HomeMy WebLinkAboutLFMP 07; LOCAL FACILITIES MANAGEMENT PLAN ZONE 07; LOCAL FACILITIES MANAGEMENT PLAN ZONE 7 FINANCING PLAN; 1991-08-23CITY OF CARLSBAD GROWIB MANAGEMENT PROGRAM ZONE7 LOCAL FACILITIFS MANAGEMENT PLAN -FINANCING PLAN - Prepared for: City of Carlsbad 2075 Las Palmas Drive Carlsbad, California 92009 Prepared by: Hofman Planning Associates 2386 Faraday A venue, Suite 120 Carlsbad, California 92008 (619) 438-1465 August 23, 1991 INDIVIDUAI.S RESPONSIBLE FOR 1HE PREPARATION OF THIS PLAN SPONSORING LAND OWNER: LYON COMMUNITIF.S 4330 La Jolla Village Drive, Suite 130 San Diego, California 92122 (619) 546-1200 George Haviar CONSULTANTS: HOFMAN PLANNING ASSOCIATES 2386 Faraday A venue, Suite 120 Carlsbad, California 92008 (619) 438-1465 Bill Hofman Grace Manues HUNSAKER & ASSOCIATES 10179 Huennekens Street, Suite 200 San Diego, California 92121 (619) 558-4500 David Hammar Greg Gallagher CITY OF CARLSBAD: Jim Elliott, Financial Management Director Don Rideout, Senior Management Analyst Brian Hunter, Senior Planner Steven C. Jantz, Associate Engineer TABLE OF CONTENTS Executive S11mmary . . . . . . . . . . . . . . . . . . . . . . . . . Financing Matrix . . . . . . . . . . . . . . . . . . . . . . . City Administrative Facilities Conditions . . . . . . . . . . . . . . . . . . . . . . . . . • • . Financing . . . . . . . . . . . . . . . . . . . . . . . . . . . . Library Facilities Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . Financing ........................... . Wastewater Treatment Capacity Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . Financing ........................... . Park Facilities Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . Financing ........................... . Drainage Facilities Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . F1nanc1ng ........................... . Circulation Facilities Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . Financing ........................... . Fire Facilities Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . Financing ........................... . Open Space Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . Financing ........................... . School Facilities Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . Financing ........................... . Sewer Facilities Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . Financing . . . . . . . . . . . . . . . . . . . . . . . . . . . . Water Facilities Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . F. . 1nanc1ng ........................... . 1 3 4 4 5 5 6 6 7 7 8 9 17 20 28 28 29 29 30 30 31 34 43 44 - - EXECUTIVE SUMMARY This financing plan details how the public facilities and improvements that are required to maintain the adopted Growth Management performance standards for Zone 7 will be financially guaranteed. This plan addresses all applicable general and special conditions contained within the adopted Zone 7 Local Facilities Management Plan (LFMP)1• Both the LFMP and this financing plan were prepared pursuant to the City's Growth Management Program and Chapter 21. 90 of the Carlsbad Municipal Code. In preparing this financing plan, it became clear that no single financing mechanism could satisfy the complex infrastructure requirements of this zone. Therefore, several :financing techniques are being used to address both the need for upgrading facilities, enabling them to conform with the adopted performance standards, and to ensure conformance of future facilities as development occurs. The following :financing techniques will be used to guarantee the public facilities needed to serve future development within Zone 7: A. B. Developer Fundin& Many of the drainage, sewer, water and circulation improvements will be directly funded and constructed by the developer(s). Facilities earmarked for developer funding are limited to those which normally would have been imposed as a condition of approval of a tentative map under the City's existing development review process. Without these essential facilities, the associated subdivisions could not be developed. Therefore, the City is already guaranteed that these specific facilities will pc constructed concurrent with need; no further action is required at this time. The developer shall post a surety bond to ensure the construction of a drainage detention basin and a sewer line upgrade and the removal of a temporary sewer pump station. The form of the bond shall be substantially similar to the City's standard faithful performance bond. The amount of the bond(s) shall be based upon the best available information satisfactory to the City Engineer at time of posting. Execution of the bond agreement shall constitute the financial guarantee for this facility. c. Reimbursement A2reements with the City When appropriate, the City may enter into a reimbursement agreement with the developer for any facility which is included in a City impact fee program. The source of reimbursement shall be from the appropriate City impact fee. The schedule for reimbursement shall be based on the City's capital improvement program and the 1 Adopted by the City Council on December 5, 1989 per City Council Resolution No. 89- 424. :lone 7 Finance Plan 1 8/23/91 D. availability of unobligated impact fee revenue. Coordination with Financin& Plans for Other Zones Several facilities discussed in this plan are also required of other zones and property owners. Developers of Zone 7 may enter into private agreements with other property owners to address reimbursement for such facilities. Any such agreement must be recorded against the title of the participating properties and a copy of the recorded document must be provided to the City's Growth Management Division. Per the Growth Management Ordinance, future finance plans for other zones which impact facilities in common with Zone 7 shall be coordinated with the Zone 7 Finance Plan. Coordination, however, shall not require identical funding methods. E. Timin& of Development F. This plan is based on the assumption that development in Zone 7 will precede development in other zones that share certain facilities with Zone 7. In the event that another zone develops earlier than anticipated and constructs a facility needed by Zone 7, this plan may need to be amended. Development in Zone 7 is contingent upon the satisfaction of all eleven growth management performance standards per Chapter 21.90 of the Carlsbad Municipal Code. Additional Facility Requirements Further facility requirements may be identified through individual Master Plan and/or project review. The appropriate financing mechanism for each special condition was determined based on the scale, scope and timing of the improvement. The following matrix summarizes the financing strategy for each public facility and also correlates the schedule of facilities requirements to individual development projects within Zone 7. A discussion of each facility follows, including the presentation of all special conditions contained in the approved Zone 7 LFMP and an analysis of the financial guarantee for each special condition. UM 7 Finance Plan 2 8123/91 -- - FACILITY CITY ADMINISTRATIVE (p. 4) UBRARY (p. S) WASTEWATER TREATMENT (p. 6) PARK (p. 7) DRAINAGE (p. I) 36" Storm Drain (p. 10) 30" Storm Drain (BF) (p. 11) 30" Storm Drain crossing College Blvd (p. 12) 36" Storm Drain (BH-1) (p. 13) 41" and 42" Storm Drainl (BE) (p. 14) Sedi.