HomeMy WebLinkAbout2758 AUBURN AVE; ; CBR2023-1421; PermitBuilding Permit Finaled
Residential Permit
Print Date: 04/05/2023
Job Address: 2758 AUBURN AVE, CARLSBAD, CA 92010-2170
Permit Type: BLDG-Residential Work Class: P/M/E
Parcel#:
Valuation:
Occupancy Group:
#of Dwelling Units:
1674900400 Track#:
$3,200.00 Lot#:
Project#:
Plan#:
Bedrooms: Construction Type:
Bathrooms: Orig. Plan Check#:
Occupant Load: Plan Check#:
Code Edition:
Sprinkled:
Project Title:
Description: DIRECT REPLACEMENT OF FURNACE (E-REVIEW)
Applicant:
STERLING MECHANICAL
JASON LYNCH
825 COLLEGE BLVD, # STE 102
OCEANSIDE, CA 92057-5512
(760) 822-3216
FEE
PLUMBING, MECHANICAL & ELECTRICAL PERMITS
Total Fees : $208.00 Total Payments To Date: $208.00
Permit No:
Status:
{city of
Carlsbad
CBR2023-1421
Closed -Finaled
Applied: 03/24/2023
Issued : 04/01/2023
Finaled Close Out: 04/05/2023
Final Inspection: 04/05/2023
INSPECTOR: Alvarado, Tony
Balance Due:
AMOUNT
$208.00
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
( City of
Carlsbad
RESIDENTIAL
BUILDING PERMIT
APPLICATION
B-1
Plan Check ---------
Est. Value
PC Deposit ---------
Date ---------
Job Address 2758 Auburn Ave Carlsbad, CA 920l0 Suite: APN: 1674900400 ----
CT/Project#: _________________ Lot#: ___ _
Fire Sprinklers: yes /liit Air Conditioning: yes /CwD Electrical Panel Upgrade: yes /ffig
BRIEF DESCRIPTION OF WORK: Direct replacement of furnace
□ Addition/New: _____ Living SF, ____ Deck SF, ____ Patio SF, ____ Garage SF
Is this to create an Accessory Dwelling Unit? Yes/ No New Fireplace? Yes/ No, if yes how many? __
D Remodel: ____ SF of affected area Is the area a conversion or change of use ? Yes/ No
□ Pool/Spa: ____ SF Additional Gas or Electrical Features? ____________ _
□ Solar: ___ KW, ___ Modules, Mounted: Roof/ Ground, Tilt: Yes/ No, RMA: Yes/ No, Battery: Yes/ No
Panel Upgrade: Yes/ No
D Reroof: -------------------------------------
~ Plumbing/Mechanical/Electrical Only: ~D=ir=e=ct~r~e_p=la~c=e~m~e=n=t~o~f~fu=r~n=a=ce~--------------
□ Other: --------------------------------------
APPLICANT (PRIMARY CONTACT)
Name: Brandi Lynch
Address: 825 College Blvd. Suite 102 PMB#314
City: Oceanside State: CA Zip: 92057
Phone: 760-822-3216
Email: Sterlingairsd@gmail.com
DESIGN PROFESSIONAL
Name: _________________ _
Address: -----------------City: ________ State: ___ Zip: ____ _
Phone: ________________ _
Email: _________________ _
Architect State License: __________ _
PROPERTY OWNER
Name: Jill Ganey
Address: 2758 Auburn Ave
City: Carlsbad
Phone: (760)518-5015
Email: iill@lioksoul,com
CONTRACTOR BUSINESS
Name: Sterling Mechanical
State: CA Zip: 92010
Address: 825 College Blvd. Suite 102 PMB#314
City: Oceanside State: CA Zip: .... 9-=2 ___ 05 ____ 7 _____ _
Phone: 760-822-3216
Email: Sterlingairsd@gmail.com
State License: 1003161 Bus. License: BLOS0072736
(Sec. 7031.S Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law
{Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}).
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email : Building@carlsbadca.gov
B-1 Page 1 of 2 Rev. 06/18
( OPTION A): WORKERS'COMPENSATION DECLARATION:
I hearby affirm under penalty of perjury one of the following declarations:
□ I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued.
8 I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My
workers' compensation insurance carrier and policy number are: Insurance Company Name: ---'-M"'"a"'r ... k""e"-I '"'"ln""s-"u"-ra"'n""'cc..cec...Cc...occ. __ _,_ ________ _
Policy No. MWC0206801-01 Expiration Date: 10/31/20_2_3 ___ _
□ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer
to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees. ff
CONTRACTOR SIGNATURE: -r-,._... _______________ □AGENT DATE: 3/24/2023
( OPTION B ): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
□ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work
himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
□ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
□ I am exempt under Section ________ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. □ Yes □ No
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone/
contractors' license number):
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name/ address/ phone/ type of work):
OWNER SIGNATURE: □AGENT DATE: _____ _ --------------------------
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: _____________________ Lender's Address: ____________________ _
ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? □ Yes □ No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes □ No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes □ No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
APPLICANT CERTIFICATION:
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP
HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF
THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized
by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time
after the work is commenced for a perio 18:day;,?ction 1~.4 ,form Building Code).
