DRIVE LAS PALMAS DRIVE LAS PALMAS DRIVE LAS PALMAS DRIVE LAS PALMAS DRIVE LAS PALMAS DRIVE LAS PALMAS DRIVE LAS PALMAS DRIVE LAS PALMAS DRIVE LAS PALMAS DRIVE INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL 24,864 26,864 18,019 11,450 22,032 16,496 6,500 40,200 3,180 76,800 18,890 6,200 18,300 8,250 34,136 18,300 7,240 30,704 14,420 47,798 48,995 50,094 23,750 34,818 44,904 30,556 22,627 15,164 29,115 14,925 14,700 16,168 14,700 31,820 17,410 ZONE 5 EXISTING STRUCTURAL SQUARE FOOTAGE APN PROJECT NAME NUMBER STREET LAND USE SQUARE FOOTAGE ---------------------------------------------------------------------------------------------213-050-31 PALOMAR BUSINESS PARK 2221 LAS PALHAS DRIVE INDUSTRIAL 37,000 213-050-30 PALOMAR BUSINESS PARK 2251 LAS PALHAS DRIVE INDUSTRIAL 11,600 213-050-29 PALOMAR BUSINESS PARK 2281 LAS PALHAS DRIVE INDUSTRIAL 41,285 209-050-26 SAFETY CENTER 2560 ORION WAY INDUSTRIAL 63,376 209-041-25 FARADAY BUSINESS PARK 5731 PALMER WAY INDUSTRIAL 7,867 209-041-25 FARADAY BUSINESS PARK 5741 PALMER WAY INDUSTRIAL 11,330 209-041-05 FARADAY BUSINESS PARK 5751 PALMER WAY INDUSTRIAL 17,448 213-092-17 CARLSBAD RESEARCH CENTER 1991 PALOMAR AIRPORT ROAD INDUSTRIAL 3,267 213-092-17 PALOMAR BUSINESS PARK 1991 PALOMAR AIRPORT ROAD INDUSTRIAL 3,078 213-061-22 PALOMAR BUSINESS PARK 2011 PALOMAR AIRPORT ROAD INDUSTRIAL 50,600 I 213-050-39 PALOMAR BUSINESS PARK 2051 PALOMAR AIRPORT ROAD INDUSTRIAL 103,159 ~ 213-070-14 PALOMAR BUSINESS PARK 2111 PALOMAR AIRPORT ROAD INDUSTRIAL 34,550 1.0 213-070-13 PALOMAR BUSINESS PARK 2121 PALOMAR AIRPORT ROAD INDUSTRIAL 34,550 I 213-070-15 PALOMAR BUSINESS PARK 2131 PALOMAR AIRPORT ROAD INDUSTRIAL 34,550 213-070-16 PALOMAR BUSINESS PARK 2141 PALOMAR AIRPORT ROAD INDUSTRIAL 34,550 213-070-12 PALOMAR BUSINESS PARK 2219 PALOMAR AIRPORT ROAD INDUSTRIAL 5,553 213-092-18 BIRTCHER BUSINESS CENTER 6349 PALOMAR OAKS COURT INDUSTRIAL 27,026 213-092-19 BIRTCHER BUSINESS CENTER 6350 PALOMAR OAKS COURT INDUSTRIAL 44,609 213-092-20 BIRTCHER BUSINESS CENTER 1969 PALOMAR OAKS WAY INDUSTRIAL 64,112 213-092-21 BIRTCHER BUSINESS CENTER 1979 PALOMAR OAKS WAY INDUSTRIAL 17,532 213-092-22 BIRTCHER BUSINESS CENTER 1985 PALOMAR OAKS WAY INDUSTRIAL 15,049 213-092-23 BIRTCHER BUSINESS CENTER 1989 PALOMAR OAKS WAY INDUSTRIAL 19,490 212-062-07 CARLSBAD RESEARCH CENTER 5931 PRIESTLY DRIVE INDUSTRIAL 45,400 212-070-16 CARLSBAD RESEARCH CENTER 2221 RUTHERFORD ROAD INDUSTRIAL 25,709 212-070-19 CARLSBAD RESEARCH CENTER 2231 RUTHERFORD ROAD INDUSTRIAL 27,761 212-061-17 CARLSBAD RESEARCH CENTER 2250, RUTHERFORD ROAD INDUSTRIAL 32,569 212-061-20 CARLSBAD RESEARCH CENTER 2251 RUTHERFORD ROAD INDUSTRIAL 33,424 212-061-18 CARLSBAD RESEARCH CENTER 2258 RUTHERFORD ROAD INDUSTRIAL 42,260 212-061-21 CARLSBAD RESEARCH CENTER 2261 RUTHERFORD ROAD INDUSTRIAL 21,088 213-070-03 PALOMAR BUSINESS PARK 6110 YARROW DRIVE INDUSTRIAL 22,263 213-070-02 PALOMAR BUSINESS PARK 6150 YARROW DRIVE INDUSTRIAL 14,018 213-070-01 PALOMAR BUSINESS PARK 6190 YARROW DRIVE INDUSTRIAL 17,668 213-050-04 PALOMAR BUSINESS PARK 6200 YARROW DRIVE INDUSTRIAL 59,000 213-050-19 PALOMAR BUSINESS PARK 6211 YARROW DRIVE INDUSTRIAL 40,176 213-050-19 PALOMAR BUSINESS PARK 6221 YARROW DRIVE INDUSTRIAL 40,176 ZONE 5 EXISTING STRUCTURAL SQUARE FOOTAGE APN PROJECT NAME NUMBER STREET LAND USE SQUARE FOOTAGE n ---------------------------------------------------------------------------------------------213-050-20 213-050-20 213-050-061 213-050-21 213-050-21 I .... ...... 0 I PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK PALOMAR AIRPORT BUSINESS PALOMAR BUSINESS PARK PALOMAR BUSINESS PARK 6231 6241 6350 6351 6361 YARROW DRIVE YARROW DRIVE YARROW DRIVE YARROW DRIVE YARROW DRIVE INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL 40,176 40,176 44,800 43,200 20,800 APPENDIX 5 -171- ZONE 5 BUILDOUT ARTERIAL IMPROVEMENTS This appendix lists and maps the improvements that will be needed to completely develop all Circulation Element roads in Zone 5 to their ultimate right-of-way width. Zone 5 differs from the other infill zones since it ls basically a non-residential area. In addition, most of the properties in Zone 5 all consist of large parcels with significant development potential. Zone 5: The following Circulation Element roadways are located in Palomar Airport Road El Camino Real El Fuerte Street Camino Vida Roble College Avenue Faraday Avenue Hidden Valley Road Of the above Fuerte Street have right-of-way width in listed roads only Camino Vida Roble and El been improved to their full length and full Zone 5. El Camino Real and Palomar Airport Road have been constructed for their full length in Zone 5, but have not been improved to their full right-of-way width. College Avenue ls presently being constructed for its full right-of-way width from El Camino Real to Palomar Airport Road. A small piece of College Avenue within Zone 5 south of Palomar Airport Road remains to be built. Portions of Faraday Avenue in the easterly and westerly sections of Zone 5 have not been constructed. No portion of Hidden Valley Road has not been constructed. Each of the arterials within Zone 5 has been broken into segments, as shown on map "Existing and Proposed Street Improvements", on Page 174. This exhibit distinguishes between fully improved and partially improved segments of the roads. Partially improved segments have been assigned a letter. Underneath this letter is a series of numbers and letters which list the needed improvements on each unimproved or partially improved section. The legend on this exhibit explains what each of these letters signifies. -172- C C C d The needed improvements, the approximate length of the needed improvements, the approximate cost of the improvements and the source of the improvements is shown on Page 64, "Needed Arterial Improvements". This information was obtained from a number of sources. A field survey was done by staff to determine what improvements were needed on each partially improved segment. The approximate length of