-it Detention Buia (p. IS) Dredging of Agua Hedionda Creek (p. IS) Ma~ of Sediment Detentioa Buia (p. 16) CIRCULATION (p. 17) College Blvd (Lab to CVD) (p. 21) CVD (Tammic:k to College) (p. 22) College Blvd (CVD to 7-14 Bdry) (p. 23) College Blvd (7-14 Bdry to C-) (p. 24) C-Road (College to El Camino Real) (p. 25) College Blvd Widening (CVD to C-) (p. 26) CVD (Pontiac to ViclOria) (p. 27) PIRE (p. 21) OPEN SPACE (p. 29) SCHOOL (p. 30) SEWER (p. 31) VCTIA (p. 35) Gravity Flow from Simsberry Pump Station (p. 35) NAHTIA along Tamarack Avenue (p. 36) SAHT2B (p. 37) SAHT2C (p. 31) SAHi, SAH2, SAHJ, SAH4 (7-7 lbare) (p. 39) Temp. Pump Station, Force Main, MainL (p. 40) Removal of Pump Station (p. 41) NAHTIB (p. 42) WATER (p. 43) 14" A.C.P. (p. 45) 12" A.C.P. (p. 46) 14" A.C.P. (p. 46) 16" A.C.P. (p. 46) 21" A.C.P. (p. 46) August 23, 1991 ZONE 7 FINANCE SUMMARY E-1 H K L-1 L-2 Q T R u w X y Participation in CFO and Payment of Public Facilities Fee (PFF) at Building Permit Issuance Participation in CFO and Payment of Public Facilities Fee (PFF) at Buildina Permit Issuance Payment of Sewer Connecti011 Fees at Building Permit !nuance Payment of Park-in-Lieu F-and PFF at Building Permit Issuance Dew:loper ·,·.· ·,. ·. Developer .: · .. ·•.' Develooer . Developer -. Developer · ... \.·.··)''\ Bond Prior to Final Map . Bond Prior to Final Map Agreement prior to Final Map Recordatioa Developer -Guaranteo prior to fint fillll map Devetc-r -Guaranteo prior to fint fillll map ·' . .· Develooer -Construct at tinlJe of med 1<• .. ..,.,: ·• .· DeveloDor -Construct if -w .: i .: . •· ,,., ·.,,·, .. '· Developer -Comtruct if-W ·.·· .. .· .... · Developer -Construct if-W TIF Fee Developer Payment of Traffic hnPact Fee (TIF) at Building Permit Iuuance Payment of PFF at Building Permit 1- No finaucial maranteo required Agreement with School District prior to firat Final Map Recordation Payment of SBA Fee at Bldg Permit luuanc:e Payment of SBA Fee at Bldg Permit Issuance Develooer -Comtruct with fint dewl-t .. CFO • Community Focililim Dillrid CVD • Culobad VW■119 Drlw SBA • S.-8-fd Area F- Developer Boacl Boacl Developer ··,. Develooer -ComtNct at tinlJe of med I Develooer -Comlnll:t at limD of med Payment of SBA F- Develooer Developer Developer Developer Also Required by: Muter Drainage Pia Muter Drainage Pia Muter Drainaae Plan Muter Drainage Plan Muter Drainage Plan 7-14LFMP 7-14LFMP 7-14LFMP 7-14LFMP 7-14 & IS LFMPs 7-14LFMP City TIP Program Muter Sewer Plan Muter Sewer Plan Muter Sewer Plan Muter Sewer Plan Muter Sewer Plan Muter Sewer Plan Page J , I CITY ADMINISTRATIVE FACILITIES I. CONDITIONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of City Administrative Facilities refer to the Zone 7 LFMP, pages 57 to 63. General Conditions If the adopted performance standard for city administrative facilities is not being complied with, then residential development in Zone 7 will be stopped until the performance standard is met. Special Conditions No special conditions. II. FINANCING Zone 7 will contribute to the funding of City Administrative Facilities through participation in the Citywide Mello-Roos Community Facilities District and through the payment of Public Facilities Fees (PFF). 'Zone 7 Finance Plan 4 8123/91 - LIBRARY FACILITIFS I. CONDIDONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of library facilities refer to the Zone 7 LFMP, pages 64 to 71. General Conditions If the adopted performance standard for library facilities is not being complied with, then residential development in Zone 7 will be stopped until the performance standard is met. Special Conditions No special conditions. II. FINANCING Zone 7 will contribute to the funding of library facilities through participation in the Citywide Mello-Roos Community Facilities District and through the payment of Public Facilities Fees (PFF). Zone 7 Finance Plan 5 8123/91 WASTEWATER TREATMENT CAPACITY I. CONDITIONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of wastewater treatment capacity refer to the Zone 7 LFMP, pages 72 to 79. Special Conditions The following action shall be pursued jointly by each sewer district to ensure adequate wastewater treatment capacity through the year 2000: A. Monitor Encina treatment plant flows on a monthly basis to determine actual flow rates and to have an early warning of capacity problems. Il. FINANCING Sewer connection fees provide the primary source of funding for both sewer line upgrades and expansion of treatment plant capacity. The timing of sewer facilities upgrades and the mechanism of financing are critical to analysis of the adequacy of funding for plant expansion. Carlsbad Sewer Service District has projected Capital Improvement Funds to provide for needed facilities. No special financing mechanism for wastewater treatment facilities is required as a condition of development within Zone 7. Z.One 7 Finance Plan 6 8123/91 - ,. ... - PARK FACILITIFS I. CONDITIONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of park facilities refer to the Zone 7 LFMP, pages 80 to 88. Special Conditions A. All development shall pay Park-in-Lieu Fees and Public Facility Fees for Park District 2. B. No residential development shall be allowed after 1992 unless actions have been taken by the City to construct additional park facilities. II. FINANCING A. B. Condition A All development shall pay Park-in-Lieu Fees and Public Facility Fees for Park District 2. Condition B On June 19, 1990, the City Council took specific action to keep Larwin Park on schedule; this 22.3 acre park will be constructed in 1991-92. Demand for additional park facilities is not date specific, but is based on adopted thresholds per the performance standards. Residential development will be allowed to continue in the northeast quadrant as long as all performance standards are satisfied. Zone 7 Finance Plan 7 8123191 DRAINAGE FACILITIF.S I. CONDfflONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of drainage facilities refer to the Zone 7 LFMP, pages 89 to 97. A. All future development in Zone 7 will be required to construct any future Zone 7 storm drain facilities identified in the current Drainage Master Plan and revised Drainage Master Plan as determined by the City Engineer. Any facilities necessary to accommodate future development must be guaranteed prior to the recordation of any final map, issuance of a grading permit or building permit, for any development requiring future storm drain facilities in Zone 7. B. Prior to the recordation of the final map, issuance of grading permit or building permit, whichever occurs first for any specific village within Zone 7, the developers of that project are required to: 1. Pay the required drainage area fees established in the current Drainage Master Plan and; 2. Execute an agreement to pay any drainage area fees established in the forthcoming revised Master Drainage Plan. C. WATERSHED A 1. Prior to the recordation of the first final map, issuance of grading permit or building permit, whichever occurs first within Watershed A of Zone 7, the developers are required to financially guarantee the construction of the 36" continuation of the storm drain in College Boulevard northerly into the City of Oceanside. Financin,:: The cost of the proposed 36" storm drain is estimated to be $109,000. This storm drain is to be financed by the Developer of Watershed A. D. WATERSHED B 1. Prior to the recordation of the first final map, issuance of grading permit or building permit, whichever occurs first within Watershed B of Zone 7, the developers are required to financially guarantee the construction of the following storm drain facilities: Zone 7 Finance Plan 8 8123191 - a. 30" storm drain (BF) crossing into Zone 14 from Zone 7B. b. 30" storm drain crossing College Blvd. c. 36" storm drain (BH-1) crossing into Zone 14. d. 48" and 42" storm drains (BE) adjacent to Tamarack Avenue. F' . mancmg: The cost of the proposed storm drains within Watershed B is estimated to be $435,475. These storm drains are to be financed by the Developer of Watershed B. 2. Prior to recordation of the first final map, issuance of a grading or building permit within Watershed B of Zone 7, the developers are required to guarantee Zone 7's proportional share of the following facilities to the satisfaction of the City Engineer: II. FINANCING a. Sediment detention basin approximately 1-2 acres in size to be installed in Zone 14 upstream of Rancho Carlsbad Mobile Home Park. b. Restoration by dredging and lining of approximately 3,500 feet of Agua Hedionda Creek from the Calavera Lake Creek to El Camino Real bridge. c. Provide a mechanism for the maintenance of the sediment detention basin. Prior to issuance of any building permits for dwelling units draining south into Agua Hedionda Creek within Watershed B of Zone 7, the sediment detention basin and restoration of Agua Hedionda Creek shall be provided. Financing: The cost of the proposed sediment detention basin is estimated to be $86,250 and the proposed cost for dredging and lining of Agua Hedionda Creek is $644,000. The following pages detail the financial guarantee for each special drainage condition identified above. 