Loading...
HomeMy WebLinkAboutMS 04-06; MAY DRIVEWAY AND PRIVATE JOINT ACCESS; CHANGE OF CONSULTANT AND RESPONSIBLE CHARGE; 2023-03-08 GEOTECHNICAL | ENVIRONMENTAL | MATERIALS March 8, 2023 Project No. 3792-SD Hope Love hopeloverealty@gmail.com Carlsbad, CA 92008 Subject: Change of Geotechnical Consultant Proposed El Camino Real Residential Development APNs 167-080-52-00 and 167-080-53-00 Carlsbad, California References: See Page 3 Dear Ms. Hope, In accordance with your request, GeoTek, Inc. (GeoTek) is submitting this letter to provide a change of consultant statement for the subject project located at 3817 El Camino Real, Carlsbad, California. Change of Consultant Statement Upon review of the referenced report, prepared by Vinje Middleton and Associates, GeoTek generally agrees with the data, recommendations, and conclusions, provided therein. The data, recommendations, and conclusions provided by Vinje Middleton and Associates along with the geotechnical update report by GeoTek remain valid for the proposed construction with regards to the subject site. GeoTek assumes responsibility and obligation as geotechnical consultant of record for the subject project as of March 8, 2023. Hope Love Project No. 3864-SD Change of Geotechnical Consultant March 8, 2023 El Camino Real Residential Development, Carlsbad, California Page 2 The opportunity to be of service is sincerely appreciated. If you should have any questions, please do not hesitate to call our office. Respectfully submitted, GeoTek, Inc. Christopher D. Livesey CEG 2733, Exp. 05/30/2023 Vice President Edwin R. Cunningham RCE 81687, Exp. 03/31/2024 Project Engineer Distribution: (1) Addressee via email Hope Love Project No. 3864-SD Change of Geotechnical Consultant February 14, 2023 El Camino Real Residential Development, Carlsbad, California Page 3 REFERENCES GeoTek, Inc., 2023, “Updated Geotechnical Evaluation, Proposed El Camino Real Residential Development, APN’s 167-080-52-00 and 167-080-53-00, Carlsbad, California,” dated February 14, 2023 Vinje and Middleton Engineering, Inc., 2003, “Preliminary Geotechnical Investigation, Proposed Two-Lot Development, El Camino Real, Carlsbad, California, A.P.N. #167-080-36,” Job No. #03-390-P, dated October 17, 2003.