the needed improvements was determined by the use of maps, recent aerial photos, or actually measuring the length of the needed improvements in the field. The City of Carlsbad and County of San Diego have entered into an agreement to provide a number of the needed improvements along Palomar Airport Road and El Camino Real. Under the terms of this agreement the County will pay for the construction costs while the City will pay for the design and project management costs. The processing of these improvements is being handled by the City of Carlsbad's Municipal Projects Department. It is anticipated that these improvements may be constructed within the next two years. An assessment district is in the formative stages for the full width improvement of Palomar Airport Road from Paseo del Norte to Palomar Oaks way. The improvements are being designed and construction could start as -soon as fall, 1987. Other assessment districts are currently being considered and it is highly likely that in the near future one or more assessment district(s) will be formed to construct needed roadway improvements in Zone 5 and in other zones impacted by traffic generated by Zone 5. Some of the estimated costs for road segment improvements of Arterial roads in Zone 5 are approximations obtained by estimating an approximate cost per linear foot for various portions of the Circulation Element Roadway. Others are more accurate since they have had some design work done by the Municipal Projects Department. It should be noted that all of the estimated costs for the needed improvements are based on 1987 costs. Future inflation rates could substantially increase the cost of these improvements. In addition, unforseen soils problems necessitating excessive amounts of grading could substantially increase the cost of the needed improvments. This is especially so for sections that need excessive amounts of grading or remedial improvements since no detailed engineering studies have been completed for these areas. FINANCING ALTERNATIVES Almost all would eventually impacted segments may not be ready to of the needed roadway improvements in Zone 5 be constructed as the property adjacent to the develops. However, some of these properties develop in the near future and substantial -173- C improvements must be constructed in the next few years to comply with the Circulation Performance Standard. The most logical way to finance and construct these improvements would be through the formation of assessment districts. These assessment districts would include properties within Zone 5 as well as properties outside of Zone 5 that impacted arterials and intersections within Zone 5. Other alternatives that may be considered or used in conjunction with assessment districts are listed below. 1. Require future development within Zone 5 and outside Zone 5 which contributes traffic to these segments to fund part or all of the cost of the needed improvements. 2. Establish traffic impact fees for all projects contributing traffic to the impacted road sections or intersections. -174- I .... -..J ,I=' QI I ---FUTURE RO AD -EXISTING ROAD 0 INTERSECTIONS IMPACTED IN ZONE * INTERSECTIONS IMPACTED OUTSIDE ZONE ZONE 5 ~ 0~ _.,,. \. cl'-~~------..... ..,,,.--\ ___ .,,. \ HIDDEN ,->\ VALLEY v -\ ROAD CIRCULATION IMPROVEMENTS \ \ ' ' CAMINO '- 4/IDA ROBLE ', ' ' '\ \ \ \ Cllw, ot Ca,labad Growlh M1n1gemen1 Program JANUARY 1987 LOCAL FACILITIES MANAGEMENT PLAN .... ..... .i:, O" I lili FULLY IMPROVED ROADWAYS 0 PARTIALLY IMPROVED ROADWAYS Needed Improvements Q PFF TRAFFIC SIGNAL L-LANE BL-BIKE LANE M-MEDIAN CG-CURB & GUTTER S-SIDEWALK SL-STREET LIGHT ST-STREET TREE FULL ZONE U :· I -I -I -I -I -I -- 1 ZONE-1 ZONE 5 ZONE 8 LOCAL FACILITIES (R) 4 L, 2C G, 2 S, 2 ST ,2SL,M ZONE 20 MANAGEMENT CIRCULATION IMPROVEMENTS BUILDOUT IMPROVEMENTS (I) M,L,CG,S,SL, ~• ST on east aide ·, (H) (G) I L,CG,S,SL,ST, M on ei••t aide -·-·-·• -·-· -••• I ( J) Full ZONE 16 • Improvements ( L,CG,S,SL, M on eaat (P) 2L,CG,S,SL,S M on north al PROGRAM I ZONE 10 (B) L,CG,S,ST,SL, M on ••• , llde aide M on aouth aide Clly of Carl1b10 Growrh Managemen1 Program JANUARY 1987 A. B. C. D. E. ZONE 5 NEEDED ARTERIAL IMPROVEMENTS El Camino Real (southern boundary of Zone 5 to Camino Vida Roble) lane, bike lane, curb and gutter, street light, street tree for approximately 1600 feet on the east side. Approximate cost $196,460. Source -Future development of adjacent property. El Camino Real (Camino Vida Roble to Palomar Airport Road) median, lane, bike lane, curb and gutter, sidewalk, street light, street tree, median on the east side. Approximate cost $775,275. Source -Future development of adjacent property. Note -Olympic Resorts was required to install the median along their frontage as a condition of approval for SDP 83-6. El Camino Real (Palomar Airport Road adjacent to Palomar Airport) median, 2 lanes, 2 curb and gutters, 2 sidewalks, 2 street lights, 2 street trees for approximately 950 feet. Approximate cost $258,650. Source -City of Carlsbad and San Diego County. Note -This section will be constructed by the City and County as a joint venture with the County paying for the construction cost and the City paying for the design and management costs. Improvements should be completed within 2 years. El Camino Real (Costa Real Municipal Water District Office Frontage) median for approximately 200 feet. Approximate cost -$25,300. Source -City and County. Note -This section will be constructed by the City and County as a joint venture with the County paying for the construction cost and the City paying for the design and management costs. Improvements should be completed within 2 years. El Camino Real (median, lane, curb and gutter, sidewalk, street light, street tree for approximately 1850 feet on the east side. Approximate cost - $362,900. Source -City and County. Note -This section will ,be constructed by the City and County as a joint venture with the County paying for the cosntruction cost and the City paying