7.one 7 Finance Plan 9 8123191 Condition Cl 36" Storm Drain Estimated Cost $109,000 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to Final Map recordation Participating Village Village Q Reimbursement None Financing Mechanism The developer of Village Q (CT 83-32) shall finance the construction of this improvement. This 36" storm drain is included in the improvement plans for CT 83-32. Guarantee Condition Cl referenced above shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Village Q. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. No final maps in Watershed A may be recorded until a financial guarantee, acceptable to the Financial Management Director and City Attorney, for this improvement has been provided to the City. Zone 7 Finance Plan 8/23191 Condition D.1.a. 30" Storm Drain (BF) Estimated Cost $113,000 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to Final Map recordation Participating Villages Villages X and Y Reimbursement Drainage Fees Financin~ Mechanism If at the time of development of Villages X and Y, the City Engineer determines that this drainage facility is necessary, the developer of Villages X or Y, whichever occurs first, shall finance its construction. If needed, this facility would normally be imposed as a condition of approval on the tentative map{s) for Villages X and Y. Guarantee If required by the City Engineer, Condition D. I .a referenced above shall be constructed or an improvement agreement shall be provided by the developer prior to the recordation of a final map for Villages X or Y. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. As this requirement precludes the development of villages impacting this improvement prior to its financial guarantee, no other guarantee is required at this time. Reimbursement This 30" storm drain (BF) is identified in the Master Drainage Plan and as such is included in the City's Drainage Fee program. The developer may receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from drainage fees as allowed under Section 20.09.090 of the Carlsbad Municipal Code. The schedule for reimbursement shall be based on the City's capital improvement program and the availability of unobligated drainage funds. Zone 7 Finance Plan 11 8123191 Condition D.1.b. 30" Storm Drain crossing College Estimated Cost $47,500 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to Final Map recordation Participating Villages Village T Reimbursement None Financing Mechanism The developer of Village T (CT 83-19) shall finance the construction of this improvement. This 30" storm drain is included in the improvement plans for CT 83-19. Guarantee Condition D.1.b referenced above shall be constructed or an improvement agreement shall be provided by the developer prior to the recordation of a final map for Village T. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21. 16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. No final maps in Watershed B may be recorded until a financial guarantee, acceptable to the Financial Management Director and City Attorney, for this improvement has been provided to the City. Zone 7 Finance Plan 12 8/23191 Condition D.1.c. 36" Storm Drain (BH-1) Estimated Cost $79,575 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to Final Map recordation Participating Villages Villages U and W Reimbursement Drainage Fees Financin& Mechanism If at the time of development of Villages U or W, the City Engineer determines that this drainage facility is necessary, the developer of Villages U or W, whichever occurs first, shall finance its construction. If needed, this facility would normally be imposed as a condition of approval on the tentative map(s) for Villages U or W. Guarantee If required by the City Engineer, Condition D.1.c referenced above shall be constructed or an improvement agreement shall be provided by the developer prior to the recordation of a final map for Village U or W. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16. 070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. As this requirement precludes the development of villages impacting this improvement prior to its financial guarantee, no other guarantee is required at this time. Reimbursement This 36" storm drain (BH-1) is identified in the Master Drainage Plan and as such is included in the City's Drainage Fee program. The developer may receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from drainage fees as allowed under Section 20.09.090 of the Carlsbad Municipal Code. The schedule for reimbursement shall be based on the City's capital improvement program and the availability of unobligated drainage funds. Zone 7 Finance Plan 13 8123/91 Condition D.l.d. 48" and 42" Storm Drains (BE) Estimated Cost $195,400 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to Final Map recordation Participating Villages Villages K and E-1 Reimbursement Drainage Fees Financin& Mechanism If at the time of development of Villages K or E-1, the City Engineer determines that this drainage facility is necessary, the developers of Villages K or E-1, whichever occurs first, shall finance its construction. If needed, this facility would normally be imposed as a condition of approval on the tentative map(s) for Villages K or E-1. Guarantee If required by the City Engineer, Condition D.1.d. referenced above shall be constructed or an improvement agreement shall be provided by the developer prior to the recordation of a final map for VilJages K or E-1. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. As this requirement precludes the development of villages impacting this improvement prior to its financial guarantee, no other guarantee is required at this time. Reimbursement These 48" and 42" storm drains (BE) are identified in the Master Drainage Plan and as such are included in the City's Drainage Fee program. The developer may receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from drainage fees as allowed under Section 20.09.090 of the Carlsbad Municipal Code. The schedule for reimbursement shall be based on the City's capital improvement program and the availability of unobligated drainage funds. Zone 7 Finance Plan 14 8/23/91 Condition D.2.a. Sediment Detention Basin ($86,250) Condition D.2.b. Dredging of Agua Hedionda Creek ($644,000) Total Estimated Cost $730,250 Financing Mechanism Developer Funding and Planned Local Drainage Fees Guarantee See below Participating Villages Villages E-1, K, L-2, R, T, U, W, X and Y (portions within Watershed B only) Reimbursement Planned Local Drainage Fees Financing Mechanism The above improvements will be funded with a combination of developer funding and Planned Local Drainage (PLD) fees. If Lyon Communities, or its successor in interest, is the first to develop property in this watershed, then they shall provide a guarantee for any funds required to construct the detention basin, including costs associated with the acquisition of land, engineering design, and construction. Guarantee Prior to the final map recordation of Village T, the applicant shall enter into a subdivision agreement