Loading...
HomeMy WebLinkAbout2758 AUBURN AVE; ; CBR2023-1421; PermitBuilding Permit Finaled Residential Permit Print Date: 04/05/2023 Job Address: 2758 AUBURN AVE, CARLSBAD, CA 92010-2170 Permit Type: BLDG-Residential Work Class: P/M/E Parcel#: Valuation: Occupancy Group: #of Dwelling Units: 1674900400 Track#: $3,200.00 Lot#: Project#: Plan#: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check#: Occupant Load: Plan Check#: Code Edition: Sprinkled: Project Title: Description: DIRECT REPLACEMENT OF FURNACE (E-REVIEW) Applicant: STERLING MECHANICAL JASON LYNCH 825 COLLEGE BLVD, # STE 102 OCEANSIDE, CA 92057-5512 (760) 822-3216 FEE PLUMBING, MECHANICAL & ELECTRICAL PERMITS Total Fees : $208.00 Total Payments To Date: $208.00 Permit No: Status: {city of Carlsbad CBR2023-1421 Closed -Finaled Applied: 03/24/2023 Issued : 04/01/2023 Finaled Close Out: 04/05/2023 Final Inspection: 04/05/2023 INSPECTOR: Alvarado, Tony Balance Due: AMOUNT $208.00 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov ( City of Carlsbad RESIDENTIAL BUILDING PERMIT APPLICATION B-1 Plan Check --------- Est. Value PC Deposit --------- Date --------- Job Address 2758 Auburn Ave Carlsbad, CA 920l0 Suite: APN: 1674900400 ---- CT/Project#: _________________ Lot#: ___ _ Fire Sprinklers: yes /liit Air Conditioning: yes /CwD Electrical Panel Upgrade: yes /ffig BRIEF DESCRIPTION OF WORK: Direct replacement of furnace □ Addition/New: _____ Living SF, ____ Deck SF, ____ Patio SF, ____ Garage SF Is this to create an Accessory Dwelling Unit? Yes/ No New Fireplace? Yes/ No, if yes how many? __ D Remodel: ____ SF of affected area Is the area a conversion or change of use ? Yes/ No □ Pool/Spa: ____ SF Additional Gas or Electrical Features? ____________ _ □ Solar: ___ KW, ___ Modules, Mounted: Roof/ Ground, Tilt: Yes/ No, RMA: Yes/ No, Battery: Yes/ No Panel Upgrade: Yes/ No D Reroof: ------------------------------------- ~ Plumbing/Mechanical/Electrical Only: ~D=ir=e=ct~r~e_p=la~c=e~m~e=n=t~o~f~fu=r~n=a=ce~-------------- □ Other: -------------------------------------- APPLICANT (PRIMARY CONTACT) Name: Brandi Lynch Address: 825 College Blvd. Suite 102 PMB#314 City: Oceanside State: CA Zip: 92057 Phone: 760-822-3216 Email: Sterlingairsd@gmail.com DESIGN PROFESSIONAL Name: _________________ _ Address: -----------------City: ________ State: ___ Zip: ____ _ Phone: ________________ _ Email: _________________ _ Architect State License: __________ _ PROPERTY OWNER Name: Jill Ganey Address: 2758 Auburn Ave City: Carlsbad Phone: (760)518-5015 Email: iill@lioksoul,com CONTRACTOR BUSINESS Name: Sterling Mechanical State: CA Zip: 92010 Address: 825 College Blvd. Suite 102 PMB#314 City: Oceanside State: CA Zip: .... 9-=2 ___ 05 ____ 7 _____ _ Phone: 760-822-3216 Email: Sterlingairsd@gmail.com State License: 1003161 Bus. License: BLOS0072736 (Sec. 7031.S Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law {Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}). 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email : Building@carlsbadca.gov B-1 Page 1 of 2 Rev. 06/18 ( OPTION A): WORKERS'COMPENSATION DECLARATION: I hearby affirm under penalty of perjury one of the following declarations: □ I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. 8 I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Company Name: ---'-M"'"a"'r ... k""e"-I '"'"ln""s-"u"-ra"'n""'cc..cec...Cc...occ. __ _,_ ________ _ Policy No. MWC0206801-01 Expiration Date: 10/31/20_2_3 ___ _ □ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. ff CONTRACTOR SIGNATURE: -r-,._... _______________ □AGENT DATE: 3/24/2023 ( OPTION B ): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractor's License Law for the following reason: □ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). □ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). □ I am exempt under Section ________ Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. □ Yes □ No 2. I (have/ have not) signed an application for a building permit for the proposed work. 3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone/ contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name/ address/ phone/ type of work): OWNER SIGNATURE: □AGENT DATE: _____ _ -------------------------- CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: _____________________ Lender's Address: ____________________ _ ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? □ Yes □ No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes □ No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes □ No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a perio 18:day;,?ction 1~.4 ,form Building Code). APPLICANT SIGNATURE: """""""-'--'~:..::.......:://:U.~:......