for the design and management costs. Improvements should be completed within 2 years. -175- F • G) H) I) J) K) L) M) C El Camino Real (from 150 feet south of Faraday Avenue to 350 feet north of Faraday Avenue) median for approximately 400 feet. Approximate cost -$50,600. Source -City and County. Note -This section will be constructed by the City and County as a joint venture with the County paying for the construction cost and the City paying for the design and management costs. Improvements should be completed within 2 years. El Camino real (from 350 feet north of Faraday Avenue to 540 feet north of Faraday Avenue) median, lane, curb and gutter, sidewalk, street light, street tree for approximately 190 feet. Approximate cost -$39,495. Source -Future development of the property. El Camino Real (Fox property frontage) median, lane, curb and gutter, sidewalk, street light, street tree for approximately 2,600 feet on the west side. Approximate cost -$509,975. Source -Future development of adjacent property. Note: massive grading required, which could substantially increase the price of this improvement. El Camino Real (Carlsbad Research Center frontage) median, 2 lanes, 2 curb and gutters, 2 sidewalks, 2 street lights, 2 street trees for approximately 1,100 feet. Approximate cost -$305,225. Source -Future development on both sides of El Camino Real. Note: CT85-24 -Carlsbad Research Center is responsible for improvements on west side and CT83-36 Sycamore Creek is responsible for improvements on east side of this segment. Faraday Avenue (from easterly terminus to easterly boundary of Zone 5) full improvements for approximately 1500 feet. Approximate cost $885,000. Source -Future development of County owned property. Faraday Avenue (from El Camino Real to approximately 360 feet east) sidewalk for approximately 360 feet on the south side. Approximate cost $5,400. Source - Future redevelopment of the adjacent property. Faraday Avenue (from westerly terminus to westerly edge of Zone 5) full improvements. Source required for phases III -V of CT85-24 Carlsbad Research Center). Palomar Airport Road (from easterly boundary of Zone 5 to about 4,600 feet west) median, 2 lanes, curb and gutter, sidewalk, street lights, street trees for approximately 4,600 feet on the south side. Approximate cost -$1,116,075. Source -future development of adjacent property. -176- C N) 0) P) C Q) R) C , Palomar Airport Road (from 4,600 feet from the easterly boundary of Zone 5 to El Camino Real) median, 4 lanes, 2 curb and gutters, 2 sidewalks, 2 street trees, and 2 street lights for approximately 1,900 feet. Approximate cost -$703,475. Source -City on the north side and future development on the south side. Note: The City will install full width improvements on the north side and do some remedial work on the south side. These improvements will bring this section of Palomar Airport Road up to four lanes and should be completed within two years. Palomar Airport Road (from El Camino Real to approximately 1,250 feet to the west) median, lane, curb and gutter, street light, street tree on north side for approximately 1,250 feet. Approximate cost - $244,531. Source: City and County. Note: This section will be constructed by the City and County as a joint venture with the County paying for the construction cost and the City paying for the design and management costs. Improvements should be completed within 2 years. Palomar Airport Road (from approximately 1,250 feet west of El Camino Real to approximately 350 feet west of Yarrow Drive) median, 2 lanes, curb and gutter, sidewalk, street light, street tree on the north side for approximately 2,200 feet. Approximate cost $533,775. Source -City and County. Note: This section will be constructed by the City and County as a joint venture with the County paying for the construction cost and the City paying for the design and management costs. Improvements should be completed within 2 years. Palomar Airport Road (from approximately 350 feet west of Yarrow Drive to existing full width improvments) median, 2 lanes, curb and gutter, sidewalk, street light, street trees for approximately 1,900 feet. Approximate cost -$461,012. Source -Phase II development of Carlsbad Airport Center, CT81-46. Palomar Airport Road (from westerly edge of fully improved section to westerly boundary of Zone 5) median, 4 lanes, 2 sidewalks, 2 curb and gutters, 2 street lights, 2 street trees for approximately 9,200 feet. Approximate cost -$7,300,000. Source -Public facilities fees and an assessment district. -177- s. T. College Avenue (from Palomer Airport Road to the southerly boundary of Zone 5) full width improvements for approximately 1100 feet. Approximate Cost - $759,000. Source -Development of adjacent property. Note: CT 84-32/PUD-73 Cobblestone Sea Village was conditioned to construct a portion of this segment of College Avenue to provide access to their site. Hidden Valley Road (from westerly boundary of one 5 to Palomar airport Road) full width improvements for approximately 2300 feet. Approximate Cost - $1,357,000. Source -Development of adjacent property. Note: Ct-85-17 College Business Park, is conditioned to construct half width plus 12 feet within a fully graded right of way for this section during Phase II of their development. -178- Note -Page 179 was not used. (_ APPENDIX 6 -180- C EXISTING PLUS COMMITTED TRAFFIC PROJECTION FOR IMPACTED ROAD SEGMENTS WITHIN ZONE 5 The following worksheets represent level of service projections for impacted road segments within Zone 5. The existing AM and PM peak traffic counts from the Barton-Aschman traffic study were projected across a linear time table with threshold level of service (E) noted. Information derived from this chart enabled staff to determine when the road segments on Palomar Airport Road would fall below an acceptable Level of Service "D". The methodology was.based on information available in the Highway Capacity Manual developed by the Transportation Research Board, Washington, D.C. 1985. -181- \I . . ~ "' ~- i Q C' "' I c" ~ .. . ~ { " .. , ~ i ). i 0 ! ~ ~ i ~ l ":, . ~ ..a 'I ! ~ i ~ t 'lo . ,S l 9 ~ \o ~l 8 ~ ~ ~ ~ i ~ : .. . , .. . . ! ~ ~ ~ a) ~ :l "' ~ Q 'I t ~ ~ i "' ') , , "" t ~ " ~ ~ l ~ ! >- ~ t v t l " " f 2 ~ I( t t \., : ... - ~ ' .t l s ~ ~ ~ ~t Q I -i : : ~ 'U i t .Q ~ "' i t !; I o ( ~ ~ 'W ~ " ~ .. . . ': : , , ~ ~ t <:a ~ l. ~ € .,. ,e :) ~ 0 ~ ,I q: ,I \ t t .. . . :i t t ~ ~ \U :9 0 I- - - "' ~~ ~ IJ ~ < ~ X ~ mm m '" " << < :; = = i 'I t ~S ? ~ ~ ~ ~~ ~ 'f l : : ! ~~ ~ ~ \u .. . ~~ ~ q,: 'I f -N O - < , ~~ ~ i NN N '. .J ... . . . . . 