and post a bond covering all costs required for the construction of the detention basin. If final engineering drawings are not complete, said bond amount may be based on the preliminary cost estimates approved by the City Engineer. Prior to the issuance of building permits for homes in Watershed B of Village T, the applicant must construct the required temporary onsite basins which will serve to mitigate drainage flows to predevelopment levels. The applicant shall be required to maintain these temporary onsite basins until the permanent offsite basin is completed. Subject to the above, the City shall issue building permits for Village T with the exception of lots which contain temporary onsite basins and which must remain undeveloped until the completion of the permanent offsite basin. If not already constructed, the permanent offsite detention basin shall be imposed as a condition of approval on the remaining Villages in Watershed B of Zone 7, including all or portions of Villages E-1, K, L-2, R, U, W, X and Y. The applicant shall comply with and be subject to Section 20.16.095 (Off-site improvements -Acquisition of property interests) of the Carlsbad Municipal Code. Reimbursement The detention basin is identified in the Master Drainage Plan and as such is included in the City's Drainage Fee program. The developer may receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from drainage fees as allowed under Section 20.09.090 of the Carlsbad Municipal Code. The amount and timing of any reimbursement shall be based on the revised Master Drainage Plan, the City's capital improvement program and the availability of unobligated drainage funds. ZoM 7 Finance Plan 1S 8/23/91 Condition D.2.c. Maintenance of Sediment Detention Basin Estimated Cost $3,045 per year2 Financing Mechanism Maintenance Agreement Participating Villages Future development within Watershed B including Village T, U, W, X and Y Reimbursement None Financin& Mechanism A maintenance district will be formed to maintain this sediment detention basin. The details of said district shall be determined by the City's Utilities and Maintenance Director. Guarantee Prior to the final map recordation of Village T, the property owner shall: (i) record an agreement not to oppose the formation of the maintenance district, and (ii) submit a letter to the Utilities and Maintenance Director consenting to and requesting the formation of the district. Prior to the final map recordations of Villages U, W, X and Y, the property owner shall annex into the maintenance district if it has been established, or record an agreement not to oppose the formation of the maintenance district if it has not been established. In addition, the applicant of the above subdivisions shall be required to maintain the off-site detention basin until the maintenance district is formed or for a period of five years, whichever occurs first. 2Based upon estimated 662 CY per year. Cost of silt removal equals $4.00 per CY, plus 15 % contingency. Zone 7 Finance Plan 16 8/23/91 -CIRCULATION FACILITIES I. CONDfflONS The following conditions were identified in the 2.one 7 Local Facilities Management Plan. For a complete analysis of circulation facilities refer to the 2.one 7 LFMP, pages 98 to 119. A. An on-going monitoring program shall be established to evaluate the aspects of improvements, development, and demand on circulation facilities. The required timing of improvements is based upon the projected demand of development in the zone and the surrounding region. This timing may be modified without amendment to this plan, however, any deletions or additions to the improvements will require amending this local plan. B. Prior to the approval of any tentative map for any future development within 2.one 7, except for Villages Q, T and Ll, the specific alignment for College Boulevard between Carlsbad Village Drive and Cannon Road must be established. This shall include the necessary environmental clearances and required public hearings so that construction of College Boulevard can accommodate future development. The funding for the construction of College Boulevard will be guaranteed as provided by Condition C below. C. Prior to the recordation of the first final map, issuance of grading permit or building permit, whichever occurs first, within 2.one 7, a comprehensive financing program guaranteeing construction of the following circulation improvements shall be approved: 1. IMPROVEMENTS NEEDED NOW No improvements are needed. 2. IMPROVEMENTS NEEDED WITH FIRST DEVELOPMENT ZoM 7 Finance Plan a. College Boulevard (Lake Blvd, to Carlsbad Village Drive) College Boulevard from Carlsbad Village Drive to Lake Boulevard shall be constructed to include the following improvements: i. Complete grading to ultimate right-of-way width to major . arterial standards. ii. Construction of four through travel lanes including a fully landscaped median. 17 B/23/91 m. Improvement of Carlsbad Village Drive/College intersection to include the installation of a traffic signal when traffic signals warrants are met as determined by the City Engineer. Estimated Cost -$3,074,000 b. Carlsbad Villue Drive (famarack Ave, to Glasgow Dr.} Carlsbad Village Drive from Tamarack Avenue to Glasgow Drive shall be constructed to major arterial standards to include the following improvements: 1. Construction of two additional through travel lanes including a fully landscaped median. ii. Installation of a traffic signal at the intersection of Carlsbad Village Drive and Tamarack Avenue when traffic signals warrants are met as determined by the City engineer. Estimated Cost -$160,000 c. Carlsbad Village Drive (Glasgow Dr. to College Blvd.} Carlsbad Village Drive from Glasgow Drive to College Boulevard shall be constructed to major arterial standards to include the following improvements: 1. Complete grading to ultimate right-of-way width to secondary arterial standards. 11. Construction of four through travel lanes including a fully landscaped median. Estimated Cost -$535,000 3. IMPROVEMENTS NEEDED BY 1995 Zone 7 Finance Plan a. Colle_ge Blvd (Carlsbad Yilla&e Drive to Cannon -2 lanes) College Boulevard from Carlsbad Village Drive to Cannon Road shall be constructed to include the following improvements: i. Complete grading to ultimate right-of-way width to major arterial standards. 18 8/23/91 b. ii. Construction of two through travel lanes including a fully landscaped median. iii. Improvement of Carlsbad Village Drive/College intersection. Estimated Cost -$3,773,000 Cannon Road (El Camino Real to Colleie Blvd.) Cannon Road from El Camino Real to College Boulevard shall be constructed to include the following improvements: i. Grading of Cannon Road to ultimate right-of-way width to major arterial standards. ii. Construction of two through lanes including a fully landscaped median. iii. Improvement of El Camino Real/Cannon intersection. iv. Improvement of College/Cannon intersection. Estimated Cost -$3,450,000 4. IMPROVEMENTS NEEDED BY 2000 a. College Boulevard (Carlsbad Village Drive to Cannon - widening) College Boulevard from Carlsbad Village Drive to Cannon Road shall be constructed to include the following improvements: i. Two additional lanes necessary to complete full width improvements to major arterial standards. ii. Improvement of Carlsbad Village Drive/College intersection. Estimated Cost -$1,220,000 5. IMPROVEMENTS NEEDED BY BUILD OUT a. 