APPLICANT SIGNATURE: """""""-'--'~:..::.......:://:U.~:......__.,e;-~....:...._ ____________ DATE: 3/24/2023
1635 Faraday Ave Carlsbad, CA 92008
B-1
Ph: 760-602-2719 Fax: 760-602-8558
Page 2 of 2
Email: Building@carlsbadca.gov
Rev. 06/18
Building Permit Inspection History Finaled
{city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBR2023-1421)
Permit Type:
Work Class:
Status:
Scheduled
Date
04/05/2023
BLDG-Residential Application Date: 03/24/2023
P/M/E Issue Date: 04/01/2023
Closed -Finaled Expiration Date: 10/02/2023
IVRNumber: 47675
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
04/05/2023 BLDG-43 Air
Cond./Furnace Set
207139-2023
NOTES Created By
Angie Teanio
BLDG-Final Inspection 207138-2023
Passed
TEXT
760-207-9188 Jason
Passed
Checklist Item COMMENTS
BLDG-Plumbing Final
BLDG-Mechanical Final
NOTES Created By
Angie Teanio
TEXT
760-207-9188 Jason
Wednesday, April 5, 2023
Owner:
Subdivision:
Address: 2758 AUBURN AVE
CARLSBAD, CA 92010-2170
Primary Inspector Reinspection Inspection
Tony Alvarado
Tony Alvarado
Created Date
04/04/2023
Passed
Yes
Yes
Created Date
04/04/2023
Complete
Complete
Page 1 of 1
C cityof
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. The completed checklist must be included in the building permit application. It may be
necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate
full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach
to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as
specified by the ordinances.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
..iii If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
an explanation must be provided to the satisfaction of the Building Official.
..iii Details on CAP ordinance requirements are available on the city's website .
..iii A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be
completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and
download the latest form.
Project Name/Building
Permit No.:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone:
Application Information
2758 Auburn Ave Carlsbad, CA 92010 BP No.:
1674900400
Sterling Mechanical Inc.
825 College Blvd Suite 102 #314 Oceanside, CA 92057
760-822-3216 Contact Email:
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
Applicant Signature: &~L
B-50
Contact Phone:
Contact Email:
Date: 3/24/2023
Page 1 of 6
Sterlingairsd@gmail.com
Revised 08/19
City of Carlsbad Climate Action Plan Consistency Checklist
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project.
For alterations and additions to existing buildings, attach Building Permit Valuation worksheet.
Building Permit Valuation (BPV) from worksheet: $_3_,2_0_0 ___ _
Construction Type
D Residential
□ New construction
□ Additions and alterations:
□ BPV < $60,000
□ BPV ~ $60,000
□ Electrical service panel upgrade only
□ BPV ~ $200,000
D Nonresidential
□ New construction
□ Alterations:
□ BPV ~ $200,000 or additions ~ 1,000
square feet
□ BPV ~ $1,000,000
□ ~ 2,000 sq. ft. new roof addition
Checklist Item
Complete Section{s) Notes:
A high-rise residential building is 4 or more stories, including a
Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor
area is residential use
2A,3A, 1B, 2B,
4A 3B,4A
N/A N/A All residential additions and alterations
1A,4A 4A 1-2 family dwellings and townhouses with attached garages
only
*Multi-family dwellings only where interior finishes are removed
1A, 4A* 1B, 4A* and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
1B, 2B, 3B, 4B and 5 I
1B, 5
1B, 2B, 5 Building alterations of~ 75% existing gross floor area
2B, 5 1 B also applies if BPV ~ $200,000
CAP Ordinance Compllance
Check the appropriate boxes, explain all not applicable and exception ~ems, and provide supporting calculations and documentation as necessary.
I 1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CAL Green) for
more infonnation when completing this section.
A D Residential addition or alteration ~ $60,000 building permit valuation.
See CMC section 18.30.190.