1: 9 \I S ~i . c{ ~ Q ,, , . . . . . . ,. . . . . . u, -4 : -I : ~ q, '- ~ ~ :) ,. ; : f c:) 0 - () C) ~ Gil l 0 .- ! J < ~ '- . : I \V Q i i ~ C. ~ a. < ~- " ~ J ~ "" ~~ e 0 ... . ; "' [ ._ , ;;; ; ~ IT " ~ a) r " ~ zt r 'il l t Il l -- l \l J • ), . ~ 4 .. . . V\ \U 'I t ':: ! ~ -: : , ,. ~ .., >- i °" ' "' \ .. . ~ " ~ - - - .. . ., :r • ... • QI . .. . . til l (_ , , : :? : 0 Q 8 C) i & ~ 8 Q n 11' 1 ~ (" \ M N C'< I ( ~V l ' I Of ' I I J . ) 3. L f f ~ "j ( ~ - : J l i / ~ 1 - ,- ( ' O f f >i ' l : l d -1 8 2 - - ~ C ~ t "' .. . ) 0 t ,.. , . ii : : . t .. J ~ 0 ... u. : "' ('I E t ~ ~ ' t N --. 1 ~ II \ \. . ., i t ~ ~ 0 i ~ ~ ~ ~ - .. . . ., ~ ~ IJ {2 ~ I I- . . \I J ! ;: ; i ~ :. ,. .. . ~ >.. <t ~ ~ • ~ C \J ~ ~ ~ t .. . l t 'I / ! ... ~ ~ ,l ~ ~ ~ "' ~ "" .. . . . ~ ~ £ \) j ~ ~ - ~ t ~ t ~ \la 0 1 1 "' "' "' ~ ~ ~ ~ ~ s ,I t mm m .. J ! " << < 'l £ ~ ~ ~ ~ ! ~ o: { 1 ~= = > ~ S? S ? S ? \U 2 u. . i ~ .: i ~ .. . '- ~ "'" ' " ' & ~ t ") I" r- . . ~ ~~ ~ "' .. . : ~ "' 00 0 £ t "< .n ~ ; . : s -~ < > ~ mm m ,- , M M s: - NN t " < ! ~ ~~ ~ -: . ~ i It [ ~ C:) i= ; ~ .. . -c \J :> "' \u ,. .. , 0 ~ ~ C 0 C. ~ " ~ "" ' (' f \ ~ -:. ~ l ~ ,.. . ~ ..J .. il l 0 '= > 'l : _, u.. "' C \{ _ 0 ~ ,a - .. ~ ,r ~ ~ .. . . ~ ~ lu "' ~v ' "" ' t .. . . II \ 6- . a , . + .. . ~ ~ c,, , l +6 - -- l ~ "" ~ ,. "' 'i - 0 " _} .. . , '/ / ( .- r SC ~ >- -.:r - - -- - Q .,. . ~ Cl -G:> .. . . C 0 C) 0 Q 0 0 Qa Q Q 0 8 "' 8 ~ .. . . '- ) ~ ~ IW \ I" \ N r, r. i (. < ~ , . , ot N . ) ;. H / " 1 ., t; i : l it .. J. . ') l l ' ( ) f - 4 )J . 1 t 1 : : / d -1 8 3 - TWO-LANE HIGHWAYS 8-3 I WORKSHEET FOR GENERAL TERRAIN SEGMENTS PA1.om41Z 1t,t1.. Porrr P-o 1/-o bL I /8 7 Site Identification: E c ({ n:, EMT C.1t7'. J../tt110 Date: Time: 7 · .Jo 1'111 ; Name: f) f1,-J1~ 1-MvSE.fl... Checked by: I. GEOMETRIC DATA 0 ,-~ i-8 ft Design Speed: ss-mph % No Passing: 60 % NORTH ~ft Terrain (L,R,M): t... r:;~'t:.L Shoulder _~_ft Segment Length: -z . --z.. mi II. TRAFFIC DATA E1'i~r fr><isr -1-ui,.. ft.A,'(-A,. lttt> 3000 Total Volume, Both Dir.~,.. }Se>O 3"oo vph Directional Distribution: Co/to Flow Rate = Volume + PHF Traffic Composition: JO %T, '-%RV,_l_%B = ·-PHF: 'S;;-~ Sr;€ let.ow \. ~ '1l, :5 c'c tJt'to,., ill. LEVEL OF SERVICE ANALYSIS SF,= 2,800 X (v /c)i X fd X f.,, X fHv fHv = 1 / [1 + Pr(Er-1) + PR(ER-1) + P8(E8-l)] - C LOS SF = 2,800 X (v/c) X fd X f.,, X fHV Pr Er PR ER Pa Es Table 8-1 Table 8-4 Table 8-5 Table 8-6 Table 8-6 Table 8-6 A Jb-z.. 2,800 .01 ,'ti-I ,BB 'I -z... 0 ,o 2. Z.. L ,0 I /. B B 410 2,800 I 19 I 14 I ,~(. I 1 2.., 't. .o?.. 'Z, $ I 0\ -z..o C 770 2,800 ,Jt I "'.,. I , 'ob I I 2.. l.. .cl. Z,5 ,01 2..0 D 1'30t. 2,800 I)'\ ,q+ ( ,S'l . I '2. 0 ,oz. I, l, '01 I. b E 2 J42. 2,800 I .o .er+ I ,Sc:, ,1 7-, i) I ot I ,i::, .0\ /,6 IY. COMMENTS Flow Rate vph LOS=- 6 "X1.>1uv(, AtYI ~An:· : l+oo -:-.'i+ -= I+ S'1 1.-0 .s = D rw1 .( ,r, .:: )$'0-b "i ,C,1 ~ 1518 l.-0> :: {) c-Xl5'T1#' Pt-vs co~ ,,,,rr ea C A~ -+ '~, 31-z.; L. 0 ~ =-E. oil., r,,vc1t:,I ~+-rf = 3000 .,,,. 3 ,oo ..;. . ,, 3 '150 1,..0; ::-C. o-<. ivMSt p~ ft.Ht' = -= -184- TWO-LANE HIGHWAYS 8-31 C WORKSHEET FOR GENERAL TERRAIN SEGMENTS PALOIPll\-12. A ,r<i'o4.T r'2..o it sJ Site Identification: poAI ro P4:..o,,,,q,-z Q,,,_KS W~) Date: ~ l I )8 7 Time: z:30 /'NJ I Name: 01tu10 1-1,1 J5e1L. Checked by: I. GEOMETRIC DATA 0 s~= i-B ft Design Speed: !i'S mph % No Passing: C/0 % NORTH . ~ft Terrain (L,R,M): r_eve~ Shoulder _S_ft Segment Length: 1,8 mi II. TRAFFIC DATA IS,-')C1tj1/fl/C, f.t:A" 17ooLJsoo vph Directional Distribution: 60/+o Total Volume, Both Dir. Flow Rate = Volume + PHF fll'I A,,., Traffic Composition: JO %1; '2. o/oR'J,_I %8 ;,~ /781 = 1700 + .,$ PHF: o,-,s ""' 1518 1500 ''if ill. LEVEL OF SERVICE ANALYSIS SF,= 2,800 X (v /c)i X fd X fw X fHv fHv = 1 / [1 + Pr(Er-1) + PR(ER-1) + Pe(Ee-1)] - LOS SF = 2,800 X (v/c) X fd X fw X fHV Pr Er PR ER Pe Ee Table 8-1 Table 8-4 Table 8-5 Table 8-6 Table 8-6 Table 8-6 A 11& 2,800 ,05' , '14-I .~B , I 2.0 IC 2. 2. '2 ,01 ,. & B J84 2,800 '17 . 9+ I -~b , I '2., z. ,OL z.. S" ·01 2... 0 C 74-b 2,800 ,33 ,q4-I ,8b . I 2 . 'Z. ,02.. 2., J" ,0/ 2.0 D I 358 2,800 ,58 ' c;4-I , 61 . I Z,o .oa I, C. · o I I ,b E -z Jtz. 2.800 /.o , '1+ I .Si . I '2.,0 ,02. /. b , <, I I •b 5-XI 5TI/I/'- IY. COMMENTS Flow Rate I 51B vph AM LOS= 0 5 f=XJ 51JN(. I 7Bci II f" f,,, Pn1 LOS = D ~x,~-n~, fL-U5 c.o,,.,,, ,rreo AfYI f1.,ou1 ti.1t-rl -: 2800 -:' ·"' = '2.'lt7 Lo5 = ~ 0"~ ,;011.~f p"' p /.,o,,J a.itTt: : Jsoo ..;. '~, ~ 36+'-t..oS = E. c:, C. i,oJC4,H' ,. C -185- C Descriptions of Conditions for Various Roadway Levels of Service Level of Service A B C D E F Operating Conditions Free flow; speed controlled by driver's desires, speed limits, or physical roadway conditions. Stable flows; operating speeds beginning to be restricted; little or no restrictions on maneuverability from other vehicles. Stable flow; speeds and maneuverability more closely restricted. Approaches unstable flow; tolerable speeds can be maintained, but temporary restrictions to flow cause substantial drops in speed. Little freedom to maneuver, comfort and convenience low. Volumes near capacity; flow unstable; stoppages of momentary duration. Ability to maneuver severely limited. Forced flow; low operating speeds; volumes below capacity, queues form. -186- APPENDIX 7 -187- C C AMENDED COST ESTIMATES FOR IMPACTED INTERSECTIONS The following specific intersections additional costs are provisions for right includes provisions for represents amended cost estimates for which staff has determined specific and/or associated. Two intersections include of way acquisition. One intersection sewer pump station relocation. The identified adequate. costs in the for mitigating the remianing intersections Barton-Aschman traffic study were considered -188- I .... 