'Zone 7 Finance Plan Carlsbad Village Drive (Pontiac Dr. to Victoria Ave.) Carlsbad Village Drive from Pontiac Drive to Victoria Avenue shall be constructed to include the following improvements: 19 8123/91 II. FINANCING i. Two additional lanes necessary to complete full width improvements to major arterial standards. Estimated Cost -$1,391,500 The following pages detail the financial guarantee for each special circulation condition identified above. Z.One 7 Finance Plan 20 8/23191 Condition 2a College Blvd (Lake to Carlsbad Village Drive) Estimated Cost $3,074,000 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to Final Map recordation Participating Villages Villages E-1, H, K, L-1, L-2, Q or T, whichever occurs first Facility Also Required by: Zone 14 LFMP Financing Mechanism It is anticipated that the developer of Villages Q and T shall fund the construction of this improvement. Full width improvements to College Boulevard from Lake Boulevard to Carlsbad Village Drive are included in the improvement plans for Villages Q and T. If not already constructed by Villages Q and/or T, the developers of the remaining villages in Zone 7 shall be required to improve their respective frontage on College Boulevard. Guarantee Condition 2a referenced above shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Village Q or T. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21. 16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. If Villages Q and/or Tare not developed, then the City can ensure this improvement is constructed with the development of the remaining villages by imposing the construction of the associated frontage improvements as a condition of approval on the remaining tentative maps in Zone 7. No final maps in Zone 7 may be recorded until an acceptable financial guarantee for the entire length of College Boulevard from Lake to Carlsbad Village Drive has been provided to the City. Zone 7 Finance Plan 21 8/23191 Condition 2b and 2c Carlsbad Village Drive (Tamarack to College) Estimated Cost $695,000 ($160,000 + $535,000) Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to ~inal Map recordation Participating Villages Villages E-1, H, K, L-1, L-2, Q or T, whichever occurs first Facility Also Required by: Z.One 14 LFMP Financini Mechanism It is anticipated that the developer of Villages Q and T shall finance the construction of this improvement to major arterial standards. Full width improvements from College to Glasgow and completion of Carlsbad Village Drive from Glasgow to Tamarack are included in the improvement plans for Villages Q and T. If not already constructed by Villages Q and/or T, the developers of the remaining villages in Zone 7 shall be required to improve their respective frontage on College Boulevard. Guarantee Conditions 2b and 2c referenced above shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Village Q or T. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. If Villages Q and/or Tare not developed, then the City can ensure this improvement is constructed with the development of the remaining villages by imposing the construction of the associated frontage improvements as a condition of approval on the remaining tentative maps in Z.One 7. No final maps in Z.One 7 may be recorded until an acceptable financial guarantee for the entire length of Carlsbad Village Drive from Tamarack to College has been provided to the City. Z.One 7 Financ~ Plan 22 8123191 ... Condition 3a (portion) College Blvd (Carlsbad Village Drive to Zone 14 boundary) . Estimated Cost $2,850,000 Financing Mechanism Developer Funding Guarantee Future tentative map condition; Improvement Agreement Participating Villages Villages U, W, X and Y Facility Also Required by: Zone 14 LFMP Financin1: Mechanism If not already constructed, the developer of Villages U, W, X and Y shall finance the construction of this improvement concurrent with the need to serve Zone 7; whether it be to maintain the adopted circulation performance standard or to satisfy City Engineering Design standards (ie., Cul-de-Sac Policy). College Boulevard fronts Villages U, W, X and Y from Carlsbad VilJage Drive south to the Zone 7/14 boundary and would normally be required as a condition of approval of these tentative maps. Other than Villages U, W, X and Y this improvement is not needed for the development of any other village within Zone 7. Guarantee The City can ensure this improvement will be constructed with development of Villages U, W, X and Y by imposing Condition 3a as a condition of approval on the tentative map(s) for the appropriate phases of these villages. Condition 3a referenced above shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the final map for the phase of development requiring the improvement (Village U, W, X or Y). The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. This requirement precludes development which would necessitate this improvement prior to its financial guarantee. No other guarantee is required at this time. ZoM 7 Finance Plan 23 8123/91 Condition 3a (portion) College Blvd (Zone 14 boundary to Cannon) Estimated Cost $923,000 Financing Mechanism Developer Funding Guarantee Condition of Tentative Map Approval Participating Villages Villages U, W, X and Y Facility Also Required by: Zone 14 LFMP Financing Mechanism If not already constructed, the developer(s) of Villages U, W, X and Y shall construct this improvement concurrent with the need to serve Zone 7; whether it be to maintain the adopted circulation performance standard or to satisfy City Engineering Design Standards (i.e., Cul- de-Sac Policy). Guarantee To ensure the timely construction of this improvement, the following condition shall be imposed on the applicable phase of Villages U, W, X or Y, as determined by the City Engineer. ~ The developer shall install College Boulevard from the southerly Zone 7 boundary to Cannon Road, including grading to major arterial standards and the construction of two through lanes, a fully landscaped median and other related improvements. All or portions of Villages U, W, X and Y may be developed without the construction of College Boulevard from the Zone 14 boundary to Cannon Road subject to the following: (i) consistency with the City's Cul-de-Sac Policy, (ii) maintenance of the adopted Growth Management circulation performance standard, (iii) other adopted City standards or policies which may be in effect at the time of tentative map approval for Village U, W, X or Y. Zone 7 Finance Plan 24 8/23191 . -- Condition 3b Cannon Road (College to El Camino Real) Estimated Cost $3,450,000 Financing Mechanism Developer Funding Guarantee Condition of Tentative Map Approval Participating Villages Villages U, W, X and Y Facility Also Required by: Zone 14 LFMP and Zone 15 LFMP Financin& Mechanism If not already constructed, the developer(s) of Villages U, W, X, and Y shall construct this improvement concurrent with the need to serve Zone 7; whether it be to maintain the adopted circulation performance standard or to satisfy City Engineering Design Standards (ie. , Cul- de-Sac Policy). Guarantee . To ensure the timely construction of this improvement, the following condition shall be imposed on the applicable phase of Villages U, W, X or Y, as determined by the City Engineer: The developer shall install Cannon Road from College Boulevard west to El Camino Real, including grading to major arterial standards and the construction of two through lanes, a fully landscaped median and other related improvements. All or portions of Villages U, W, X and Y may be developed without the construction of Cannon Road from College Boulevard to El Camino Real subject to the following: (i) consistency with the City's Cul-de-Sac Policy, (ii) maintenance of the adopted Growth Management circulation performance standard, (iii) other adopted City standards or policies which may be in effect at the time of tentative map approval for Village U, W, X or Y . Zone 7 Finance Plan 25 8123191 Condition 4a College Widenina (Carlsbad Village Drive to Cannon) Estimated Cost $1,220,000 Financing Mechanism Developer Funding Guarantee Condition of Tentative Map Approval Participating Villages Villages U, W, X and Y Reimbursement Yes Facility Also Required by: Zone 14 LFMP Financine Mechanism The developer(s) of Villages U, W, X and Y may be required to construct