__.,e;-~....:...._ ____________ DATE: 3/24/2023 1635 Faraday Ave Carlsbad, CA 92008 B-1 Ph: 760-602-2719 Fax: 760-602-8558 Page 2 of 2 Email: Building@carlsbadca.gov Rev. 06/18 Building Permit Inspection History Finaled {city of Carlsbad PERMIT INSPECTION HISTORY for (CBR2023-1421) Permit Type: Work Class: Status: Scheduled Date 04/05/2023 BLDG-Residential Application Date: 03/24/2023 P/M/E Issue Date: 04/01/2023 Closed -Finaled Expiration Date: 10/02/2023 IVRNumber: 47675 Actual Inspection Type Start Date Inspection No. Inspection Status 04/05/2023 BLDG-43 Air Cond./Furnace Set 207139-2023 NOTES Created By Angie Teanio BLDG-Final Inspection 207138-2023 Passed TEXT 760-207-9188 Jason Passed Checklist Item COMMENTS BLDG-Plumbing Final BLDG-Mechanical Final NOTES Created By Angie Teanio TEXT 760-207-9188 Jason Wednesday, April 5, 2023 Owner: Subdivision: Address: 2758 AUBURN AVE CARLSBAD, CA 92010-2170 Primary Inspector Reinspection Inspection Tony Alvarado Tony Alvarado Created Date 04/04/2023 Passed Yes Yes Created Date 04/04/2023 Complete Complete Page 1 of 1 C cityof Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST B-50 Development Services Building Division 1635 Faraday Avenue (760) 602-2719 www.carlsbadca.gov This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their projects. The completed checklist must be included in the building permit application. It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool ..iii If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, an explanation must be provided to the satisfaction of the Building Official. ..iii Details on CAP ordinance requirements are available on the city's website . ..iii A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and download the latest form. Project Name/Building Permit No.: Property Address/APN: Applicant Name/Co.: Applicant Address: Contact Phone: Application Information 2758 Auburn Ave Carlsbad, CA 92010 BP No.: 1674900400 Sterling Mechanical Inc. 825 College Blvd Suite 102 #314 Oceanside, CA 92057 760-822-3216 Contact Email: Contact information of person completing this checklist (if different than above): Name: Company name/address: Applicant Signature: &~L B-50 Contact Phone: Contact Email: Date: 3/24/2023 Page 1 of 6 Sterlingairsd@gmail.com Revised 08/19 City of Carlsbad Climate Action Plan Consistency Checklist Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. For alterations and additions to existing buildings, attach Building Permit Valuation worksheet. Building Permit Valuation (BPV) from worksheet: $_3_,2_0_0 ___ _ Construction Type D Residential □ New construction □ Additions and alterations: □ BPV < $60,000 □ BPV ~ $60,000 □ Electrical service panel upgrade only □ BPV ~ $200,000 D Nonresidential □ New construction □ Alterations: □ BPV ~ $200,000 or additions ~ 1,000 square feet □ BPV ~ $1,000,000 □ ~ 2,000 sq. ft. new roof addition Checklist Item Complete Section{s) Notes: A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use 2A,3A, 1B, 2B, 4A 3B,4A N/A N/A All residential additions and alterations 1A,4A 4A 1-2 family dwellings and townhouses with attached garages only *Multi-family dwellings only where interior finishes are removed 1A, 4A* 1B, 4A* and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 1B, 2B, 3B, 4B and 5 I 1B, 5 1B, 2B, 5 Building alterations of~ 75% existing gross floor area 2B, 5 1 B also applies if BPV ~ $200,000 CAP Ordinance Compllance Check the appropriate boxes, explain all not applicable and exception ~ems, and provide supporting calculations and documentation as necessary. I 1. Energy Efficiency Please refer to Carlsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CAL Green) for more infonnation when completing this section. A D Residential addition or alteration ~ $60,000 building permit valuation. See CMC section 18.30.190. Year Built Single-family Requirements □ Before 1978 Select one: □ Duct sealing □ Attic insulation □ Cool roof □ 1978 and later Select one: □ Lighting package □ Water heating Package □ Between 1978 and 1991 □ 1992 and later □ N/A _________ _ □ Exception: Home energy score~ 7 (attach certification) Multi-family Requirements □ Attic insulation Select one: □ Duct sealing □ Attic insulation □ Cool roof Select one: □ Lighting package □ Water heating package B. D Nonresidential* new construction or alterations ~ $200,000 building permit valuation, or additions ~ 1,000 square feet. □ N/A Updated 8/15/2019 2 City of Carlsbad Climate Action Plan Consistency Checklist See CMC 18.21.155 and CALGreen Appendix AS, Division AS.2-Energy Efficiency. A5.203.1.1 Choose one: □ .1 Outdoor lighting □ .2 Warehouse dock seal doors □ .3 Restaurant service water heating (comply with California Energy Code section 140.5, as amended) □ N/A ----------□ .4 Daylight design PAFs □ .5 Exhaust air heat recovery A5.203.1.2.1 Choose one as applicable: □ .95 Energy budget □ .90 Energy budget □ N/A A5.211.1** □ On-site renewable energy □ N/A A5.211 .3** □ Green power (if offered by local utility provider, 50% minimum renewable sources) □ N/A A5.212.1 □ Elevators and escalators □ N/A A5.213.1 □ Steel framing □ N/A * lndudes hotels/motels and high-rise residential buildings ** For alterations ~ $1,000,000 BPV and affecting > 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with CMC 18.30.130 instead. 