00 U) I 0 l PALOMAR AIRPORT RD. (E. SIDE) W-BOUND PALOMAR AIRPORT RD. (E. SIDE) E-BOUND PALOMAR AIRPORT RD. (W. SIDE) W-BOUND PALOMAR AIRPORT RD. (W. SIDE) E-BOUND PASEO DEL NORTE (N-SIDE) N-BOUND PASEO DEL NORTE (N-SIDE) S-BOUND PASEO DEL NORTE (S-SIDE) N-BOUND PASEO DEL NORTE (S-SIDE) S-BOUND EXISTING PLUS COMMITTED PALOMAR AIRPORT ROAD AND PASEO DEL NORTE 1 ADDITIONAL LANE (free right) RESTRIPE (w'ly thru lane) EXTEND MEDIAN EASTERLY RE-STRIPE & sign EXTEND IMPROVMENTS & MERGE E'LY RE-STRIPE & SIGN COMPLETER-LANE IMPROVEMENTS 1 ADDITIONAL LANE OK MEDIAN 1 ADDITIONAL LANE R/W ACQUISITION (7-11) OK TOTAL COST ENGINEERING & CONTINGENCY $500.00 $2,000.00 $5000.00 $25,000.00 $12,000.00 $ 44,000.00 $ 6,000.00 $ 50,000.00 I .... 1,0 0 I EL CAMINO REAL (N-SIDE) S-BOUNO EL CAMINO REAL (S-SIDE) N-BOUl~D TAMARACK AVENUE ( E. SIDE) E-BOUND TAMARACK AVENUE (E. SIDE) W-BOUNU TAMARACK AVENUE (W. SIDE) E-BOUND TAMARACK AVENUE (W. SIDE) W-BOUND n EXISTING PLUS COMMITTED EL CAMINO REAL AND TAMARACK AVENUE RE-STRIPE (opp. r-turn) 3 ADDITIONAL LANES (1R, 15, 1L) R/W ACQUISITION (Robertson) RE-LOCATE UTILITIES & PUMP STATION (OK) (OK, 1 EXTRA LANE -FREE RIGHT) RE-STRIPE (opp. r-turn) (OK) TOTAL COST= -0- $75,000.00 $25,000.00 $100,000.00 $70,000.00 $270,000.00 n EXISTING PLUS COMMITTED EL CAMINO REAL AND FARADAY AVENUE EL CAMINO REAL EXTEND IMPROVEMENTS N'LY $50,000.00 (N-SIDE) N-BOUND EL CAMINO REAL (OK, 1 EXTRA LANE) (N-SIDE) S-BOUND EL CAMINO REAL (OK 1 EXTRA LANE) (S-SIDE) N-BOUND I EL CAMINO REAL (OK) _. ID (S-SIDE) 5-BOUND _. I FARADAY (W.SIDE) (OK) ( W-BOUIW) FARADAY (W. SIDE) ( OK, 2 EXTRA LANES) (E-BOUND) FARADAY (E. SIDE) (OK, 1 EXTRA LANE) (W-BOUND) FARADAY (E. SIDE) (OK) (E-BOUND) TOTAL COST = $50,000.00 I .... ID N I n PALOMAR AIRPORT RD. (W. SIDE) W-BOUND PALOMAR AIRPORT RD. (W. SIDE) E-BOUND PALOMAR AIRPORT RD. (E. SIDE) W-BOUND PALOMAR AIRPORT RD. (E. SIDE) E-BOUND EL CAMINO REAL (N-SIDE) N-BOUND EL CAMINO REAL (N-SIDE) S-BOUND EL CAMINO REAL (S-SIDE) N-BOUND EL CAMINO REAL (S-SIDE) S-BOUND EXISTING PLUS COMMITTED PALOMAR AIRPORT ROAD AND EL CAMINO REAL 1 ADDITIONAL LANE COMPLETE REQ'D IMPROVEMENTS, MEDIAN (Olympic Resorts) 2 ADDITIONAL LANES 1 ADDITIONAL LANE EXTEND IMPROVEMENTS N'LY 1 ADDITIONAL LANE EXTEND IMPROVEMENTS N'LY 2 ADDITIONAL LANES EXTEND IMPROVEMENTS N'LY 1 ADDITIONAL LANE RE-STRIPE COMPLETE REQ'D IMPROVEMENTS, MEDIAN (Olympic Resorts) TOTAL COST= $42,000.00 00 $50,000.00 $42,000.00 $25,000.00 $42,000.00 $25,000.00 $50,000.00 $25,000.00 $25,000.00 $1,500.00 00 $327,500.00 ( C 4CXJ' ------------------.. ---------" . I I "·------~--------~ ~ t l~,C:CO~ 1'.:>:) T'fP& ''cl' ~OllJS~C.umtz.. @ I\.•.!/ i:=-r. ~ .. 3,?Jff .0 :. Zl,7oe- c.7\ G,CZA.01~ ~ -o,rc ?Ref'. (1.-1.111\,\p ~IM> P:'\ STlZ.\P\~ £. ~~~~ ( II " ) e~ ~l<dN~ ~ C,O~ ~O\Ftc:A=r1otJ ~-Z5,C::CCS.2_ ~ 1'"1E IN'lc~C::nCN ) 1-•---- ~ A.e. t)~"E ~ ~M s~ .,..,,i .. ~•· o,~,,~~--.. c~ <21Uio,w<.o <t-fAtl: ft.EP. o~ ~T~1P11ll=, ~ t(<dNI~ .. ti -193- .. _ : 31/1:0 ~l'-1a-1Cis ~c.ojl,J n~1..~ ~ 4i.,oco ·:.. APPENDIX 8 C .. -194- C April 27 , 1987 TO: CITY MANAGER FROM: Fire Chief SAFETY CENTER FIRE STATION -AIRPORT IMPACT AND GROWTH MANAGEMENT STANDARDS RECOMMENDATION Abstract: This report will discuss the central or Safety Center fire station in three different contexts. First, the F. A. A. standards for airport fire protection will be review~d against what the Safety Center site would offer Palomar Airport. Second, the needs for a central fire station will be discussed. Third, we will present a draft growth management plan fire protection standards for the industrial/commercial center city (Planning Zone 5). Fire Protection and Palomar Airport Staff has consulted with Mr. Bob Bloom, Chief of Airport Inspection Services, with the Federal Aviation Administration in Los Angeles. The current and future of Palomar Airport was reviewed. Currently, Palomar has a part time operating certificate under which no airport or municipal fire protection is required. If Palomar obtained a full operating certificate, their firefighting capabilities would have to comply with F .A.A. Regulations, Volume 10, part 139 (see attachment A). A full operating certificate would allow an air carrier five or more regularly scheduled flights per day with 30 or more passengers. The fire protection standards are split into indexes based on aircraft size. Due to Palomar's short, single runway (4,000 feet), their operations are limited to Index A and a few Index B aircraft. In all probability, the current carrier would only use Index A aircraft. In summary, the firefighting standards for Index A is one "lightweight" vehicle (pickup truck) with 500 lbs. of dry chemical extinguishing agents with a response time to runway center from time of alarm at three minutes or less. This vehicle may be privately owned and operated by minimally trained airport employees. If Index B aircraft are serviced, then a second lightweight vehicle is required with a capacity to generate 1,500 gallons of foam at a runway center within four minutes of alarm. Again, private ownership and trained airport employees are acceptable. The Safety Center fire station site is 1. 9 miles from runway center with a response time (driving) of at least 3. 