this improvement. Guarantee To ensure the timely construction of this improvement, the following condition may be imposed on the applicable phase of Villages U, W, X or Y, as determined by the City Engineer: ~ The developer shall install College Boulevard from Carlsbad Village Drive to Cannon Road, including the construction of the two additional lanes and bicycle lanes necessary to complete College Boulevard to major arterial standards. All or portions of Villages U, W, X and Y may be developed without the widening of College Boulevard from Carlsbad Village Drive to Cannon Road subject to the following: (i) consistency with the City's Cul-de-Sac Policy, (ii) maintenance of the adopted Growth Management circulation performance standard, (iii) other adopted City standards or policies which may be in effect at the time of tentative map approval for Village U, W, X or Y. Reimbursement If the developer(s) of Villages U, W, X or Y is required to widen College Boulevard from the southerly Zone 7 boundary to Cannon Road, he may be eligible for reimbursements per Section 20.16.041 of the Carlsbad Municipal Code. :zone 7 Finance Plan 26 8/23/91 J Condition Sa Carlsbad Village Drive (Pontiac to Victoria) Estimated Cost $1,391,500 Financing Mechanism Traffic Impact Fee (TIF) Guarantee Payment of TIF at building permit issuance Participating Villages All Villages Reimbursement City TIF Financin& Mechanism The widening of Carlsbad Village Drive between Pontiac and Victoria shall be constructed with the development of Village H with reimbursement from Traffic impact Fees. If Village His not developed, then Carlsbad Village Drive shall be widened as required by the City considering roadway capacity and safety requirements. Guarantee The construction of this improvement shall be guaranteed by imposing it as a condition of approval of the tentative map for Village H. Condition 5a above shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Village H. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Payment of Traffic Impact Fees at time of building permit issuance shall constitute the financial guarantee for all other villages in Zone 7. Reimbursement If a developer constructs the widening of Carlsbad Village Drive from Pontiac to Victoria, the developer shall receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from Traffic Impact Fee revenues. The schedule for reimbursement shall be based on the City's Capital Improvement Program (CIP) and the availability of unobligated TIF funds. 'Zone 7 Finance Plan 27 8/23/91 FIRE FACILITIF.S I. · CONDfflONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of fire facilities refer to the Zone 7 LFMP, pages 120 to 123. Special Condition No special conditions. Il. FINANCE No special financing mechanism for fire facilities is required as a condition of development within Zone 7. Zone 7 Finance Plan 28 8/23/91 'I. --OPEN SPACE I. CONDffiONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of open space refer to the Zone 7 LFMP, pages 124 to 128. Special Condition No special conditions. II. FINANCE Funding for performance standard open space will be provided by the property owners of Zone 7. Affected property owners or homeowners associations will be responsible for maintaining open space facilities within their development. Unconstrained open space that is not developed will not require maintenance. If unconstrained open space is developed, the funding will be provided by the developer of that open space. 'Zone 7 Finance Plan 29 8/23/91 SCHOOL FACILITIES I. CONDmONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of school facilities refer to the Zone 7 LFMP, pages 129 to 133. Special Conditions Prior to recordation of the first fmal map, issuance of grading permit or building permit, whichever occurs first, within Zone 7, the developers and Carlsbad Unified School District will enter into an agreement which will exchange parcel tax and developer fee credit for the land valuation, site preparation costs, and certain off-site improvements for the 20 acre site known as Village S. Il. FINANCING The K-8 school site will be dedicated by the property owners to the CUSD. The purchase of the junior high site will be through fee credits or some other form of reimbursement. The cost for construction of the junior high site in Zone 7 is not known at this time. Zone 7 Finance Plan 30 8123191 - - SEWER FACILITIF.S I. CONDITIONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of sewer facilities refer to the Zone 7 LFMP, pages 134 to 156. A. WATERSHED A 1. Prior to the recordation of the first final map, issuance of building permit or grading permit, whichever occurs first for any development in Watershed A of Zone 7, a financing mechanism guaranteeing the construction of the following sewer facilities must be provided: a. Reach VCTlA from Zone 7 boundary to Marron Road. b. Gravity flow from Simsberry Pump Station to Zone 7/25 boundary. c. Reach NAHTlA along Tamarack Avenue. Reach NAHTlA shall be completed and operational to the satisfaction of the City Engineer prior to the occupancy of the first unit in Watershed A of Zone 7. Financing The cost for construction of the NAHTlA, and VCTlA is estimated to be $272,500 and will be financed by the developers in Zone 7. B. WATERSHED B 1. Prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first, for any development in Watershed B of Zone 7, a financing mechanism guaranteeing the construction of the following sewer facilities must be provided: 'Zone 7 Finance Plan a. Reach NAHTlA along Tamarack Avenue. Reach NAHTlA shall be completed and operational to the satisfaction of the City Engineer prior to the occupancy of the first unit in Watershed B of Zone 7. 31 8/23/91 Financin1: The cost for construction of the NAHTlA is estimated to be $300,000 and will be financed by the developers in Zone 7. C. WATERSHED C Two options for future development of Watershed C are provided below. SAHT2C is projected to be built concurrently with Cannon Road from College Boulevard to El Camino Real. If development within Watershed C occurs prior to construction of the SAHT2C, then the Calavera Hills Master Plan provides for temporary sewerage to pump into North Agua Hedionda Interceptor Basin as outlined in Option #2. Qption #1 1. Prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first, for any development in Watershed C of Zone 7, a financing mechanism guaranteeing the construction of the following sewer facilities must be provided: a. Reach SAHT2B from Zone 7 to Cannon Road. b. Reach SAHT2C from College Boulevard to El Camino Real. 2. Prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first, for any development in Watershed C of Zone 7, a financing mechanism guaranteeing Zone 7' s proportional share for the construction of the following sewer facilities must be provided: Zone 7 Finance Plan a. SAHl adjacent to Cannon Road. b. SAH2 adjacent to Cannon Road. c. SAH3 adjacent to Cannon Road. d. SAH4 adjacent to Cannon Road. If the construction of the South Agua Hedionda Interceptor west of El Camino Real is not completed, Reach SAHT2C shall connect into the existing North Agua Hedionda Interceptor. Reaches SAHT2B and SAHT2C shall be completed and operational to the satisfaction of the City Engineer prior to the occupancy of the first unit in Watershed C. 32 8/23/91 Financing The cost for construction of the SAHi, SAHr2B, and SAHr2C is estimated to be $ 2,278,900. Q_ption #2 1. Prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first, for any development in Watershed C of Zone 7, a financing plan guaranteeing the construction of the following sewer facilities must be provided: 2. a. Reach SAHr2B from Zone 7 to Cannon Road. b. Reach SAHr2C from Cannon Road to El Camino Real. c. Reach NAHTlA along Tamarack Avenue. Reach NAHTlA shall be completed and operational to the satisfaction of the City Engineer prior to the occupancy of the first unit in Watershed C of Zone 7. Prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first, for any development in Watershed C of Zone 7, a financing mechanism guaranteeing Zone . 