2. Photovoltaic Systems A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic requirement (28 below) instead. 2) If project includes installation of an electric heat pump water heater pursuant to CMC 18.30.150(8) (high-rise residential) or 18.30.170(8) (low-rise residential), increase system size by .3kWdc if PY offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc* sheets if necessary) Total System Size: kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. Exception □ □ □ □ kWdc 8. D Nonresidential new construction or alterations ~$1,000,000 8PV and affecting ~75% existing floor area, or addition that increases roof area by ~,000 square feel Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to high-rise residential and hotel/motel buildings. Choose one of the following methods: □ Gross Floor Area (GFA) Method GFA: □If< 10,000s.f. Enter: 5 kWdc Min. System Size: □If~ 10,000s.f. calculate: 15 kWdc x (GFA/10,000) ** __ kWdc **Round building size factor to nearest tenth, and round system size to nearest whole number. □ Time-Dependent Valuation Method Updated 8/15/2019 3 City of Carlsbad Climate Action Plan Consistency Checklist Annual TDV Energy use:*** ______ x .80= Min. system size: _____ kWdc ***Attach calculation documentation using modeling software approved by the California Energy Commission . 3. Water Heating A D Residential and hotel/motel new construction Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section. □ For systems serving individual dwelling units choose one: □ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) □ Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 ( c) 14 (low-rise residential) □ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher □ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors □ Exception: □ For systems serving multiple dwelling units, install a central water-heating system with all of the following: □ Gas or propane water heating system □ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low- rise residential) □ Solar water heating system that is either: □ .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recovery □ Exception: B. D Nonresidential new construction Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section. □ Water heating system derives at least 40% of its energy from one of the following (attach documentation): □ Solar-thermal □ Photovoltaics □ Recovered energy □ Water heating system is (choose one): □ Heat pump water heater □ Electric resistance water heater(s) □Solar water heating system with .40 solar savings fraction □ Exception: Updated 8/15/2019 4 City of Carlsbad Climate Action Plan Consistency Checklist 4. Electric Vehicle Charging A. D Residential New construction and major alterations* Please refer to Carlsbad Ordinance CMC section 18.21.140 when completing this section. □ One and two-family residential dwelling or townhouse with attached garage: □ One EVSE Ready parking space required □ Exception : □ Multi-family residential: □ Exception : Total Parking Spaces EVSESpaces Proposed Capable Ready Calculations: Total EVSE spaces = .10 x Total parking (rounded up to nearest whole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other= Total EVSE spaces -EVSE Installed (EVSE other may be "Capable," "Ready'' or "Installed.") Installed Total *Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation ~ $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation ~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. B D Nonresidential new construction (includes hotels/motels) □ Exception · Total Parking Spaces EVSE Spaces Proposed Capable I Ready I Installed I Total I I I Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces □ 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 □ 101-150 12 6 □ 151-200 17 9 □ 201 and over 10 percent of total 50 percent of Required EV Spaces Updated 8/15/2019 5 City of Carlsbad Climate Action Plan Consistency Checklist 5. D Transportation Demand Management (TDM): Nonresidential ONLY An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to determine whether or nor your permit requires a TOM plan. If TOM is applicable to your permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Use EmpADTfor first 1,000 s.f. EmpADTI 1000 s.f.1 Office (all}2 20 Restaurant 11 Retaib 8 Industrial 4 Manufacturing 4 Warehousin 4 1 Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 1()lhEdition 13 11 4.5 3.5 3 1 2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to calculate employee ADT 3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Sample calculations: Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf = 8 ADT 2. 9,334 sf -1,000 sf = 8,334 sf 3. 8,334 sf I 1,000 x 4.5 + 8 = 46 Em lo ee ADT I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TOM plan and understand that an a proved TOM plan is a condition of permit issuance. Date: 3/24/2023 Person other than Applicant to be contacted for TDM compliance (if applicable): Name (Printed): __________________ _ Phone Number: ____ _ Email Address: __________________ _ Updated 8/15/2019 6