5 minutes. Mr. Bloom stated with that distance no fire protection credit would ever be extended to the airport for operation of any Index aircraft. He further stated most small airports with a full operating certificate buy a pickup truck and have local mechanics man it. If more fire protection than that is required, it has to be sited on the runway itself to satisfy response time requirements. -195- C C Mr. Bloom went on to state that for Palomar to get a full operating certificate, fire protection is their least worry. Rather, the EIR, noise and zoning hurdles are immense. Mr. Bloom ltnows the principals behind the Palomar operation and is sure these major obstacles are what is delaying their application for a full operating certificate. In conclusion, for Palomar Airport to expand its operation, City of Carlsbad assistance with fire protection is not required. Additionally, the Safety Center site is too far from the runway center to ever be of measurable service within F.A.A. standards. The F.A.A. is also expected to release even stricter fire protection standards in six months, further making the Safety Center site unusable to the Airport to meet F. A. A. standards. Of course, if an aircraft were to crash short of or around the runway in the industrial center, then the Safety Center fire station would be ideally located. ~~~ ~a,. ... ,~.,~ ~---K. THOMPSON Fire Chief fg c: Frank Mannen Marty Orenyak Michael Holzmiller -196- C C, CAPITAL IMPROVEMENT PROJECT -PROJECT NEED ANALYSIS CENTRAL FIRE STATION -PHASE III SAFETY CENTER RECOMMENDATION To schedule the start of construction of Fire Station No. 5 in January 1988. This means placing the project in the 87/88 C.I.P. budget. The approximately 12,000 square foot station is currently under design with an approximate budget of 1.68 million dollars. A construction time of eight months is estimated. By starting on January 1988 the project funding will be split over two fiscal years. Manpower and equipment will be brought on line in early Fiscal 88/89 for a projected October 1, 1988 opening date. BACKGROUND/JUSTIFICATION There are several factors guiding placement and timing of new fire stations. Historically, Carlsbad Fire Department has planned a central fire station to meet the needs of the expanding center city. That station was originally part of a new headquarters project, and if not for the Safety Center, would have been built today. However, the station and administrative functions were split with the Safety Center concept, and with financial timing, the fire station was pushed back to be scheduled as Phase III. The central fire station will first of all provide improved response times and service delivery capabilities to the largely industrial city center. With its strategic lcoation, it will also house specialized equipment such as our heavy rescue truck or brush fire truck. Thus, either the fire truck or special vehicles have a greatly improved response time in backing up the stations in the four corners of the City. Commonly accepted response time standards for industrial fire protection such as Insurance Service Offie guidelines call for the first fire truck to be on scene in less than 5 minutes, and the rest of the required fire trucks to be on scene in less than 10 minutes. The following chart outlines our approximate response time capabilities in minutes. LOCATION FIRE STATION: 1 2 3 4 Palomar Airport Rd. & El Camino Real 12 5 9 11 Palomar Airport 13 7 10 10 Faraday and Orion 11 6 9 12 197 C (_ (_ The other commonly accepted standard of performance is to be able to provide 1,000 gallons of water per minute fire flow at a sprinklered industrial building within 10 minutes. Combined with repsonse time, Carlsbad's measure of performance should be the first fire truck on scene in less than 5 minutes, and the balance of the trucks needed for a 11,000 gallon per minute fire flow in 10 minutes. Carlsbad operates three person fire companies. We know through testing that it takes one man on the fireground to deliver 100 gallons per minute through a variety of means. Therefore, to deliver a 1,000 gpm fire flow in 10 minutes we need three engine companies on scene. As is apparent from the response time chart, we cannot deliver one truck in less than 5 minutes, or three trucks in less than 10 minutes in Growth Management Planning Zone 5. Also, those times assume all units are in quarters and available, it does not measure our significant emergency medical workload demand. Another planning factor is what we are responding to and its probability of risk for generating fire, ambulance or hazardous materials emergencies. The following chart is data from the Planning Department's Growth Management Zone 5 Plan. It outlines the exlsiting and projected industrial square footage demand, and projected population which ls based upon a workforce population survey conducted by Planning Staff. Currently for example, Orange County Fire Department, for industrial parks, in addition to the standards already reviewed, sites fire stations for these areas when the work force population exceeds 25,000. INDUSTRIAL ZONE ANALYSIS CATEGORY SQUARE FOOTAGE 1. Built 4,256,609 2. Approved, committed to devel-9,545,303 opment, maps and site plans approved. Construction two years or less SUBTOTAL: 13,801,912 3. Future to build out. 8,394,387 Parcel maps approved, zoning density factors used to predict square footage yield. BUILD OUT TOTAL: 22,196,299 -198- LABOR FORCE POPULATION 7,820 17,547 25,371 15,431 40,802 What is significant is the dollar valuation of these buildings to our tax base, and sales tax revenues. A major fire, medical or hazardous materials incident could have a significant fiscal or life loss impact. On site mitigation and inspection measures are critical, but once an incident occurs so is prompt initial response to start control and containment of the emergency. The following chart shows our responses to Planning Zone 5 for two years: Emergency Medical Fire/Other CONCLUSION 1985 70 79 149 annual 1986 64 100 164 annual Due to the factors reviewed and the construction lag time involved, we feel it prudent to have a central fire station open by Fall 1988. This station will not only ensure adequate coverage to Planning Zone 5, but provide improved second due unit or specialized unit coverage to residents in the entire City. -199- C. C .. GROWTH MANAGEMENT PLAN INDUSTRIAL COMPOSITE FIRE PROTECTION STANDARD 1. First due engine on scene< 5 minutes, and work force is> 12,000 people*. - 2. Provide 1,000 GPM fire flow< 10 minutes. A. 1,000 GPM -100 GPM/man = 10 men 10 men= 3 engines, 1 ambulance 10 minutes 10 minutes * 12,000 people is the residential standard times four since the 40 hour work week is 1/4 of the total hours of protection in one week. Station 5 provides: The department the ability to meet both Industrial Standards 1 and 2. STATION 5 LOCATION ANALYSIS LOCATION MILES TIME (mins. at 30MPH mean) Faraday & E.C.R. .35 --:-rs P.A.R. & E.C.R. 1.00 2.00 Airport 1. 