7's proportional share for the construction of the following sewer facilities must be provided: a. SAHl adjacent to Cannon Road. b. SAH2 adjacent to Cannon Road. c. SAH3 adjacent to Cannon Road. d. SAH4 adjacent to Cannon Road. 3. Prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first, for any development in Watershed C of Zone 7, a financing plan guaranteeing the construction of the following sewer facilities must be provided: Z.One 7 Finance Plan a. Construction of a temporary pump station to service all units in Watershed C that can gravity flow to the pump station. b. Construction of a force main from the temporary pump station to convey sewage to Reach NAHTlA in Tamarack Avenue. c. Yearly operational and maintenance costs for the temporary pump station. 33 8123191 d. Removal of the temporary pump station and restoration of the pump station site upon completion of the SAHT2B and SAHT2C. Financing The cost for construction of the facilities listed in Option #2 is estimated to be$ 2,975,950. D. ALL WATERSHEDS Prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first for any development in Zone 7, a financing mechanism guaranteeing construction of Reach NAHTlB shall be provided which will ensure that adequate funding is available to upgrade the NAHTlB sewer line prior to the issuance of the 590th building permit in Zone 7. Financing The cost for construction of the NAHTlB is estimated to be $300,000 and will be financed by the developers in Zone 7. II. FINANCING The following pages detail the financial guarantee for each special sewer condition identified above. Zone 7 Finance Plan 34 8123191 .,. .- -- Condition A.1.a VCTlA ($52,500) Condition A.1.b Gravity Flow from Simsberry Pump Station to Zone 7/25 Boundary ($61,600) Total Estimated Cost $114,100 Financing Mechanism Sewer Benefit Area (SBA) Fees Guarantee Payment of SBA Fee at building permit issuance Participating Villages Villages H, K, L-1, L-2 and Q Reimbursement None Financin~ Mechanism Sewer Benefit Area fees will be used to fund the construction of these improvements. These facilities are not needed until build out of Watershed A of Zone 7, therefore, the fee/pay-as- you-go program is an acceptable mechanism for these improvements because 100% of the necessary funds will be collected prior to need. Guarantee Payment of Sewer Benefit Area fees at time of building permit issuance shall constitute the financial guarantee for future development within Watershed A. No other financial guarantee is required at this time. :zone 7 Finance Plan 35 8/23/91 Condition A.1.c. Condition B.1.a. Reach NAHTlA along Tamarack Avenue Condition C.1.c. Estimated Cost $220,000 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to final map recordation or for Village L-1, prior to building permit issuance Participating Villages All Villages Reimbursement Sewer Benefit Area Fees (Benefit Area B) Financing Mechanism The developer of the first village in Zone 7 shall front the construction of this facility. Currently, NAHTIA is contained within the improvement agreements for Villages Q and T. Guarantee NAHTlA shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the first final map in Zone 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Said agreement shall stipulate that Reach NAHTlA must be completed and operational to the satisfaction of the City Engineer prior to the occupancy of the first unit in Zone 7. No final maps in Watersheds A, B or C in Zone 7 may be recorded and no building permits for Village L-1 may be issued until an acceptable financial guarantee for this improvement has been provided to the City. Reimbursement The NAHTlA is identified in the Master Plan of Sewerage Update and as such is included in the City's Sewer Benefit Area (SBA) Fee program. The developer who constructs this facility shall receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from future SBA fees. Zone 7 Finance Plan 36 8123191 Condition C.1.a SAHT2B Estimated Cost $94,200 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to final map recordation Participating Villages Villages U, W, X and Y Reimbursement Sewer Benefit Area Fees (Benefit Area D) Financin& Mechanism If required, the developer of Villages U, W, X and Y shall front the construction of this facility. This facility will be required to serve Villages U, W, X and Y and would normally be imposed as a condition of approval of these tentative maps. This facility is not required for the development of any other village in Watershed C which can temporarily sewer into the North Agua Hedionda Interceptor per the Calavera Hills Master Plan. Guarantee Condition C.1.a. referenced above shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Villages U, -W, X, or Y. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21. 16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. As this requirement guarantees the construction of this facility, no other guarantee for Condition C. l .a. is required at this time. Reimbursement The SAHl'2B is identified in the Master Plan of Sewerage Update and as such is included in the City's Sewer Benefit Area (SBA) Fee program. The developer who constructs this facility shall receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from future SBA fees. ume 7 Finance Plan 37 8123/91 Condition C.l.b SAH'l'2C Estimated Cost $252,000 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to final map recordation Participating Villages Villages U, W, X and Y Reimbursement Sewer Benefit Area Fees (Benefit Area D) Financin& Mechanism If required, the developer(s) of Villages U, W, X and Y shall front the construction of this facility. This facility will be required to serve Villages U, W, X and Y and if not already constructed, would normally be imposed as a condition of approval of these tentative maps. This facility is not required by Zone 7 prior to the development of these villages. The other villages in Watershed C can temporarily sewer into the North Agua Hedionda Interceptor per the Calavera Hills Master Plan. Guarantee Condition C. l.b. referenced above shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Villages U, W, X, or Y. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. As this requirement guarantees the construction of this facility, no other guarantee for Condition C. l. b. is required of Village T. Reimbursement The SAHT2C is identified in the Master Plan of Sewerage Update and as such is included in the City's Sewer Benefit Area (SBA) Fee program. The developer who constructs this facility shall receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from future SBA fees. Zone 7 Finance Plan 38 8/23/91 -. .