Year Built Single-family Requirements
□ Before 1978 Select one:
□ Duct sealing □ Attic insulation □ Cool roof
□ 1978 and later Select one:
□ Lighting package □ Water heating Package
□ Between 1978 and 1991
□ 1992 and later
□ N/A _________ _
□ Exception: Home energy score~ 7
(attach certification)
Multi-family Requirements
□ Attic insulation
Select one:
□ Duct sealing □ Attic insulation □ Cool roof
Select one:
□ Lighting package □ Water heating package
B. D Nonresidential* new construction or alterations ~ $200,000 building permit valuation,
or additions ~ 1,000 square feet. □ N/A
Updated 8/15/2019 2
City of Carlsbad Climate Action Plan Consistency Checklist
See CMC 18.21.155 and CALGreen Appendix AS, Division AS.2-Energy Efficiency.
A5.203.1.1 Choose one: □ .1 Outdoor lighting □ .2 Warehouse dock seal doors
□ .3 Restaurant service water heating (comply with California Energy Code section 140.5, as amended) □ N/A ----------□ .4 Daylight design PAFs □ .5 Exhaust air heat recovery
A5.203.1.2.1
Choose one as applicable: □ .95 Energy budget □ .90 Energy budget □ N/A
A5.211.1**
□ On-site renewable energy □ N/A
A5.211 .3**
□ Green power (if offered by local utility provider, 50% minimum renewable sources) □ N/A
A5.212.1
□ Elevators and escalators □ N/A
A5.213.1
□ Steel framing □ N/A
* lndudes hotels/motels and high-rise residential buildings
** For alterations ~ $1,000,000 BPV and affecting > 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply
with CMC 18.30.130 instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic
requirement (28 below) instead. 2) If project includes installation of an electric heat pump water heater pursuant to CMC 18.30.150(8)
(high-rise residential) or 18.30.170(8) (low-rise residential), increase system size by .3kWdc if PY offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
Exception
□
□
□
□
kWdc
8. D Nonresidential new construction or alterations ~$1,000,000 8PV and affecting ~75% existing floor area, or addition that increases roof
area by ~,000 square feel Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
□ Gross Floor Area (GFA) Method
GFA:
□If< 10,000s.f. Enter: 5 kWdc
Min. System Size:
□If~ 10,000s.f. calculate: 15 kWdc x (GFA/10,000) **
__ kWdc
**Round building size factor to nearest tenth, and round system size to nearest whole number.
□ Time-Dependent Valuation Method
Updated 8/15/2019 3
City of Carlsbad Climate Action Plan Consistency Checklist
Annual TDV Energy use:*** ______ x .80= Min. system size: _____ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission .
3. Water Heating
A D Residential and hotel/motel new construction
Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section.
□ For systems serving individual dwelling units choose one:
□ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
□ Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 ( c) 14 (low-rise residential)
□ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
□ For systems serving multiple dwelling units, install a central water-heating system with all of the following:
□ Gas or propane water heating system
□ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
□ Solar water heating system that is either:
□ .20 solar savings fraction
□ .15 solar savings fraction, plus drain water heat recovery
□ Exception:
B. D Nonresidential new construction
Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section.
□ Water heating system derives at least 40% of its energy from one of the following (attach documentation):
□ Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
□ Heat pump water heater
□ Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
□ Exception:
Updated 8/15/2019 4
City of Carlsbad Climate Action Plan Consistency Checklist
4. Electric Vehicle Charging
A. D Residential New construction and major alterations*
Please refer to Carlsbad Ordinance CMC section 18.21.140 when completing this section.
□ One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE Ready parking space required □ Exception :
□ Multi-family residential: □ Exception :
Total Parking Spaces EVSESpaces
Proposed Capable Ready
Calculations: Total EVSE spaces = .10 x Total parking (rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces -EVSE Installed
(EVSE other may be "Capable," "Ready'' or "Installed.")
Installed Total
*Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation ~ $60,000
or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit
valuation ~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing
systems are proposed.
B D Nonresidential new construction (includes hotels/motels) □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable I Ready I Installed I Total
I I I
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
□ 101-150 12 6
□ 151-200 17 9
□ 201 and over 10 percent of total 50 percent of Required EV Spaces
Updated 8/15/2019 5
City of Carlsbad Climate Action Plan Consistency Checklist
5. D Transportation Demand Management (TDM): Nonresidential ONLY
An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on your submitted plans to determine whether or nor your permit requires a TOM plan. If TOM is applicable to your
permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Use
EmpADTfor
first 1,000 s.f.
EmpADTI
1000 s.f.1
Office (all}2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousin 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 1()lhEdition
13
11
4.5
3.5
3
1
2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf = 8 ADT
2. 9,334 sf -1,000 sf = 8,334 sf
3. 8,334 sf I 1,000 x 4.5 + 8 = 46 Em lo ee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my permit require a TOM plan and understand that an a proved TOM plan is a condition of permit issuance.
Date: 3/24/2023
Person other than Applicant to be contacted for TDM compliance (if applicable):
Name (Printed): __________________ _ Phone Number: ____ _
Email Address: __________________ _
Updated 8/15/2019 6