70 3.40 P.A.R. & Camino Vida Robles 2.10 4.20 P.A.R. & Palomar Oaks 2.60 5.20 Yarrow & Camino Vida Robles 2.10 4.20 E.C.R. & Camino Vida Robles 1. 70 3.40 P.A.R. & El Fuette 1. 80 3.60 -200- c: APPENDIX 9 -201- (MISSING) ( C APPENDIX 10 C C -204- (-· - C l SURVEY OF WORK FORCE POPULATION IN ZONE 5 This survey establishes the number of employees in the industrial area of the City. This information will help facilitate the completion of the Public Facilities Management Plan for that area. The survey was conducted from 5/12/87 to 5/19/87 between the hours of 9:00-12 p.m. and 1:00 to 3:00 p.m. The total work force was found to be approximately 7,820. This number is an approximation due to some businesses unwillingness to provide the information requested. -205- c~ Street Address Work Force Poeulation 1969 Palomar Oaks Way 0 1979 Palomar Oaks Way 23 1985 Palomar Oaks Way 25 1989 Palomar Oaks Way 6 6349 Palomar Oaks Court 50 6350 Palomar Oaks Court 40 2075 Las Palmas Drive 87 2077 Las Palmas Drive 0 2081 Las Palmas Drive 10 2101 Las Palmas Drive 17 2131 Las Palmas Drive 23 2151 Las Palmas Drive 17 2221 Las Palmas Drive 110 2160 Las Palmas Drive 0 2120 Las Palmas Drive 22 2180 Las Palmas Drive 90 2281 Las Palmas Drive 25 2281 Las Palmas Drive 110 2175 Camino Vida Roble Left Letter 2225 Camino Vida Roble ] 2245 Camino Vida Roble ] 300 2265 Camino Vida Roble ] 2385 Camino Vida Roble 40 C 2380 Camino Vida Roble 11 2382 Camino Vida Roble 41 2384 Camino Vida Roble 0 2350 Camino Vida Roble 20 2310 Camino Vida Roble 200 2320 Camino Vida Roble 40 2270 Camino Vida Roble 177 2325 Camino Vida Roble 6 2335 Camino Vida Roble 50 2345 Camino Vida Roble 100 2355 Camino Vida Roble 0 2365 Camino Vida Roble 0 2375 Camino Vida Roble 0 6451 El Camino Real 0 6305 El Camino Real 150 6225 El Camino Real 150 6155 El Camino Real 1500 (all Hughes) 5815 El Camino Real 260 5720 El Camino Real 90 5960 El Camino Real 81 5950 El Camino Real 26 5580 El Camino Real 12 6350 Yarrow Drive 59 6361 Yarrow Drive 38 6351 Yarrow Drive 55 (._ 6241 Yarrow Drive 73 6231 Yarrow Drive 25 -206- ,.,. Street Address Work Force Poeulation '---6221 Yarrow Drive ] 194 6200 Yarrow Drive ] 6211 Yarrow Drive 40 6110 Yarrow Drive 15 6150 Yarrow Drive 24 6190 Yarrow Drive 35 6354 Corte Del Abeto 25 6352 Corte Del Abeto 130 6212 Corte Del Abeto 65 2055 Corte Del Noga! 140 2045 Corte Del Noga! 17 2042 Corte Del Noga! 80 2052 Corte Del Noga! 25 2075 Corte Del Noga! 51 2051 Palomar Airport Road --(part of Hughes) 2121 Palomar Airport Road 40 2219 Palomar Airport Road 15 1991 Palomar Airport Road 4 2141 Palomar Airport Road 36 2131 Palomar Airport Road --(Hughes) 2111 Palomar Airport Road 100 2011 Palomar Airport Road 12 2261 Cosmos Court --(Hughes) 2270 Cosmos Court 90 C 2271 Cosmos Court 0 6054 Corte Del Cedro 50 6056 Corte Del Cedro 15 6058 Corte Del Cedro 19 6060 Corte Del Cedro 5 6062 Corte Del Cedro 0 6064 Corte Del Cedro 0 6066 Corte Del Cedro 13 6068 Corte Del Cedro ] 32 6072 Corte Del Cedro ] 6070 Corte Del Cedro 5 6074 Corte Del Cedro 3 6076 Corte Del Cedro 0 6078 Corte Del Cedro 9 6082 Corte Del Cedro 18 6084 Corte Del Cedro 0 6086 Corte Del Cedro 22 6088 Corte Del Cedro 12 2386 Faraday Avenue 81 2390 Faraday Avenue 3 2351 Faraday Avenue 0 Beckman Instruments Faraday Avenue ] 270 Beckman Faraday Avenue ] 2330 Faraday Avenue 0 2320 Faraday Avenue 0 2310 Faraday Avenue 0 c· -207- C Street Address Work Force Population 2292 Faraday Avenue 0 2282 Faraday Avenue 0 2280 Faraday Avenue 25 2240 Faraday Avenue 0 2237 Faraday Avenue 42 2235 Faraday Avenue 18 2233 Faraday Avenue 45 2231 Faraday Avenue 15 2225 Faraday Avenue 5 2215 Faraday Avenue 0 2227 Faraday Avenue 1 2205 Faraday Avenue 7 2185 Faraday Avenue 8 2195 Faraday Avenue 7 2131 Faraday Avenue 0 5751 Palmer Way 30 5741 Palmer Way 40 5731 Palmer Way 162 2431-3433 Impala Drive 45 2440 Impala Drive 210 2460 Impala Drive 0 2443-2445 Impala Drive 0 2453-2455 Impala Drive 60 C 2463-2465 Impala Drive 19 2461 Impala Drive 12 2451 Impala Drive 0 2441 Impala Drive 17 2560 Orion Way 84 2250 Rutherford Road 25 2258 Rutherford Road 150 2221 Rutherford Road 40 2231 Rutherford Road 119 2251 Rutherford Road 0 2261 Rutherford Road 30 5927 Landau Court 24 5957 Landau Court 0 5928 Pascal Drive 0 5931 Priestly Drive 47 5964 La Place Court 0 5966 La Place Court 0 5962 La Place Court 20 1991 Palomar Airport Road 4 6115 El Camino Real 155 Palomar Airport 500 TOTAL WORK FORCE POPULATION = 7,820 C -208- APPEN.DIX 11 -209- C 1 2 3 4 5 6 7 8 9 10 ll 12 PLANNING COMMISSION RESOLUTION NO. 2668 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA RECOMMENDING APPROVAL OF THE LOCAL FACILITIES MANAGEMENT PLAN FOR ZONE 5 ON PROPERTY DESIGNATED FOR NON-RESIDENTIAL DEVELOPMENT IN THE VICINITY OF PALOMAR AIRPORT APPLICANT: CITY OF CARLSBAD CASE NO.: LOCAL FACILIITES MANAGEMENT PLAN -ZONE 5 WHEREAS, a verified application has been filed with the City of Carlsbad and referred to the Planning Commission, and WHEREAS, the City Council passed Resolution No. 8797 adopting the Citywide Facilities and Improvements Plan establishing facility zones and performance standards for public facilities, and WHEREAS, the City Council passed Resolution No. 9808 C 13 requiring the processing of a Local Facilities Management Plan, 14 and C 15 WHEREAS, the Planning Commission did, on the 17th day of 16 June, 1987, and on the 1st day of July, 1987, hold a duly noticed 17 public hearing as prescribed by law to consider said request; and 18 WHEREAS, at said public hearing, upon hearing and 19 considering all testimony and arguments, if any, of all persons 20 desiring to be heard, said Commission considered all factors 21 relating to the Local Facilities Management Plan for Zone 5. 