- . - Condition C.2.a. SAHl ($313,200) Condition C.2.b. SAH2 ($297,000) Condition C.2.c. SAH3 ($850,000) Condition C.2.d. SAH4 ($472,500) Total Estimated Cost $1,932,700 Financing Mechanism Sewer Benefit Area (SBA) Fees Guarantee Payment of SBA Fees as specified Participating Villages Villages Q, T (payment of fees at bldg permit) Villages R, U, W, X and Y (payment of fees at final map) Reimbursement None Financin~ Mechanism The special condition contained in the approved zone plan requires Zone 7 to provide a financing mechanism guaranteeing only Zone 7' s proportional share of the above improvements; as opposed to guaranteeing the entire facility. Subsequent to the approval of the Zone 7 Local Facilities Management Plan, the City established such a mechanism -the Sewer Benefit Area Fee program. Villages located in Benefit Area D shall contribute toward SAHl, SAH2, SAH3 and SAH4 through the payment of Sewer Benefit Area Fees. · Guarantee Development in Benefit Area D will contribute to SAHi, SAH2, SAH3 and SAH4 through the payment of Sewer Benefit Area Fees. Villages Q and T shall pay these fees at time of building permit issuance. In order to facilitate the construction of SAHl, SAH2, SAH3 and SAH4, Villages R, U, W, X and Y shall pre-pay their respective Sewer Benefit Area Fee obligations at time of final map recordation . Zone 7 Finance Plan 39 8/23/91 Condition C.3.a. Village W Pump Station Condition C.3.b. Force Main from pump station Condition C.3.c. Yearly Maintenance of pump station Total Estimated Cost $477,050 (not including maintenance) Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to final map recordation Participating Villages Villages Q and T Reimbursement None Financin& Mechanism The developer of Villages Q and T shall fund the construction of these facilities and the yearly operating and maintenance costs for the temporary pump station. These facilities are contained within the improvement plans for Villages Q and T. Guarantee The temporary pump station and associated force mains and gravity lines shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Village Q or T. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. These facilities must be complete and operational to the satisfaction of the City Engineer prior to the occupancy of the first unit within Watershed C of Zone 7. As this requirement guarantees the construction of these facilities prior to the occupancy of the first unit within Watershed C of Zone 7, no other guarantee for Conditions C.3.a. and C.3.b. is required at this time. Z.One 7 Financ~ Plan 40 8123/91 -. Condition C.3.d Removal of pump station Estimated Cost Unknown at this time Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to final map recordation Participating Villages Villages Q and T Reimbursement None Financin~ Mechanism The developer of Villages Q and T shall finance the removal of the pump station. The temporary pump station is needed to serve Villages Q and T, therefore, its removal shall also be the responsibility of Villages Q and T. Guarantee Prior to the final map recordation of Villages Q and T, the applicant shall be required to post a bond covering all costs required for the removal of the pump station. The bond amount shall be based upon the best available information satisfactory to the City Engineer at time of posting. Zone 7 Finance Plan 41 8123/91 Condition D NAHTlB Total Estimated Cost $300,000 Financing Mechanism Developer Funding Guarantee Bond prior to Final Map Recordation Participating Villages Village T Reimbursement None Financin& Mechanism As approved, Village Twill temporarily sewer out of its natural basin into the North Agua Hedionda Interceptor. This temporary situation may necessitate the upgrading of the NAHTlB. Therefore, the developer of Village T (CT 83-19) shall be responsible for the financial guarantee of this improvement. Guarantee Prior to final map recordation of Village T, the developer shall be required to provide to the City a surety bond acceptable to the Financial Management Director and City Attorney in the amount of $300,000, or most recent, accepted cost estimate. If Village T is still pumping into the NAHi, said surety bond shall be called upon the issuance of the 540th building permit which impacts the NAHTlB. If Village T ceases to pump out of its basin prior to the need to upgrade the NAHTlB (ie., before the 540th building permit is issued), then said bond shall be released to Lyon Communities. 'Zone 7 Finance Plan 42 8/23191 WATER FACILITIES I. CONDmONS The following conditions were identified in the Zone 7 Local Facilities Management Plan. For a complete analysis of water facilities refer to the Zone 7 LFMP, pages 157 to 166. A. All future development in Zone 7 shall be required to provide any water reclamation facilities identified in the future Water Reclamation Master Plan as determined by the District Engineer. Any water reclamation facilities necessary to accommodate future development must be guaranteed prior to the recordation of a final map, issuance of a grading permit or building permit, whichever occurs first for any project in Zone 7. B. SERVICE AREA A 1. Water facilities will be provided at the time of development to the satisfaction of CMWD. The existing pressure reducing and pumping station at the intersection of College Boulevard and Carlsbad Village Drive and the transmission lines from this station to the existing 6. 0 MG TAP reservoir are installed. 'Zone 7 Finance Plan a. Transmission lines in College Boulevard and Tamarack Avenue (Facilities #3 and 9) will be granted to the district by development at ultimate final grade and right-of-way prior to any granting of occupancy. Any expenses for transmission lines installed by the district will be reimbursed by the developer. b. A portion of the easement in College Boulevard at Carlsbad Village Drive will be granted to the district prior to recordation of any final map, issuance of a building permit or grading permit, whichever occurs first in Service Area A. Financin~ The cost of the items discussed in Service Area A, Special Conditions, will be financed by the developers of Service Area A. CMWD has paid for the reservoir and pressure reducing and pump station. Developers will finance and construct all transmission lines in the zone. 43 8/23/91 C. SERVICE AREA B 1. Water facilities will be provided concurrent with development to the satisfaction of the CMWD. Main transmission lines (Facilities # 8 and 9) from Squires Dam I are to be installed as required by CMWD. Il. FINANCING Financin,: The cost of the portion of the proposed facilities in Service Area B is estimated to be $1,075,085. The cost of the items discussed in Service Area B, Special Conditions, required as needed per development will be financed by the developers of Service Area B. The following pages detail the financial guarantee for each special water condition identified above. Zone 7 Finance Plan 44 8/23/91 - ,.. Condition B 14" A.C.P. Estimated Cost $72,270 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to Final Map recordation Participating Villages Village Q Reimbursement None Financing Mechanism The developer of Village Q (CT 83-32) shall finance the construction of this improvement. This water line has been included in the improvement plans for CT 83-32. Guarantee The 14" A.C.P. referenced above shall be constructed or an improvement agreement shall be provided by the developer prior to the recordation of a final map for Village Q. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21. 16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. As this requirement precludes development within Service Area A prior to the financial guarantee of this improvement, no other guarantee is required at this time. Zone 7 Finance Plan 45 8123191 Condition C 1211 A.C.P. ($311,410) 14" A.C.P. ($301,125) 16" A.C.P. ($190,080) 21" A.C.P. ($200,200) Estimated Cost $1,002,815 Financing Mechanism Developer Funding Guarantee Improvement Agreement prior to Final Map recordation Participating Villages Villages U, W, X and Y Reimbursement None Financin& Mechanism If, at the time of development of Villages U, W, X and/or Y, the District Engineer determines that these water lines are necessary, the developers of Villages U, W, X or Y shall finance the construction. If required, these lines would normally be imposed as a condition of approval on the tentative map(s) for Villages U, W, X or Y. Guarantee If required by the District Engineer, the water lines referenced above shall be constructed or an improvement agreement shall be provided by the developer prior to the recordation of a final map for Villages U, W, X or Y. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. As this requirement precludes the development of villages impacting these lines prior to its financial guarantee, no other guarantee is required at this time. Zone 7 Finanu Plan 46 B/23/91 ..