22 NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning 23 Commission of the City of Carlsbad as follows: 24 A) 25 B) 26 27 I I II 28 I I I I That the above recitations are true and correct. That based on the evidence presented at the public hearing, the Commission APPROVES Local Facilities Management Plan - Zone 5, based on the following findings and subject to the following conditions: -210- C C C ]. 2 3 4 5 6 Findings: 1) 2) That the Local Facilities Management Plan for Zone 5 is consistent with the Land Use Element, the Public Facilities Element, and the other Elements contained in Carlsbad's General Plan. That the Local Facilities Management Plan for Zone 5 is consistent with Section 21.90 of the Carlsbad Municipal Code (Growth Management), and with the adopted Citywide Facilities and Improvements Plan. 7 3) That the Local Facilities Management Plan and the conditions contained therein will promote the public safety and welfare by ensuring that public facilities will be provided in conformance with the adopted performance standards. 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 4) 5) 6) The Local Facilities Management Plan will control the timing and locations of growth by tying the pace of development to the provision of public facilities and improvements. The Plan will prevent growth unless public facilities and servi~es are available in conformance with the adopted performance standards. This Plan will not cause any significant environmental impacts and a Negative Declaration has been issued by the Planning Director on Ju·ne 5, 198 7 and approved by the Planning Commission on July 1, 1987. Conditions: 1) I II I Ill/ /Ill / // / II// Ill/ I I I I II I I Approval is granted for Local Facilities Management Plan - Zone 5 as contained in the Plan titled Local Facilities Management Plan Zone 5, dated June 17, 1987, attached hereto, and incorporated herein by reference. PC RESO NO. 2668 -2- -211- C C C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on the 1st day of July, 1987, by the following vote, to wit: AYES: Chairman Marcus, Commissioners Schlehuber, Schramm, Hall, Holmes, McFadden and McBane. ATTEST: NOES: None. ABSENT: None. ABSTAIN: None. . ~' PLANNING DIRECTOR PC RESO NO. 2668 -212- MARY CUS, Chairman CARLS D PLANNING COMMISSION -3- I C C C l 2 3 4 RESOLUTION NO. 9188 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA APPROVING A LOCAL FACILITIES MANAGEMENT PLAN FOR LOCAL FACILITIES MANAGEMENT ZONE 5. WHEREAS, a Local Facilities Management Plan has been · 5 prepared for Local Facilities Management Zone 5 in accordance 6 with Chapter 21.90 of the Carlsbad Municipal Code; and 7 WHEREAS, the Planning Commission did on July 1, 1987 81 hold a duly noticed public hearing as required by law to g consider said plan and at the conclusion of the hearing adopted . 10 Resolution No. 2668 making findings and recommending that the 11 City Council adopt a plan; and 12 WHEREAS, a Negative Declaration was issued by the 13 Planning Director on June 5, 1987 indicating that the Local i 11 14: Facilities Management Plan is not anticipated to have any 15 significant adverse impact on the environment; and 16 WHEREAS, the City Council at their meeting of August 4, 17 1987 held a duly noticed public hearing and considered all 18 1 testimony and arguments of anyone desiring to be heard; I 19 1! NOW, THEREFORE, BE IT HEREBY RESOLVED by the City 2oilcouncil of the City of Carlsbad, California as follows: 211 22 1. 2. That the above recitations are true and correct. That the findings of the Planning Commission in 23 Resolution No. 2668 also constitute findings of the City 24 Council. 25 3. That the Local Facilities Management Plan for Zone 5 26 dated June 17, 1987 on file with the City Clerk and incorporated 27 herein by reference and the amendments attached as Exhibit 11 111 28 -213- C C C l 2 3 4 .5 6 7 8 9 10 11 12 13 are hereby boundaries conditions approved. of Zone 5 of said plan. Any development occurring within the shall comply with all the terms and 4. That a non-residential park/recreation fee is needed to help meet the recreational needs of a daytime work force in excess of 40,000: to help provide safe recreational areas for this work force: to help reduce peak hour traffic trips, to encourage a healthful working environment: and, to implement the policies of the Parks and Recreation Element of the General Plan. 5. That a non-residential standard is necessary for fire services to help provide adequate response times and adequate fire department facilities to ensure the safety of 1 persons and structures located in non-residential areas such as 141 Zone 5. 15 PASSED, APPROVED AND ADOPTED at a regular meeting of the 16 Carlsbad City Council held on the 4 th day of August , 1987 17 tbY the following vote, to wit: 18 1'. AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson 19 i ;> 201 211 221 I 231 A'r'!EST: NOES: None ABSENT: None 24111 ~ ✓ {2a,,:t;-;J,,..,,.,. :l= ALETHA L. RAUTENKRANZ, City Clk 25 26 27 28 (SEAL) -214- CLAUDE A. LEWIS, Mayor C C C EXHIBIT 11111 PAGE 8 UNDER SPECIAL CONDITIONS FOR PARKS SHOULD READ: All future development in Zone 5 shall be required to pay a local facilities management fee for park/recreational facilities. Until the specific fee is adopted, all future developers shall be required to sign an agreement to pay the fee prior to obtaining building permits. PAGE 11 UNDER SPECIAL CONDITIONS FOR FIRE SHOULD READ: Based upon the adoption of a non-residential fire standard, the construction of Fire Station No. 5 (Safety center Location) shall be required to be constructed and will begin in 1988 with an opening date projected for early 1989. -215-